SECTION
DRILLING SECTION
GRINDING &
CURRENT LAYOUT 5862 (SS RAIL ASS)
DEBURRING
DRILL Ø 4 & Ø 10,2
1
5862 (SS RAIL ASS)
)
SS
FULL 6021 4
5964 SPOT FULL
SA
2 1 5777 5778
5965 4
IN
4 1 4204
5703
+L
AI
SR
HELPER
(S
5861
61
6117
FULL
58
5862 (SS RAIL ASS) AFTER DRILLED
OEE ?
Number of M/C 9
Man Power 12 + Material Transporter
Production Time (batch size 63 pcs)
Total Idle Time 0
WIP Small Batch & Full Batch
WIP Coverage Distance 550 m
603B WELDING PROCESS
CURRENT LAYOUT + ONE PIECE FLOW
CE
LEVELING DRILL Ø 4 & Ø 10,2
DEBURRING
PIE
CE )
S1
1 1
PIE
AS
58
58
(1
61
AIL
61
SS
62
(1
R
R AI L
PI
58
SS
E
+ IN
CE
62
S(
)
1P
58
IEC 5861 5862 5759
E) 5861
5778, 3 4
4204 1 2
5964 5965 5703 5966
5757 4 5862
6020, 1 SPOT
3 6116
HELP
2 3 4 5
2
HELPER
ER
3 2 4
3 HELPER
6021
A B C D 6 2
E 6
1 5777
6117
1
5 5
1
#1. SPOT 5862 SS RAIL ASS TOP RAIL + INSERT NUT #1. SPOT 5861 SS RAIL + INS #1. SPOT 6117 CENTER RAIL SPOT 5966
#2. FULL 5862 SS RAIL ASS SPOT & FULL 5777 #2. FULL 5861 SS RAIL ASS + INS #2. SPOT 6021 SS FRAME ASS SS FRAME + PLATE + CENTER
FULL 5966 FULL 5966
SS FRAME + PLATE + CENTER SS FRAME + PLATE + CENTER
1
2 G 2
F
1
5966 FULL 5966 FULL
OEE ?
Number of M/C 7
Man Power 9 + No Need Material Transporter
Production Time (batch size 63 pcs) 13 hour 12 minutes
Total Idle Time 0
WIP One Piece Flow
WIP Coverage Distance 50 m
PROBLEM CAUSE COUNTER MEASURE PIC DUE DATE
Low OEE Batch System Small Batch / One Piece Flow
High WIP High Repair Activity Work Standardization
High Manhour Clamping System Improve Clamping
Layout Adjust to Sequence (base on product)
Transportation
Insert Nut Set up Improve Insert Nut Setup