This document summarizes a site investigation for installing a flow meter. The location has a 36-inch concrete pipe with 12.75 feet deep manhole. Some surcharge was present with debris 4 feet deep and flow depth of 13 inches. Hazards were minimal with no traffic issues. The cellular signal was strong but the measured velocity was too slow for the proposed 2150 meter, so a Sigma 910 meter was recommended instead. Permanent power was available at the site.
This document summarizes a site investigation for installing a flow meter. The location has a 36-inch concrete pipe with 12.75 feet deep manhole. Some surcharge was present with debris 4 feet deep and flow depth of 13 inches. Hazards were minimal with no traffic issues. The cellular signal was strong but the measured velocity was too slow for the proposed 2150 meter, so a Sigma 910 meter was recommended instead. Permanent power was available at the site.
Droits d'auteur :
Attribution Non-Commercial (BY-NC)
Formats disponibles
Téléchargez comme PDF, TXT ou lisez en ligne sur Scribd
This document summarizes a site investigation for installing a flow meter. The location has a 36-inch concrete pipe with 12.75 feet deep manhole. Some surcharge was present with debris 4 feet deep and flow depth of 13 inches. Hazards were minimal with no traffic issues. The cellular signal was strong but the measured velocity was too slow for the proposed 2150 meter, so a Sigma 910 meter was recommended instead. Permanent power was available at the site.
Droits d'auteur :
Attribution Non-Commercial (BY-NC)
Formats disponibles
Téléchargez comme PDF, TXT ou lisez en ligne sur Scribd