0 évaluation0% ont trouvé ce document utile (0 vote)
79 vues1 page
Installation assignment Presentations and Assessment Thursday 2nd September 2010 Wednesday 3rd November 2010 Thursday 18th November 2010 Key Dates: Submission of Project Execution Plan to Course Coordinator Submission of Reports (plus all electronic) to Course Coordinator Award to Winning Team by Vince Vetter, INTECSEA.
Installation assignment Presentations and Assessment Thursday 2nd September 2010 Wednesday 3rd November 2010 Thursday 18th November 2010 Key Dates: Submission of Project Execution Plan to Course Coordinator Submission of Reports (plus all electronic) to Course Coordinator Award to Winning Team by Vince Vetter, INTECSEA.
Droits d'auteur :
Attribution Non-Commercial (BY-NC)
Formats disponibles
Téléchargez comme PDF, TXT ou lisez en ligne sur Scribd
Installation assignment Presentations and Assessment Thursday 2nd September 2010 Wednesday 3rd November 2010 Thursday 18th November 2010 Key Dates: Submission of Project Execution Plan to Course Coordinator Submission of Reports (plus all electronic) to Course Coordinator Award to Winning Team by Vince Vetter, INTECSEA.
Droits d'auteur :
Attribution Non-Commercial (BY-NC)
Formats disponibles
Téléchargez comme PDF, TXT ou lisez en ligne sur Scribd
SUBSEA TECHNOLOGY OENA8554 SCHEDULE OF LECTURES 2010
Date Title Presenter
1 Thursday 5:30-7:15 Introduction and Overview Kevin Mullen, INTECSEA 29/07/10 7:30-8:30 Assignment Kevin Mullen, INTECSEA 2 Thursday 5:30-7:30 Tree and Wellhead Systems Tim Stuart, GE Oil & Gas 05/08/10 7:45-8:30 Risk Kevin Mullen, INTECSEA 3 Thursday 5:30-7:15 Tie-In and Connection Systems Randy Isenor, INTECSEA 12/08/10 7:30-8:30 Reliability and Availability Kevin Mullen, INTECSEA 4 Thursday 5:30-7:30 Subsea Structures and Manifolds Randy Isenor, INTECSEA 19/08/10 7:45-8:30 Umbilicals Kevin Mullen, INTECSEA 5 Thursday 5:30-7:30 Subsea Control Systems Grunde Simonstad, INTECSEA 26/08/10 7:45-8:30 Subsea Valves Kevin Mullen, INTECSEA 6 Thursday 5:30 Submission of Project Execution Plans Kevin Mullen, INTECSEA 02/09/10 5:35-7:30 Case Study - Snohvit Will Acworth, GE Oil & Gas 7:30-8:30 Team Interviews Kevin Mullen, INTECSEA 7 Thursday 5:30-6:30 Flexible Flowlines Richard Stuart, INPEX 09/09/10 6:30-7:30 Flexible Dynamic Risers Richard Stuart, INPEX 7:30-8:30 Workshop – work together on assignment 8 Thursday 5:30-6:45 System Integration Testing and Commissioning Glyn Overbury, Chevron 16/09/10 7:00-8:30 Case Study - Angel Gas Development Harry Mackay, Woodside 9 Thursday 5:30-6:30 Flow Assurance Ashfaq Palejwala, INTECSEA 23/09/10 6:30-8:30 Inspection, Maintenance, Construction and Repair Mike Johnson 10 Thursday no class Study Break 30/09/10 11 Thursday 5:30-6:30 Fabrication Peter Brownlie, INTECSEA 07/10/10 6:45-8:30 Case Study - East Spar Project Evan Boyle, Technip 12 Thursday 5:30-7:00 Future Subsea Technology Greg Ross, Aker Solutions 14/10/10 7:00-8:30 Subsea System Development Chris Lawlor, Woodside 13 Thursday 5:30-6:15 Introduction to Thursday Night Presentations Kevin Mullen, INTECSEA 21/10/10 6:30-8:30 Installation Neil Yann, Technip 14 Thursday 5:30-8:30 Assignment Presentations and Assessment Randy Isenor, INTECSEA 28/10/10 Evan Boyle, Technip Norman O’Rourke, GE Oil & Gas Ron Ledbetter, INTECSEA
Other Key Dates:
Thursday 2nd September 2010 Submission of Project Execution Plan to Course Coordinator Wednesday 3rd November 2010 Submission of Reports (plus all electronic files) to Course Coordinator Thursday 18th November 2010 Award to Winning Team by Vince Vetter, INTECSEA