Contents
1 Introduction 1
1.1 About Andhra Pradesh State Road Transport Corporation 1
1.2 APSRTC Organization 1
1.3 Key Achievements of APSRTC 1
1.4 Information Technology Initiatives of APSRTC 2
1.4.1 Depot Computerization Project (DCP) 2
1.4.2 Personnel Management System (PMS) 2
1.4.3 Ticket Issuing Machines 2
1.4.4 Financial Accounting Information System (FACTIS) 3
1.4.5 Online Inventory Management System 3
1.4.6 Payroll 4
1.4.7 Online Hospital Management System (OHMS) 4
1.4.8 Online Passenger Reservation System (OPRS) 5
1.4.9 Pass Automation and Accountal System (PASS) 5
1.4.10 Central Management Information System (CMIS) 5
1.4.11 PF Accounting System (PFAS) 6
1.4.12 Staff Retirement Benefit Scheme (SRBS) 6
1.4.13 Staff Benevolent Thrift Fund (SBT) 6
1.4.14 Credit Cooperative Society 7
1 Introduction
1
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
2
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
Fares) data is loaded on to the TIM and after the duty of the driver is completed the TIM will be
taken back. Such TIM will be connected to the Server to download the data (of sale of tickets)
into DCP system. TIMS are being provided to conductors and it is planned to move all
operations related to issue of tickets onto TIMS.
3
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
1.4.6 Payroll
PAY ROLLS Project was also developed using RM-COBOL on UNIX platform and deals
mainly with generation of Pay slips of Officers and employees of APSRTC.
• Employee Master Data files (Unit-wise) are available with Pay Roll Centers.
• Attendance data for the month is received from PMS Project.
• Certain allowances data is received from DCP.
• Current month transactional data is fed at Units / Depots, viz. Maser file corrections, misc.
earnings and recoveries etc.
• At Regional Pay roll Processing center, the entire data so received is processed to generate
Salary Bills and a consolidated data file is generated from which many reports would be
generated and printed, such as Pay slips, Summaries, Non-Departmental Recoveries (NDR)
etc.
• The consolidated data file/s are given to other projects, viz. Provident Fund (PF), Credit Co-
operative Society (CCS), Staff Retirement Benefit Scheme (SRBS) and Staff Benevolent
Thrift Fund (SBT) etc.
• Revised pay scales (RPS) and pay arrears are also calculated using a peripheral software
(RPS software) which draws the current basic pay data from payroll application, the revised
pay scales and arrears payable to employees are calculated and fed back to Payroll
application. Once changed to revised pay scale, the payroll application calculates the
monthly pay.
4
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
from Central Contracts Cell at Head Office through dial-up connectivity to the Server at
Tarnaka Hospital.
5
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
• Data has to be automatically pushed to the central Server at Corporate Office, from the
originating source of information, i.e., Depots, workshops, etc.
• Data uploaded / pushed to the Central Server has to be processed, consolidated periodically
(daily, monthly and yearly) and generate required queries and reports.
The consolidated information should be able to be accessed through a Dashboard, and access to
the dashboard should be given to the authorities concerned.
6
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
payment defaults, benefits payments and settlements. It also has an accounting module for
creation of ledger for SBT.
7
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
8
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
9
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
10
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
11
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
In brief, the system integrator should study the existing systems/projects and deliver the
functional and technical requirements as provided in Request for Proposal (RFP), develop
the solution (configuration of existing features and development of customized
components), perform unit integration and system testing, perform user acceptance testing,
conduct a pilot implementation based on the pilot implementation plan and deploy the
solution across all APSRTC Units.
The System Integrator (SI) would be responsible for supplying necessary hardware,
Licenses, connectivity in the name of APSRTC and implement an enterprise network
covering LAN, WAN, IBW and all network components. The SI must deploy the required
Hardware and networking equipment, Setup the Data Centre and Disaster Recovery (DR)
Centre, deploy suitable Operating Systems, Application packages like RDBMS, application
development tools etc.
In addition, the system integrator is also expected to provide interfaces between the
proposed solution and the existing systems in use such as – Ticket Issuing Machines, Online
Passenger Reservation System, Pass Automation and Accountal System and Intelligent
Transport System for Buses. SI is also expected to train, involve and utilise the IT team
during the project and conduct train the trainer programme for the end users of APSRTC as
per the Training Plan (to be provided in the RFP).
In Phase - I, the SI would study the existing systems, infrastructure, processes and
documentation and prepare functional and technical requirements (for total solution
covering systems, architecture, hardware, networking equipment, networking (LAN &
WAN) solution, internet bandwidth, data centre, DR Centre etc.
To gain understanding on the existing IT Projects the system integrator may visit following
sites/ locations:
In Phase - II, the SI would develop the proposed solution incorporating the customization if
needed and configuring the existing functionality available in their system. Ensuring the
installation and commissioning of related hardware, network equipment, operating system,
RDBMS and related packages duly coordinating with the relevant partners (if any).
12
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
In Phase - III the SI would conduct relevant test procedures (including but not limited to
unit testing, system testing, integration testing and user acceptance testing) for the solution.
On successful completion of these procedures, the system integrator is expected to conduct
pilot implementation as per the Pilot implementation plan as per the RFP.
During Phase – IV, the SI would roll out the solution at all locations of the Corporation, as
per the roll out plan.
In Phase - V the SI is expected to provide warranty support and managed services (like
AMC, License renewals etc.) for the implemented solution for a period of five years from
the date of acceptance. During this phase the integrator is expected to provide helpdesk
support to end users and to the IT team of APSRTC.
13
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
14
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
The bids must be submitted in a sealed envelope with the following title “EOI Bid for
Implementation of Centralised Integrated Solution at APSRTC” and must include the EOI
reference and date on the bid cover.
The Bids received would be opened on 01 December 2010 at 15.30 hours.
15
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
16
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
17
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
Format - Annexure A
To
The Chief Engineer (IT),
Andhra Pradesh State Road Transport Corporation (APSRTC),
Bus Bhavan, Mushirabad,
Hyderabad 500 624
The undersigned Firm / Consultant, having read and examined in detail all the contents of EOI
documents for taking up the activities mentioned therein, is willing to empanelment of various
tasks to be undertaken.
1. Correspondence details:
Particulars Details
Name of Organization (Primary Bidder) :
Postal Address :
Name of contact person to whom all
:
references shall be made
18
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
We hereby declare that our EOI is made in good faith and the information contained is true and
correct to the best of our knowledge and belief.
Thanking you,
Yours faithfully,
Authorised Signatory
Name: ___________________________
Designation: _______________________
Date: ____________________________
Place: ___________________________
19
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
20
Andhra Pradesh state Road Transport Corporation
EOI for implementation of Centralized Integrated Solution (CIS)
November 2010
Particulars Details
Proposed Position
Name of Company
Profession .
Date of Birth
Years with Firm
Membership of
Professional Societies
Detailed Tasks
Assigned
Key Qualifications
Education
Employment Record
Certification:
I, the undersigned, certify that, to the best of my knowledge this Bio-data correctly describes
me, my qualifications and my experience.
Date
Signature of Staff
Member
Signature of authorized
Official from the firm
Education: Summarize College / University and other specialized education of each staff
member, giving name of schools, dates attended and degrees obtained.
Employment Record: Starting with present position, list in reverse order every employment
held. List all positions held by the staff members since graduation, providing the dates for each
position held, name of employing organization, title of positions held and location of
assignments. For experience in the last ten years, also give types of activities performed and
Client references, where appropriate.
21