P Package List

Site QA/QC 12/08/2021

PKG Description Remarks

P01 Gas Turbine Generator

P02 Gas Heat Recovery Steam Generator & Associated Plant


P03 N/A

P04 Steam Turbine Generator

P05 Steam, Condensate and Feedwater System

P06 Auxiliary System

P06.1 Diesel Oil Storage and Forwarding System

P06.2 Gas Fuel Supply System

P06.3 Closed Cooling Water System

P06.4 Instrument and Service Air System

P06.5 Fire Fighting Equipment

P07 Boiler Feedwater Treatment

P07.1 Demi Water Plant, Steam / Water Circuit, Chemistry / Dosing

P07.2 Steam / Water Sampling System

P07.3 Chemical Laboratory

P08 Waste Water System / Sump Pump

P09 Cranes and Lifting Equipment

P10 Workshop and Store Equipment

P11 Black Start / Emergency Power Supply

P12 Electrical Works Power Plants

P13 N/A

P14 Instrumentation and Control System

P14.1 Control, Instrumentation and Monitoring System

P14.2 Continuos Emission Monitoring System

P14.3 Gas and Fire Detection System

P15 Civil Works

P16 Heating, Ventilation, Air Conditioning


Total Q'ty of Approved CCP
QA/QC 8-Dec-21

No Discipline Plan Q'ty App Q'ty %

1 Mechanical Work 1,187 294 24.8%

2 Electrical Work 754 284 37.7%

3 I &C Work 152 36 23.7%

4 Civil & Architectural Work 159 #REF! #REF!

Total CCP 2,252 #REF! #REF!


Approved CCP List
Site QA/QC 8-Dec-21
CCP No. Discipline Approve H/O Sign
No. PKG. No. System Description Remarks
Group Sub No. M EQ Pipe E EQ Cable I&C HVAC FF Date(FCE) Date(COM)
1 P12. ELEC. Sys CCC12-A CCP12-A-01a GTG #11 11KV Unit Board MV Switchgear-1 ● ● ● 9-Mar-09 27-May-09 LEB GT GF
2 P12. ELEC. Sys CCC12-A CCP12-A-01b GTG #11 11KV Unit Board MV Switchgear-2 ● ● ● 9-Mar-09 27-May-09 LEB GT GF
3 P12. ELEC. Sys CCC12-A CCP12-A-02a GTG #11 380V GTG Essential Board LV Switchgear-1 ● ● ● 20-Jul-09 20-Jul-09 LEB GT GF
4 P12. ELEC. Sys CCC12-A CCP12-A-02b GTG #11 380V GTG Essential Board LV Switchgear-2 ● ● ● 20-Jul-09 20-Jul-09 LEB GT GF
5 P12. ELEC. Sys CCC12-A CCP12-A-03a GTG #11 380V GTG Normal Board LV Switchgear -1 ● ● ● 20-Jul-09 20-Jul-09 LEB GT GF
6 P12. ELEC. Sys CCC12-A CCP12-A-03b GTG #11 380V GTG Normal Board LV Switchgear -2 ● ● ● 20-Jul-09 20-Jul-09 LEB GT GF
7 P12. ELEC. Sys CCC12-A CCP12-A-04a GTG #11 Transformer LV Switchgear-1 ● ● ● 11-May-09 27-May-09 LEB GT GF
8 P12. ELEC. Sys CCC12-A CCP12-A-04b GTG #11 Transformer LV Switchgear-2 ● ● ● 11-May-09 27-May-09 LEB GT GF
9 P12. ELEC. Sys CCC12-A CCP12-A-21a GTG #11 PCC ● ● ● 15-Mar-09 12-May-09 LEB GT FF
10 P12. ELEC. Sys CCC12-A CCP12-A-77a 11KV Unit Board #11 (MSF) MV Switchgear ● ● 21-Jun-09 21-Jun-09 L2 Temp Power (LEB HRSG)
11 P12. ELEC. Sys CCC12-A CCP12-A-23a 11KV Station Service Board MV Switchgear System -1 ● ● 6-Apr-09 27-May-09 CSB GF
12 P12. ELEC. Sys CCC12-A CCP12-A-23b 11KV Station Service Board MV Switchgear System -2 ● ● 6-Apr-09 26-May-09 CSB GF
13 P12. ELEC. Sys CCC12-A CCP12-A-41a 220V DC Distribution Panel -1 ● ● 6-Apr-09 27-May-09 CCB GF
14 P12. ELEC. Sys CCC12-A CCP12-A-41b 220V DC Distribution Panel -2 ● ● 6-Apr-09 27-May-09 CCB GF
15 P12. ELEC. Sys CCC12-A CCP12-A-42a 24V DC Distribution Panel-1 ● ● 6-Apr-09 27-May-09 CCB GF
16 P12. ELEC. Sys CCC12-A CCP12-A-42b 24V DC Distribution Panel-2 ● ● 6-Apr-09 27-May-09 CCB GF
17 P12. ELEC. Sys CCC12-A CCP12-A-43a 220V Safe AC Distribution-1 ● ● 6-Apr-09 27-May-09 CCB GF
18 P12. ELEC. Sys CCC12-A CCP12-A-43b 220V Safe AC Distribution-2 ● ● 6-Apr-09 27-May-09 CCB GF
19 P12. ELEC. Sys CCC12-A CCP12-A-64a 380V Fuel Gas Switch Board LV Switchgear -1 ● ● 8-Apr-09 19-Jul-09 GPRS LEB GF
20 P12. ELEC. Sys CCC12-A CCP12-A-64b 380V Fuel Gas Switch Board LV Switchgear -2 ● ● 8-Apr-09 19-Jul-09 GPRS LEB GF
21 P12. ELEC. Sys CCC12-A CCP12-A-65a 380V Fuel Gas Switch Essential Board LV Switchgear-1 ● ● 9-Apr-09 19-Jul-09 GPRS LEB GF
22 P12. ELEC. Sys CCC12-A CCP12-A-65b 380V Fuel Gas Switch Essential Board LV Switchgear-2 ● ● 9-Apr-09 19-Jul-09 GPRS LEB GF
23 P12. ELEC. Sys CCC12-A CCP12-A-24a 380V Control BLDG Switch Board LV Switchgear-1 ● ● 9-Apr-09 29-Aug-09 CSB GF
24 P12. ELEC. Sys CCC12-A CCP12-A-24b 380V Control BLDG Switch Board LV Switchgear-2 ● ● 9-Apr-09 27-May-09 CSB GF
25 P12. ELEC. Sys CCC12-A CCP12-A-25a 380V Control BLDG Switch Essential Board LV Switchgear-1 ● ● 9-Apr-09 27-May-09 CSB GF
26 P12. ELEC. Sys CCC12-A CCP12-A-25b 380V Control BLDG Switch Essential Board LV Switchgear -2 ● ● 9-Apr-09 27-May-09 CSB GF
27 P12. ELEC. Sys CCC12-A CCP12-A-26a 380V Station Switch Essential Board LV Switchgear-1 ● ● 9-Apr-09 27-May-09 CSB GF
28 P12. ELEC. Sys CCC12-A CCP12-A-26b 380V Station Switch Essential Board LV Switchgear-2 ● ● 9-Apr-09 27-May-09 CSB GF
29 P12. ELEC. Sys CCC12-A CCP12-A-27a 380V Station Switch Board LV Switchgear-1 ● ● 9-Apr-09 27-May-09 CSB GF
30 P12. ELEC. Sys CCC12-A CCP12-A-27b 380V Station Switch Board LV Switchgear-2 ● ● 9-Apr-09 27-May-09 CSB GF
31 P12. ELEC. Sys CCC12-A CCP12-A-28a 380V Station Essential Service Board LV Switchgear -1 ● ● 9-Apr-09 27-May-09 CSB GF
32 P12. ELEC. Sys CCC12-A CCP12-A-28b 380V Station Essential Service Board LV Switchgear -2 ● ● 9-Apr-09 27-May-09 CSB GF
33 P12. ELEC. Sys CCC12-A CCP12-A-11a GTG #11 220V DC Battery Charger-1 ● ● ● 20-Apr-09 27-May-09 LEB GT FF
34 P12. ELEC. Sys CCC12-A CCP12-A-11b GTG #11 220V DC Battery Charger-2 ● ● ● 20-Apr-09 27-May-09 LEB GT FF
35 P12. ELEC. Sys CCC12-A CCP12-A-12a GTG #11 110V DC Battery Charger-1 ● ● ● 20-Apr-09 27-May-09 LEB GT FF
36 P12. ELEC. Sys CCC12-A CCP12-A-12b GTG #11 110V DC Battery Charger-2 ● ● ● 20-Apr-09 27-May-09 LEB GT FF
37 P12. ELEC. Sys CCC12-A CCP12-A-13a GTG #11 220V DC /24 DC Converter -1 ● ● ● 20-Apr-09 27-May-09 LEB GT FF
38 P12. ELEC. Sys CCC12-A CCP12-A-13b GTG #11 220V DC /24 DC Converter -2 ● ● ● 20-Apr-09 27-May-09 LEB GT FF

3 / 119
Approved CCP List
Site QA/QC 8-Dec-21
CCP No. Discipline Approve H/O Sign
No. PKG. No. System Description Remarks
Group Sub No. M EQ Pipe E EQ Cable I&C HVAC FF Date(FCE) Date(COM)
39 P12. ELEC. Sys CCC12-A CCP12-A-14a GTG #11 220V Safe AC Inverter -1 ● ● ● 20-Apr-09 27-May-09 LEB GT FF
40 P12. ELEC. Sys CCC12-A CCP12-A-14b GTG #11 220V Safe AC Inverter -2 ● ● ● 20-Apr-09 27-May-09 LEB GT FF
41 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-20a Common DCS System ● ● ● 27-Apr-09 5-May-09 CCB GF
42 P12. ELEC. Sys CCC12-A CCP12-A-05a GTG #11 220V DC Battery -1 ● ● 4-May-09 27-May-09 LEB GT GF
43 P12. ELEC. Sys CCC12-A CCP12-A-05b GTG #11 220V DC Battery -2 ● ● 4-May-09 27-May-09 LEB GT GF
44 P12. ELEC. Sys CCC12-A CCP12-A-06a GTG #11 110V DC Battery -1 ● ● 4-May-09 27-May-09 LEB GT GF
45 P12. ELEC. Sys CCC12-A CCP12-A-06b GTG #11 110V DC Battery -2 ● ● 4-May-09 27-May-09 LEB GT GF
46 P12. ELEC. Sys CCC12-A CCP12-A-08a GTG #11 220V DC Distribution -1 ● ● ● 4-May-09 27-May-09 LEB GT FF
47 P12. ELEC. Sys CCC12-A CCP12-A-08b GTG #11 220V DC Distribution -2 ● ● ● 4-May-09 27-May-09 LEB GT FF
48 P12. ELEC. Sys CCC12-A CCP12-A-09a GTG #11 110V DC Distribution -1 ● ● ● 4-May-09 27-May-09 LEB GT FF
49 P12. ELEC. Sys CCC12-A CCP12-A-09b GTG #11 110V DC Distribution -2 ● ● ● 4-May-09 27-May-09 LEB GT FF
50 P12. ELEC. Sys CCC12-A CCP12-A-10a GTG #11 220V Safe AC Distribution-1 ● ● ● 4-May-09 27-May-09 LEB GT FF
51 P12. ELEC. Sys CCC12-A CCP12-A-10b GTG #11 220V Safe AC Distribution-2 ● ● ● 4-May-09 27-May-09 LEB GT FF
52 P12. ELEC. Sys CCC12-A CCP12-A-201a GTG #11 24V DC Distribution -1 ● ● ● 4-May-09 27-May-09 LEB GT FF
53 P12. ELEC. Sys CCC12-A CCP12-A-201b GTG #11 24V DC Distribution -2 ● ● ● 4-May-09 27-May-09 LEB GT FF
54 P12. ELEC. Sys CCC12-A CCP12-A-36a 220V DC Battery Charger-1 ● ● ● 10-May-09 27-May-09 CSB FF
55 P12. ELEC. Sys CCC12-A CCP12-A-36b 220V DC Battery Charger-2 ● ● ● 7-May-09 27-May-09 CSB FF
56 P12. ELEC. Sys CCC12-A CCP12-A-37a 110V DC Battery Charger -1 ● ● 10-May-09 27-May-09 CSB FF
57 P12. ELEC. Sys CCC12-A CCP12-A-37b 110V DC Battery Charger -2 ● ● 10-May-09 27-May-09 CSB FF
58 P12. ELEC. Sys CCC12-A CCP12-A-38a 220V DC/ 24 DC Converter-1 ● ● 10-May-09 27-May-09 CSB FF
59 P12. ELEC. Sys CCC12-A CCP12-A-38b 220V DC/ 24 DC Converter-2 ● ● 10-May-09 27-May-09 CSB FF
60 P12. ELEC. Sys CCC12-A CCP12-A-39a 220V Safe AC Inverter-1 ● ● 10-May-09 27-May-09 CSB FF
61 P12. ELEC. Sys CCC12-A CCP12-A-39b 220V Safe AC Inverter-2 ● ● 10-May-09 27-May-09 CSB FF
62 P12. ELEC. Sys CCC12-A CCP12-A-44a 220V DC Battery Charger-1 ● ● 7-May-09 27-May-09 CCB GF
63 P12. ELEC. Sys CCC12-A CCP12-A-44b 220V DC Battery Charger-2 ● ● 10-May-09 27-May-09 CCB GF
64 P12. ELEC. Sys CCC12-A CCP12-A-46a 220V DC/ 24 DC Converter-1 ● ● 10-May-09 27-May-09 CCB GF
65 P12. ELEC. Sys CCC12-A CCP12-A-46b 220V DC/ 24 DC Converter-2 ● ● 10-May-09 27-May-09 CCB GF
66 P12. ELEC. Sys CCC12-A CCP12-A-47a 220V Safe AC Inverter-1 ● ● 10-May-09 27-May-09 CCB GF
67 P12. ELEC. Sys CCC12-A CCP12-A-47b 220V Safe AC Inverter-2 ● ● 10-May-09 27-May-09 CCB GF
68 P12. ELEC. Sys CCC12-A CCP12-A-68a Transformer LV Switchgear-1 ● ● 11-May-09 27-May-09 LEB GPRS GF
69 P12. ELEC. Sys CCC12-A CCP12-A-68b Transformer LV Switchgear-2 ● ● 11-May-09 27-May-09 LEB GPRS GF
70 P12. ELEC. Sys CCC12-A CCP12-A-17a GTG #11 Unit Step-up Transformer (147/249/311MVA) ● ● ● 17-May-09 24-May-09
71 P12. ELEC. Sys CCC12-A CCP12-A-18a GTG #11 Unit Aux Transformer (33/55MVA) ● ● ● 17-May-09 24-May-09
72 P12. ELEC. Sys CCC12-A CCP12-A-19a GTG #11 Unit Aux Transformer (39/65MVA) ● ● ● 17-May-09 24-May-09
73 P12. ELEC. Sys CCC12-A CCP12-A-15a GTG #11 GIL Local Control Panel ● ● 20-May-09 24-May-09 LEB GT FF
74 P12. ELEC. Sys CCC12-A CCP12-A-15g Radial Control Cabinet-1a ● ● 19-May-09 24-May-09 GIS RM
75 P12. ELEC. Sys CCC12-A CCP12-A-15h Radial Control Cabinet-1b ● ● 19-May-09 24-May-09 GIS RM
76 P12. ELEC. Sys CCC12-A CCP12-A-15i Radial Control Cabinet-2a ● ● 19-May-09 24-May-09 GIS RM

4 / 119
Approved CCP List
Site QA/QC 8-Dec-21
CCP No. Discipline Approve H/O Sign
No. PKG. No. System Description Remarks
Group Sub No. M EQ Pipe E EQ Cable I&C HVAC FF Date(FCE) Date(COM)
77 P12. ELEC. Sys CCC12-A CCP12-A-15j Radial Control Cabinet-2b ● ● 19-May-09 24-May-09 GIS RM
78 P12. ELEC. Sys CCC12-A CCP12-A-15k Radial Control Cabinet-3 ● ● 19-May-09 24-May-09 GIS RM
79 P12. ELEC. Sys CCC12-A CCP12-A-15l Radial Distribution Cabinet-1 ● ● 19-May-09 24-May-09 GIS RM
80 P12. ELEC. Sys CCC12-A CCP12-A-15m Radial Distribution Cabinet-2 ● ● 19-May-09 24-May-09 GIS RM
81 P12. ELEC. Sys CCC12-A CCP12-A-15n Radial Distribution Cabinet-3 ● ● 19-May-09 24-May-09 GIS RM
82 P12. ELEC. Sys CCC12-A CCP12-A-29a LV Transformer Switchgear ● ● 20-May-09 27-May-09 CSB GF
83 P12. ELEC. Sys CCC12-A CCP12-A-29b LV Transformer Switchgear ● ● 20-May-09 27-May-09 CSB GF
84 P12. ELEC. Sys CCC12-A CCP12-A-29c LV Transformer Switchgear ● ● 20-May-09 27-May-09 CSB GF
85 P01. GTG CCC01-A CCP01-A-10a Generator Circuit Breaker ● ● ● 27-May-09 27-May-09
86 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-45 LER for Fuel GAS #11 & Common DCS ● ● ● 28-May-09 1-Jun-09
87 P01. GTG CCC01-A CCP01-A-12a Gas Turbine & IGV ● ● ● 25-Aug-09 2-Sep-09
88 P01. GTG CCC01-A CCP01-A-12d Blow-off System & GT Cooling System ● 13-Sep-09 15-Sep-09
89 P01. GTG CCC01-A CCP01-A-12f Enclosure for Gas Turbine (with Lighting) ● 14-Sep-09 15-Sep-09
90 P01. GTG CCC01-A CCP01-A-12g GT False Start Drain Piping & Tank ● ● ● 31-May-09 21-Jul-09 2/11(E)
91 P01. GTG CCC01-A CCP01-A-10b IPB ● ● ● 3-Jun-09 15-Jun-09
92 P12. ELEC. Sys CCC12-A CCP12-A-16a GTG #11 GIL ● 7-Jun-09 19-Aug-09
93 P12. ELEC. Sys CCC12-A CCP12-A-45a 220V DC Battery -1 ● ● 10-Jun-09 10-Jun-09 CCB GF
94 P12. ELEC. Sys CCC12-A CCP12-A-45b 220V DC Battery -2 ● ● 10-Jun-09 10-Jun-09 CCB GF
95 P12. ELEC. Sys CCC12-A CCP12-A-20a GTG #11 UAT-1 AVR & OLTC Control Panel ● ● ● 16-Jun-09 17-Jun-09 LEB GT FF
96 P12. ELEC. Sys CCC12-A CCP12-A-20b GTG #11 UAT-2 AVR & OLTC Control Panel ● ● ● 16-Jun-09 17-Jun-09 LEB GT FF
97 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-01 LER for GTG #11 DCS ● ● ● 18-Jun-09 21-Jun-09 LEB GT FF
98 P12. ELEC. Sys CCC12-A CCP12-A-202b 380V LV SwitchgearBoard LV Switchgear (PGI) Block-1 ● ● 24-Jun-09 28-Jul-09 GPRS CNT RM
99 P06.2 FG Sys CCC06.2-A CCP06.2-A-05b GT/HRSG GPRS Skid for GT11&12 ● ● ● 2-Aug-09 31-Aug-09
100 P06.2 FG Sys CCC06.2-A CCP06.2-A-07 Fuel Gas Booster Compressor ● ● ● 23-Aug-09 31-Aug-09
101 P06.2 FG Sys CCC06.2-A CCP06.2-A-08 Condensate Tank & Pumps ● ● ● 2-Aug-09 31-Aug-09
102 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-10 Common Electrical DCS System ● ● ● 29-Jun-09 29-Jun-09 CSB
103 P12. ELEC. Sys CCC12-A CCP12-A-30a 220V DC Battery -1 ● ● 1-Jul-09 2-Jul-09 CSB FF
104 P12. ELEC. Sys CCC12-A CCP12-A-30b 220V DC Battery -2 ● ● 1-Jul-09 2-Jul-09 CSB FF
105 P12. ELEC. Sys CCC12-A CCP12-A-31a 110V DC Battery -1 ● ● 1-Jul-09 2-Jul-09 CSB FF
106 P12. ELEC. Sys CCC12-A CCP12-A-31b 110V DC Battery -2 ● ● 1-Jul-09 2-Jul-09 CSB FF
107 P12. ELEC. Sys CCC12-A CCP12-A-32a 24V DC Distribution Panel-1 ● ● 5-Jul-09 22-Jul-09 CSB FF
108 P12. ELEC. Sys CCC12-A CCP12-A-32b 24V DC Distribution Panel -2 ● ● 5-Jul-09 22-Jul-09 CSB FF
109 P12. ELEC. Sys CCC12-A CCP12-A-33a 110V DC Distribution Panel -1 ● ● 5-Jul-09 22-Jul-09 CSB FF
110 P12. ELEC. Sys CCC12-A CCP12-A-33b 110V DC Distribution Panel -2 ● ● 5-Jul-09 22-Jul-09 CSB FF
111 P12. ELEC. Sys CCC12-A CCP12-A-34a 220V DC Distribution Panel -1 ● ● 5-Jul-09 22-Jul-09 CSB FF
112 P12. ELEC. Sys CCC12-A CCP12-A-34b 220V DC Distribution Panel -2 ● ● 5-Jul-09 22-Jul-09 CSB FF
113 P12. ELEC. Sys CCC12-A CCP12-A-35a 220V Safe AC Distribution Panel -1 ● ● 5-Jul-09 22-Jul-09 CSB FF
114 P12. ELEC. Sys CCC12-A CCP12-A-35b 220V Safe AC Distribution Panel- 2 ● ● 5-Jul-09 22-Jul-09 CSB FF

5 / 119
Approved CCP List
Site QA/QC 8-Dec-21
CCP No. Discipline Approve H/O Sign
No. PKG. No. System Description Remarks
Group Sub No. M EQ Pipe E EQ Cable I&C HVAC FF Date(FCE) Date(COM)
115 P01. GTG CCC01-A CCP01-A-02 Lube Oil / Lifting Oil System ● ● ● 9-Jul-09 13-Jul-09
116 P01. GTG CCC01-A CCP01-A-04 Hydraulic Oil Skid ● ● ● 9-Jul-09 27-Jul-09
117 P01. GTG CCC01-A CCP01-A-05a Fuel Gas System & Drainage Package ● ● ● 6-Aug-09 6-Aug-09
118 P01. GTG CCC01-A CCP01-A-05d Nox Water System ● ● ● 9-Jul-09 13-Jul-09
119 P01. GTG CCC01-A CCP01-A-06 Purge Water System ● ● ● 9-Jul-09 4-Aug-09
120 P01. GTG CCC01-A CCP01-A-13a GT Area Vent & Drain Line for Fuel Gas System ● 13-Jul-09 21-Jul-09
121 P01. GTG CCC01-A CCP01-A-08b Exhaust Gas Diffuser ● 2-Sep-09 9-Sep-09
122 P01. GTG CCC01-A CCP01-A-12e Ventilation System for GT & Auxiliaries ● 14-Sep-09 15-Sep-09
123 P06.2 FG Sys CCC06.2-A CCP06.2-A-05c Fuel Gas Changeover GPRS Skid ● ● ● 29-Jul-09 8-Aug-09
124 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-46d LER for Fuel GAS #11,12 ESDV Panel ● ● ● 29-Jul-09 30-Jul-09
125 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-46c LER for Fuel GAS #11,12 Fiscal metering Panel ● ● ● 29-Jul-09 30-Jul-09
126 P06.2 FG Sys CCC06.2-A CCP06.2-A-04a ESDV/Main Filter/Scrubber/Fiscal Metering Skid GT11&12 ● ● ● 29-Jul-09 8-Aug-09
127 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-46a LER for Fuel GAS #12 DCS ● ● ● 29-Jul-09 30-Jul-09
128 P06.2 FG Sys CCC06.2-A CCP06.2-A-02b N2 Gas Rack ● 4-Aug-09 27-Sep-09
129 P06.2 FG Sys CCC06.2-A CCP06.2-A-05a Fuel Gas Heater Skid for GT11&12 ● ● ● 31-Aug-09 1-Sep-09
130 P01. GTG CCC01-A CCP01-A-07a Pneumatic Skid ● ● ● 5-Aug-09 5-Aug-09
131 P01. GTG CCC01-A CCP01-A-12c Compressor Washing Skid ● ● ● 6-Aug-09 9-Aug-09
132 P01. GTG CCC01-A CCP01-A-05b Fuel Oil System ● ● ● 6-Aug-09 9-Aug-09
133 P01. GTG CCC01-A CCP01-A-11 Gas Turbine Control System ● ● 9-Aug-09 10-Aug-09
134 P01. GTG CCC01-A CCP01-A-03a Generator Fin Fan Cooler ● ● ● 30-Aug-09 30-Aug-09
135 P09. Crane/Hoist CCC09-A CCP09-A-01a 130/25/12.5 Ton Overhead Crane for GT Hall 10 ● ● 13-Sep-09 27-Sep-09
136 P09. Crane/Hoist CCC09-A CCP09-A-02a 16 Ton Overhead Crane for Unstacking Rotor Disc 10 ● ● 13-Sep-09 27-Sep-09
137 P09. Crane/Hoist CCC09-A CCP09-A-03a 3.6 Ton Underhung Crane for GTG Cooler #11 ● ● 13-Sep-09 27-Sep-09
138 P09. Crane/Hoist CCC09-A CCP09-A-04a 6.5 Ton Underhung Crane for Aux Equipment Skid #11 ● ● 13-Sep-09 27-Sep-09
139 P01. GTG CCC01-A CCP01-A-13c GT Area Vent & Drain Line for Water & Air System ● 11-Aug-09 29-Aug-09
140 P01. GTG CCC01-A CCP01-A-12b Gas Turbine Generator ● ● ● 18-Aug-09 21-Sep-09
141 P06.5. Fire Fight CCC06.5-A CCP06.5-A-19a GTG Transformer #11 ● 17-Aug-09 19-Aug-09
142 P01. GTG CCC01-A CCP01-A-13b GT Area Vent & Drain Line for Fuel Oil & Lube Oil System ● 19-Aug-09 29-Aug-09
143 P01. GTG CCC01-A CCP01-A-09a Fire Alarm System for GTG Skid (Hydraulic & Lube Oil Skid) ● 20-Aug-09 20-Aug-09
144 P01. GTG CCC01-A CCP01-A-01 Air Intake System ● ● ● 27-Aug-09 30-Aug-09
145 P01. GTG CCC01-A CCP01-A-14a Generator Fin Fan Cooler Sys Piping GT #11 ● 26-Aug-09 30-Aug-09
146 P06.2 FG Sys CCC06.2-A CCP06.2-A-06 Fuel Gas Receiving Header & Tie-in BR-8 Piping ● ● 27-Aug-09 30-Aug-09
147 P12. ELEC. Sys CCC12-A CCP12-A-69a 220V DC Distribution Panel -1 ● 27-Aug-09 29-Aug-09 LEB GPRS FF
148 P12. ELEC. Sys CCC12-A CCP12-A-69b 220V DC Distribution Panel -2 ● 27-Aug-09 29-Aug-09 LEB GPRS FF
149 P12. ELEC. Sys CCC12-A CCP12-A-70a 110V DC Distribution Panel -1 ● 27-Aug-09 29-Aug-09 LEB GPRS FF
150 P12. ELEC. Sys CCC12-A CCP12-A-70b 110V DC Distribution Panel -2 ● 27-Aug-09 29-Aug-09 LEB GPRS FF
151 P12. ELEC. Sys CCC12-A CCP12-A-71a 24V DC Distribution Panel -1 ● 27-Aug-09 29-Aug-09 LEB GPRS FF
152 P12. ELEC. Sys CCC12-A CCP12-A-71b 24V DC Distribution Panel -2 ● 27-Aug-09 29-Aug-09 LEB GPRS FF

6 / 119
Approved CCP List
Site QA/QC 8-Dec-21
CCP No. Discipline Approve H/O Sign
No. PKG. No. System Description Remarks
Group Sub No. M EQ Pipe E EQ Cable I&C HVAC FF Date(FCE) Date(COM)
153 P06.5. Fire Fight CCC06.5-A CCP06.5-A-42c GT PCC Enclosure #11 (FA) ● 30-Aug-09 30-Aug-09
154 P01. GTG CCC01-A CCP01-A-15 Turning Gear System ● 1-Sep-09 2-Sep-09
155 P01. GTG CCC01-A CCP01-A-03b Lube Oil Fin Fan Cooler ● ● ● 2-Sep-09 3-Sep-09
156 P06.2 FG Sys CCC06.2-A CCP06.2-A-14a Final Metering/Final Chance Filter Skid Piping GT11 ● 2-Sep-09 19-Nov-09 9/2(M)
157 P12. ELEC. Sys CCC12-A CCP12-A-135d CVDC Panel ● 3-Sep-09 6-Sep-09 LER GPRS
158 P12. ELEC. Sys CCC12-A CCP12-A-135e L&ADC Panel ● 3-Sep-09 6-Sep-09 LER GPRS
159 P12. ELEC. Sys CCC12-A CCP12-A-73a 220V DC Battery Charger-1 ● ● 3-Sep-09 6-Sep-09 LEB GPRS FF
160 P12. ELEC. Sys CCC12-A CCP12-A-73b 220V DC Battery Charger-2 ● ● 3-Sep-09 6-Sep-09 LEB GPRS FF
161 P12. ELEC. Sys CCC12-A CCP12-A-74a 110V DC Battery Charger-1 ● ● 3-Sep-09 6-Sep-09 LEB GPRS FF
162 P12. ELEC. Sys CCC12-A CCP12-A-74b 110V DC Battery Charger-2 ● ● 3-Sep-09 6-Sep-09 LEB GPRS FF
163 P12. ELEC. Sys CCC12-A CCP12-A-75a 220V DC/ 24 DC Converter-1 ● ● 3-Sep-09 6-Sep-09 LEB GPRS FF
164 P12. ELEC. Sys CCC12-A CCP12-A-75b 220V DC/ 24 DC Converter-2 ● ● 3-Sep-09 6-Sep-09 LEB GPRS FF
165 P12. ELEC. Sys CCC12-A CCP12-A-76a 220V Safe AC Inverter-1 ● ● 3-Sep-09 6-Sep-09 LEB GPRS FF
166 P12. ELEC. Sys CCC12-A CCP12-A-76b 220V Safe AC Inverter-2 ● ● 3-Sep-09 6-Sep-09 LEB GPRS FF
167 P12. ELEC. Sys CCC12-A CCP12-A-202a 380V LV SwitchgearBoard LV Switchgear (GEA) Block-1 ● 3-Sep-09 6-Sep-09 LER GPRS
168 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-01a GTG #11 DCS Aus Cabinet(11CJV71) ● ● ● 10-Sep-09 10-Sep-09
169 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-20c GTCS Metering Panel ● ● ● 10-Sep-09 10-Sep-09
170 P01. GTG CCC01-A CCP01-A-09c Fire Alarm System for GT Enclosure ● 10-Sep-09 10-Sep-09
171 P06.5. Fire Fight CCC06.5-A CCP06.5-A-42a LEB for GTG #11 (FA) ● 10-Sep-09 10-Sep-09
172 P12. ELEC. Sys CCC12-A CCP12-A-15b GTG #12 GIL Local Control Panel ● ● 10-Sep-09 13-Sep-09 LEB GT FF
173 P12. ELEC. Sys CCC12-A CCP12-A-66a 220V DC Battery -1 ● ● 10-Sep-09 13-Sep-09 LEB GPRS GF
174 P12. ELEC. Sys CCC12-A CCP12-A-67a 110V DC Battery -1 ● ● 10-Sep-09 13-Sep-09 LEB GPRS GF
175 P12. ELEC. Sys CCC12-A CCP12-A-66b 220V DC Battery -2 ● ● 10-Sep-09 13-Sep-09 LEB GPRS GF
176 P12. ELEC. Sys CCC12-A CCP12-A-67b 110V DC Battery -2 ● ● 10-Sep-09 13-Sep-09 LEB GPRS GF
177 P06.2 FG Sys CCC06.2-A CCP06.2-A-05d Final Metering/Final Chance Filter Skid for GT11 ● ● 22-Oct-09 28-Oct-09 9/16(M), 10/22(E)
178 P01. GTG CCC01-A CCP01-A-09d Fire Alarm System for Fuel Gas Enclosure ● 17-Sep-09 17-Sep-09
179 P01. GTG CCC01-A CCP01-A-09e Fire Alarm System for Fuel Oil Enclosure ● 17-Sep-09 17-Sep-09
180 P01. GTG CCC01-A CCP01-A-09f Fire Alarm System for GT Bearing Enclosure ● 17-Sep-09 17-Sep-09
181 P06.2 FG Sys CCC06.2-A CCP06.2-A-02c N2 Gas Piping for GPRS Block 1 ● 17-Sep-09 20-Sep-09
182 P06.5. Fire Fight CCC06.5-A CCP06.5-A-65a GPRS & TR Area Ring Main Piping Block 1 ● 22-Sep-09 29-Sep-09
183 P01. GTG CCC01-A CCP01-A-08a Diverter System & Bypass Stack ● ● ● 24-Sep-09 26-Oct-09 9/23(M), 9/24(E)
184 P01. GTG CCC01-A CCP01-A-09j Fire Fighting System for GT Enclosure ● 23-Sep-09 24-Sep-09
185 P01. GTG CCC01-A CCP01-A-09k Fire Fighting System for Fuel Gas Enclosure ● 23-Sep-09 24-Sep-09
186 P01. GTG CCC01-A CCP01-A-09l Fire Fighting System for Fuel Oil Enclosure ● 23-Sep-09 24-Sep-09
187 P01. GTG CCC01-A CCP01-A-09m Fire Fighting System for GT Bearing Enclosure ● 23-Sep-09 24-Sep-09
188 P06.2 FG Sys CCC06.2-A CCP06.2-A-11b Interconnecting Piping - Fuel Gas Heater to GPRS ● ● 5-Oct-09 18-Nov-09 9/23(M), 10/5(E)
189 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-39a AUS & Marshalling Cabinet for Diverter Damper & HRSG 11 ● ● ● 24-Sep-09 14-Oct-09
190 P09. Crane/Hoist CCC09-A CCP09-A-04b 6.5 Ton Underhung Crane for Aux Equipment Skid #12 ● ● 12-Oct-09 13-Oct-09 9/27(M), 10/12(E)

7 / 119
Approved CCP List
Site QA/QC 8-Dec-21
CCP No. Discipline Approve H/O Sign
No. PKG. No. System Description Remarks
Group Sub No. M EQ Pipe E EQ Cable I&C HVAC FF Date(FCE) Date(COM)
191 P14.2. CEMS CCC14.2-A CCP14.2-A-01 GTG #11 Bypass Stack CEMS ● ● 27-Sep-09 28-Sep-09
192 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-20b APS & Win-TS Cabinet (10CRR11,20CRR11,10CRR21,22) ● ● ● 27-Sep-09 28-Sep-09 CCB CER
193 P01. GTG CCC01-B CCP01-B-01 Air Intake System ● ● ● 22-Mar-10 30-Mar-10 9/27(M), 3/22(E)
194 P01. GTG CCC01-B CCP01-B-05a Fuel Gas System & Drainage Package ● ● ● 22-Mar-10 27-Mar-10 9/27(M), 3/22(E)
195 P01. GTG CCC01-B CCP01-B-05d Nox Water System ● ● ● 7-Mar-10 15-Mar-10 9/27(M), 3/7(E)
196 P01. GTG CCC01-B CCP01-B-06 Purge Water System ● ● ● 21-Feb-10 25-Feb-10 9/27(M), 2/21(E)
197 P01. GTG CCC01-B CCP01-B-07a Pneumatic Skid ● ● ● 21-Feb-10 25-Feb-10 9/27(M), 2/21(E)
198 P01. GTG CCC01-B CCP01-B-12d Blow-off System & GT Cooling System ● ● ● 7-Mar-10 10-Mar-10 9/27(M), 3/7(E)
199 P01. GTG CCC01-B CCP01-B-12g GT False Start Drain Piping & Tank ● ● ● 18-Aug-10 23-Aug-10 9/27(M), 8/18(E)
200 P01. GTG CCC01-A CCP01-A-07b Seal Air System ● ● ● 1-Oct-09 10-Oct-09 7/13(M), 10/1(E)
201 P09. Crane/Hoist CCC09-A CCP09-A-09 Air Compressor Building Crane ● ● 1-Oct-09 9/27(M), 10/1(E)
202 P06.2 FG Sys CCC06.2-A CCP06.2-A-09 Ground Flare Cum Incenerator System ● ● ● ● 1-Oct-09 2-Oct-09 10/1(M), 9/7(E)
203 P06.2 FG Sys CCC06.2-A CCP06.2-A-11a Interconnecting Piping - Fiscal metering to Fuel Gas Heater ● 1-Oct-09 14-Oct-09
204 P14.2. CEMS CCC14.2-A CCP14.2-A-13a Lan Cabinet for Block 10 (10CRR35) ● 1-Oct-09 6-Oct-09
205 P06.2 FG Sys CCC06.2-A CCP06.2-A-11c Interconnecting Piping - HP Gas Buffer Crossover Pipe ● 1-Oct-09 8-Nov-09 10/1(M)
206 P12. ELEC. Sys CCC12-A CCP12-A-22a GTG #11 SFC(4200KVA) EXC(1600KVA) Transformer ● ● ● 1-Oct-09 7-Oct-09
207 P06.5. Fire Fight CCC06.5-A CCP06.5-A-31a Fuel Gas Compressor Station Block 1 (FA) ● 4-Oct-09 4-Oct-09
208 P06.5. Fire Fight CCC06.5-A CCP06.5-A-62a LEB for GPRS (FA) ● 4-Oct-09 4-Oct-09
209 P01. GTG CCC01-B CCP01-B-04 Hydraulic Oil Skid ● ● ● 28-Feb-10 3-Mar-10 10/4(M), 2/28(E)
210 P01. GTG CCC01-B CCP01-B-07b Seal Air System ● ● ● 9-Feb-10 11-Feb-10 10/4(M), 2/9(E)
211 P06.5. Fire Fight CCC06.5-A CCP06.5-A-30a GPRS LER Block 1 (FA) ● 4-Oct-09 5-Oct-09
212 P06.2 FG Sys CCC06.2-A CCP06.2-A-01a Fuel Gas Compressor 1&2 ● ● ● 26-Oct-09 19-Nov-09 10/7(M), 10/26(E)
213 P06.2 FG Sys CCC06.2-A CCP06.2-A-01b Fuel Gas Compressor 3&4 ● ● ● 5-Mar-10 20-Mar-10 10/7(M), 3/5(E)
214 P06.4. Air Sys CCC06.4-A CCP06.4-A-06a Instrument Air Distribution System Block 1 GT & GPRS ● ○ 16-Jun-10 5/30(M)
215 P06.5. Fire Fight CCC06.5-A CCP06.5-A-30c Fuel Gas Skid Block 1 (FA) ● 7-Oct-09 7-Oct-09
216 P12. ELEC. Sys CCC12-A CCP12-A-72a 220V Safe AC Distribution Panel -1 ● ● 6-Oct-09 6-Oct-09 LEB GPRS FF
217 P06.5. Fire Fight CCC06.5-A CCP06.5-A-30b LER Block 1 (FF) ● 12-Oct-09 12-Oct-09
218 P06.5. Fire Fight CCC06.5-A CCP06.5-A-62b LEB for GPRS (FF) ● 12-Oct-09 12-Oct-09
219 P06.2 FG Sys CCC06.2-A CCP06.2-A-03 HP Gas Buffer System ● ● ● 7-Nov-09 10-Nov-09 10/13(M), 11/7(E)
220 P06.2 FG Sys CCC06.2-A CCP06.2-A-10 Gas Chromatograph System ● ● 13-Oct-09 14-Oct-09
221 P06.5. Fire Fight CCC06.5-A CCP06.5-A-42d GT PCC Enclosure #11 (FF) ● 13-Oct-09 13-Oct-09
222 P01. GTG CCC01-A CCP01-A-09h Fire Fighting System for GTG Skid ● 13-Oct-09 13-Oct-09
223 P12. ELEC. Sys CCC12-A CCP12-A-29d LV Transformer Switchgear ● ● 18-Oct-09 18-Oct-09 CSB GF
224 P01. GTG CCC01-A CCP01-A-14b Nox Water System Makeup Supply Sys Piping ● ● 22-Jun-10 28-Jun-10 2/18(M), 6/22(E)
225 P06.2 FG Sys CCC06.2-A CCP06.2-A-12 Fuel Gas System Piping #11 ● 21-Oct-09 25-Oct-09 10/21(M)
226 P06.5. Fire Fight CCC06.5-A CCP06.5-A-19b GTG Transformer #12 (FF) ● 25-Oct-09 25-Oct-09
227 P12. ELEC. Sys CCC12-A CCP12-A-17b GTG #12 Unit Step-up Transformer (147/249/311MVA) ● ● 25-Oct-09 25-Oct-09
228 P12. ELEC. Sys CCC12-A CCP12-A-72b 220V Safe AC Distribution Panel- 2 ● ● 25-Oct-09 25-Oct-09

8 / 119
Approved CCP List
Site QA/QC 8-Dec-21
CCP No. Discipline Approve H/O Sign
No. PKG. No. System Description Remarks
Group Sub No. M EQ Pipe E EQ Cable I&C HVAC FF Date(FCE) Date(COM)
229 P06.5. Fire Fight CCC06.5-A CCP06.5-A-16a GT Building Outside Skid / Equipment #11 (FA) ● 26-Oct-09 26-Oct-09
230 P12. ELEC. Sys CCC12-A CCP12-A-16b GTG #12 GIL ● 2-Nov-09 22-Feb-10
231 P06.5. Fire Fight CCC06.5-A CCP06.5-A-65b GT 11 Area Ring Main Piping ● 3-Nov-09
232 P06.5. Fire Fight CCC06.5-A CCP06.5-A-08a Common Switchgear Building (FA) ● 3-Nov-09 3-Nov-09
233 P12. ELEC. Sys CCC12-A CCP12-A-06c GTG #12 110V DC Battery -1 ● ● 3-Nov-09 4-Nov-09
234 P12. ELEC. Sys CCC12-A CCP12-A-06d GTG #12 110V DC Battery -2 ● ● 3-Nov-09 4-Nov-09
235 P12. ELEC. Sys CCC12-A CCP12-A-05c GTG #12 220V DC Battery -1 ● ● 3-Nov-09 4-Nov-09
236 P12. ELEC. Sys CCC12-A CCP12-A-05d GTG #12 220V DC Battery -2 ● ● 3-Nov-09 4-Nov-09
237 P06.2 FG Sys CCC06.2-A CCP06.2-A-11d Interconnecting Piping - Gas Vent Header ● 5-Nov-09 6-Nov-09
238 P06.2 FG Sys CCC06.2-A CCP06.2-A-02a N2 Generation System for Block 1 ● ● ● 11-Nov-09 15-Nov-09 11/7(E), 11/11(M)
239 P01. GTG CCC01-B CCP01-B-10b IPB ● ● 8-Nov-09 10-Feb-10
240 P12. ELEC. Sys CCC12-A CCP12-A-04c GTG #12 Transformer LV Switchgear-1 ● ● 12-Nov-09 14-Nov-09
241 P12. ELEC. Sys CCC12-A CCP12-A-04d GTG #12 Transformer LV Switchgear-2 ● ● 12-Nov-09 14-Nov-09
242 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-46b LER for Fuel GAS #11,12 Marshaling & Vib Mon CAB ● ● ● 18-Nov-09 19-Nov-09
243 P06.5. Fire Fight CCC06.5-A CCP06.5-A-42b LEB for GTG #11 (FF) ● 18-Nov-09 18-Nov-09
244 P12. ELEC. Sys CCC12-A CCP12-A-03c GTG #12 380V GTG Normal Board LV Switchgear -1 ● ● 19-Nov-09 24-Nov-09
245 P12. ELEC. Sys CCC12-A CCP12-A-03d GTG #12 380V GTG Normal Board LV Switchgear -2 ● ● 19-Nov-09 24-Nov-09
246 P12. ELEC. Sys CCC12-A CCP12-A-02c GTG #12 380V GTG Essential Board LV Switchgear-1 ● ● 19-Nov-09 24-Nov-09
247 P12. ELEC. Sys CCC12-A CCP12-A-02d GTG #12 380V GTG Essential Board LV Switchgear-2 ● ● 19-Nov-09 24-Nov-09
248 P12. ELEC. Sys CCC12-A CCP12-A-11c GTG #12 220V DC Battery Charger-1 ● ● 19-Nov-09 24-Nov-09
249 P12. ELEC. Sys CCC12-A CCP12-A-11d GTG #12 220V DC Battery Charger-2 ● ● 19-Nov-09 24-Nov-09
250 P12. ELEC. Sys CCC12-A CCP12-A-12c GTG #12 110V DC Battery Charger-1 ● ● 19-Nov-09 24-Nov-09
251 P12. ELEC. Sys CCC12-A CCP12-A-12d GTG #12 110V DC Battery Charger-2 ● ● 19-Nov-09 24-Nov-09
252 P12. ELEC. Sys CCC12-A CCP12-A-13c GTG #12 220V DC /24 DC Converter -1 ● ● 19-Nov-09 24-Nov-09
253 P12. ELEC. Sys CCC12-A CCP12-A-13d GTG #12 220V DC /24 DC Converter -2 ● ● 19-Nov-09 24-Nov-09
254 P12. ELEC. Sys CCC12-A CCP12-A-14c GTG #12 220V Safe AC Inverter -1 ● ● 19-Nov-09 24-Nov-09
255 P12. ELEC. Sys CCC12-A CCP12-A-14d GTG #12 220V Safe AC Inverter -2 ● ● 19-Nov-09 24-Nov-09
256 P06.5. Fire Fight CCC06.5-A CCP06.5-A-52a Compressed Air Building (F/A) ● 22-Nov-09 22-Nov-09
257 P01. GTG CCC01-B CCP01-B-09j Fire Fighting System for GT Enclosure ● 22-Nov-09 22-Nov-09
258 P01. GTG CCC01-B CCP01-B-09k Fire Fighting System for Fuel Gas Enclosure ● 22-Nov-09 22-Nov-09
259 P01. GTG CCC01-B CCP01-B-09l Fire Fighting System for Fuel Oil Enclosure ● 22-Nov-09 22-Nov-09
260 P01. GTG CCC01-B CCP01-B-09m Fire Fighting System for GT Bearing Enclosure ● 22-Nov-09 22-Nov-09
261 P06.2 FG Sys CCC06.2-A CCP06.2-A-02e N2 Gas Piping for GTG Block 1 ● 23-Nov-09 26-Nov-09
262 P09. Crane/Hoist CCC09-A CCP09-A-03b 3.6 Ton Underhung Crane for GTG Cooler #12 ● ● 24-Nov-09 11/24(M), 11/24(E)
263 P12. ELEC. Sys CCC12-A CCP12-A-08c GTG #12 220V DC Distribution -1 ● ● 3-Dec-09 15-Dec-09
264 P12. ELEC. Sys CCC12-A CCP12-A-08d GTG #12 220V DC Distribution -2 ● ● 3-Dec-09 15-Dec-09
265 P12. ELEC. Sys CCC12-A CCP12-A-09c GTG #12 110V DC Distribution -1 ● ● 3-Dec-09 15-Dec-09
266 P12. ELEC. Sys CCC12-A CCP12-A-09d GTG #12 110V DC Distribution -2 ● ● 3-Dec-09 15-Dec-09

9 / 119
Approved CCP List
Site QA/QC 8-Dec-21
CCP No. Discipline Approve H/O Sign
No. PKG. No. System Description Remarks
Group Sub No. M EQ Pipe E EQ Cable I&C HVAC FF Date(FCE) Date(COM)
267 P12. ELEC. Sys CCC12-A CCP12-A-10c GTG #12 220V Safe AC Distribution-1 ● ● 3-Dec-09 15-Dec-09
268 P12. ELEC. Sys CCC12-A CCP12-A-10d GTG #12 220V Safe AC Distribution-2 ● ● 3-Dec-09 15-Dec-09
269 P12. ELEC. Sys CCC12-A CCP12-A-201c GTG #12 24V DC Distribution -1 ● ● 3-Dec-09 15-Dec-09
270 P12. ELEC. Sys CCC12-A CCP12-A-201d GTG #12 24V DC Distribution -2 ● ● 3-Dec-09 15-Dec-09
271 P01. GTG CCC01-B CCP01-B-03b Lube Oil Fin Fan Cooler ● ● ● 18-Feb-10 27-Feb-10 12/7(M), 2/18(M)
272 P01. GTG CCC01-B CCP01-B-03a Generator Fin Fan Cooler ● ● ● 8-Mar-10 10-Mar-10 12/7(M), 3/8(E)
273 P12. ELEC. Sys CCC12-A CCP12-A-01c GTG #12 11KV Unit Board MV Switchgear-1 ● ● 7-Dec-09 8-Dec-09
274 P12. ELEC. Sys CCC12-A CCP12-A-01d GTG #12 11KV Unit Board MV Switchgear-2 ● ● 7-Dec-09 8-Dec-09
275 P01. GTG CCC01-B CCP01-B-08b Exhaust Gas Diffuser ● ● ● 23-Feb-10 25-Feb-10 12/10(M), 2/23(E)
276 P01. GTG CCC01-B CCP01-B-12c Compressor Washing Skid ● ● ● 17-Mar-10 21-Mar-10 12/13(M), 3/17(E)
277 P12. ELEC. Sys CCC12-A CCP12-A-203a GTG #11 HSBT Panel ● ● 15-Dec-09 12-Jan-10
278 P01. GTG CCC01-B CCP01-B-02 Lube Oil / Lifting Oil System ● ● ● 17-Mar-10 20-Mar-10 12/20(M), 3/17(E)
279 P01. GTG CCC01-B CCP01-B-13a GT Area Vent & Drain Line for Fuel Gas System ● 20-Dec-09 25-Jan-10
280 P06.4. Air Sys CCC06.4-A CCP06.4-A-06c1 Instrument Air Distribution System Block 1 11 Bypass Stack CEMS ● 20-Dec-09 29-Dec-10
281 P06.2 FG Sys CCC06.2-A CCP06.2-A-14b Final Metering/Final Chance Filter Skid Piping GT12 ● 20-Dec-09 31-Mar-10 12/20(M)
282 P01. GTG CCC01-B CCP01-B-12a Gas Turbine & IGV ● ● 7-Feb-10 11-Feb-10 12/21(M), 2/7(E)
283 P07.1. Dosing CCC07.1-A CCP07.1-A-01 Chemical Dosing System for Block 1 ● ● ● 16-Jan-10 17-Jan-10 12/22(M), 1/16(E)
284 P01. GTG CCC01-B CCP01-B-13b GT Area Vent & Drain Line for Fuel Oil & Lube Oil System ● 22-Dec-09 25-Jan-10
285 P12. ELEC. Sys CCC12-A CCP12-A-20c GTG #12 UAT-1 AVR & OLTC Control Panel ● ● 27-Dec-09 12-Jan-10
286 P12. ELEC. Sys CCC12-A CCP12-A-20d GTG #12 UAT-2 AVR & OLTC Control Panel ● ● 27-Dec-09 12-Jan-10
287 P01. GTG CCC01-B CCP01-B-12e Ventilation System for GT & Auxiliaries ● ● ● 29-Mar-10 4-Apr-10 12/31(M), 3/29(E)
288 P01. GTG CCC01-B CCP01-B-12f Enclosure for Gas Turbine (with Lighting) ● ● 24-Feb-10 25-Feb-10 12/31(M), 2/24(E)
289 P01. GTG CCC01-A CCP01-A-09i Fire Fighting System for GTG Building ● 4-Jan-10 4-Jan-10
290 P07.1. Dosing CCC07.1-A CCP07.1-A-07 Interconnecting Piping for Aux Boiler #1/2 ● 4-Jan-10 6-Jan-10
291 P12. ELEC. Sys CCC12-A CCP12-A-21b GTG #12 PCC ● ● 6-Jan-10 12-Jan-10
292 P12. ELEC. Sys CCC12-A CCP12-A-204a 380V Dosing MCC Block1 ● ● 11-Jan-10 12-Jan-10
293 P12. ELEC. Sys CCC12-A CCP12-A-204b Auto Stroke Power Distribution Panel Block1 ● ● 11-Jan-10 12-Jan-10
294 P06.2 FG Sys CCC06.2-A CCP06.2-A-05e Final Metering/Final Chance Filter Skid for GT12 ● ● ● 24-Mar-10 1-Apr-10 1/12(M), 3/24(E)
295 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-39b AUS & Marshalling Cabinet for Chemical Dosing & HRSG 11 ● ● ● 16-Jan-10 17-Jan-10
296 P01. GTG CCC01-B CCP01-B-14a Generator Fin Fan Cooler Sys Piping GT #12 ● 19-Jan-10 8-Feb-10 1/19(M)
297 P01. GTG CCC01-B CCP01-B-13c GT Area Vent & Drain Line for Water & Air System ● 21-Jan-10 6-Feb-10
298 P01. GTG CCC01-B CCP01-B-10a Generator Circuit Breaker ● ● 21-Jan-10 24-Jan-10
299 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-02 LER for GTG #12 DCS ● ● ● 24-Jan-10 25-Jan-10
300 P01. GTG CCC01-B CCP01-B-12b Gas Turbine Generator ● ● 17-Mar-10 20-Mar-10 1/25(M), 3/17(E)
301 P12. ELEC. Sys CCC12-A CCP12-A-18b GTG #12 Unit Aux Transformer (33/55MVA) ● ● 24-Jan-10 26-Jan-10
302 P12. ELEC. Sys CCC12-A CCP12-A-19b GTG #12 Unit Aux Transformer (39/65MVA) ● ● 24-Jan-10 26-Jan-10
303 P01. GTG CCC01-B CCP01-B-08a Diverter System & Bypass Stack ● ● ● 3-May-10 10-May-10 1/25(M), 5/3(E)
304 P01. GTG CCC01-B CCP01-B-05b Fuel Oil System ● ● ● 22-Mar-10 27-Mar-10 2/2(M), 3/22(E)

10 / 119
Approved CCP List
Site QA/QC 8-Dec-21
CCP No. Discipline Approve H/O Sign
No. PKG. No. System Description Remarks
Group Sub No. M EQ Pipe E EQ Cable I&C HVAC FF Date(FCE) Date(COM)
305 P07.1. WTR Sys CCC07.1-B CCP07.1-B-01a Makeup Water Storage Tank 1 ● ● 2-Jun-10 16-Jun-10 2/3(M), 6/2(E)
306 P07.1. WTR Sys CCC07.1-B CCP07.1-B-01b Makeup Water Storage Tank 2 ● ● 2-Jun-10 16-Jun-10 2/3(M), 6/2(E)
307 P01. GTG CCC01-B CCP01-B-15 Turning Gear System ● 7-Feb-10 11-Feb-10
308 P01. GTG CCC01-B CCP01-B-09a Fire Alarm System for GTG Skid ● 7-Feb-10 7-Feb-10
309 P01. GTG CCC01-B CCP01-B-09c Fire Alarm System for GT Enclosure ● 7-Feb-10 7-Feb-10
310 P01. GTG CCC01-B CCP01-B-09d Fire Alarm System for Fuel Gas Enclosure ● 7-Feb-10 7-Feb-10
311 P01. GTG CCC01-B CCP01-B-09e Fire Alarm System for Fuel Oil Enclosure ● 7-Feb-10 7-Feb-10
312 P01. GTG CCC01-B CCP01-B-09f Fire Alarm System for GT Bearing Enclosure ● 7-Feb-10 7-Feb-10
313 P06.5. Fire Fight CCC06.5-A CCP06.5-A-20b HRSG #11 (FF) ● 7-Feb-10 7-Feb-10
314 P06.5. Fire Fight CCC06.5-A CCP06.5-A-11d Chemical Dosing House #10 (FF) ● 7-Feb-10 7-Feb-10
315 P06.4. Air Sys CCC06.4-A CCP06.4-A-06d1 Instrument Air Distribution System Block 1 11 Main Stack CEMS ● 9-Feb-10 16-Jun-10 2/9(M)
316 P06.5. Fire Fight CCC06.5-A CCP06.5-A-43a LEB for GTG #12 (FA) ● 8-Feb-10 8-Feb-10
317 P12. ELEC. Sys CCC12-A CCP12-A-22b GTG #12 SFC(4200KVA) EXC(1600KVA) Transformer ● ● 9-Feb-10 14-Feb-10
318 P06.5. Fire Fight CCC06.5-A CCP06.5-A-16a2 Ignition Tank #11 (FA) ● 16-Feb-10 16-Feb-10
319 P06.5. Fire Fight CCC06.5-A CCP06.5-A-20a HRSG #11 Burner, CEMS, FG Skid, FW Pump (FA) ● 16-Feb-10 16-Feb-10
320 P06.5. Fire Fight CCC06.5-A CCP06.5-A-43d GT PCC Enclosure #12 (FF) ● 17-Feb-10 17-Feb-10
321 P06.5. Fire Fight CCC06.5-A CCP06.5-A-63a LEB for FFWPH & M&E workshop (F/A) ● 17-Feb-10 17-Feb-10
322 P06.5. Fire Fight CCC06.5-A CCP06.5-A-36a LEB for HRSG #11 (FA) ● 17-Feb-10 17-Feb-10
323 P06.5. Fire Fight CCC06.5-A CCP06.5-A-16b1 Final Filtering & Metering Skid #12 (FA) ● 20-Feb-10 20-Feb-10
324 P06.5. Fire Fight CCC06.5-A CCP06.5-A-11a Chemical Dosing House #10, Sampling Container (FA) ● 21-Feb-10 21-Feb-10
325 P06.5. Fire Fight CCC06.5-A CCP06.5-A-09a Central Control Building (FA - BF/GF/1F) ● 22-Feb-10 22-Feb-10
326 P06.1 DFO Sys CCC06.1-A CCP06.1-A-23 DFO Recirculation Tank 1.2 ● ○ 2/24(M)
327 P14.2. CEMS CCC14.2-A CCP14.2-A-13b Aux. Boiler #1 CEMS ● 2-Mar-10 2-Mar-10
328 P06.2 FG Sys CCC06.2-A CCP06.2-A-13 Fuel Gas System Piping #12 ● 4-Mar-10 15-Apr-10 3/4(M)
329 P02. HRSG CCC02-A CCP02-A-07 Fuel Gas Supply System for HRSG #11 ● 9-Mar-10
330 P12. ELEC. Sys CCC12-A CCP12-A-77b 11KV Unit Board #12 (MSF) MV Switchgear ● ● 11-Mar-10 16-Mar-10
331 P12. ELEC. Sys CCC12-A CCP12-A-119a 380V LV SwitchgearBoard LV Switchgear-1 (Air Compressor) ● ● 15-Mar-10 16-Mar-10
332 P12. ELEC. Sys CCC12-A CCP12-A-119b 380V LV SwitchgearBoard LV Switchgear-2 (Air Compressor) ● ● 15-Mar-10 16-Mar-10
333 P12. ELEC. Sys CCC12-A CCP12-A-119c 380V LV SwitchgearBoard LV Switchgear-3 (Air Compressor) ● ● 15-Mar-10 16-Mar-10
334 P12. ELEC. Sys CCC12-A CCP12-A-119d 380V LV SwitchgearBoard LV Switchgear-4 (Air Compressor) ● ● 15-Mar-10 16-Mar-10
335 P06.5. Fire Fight CCC06.5-A CCP06.5-A-43c GT PCC Enclosure #12 (FA) ● 16-Mar-10 16-Mar-10
336 P01. GTG CCC01-C CCP01-C-04 Hydraulic Oil Skid ● ● ● 20-Jun-10 3-Jul-10 3/16(M), 6/20(E)
337 P01. GTG CCC01-C CCP01-C-06 Purge Water System ● ● ● 1-Jul-10 9-Jul-10 3/16(M), 7/1(E)
338 P01. GTG CCC01-C CCP01-C-07a Pneumatic Skid ● ● ● 1-Jul-10 9-Jul-10 3/16(M), 7/1(E)
339 P07.1. WTR Sys CCC07.1-B CCP07.1-B-03 Make Up Water Return Line for Nox Water Skid Block1 ● ○ 3/18(M)
340 P06.5. Fire Fight CCC06.5-A CCP06.5-A-19c GTG Transformer #21 (FF) ● 18-Mar-10 18-Mar-10
341 P07.1. WTR Sys CCC07.1-B CCP07.1-B-15 Make Up Water Supply for Auxiliary Boiler ● ● ● 7-Jun-10 16-Jun-10 3/22(M), 6/7(E)
342 P12. ELEC. Sys CCC12-A CCP12-A-05e GTG #21 220V DC Battery -1 ● ● 25-Mar-10 10-Apr-10

11 / 119
Approved CCP List
Site QA/QC 8-Dec-21
CCP No. Discipline Approve H/O Sign
No. PKG. No. System Description Remarks
Group Sub No. M EQ Pipe E EQ Cable I&C HVAC FF Date(FCE) Date(COM)
343 P12. ELEC. Sys CCC12-A CCP12-A-05f GTG #21 220V DC Battery -2 ● ● 25-Mar-10 10-Apr-10
344 P12. ELEC. Sys CCC12-A CCP12-A-06e GTG #21 110V DC Battery -1 ● ● 25-Mar-10 10-Apr-10
345 P12. ELEC. Sys CCC12-A CCP12-A-06f GTG #21 110V DC Battery -2 ● ● 25-Mar-10 10-Apr-10
346 P01. GTG CCC01-B CCP01-B-11 Gas Turbine Control System ● 25-Mar-10 30-Mar-10
347 P09. Crane/Hoist CCC09-A CCP09-A-14a GT/HRSG PRS Crane #10 ● ● 22-Apr-10 3/28(M), 4/22 (E)
348 P01. GTG CCC01-B CCP01-B-09h Fire Fighting System for GTG Skid (Foam) ● 29-Mar-10 29-Mar-10
349 P12. ELEC. Sys CCC12-A CCP12-A-203c GTG #12 HSBT Panel ● ● 1-Apr-10 10-Apr-10
350 P01. GTG CCC01-C CCP01-C-12d Blow-off System & GT Cooling System ● ● ● 12-Jul-10 14-Jul-10 4/4(M), 7/12(E)
351 P09. Crane/Hoist CCC09-A CCP09-A-05a ST Building Crane #10 ● ● 25-Apr-10 4/5(M), 4/25(E)
352 P09. Crane/Hoist CCC09-A CCP09-A-04c 6.5 Ton Underhung Crane for Aux Equipment Skid #21 ● ○ 4/5(M)
353 P01. GTG CCC01-B CCP01-B-09i Fire Fighting System for GTG Building ● 8-Apr-10 8-Apr-10
354 P02. HRSG CCC02-B CCP02-B-07 Fuel Gas Supply System for HRSG #12 ● 8-Apr-10
355 P09. Crane/Hoist CCC09-A CCP09-A-06a EDG Crane #10 ● ● 25-Apr-10 4/14(M), 4/25(E)
356 P07.1. WTR Sys CCC07.1-B CCP07.1-B-12 Make Up Water Supply Line for HRSG Block1 ● ○ 4/13(M)
357 P06.5. Fire Fight CCC06.5-A CCP06.5-A-43b LEB for GTG #12 (FF) ● 20-Apr-10 20-Apr-10
358 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-40 LER for HRSG #12 DCS ● ● ● 21-Apr-10 22-Apr-10
359 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-40a AUS & Marshalling Cabinet for Diverter Damper & HRSG 12 ● ● ● 21-Apr-10 22-Apr-10
360 P07.1. WTR Sys CCC07.1-B CCP07.1-B-16 Distillate Water Supply Line for Demi Plant ● ○ 4/21(M)
361 P06.5. Fire Fight CCC06.5-A CCP06.5-A-36b LEB for HRSG #11 (FF) ● 26-Apr-10 26-Apr-10
362 P09. Crane/Hoist CCC09-A CCP09-A-04d 6.5 Ton Underhung Crane for Aux Equipment Skid #22 ● ○ 4/27(M)
363 P02. HRSG CCC02-A CCP02-A-02a Exhaust Gas System ● ● ● 26-Jul-10 4/27(M), 7/26(E)
364 P06.2 FG Sys CCC06.2-B CCP06.2-B-05b GT/HRSG GPRS Skid for GT21&22 ● ● ● 16-Aug-10 4/29(M), 8/16(E)
365 P06.2 FG Sys CCC06.2-B CCP06.2-B-05c Fuel Gas Changeover GPRS Skid ● ● 10-Aug-10 4/29(M), 8/10(E)
366 P09. Crane/Hoist CCC09-A CCP09-A-10a Gas Compressor Building Crane #10 ● ● 3-May-10 5/3(M), 4/19(E)
367 P07.1. WTR Sys CCC07.1-B CCP07.1-B-02a Make Up Water Pump ● 3-May-10 16-Jun-10 5/3(M)
368 P12. ELEC. Sys CCC12-A CCP12-A-94b 380V Fire fighting Switch Board LV Switchgea-2 ● ● 4-May-10 5-May-10
369 P12. ELEC. Sys CCC12-A CCP12-A-95a 380V Fire fighting Switch Essential Board LV Switchgear-1 ● ● 4-May-10 5-May-10
370 P12. ELEC. Sys CCC12-A CCP12-A-95b 380V Fire fighting Switch Essential Board LV Switchgear-2 ● ● 4-May-10 5-May-10
371 P12. ELEC. Sys CCC12-A CCP12-A-94a 380V Fire fighting Switch Board LV Switchgea-1 ● ● 4-May-10 5-May-10
372 P14.2. CEMS CCC14.2-A CCP14.2-A-03 GTG #12 Bypass Stack CEMS ● 4-May-10
373 P06.4. Air Sys CCC06.4-A CCP06.4-A-06d2 Instrument Air Distribution System Block 1 12 Main Stack CEMS ● 4-May-10 16-Jun-10 5/4(M)
374 P06.2 FG Sys CCC06.2-B CCP06.2-B-02b N2 Gas Rack for GPRS Block 2 ● 4-May-10
375 P07.1. WTR Sys CCC07.1-B CCP07.1-B-02 Make Up Water PP Header & Demi Water Supply & Min Recirculation Line ● ● ● 7-Jun-10 16-Jun-10 5/5(M), 6/7(E)
376 P12. ELEC. Sys CCC12-A CCP12-A-203b HRSG #11 HSBT Panel ● ● 6-May-10 9-May-10
377 P02. HRSG CCC02-A CCP02-A-06 Drain and Vents System ● 6-May-10
378 P02. HRSG CCC02-A CCP02-A-01 Duct Burner Sytem for HRSG #11 ● ● ○ ○ 5/6(M)
379 P12. ELEC. Sys CCC12-A CCP12-A-96b 220V Safe AC Distribution Panel- 2 ● ● 9-May-10 10-May-10
380 P12. ELEC. Sys CCC12-A CCP12-A-97b Transformer LV Switchgear-2 ● ● 9-May-10 10-May-10

12 / 119
Approved CCP List
Site QA/QC 8-Dec-21
CCP No. Discipline Approve H/O Sign
No. PKG. No. System Description Remarks
Group Sub No. M EQ Pipe E EQ Cable I&C HVAC FF Date(FCE) Date(COM)
381 P12. ELEC. Sys CCC12-A CCP12-A-96a 220V Safe AC Distribution Panel -1 ● ● 9-May-10 10-May-10
382 P12. ELEC. Sys CCC12-A CCP12-A-97a Transformer LV Switchgear-1 ● ● 9-May-10 10-May-10
383 P12. ELEC. Sys CCC12-A CCP12-A-14e GTG #21 220V Safe AC Inverter -1 ● ● 9-May-10 10-May-10
384 P12. ELEC. Sys CCC12-A CCP12-A-12f GTG #21 110V DC Battery Charger-2 ● ● 9-May-10 10-May-10
385 P12. ELEC. Sys CCC12-A CCP12-A-15c GTG #21 GIL Local Control Panel ● ● 9-May-10 10-May-10
386 P12. ELEC. Sys CCC12-A CCP12-A-13e GTG #21 220V DC /24 DC Converter -1 ● ● 9-May-10 10-May-10
387 P12. ELEC. Sys CCC12-A CCP12-A-11f GTG #21 220V DC Battery Charger-2 ● ● 9-May-10 10-May-10
388 P12. ELEC. Sys CCC12-A CCP12-A-11e GTG #21 220V DC Battery Charger-1 ● ● 9-May-10 10-May-10
389 P12. ELEC. Sys CCC12-A CCP12-A-14f GTG #21 220V Safe AC Inverter -2 ● ● 9-May-10 10-May-10
390 P12. ELEC. Sys CCC12-A CCP12-A-12e GTG #21 110V DC Battery Charger-1 ● ● 9-May-10 10-May-10
391 P12. ELEC. Sys CCC12-A CCP12-A-20e GTG #21 UAT-1 AVR & OLTC Control Panel ● ● 9-May-10 3-Jun-10
392 P12. ELEC. Sys CCC12-A CCP12-A-20f GTG #21 UAT-2 AVR & OLTC Control Panel ● ● 9-May-10 3-Jun-10
393 P12. ELEC. Sys CCC12-A CCP12-A-13f GTG #21 220V DC /24 DC Converter -2 ● ● 9-May-10 10-May-10
394 P06.2 FG Sys CCC06.2-B CCP06.2-B-04 ESDV/Main Filter/Scrubber/Fiscal Metering Skid GT21&22 ● ● ● 24-Aug-10 5/9(M), 8/24(M)
395 P12. ELEC. Sys CCC12-A CCP12-A-78a 380V HRSG #11 Board LV Switchgear -1 ● ● 10-May-10 11-May-10
396 P12. ELEC. Sys CCC12-A CCP12-A-79a 380V HRSG #11 Essential Board LV Switchgear -1 ● ● 10-May-10 11-May-10
397 P12. ELEC. Sys CCC12-A CCP12-A-80a 380V HRSG #11 Board LV Switchgear -2 ● ● 10-May-10 11-May-10
398 P12. ELEC. Sys CCC12-A CCP12-A-81a 380V HRSG #11 Essential Board LV Switchgear -2 ● ● 10-May-10 11-May-10
399 P12. ELEC. Sys CCC12-A CCP12-A-08e GTG #21 220V DC Distribution -1 ● ● 10-May-10 11-May-10
400 P12. ELEC. Sys CCC12-A CCP12-A-08f GTG #21 220V DC Distribution -2 ● ● 10-May-10 11-May-10
401 P12. ELEC. Sys CCC12-A CCP12-A-09e GTG #21 110V DC Distribution -1 ● ● 10-May-10 11-May-10
402 P12. ELEC. Sys CCC12-A CCP12-A-09f GTG #21 110V DC Distribution -2 ● ● 10-May-10 11-May-10
403 P12. ELEC. Sys CCC12-A CCP12-A-10e GTG #21 220V Safe AC Distribution-1 ● ● 10-May-10 11-May-10
404 P12. ELEC. Sys CCC12-A CCP12-A-10f GTG #21 220V Safe AC Distribution-2 ● ● 10-May-10 11-May-10
405 P12. ELEC. Sys CCC12-A CCP12-A-201e GTG #21 24V DC Distribution -1 ● ● 10-May-10 11-May-10
406 P12. ELEC. Sys CCC12-A CCP12-A-201f GTG #21 24V DC Distribution -2 ● ● 10-May-10 11-May-10
407 P06.5. Fire Fight CCC06.5-A CCP06.5-A-65c GT 12 Area Ring Main Piping ● 12-May-10 23-May-10
408 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-56 LER for Air Compressor DCS ● ● ● 13-May-10
409 P06.2 FG Sys CCC06.2-A CCP06.2-A-15b Fuel Gas Tie-in BR-7 Piping ● 2-Jun-10
410 P06.4. Air Sys CCC06.4-A CCP06.4-A-01 Instrument Air System ● ● ● ● 8-Jun-10 16-Jun-10 5/13(M), 6/8(E)
411 P02. HRSG CCC02-A CCP02-A-03 High Pressure System ● ● ● 12-Aug-10 5/13(M), 8/12(E)
412 P02. HRSG CCC02-A CCP02-A-05 Blowdown System ● ● ● ● 26-Jul-10 5/13(M), 7/26(E)
413 P02. HRSG CCC02-A CCP02-A-04 Low Pressure System ● ● ● 12-Aug-10 5/13(M), 8/12(E)
414 P06.4. Air Sys CCC06.4-A CCP06.4-A-02 Service Air System ● ● ● 16-May-10 16-Jun-10 5/16(M), 6/8(E)
415 P12. ELEC. Sys CCC12-A CCP12-A-04e GTG #21 Transformer LV Switchgear-1 ● ● 16-May-10 17-May-10
416 P12. ELEC. Sys CCC12-A CCP12-A-04f GTG #21 Transformer LV Switchgear-2 ● ● 16-May-10 17-May-10
417 P09. Crane/Hoist CCC09-A CCP09-A-03c 3.6 Ton Underhung Crane for GTG Cooler #21 ● ○ 5/18(M)
418 P01. GTG CCC01-C CCP01-C-12g GT False Start Drain Piping & Tank ● ● ● 16-Aug-10 23-Aug-10 5/18(M), 8/16(E)

13 / 119
Approved CCP List
Site QA/QC 8-Dec-21
CCP No. Discipline Approve H/O Sign
No. PKG. No. System Description Remarks
Group Sub No. M EQ Pipe E EQ Cable I&C HVAC FF Date(FCE) Date(COM)
419 P06.4. Air Sys CCC06.4-A CCP06.4-A-06c2 Instrument Air Distribution System Block 1 12 Bypass Stack CEMS ● 13-May-10 16-Jun-10 5/13(M)
420 P02. HRSG CCC02-B CCP02-B-03 High Pressure System ● ● ○ 5/19(M)
421 P06.5. Fire Fight CCC06.5-A CCP06.5-A-29b LEB HVAC, M&E Storage & Carpenter Workshop (FF) ● 19-May-10 19-May-10
422 P06.5. Fire Fight CCC06.5-A CCP06.5-A-63b LEB for FFWPH & M&E workshop (F/F) ● 19-May-10 19-May-10
423 P06.5. Fire Fight CCC06.5-A CCP06.5-A-29a LEB HVAC, M&E Storage & Carpenter Workshop (FA) ● 20-May-10 20-May-10
424 P06.5. Fire Fight CCC06.5-A CCP06.5-A-19d GTG Transformer #22 (FF) ● 20-May-10 20-May-10
425 P02. HRSG CCC02-B CCP02-B-05 Blowdown System ● ● ○ 5/23(M)
426 P12. ELEC. Sys CCC12-A CCP12-A-02e GTG #21 380V GTG Essential Board LV Switchgear -1 ● ● 25-May-10 26-May-10
427 P12. ELEC. Sys CCC12-A CCP12-A-02f GTG #21 380V GTG Essential Board LV Switchgear -2 ● ● 25-May-10 26-May-10
428 P12. ELEC. Sys CCC12-A CCP12-A-03e GTG #21 380V GTG Normal Board LV Switchgear -1 ● ● 25-May-10 26-May-10
429 P12. ELEC. Sys CCC12-A CCP12-A-03f GTG #21 380V GTG Normal Board LV Switchgear -2 ● ● 25-May-10 26-May-10
430 P12. ELEC. Sys CCC12-A CCP12-A-01f GTG #21 11KV Unit Board MV Switchgear -1 ● ● 25-May-10 26-May-10
431 P12. ELEC. Sys CCC12-A CCP12-A-01h GTG #21 11KV Unit Board MV Switchgear -2 ● ● 25-May-10 26-May-10
432 P01. GTG CCC01-C CCP01-C-01 Air Intake System ● ● ● 29-Jul-10 2-Aug-10 5/23(M), 7/29(E)
433 P01. GTG CCC01-C CCP01-C-02 Lube Oil / Lifting Oil System ● ● ● 1-Aug-10 2-Aug-10 5/25(M), 8/1(E)
434 P01. GTG CCC01-C CCP01-C-03b Lube Oil Fin Fan Cooler ● ● ● 22-Jul-10 25-Jul-10 5/23(M), 7/22(E)
435 P01. GTG CCC01-C CCP01-C-05a Fuel Gas System & Drainage Package ● ● ● 26-Jul-10 31-Jul-10 5/25(M), 7/26(E)
436 P01. GTG CCC01-C CCP01-C-07b Seal Air System ● ● ● 12-Jul-10 14-Jul-10 5/25(M), 7/12(E)
437 P01. GTG CCC01-C CCP01-C-12a Gas Turbine & IGV ● ● ● 12-Jul-10 14-Jul-10 5/25(M), 7/12(E)
438 P01. GTG CCC01-C CCP01-C-12b Gas Turbine Generator ● ● ● 28-Jul-10 31-Jul-10 5/25(M), 7/28(E)
439 P01. GTG CCC01-C CCP01-C-12e Ventilation System for GT & Auxiliaries ● ● ● 29-Jul-10 2-Aug-10 5/26(M), 7/29(E)
440 P01. GTG CCC01-C CCP01-C-12f Enclosure for Gas Turbine (with Lighting) ● ● ● 19-Jul-10 21-Jul-10 5/26(M), 7/19(E)
441 P06.4. Air Sys CCC06.4-A CCP06.4-A-06f Instrument Air Distribution System for Air Compressor Building ● 27-May-10 16-Jun-10
442 P09. Crane/Hoist CCC09-A CCP09-A-12 Fire Fighting Pump House Crane ● ● 25-Jul-10 5/26(M), 7/25(M)
443 P01. GTG CCC01-C CCP01-C-10b IPB ● ● 30-May-10
444 P02. HRSG CCC02-B CCP02-B-04 Low Pressure System ● ● ○ 6/1(M)
445 P12. ELEC. Sys CCC12-A CCP12-A-17c GTG #21 Unit Step-up Transformer (147/249/311MVA) ● ● 2-Jun-10 3-Jun-10
446 P12. ELEC. Sys CCC12-A CCP12-A-18c GTG #21 Unit Aux Transformer (33/55MVA) ● ● 2-Jun-10 3-Jun-10
447 P12. ELEC. Sys CCC12-A CCP12-A-19c GTG #21 Unit Aux Transformer (39/65MVA) ● ● 2-Jun-10 3-Jun-10
448 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-13a Block #10 Common DCS System(10CJV61,10CVA61) ● ● ● 2-Jun-10 6-Jun-10 CCB GF
449 P01. GTG CCC01-C CCP01-C-08b Exhaust Gas Diffuser ● ● ● 12-Jul-10 14-Jul-10 6/3(M), 7/12(E)
450 P01. GTG CCC01-C CCP01-C-10a Generator Circuit Breaker ● ● 9-Jun-10 12-Jun-10
451 P12. ELEC. Sys CCC12-A CCP12-A-22c GTG #21 SFC(4200KVA) EXC(1600KVA) Transformer ● ● 9-Jun-10 12-Jun-10
452 P07.1. WTR Sys CCC07.1-B CCP07.1-B-16a Distillate Water Buffer Tank ● ● 24-Aug-10 6/9(M), 8/24(E)
453 P01. GTG CCC01-C CCP01-C-09m Fire Fighting System for GT Bearing Enclosure (CO2) ● 13-Jun-10 13-Jun-10
454 P01. GTG CCC01-C CCP01-C-09k Fire Fighting System for Fuel Gas Enclosure (CO2) ● 13-Jun-10 13-Jun-10
455 P01. GTG CCC01-C CCP01-C-03a Generator Fin Fan Cooler ● ● ● 13-Jul-10 21-Jul-10 6/13(M), 7/13(E)
456 P01. GTG CCC01-D CCP01-D-04 Hydraulic Oil Skid ● ● ● 22-Aug-10 6/13(M), 8/22(E)

14 / 119
Approved CCP List
Site QA/QC 8-Dec-21
CCP No. Discipline Approve H/O Sign
No. PKG. No. System Description Remarks
Group Sub No. M EQ Pipe E EQ Cable I&C HVAC FF Date(FCE) Date(COM)
457 P01. GTG CCC01-D CCP01-D-06 Purge Water System ● ● ● 24-Aug-10 6/13(M), 8/24(E)
458 P06.2 FG Sys CCC06.2-B CCP06.2-B-05a Fuel Gas Heater Skid for GT21&22 ● ● ● 14-Sep-10 6/13(M), 9/14(E)
459 P01. GTG CCC01-D CCP01-D-12a Gas Turbine & IGV ● ● 14-Sep-10 6/15(M), 9/14(E)
460 P01. GTG CCC01-D CCP01-D-12d Blow-off System & GT Cooling System ● ● ● 14-Sep-10 6/15(M), 9/14(E)
461 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-60a Central Control Building (Master Clock) (00CYF10,00CYF11) ● 15-Jun-10
462 P01. GTG CCC01-C CCP01-C-14a Generator Fin Fan Cooler Sys Piping GT #21 ● 15-Jun-10 22-Jul-10
463 P01. GTG CCC01-C CCP01-C-09a Fire Alarm System for GTG Skid ● 15-Jun-10 16-Jun-10
464 P01. GTG CCC01-C CCP01-C-09c Fire Alarm System for GT Enclosure ● 15-Jun-10 16-Jun-10
465 P01. GTG CCC01-C CCP01-C-09d Fire Alarm System for Fuel Gas Enclosure ● 15-Jun-10 16-Jun-10
466 P01. GTG CCC01-C CCP01-C-09e Fire Alarm System for Fuel Oil Enclosure ● 15-Jun-10 16-Jun-10
467 P01. GTG CCC01-C CCP01-C-09f Fire Alarm System for GT Bearing Enclosure ● 15-Jun-10 16-Jun-10
468 P06.5. Fire Fight CCC06.5-A CCP06.5-A-44c GT PCC Enclosure #21 (FA) ● 15-Jun-10 16-Jun-10
469 P01. GTG CCC01-C CCP01-C-09j Fire Fighting System for GT Enclosure (CO2) ● 15-Jun-10 20-Jun-10
470 P01. GTG CCC01-C CCP01-C-09l Fire Fighting System for Fuel Oil Enclosure (CO2) ● 16-Jun-10 17-Jun-10
471 P01. GTG CCC01-D CCP01-D-07a Pneumatic Skid ● ● ● 22-Aug-10 6/20(M), 8/22(E)
472 P01. GTG CCC01-D CCP01-D-12e Ventilation System for GT & Auxiliaries ● ○ ○ 6/20(M)
473 P06.5. Fire Fight CCC06.5-A CCP06.5-A-44d GT PCC Enclosure #21 (FF) ● 20-Jun-10 21-Jun-10
474 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-03 LER for GTG #21 DCS ● ● ● 20-Jun-10 21-Jun-10
475 P01. GTG CCC01-D CCP01-D-12g GT False Start Drain Piping & Tank ● ● ○ 6/20(M)
476 P01. GTG CCC01-D CCP01-D-05a Fuel Gas System & Drainage Package ● ○ ○ 6/22(M)
477 P01. GTG CCC01-C CCP01-C-05d Nox Water System ● ● ● 26-Jul-10 31-Jul-10 6/22(M), 7/26(E)
478 P01. GTG CCC01-C CCP01-C-12c Compressor Washing Skid ● ● ● 11-Jul-10 13-Jul-10 6/22(M), 7/11(E)
479 P01. GTG CCC01-D CCP01-D-03a Generator Fin Fan Cooler ● ○ ○ 6/27(M)
480 P01. GTG CCC01-D CCP01-D-12c Compressor Washing Skid ● ● ● 2-Sep-10 6/27(M), 9/2(E)
481 P01. GTG CCC01-D CCP01-D-12f Enclosure for Gas Turbine (with Lighting) ● ○ ○ 6/27(M)
482 P01. GTG CCC01-D CCP01-D-07b Seal Air System ● ● ● 24-Aug-10 6/27(M), 8/24(E)
483 P12. ELEC. Sys CCC12-A CCP12-A-21c GTG #21 PCC ● ● 27-Jun-10
484 P01. GTG CCC01-D CCP01-D-08b Exhaust Gas Diffuser ● ● ● 9-Sep-10 7/1(M), 9/9(E)
485 P01. GTG CCC01-D CCP01-D-01 Air Intake System ● ○ ○ 7/4(M)
486 P01. GTG CCC01-D CCP01-D-12b Gas Turbine Generator ● ○ ○ 7/4(M)
487 P01. GTG CCC01-C CCP01-C-05b Fuel Oil System ● ● ● 22-Jul-10 25-Jul-10 7/7(M), 7/22(E)
488 P02. HRSG CCC02-A CCP02-A-02b Main Stack System ● ○ 7/7(M)
489 P01. GTG CCC01-C CCP01-C-13a GT Area Vent & Drain Line for Fuel Gas System ● 7-Jul-10 2-Aug-10
490 P06.5. Fire Fight CCC06.5-A CCP06.5-A-58b LEB for DFO (F/F) ● 7-Jul-10 7-Jul-10
491 P01. GTG CCC01-D CCP01-D-05b Fuel Oil System ● ○ ○ 7/8(M)
492 P01. GTG CCC01-D CCP01-D-03b Lube Oil Fin Fan Cooler ● ○ ○ 8/3(M)
493 P12. ELEC. Sys CCC12-A CCP12-A-04g GTG #22 Transformer LV Switchgear-1 ● ● 11-Jul-10 14-Jul-10
494 P12. ELEC. Sys CCC12-A CCP12-A-04h GTG #22 Transformer LV Switchgear-2 ● ● 11-Jul-10 14-Jul-10

15 / 119
Approved CCP List
Site QA/QC 8-Dec-21
CCP No. Discipline Approve H/O Sign
No. PKG. No. System Description Remarks
Group Sub No. M EQ Pipe E EQ Cable I&C HVAC FF Date(FCE) Date(COM)
495 P01. GTG CCC01-C CCP01-C-15 Turning Gear System ● 12-Jul-10 13-Jul-10
496 P09. Crane/Hoist CCC09-A CCP09-A-03d 3.6 Ton Underhung Crane for GTG Cooler #22 ● ○ 7/13(M)
497 P01. GTG CCC01-D CCP01-D-02 Lube Oil / Lifting Oil System ● ○ ○ 7/13(M)
498 P01. GTG CCC01-D CCP01-D-05d Nox Water System ● ○ ○ 7/13(M)
499 P02. HRSG CCC02-B CCP02-B-06 Drain and Vents System ● 14-Jul-10
500 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-14a Lan Cabinet for Block 20 ● ● ● 18-Jul-10 20-Jul-10
501 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-15a Lan Cabinet for Block 30 ● ● ● 18-Jul-10 20-Jul-10
502 P01. GTG CCC01-C CCP01-C-13c GT Area Vent & Drain Line for Water & Air System ● 18-Jul-10 2-Aug-10
503 P12. ELEC. Sys CCC12-A CCP12-A-05g GTG #22 220V DC Battery -1 ● ● 19-Jul-10 4-Aug-10
504 P12. ELEC. Sys CCC12-A CCP12-A-05h GTG #22 220V DC Battery -2 ● ● 19-Jul-10 4-Aug-10
505 P12. ELEC. Sys CCC12-A CCP12-A-06g GTG #22 110V DC Battery -1 ● ● 19-Jul-10 4-Aug-10
506 P12. ELEC. Sys CCC12-A CCP12-A-06h GTG #22 110V DC Battery -2 ● ● 19-Jul-10 4-Aug-10
507 P01. GTG CCC01-C CCP01-C-13b GT Area Vent & Drain Line for Fuel Oil & Lube Oil System ● 22-Jul-10 25-Jul-10
508 P12. ELEC. Sys CCC12-A CCP12-A-202c 380V LV SwitchgearBoard LV Switchgear (GEA) Block-2 ● ● 25-Jul-10 27-Jul-10
509 P12. ELEC. Sys CCC12-A CCP12-A-202d 380V LV SwitchgearBoard LV Switchgear (PGI) Block-2 ● ● 25-Jul-10 27-Jul-10
510 P02. HRSG CCC02-B CCP02-B-02b Main Stack System ● ○ 7/25(M)
511 P06.5. Fire Fight CCC06.5-A CCP06.5-A-69h Cable Tunnel - HRSG Unit 11 Zone 73 (FF) ● 26-Jul-10 26-Jul-10
512 P06.5. Fire Fight CCC06.5-A CCP06.5-A-80d Cable Tunnel - CSB Zone 616 (FF) ● 26-Jul-10 26-Jul-10
513 P06.5. Fire Fight CCC06.5-A CCP06.5-A-81f Cable Tunnel - CCB Zone 673 (FF) ● 26-Jul-10 26-Jul-10
514 P06.5. Fire Fight CCC06.5-A CCP06.5-A-80f Cable Tunnel - CSB Zone 617 (FF) ● 26-Jul-10 29-Jul-10
515 P12. ELEC. Sys CCC12-A CCP12-A-61a 380V EDG Essential Board LV Switchgear-1 ● ● 28-Jul-10 29-Jul-10
516 P12. ELEC. Sys CCC12-A CCP12-A-61b 380V EDG Essential Board LV Switchgear-2 ● ● 28-Jul-10 29-Jul-10
517 P12. ELEC. Sys CCC12-A CCP12-A-78b 380V HRSG #12 Board LV Switchgear -1 ● ● 28-Jul-10 29-Jul-10
518 P12. ELEC. Sys CCC12-A CCP12-A-79b 380V HRSG #12 Essential Board LV Switchgear -1 ● ● 28-Jul-10 29-Jul-10
519 P12. ELEC. Sys CCC12-A CCP12-A-80b 380V HRSG #12 Board LV Switchgear -2 ● ● 28-Jul-10 29-Jul-10
520 P12. ELEC. Sys CCC12-A CCP12-A-81b 380V HRSG #12 Essential Board LV Switchgear -2 ● ● 28-Jul-10 29-Jul-10
521 P12. ELEC. Sys CCC12-A CCP12-A-201g GTG #22 24V DC Distribution -1 ● ● 29-Jul-10 1-Aug-10
522 P12. ELEC. Sys CCC12-A CCP12-A-201h GTG #22 24V DC Distribution -2 ● ● 29-Jul-10 1-Aug-10
523 P12. ELEC. Sys CCC12-A CCP12-A-02g GTG #22 380V GTG Essential Board LV Switchgear-1 ● ● 29-Jul-10 4-Aug-10
524 P12. ELEC. Sys CCC12-A CCP12-A-02h GTG #22 380V GTG Essential Board LV Switchgear-2 ● ● 29-Jul-10 4-Aug-10
525 P12. ELEC. Sys CCC12-A CCP12-A-03g GTG #22 380V GTG Normal Board LV Switchgear -1 ● ● 29-Jul-10 4-Aug-10
526 P12. ELEC. Sys CCC12-A CCP12-A-03h GTG #22 380V GTG Normal Board LV Switchgear -2 ● ● 29-Jul-10 4-Aug-10
527 P12. ELEC. Sys CCC12-A CCP12-A-08g GTG #22 220V DC Distribution -1 ● ● 29-Jul-10 1-Aug-10
528 P12. ELEC. Sys CCC12-A CCP12-A-08h GTG #22 220V DC Distribution -2 ● ● 29-Jul-10 1-Aug-10
529 P12. ELEC. Sys CCC12-A CCP12-A-09g GTG #22 110V DC Distribution -1 ● ● 29-Jul-10 1-Aug-10
530 P12. ELEC. Sys CCC12-A CCP12-A-09h GTG #22 110V DC Distribution -2 ● ● 29-Jul-10 1-Aug-10
531 P12. ELEC. Sys CCC12-A CCP12-A-10g GTG #22 220V Safe AC Distribution-1 ● ● 29-Jul-10 1-Aug-10
532 P12. ELEC. Sys CCC12-A CCP12-A-10h GTG #22 220V Safe AC Distribution-2 ● ● 29-Jul-10 1-Aug-10

16 / 119
Approved CCP List
Site QA/QC 8-Dec-21
CCP No. Discipline Approve H/O Sign
No. PKG. No. System Description Remarks
Group Sub No. M EQ Pipe E EQ Cable I&C HVAC FF Date(FCE) Date(COM)
533 P12. ELEC. Sys CCC12-A CCP12-A-11g GTG #22 220V DC Battery Charger-1 ● ● 29-Jul-10 1-Aug-10
534 P12. ELEC. Sys CCC12-A CCP12-A-11h GTG #22 220V DC Battery Charger-2 ● ● 29-Jul-10 1-Aug-10
535 P12. ELEC. Sys CCC12-A CCP12-A-12g GTG #22 110V DC Battery Charger-1 ● ● 29-Jul-10 1-Aug-10
536 P12. ELEC. Sys CCC12-A CCP12-A-12h GTG #22 110V DC Battery Charger-2 ● ● 29-Jul-10 1-Aug-10
537 P12. ELEC. Sys CCC12-A CCP12-A-13g GTG #22 220V DC /24 DC Converter -1 ● ● 29-Jul-10 1-Aug-10
538 P12. ELEC. Sys CCC12-A CCP12-A-13h GTG #22 220V DC /24 DC Converter -2 ● ● 29-Jul-10 1-Aug-10
539 P12. ELEC. Sys CCC12-A CCP12-A-14g GTG #22 220V Safe AC Inverter -1 ● ● 29-Jul-10 1-Aug-10
540 P12. ELEC. Sys CCC12-A CCP12-A-14h GTG #22 220V Safe AC Inverter -2 ● ● 29-Jul-10 1-Aug-10
541 P12. ELEC. Sys CCC12-A CCP12-A-16c GTG #21 GIL ● ● 29-Jul-10
542 P06.2 FG Sys CCC06.2-B CCP06.2-B-05d Final Metering/Final Chance Filter Skid for GT21 ● ○ ○ 7/28(M)
543 P06.4. Air Sys CCC06.4-A CCP06.4-A-09a Service Air Distribution System Block 1 ● ● 29-Jul-10 7/29(M), 6/8(E)
544 P01. GTG CCC01-C CCP01-C-11 Gas Turbine Control System ● ● 1-Aug-10 2-Aug-10
545 P12. ELEC. Sys CCC12-A CCP12-A-88a 220V Safe AC Distribution Panel -1 (LEB HVAC) ● ● 3-Aug-10 4-Aug-10
546 P12. ELEC. Sys CCC12-A CCP12-A-88b 220V Safe AC Distribution Panel- 2 (LEB HVAC) ● ● 3-Aug-10 4-Aug-10
547 P12. ELEC. Sys CCC12-A CCP12-A-89a 220V DC Distribution Panel -1 (LEB HVAC) ● ● 3-Aug-10 4-Aug-10
548 P12. ELEC. Sys CCC12-A CCP12-A-89b 220V DC Distribution Panel -2 (LEB HVAC) ● ● 3-Aug-10 4-Aug-10
549 P12. ELEC. Sys CCC12-A CCP12-A-90a 110V DC Distribution Panel -1 (LEB HVAC) ● ● 3-Aug-10 4-Aug-10
550 P12. ELEC. Sys CCC12-A CCP12-A-90b 110V DC Distribution Panel -2 (LEB HVAC) ● ● 3-Aug-10 4-Aug-10
551 P12. ELEC. Sys CCC12-A CCP12-A-85a 220V DC Battery-1 (LEB HVAC) ● ● 3-Aug-10
552 P12. ELEC. Sys CCC12-A CCP12-A-85b 220V DC Battery-2 (LEB HVAC) ● ● 3-Aug-10
553 P12. ELEC. Sys CCC12-A CCP12-A-86a 110V DC Battery-1 (LEB HVAC) ● ● 3-Aug-10
554 P12. ELEC. Sys CCC12-A CCP12-A-86b 110V DC Battery-2 (LEB HVAC) ● ● 3-Aug-10
555 P12. ELEC. Sys CCC12-A CCP12-A-91a 220V Safe AC Inverter-1 (LEB HVAC) ● ● 3-Aug-10 7-Aug-10
556 P12. ELEC. Sys CCC12-A CCP12-A-91b 220V Safe AC Inverter-2 (LEB HVAC) ● ● 3-Aug-10 7-Aug-10
557 P12. ELEC. Sys CCC12-A CCP12-A-92a 220V DC Battery Charger-1 (LEB HVAC) ● ● 3-Aug-10 7-Aug-10
558 P12. ELEC. Sys CCC12-A CCP12-A-92b 220V DC Battery Charger-2 (LEB HVAC) ● ● 3-Aug-10 7-Aug-10
559 P12. ELEC. Sys CCC12-A CCP12-A-93a 110V DC Battery Charger-1 (LEB HVAC) ● ● 3-Aug-10 7-Aug-10
560 P12. ELEC. Sys CCC12-A CCP12-A-93b 110V DC Battery Charger-2 (LEB HVAC) ● ● 3-Aug-10 7-Aug-10
561 P06.5. Fire Fight CCC06.5-A CCP06.5-A-50a Central HVAC (F/A) ● 3-Aug-10 18-Aug-10
562 P01. GTG CCC01-D CCP01-D-09i Fire Fighting System for GTG Building ● 4-Aug-10 12-Aug-10
563 P01. GTG CCC01-C CCP01-C-09i Fire Fighting System for GTG Building ● 4-Aug-10 12-Aug-10
564 P06.5. Fire Fight CCC06.5-A CCP06.5-A-52b Compressed Air Building (F/F) ● 4-Aug-10 12-Aug-10
565 P06.5. Fire Fight CCC06.5-A CCP06.5-A-44b LEB for GTG #21 (FF) ● 5-Aug-10 12-Aug-10
566 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-47 LER for Fuel GAS #21 DCS ● ● 10-Aug-10
567 P01. GTG CCC01-C CCP01-C-09h Fire Fighting System for GTG Skid (Foam) ● 15-Aug-10 15-Aug-10
568 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-48a LER for Fuel GAS #22 DCS ● ● 15-Aug-10
569 P06.2 FG Sys CCC06.2-C CCP06.2-C-05c Fuel Gas Changeover GPRS Skid ● ○ ○ 8/16(M)
570 P06.2 FG Sys CCC06.2-C CCP06.2-C-05a Fuel Gas Heater Skid for GT31&32 ● ○ ○ 8/16(M)

17 / 119
Approved CCP List
Site QA/QC 8-Dec-21
CCP No. Discipline Approve H/O Sign
No. PKG. No. System Description Remarks
Group Sub No. M EQ Pipe E EQ Cable I&C HVAC FF Date(FCE) Date(COM)
571 P06.5. Fire Fight CCC06.5-A CCP06.5-A-48c Fire Fighting Water Pump House(Electric) ● 18-Aug-10 18-Aug-10
572 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-39c AUS & Marshalling Cabinet for BMS 11 ● ● 18-Aug-10
573 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-39e VMS Panel HRSG 11 ● ● 18-Aug-10
574 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-48d LER for Fuel GAS #21,22 ESDV Panel ● ● 18-Aug-10
575 P12. ELEC. Sys CCC12-A CCP12-A-20g GTG #22 UAT-1 AVR & OLTC Control Panel ● ● 19-Aug-10
576 P12. ELEC. Sys CCC12-A CCP12-A-20h GTG #22 UAT-2 AVR & OLTC Control Panel ● ● 19-Aug-10
577 P12. ELEC. Sys CCC12-A CCP12-A-146e L&ADC Panel(LER GPRS #2) ● ● 19-Aug-10
578 P12. ELEC. Sys CCC12-A CCP12-A-21d GTG #22 PCC ● ● 22-Aug-10
579 P11. DG Sys CCC11-A CCP11-A-01 Emergency Diesel Generator 1 for BL 1 ● ● ○ ○ 8/23(M)
580 P11. DG Sys CCC11-A CCP11-A-02 Emergency Diesel Generator 2 for BL 1 ● ● ○ ○ 8/23(M)
581 P01. GTG CCC01-C CCP01-C-08a Diverter System & Bypass Stack ● ○ ○ 8/23(M)
582 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-39d AUS & Marshalling Cabinet for BPS 11 ● ● 23-Aug-10
583 P12. ELEC. Sys CCC12-A CCP12-A-01i GTG #22 11KV Unit Board MV Switchgear-1 ● ● 24-Aug-10
584 P12. ELEC. Sys CCC12-A CCP12-A-01j GTG #22 11KV Unit Board MV Switchgear-2 ● ● 24-Aug-10
585 P12. ELEC. Sys CCC12-A CCP12-A-116 380V LV SwitchgearBoard LV Switchgear (DWP) ● ● 24-Aug-10
586 P06.5. Fire Fight CCC06.5-A CCP06.5-A-55a Makeup Water Pump with Sunshade (FA) ● 24-Aug-10 24-Aug-10
587 P12. ELEC. Sys CCC12-A CCP12-A-15d GTG #22 GIL Local Control Panel ● ● 25-Aug-10
588 P12. ELEC. Sys CCC12-A CCP12-A-146d CVDC Panel (LER GPRS #2) ● ● 25-Aug-10
589 P14.2. CEMS CCC14.2-A CCP14.2-A-14b Aux. Boiler #2 CEMS ● 24-Aug-10
590 P01. GTG CCC01-D CCP01-D-14a Generator Fin Fan Cooler Sys Piping GT #22 ● 25-Aug-10
591 P02. HRSG CCC02-B CCP02-B-01 Duct Burner Sytem for HRSG #12 ● ● ○ ○ 8/29(M)
592 P06.5. Fire Fight CCC06.5-A CCP06.5-A-19e GTG Transformer #31 (FF) ● 29-Aug-10 29-Aug-10
593 P06.5. Fire Fight CCC06.5-A CCP06.5-A-48b Fire Fighting Water Pump House(FF) ● 19-Aug-10 19-Aug-10
594 P06.2 FG Sys CCC06.2-B CCP06.2-B-05e Final Metering/Final Chance Filter Skid for GT22 ● ○ ○ 8/31(M)
595 P14.2. CEMS CCC14.2-A CCP14.2-A-02 HRSG #11 Main Stack CEMS ● 31-Aug-10 14-Sep-10
596 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-48b LER for Fuel GAS #21,22 Marshaling & Vib Mon CAB ● ● 1-Sep-10
597 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-48c LER for Fuel GAS #21,22 Fiscal metering Panel ● ● 1-Sep-10 7-Sep-10
598 P01. GTG CCC01-E CCP01-E-06 Purge Water System ● ○ ○ 9/2(M)
599 P06.2 FG Sys CCC06.2-B CCP06.2-B-09a Final Metering/Final Chance Filter Skid Piping GT21 ● 9/5(M)
600 P01. GTG CCC01-D CCP01-D-13a GT Area Vent & Drain Line for Fuel Gas System ● 5-Sep-10
601 P01. GTG CCC01-E CCP01-E-04 Hydraulic Oil Skid ● ○ ○ 9/5(M)
602 P01. GTG CCC01-E CCP01-E-07a Pneumatic Skid ● ○ ○ 9/5(M)
603 P01. GTG CCC01-E CCP01-E-05d Nox Water System ● ○ ○ 9/6(M)
604 P01. GTG CCC01-A CCP01-A-05c Ignition Gas System ● ○ ○ 9/6(M)
605 P12. ELEC. Sys CCC12-A CCP12-A-77c 11KV Unit Board #21 (MSF) MV Switchgear ● 5-Sep-10
606 P12. ELEC. Sys CCC12-A CCP12-A-17d GTG #22 Unit Step-up Transformer (147/249/311MVA) ● 7-Sep-10
607 P12. ELEC. Sys CCC12-A CCP12-A-18d GTG #22 Unit Aux Transformer (33/55MVA) ● 7-Sep-10
608 P06.2 FG Sys CCC06.2-B CCP06.2-B-06a Interconnecting Piping - Fiscal metering to Fuel Gas Heater ● ● 14-Sep-10 9/7(M), 9/14(E)

18 / 119
Approved CCP List
Site QA/QC 8-Dec-21
CCP No. Discipline Approve H/O Sign
No. PKG. No. System Description Remarks
Group Sub No. M EQ Pipe E EQ Cable I&C HVAC FF Date(FCE) Date(COM)
609 P09. Crane/Hoist CCC09-A CCP09-A-05b ST Building Crane #20 ● ● ● 9-Sep-10 9/9(M), 9/7(E)
610 P01. GTG CCC01-D CCP01-D-15 Turning Gear System ● 9-Sep-10
611 P01. GTG CCC01-E CCP01-E-03b Lube Oil Fin Fan Cooler ● ○ ○ 9/13(M)
612 P01. GTG CCC01-E CCP01-E-12c Compressor Washing Skid ● ○ ○ 9/13(M)
613 P01. GTG CCC01-E CCP01-E-12g GT False Start Drain Piping & Tank ● ● ○ 9/13(M)
614 P01. GTG CCC01-E CCP01-E-07b Seal Air System ● ○ ○ 9/14(M)

19 / 119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

1 P01. GTG CCC01-A CCP01-A-01 Air Intake System 26-Jul-09 27-Aug-09 30-Aug-09
2 P01. GTG CCC01-A CCP01-A-02 Lube Oil / Lifting Oil System 16-Jun-09 9-Jul-09 13-Jul-09
3 P01. GTG CCC01-A CCP01-A-03a Generator Fin Fan Cooler 10-Aug-09 30-Aug-09 30-Aug-09
4 P01. GTG CCC01-A CCP01-A-03b Lube Oil Fin Fan Cooler 14-Jul-09 2-Sep-09 3-Sep-09
5 P01. GTG CCC01-A CCP01-A-04 Hydraulic Oil Skid 9-Jul-09 8-Jul-09 27-Jul-09
6 P01. GTG CCC01-A CCP01-A-05a Fuel Gas System & Drainage Package 12-Jul-09 6-Aug-09 6-Aug-09
7 P01. GTG CCC01-A CCP01-A-05b Fuel Oil System 15-Jul-09 6-Aug-09 9-Aug-09
8 P01. GTG CCC01-A CCP01-A-05c Ignition Gas System 6-Sep-10
9 P01. GTG CCC01-A CCP01-A-05d Nox Water System 9-Jul-09 9-Jul-09 13-Jul-09
10 P01. GTG CCC01-A CCP01-A-06 Purge Water System 9-Jul-09 9-Jul-09 4-Aug-09
11 P01. GTG CCC01-A CCP01-A-07a Pneumatic Skid 13-Jul-09 5-Aug-09 5-Aug-09
12 P01. GTG CCC01-A CCP01-A-07b Seal Air System 13-Jul-09 1-Oct-09 10-Oct-09
13 P01. GTG CCC01-A CCP01-A-08a Diverter System & Bypass Stack 23-Sep-09 24-Sep-09 26-Oct-09
14 P01. GTG CCC01-A CCP01-A-08b Exhaust Gas Diffuser 13-Jul-09 2-Sep-09 9-Sep-09
15 P01. GTG CCC01-A CCP01-A-09a Fire Alarm System for GTG Skid 20-Aug-09 NA 20-Aug-09
16 P01. GTG CCC01-A CCP01-A-09b Fire Alarm System for GTG Building CCP06.5-A-42a
17 P01. GTG CCC01-A CCP01-A-09c Fire Alarm System for GT Enclosure 10-Sep-09 10-Sep-09 10-Sep-09
18 P01. GTG CCC01-A CCP01-A-09d Fire Alarm System for Fuel Gas Enclosure 17-Sep-09 17-Sep-09 17-Sep-09
19 P01. GTG CCC01-A CCP01-A-09e Fire Alarm System for Fuel Oil Enclosure 17-Sep-09 17-Sep-09 17-Sep-09
20 P01. GTG CCC01-A CCP01-A-09f Fire Alarm System for GT Bearing Enclosure 17-Sep-09 17-Sep-09 17-Sep-09
21 P01. GTG CCC01-A CCP01-A-09g Fire Alarm System for GT Intermediate Enclosure CCP01-A-09f
22 P01. GTG CCC01-A CCP01-A-09h Fire Fighting System for GTG Skid (Foam) 13-Oct-09 NA 13-Oct-09
23 P01. GTG CCC01-A CCP01-A-09i Fire Fighting System for GTG Building 4-Jan-10 NA 4-Jan-10
24 P01. GTG CCC01-A CCP01-A-09j Fire Fighting System for GT Enclosure (CO2) 23-Sep-09 NA 24-Sep-09
25 P01. GTG CCC01-A CCP01-A-09k Fire Fighting System for Fuel Gas Enclosure (CO2) 23-Sep-09 NA 24-Sep-09
26 P01. GTG CCC01-A CCP01-A-09l Fire Fighting System for Fuel Oil Enclosure (CO2) 23-Sep-09 NA 24-Sep-09
27 P01. GTG CCC01-A CCP01-A-09m Fire Fighting System for GT Bearing Enclosure (CO2) 23-Sep-09 NA 24-Sep-09
28 P01. GTG CCC01-A CCP01-A-09n Fire Fighting System for GT Intermediate Enclosure CCP01-A-09m
29 P01. GTG CCC01-A CCP01-A-10a Generator Circuit Breaker 27-May-09 27-May-09 27-May-09
30 P01. GTG CCC01-A CCP01-A-10b IPB 3-Jun-09 3-Jun-09 15-Jun-09
31 P01. GTG CCC01-A CCP01-A-11 Gas Turbine Control System 9-Aug-09 9-Aug-09 10-Aug-09
32 P01. GTG CCC01-A CCP01-A-12a Gas Turbine & IGV 31-May-09 25-Aug-09 2-Sep-09
33 P01. GTG CCC01-A CCP01-A-12b Gas Turbine Generator 13-Jul-09 18-Aug-09 21-Sep-09
34 P01. GTG CCC01-A CCP01-A-12c Compressor Washing Skid 26-Jul-09 6-Aug-09 9-Aug-09
35 P01. GTG CCC01-A CCP01-A-12d Blow-off System & GT Cooling System 31-May-09 13-Sep-09 15-Sep-09
36 P01. GTG CCC01-A CCP01-A-12e Ventilation System for GT & Auxiliaries 13-Jul-09 14-Sep-09 15-Sep-09
37 P01. GTG CCC01-A CCP01-A-12f Enclosure for Gas Turbine (with Lighting) 31-May-09 14-Sep-09 15-Sep-09
38 P01. GTG CCC01-A CCP01-A-12g GT False Start Drain Piping & Tank 31-May-09 11-Feb-10 21-Jul-09
39 P01. GTG CCC01-A CCP01-A-13a GT Area Vent & Drain Line for Fuel Gas System 13-Jul-09 NA 21-Jul-09
40 P01. GTG CCC01-A CCP01-A-13b GT Area Vent & Drain Line for Fuel Oil & Lube Oil System 19-Aug-09 NA 29-Aug-09
41 P01. GTG CCC01-A CCP01-A-13c GT Area Vent & Drain Line for Water & Air System 11-Aug-09 NA 29-Aug-09

20/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

42 P01. GTG CCC01-A CCP01-A-14a Generator Fin Fan Cooler Sys External Piping 26-Aug-09 NA 30-Aug-09
43 P01. GTG CCC01-A CCP01-A-14b Makeup Supply Sys Piping for GT 11&12 18-Feb-10 22-Jun-10 28-Jun-10
44 P01. GTG CCC01-A CCP01-A-15 Turning Gear System 1-Sep-09 1-Sep-09 2-Sep-09
45 P01. GTG CCC01-B CCP01-B-01 Air Intake System 27-Sep-09 22-Mar-10 30-Mar-10
46 P01. GTG CCC01-B CCP01-B-02 Lube Oil / Lifting Oil System 20-Dec-09 17-Mar-10 20-Mar-10
47 P01. GTG CCC01-B CCP01-B-03a Generator Fin Fan Cooler 7-Dec-09 8-Mar-10 10-Mar-10
48 P01. GTG CCC01-B CCP01-B-03b Lube Oil Fin Fan Cooler 7-Dec-09 18-Feb-10 27-Feb-10
49 P01. GTG CCC01-B CCP01-B-04 Hydraulic Oil Skid 4-Oct-09 28-Feb-10 3-Mar-10
50 P01. GTG CCC01-B CCP01-B-05a Fuel Gas System & Drainage Package 27-Sep-09 22-Mar-10 27-Mar-10
51 P01. GTG CCC01-B CCP01-B-05b Fuel Oil System 2-Feb-10 22-Mar-10 27-Mar-10
52 P01. GTG CCC01-B CCP01-B-05c Ignition Gas System
53 P01. GTG CCC01-B CCP01-B-05d Nox Water System 27-Sep-09 7-Mar-10 15-Mar-10
54 P01. GTG CCC01-B CCP01-B-06 Purge Water System 27-Sep-09 21-Feb-10 25-Feb-10
55 P01. GTG CCC01-B CCP01-B-07a Pneumatic Skid 27-Sep-09 21-Feb-10 25-Feb-10
56 P01. GTG CCC01-B CCP01-B-07b Seal Air System 4-Oct-09 9-Feb-10 11-Feb-10
57 P01. GTG CCC01-B CCP01-B-08a Diverter System & Bypass Stack 25-Jan-10 3-May-10 10-May-10
58 P01. GTG CCC01-B CCP01-B-08b Exhaust Gas Diffuser 10-Dec-09 23-Feb-10 25-Feb-10
59 P01. GTG CCC01-B CCP01-B-09a Fire Alarm System for GTG Skid 7-Feb-10 7-Feb-10 7-Feb-10
60 P01. GTG CCC01-B CCP01-B-09b Fire Alarm System for GTG Building
61 P01. GTG CCC01-B CCP01-B-09c Fire Alarm System for GT Enclosure 7-Feb-10 7-Feb-10 7-Feb-10
62 P01. GTG CCC01-B CCP01-B-09d Fire Alarm System for Fuel Gas Enclosure 7-Feb-10 7-Feb-10 7-Feb-10
63 P01. GTG CCC01-B CCP01-B-09e Fire Alarm System for Fuel Oil Enclosure 7-Feb-10 7-Feb-10 7-Feb-10
64 P01. GTG CCC01-B CCP01-B-09f Fire Alarm System for GT Bearing Enclosure 7-Feb-10 7-Feb-10 7-Feb-10
65 P01. GTG CCC01-B CCP01-B-09g Fire Alarm System for GT Intermediate Enclosure CCP01-B-09f
66 P01. GTG CCC01-B CCP01-B-09h Fire Fighting System for GTG Skid (Foam) 29-Mar-10 NA 29-Mar-10
67 P01. GTG CCC01-B CCP01-B-09i Fire Fighting System for GTG Building 8-Apr-10 NA 8-Apr-10
68 P01. GTG CCC01-B CCP01-B-09j Fire Fighting System for GT Enclosure (CO2) 22-Nov-09 NA 22-Nov-09
69 P01. GTG CCC01-B CCP01-B-09k Fire Fighting System for Fuel Gas Enclosure (CO2) 22-Nov-09 NA 22-Nov-09
70 P01. GTG CCC01-B CCP01-B-09l Fire Fighting System for Fuel Oil Enclosure (CO2) 22-Nov-09 NA 22-Nov-09
71 P01. GTG CCC01-B CCP01-B-09m Fire Fighting System for GT Bearing Enclosure (CO2) 22-Nov-09 NA 22-Nov-09
72 P01. GTG CCC01-B CCP01-B-09n Fire Fighting System for GT Intermediate Enclosure CCP01-B-09m
73 P01. GTG CCC01-B CCP01-B-10a Generator Circuit Breaker 21-Jan-10 21-Jan-10 24-Jan-10
74 P01. GTG CCC01-B CCP01-B-10b IPB 8-Nov-09 8-Nov-09 10-Feb-10
75 P01. GTG CCC01-B CCP01-B-11 Gas Turbine Control System 25-Mar-10 25-Mar-10 30-Mar-10
76 P01. GTG CCC01-B CCP01-B-12a Gas Turbine & IGV 21-Dec-09 7-Feb-10 11-Feb-10
77 P01. GTG CCC01-B CCP01-B-12b Gas Turbine Generator 25-Jan-10 17-Mar-10 20-Mar-10
78 P01. GTG CCC01-B CCP01-B-12c Compressor Washing Skid 13-Dec-09 17-Mar-10 21-Mar-10
79 P01. GTG CCC01-B CCP01-B-12d Blow-off System & GT Cooling System 27-Sep-09 7-Mar-10 10-Mar-10
80 P01. GTG CCC01-B CCP01-B-12e Ventilation System for GT & Auxiliaries 31-Dec-09 29-Mar-10 4-Apr-10
81 P01. GTG CCC01-B CCP01-B-12f Enclosure for Gas Turbine (with Lighting) 31-Dec-09 24-Feb-10 25-Feb-10
82 P01. GTG CCC01-B CCP01-B-12g GT False Start Drain Piping & Tank 27-Sep-09 18-Aug-10 23-Aug-10

21/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

83 P01. GTG CCC01-B CCP01-B-13a GT Area Vent & Drain Line for Fuel Gas System 20-Dec-09 NA 25-Jan-10
84 P01. GTG CCC01-B CCP01-B-13b GT Area Vent & Drain Line for Fuel Oil & Lube Oil System 22-Dec-09 NA 25-Jan-10
85 P01. GTG CCC01-B CCP01-B-13c GT Area Vent & Drain Line for Water & Air System 21-Jan-10 NA 6-Feb-10
86 P01. GTG CCC01-B CCP01-B-14a Generator Fin Fan Cooler Sys Piping 19-Jan-10 NA 8-Feb-10
87 P01. GTG CCC01-B CCP01-B-14b Nox Water System Makeup Supply Sys Piping CCP01-A-14b
88 P01. GTG CCC01-B CCP01-B-15 Turning Gear System 7-Feb-10 7-Feb-10 11-Feb-10
89 P01. GTG CCC01-C CCP01-C-01 Air Intake System 23-May-10 29-Jul-10 2-Aug-10
90 P01. GTG CCC01-C CCP01-C-02 Lube Oil / Lifting Oil System 25-May-10 1-Aug-10 2-Aug-10
91 P01. GTG CCC01-C CCP01-C-03a Generator Fin Fan Cooler 13-Jun-10 13-Jul-10 21-Jul-10
92 P01. GTG CCC01-C CCP01-C-03b Lube Oil Fin Fan Cooler 23-May-10 22-Jul-10 25-Jul-10
93 P01. GTG CCC01-C CCP01-C-04 Hydraulic Oil Skid 16-Mar-10 20-Jun-10 3-Jul-10
94 P01. GTG CCC01-C CCP01-C-05a Fuel Gas System & Drainage Package 25-May-10 26-Jul-10 31-Jul-10
95 P01. GTG CCC01-C CCP01-C-05b Fuel Oil System 7-Jul-10 22-Jul-10 25-Jul-10
96 P01. GTG CCC01-C CCP01-C-05c Ignition Gas System
97 P01. GTG CCC01-C CCP01-C-05d Nox Water System 22-Jun-10 26-Jul-10 31-Jul-10
98 P01. GTG CCC01-C CCP01-C-06 Purge Water System 16-Mar-10 1-Jul-10 9-Jul-10
99 P01. GTG CCC01-C CCP01-C-07a Pneumatic Skid 16-Mar-10 1-Jul-10 9-Jul-10
100 P01. GTG CCC01-C CCP01-C-07b Seal Air System 25-May-10 12-Jul-10 14-Jul-10
101 P01. GTG CCC01-C CCP01-C-08a Diverter System & Bypass Stack 23-Aug-10
102 P01. GTG CCC01-C CCP01-C-08b Exhaust Gas Diffuser 3-Jun-10 12-Jul-10 14-Jul-10
103 P01. GTG CCC01-C CCP01-C-09a Fire Alarm System for GTG Skid 15-Jun-10 15-Jun-10 16-Jun-10
104 P01. GTG CCC01-C CCP01-C-09b Fire Alarm System for GTG Building
105 P01. GTG CCC01-C CCP01-C-09c Fire Alarm System for GT Enclosure 15-Jun-10 15-Jun-10 16-Jun-10
106 P01. GTG CCC01-C CCP01-C-09d Fire Alarm System for Fuel Gas Enclosure 15-Jun-10 15-Jun-10 16-Jun-10
107 P01. GTG CCC01-C CCP01-C-09e Fire Alarm System for Fuel Oil Enclosure 15-Jun-10 15-Jun-10 16-Jun-10
108 P01. GTG CCC01-C CCP01-C-09f Fire Alarm System for GT Bearing Enclosure 15-Jun-10 15-Jun-10 16-Jun-10
109 P01. GTG CCC01-C CCP01-C-09g Fire Alarm System for GT Intermediate Enclosure
110 P01. GTG CCC01-C CCP01-C-09h Fire Fighting System for GTG Skid (Foam) 15-Aug-10 NA 15-Aug-10
111 P01. GTG CCC01-C CCP01-C-09i Fire Fighting System for GTG Building 4-Aug-10 NA 12-Aug-10
112 P01. GTG CCC01-C CCP01-C-09j Fire Fighting System for GT Enclosure (CO2) 15-Jun-10 NA 15-Jun-10
113 P01. GTG CCC01-C CCP01-C-09k Fire Fighting System for Fuel Gas Enclosure (CO2) 13-Jun-10 NA 13-Jun-10
114 P01. GTG CCC01-C CCP01-C-09l Fire Fighting System for Fuel Oil Enclosure (CO2) 16-Jun-10 NA 17-Jun-10
115 P01. GTG CCC01-C CCP01-C-09m Fire Fighting System for GT Bearing Enclosure (CO2) 13-Jun-10 NA 13-Jun-10
116 P01. GTG CCC01-C CCP01-C-09n Fire Fighting System for GT Intermediate Enclosure
117 P01. GTG CCC01-C CCP01-C-10a Generator Circuit Breaker 9-Jun-10 9-Jun-10 12-Jun-10
118 P01. GTG CCC01-C CCP01-C-10b IPB 30-May-10 30-May-10
119 P01. GTG CCC01-C CCP01-C-11 Gas Turbine Control System 1-Aug-10 1-Aug-10 2-Aug-10
120 P01. GTG CCC01-C CCP01-C-12a Gas Turbine & IGV 25-May-10 12-Jul-10 14-Jul-10
121 P01. GTG CCC01-C CCP01-C-12b Gas Turbine Generator 25-May-10 28-Jul-10 31-Jul-10
122 P01. GTG CCC01-C CCP01-C-12c Compressor Washing Skid 22-Jun-10 11-Jul-10 13-Jul-10
123 P01. GTG CCC01-C CCP01-C-12d Blow-off System & GT Cooling System 4-Apr-10 12-Jul-10 14-Jul-10

22/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

124 P01. GTG CCC01-C CCP01-C-12e Ventilation System for GT & Auxiliaries 26-May-10 29-Jul-10 2-Aug-10
125 P01. GTG CCC01-C CCP01-C-12f Enclosure for Gas Turbine (with Lighting) 26-May-10 19-Jul-10 21-Jul-10
126 P01. GTG CCC01-C CCP01-C-12g GT False Start Drain Piping & Tank 18-May-10 16-Aug-10 23-Aug-10
127 P01. GTG CCC01-C CCP01-C-13a GT Area Vent & Drain Line for Fuel Gas System 7-Jul-10 NA 2-Aug-10
128 P01. GTG CCC01-C CCP01-C-13b GT Area Vent & Drain Line for Fuel Oil & Lube Oil System 22-Jul-10 NA 25-Jul-10
129 P01. GTG CCC01-C CCP01-C-13c GT Area Vent & Drain Line for Water & Air System 18-Jul-10 NA 2-Aug-10
130 P01. GTG CCC01-C CCP01-C-14a Generator Fin Fan Cooler Sys Piping 15-Jun-10 NA 22-Jul-10
131 P01. GTG CCC01-C CCP01-C-14b Makeup Supply Sys Piping for GT 21&22
132 P01. GTG CCC01-C CCP01-C-15 Turning Gear System 12-Jul-10 12-Jul-10 13-Jul-10
133 P01. GTG CCC01-D CCP01-D-01 Air Intake System 4-Jul-10
134 P01. GTG CCC01-D CCP01-D-02 Lube Oil / Lifting Oil System 13-Jul-10
135 P01. GTG CCC01-D CCP01-D-03a Generator Fin Fan Cooler 27-Jun-10
136 P01. GTG CCC01-D CCP01-D-03b Lube Oil Fin Fan Cooler 3-Aug-10
137 P01. GTG CCC01-D CCP01-D-04 Hydraulic Oil Skid 13-Jun-10 22-Aug-10
138 P01. GTG CCC01-D CCP01-D-05a Fuel Gas System & Drainage Package 22-Jun-10
139 P01. GTG CCC01-D CCP01-D-05b Fuel Oil System 8-Jul-10
140 P01. GTG CCC01-D CCP01-D-05c Ignition Gas System
141 P01. GTG CCC01-D CCP01-D-05d Nox Water System 13-Jul-10
142 P01. GTG CCC01-D CCP01-D-06 Purge Water System 13-Jun-10 24-Aug-10
143 P01. GTG CCC01-D CCP01-D-07a Pneumatic Skid 20-Jun-10 23-Aug-10
144 P01. GTG CCC01-D CCP01-D-07b Seal Air System 27-Jun-10 24-Aug-10
145 P01. GTG CCC01-D CCP01-D-08a Diverter System & Bypass Stack
146 P01. GTG CCC01-D CCP01-D-08b Exhaust Gas Diffuser 1-Jul-10 9-Sep-10
147 P01. GTG CCC01-D CCP01-D-09a Fire Alarm System for GTG Skid
148 P01. GTG CCC01-D CCP01-D-09b Fire Alarm System for GTG Building
149 P01. GTG CCC01-D CCP01-D-09c Fire Alarm System for GT Enclosure
150 P01. GTG CCC01-D CCP01-D-09d Fire Alarm System for Fuel Gas Enclosure
151 P01. GTG CCC01-D CCP01-D-09e Fire Alarm System for Fuel Oil Enclosure
152 P01. GTG CCC01-D CCP01-D-09f Fire Alarm System for GT Bearing Enclosure
153 P01. GTG CCC01-D CCP01-D-09g Fire Alarm System for GT Intermediate Enclosure
154 P01. GTG CCC01-D CCP01-D-09h Fire Fighting System for GTG Skid (Foam)
155 P01. GTG CCC01-D CCP01-D-09i Fire Fighting System for GTG Building 4-Aug-10 NA 12-Aug-10
156 P01. GTG CCC01-D CCP01-D-09j Fire Fighting System for GT Enclosure (CO2)
157 P01. GTG CCC01-D CCP01-D-09k Fire Fighting System for Fuel Gas Enclosure (CO2)
158 P01. GTG CCC01-D CCP01-D-09l Fire Fighting System for Fuel Oil Enclosure (CO2)
159 P01. GTG CCC01-D CCP01-D-09m Fire Fighting System for GT Bearing Enclosure (CO2)
160 P01. GTG CCC01-D CCP01-D-09n Fire Fighting System for GT Intermediate Enclosure
161 P01. GTG CCC01-D CCP01-D-10a Generator Circuit Breaker
162 P01. GTG CCC01-D CCP01-D-10b IPB
163 P01. GTG CCC01-D CCP01-D-11 Gas Turbine Control System
164 P01. GTG CCC01-D CCP01-D-12a Gas Turbine & IGV 15-Jun-10 14-Sep-10

23/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

165 P01. GTG CCC01-D CCP01-D-12b Gas Turbine Generator 4-Jul-10


166 P01. GTG CCC01-D CCP01-D-12c Compressor Washing Skid 27-Jun-10 2-Sep-10
167 P01. GTG CCC01-D CCP01-D-12d Blow-off System & GT Cooling System 15-Jun-10 14-Sep-10
168 P01. GTG CCC01-D CCP01-D-12e Ventilation System for GT & Auxiliaries 20-Jun-10
169 P01. GTG CCC01-D CCP01-D-12f Enclosure for Gas Turbine (with Lighting) 27-Jun-10
170 P01. GTG CCC01-D CCP01-D-12g GT False Start Drain Piping & Tank 20-Jun-10
171 P01. GTG CCC01-D CCP01-D-13a GT Area Vent & Drain Line for Fuel Gas System 5-Sep-10 NA
172 P01. GTG CCC01-D CCP01-D-13b GT Area Vent & Drain Line for Fuel Oil & Lube Oil System
173 P01. GTG CCC01-D CCP01-D-13c GT Area Vent & Drain Line for Water & Air System
174 P01. GTG CCC01-D CCP01-D-14a Generator Fin Fan Cooler Sys Piping 25-Aug-10 NA
175 P01. GTG CCC01-D CCP01-D-14b Nox Water System Makeup Supply Sys Piping CCP01-C-14b
176 P01. GTG CCC01-D CCP01-D-15 Turning Gear System 9-Sep-10 9-Sep-10
177 P01. GTG CCC01-E CCP01-E-01 Air Intake System
178 P01. GTG CCC01-E CCP01-E-02 Lube Oil / Lifting Oil System
179 P01. GTG CCC01-E CCP01-E-03a Generator Fin Fan Cooler
180 P01. GTG CCC01-E CCP01-E-03b Lube Oil Fin Fan Cooler 13-Sep-10
181 P01. GTG CCC01-E CCP01-E-04 Hydraulic Oil Skid 5-Sep-10
182 P01. GTG CCC01-E CCP01-E-05a Fuel Gas System & Drainage Package
183 P01. GTG CCC01-E CCP01-E-05b Fuel Oil System
184 P01. GTG CCC01-E CCP01-E-05c Ignition Gas System
185 P01. GTG CCC01-E CCP01-E-05d Nox Water System 6-Sep-10
186 P01. GTG CCC01-E CCP01-E-06 Purge Water System 2-Sep-10
187 P01. GTG CCC01-E CCP01-E-07a Pneumatic Skid 5-Sep-10
188 P01. GTG CCC01-E CCP01-E-07b Seal Air System 14-Sep-10
189 P01. GTG CCC01-E CCP01-E-08a Diverter System & Bypass Stack
190 P01. GTG CCC01-E CCP01-E-08b Exhaust Gas Diffuser
191 P01. GTG CCC01-E CCP01-E-09a Fire Alarm System for GTG Skid
192 P01. GTG CCC01-E CCP01-E-09b Fire Alarm System for GTG Building
193 P01. GTG CCC01-E CCP01-E-09c Fire Alarm System for GT Enclosure
194 P01. GTG CCC01-E CCP01-E-09d Fire Alarm System for Fuel Gas Enclosure
195 P01. GTG CCC01-E CCP01-E-09e Fire Alarm System for Fuel Oil Enclosure
196 P01. GTG CCC01-E CCP01-E-09f Fire Alarm System for GT Bearing Enclosure
197 P01. GTG CCC01-E CCP01-E-09g Fire Alarm System for GT Intermediate Enclosure
198 P01. GTG CCC01-E CCP01-E-09h Fire Fighting System for GTG Skid (Foam)
199 P01. GTG CCC01-E CCP01-E-09i Fire Fighting System for GTG Building
200 P01. GTG CCC01-E CCP01-E-09j Fire Fighting System for GT Enclosure (CO2)
201 P01. GTG CCC01-E CCP01-E-09k Fire Fighting System for Fuel Gas Enclosure (CO2)
202 P01. GTG CCC01-E CCP01-E-09l Fire Fighting System for Fuel Oil Enclosure (CO2)
203 P01. GTG CCC01-E CCP01-E-09m Fire Fighting System for GT Bearing Enclosure (CO2)
204 P01. GTG CCC01-E CCP01-E-09n Fire Fighting System for GT Intermediate Enclosure
205 P01. GTG CCC01-E CCP01-E-10a Generator Circuit Breaker

24/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

206 P01. GTG CCC01-E CCP01-E-10b IPB


207 P01. GTG CCC01-E CCP01-E-11 Gas Turbine Control System
208 P01. GTG CCC01-E CCP01-E-12a Gas Turbine & IGV
209 P01. GTG CCC01-E CCP01-E-12b Gas Turbine Generator
210 P01. GTG CCC01-E CCP01-E-12c Compressor Washing Skid 13-Sep-10
211 P01. GTG CCC01-E CCP01-E-12d Blow-off System & GT Cooling System
212 P01. GTG CCC01-E CCP01-E-12e Ventilation System for GT & Auxiliaries
213 P01. GTG CCC01-E CCP01-E-12f Enclosure for Gas Turbine (with Lighting)
214 P01. GTG CCC01-E CCP01-E-12g GT False Start Drain Piping & Tank 13-Sep-10
215 P01. GTG CCC01-E CCP01-E-13a GT Area Vent & Drain Line for Fuel Gas System
216 P01. GTG CCC01-E CCP01-E-13b GT Area Vent & Drain Line for Fuel Oil & Lube Oil System
217 P01. GTG CCC01-E CCP01-E-13c GT Area Vent & Drain Line for Water & Air System
218 P01. GTG CCC01-E CCP01-E-14a Generator Fin Fan Cooler Sys Piping
219 P01. GTG CCC01-E CCP01-E-14b Makeup Supply Sys Piping for GT 31&32
220 P01. GTG CCC01-E CCP01-E-15 Turning Gear System
221 P01. GTG CCC01-F CCP01-F-01 Air Intake System
222 P01. GTG CCC01-F CCP01-F-02 Lube Oil / Lifting Oil System
223 P01. GTG CCC01-F CCP01-F-03a Generator Fin Fan Cooler
224 P01. GTG CCC01-F CCP01-F-03b Lube Oil Fin Fan Cooler
225 P01. GTG CCC01-F CCP01-F-04 Hydraulic Oil Skid
226 P01. GTG CCC01-F CCP01-F-05a Fuel Gas System & Drainage Package
227 P01. GTG CCC01-F CCP01-F-05b Fuel Oil System
228 P01. GTG CCC01-F CCP01-F-05c Ignition Gas System
229 P01. GTG CCC01-F CCP01-F-05d Nox Water System
230 P01. GTG CCC01-F CCP01-F-06 Purge Water System
231 P01. GTG CCC01-F CCP01-F-07a Pneumatic Skid
232 P01. GTG CCC01-F CCP01-F-07b Seal Air System
233 P01. GTG CCC01-F CCP01-F-08a Diverter System & Bypass Stack
234 P01. GTG CCC01-F CCP01-F-08b Exhaust Gas Diffuser
235 P01. GTG CCC01-F CCP01-F-09a Fire Alarm System for GTG Skid
236 P01. GTG CCC01-F CCP01-F-09b Fire Alarm System for GTG Building
237 P01. GTG CCC01-F CCP01-F-09c Fire Alarm System for GT Enclosure
238 P01. GTG CCC01-F CCP01-F-09d Fire Alarm System for Fuel Gas Enclosure
239 P01. GTG CCC01-F CCP01-F-09e Fire Alarm System for Fuel Oil Enclosure
240 P01. GTG CCC01-F CCP01-F-09f Fire Alarm System for GT Bearing Enclosure
241 P01. GTG CCC01-F CCP01-F-09g Fire Alarm System for GT Intermediate Enclosure
242 P01. GTG CCC01-F CCP01-F-09h Fire Fighting System for GTG Skid (Foam)
243 P01. GTG CCC01-F CCP01-F-09i Fire Fighting System for GTG Building
244 P01. GTG CCC01-F CCP01-F-09j Fire Fighting System for GT Enclosure (CO2)
245 P01. GTG CCC01-F CCP01-F-09k Fire Fighting System for Fuel Gas Enclosure (CO2)
246 P01. GTG CCC01-F CCP01-F-09l Fire Fighting System for Fuel Oil Enclosure (CO2)

25/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

247 P01. GTG CCC01-F CCP01-F-09m Fire Fighting System for GT Bearing Enclosure (CO2)
248 P01. GTG CCC01-F CCP01-F-09n Fire Fighting System for GT Intermediate Enclosure
249 P01. GTG CCC01-F CCP01-F-10a Generator Circuit Breaker
250 P01. GTG CCC01-F CCP01-F-10b IPB
251 P01. GTG CCC01-F CCP01-F-11 Gas Turbine Control System
252 P01. GTG CCC01-F CCP01-F-12a Gas Turbine & IGV
253 P01. GTG CCC01-F CCP01-F-12b Gas Turbine Generator
254 P01. GTG CCC01-F CCP01-F-12c Compressor Washing Skid
255 P01. GTG CCC01-F CCP01-F-12d Blow-off System & GT Cooling System
256 P01. GTG CCC01-F CCP01-F-12e Ventilation System for GT & Auxiliaries
257 P01. GTG CCC01-F CCP01-F-12f Enclosure for Gas Turbine (with Lighting)
258 P01. GTG CCC01-F CCP01-F-12g GT False Start Drain Piping & Tank
259 P01. GTG CCC01-F CCP01-F-13a GT Area Vent & Drain Line for Fuel Gas System
260 P01. GTG CCC01-F CCP01-F-13b GT Area Vent & Drain Line for Fuel Oil & Lube Oil System
261 P01. GTG CCC01-F CCP01-F-13c GT Area Vent & Drain Line for Water & Air System
262 P01. GTG CCC01-F CCP01-F-14a Generator Fin Fan Cooler Sys Piping
263 P01. GTG CCC01-F CCP01-F-14b Nox Water System Makeup Supply Sys Piping CCP01-E-14b
264 P01. GTG CCC01-F CCP01-F-15 Turning Gear System
265 P02. HRSG CCC02-A CCP02-A-01 Duct Burner Sytem 6-May-10
266 P02. HRSG CCC02-A CCP02-A-02a Exhaust Gas System 27-Apr-10 26-Jul-10
267 P02. HRSG CCC02-A CCP02-A-02b Main Stack System 7-Jul-10
268 P02. HRSG CCC02-A CCP02-A-03 High Pressure System 13-May-10 12-Aug-10
269 P02. HRSG CCC02-A CCP02-A-04 Low Pressure System 13-May-10 12-Aug-10
270 P02. HRSG CCC02-A CCP02-A-05 Blowdown System 13-May-10 26-Jul-10
271 P02. HRSG CCC02-A CCP02-A-06 Drain and Vents System 6-May-10 NA
272 P02. HRSG CCC02-A CCP02-A-07 Fuel Gas Supply System 9-Mar-10 NA
273 P02. HRSG CCC02-A CCP02-A-08 HRSG 11 Steel Structure
274 P02. HRSG CCC02-B CCP02-B-01 Duct Burner Sytem 29-Aug-10
275 P02. HRSG CCC02-B CCP02-B-02a Exhaust Gas System
276 P02. HRSG CCC02-B CCP02-B-02b Main Stack System 25-Jul-10
277 P02. HRSG CCC02-B CCP02-B-03 High Pressure System 19-May-10
278 P02. HRSG CCC02-B CCP02-B-04 Low Pressure System 1-Jun-10
279 P02. HRSG CCC02-B CCP02-B-05 Blowdown System 23-May-10
280 P02. HRSG CCC02-B CCP02-B-06 Drain and Vents System 14-Jul-10 NA
281 P02. HRSG CCC02-B CCP02-B-07 Fuel Gas Supply System 8-Apr-10 NA
282 P02. HRSG CCC02-B CCP02-B-08 HRSG 12 Steel Structure
283 P02. HRSG CCC02-C CCP02-C-01 Duct Burner Sytem
284 P02. HRSG CCC02-C CCP02-C-02a Exhaust Gas System
285 P02. HRSG CCC02-C CCP02-C-02b Main Stack System
286 P02. HRSG CCC02-C CCP02-C-03 High Pressure System
287 P02. HRSG CCC02-C CCP02-C-04 Low Pressure System

26/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

288 P02. HRSG CCC02-C CCP02-C-05 Blowdown System


289 P02. HRSG CCC02-C CCP02-C-06 Drain and Vents System
290 P02. HRSG CCC02-C CCP02-C-07 Fuel Gas Supply System
291 P02. HRSG CCC02-C CCP02-C-08 HRSG 21 Steel Structure
292 P02. HRSG CCC02-D CCP02-D-01 Duct Burner Sytem
293 P02. HRSG CCC02-D CCP02-D-02a Exhaust Gas System
294 P02. HRSG CCC02-D CCP02-D-02b Main Stack System
295 P02. HRSG CCC02-D CCP02-D-03 High Pressure System
296 P02. HRSG CCC02-D CCP02-D-04 Low Pressure System
297 P02. HRSG CCC02-D CCP02-D-05 Blowdown System
298 P02. HRSG CCC02-D CCP02-D-06 Drain and Vents System
299 P02. HRSG CCC02-D CCP02-D-07 Fuel Gas Supply System
300 P02. HRSG CCC02-D CCP02-D-08 HRSG 22 Steel Structure
301 P02. HRSG CCC02-E CCP02-E-01 Duct Burner Sytem
302 P02. HRSG CCC02-E CCP02-E-02a Exhaust Gas System
303 P02. HRSG CCC02-E CCP02-E-02b Main Stack System
304 P02. HRSG CCC02-E CCP02-E-03 High Pressure System
305 P02. HRSG CCC02-E CCP02-E-04 Low Pressure System
306 P02. HRSG CCC02-E CCP02-E-05 Blowdown System
307 P02. HRSG CCC02-E CCP02-E-06 Drain and Vents System
308 P02. HRSG CCC02-E CCP02-E-07 Fuel Gas Supply System
309 P02. HRSG CCC02-E CCP02-E-08 HRSG 31 Steel Structure
310 P02. HRSG CCC02-F CCP02-F-01 Duct Burner Sytem
311 P02. HRSG CCC02-F CCP02-F-02a Exhaust Gas System
312 P02. HRSG CCC02-F CCP02-F-02b Main Stack System
313 P02. HRSG CCC02-F CCP02-F-03 High Pressure System
314 P02. HRSG CCC02-F CCP02-F-04 Low Pressure System
315 P02. HRSG CCC02-F CCP02-F-05 Blowdown System
316 P02. HRSG CCC02-F CCP02-F-06 Drain and Vents System
317 P02. HRSG CCC02-F CCP02-F-07 Fuel Gas Supply System
318 P02. HRSG CCC02-F CCP02-F-08 HRSG 32 Steel Structure
319 P04. STG CCC04-A CCP04-A-01 Steam Turbine & Generator #10
320 P04. STG CCC04-A CCP04-A-02 Gland Steam & Exhaust System
321 P04. STG CCC04-A CCP04-A-03 ST-Instrument & Drain System
322 P04. STG CCC04-A CCP04-A-04 ST & Piston Piping Drain System
323 P04. STG CCC04-A CCP04-A-05 Turbine Extr. IP Drain System
324 P04. STG CCC04-A CCP04-A-06 Turbine Extr. LP Drain System
325 P04. STG CCC04-A CCP04-A-07 Lube Oil Supply System
326 P04. STG CCC04-A CCP04-A-08 Hydraulic Supply & Protection System
327 P04. STG CCC04-A CCP04-A-09 Control & Protection System
328 P04. STG CCC04-A CCP04-A-10 Lube Oil Purification Unit

27/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

329 P04. STG CCC04-A CCP04-A-11 Clean & Dirty Oil System
330 P04. STG CCC04-B CCP04-B-01 Steam Turbine & Generator #20
331 P04. STG CCC04-B CCP04-B-02 Gland Steam & Exhaust System
332 P04. STG CCC04-B CCP04-B-03 ST-Instrument & Drain System
333 P04. STG CCC04-B CCP04-B-04 ST & Piston Piping Drain System
334 P04. STG CCC04-B CCP04-B-05 Turbine Extr. IP Drain System
335 P04. STG CCC04-B CCP04-B-06 Turbine Extr. LP Drain System
336 P04. STG CCC04-B CCP04-B-07 Lube Oil Supply System
337 P04. STG CCC04-B CCP04-B-08 Hydraulic Supply & Protection System
338 P04. STG CCC04-B CCP04-B-09 Control & Protection System
339 P04. STG CCC04-B CCP04-B-10 Lube Oil Purification Unit
340 P04. STG CCC04-B CCP04-B-11 Clean & Dirty Oil System
341 P04. STG CCC04-C CCP04-C-01 Steam Turbine & Generator #30
342 P04. STG CCC04-C CCP04-C-02 Gland Steam & Exhaust System
343 P04. STG CCC04-C CCP04-C-03 ST-Instrument & Drain System
344 P04. STG CCC04-C CCP04-C-04 ST & Piston Piping Drain System
345 P04. STG CCC04-C CCP04-C-05 Turbine Extr. IP Drain System
346 P04. STG CCC04-C CCP04-C-06 Turbine Extr. LP Drain System
347 P04. STG CCC04-C CCP04-C-07 Lube Oil Supply System
348 P04. STG CCC04-C CCP04-C-08 Hydraulic Supply & Protection System
349 P04. STG CCC04-C CCP04-C-09 Control & Protection System
350 P04. STG CCC04-C CCP04-C-10 Lube Oil Purification Unit
351 P04. STG CCC04-C CCP04-C-11 Clean & Dirty Oil System
352 P05. STM/FW CCC05-A CCP05-A-01 #10 Main Steam Supply Line
353 P05. STM/FW CCC05-A CCP05-A-02 #10 HRSG LP Steam Supply Line
354 P05. STM/FW CCC05-A CCP05-A-03 #10 Steam Turbine Steam Supply
355 P05. STM/FW CCC05-A CCP05-A-04 #10 Steam Turbine IP Extraction
356 P05. STM/FW CCC05-A CCP05-A-05a #10 Steam Bypass - HP/LP Pressure Reducing and Desuperheating
357 P05. STM/FW CCC05-A CCP05-A-05b #10 Steam Bypass - HP/IP Pressure Reducing and Desuperheating
358 P05. STM/FW CCC05-A CCP05-A-05c #10 Hydraulic Supply Unit
359 P05. STM/FW CCC05-A CCP05-A-06 #10 Steam Bypass - Startup Bypass
360 P05. STM/FW CCC05-A CCP05-A-07 #10 Steam Bypass - Steam Turbine Bypass
361 P05. STM/FW CCC05-A CCP05-A-08 #10 Condenser & CEP
362 P05. STM/FW CCC05-A CCP05-A-08a #10 Condenser & CEP Line
363 P05. STM/FW CCC05-A CCP05-A-09 #10 Air Extraction System for Piping
364 P05. STM/FW CCC05-A CCP05-A-09a #10 Steam Jet Air Ejector
364 P05. STM/FW CCC05-A CCP05-A-10 #10 Valve Sealing Water System
365 P05. STM/FW CCC05-A CCP05-A-11 HRSG Feedwater System #11
366 P05. STM/FW CCC05-A CCP05-A-12 HRSG Feedwater System #12
367 P05. STM/FW CCC05-A CCP05-A-13 #10 Condenser Vacuum Pump
368 P05. STM/FW CCC05-A CCP05-A-14 #10 Condenser Waterbox Vacuum Pump

28/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

369 P05. STM/FW CCC05-A CCP05-A-15 #10 Clean Drain Collecting System
370 P05. STM/FW CCC05-A CCP05-A-15a #10 Clean Drain Collecting Line
371 P05. STM/FW CCC05-A CCP05-A-16 #10 Condenser Tube Cleaning System
372 P05. STM/FW CCC05-B CCP05-B-01 #20 Main Steam Supply Line
373 P05. STM/FW CCC05-B CCP05-B-02 #20 HRSG LP Steam Supply Line
374 P05. STM/FW CCC05-B CCP05-B-03 #20 Steam Turbine Steam Supply
375 P05. STM/FW CCC05-B CCP05-B-04 #20 Steam Turbine IP Extraction
376 P05. STM/FW CCC05-B CCP05-B-05a #20 Steam Bypass - HP/LP Pressure Reducing and Desuperheating
377 P05. STM/FW CCC05-B CCP05-B-05b #20 Steam Bypass - HP/IP Pressure Reducing and Desuperheating
378 P05. STM/FW CCC05-B CCP05-B-05c #20 Hydraulic Supply Unit
379 P05. STM/FW CCC05-B CCP05-B-06 #20 Steam Bypass - Startup Bypass
380 P05. STM/FW CCC05-B CCP05-B-07 #20 Steam Bypass - Steam Turbine Bypass
381 P05. STM/FW CCC05-B CCP05-B-08 #20 Condenser & CEP
382 P05. STM/FW CCC05-B CCP05-B-08a #20 Condenser & CEP Line
383 P05. STM/FW CCC05-B CCP05-B-09 #20 Air Extraction System for Piping
384 P05. STM/FW CCC05-B CCP05-B-09a #20 Steam Jet Air Ejector
385 P05. STM/FW CCC05-B CCP05-B-10 #20 Valve Sealing Water System
386 P05. STM/FW CCC05-B CCP05-B-11 HRSG Feedwater System #21
387 P05. STM/FW CCC05-B CCP05-B-12 HRSG Feedwater System #22
388 P05. STM/FW CCC05-B CCP05-B-13 #20 Condenser Vacuum Pump
389 P05. STM/FW CCC05-B CCP05-B-14 #20 Condenser Waterbox Vacuum Pump
390 P05. STM/FW CCC05-B CCP05-B-15 #20 Clean Drain Collecting System
391 P05. STM/FW CCC05-B CCP05-B-15a #20 Clean Drain Collecting Line
392 P05. STM/FW CCC05-B CCP05-B-16 #20 Condenser Tube Cleaning System
393 P05. STM/FW CCC05-C CCP05-C-01 #30 Main Steam Supply Line
394 P05. STM/FW CCC05-C CCP05-C-02 #30 HRSG LP Steam Supply Line
395 P05. STM/FW CCC05-C CCP05-C-03 #30 Steam Turbine Steam Supply
396 P05. STM/FW CCC05-C CCP05-C-04 #30 Steam Turbine IP Extraction
397 P05. STM/FW CCC05-C CCP05-C-05a #30 Steam Bypass - HP/LP Pressure Reducing and Desuperheating
398 P05. STM/FW CCC05-C CCP05-C-05b #30 Steam Bypass - HP/IP Pressure Reducing and Desuperheating
399 P05. STM/FW CCC05-C CCP05-C-05c #30 Hydraulic Supply Unit
400 P05. STM/FW CCC05-C CCP05-C-06 #30 Steam Bypass - Startup Bypass
401 P05. STM/FW CCC05-C CCP05-C-07 #30 Steam Bypass - Steam Turbine Bypass
402 P05. STM/FW CCC05-C CCP05-C-08 #30 Condenser & CEP
403 P05. STM/FW CCC05-C CCP05-C-08a #30 Condenser & CEP Line
404 P05. STM/FW CCC05-C CCP05-C-09 #30 Air Extraction System for Piping
405 P05. STM/FW CCC05-C CCP05-C-09a #30 Steam Jet Air Ejector
406 P05. STM/FW CCC05-C CCP05-C-10 #30 Valve Sealing Water System
407 P05. STM/FW CCC05-C CCP05-C-11 HRSG Feedwater System #31
408 P05. STM/FW CCC05-C CCP05-C-12 HRSG Feedwater System #32
409 P05. STM/FW CCC05-C CCP05-C-13 #30 Condenser Vacuum Pump

29/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

410 P05. STM/FW CCC05-C CCP05-C-14 #30 Condenser Waterbox Vacuum Pump
411 P05. STM/FW CCC05-C CCP05-C-15 #30 Clean Drain Collecting System
412 P05. STM/FW CCC05-C CCP05-C-15a #30 Clean Drain Collecting Line
413 P05. STM/FW CCC05-C CCP05-C-16 #30 Condenser Tube Cleaning System
414 P06.1 DFO Sys CCC06.1-A CCP06.1-A-01a M-Station DFO Tank #1
415 P06.1 DFO Sys CCC06.1-A CCP06.1-A-01b M-Station DFO Tank #1 Common Sys Piping
416 P06.1 DFO Sys CCC06.1-A CCP06.1-A-02a M-Station DFO Tank #2
417 P06.1 DFO Sys CCC06.1-A CCP06.1-A-02b M-Station DFO Tank #2 Common Sys Piping
418 P06.1 DFO Sys CCC06.1-A CCP06.1-A-03a M-Station DFO Tank #3
419 P06.1 DFO Sys CCC06.1-A CCP06.1-A-03b M-Station DFO Tank #3 Common Sys Piping
420 P06.1 DFO Sys CCC06.1-A CCP06.1-A-04a M-Station DFO Tank #4
421 P06.1 DFO Sys CCC06.1-A CCP06.1-A-04b M-Station DFO Tank #4 Common Sys Piping
422 P06.1 DFO Sys CCC06.1-A CCP06.1-A-05a M-Station DFO Tank #5
423 P06.1 DFO Sys CCC06.1-A CCP06.1-A-05b M-Station DFO Tank #5 Common Sys Piping
424 P06.1 DFO Sys CCC06.1-A CCP06.1-A-06a M-Station DFO Tank #6
425 P06.1 DFO Sys CCC06.1-A CCP06.1-A-06b M-Station DFO Tank #6 Common Sys Piping
426 P06.1 DFO Sys CCC06.1-A CCP06.1-A-07a JAPS DFO Tank #1
427 P06.1 DFO Sys CCC06.1-A CCP06.1-A-07b JAPS DFO Tank #1 Common Sys Piping
428 P06.1 DFO Sys CCC06.1-A CCP06.1-A-08a JAPS DFO Tank #2
429 P06.1 DFO Sys CCC06.1-A CCP06.1-A-08b JAPS DFO Tank #2 Common Sys Piping
430 P06.1 DFO Sys CCC06.1-A CCP06.1-A-09a JAPS DFO Tank #3
431 P06.1 DFO Sys CCC06.1-A CCP06.1-A-09b JAPS DFO Tank #3 Common Sys Piping
432 P06.1 DFO Sys CCC06.1-A CCP06.1-A-10a JAPS DFO Tank #4
433 P06.1 DFO Sys CCC06.1-A CCP06.1-A-10b JAPS DFO Tank #4 Common Sys Piping
434 P06.1 DFO Sys CCC06.1-A CCP06.1-A-11a JAPS DFO Tank #5
435 P06.1 DFO Sys CCC06.1-A CCP06.1-A-11b JAPS DFO Tank #5 Common Sys Piping
436 P06.1 DFO Sys CCC06.1-A CCP06.1-A-12a JAPS DFO Tank #6
437 P06.1 DFO Sys CCC06.1-A CCP06.1-A-12b JAPS DFO Tank #6 Common Sys Piping
438 P06.1 DFO Sys CCC06.1-A CCP06.1-A-13a JAPS DFO Tank #7
439 P06.1 DFO Sys CCC06.1-A CCP06.1-A-13b JAPS DFO Tank #7 Common Sys Piping
440 P06.1 DFO Sys CCC06.1-A CCP06.1-A-14a JAPS DFO Tank #8
441 P06.1 DFO Sys CCC06.1-A CCP06.1-A-14b JAPS DFO Tank #8 Common Sys Piping
442 P06.1 DFO Sys CCC06.1-A CCP06.1-A-15a JAPS DFO Tank #9
443 P06.1 DFO Sys CCC06.1-A CCP06.1-A-15b JAPS DFO Tank #9 Common Sys Piping
444 P06.1 DFO Sys CCC06.1-A CCP06.1-A-16a JAPS DFO Tank #10
445 P06.1 DFO Sys CCC06.1-A CCP06.1-A-16b JAPS DFO Tank #10 Common Sys Piping
446 P06.1 DFO Sys CCC06.1-A CCP06.1-A-17a DFO Forwarding Pump Skid for Aux Boiler #1,2
447 P06.1 DFO Sys CCC06.1-A CCP06.1-A-17b DFO Forwarding Pump Skid for Aux Boiler #1,2 Piping
448 P06.1 DFO Sys CCC06.1-A CCP06.1-A-18a DFO Day Tank Fill-up Line with Pump for EDG
449 P06.1 DFO Sys CCC06.1-A CCP06.1-A-18b DFO Day Tank Fill-up Line with Pump for BSDG
450 P06.1 DFO Sys CCC06.1-A CCP06.1-A-18c DFO Bulk Transfer Line with Pump

30/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

451 P06.1 DFO Sys CCC06.1-A CCP06.1-A-19a DFO Forwarding Skid for GTG #11
452 P06.1 DFO Sys CCC06.1-A CCP06.1-A-19b DFO Forwarding Skid for GTG #12
453 P06.1 DFO Sys CCC06.1-A CCP06.1-A-19c DFO Forwarding Skid for GTG #21
454 P06.1 DFO Sys CCC06.1-A CCP06.1-A-19d DFO Forwarding Skid for GTG #22
455 P06.1 DFO Sys CCC06.1-A CCP06.1-A-19e DFO Forwarding Skid for GTG #31
456 P06.1 DFO Sys CCC06.1-A CCP06.1-A-19f DFO Forwarding Skid for GTG #32
457 P06.1 DFO Sys CCC06.1-A CCP06.1-A-19g DFO Forwarding Transfer Pump
458 P06.1 DFO Sys CCC06.1-A CCP06.1-A-20a DFO Filter Coalescer for GTG #11
459 P06.1 DFO Sys CCC06.1-A CCP06.1-A-20b DFO Filter Coalescer for GTG #12
460 P06.1 DFO Sys CCC06.1-A CCP06.1-A-20c DFO Filter Coalescer for GTG #21
461 P06.1 DFO Sys CCC06.1-A CCP06.1-A-20d DFO Filter Coalescer for GTG #22
462 P06.1 DFO Sys CCC06.1-A CCP06.1-A-20e DFO Filter Coalescer for GTG #31
463 P06.1 DFO Sys CCC06.1-A CCP06.1-A-20f DFO Filter Coalescer for GTG #32
464 P06.1 DFO Sys CCC06.1-A CCP06.1-A-20g DFO Filter Coalescer for Aux Boiler #1
465 P06.1 DFO Sys CCC06.1-A CCP06.1-A-20h DFO Filter Coalescer for Aux Boiler #2
466 P06.1 DFO Sys CCC06.1-A CCP06.1-A-21 Fuel Oil Unloading Pump
467 P06.1 DFO Sys CCC06.1-A CCP06.1-A-22a Slop Oil Pump Skid for M-Station
468 P06.1 DFO Sys CCC06.1-A CCP06.1-A-22b Slop Oil Pump Skid for JAPS Common
469 P06.1 DFO Sys CCC06.1-A CCP06.1-A-22c Slop Oil Pump Skid for Unloading Bay
470 P06.1 DFO Sys CCC06.1-A CCP06.1-A-23 DFO Recirculation Tank 1,2 24-Feb-10
471 P06.1 DFO Sys CCC06.1-A CCP06.1-A-24 Fuel Oil Tie-in BR-125 Piping
472 P06.1 DFO Sys CCC06.1-A CCP06.1-A-25 Fuel Oil Tie-in BR-120 Piping
473 P06.1 DFO Sys CCC06.1-A CCP06.1-A-26 Fuel Oil Tie-in BR-115 Piping
474 P06.2 FG Sys CCC06.2-A CCP06.2-A-01a Fuel Gas Compressor 1&2 7-Oct-09 26-Oct-09 19-Nov-09
475 P06.2 FG Sys CCC06.2-A CCP06.2-A-01b Fuel Gas Compressor 3&4 7-Oct-09 5-Mar-10 20-Mar-10
476 P06.2 FG Sys CCC06.2-A CCP06.2-A-02a N2 Generation System for Block 1 11-Nov-09 7-Nov-09 15-Nov-09
477 P06.2 FG Sys CCC06.2-A CCP06.2-A-02b N2 Gas Rack for GPRS Block 1 4-Aug-09 NA 27-Sep-09
478 P06.2 FG Sys CCC06.2-A CCP06.2-A-02c N2 Gas Piping for GPRS Block 1 17-Sep-09 NA 20-Sep-09
479 P06.2 FG Sys CCC06.2-A CCP06.2-A-02d N2 Gas Rack for GTG Block 1
480 P06.2 FG Sys CCC06.2-A CCP06.2-A-02e N2 Gas Piping for GTG Block 1 23-Nov-09 NA 26-Nov-09
481 P06.2 FG Sys CCC06.2-A CCP06.2-A-03 HP Gas Buffer System 13-Oct-09 7-Nov-09 10-Nov-09
482 P06.2 FG Sys CCC06.2-A CCP06.2-A-04a ESDV/Main Filter/Scrubber/Fiscal Metering Skid GT11&12 13-Jul-09 29-Jul-09 8-Aug-09
483 P06.2 FG Sys CCC06.2-A CCP06.2-A-05a Fuel Gas Heater Skid for GT11&12 4-Aug-09 31-Aug-09 1-Sep-09
484 P06.2 FG Sys CCC06.2-A CCP06.2-A-05b GT/HRSG GPRS Skid for GT11&12 24-Jun-09 2-Aug-09 31-Aug-09
485 P06.2 FG Sys CCC06.2-A CCP06.2-A-05c Fuel Gas Changeover GPRS Skid 28-Jul-09 29-Jul-09 8-Aug-09
486 P06.2 FG Sys CCC06.2-A CCP06.2-A-05d Final Metering/Final Chance Filter Skid for GT11 16-Sep-09 22-Oct-09 28-Oct-09
487 P06.2 FG Sys CCC06.2-A CCP06.2-A-05e Final Metering/Final Chance Filter Skid for GT12 12-Jan-10 24-Mar-10 1-Apr-10
488 P06.2 FG Sys CCC06.2-A CCP06.2-A-06 Fuel Gas Receiving Header & Tie-in BR-8 Piping 27-Aug-09 NA 27-Sep-09
489 P06.2 FG Sys CCC06.2-A CCP06.2-A-07 Fuel Gas Booster Compressor 24-Jun-09 13-Aug-09 31-Aug-09
490 P06.2 FG Sys CCC06.2-A CCP06.2-A-08 Condensate Tank & Pumps 24-Jun-09 2-Aug-09 31-Aug-09
491 P06.2 FG Sys CCC06.2-A CCP06.2-A-09 Ground Flare Cum Incenerator System 1-Oct-09 7-Sep-09 2-Oct-09

31/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

492 P06.2 FG Sys CCC06.2-A CCP06.2-A-10 Gas Chromatograph System 13-Oct-09 13-Oct-09 14-Oct-09
493 P06.2 FG Sys CCC06.2-A CCP06.2-A-11a Interconnecting Piping - Fiscal metering to Fuel Gas Heater 1-Oct-09 NA 14-Oct-09
494 P06.2 FG Sys CCC06.2-A CCP06.2-A-11b Interconnecting Piping - Fuel Gas Heater to GPRS 23-Sep-09 5-Oct-09 18-Nov-09
495 P06.2 FG Sys CCC06.2-A CCP06.2-A-11c Interconnecting Piping - HP Gas Buffer Crossover Pipe 1-Oct-09 NA 8-Nov-09
496 P06.2 FG Sys CCC06.2-A CCP06.2-A-11d Interconnecting Piping - Gas Vent Header 5-Nov-09 NA 6-Nov-09
497 P06.2 FG Sys CCC06.2-A CCP06.2-A-12 Fuel Gas System Piping #11 21-Oct-09 NA 25-Oct-09
498 P06.2 FG Sys CCC06.2-A CCP06.2-A-13 Fuel Gas System Piping #12 4-Mar-10 NA 15-Apr-10
499 P06.2 FG Sys CCC06.2-A CCP06.2-A-14a Final Metering/Final Chance Filter Skid Piping GT11 2-Sep-09 NA 19-Nov-09
500 P06.2 FG Sys CCC06.2-A CCP06.2-A-14b Final Metering/Final Chance Filter Skid Piping GT12 20-Dec-09 NA 31-Mar-10
501 P06.2 FG Sys CCC06.2-A CCP06.2-A-15a Fuel Gas Tie-in BR-6 Piping
502 P06.2 FG Sys CCC06.2-A CCP06.2-A-15b Fuel Gas Tie-in BR-7 Piping 2-Jun-10 NA
503 P06.2 FG Sys CCC06.2-B CCP06.2-B-01a Fuel Gas Compressor 1&2
504 P06.2 FG Sys CCC06.2-B CCP06.2-B-01b Fuel Gas Compressor 3&4
505 P06.2 FG Sys CCC06.2-B CCP06.2-B-02a N2 Generation System for Block 2
506 P06.2 FG Sys CCC06.2-B CCP06.2-B-02b N2 Gas Rack for GPRS Block 2 4-May-10 NA
507 P06.2 FG Sys CCC06.2-B CCP06.2-B-02c N2 Gas Piping for GPRS Block 2
508 P06.2 FG Sys CCC06.2-B CCP06.2-B-02d N2 Gas Rack for GTG Block 2
509 P06.2 FG Sys CCC06.2-B CCP06.2-B-02e N2 Gas Piping for GTG Block 2
510 P06.2 FG Sys CCC06.2-B CCP06.2-B-03 HP Gas Buffer System
511 P06.2 FG Sys CCC06.2-B CCP06.2-B-04 ESDV/Main Filter/Scrubber/Fiscal Metering Skid GT21&22 9-May-10 24-Aug-10
512 P06.2 FG Sys CCC06.2-B CCP06.2-B-05a Fuel Gas Heater Skid for GT21&22 13-Jun-10 14-Sep-10
513 P06.2 FG Sys CCC06.2-B CCP06.2-B-05b GT/HRSG GPRS Skid for GT21&22 29-Apr-10 16-Aug-10
514 P06.2 FG Sys CCC06.2-B CCP06.2-B-05c Fuel Gas Changeover GPRS Skid 29-Apr-10 10-Aug-10
515 P06.2 FG Sys CCC06.2-B CCP06.2-B-05d Final Metering/Final Chance Filter Skid for GT21 28-Jul-10
516 P06.2 FG Sys CCC06.2-B CCP06.2-B-05e Final Metering/Final Chance Filter Skid for GT22 31-Aug-10
517 P06.2 FG Sys CCC06.2-B CCP06.2-B-06a Interconnecting Piping - Fiscal metering to Fuel Gas Heater 7-Sep-10
518 P06.2 FG Sys CCC06.2-B CCP06.2-B-06b Interconnecting Piping - Fuel Gas Heater to GPRS
519 P06.2 FG Sys CCC06.2-B CCP06.2-B-06c Interconnecting Piping - HP Gas Buffer Crossover Pipe
520 P06.2 FG Sys CCC06.2-B CCP06.2-B-06d Interconnecting Piping - Gas Vent Header
521 P06.2 FG Sys CCC06.2-B CCP06.2-B-07 Fuel Gas System Piping #21
522 P06.2 FG Sys CCC06.2-B CCP06.2-B-08 Fuel Gas System Piping #22
523 P06.2 FG Sys CCC06.2-B CCP06.2-B-09a Final Metering/Final Chance Filter Skid Piping GT21 5-Sep-10
524 P06.2 FG Sys CCC06.2-B CCP06.2-B-09b Final Metering/Final Chance Filter Skid Piping GT22
525 P06.2 FG Sys CCC06.2-C CCP06.2-C-01a Fuel Gas Compressor 1&2
526 P06.2 FG Sys CCC06.2-C CCP06.2-C-01b Fuel Gas Compressor 3&4
527 P06.2 FG Sys CCC06.2-C CCP06.2-C-02a N2 Generation System for Block 3
528 P06.2 FG Sys CCC06.2-C CCP06.2-C-02b N2 Gas Rack for GPRS Block 3
529 P06.2 FG Sys CCC06.2-C CCP06.2-C-02c N2 Gas Piping for GPRS Block 3
530 P06.2 FG Sys CCC06.2-C CCP06.2-C-02d N2 Gas Rack for GTG Block 3
531 P06.2 FG Sys CCC06.2-C CCP06.2-C-02e N2 Gas Piping for GTG Block 3
532 P06.2 FG Sys CCC06.2-C CCP06.2-C-03 HP Gas Buffer System

32/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

533 P06.2 FG Sys CCC06.2-C CCP06.2-C-04 ESDV/Main Filter/Scrubber/Fiscal Metering Skid GT31&32
534 P06.2 FG Sys CCC06.2-C CCP06.2-C-05a Fuel Gas Heater Skid for GT31&32 16-Aug-10
535 P06.2 FG Sys CCC06.2-C CCP06.2-C-05b GT/HRSG GPRS Skid for GT31&32
536 P06.2 FG Sys CCC06.2-C CCP06.2-C-05c Fuel Gas Changeover GPRS Skid 16-Aug-10
537 P06.2 FG Sys CCC06.2-C CCP06.2-C-05d Final Metering/Final Chance Filter Skid for GT31
538 P06.2 FG Sys CCC06.2-C CCP06.2-C-05e Final Metering/Final Chance Filter Skid for GT32
539 P06.2 FG Sys CCC06.2-C CCP06.2-C-06a Interconnecting Piping - Fiscal metering to Fuel Gas Heater
540 P06.2 FG Sys CCC06.2-C CCP06.2-C-06b Interconnecting Piping - Fuel Gas Heater to GPRS
541 P06.2 FG Sys CCC06.2-C CCP06.2-C-06c Interconnecting Piping - HP Gas Buffer Crossover Pipe
542 P06.2 FG Sys CCC06.2-C CCP06.2-C-06d Interconnecting Piping - Gas Vent Header
543 P06.2 FG Sys CCC06.2-C CCP06.2-C-07 Fuel Gas System Piping #31
544 P06.2 FG Sys CCC06.2-C CCP06.2-C-08 Fuel Gas System Piping #32
545 P06.2 FG Sys CCC06.2-C CCP06.2-C-09a Final Metering/Final Chance Filter Skid Piping GT31
546 P06.2 FG Sys CCC06.2-C CCP06.2-C-09b Final Metering/Final Chance Filter Skid Piping GT32
547 P06.3. CCWS CCC06.3-A CCP06.3-A-01a CCW Cooler with Pump Block10
548 P06.3. CCWS CCC06.3-A CCP06.3-A-01b HRSG CCW Piping System Block10
549 P06.3. CCWS CCC06.3-A CCP06.3-A-01c STG CCW Piping System Block10
550 P06.3. CCWS CCC06.3-A CCP06.3-A-01d CCW Common Piping Block10
551 P06.3. CCWS CCC06.3-A CCP06.3-A-02a CCW Cooler with Pump Block20
552 P06.3. CCWS CCC06.3-A CCP06.3-A-02b HRSG CCW Piping System Block20
553 P06.3. CCWS CCC06.3-A CCP06.3-A-02c STG CCW Piping System Block20
554 P06.3. CCWS CCC06.3-A CCP06.3-A-02d CCW Common Piping Block20
555 P06.3. CCWS CCC06.3-A CCP06.3-A-03a CCW Cooler with Pump Block30
556 P06.3. CCWS CCC06.3-A CCP06.3-A-03b HRSG CCW Piping System Block30
557 P06.3. CCWS CCC06.3-A CCP06.3-A-03c STG CCW Piping System Block30
558 P06.3. CCWS CCC06.3-A CCP06.3-A-03d CCW Common Piping Block30
559 P06.3. CCWS CCC06.3-A CCP06.3-A-04a Auxiliary Cooling Water Block10
560 P06.3. CCWS CCC06.3-A CCP06.3-A-04b Auxiliary Cooling Water Block20
561 P06.3. CCWS CCC06.3-A CCP06.3-A-04c Auxiliary Cooling Water Block30
562 P06.3. CWS CCC06.3-A CCP06.3-A-05 Condenser & Cooling Water Line Block10
563 P06.3. CWS CCC06.3-A CCP06.3-A-06 Condenser & Cooling Water Line Block20
564 P06.3. CWS CCC06.3-A CCP06.3-A-07 Condenser & Cooling Water Line Block30
565 P06.4. Air Sys CCC06.4-A CCP06.4-A-01 Instrument Air System 13-May-10 8-Jun-10 16-Jun-10
566 P06.4. Air Sys CCC06.4-A CCP06.4-A-02 Service Air System 16-May-10 8-Jun-10 16-Jun-10
567 P06.4. Air Sys CCC06.4-A CCP06.4-A-03 Instrument / Service Air System for Air Compressor Building (E&I) Cancel
568 P06.4. Air Sys CCC06.4-A CCP06.4-A-04 Instrument Air Receiver System Cancel
569 P06.4. Air Sys CCC06.4-A CCP06.4-A-05 Service Air Receiver System Cancel
570 P06.4. Air Sys CCC06.4-A CCP06.4-A-06a Instrument Air Distribution System Block 1 GT & GPRS 30-May-10 8-Jun-10 16-Jun-10
571 P06.4. Air Sys CCC06.4-A CCP06.4-A-06b Instrument Air Distribution System Block 1 STG&CCW Area
572 P06.4. Air Sys CCC06.4-A CCP06.4-A-06c1 Instrument Air Distribution System Block 1 11 Bypass Stack CEMS 20-Dec-09 NA 29-Dec-09
573 P06.4. Air Sys CCC06.4-A CCP06.4-A-06c2 Instrument Air Distribution System Block 1 12 Bypass Stack CEMS 13-May-10 NA 16-Jun-10

33/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

574 P06.4. Air Sys CCC06.4-A CCP06.4-A-06d1 Instrument Air Distribution System Block 1 11 Main Stack CEMS 9-Feb-10 NA 16-Jun-10
575 P06.4. Air Sys CCC06.4-A CCP06.4-A-06d2 Instrument Air Distribution System Block 1 12 Main Stack CEMS 4-May-10 NA 16-Jun-10
576 P06.4. Air Sys CCC06.4-A CCP06.4-A-06e Instrument Air Distribution System Block 1 HRSG Area
577 P06.4. Air Sys CCC06.4-A CCP06.4-A-06f Instrument Air Distribution System for Air Compressor Building 27-May-10 NA 16-Jun-10
578 P06.4. Air Sys CCC06.4-A CCP06.4-A-07 Instrument Air Distribution System Block 2
579 P06.4. Air Sys CCC06.4-A CCP06.4-A-08 Instrument Air Distribution System Block 3
580 P06.4. Air Sys CCC06.4-A CCP06.4-A-09a Service Air Distribution System Block 1 29-Jul-10 8-Jun-10
581 P06.4. Air Sys CCC06.4-A CCP06.4-A-09b Service Air Distribution System Block 1 CCW Area
582 P06.4. Air Sys CCC06.4-A CCP06.4-A-09c Service Air Distribution System Fire Fighting House
583 P06.4. Air Sys CCC06.4-A CCP06.4-A-09d Service Air Distribution System Carpenter Workshop
584 P06.4. Air Sys CCC06.4-A CCP06.4-A-09e Service Air Distribution System Mechanical & Electric Storage
585 P06.4. Air Sys CCC06.4-A CCP06.4-A-09f Service Air Distribution System HVAC Building
586 P06.4. Air Sys CCC06.4-A CCP06.4-A-09g Service Air Distribution System Demiwater Plant Area
587 P06.4. Air Sys CCC06.4-A CCP06.4-A-09h Service Air Distribution System for STG #10
588 P06.4. Air Sys CCC06.4-A CCP06.4-A-10 Service Air Distribution System Block 2
589 P06.4. Air Sys CCC06.4-A CCP06.4-A-11 Service Air Distribution System Block 3
590 P06.5. Fire Fight CCC06.5-A CCP06.5-A-01 Gate House
591 P06.5. Fire Fight CCC06.5-A CCP06.5-A-02 Main Gate - JAP
592 P06.5. Fire Fight CCC06.5-A CCP06.5-A-03 Covered Parking Places
593 P06.5. Fire Fight CCC06.5-A CCP06.5-A-04 Central Electrical & Mechanical Workshop
594 P06.5. Fire Fight CCC06.5-A CCP06.5-A-05 Mechanical & Electrical Storage
595 P06.5. Fire Fight CCC06.5-A CCP06.5-A-06 Heat Treatment / Sand Blasting Workshop
596 P06.5. Fire Fight CCC06.5-A CCP06.5-A-07 Carpenter Workshop
597 P06.5. Fire Fight CCC06.5-A CCP06.5-A-08a Common Switchgear Building (FA) 3-Nov-09 3-Nov-09 3-Nov-09
598 P06.5. Fire Fight CCC06.5-A CCP06.5-A-08b Common Switchgear Building (FF)
599 P06.5. Fire Fight CCC06.5-A CCP06.5-A-09a Central Control Building (FA - BF/GF/1F) 22-Feb-10 22-Feb-10 22-Feb-10
600 P06.5. Fire Fight CCC06.5-A CCP06.5-A-09b Central Control Building (FF - BF/GF/1F)
601 P06.5. Fire Fight CCC06.5-A CCP06.5-A-09c Central Control Building (FA - 2F/3F)
602 P06.5. Fire Fight CCC06.5-A CCP06.5-A-09d Central Control Building (FF - 2F/3F)
603 P06.5. Fire Fight CCC06.5-A CCP06.5-A-09e Central Control Building (CCR Network System)
604 P06.5. Fire Fight CCC06.5-A CCP06.5-A-10a Feed Water Pump Station #1 Cancel
605 P06.5. Fire Fight CCC06.5-A CCP06.5-A-10b Feed Water Pump Station #2 Cancel
606 P06.5. Fire Fight CCC06.5-A CCP06.5-A-10c Feed Water Pump Station #3 Cancel
607 P06.5. Fire Fight CCC06.5-A CCP06.5-A-11a Chemical Dosing House #10, Sampling Container (FA) 21-Feb-10 21-Feb-10 21-Feb-10
608 P06.5. Fire Fight CCC06.5-A CCP06.5-A-11b Chemical Dosing House #20 (FA)
609 P06.5. Fire Fight CCC06.5-A CCP06.5-A-11c Chemical Dosing House #30 (FA)
610 P06.5. Fire Fight CCC06.5-A CCP06.5-A-11d Chemical Dosing House #10 (FF) 7-Feb-10 NA 7-Feb-10
611 P06.5. Fire Fight CCC06.5-A CCP06.5-A-11e Chemical Dosing House #20 (FF)
612 P06.5. Fire Fight CCC06.5-A CCP06.5-A-11f Chemical Dosing House #30 (FF)
613 P06.5. Fire Fight CCC06.5-A CCP06.5-A-12a STG Building #10 (FA)
614 P06.5. Fire Fight CCC06.5-A CCP06.5-A-12b STG Building #10 (FF)

34/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

615 P06.5. Fire Fight CCC06.5-A CCP06.5-A-13a STG Building #20 (FA)
616 P06.5. Fire Fight CCC06.5-A CCP06.5-A-13b STG Building #20 (FF)
617 P06.5. Fire Fight CCC06.5-A CCP06.5-A-14a STG Building #30 (FA)
618 P06.5. Fire Fight CCC06.5-A CCP06.5-A-14b STG Building #30 (FF)
619 P06.5. Fire Fight CCC06.5-A CCP06.5-A-15a STG Transformer #10 (FF)
620 P06.5. Fire Fight CCC06.5-A CCP06.5-A-15b STG Transformer #20 (FF)
621 P06.5. Fire Fight CCC06.5-A CCP06.5-A-15c STG Transformer #30 (FF)
622 P06.5. Fire Fight CCC06.5-A CCP06.5-A-16a1 Final Filtering & Metering Skid #11 (FA) 26-Oct-09 26-Oct-09 26-Oct-09
623 P06.5. Fire Fight CCC06.5-A CCP06.5-A-16a2 Ignition Tank #11 (FA) 16-Feb-10 16-Feb-10 16-Feb-10
624 P06.5. Fire Fight CCC06.5-A CCP06.5-A-16a3 Ignition Tank #11 (FF)
625 P06.5. Fire Fight CCC06.5-A CCP06.5-A-16b1 Final Filtering & Metering Skid #12 (FA) 20-Feb-10 20-Feb-10 20-Feb-10
626 P06.5. Fire Fight CCC06.5-A CCP06.5-A-16b2 Ignition Tank #12 (FA) N/A 29-Apr-10 29-Apr-10
627 P06.5. Fire Fight CCC06.5-A CCP06.5-A-16b3 Ignition Tank #12 (FF)
628 P06.5. Fire Fight CCC06.5-A CCP06.5-A-17a1 Final Filtering & Metering Skid #21 (FA)
629 P06.5. Fire Fight CCC06.5-A CCP06.5-A-17a2 Ignition Tank #21 (FA)
630 P06.5. Fire Fight CCC06.5-A CCP06.5-A-17a3 Ignition Tank #21 (FF)
631 P06.5. Fire Fight CCC06.5-A CCP06.5-A-17b1 Final Filtering & Metering Skid #22 (FA)
632 P06.5. Fire Fight CCC06.5-A CCP06.5-A-17b2 Ignition Tank #22 (FA)
633 P06.5. Fire Fight CCC06.5-A CCP06.5-A-17b3 Ignition Tank #22 (FF)
634 P06.5. Fire Fight CCC06.5-A CCP06.5-A-18a1 Final Filtering & Metering Skid #31 (FA)
635 P06.5. Fire Fight CCC06.5-A CCP06.5-A-18a2 Ignition Tank #31 (FA)
636 P06.5. Fire Fight CCC06.5-A CCP06.5-A-18a3 Ignition Tank #31 (FF)
637 P06.5. Fire Fight CCC06.5-A CCP06.5-A-18b1 Final Filtering & Metering Skid #32 (FA)
638 P06.5. Fire Fight CCC06.5-A CCP06.5-A-18b2 Ignition Tank #32 (FA)
639 P06.5. Fire Fight CCC06.5-A CCP06.5-A-18b3 Ignition Tank #32 (FF)
640 P06.5. Fire Fight CCC06.5-A CCP06.5-A-19a GTG Transformer #11 (FF) 17-Aug-09 NA 17-Aug-09
641 P06.5. Fire Fight CCC06.5-A CCP06.5-A-19b GTG Transformer #12 (FF) 25-Oct-09 NA 25-Oct-09
642 P06.5. Fire Fight CCC06.5-A CCP06.5-A-19c GTG Transformer #21 (FF) 18-Mar-10 NA 18-Mar-10
643 P06.5. Fire Fight CCC06.5-A CCP06.5-A-19d GTG Transformer #22 (FF) 20-May-10 NA 20-May-10
644 P06.5. Fire Fight CCC06.5-A CCP06.5-A-19e GTG Transformer #31 (FF) 29-Aug-10 NA 29-Aug-10
645 P06.5. Fire Fight CCC06.5-A CCP06.5-A-19f GTG Transformer #32 (FF)
646 P06.5. Fire Fight CCC06.5-A CCP06.5-A-20a HRSG #11 Burner, CEMS, FG Skid, FW Pump (FA) 16-Feb-10 16-Feb-10 16-Feb-10
647 P06.5. Fire Fight CCC06.5-A CCP06.5-A-20b HRSG #11 (FF) 7-Feb-10 NA 7-Feb-10
648 P06.5. Fire Fight CCC06.5-A CCP06.5-A-21a HRSG #12 Burner, CEMS, FG Skid, FW Pump (FA)
649 P06.5. Fire Fight CCC06.5-A CCP06.5-A-21b HRSG #12 (FF)
650 P06.5. Fire Fight CCC06.5-A CCP06.5-A-22a HRSG #21 Burner, CEMS, FG Skid, FW Pump (FA)
651 P06.5. Fire Fight CCC06.5-A CCP06.5-A-22b HRSG #21 (FF)
652 P06.5. Fire Fight CCC06.5-A CCP06.5-A-23a HRSG #22 Burner, CEMS, FG Skid, FW Pump (FA)
653 P06.5. Fire Fight CCC06.5-A CCP06.5-A-23b HRSG #22 (FF)
654 P06.5. Fire Fight CCC06.5-A CCP06.5-A-24a HRSG #31 Burner, CEMS, FG Skid, FW Pump (FA)
655 P06.5. Fire Fight CCC06.5-A CCP06.5-A-24b HRSG #31 (FF)

35/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

656 P06.5. Fire Fight CCC06.5-A CCP06.5-A-25a HRSG #32 Burner, CEMS, FG Skid, FW Pump (FA)
657 P06.5. Fire Fight CCC06.5-A CCP06.5-A-25b HRSG #32 (FF)
658 P06.5. Fire Fight CCC06.5-A CCP06.5-A-26a GT Workshop #10 (FA)
659 P06.5. Fire Fight CCC06.5-A CCP06.5-A-26b GT Workshop #10 (FF)
660 P06.5. Fire Fight CCC06.5-A CCP06.5-A-27a GT Workshop #20 (FA)
661 P06.5. Fire Fight CCC06.5-A CCP06.5-A-27b GT Workshop #20 (FF)
662 P06.5. Fire Fight CCC06.5-A CCP06.5-A-28a GT Workshop #30 (FA)
663 P06.5. Fire Fight CCC06.5-A CCP06.5-A-28b GT Workshop #30 (FF)
664 P06.5. Fire Fight CCC06.5-A CCP06.5-A-29a LEB HVAC, M&E Storage & Carpenter Workshop (FA) 20-May-10 20-May-10 20-May-10
665 P06.5. Fire Fight CCC06.5-A CCP06.5-A-29b LEB HVAC, M&E Storage & Carpenter Workshop (FF) 19-May-10 NA 19-May-10
666 P06.5. Fire Fight CCC06.5-A CCP06.5-A-30a GPRS LER Block 1 (FA) 4-Oct-09 4-Oct-09 5-Oct-09
667 P06.5. Fire Fight CCC06.5-A CCP06.5-A-30b GPRS LER, Compressor Station Block 1 (FF) 12-Oct-09 NA 12-Oct-09
668 P06.5. Fire Fight CCC06.5-A CCP06.5-A-30c Fuel Gas Skid, N2 Generation Block 1 (FA) 7-Oct-09 7-Oct-09 8-Oct-09
669 P06.5. Fire Fight CCC06.5-A CCP06.5-A-30d Fuel Gas Skid Block 1 (FF) CCP06.5-A-30b
670 P06.5. Fire Fight CCC06.5-A CCP06.5-A-30e GPRS LER Block 2 (FA)
671 P06.5. Fire Fight CCC06.5-A CCP06.5-A-30f GPRS LER, Compressor Station Block 2 (FF)
672 P06.5. Fire Fight CCC06.5-A CCP06.5-A-30g Fuel Gas Skid, N2 Generation Block 2 (FA)
673 P06.5. Fire Fight CCC06.5-A CCP06.5-A-30h Fuel Gas Skid Block 2 (FF) CCP06.5-A-30f
674 P06.5. Fire Fight CCC06.5-A CCP06.5-A-30i GPRS LER Block 3 (FA)
675 P06.5. Fire Fight CCC06.5-A CCP06.5-A-30j GPRS LER, Compressor Station Block 3 (FF)
676 P06.5. Fire Fight CCC06.5-A CCP06.5-A-30k Fuel Gas Skid, N2 Generation Block 3 (FA)
677 P06.5. Fire Fight CCC06.5-A CCP06.5-A-30l Fuel Gas Skid Block 3 (FF) CCP06.5-A-30j
678 P06.5. Fire Fight CCC06.5-A CCP06.5-A-30m Fuel Gas Skid / LER Block 3 (FA)
679 P06.5. Fire Fight CCC06.5-A CCP06.5-A-30n Fuel Gas Skid / LER Block 3 (FF)
680 P06.5. Fire Fight CCC06.5-A CCP06.5-A-31a Fuel Gas Compressor Station Block 1 (FA) 4-Oct-09 4-Oct-09 4-Oct-09
681 P06.5. Fire Fight CCC06.5-A CCP06.5-A-31b Fuel Gas Compressor Station Block 1 (FF) CCP06.5-A-30b
682 P06.5. Fire Fight CCC06.5-A CCP06.5-A-31c Fuel Gas Compressor Station Block 2 (FA)
683 P06.5. Fire Fight CCC06.5-A CCP06.5-A-31d Fuel Gas Compressor Station Block 2 (FF) CCP06.5-A-30f
684 P06.5. Fire Fight CCC06.5-A CCP06.5-A-31e Fuel Gas Compressor Station Block 3 (FA)
685 P06.5. Fire Fight CCC06.5-A CCP06.5-A-31f Fuel Gas Compressor Station Block 3 (FF) CCP06.5-A-30j
686 P06.5. Fire Fight CCC06.5-A CCP06.5-A-32a Diesel Fuel Oil Unloading Station (FA)
687 P06.5. Fire Fight CCC06.5-A CCP06.5-A-32b Diesel Fuel Oil Unloading Station (FF)
688 P06.5. Fire Fight CCC06.5-A CCP06.5-A-33a EDG Building #10 (FA)
689 P06.5. Fire Fight CCC06.5-A CCP06.5-A-33b EDG Building #10 (FF)
690 P06.5. Fire Fight CCC06.5-A CCP06.5-A-34a EDG Building #20 (FA)
691 P06.5. Fire Fight CCC06.5-A CCP06.5-A-34b EDG Building #20 (FF)
692 P06.5. Fire Fight CCC06.5-A CCP06.5-A-35a EDG Building #30 (FA)
693 P06.5. Fire Fight CCC06.5-A CCP06.5-A-35b EDG Building #30 (FF)
694 P06.5. Fire Fight CCC06.5-A CCP06.5-A-36a LEB for HRSG #11 (FA) 17-Feb-10 17-Feb-10 17-Feb-10
695 P06.5. Fire Fight CCC06.5-A CCP06.5-A-36b LEB for HRSG #11 (FF) 26-Apr-10 NA 26-Apr-10
696 P06.5. Fire Fight CCC06.5-A CCP06.5-A-37a LEB for HRSG #12 (FA)

36/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

697 P06.5. Fire Fight CCC06.5-A CCP06.5-A-37b LEB for HRSG #12 (FF)
698 P06.5. Fire Fight CCC06.5-A CCP06.5-A-38a LEB for HRSG #21 (FA)
699 P06.5. Fire Fight CCC06.5-A CCP06.5-A-38b LEB for HRSG #21 (FF)
700 P06.5. Fire Fight CCC06.5-A CCP06.5-A-39a LEB for HRSG #22 (FA)
701 P06.5. Fire Fight CCC06.5-A CCP06.5-A-39b LEB for HRSG #22 (FF)
702 P06.5. Fire Fight CCC06.5-A CCP06.5-A-40a LEB for HRSG #31 (FA)
703 P06.5. Fire Fight CCC06.5-A CCP06.5-A-40b LEB for HRSG #31 (FF)
704 P06.5. Fire Fight CCC06.5-A CCP06.5-A-41a LEB for HRSG #32 (FA)
705 P06.5. Fire Fight CCC06.5-A CCP06.5-A-41b LEB for HRSG #32 (FF)
706 P06.5. Fire Fight CCC06.5-A CCP06.5-A-42a LEB for GTG #11 (FA) 10-Sep-09 10-Sep-09 10-Sep-09
707 P06.5. Fire Fight CCC06.5-A CCP06.5-A-42b LEB for GTG #11 (FF) 18-Nov-09 NA 18-Nov-09
708 P06.5. Fire Fight CCC06.5-A CCP06.5-A-42c GT PCC Enclosure #11 (FA) 30-Aug-09 30-Aug-09 30-Aug-09
709 P06.5. Fire Fight CCC06.5-A CCP06.5-A-42d GT PCC Enclosure #11 (FF) 13-Oct-09 NA 13-Oct-09
710 P06.5. Fire Fight CCC06.5-A CCP06.5-A-43a LEB for GTG #12 (FA) 8-Feb-10 8-Feb-10 8-Feb-10
711 P06.5. Fire Fight CCC06.5-A CCP06.5-A-43b LEB for GTG #12 (FF) 20-Apr-10 NA 20-Apr-10
712 P06.5. Fire Fight CCC06.5-A CCP06.5-A-43c GT PCC Enclosure #12 (FA) 16-Mar-10 16-Mar-10 16-Mar-10
713 P06.5. Fire Fight CCC06.5-A CCP06.5-A-43d GT PCC Enclosure #12 (FF) 17-Feb-10 NA 17-Feb-10
714 P06.5. Fire Fight CCC06.5-A CCP06.5-A-44a LEB for GTG #21 (FA)
715 P06.5. Fire Fight CCC06.5-A CCP06.5-A-44b LEB for GTG #21 (FF) 5-Aug-10 NA 12-Aug-10
716 P06.5. Fire Fight CCC06.5-A CCP06.5-A-44c GT PCC Enclosure #21 (FA) 15-Jun-10 15-Jun-10 16-Jun-10
717 P06.5. Fire Fight CCC06.5-A CCP06.5-A-44d GT PCC Enclosure #21 (FF) 20-Jun-10 NA 21-Jun-10
718 P06.5. Fire Fight CCC06.5-A CCP06.5-A-45a LEB for GTG #22 (FA)
719 P06.5. Fire Fight CCC06.5-A CCP06.5-A-45b LEB for GTG #22 (FF)
720 P06.5. Fire Fight CCC06.5-A CCP06.5-A-45c GT PCC Enclosure #22 (FA)
721 P06.5. Fire Fight CCC06.5-A CCP06.5-A-45d GT PCC Enclosure #22 (FF)
722 P06.5. Fire Fight CCC06.5-A CCP06.5-A-46a LEB for GTG #31 (FA)
723 P06.5. Fire Fight CCC06.5-A CCP06.5-A-46b LEB for GTG #31 (FF)
724 P06.5. Fire Fight CCC06.5-A CCP06.5-A-46c GT PCC Enclosure #31 (FA)
725 P06.5. Fire Fight CCC06.5-A CCP06.5-A-46d GT PCC Enclosure #31 (FF)
726 P06.5. Fire Fight CCC06.5-A CCP06.5-A-47a LEB for GTG #32 (FA)
727 P06.5. Fire Fight CCC06.5-A CCP06.5-A-47b LEB for GTG #32 (FF)
728 P06.5. Fire Fight CCC06.5-A CCP06.5-A-47c GT PCC Enclosure #32 (FA)
729 P06.5. Fire Fight CCC06.5-A CCP06.5-A-47d GT PCC Enclosure #32 (FF)
730 P06.5. Fire Fight CCC06.5-A CCP06.5-A-48a Fire Fighting Water Pump House(FA)
731 P06.5. Fire Fight CCC06.5-A CCP06.5-A-48b Fire Fighting Water Pump House(FF) 19-Aug-10 19-Aug-10 19-Aug-10
732 P06.5. Fire Fight CCC06.5-A CCP06.5-A-48c Fire Fighting Water Pump House(Electric) 18-Aug-10 18-Aug-10 18-Aug-10
733 P06.5. Fire Fight CCC06.5-A CCP06.5-A-49a Fire Fighting Station (FA)
734 P06.5. Fire Fight CCC06.5-A CCP06.5-A-49b Fire Fighting Station (FF)
735 P06.5. Fire Fight CCC06.5-A CCP06.5-A-50a Central HVAC (F/A) 3-Aug-10 3-Aug-10 18-Aug-10
736 P06.5. Fire Fight CCC06.5-A CCP06.5-A-50b Central HVAC (F/F)
737 P06.5. Fire Fight CCC06.5-A CCP06.5-A-51a Demineralization Water Plant, Chemical Storage (FA)

37/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

738 P06.5. Fire Fight CCC06.5-A CCP06.5-A-51b Demineralization Water Plant, Chemical Storage (FF)
739 P06.5. Fire Fight CCC06.5-A CCP06.5-A-52a Compressed Air Building (F/A) 22-Nov-09 22-Nov-09 22-Nov-09
740 P06.5. Fire Fight CCC06.5-A CCP06.5-A-52b Compressed Air Building (F/F) 4-Aug-10 NA 12-Aug-10
741 P06.5. Fire Fight CCC06.5-A CCP06.5-A-53a Waste Water Treatment Building (FA)
742 P06.5. Fire Fight CCC06.5-A CCP06.5-A-53b Waste Water Treatment Building (FF)
743 P06.5. Fire Fight CCC06.5-A CCP06.5-A-54a Sewage Treatment Plant (FA)
744 P06.5. Fire Fight CCC06.5-A CCP06.5-A-54b Sewage Treatment Plant (FF)
745 P06.5. Fire Fight CCC06.5-A CCP06.5-A-55a Makeup Water Pump with Sunshade (FA) 24-Aug-10 24-Aug-10 24-Aug-10
746 P06.5. Fire Fight CCC06.5-A CCP06.5-A-55b Makeup Water Pump with Sunshade (FF)
747 P06.5. Fire Fight CCC06.5-A CCP06.5-A-56a Outdoor Storage for Central ME Workshop (FA)
748 P06.5. Fire Fight CCC06.5-A CCP06.5-A-56b Outdoor Storage for Central ME Workshop (FF)
749 P06.5. Fire Fight CCC06.5-A CCP06.5-A-57a BSDG (FA)
750 P06.5. Fire Fight CCC06.5-A CCP06.5-A-57b BSDG (FF)
751 P06.5. Fire Fight CCC06.5-A CCP06.5-A-57c Emergency Diesel Generator for Common (FA)
752 P06.5. Fire Fight CCC06.5-A CCP06.5-A-57d Emergency Diesel Generator for Common (FF)
753 P06.5. Fire Fight CCC06.5-A CCP06.5-A-58a LEB for DFO (F/A)
754 P06.5. Fire Fight CCC06.5-A CCP06.5-A-58b LEB for DFO (F/F) 7-Jul-10 NA 7-Jul-10
755 P06.5. Fire Fight CCC06.5-A CCP06.5-A-59a Foam station (FA)
756 P06.5. Fire Fight CCC06.5-A CCP06.5-A-59b Foam station (FF)
757 P06.5. Fire Fight CCC06.5-A CCP06.5-A-60a N2 Gas Station Block 1 Cancel
758 P06.5. Fire Fight CCC06.5-A CCP06.5-A-60b N2 Gas Station Block 2 Cancel
759 P06.5. Fire Fight CCC06.5-A CCP06.5-A-60c N2 Gas Station Block 3 Cancel
760 P06.5. Fire Fight CCC06.5-A CCP06.5-A-61a Neutralization Pit & Chemical Storage (FA)
761 P06.5. Fire Fight CCC06.5-A CCP06.5-A-61b Neutralization Pit & Chemical Storage (FF)
762 P06.5. Fire Fight CCC06.5-A CCP06.5-A-62a LEB for GPRS (FA) 4-Oct-09 4-Oct-09 4-Oct-09
763 P06.5. Fire Fight CCC06.5-A CCP06.5-A-62b LEB for GPRS (FF) 12-Oct-09 NA 12-Oct-09
764 P06.5. Fire Fight CCC06.5-A CCP06.5-A-63a LEB for FFWPH & M&E workshop (F/A) 17-Feb-10 17-Feb-10 17-Feb-10
765 P06.5. Fire Fight CCC06.5-A CCP06.5-A-63b LEB for FFWPH & M&E workshop (F/F) 19-May-10 NA 19-May-10
766 P06.5. Fire Fight CCC06.5-A CCP06.5-A-64a HVAC Chiller Plant MCC & TR Building (F/A) Cancel
767 P06.5. Fire Fight CCC06.5-A CCP06.5-A-64b HVAC Chiller Plant MCC & TR Building (F/F)
768 P06.5. Fire Fight CCC06.5-A CCP06.5-A-65a GPRS & TR Area Ring Main Piping Block 1 22-Sep-09 NA 29-Sep-09
769 P06.5. Fire Fight CCC06.5-A CCP06.5-A-65b GT 11 Area Ring Main Piping 3-Nov-09 NA
770 P06.5. Fire Fight CCC06.5-A CCP06.5-A-65c GT 12 Area Ring Main Piping 12-May-10 NA 23-May-10
771 P06.5. Fire Fight CCC06.5-A CCP06.5-A-65d GPRS Area Ring Main Piping for Block 2
772 P06.5. Fire Fight CCC06.5-A CCP06.5-A-65e Steam Turbine Area Ring Main Piping for Block 1
773 P06.5. Fire Fight CCC06.5-A CCP06.5-A-66a TR Area Ring Main Piping for Block 2
774 P06.5. Fire Fight CCC06.5-A CCP06.5-A-66b GT 21 Area Ring Main Piping
775 P06.5. Fire Fight CCC06.5-A CCP06.5-A-66c GT 22 Area Ring Main Piping
776 P06.5. Fire Fight CCC06.5-A CCP06.5-A-66d HVAC & Unloading Area Ring Main Piping
777 P06.5. Fire Fight CCC06.5-A CCP06.5-A-67a TR Area Ring Main Piping for Block 3
778 P06.5. Fire Fight CCC06.5-A CCP06.5-A-67b GT 31,32 Area Ring Main Piping

38/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

779 P06.5. Fire Fight CCC06.5-A CCP06.5-A-67c DFO Tank Area Ring Main Piping
780 P06.5. Fire Fight CCC06.5-A CCP06.5-A-68a Cable Tunnel - GT area Unit 11 Zone 43 (FA)
781 P06.5. Fire Fight CCC06.5-A CCP06.5-A-68b Cable Tunnel - GT area Unit 11 Zone 43 (FF)
782 P06.5. Fire Fight CCC06.5-A CCP06.5-A-69a Cable Tunnel - HRSG Unit 11 Zone 70 (FA)
783 P06.5. Fire Fight CCC06.5-A CCP06.5-A-69b Cable Tunnel - HRSG Unit 11 Zone 70 (FF)
784 P06.5. Fire Fight CCC06.5-A CCP06.5-A-69c Cable Tunnel - HRSG Unit 11 Zone 71 (FA)
785 P06.5. Fire Fight CCC06.5-A CCP06.5-A-69d Cable Tunnel - HRSG Unit 11 Zone 71 (FF)
786 P06.5. Fire Fight CCC06.5-A CCP06.5-A-69e Cable Tunnel - HRSG Unit 11 Zone 72 (FA)
787 P06.5. Fire Fight CCC06.5-A CCP06.5-A-69f Cable Tunnel - HRSG Unit 11 Zone 72 (FF)
788 P06.5. Fire Fight CCC06.5-A CCP06.5-A-69g Cable Tunnel - HRSG Unit 11 Zone 73 (FA)
789 P06.5. Fire Fight CCC06.5-A CCP06.5-A-69h Cable Tunnel - HRSG Unit 11 Zone 73 (FF) 26-Jul-10 NA 26-Jul-10
790 P06.5. Fire Fight CCC06.5-A CCP06.5-A-70a Cable Tunnel - GT area Unit 12 Zone 97 (FA)
791 P06.5. Fire Fight CCC06.5-A CCP06.5-A-70b Cable Tunnel - GT area Unit 12 Zone 97 (FF)
792 P06.5. Fire Fight CCC06.5-A CCP06.5-A-71a Cable Tunnel - HRSG Unit 12 Zone 136 (FA)
793 P06.5. Fire Fight CCC06.5-A CCP06.5-A-71b Cable Tunnel - HRSG Unit 12 Zone 136 (FF)
794 P06.5. Fire Fight CCC06.5-A CCP06.5-A-71c Cable Tunnel - HRSG Unit 12 Zone 137 (FA)
795 P06.5. Fire Fight CCC06.5-A CCP06.5-A-71d Cable Tunnel - HRSG Unit 12 Zone 137 (FF)
796 P06.5. Fire Fight CCC06.5-A CCP06.5-A-72a Cable Tunnel - GT area Unit 21/22 Zone 180 (FA)
797 P06.5. Fire Fight CCC06.5-A CCP06.5-A-72b Cable Tunnel - GT area Unit 21/22 Zone 180 (FF)
798 P06.5. Fire Fight CCC06.5-A CCP06.5-A-73a Cable Tunnel - HRSG Unit 21 Zone 207 (FA)
799 P06.5. Fire Fight CCC06.5-A CCP06.5-A-73b Cable Tunnel - HRSG Unit 21 Zone 207 (FF)
800 P06.5. Fire Fight CCC06.5-A CCP06.5-A-73c Cable Tunnel - HRSG Unit 21 Zone 208 (FA)
801 P06.5. Fire Fight CCC06.5-A CCP06.5-A-73d Cable Tunnel - HRSG Unit 21 Zone 208 (FF)
802 P06.5. Fire Fight CCC06.5-A CCP06.5-A-73e Cable Tunnel - HRSG Unit 21 Zone 209 (FA)
803 P06.5. Fire Fight CCC06.5-A CCP06.5-A-73f Cable Tunnel - HRSG Unit 21 Zone 209 (FF)
804 P06.5. Fire Fight CCC06.5-A CCP06.5-A-74a Cable Tunnel - HRSG Unit 22 Zone 271 (FA)
805 P06.5. Fire Fight CCC06.5-A CCP06.5-A-74b Cable Tunnel - HRSG Unit 22 Zone 271 (FF)
806 P06.5. Fire Fight CCC06.5-A CCP06.5-A-74c Cable Tunnel - HRSG Unit 22 Zone 272 (FA)
807 P06.5. Fire Fight CCC06.5-A CCP06.5-A-74d Cable Tunnel - HRSG Unit 22 Zone 272 (FF)
808 P06.5. Fire Fight CCC06.5-A CCP06.5-A-75a Cable Tunnel - GT area Unit 31/32 Zone 315 (FA)
809 P06.5. Fire Fight CCC06.5-A CCP06.5-A-75b Cable Tunnel - GT area Unit 31/32 Zone 315 (FF)
810 P06.5. Fire Fight CCC06.5-A CCP06.5-A-76a Cable Tunnel - HRSG Unit 31 Zone 342 (FA)
811 P06.5. Fire Fight CCC06.5-A CCP06.5-A-76b Cable Tunnel - HRSG Unit 31 Zone 342 (FF)
812 P06.5. Fire Fight CCC06.5-A CCP06.5-A-76c Cable Tunnel - HRSG Unit 31 Zone 343 (FA)
813 P06.5. Fire Fight CCC06.5-A CCP06.5-A-76d Cable Tunnel - HRSG Unit 31 Zone 343 (FF)
814 P06.5. Fire Fight CCC06.5-A CCP06.5-A-76e Cable Tunnel - HRSG Unit 31 Zone 344 (FA)
815 P06.5. Fire Fight CCC06.5-A CCP06.5-A-76f Cable Tunnel - HRSG Unit 31 Zone 344 (FF)
816 P06.5. Fire Fight CCC06.5-A CCP06.5-A-77a Cable Tunnel - HRSG Unit 32 Zone 406 (FA)
817 P06.5. Fire Fight CCC06.5-A CCP06.5-A-77b Cable Tunnel - HRSG Unit 32 Zone 406 (FF)
818 P06.5. Fire Fight CCC06.5-A CCP06.5-A-78a Cable Tunnel - LEG GPRS Zone 462 (FA)
819 P06.5. Fire Fight CCC06.5-A CCP06.5-A-78b Cable Tunnel - LEB GPRS Zone 462 (FF)

39/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

820 P06.5. Fire Fight CCC06.5-A CCP06.5-A-78c Cable Tunnel - LEG GPRS Zone 463 (FA)
821 P06.5. Fire Fight CCC06.5-A CCP06.5-A-78d Cable Tunnel - LEB GPRS Zone 463 (FF)
822 P06.5. Fire Fight CCC06.5-A CCP06.5-A-78e Cable Tunnel - LEG GPRS Zone 464 (FA)
823 P06.5. Fire Fight CCC06.5-A CCP06.5-A-78f Cable Tunnel - LEB GPRS Zone 464 (FF)
824 P06.5. Fire Fight CCC06.5-A CCP06.5-A-79a Cable Tunnel - Central HVAC Zone 582 (FA)
825 P06.5. Fire Fight CCC06.5-A CCP06.5-A-79b Cable Tunnel - Central HVAC Zone 582 (FF)
826 P06.5. Fire Fight CCC06.5-A CCP06.5-A-80a Cable Tunnel - CSB Zone 615 (FA)
827 P06.5. Fire Fight CCC06.5-A CCP06.5-A-80b Cable Tunnel - CSB Zone 615 (FF)
828 P06.5. Fire Fight CCC06.5-A CCP06.5-A-80c Cable Tunnel - CSB Zone 616 (FA)
829 P06.5. Fire Fight CCC06.5-A CCP06.5-A-80d Cable Tunnel - CSB Zone 616 (FF) 26-Jul-10 NA 26-Jul-10
830 P06.5. Fire Fight CCC06.5-A CCP06.5-A-80e Cable Tunnel - CSB Zone 617 (FA)
831 P06.5. Fire Fight CCC06.5-A CCP06.5-A-80f Cable Tunnel - CSB Zone 617 (FF) 26-Jul-10 NA 26-Jul-10
832 P06.5. Fire Fight CCC06.5-A CCP06.5-A-80g Cable Tunnel - CSB Zone 618 (FA)
833 P06.5. Fire Fight CCC06.5-A CCP06.5-A-80h Cable Tunnel - CSB Zone 618 (FF)
834 P06.5. Fire Fight CCC06.5-A CCP06.5-A-81a Cable Tunnel - CCB Zone 671 (FA)
835 P06.5. Fire Fight CCC06.5-A CCP06.5-A-81b Cable Tunnel - CCB Zone 671 (FF)
836 P06.5. Fire Fight CCC06.5-A CCP06.5-A-81c Cable Tunnel - CCB Zone 672 (FA)
837 P06.5. Fire Fight CCC06.5-A CCP06.5-A-81d Cable Tunnel - CCB Zone 672 (FF)
838 P06.5. Fire Fight CCC06.5-A CCP06.5-A-81e Cable Tunnel - CCB Zone 673 (FA)
839 P06.5. Fire Fight CCC06.5-A CCP06.5-A-81f Cable Tunnel - CCB Zone 673 (FF) 26-Jul-10 NA 26-Jul-10
840 P06.5. Fire Fight CCC06.5-A CCP06.5-A-82a Cable Tunnel - LEB DFO Zone 728 (FA)
841 P06.5. Fire Fight CCC06.5-A CCP06.5-A-82b Cable Tunnel - LEB DFO Zone 728 (FF)
842 P06.5. Fire Fight CCC06.5-A CCP06.5-A-83a DFO Tank #1 (FA)
843 P06.5. Fire Fight CCC06.5-A CCP06.5-A-83b DFO Tank #1 (FF)
844 P06.5. Fire Fight CCC06.5-A CCP06.5-A-84a DFO Tank #2 (FA)
845 P06.5. Fire Fight CCC06.5-A CCP06.5-A-84b DFO Tank #2 (FF)
846 P06.5. Fire Fight CCC06.5-A CCP06.5-A-85a DFO Tank #3 (FA)
847 P06.5. Fire Fight CCC06.5-A CCP06.5-A-85b DFO Tank #3 (FF)
848 P06.5. Fire Fight CCC06.5-A CCP06.5-A-86a DFO Tank #4 (FA)
849 P06.5. Fire Fight CCC06.5-A CCP06.5-A-86b DFO Tank #4 (FF)
850 P06.5. Fire Fight CCC06.5-A CCP06.5-A-87a DFO Tank #5 (FA)
851 P06.5. Fire Fight CCC06.5-A CCP06.5-A-87b DFO Tank #5 (FF)
852 P06.5. Fire Fight CCC06.5-A CCP06.5-A-88a DFO Tank #6 (FA)
853 P06.5. Fire Fight CCC06.5-A CCP06.5-A-88b DFO Tank #6 (FF)
854 P06.5. Fire Fight CCC06.5-A CCP06.5-A-89a JAPS Tank #1 (FA)
855 P06.5. Fire Fight CCC06.5-A CCP06.5-A-89b JAPS Tank #1 (FF)
856 P06.5. Fire Fight CCC06.5-A CCP06.5-A-90a JAPS Tank #2 (FA)
857 P06.5. Fire Fight CCC06.5-A CCP06.5-A-90b JAPS Tank #2 (FF)
858 P06.5. Fire Fight CCC06.5-A CCP06.5-A-91a JAPS Tank #3 (FA)
859 P06.5. Fire Fight CCC06.5-A CCP06.5-A-91b JAPS Tank #3 (FF)
860 P06.5. Fire Fight CCC06.5-A CCP06.5-A-92a JAPS Tank #4 (FA)

40/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

861 P06.5. Fire Fight CCC06.5-A CCP06.5-A-92b JAPS Tank #4 (FF)


862 P06.5. Fire Fight CCC06.5-A CCP06.5-A-93a JAPS Tank #5 (FA)
863 P06.5. Fire Fight CCC06.5-A CCP06.5-A-93b JAPS Tank #5 (FF)
864 P06.5. Fire Fight CCC06.5-A CCP06.5-A-94a JAPS Tank #6 (FA)
865 P06.5. Fire Fight CCC06.5-A CCP06.5-A-94b JAPS Tank #6 (FF)
866 P06.5. Fire Fight CCC06.5-A CCP06.5-A-95a JAPS Tank #7 (FA)
867 P06.5. Fire Fight CCC06.5-A CCP06.5-A-95b JAPS Tank #7 (FF)
868 P06.5. Fire Fight CCC06.5-A CCP06.5-A-96a JAPS Tank #8 (FA)
869 P06.5. Fire Fight CCC06.5-A CCP06.5-A-96b JAPS Tank #8 (FF)
870 P06.5. Fire Fight CCC06.5-A CCP06.5-A-97a JAPS Tank #9 (FA)
871 P06.5. Fire Fight CCC06.5-A CCP06.5-A-97b JAPS Tank #9 (FF)
872 P06.5. Fire Fight CCC06.5-A CCP06.5-A-98a JAPS Tank #10 (FA)
873 P06.5. Fire Fight CCC06.5-A CCP06.5-A-98b JAPS Tank #10 (FF)
874 P06.5. Fire Fight CCC06.5-A CCP06.5-A-99a DFO Forwarding Station (FA)
875 P06.5. Fire Fight CCC06.5-A CCP06.5-A-99b DFO Forwarding Station (FF)
876 P06.5. Fire Fight CCC06.5-A CCP06.5-A-100a DFO Re-circulation tank (FA)
877 P06.5. Fire Fight CCC06.5-A CCP06.5-A-100b DFO Re-circulation tank (FF)
878 P06.5. Fire Fight CCC06.5-A CCP06.5-A-101a HVAC TR 1 ~ 4
879 P06.5. Fire Fight CCC06.5-A CCP06.5-A-101b HVAC TR 5 ~ 8
880 P06.5. Fire Fight CCC06.5-A CCP06.5-A-101c HVAC TR 9 ~ 12
881 P06.5. Fire Fight CCC06.5-A CCP06.5-A-101d HVAC TR 13 ~ 16
882 P07.1. Dosing CCC07.1-A CCP07.1-A-01 Chemical Dosing System for Block 1 22-Dec-09 16-Jan-10 17-Jan-10
883 P07.1. Dosing CCC07.1-A CCP07.1-A-02 Chemical Dosing System for Block 2
884 P07.1. Dosing CCC07.1-A CCP07.1-A-03 Chemical Dosing System for Block 3
885 P07.1. Dosing CCC07.1-A CCP07.1-A-04 Interconnecting Piping for HRSG #11/12
886 P07.1. Dosing CCC07.1-A CCP07.1-A-05 Interconnecting Piping for HRSG #21/22
887 P07.1. Dosing CCC07.1-A CCP07.1-A-06 Interconnecting Piping for HRSG #31/32
888 P07.1. Dosing CCC07.1-A CCP07.1-A-07 Interconnecting Piping for Aux Boiler #1/2 4-Jan-10 NA 6-Jan-10
889 P07.1. Dosing CCC07.1-A CCP07.1-A-08 Interconnecting Piping for CCW Block 1
890 P07.1. Dosing CCC07.1-A CCP07.1-A-09 Interconnecting Piping for CCW Block 2
891 P07.1. Dosing CCC07.1-A CCP07.1-A-10 Interconnecting Piping for CCW Block 3
892 P07.1. Dosing CCC07.1-A CCP07.1-A-11 Interconnecting Piping for ST Block 1
893 P07.1. Dosing CCC07.1-A CCP07.1-A-12 Interconnecting Piping for ST Block 2
894 P07.1. Dosing CCC07.1-A CCP07.1-A-13 Interconnecting Piping for ST Block 3
895 P07.1. Dosing CCC07.1-A CCP07.1-A-14 Interconnecting Piping for Makeup Water System Block 1
896 P07.1. Dosing CCC07.1-A CCP07.1-A-15 Interconnecting Piping for Makeup Water System Block 2
897 P07.1. Dosing CCC07.1-A CCP07.1-A-16 Interconnecting Piping for Makeup Water System Block 3
898 P07.1. Dosing CCC07.1-A CCP07.1-A-17 Interconnecting Piping for Instrument & Potable Water Block 1
899 P07.1. Dosing CCC07.1-A CCP07.1-A-18 Interconnecting Piping for Instrument & Potable Water Block 2
900 P07.1. Dosing CCC07.1-A CCP07.1-A-19 Interconnecting Piping for Instrument & Potable Water Block 3
901 P07.1. WTR Sys CCC07.1-B CCP07.1-B-01a Makeup Water Storage Tank 1 3-Feb-10 2-Jun-10 16-Jun-10

41/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

902 P07.1. WTR Sys CCC07.1-B CCP07.1-B-01b Makeup Water Storage Tank 2 3-Feb-10 2-Jun-10 16-Jun-10
903 P07.1. WTR Sys CCC07.1-B CCP07.1-B-02 Make Up Water PP Header & Demi Water Supply & Min Recirculation Line 5-May-10 7-Jun-10 16-Jun-10
904 P07.1. WTR Sys CCC07.1-B CCP07.1-B-02a Make Up Water Pump 3-May-10 NA 16-Jun-10
905 P07.1. WTR Sys CCC07.1-B CCP07.1-B-03 Make Up Water Return Line for Nox Water Skid Block1 18-Mar-10
906 P07.1. WTR Sys CCC07.1-B CCP07.1-B-04 Make Up Water Return Line for Nox Water Skid Block2
907 P07.1. WTR Sys CCC07.1-B CCP07.1-B-05 Make Up Water Return Line for Nox Water Skid Block3
908 P07.1. WTR Sys CCC07.1-B CCP07.1-B-06 Make Up Water Supply Line for CCW Block1
909 P07.1. WTR Sys CCC07.1-B CCP07.1-B-07 Make Up Water Supply Line for CCW Block2
910 P07.1. WTR Sys CCC07.1-B CCP07.1-B-08 Make Up Water Supply Line for CCW Block3
911 P07.1. WTR Sys CCC07.1-B CCP07.1-B-09 Make Up Water Supply Line for Steam Turbine Block1
912 P07.1. WTR Sys CCC07.1-B CCP07.1-B-10 Make Up Water Supply Line for Steam Turbine Block2
913 P07.1. WTR Sys CCC07.1-B CCP07.1-B-11 Make Up Water Supply Line for Steam Turbine Block3
914 P07.1. WTR Sys CCC07.1-B CCP07.1-B-12 Make Up Water Supply Line for HRSG Block1 13-Apr-10
915 P07.1. WTR Sys CCC07.1-B CCP07.1-B-13 Make Up Water Supply Line for HRSG Block2
916 P07.1. WTR Sys CCC07.1-B CCP07.1-B-14 Make Up Water Supply Line for HRSG Block3
917 P07.1. WTR Sys CCC07.1-B CCP07.1-B-15 Make Up Water Supply for Auxiliary Boiler 22-Mar-10 7-Jun-10 16-Jun-10
918 P07.1. WTR Sys CCC07.1-B CCP07.1-B-16 Distillate Water Supply Line for Demi Plant 21-Apr-10 24-Aug-10
919 P07.1. WTR Sys CCC07.1-B CCP07.1-B-16a Distillate Water Buffer Tank 9-Jun-10 24-Aug-10
920 P07.1. WTR Sys CCC07.1-B CCP07.1-B-17 Service Water Distribution System Block 1
921 P07.1. WTR Sys CCC07.1-B CCP07.1-B-18 Service Water Distribution System Block 2
922 P07.1. WTR Sys CCC07.1-B CCP07.1-B-19 Service Water Distribution System Block 3
923 P07.1. WTR Sys CCC07.1-B CCP07.1-B-20 Portable Water Distribution System Block 1
924 P07.1. WTR Sys CCC07.1-B CCP07.1-B-21 Portable Water Distribution System Block 2
925 P07.1. WTR Sys CCC07.1-B CCP07.1-B-22 Portable Water Distribution System Block 3
926 P07.1. WTR Sys CCC07.1-B CCP07.1-B-23a Demineralization Water Treatment Plant
927 P07.1. WTR Sys CCC07.1-B CCP07.1-B-23b Chemical Storage System for Demin. Plant
928 P07.1. WTR Sys CCC07.1-B CCP07.1-B-23c Neutralization System for Demin. Plant
929 P07.1. WTR Sys CCC07.1-B CCP07.1-B-23d Bag Slitter System for Demin. Plant
930 P07.2. Sampling CCC07.2-A CCP07.2-A-01 Sampling System for Block 1
931 P07.2. Sampling CCC07.2-A CCP07.2-A-02 Sampling System for Block 2
932 P07.2. Sampling CCC07.2-A CCP07.2-A-03 Sampling System for Block 3
933 P07.2. Sampling CCC07.2-A CCP07.2-A-04 Piping for HRSG #11
934 P07.2. Sampling CCC07.2-A CCP07.2-A-05 Piping for HRSG #12
935 P07.2. Sampling CCC07.2-A CCP07.2-A-06 Piping for HRSG #21
936 P07.2. Sampling CCC07.2-A CCP07.2-A-07 Piping for HRSG #22
937 P07.2. Sampling CCC07.2-A CCP07.2-A-08 Piping for HRSG #31
938 P07.2. Sampling CCC07.2-A CCP07.2-A-09 Piping for HRSG #32
939 P07.2. Sampling CCC07.2-A CCP07.2-A-10 Piping for ST COP Disch Block 1
940 P07.2. Sampling CCC07.2-A CCP07.2-A-11 Piping for ST COP Disch Block 2
941 P07.2. Sampling CCC07.2-A CCP07.2-A-12 Piping for ST COP Disch Block 3
942 P07.2. Sampling CCC07.2-A CCP07.2-A-13 Piping for CCW Block 1

42/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

943 P07.2. Sampling CCC07.2-A CCP07.2-A-14 Piping for CCW Block 2


944 P07.2. Sampling CCC07.2-A CCP07.2-A-15 Piping for CCW Block 3
945 P07.3. LAB CCC07.3-A CCP07.3-A-01 Chemical Laboratory
946 P08. WWT CCC08-A CCP08-A-01 Waste Water Treatment System
947 P08. WWT CCC08-A CCP08-A-02a Washing Water Collecting Tank/Pump GT11
948 P08. WWT CCC08-A CCP08-A-02b Washing Water Collecting Tank/Pump GT12
949 P08. WWT CCC08-A CCP08-A-02c Washing Water Collecting Tank/Pump GT21
950 P08. WWT CCC08-A CCP08-A-02d Washing Water Collecting Tank/Pump GT22
951 P08. WWT CCC08-A CCP08-A-02e Washing Water Collecting Tank/Pump GT31
952 P08. WWT CCC08-A CCP08-A-02f Washing Water Collecting Tank/Pump GT32
953 P08. WWT CCC08-A CCP08-A-03 Sewage Treatment System
954 P08. Sump PP CCC08-B CCP08-B-01a STG 10 Area Oily Sump
955 P08. Sump PP CCC08-B CCP08-B-01b STG 20 Area Oily Sump
956 P08. Sump PP CCC08-B CCP08-B-01c STG 30 Area Oily Sump
957 P08. Sump PP CCC08-B CCP08-B-02a STG 10 Sea Water Sump
958 P08. Sump PP CCC08-B CCP08-B-02b STG 20 Sea Water Sump
959 P08. Sump PP CCC08-B CCP08-B-02c STG 30 Sea Water Sump
960 P08. Sump PP CCC08-B CCP08-B-03a STG 10 Area Sump
961 P08. Sump PP CCC08-B CCP08-B-03b STG 20 Area Sump
962 P08. Sump PP CCC08-B CCP08-B-03c STG 30 Area Sump
963 P08. Sump PP CCC08-B CCP08-B-04a Dirty Lube Oil Collecting Pit Sump GT11
964 P08. Sump PP CCC08-B CCP08-B-04b Dirty Lube Oil Collecting Pit Sump GT12
965 P08. Sump PP CCC08-B CCP08-B-04c Dirty Lube Oil Collecting Pit Sump GT21
966 P08. Sump PP CCC08-B CCP08-B-04d Dirty Lube Oil Collecting Pit Sump GT22
967 P08. Sump PP CCC08-B CCP08-B-04e Dirty Lube Oil Collecting Pit Sump GT31
968 P08. Sump PP CCC08-B CCP08-B-04f Dirty Lube Oil Collecting Pit Sump GT32
969 P08. Sump PP CCC08-B CCP08-B-05a Transformer Oily Sump GT11
970 P08. Sump PP CCC08-B CCP08-B-05b Transformer Oily Sump GT12
971 P08. Sump PP CCC08-B CCP08-B-05c Transformer Oily Sump GT21
972 P08. Sump PP CCC08-B CCP08-B-05d Transformer Oily Sump GT22
973 P08. Sump PP CCC08-B CCP08-B-05e Transformer Oily Sump GT31
974 P08. Sump PP CCC08-B CCP08-B-05f Transformer Oily Sump GT32
975 P08. Sump PP CCC08-B CCP08-B-06a Transformer Oily Sump ST10
976 P08. Sump PP CCC08-B CCP08-B-06b Transformer Oily Sump ST20
977 P08. Sump PP CCC08-B CCP08-B-06c Transformer Oily Sump ST30
978 P08. Sump PP CCC08-B CCP08-B-07 BSDG Oily Sump
979 P08. Sump PP CCC08-B CCP08-B-08 DFO Recirculation Area Sump
980 P08. Sump PP CCC08-B CCP08-B-09 Fire Water Pump House Oily Sump
981 P08. Sump PP CCC08-B CCP08-B-10 DFO Unloading Station Oily Sump
982 P08. Sump PP CCC08-B CCP08-B-11 CSB North & West Chemical Sump
983 P08. Sump PP CCC08-B CCP08-B-12 DFO Forwarding Pump Oily Sump

43/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

984 P08. Sump PP CCC08-B CCP08-B-13 M/E Workshop BLDG Oily Sump
985 P08. Sump PP CCC08-B CCP08-B-14 LEB Carpenter Workshop Sump
986 P08. Sump PP CCC08-B CCP08-B-15 Central HVAC Building Transformer Oily Sump
987 P08. Sump PP CCC08-B CCP08-B-16 Air Compressor Area Oily Sump
988 P08. Sump PP CCC08-B CCP08-B-17 Cable Tunnel Sump
989 P09. Crane/Hoist CCC09-A CCP09-A-01a 130/25/12.5 Ton Overhead Crane for GT Hall 10 10-Aug-09 13-Sep-09 27-Sep-09
990 P09. Crane/Hoist CCC09-A CCP09-A-01b 130/25/12.5 Ton Overhead Crane for GT Hall 20
991 P09. Crane/Hoist CCC09-A CCP09-A-01c 130/25/12.5 Ton Overhead Crane for GT Hall 30
992 P09. Crane/Hoist CCC09-A CCP09-A-02a 16 Ton Overhead Crane for Unstacking Rotor Disc 10 10-Aug-09 13-Sep-09 27-Sep-09
993 P09. Crane/Hoist CCC09-A CCP09-A-02b 16 Ton Overhead Crane for Unstacking Rotor Disc 20
994 P09. Crane/Hoist CCC09-A CCP09-A-02c 16 Ton Overhead Crane for Unstacking Rotor Disc 30
995 P09. Crane/Hoist CCC09-A CCP09-A-03a 3.6 Ton Underhung Crane for GTG Cooler #11 10-Aug-09 13-Sep-09 27-Sep-09
996 P09. Crane/Hoist CCC09-A CCP09-A-03b 3.6 Ton Underhung Crane for GTG Cooler #12 24-Nov-09 24-Nov-09
997 P09. Crane/Hoist CCC09-A CCP09-A-03c 3.6 Ton Underhung Crane for GTG Cooler #21 18-May-10
998 P09. Crane/Hoist CCC09-A CCP09-A-03d 3.6 Ton Underhung Crane for GTG Cooler #22 13-Jul-10
999 P09. Crane/Hoist CCC09-A CCP09-A-03e 3.6 Ton Underhung Crane for GTG Cooler #31
1000 P09. Crane/Hoist CCC09-A CCP09-A-03f 3.6 Ton Underhung Crane for GTG Cooler #32
1001 P09. Crane/Hoist CCC09-A CCP09-A-04a 6.5 Ton Underhung Crane for Aux Equipment Skid #11 10-Aug-09 13-Sep-09 27-Sep-09
1002 P09. Crane/Hoist CCC09-A CCP09-A-04b 6.5 Ton Underhung Crane for Aux Equipment Skid #12 27-Sep-09 12-Oct-09 13-Oct-09
1003 P09. Crane/Hoist CCC09-A CCP09-A-04c 6.5 Ton Underhung Crane for Aux Equipment Skid #21 5-Apr-10
1004 P09. Crane/Hoist CCC09-A CCP09-A-04d 6.5 Ton Underhung Crane for Aux Equipment Skid #22 27-Apr-10
1005 P09. Crane/Hoist CCC09-A CCP09-A-04e 6.5 Ton Underhung Crane for Aux Equipment Skid #31
1006 P09. Crane/Hoist CCC09-A CCP09-A-04f 6.5 Ton Underhung Crane for Aux Equipment Skid #32
1007 P09. Crane/Hoist CCC09-A CCP09-A-05a ST Building Crane #10 5-Apr-10 25-Apr-10
1008 P09. Crane/Hoist CCC09-A CCP09-A-05b ST Building Crane #20 9-Sep-10 7-Sep-10
1009 P09. Crane/Hoist CCC09-A CCP09-A-05c ST Building Crane #30
1010 P09. Crane/Hoist CCC09-A CCP09-A-06a EDG Crane #10 25-Apr-10 14-Apr-10
1011 P09. Crane/Hoist CCC09-A CCP09-A-06b EDG Crane #20
1012 P09. Crane/Hoist CCC09-A CCP09-A-06c EDG Crane #30
1013 P09. Crane/Hoist CCC09-A CCP09-A-07 Common EDG Crane
1014 P09. Crane/Hoist CCC09-A CCP09-A-08 Black Start DG Crane
1015 P09. Crane/Hoist CCC09-A CCP09-A-09 Air Compressor Building Crane 27-Sep-09 1-Oct-09
1016 P09. Crane/Hoist CCC09-A CCP09-A-10a Gas Compressor Building Crane #10 3-May-10 19-Apr-10
1017 P09. Crane/Hoist CCC09-A CCP09-A-10b Gas Compressor Building Crane #20
1018 P09. Crane/Hoist CCC09-A CCP09-A-10c Gas Compressor Building Crane #30
1019 P09. Crane/Hoist CCC09-A CCP09-A-11 Central M&E Worshop Gantry Crane
1020 P09. Crane/Hoist CCC09-A CCP09-A-12 Fire Fighting Pump House Crane 26-May-10 25-Jul-10
1021 P09. Crane/Hoist CCC09-A CCP09-A-13a BFP House Hoist #11
1022 P09. Crane/Hoist CCC09-A CCP09-A-13b BFP House Hoist #12
1023 P09. Crane/Hoist CCC09-A CCP09-A-13c BFP House Hoist #21
1024 P09. Crane/Hoist CCC09-A CCP09-A-13d BFP House Hoist #22

44/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

1025 P09. Crane/Hoist CCC09-A CCP09-A-13e BFP House Hoist #31


1026 P09. Crane/Hoist CCC09-A CCP09-A-13f BFP House Hoist #32
1027 P09. Crane/Hoist CCC09-A CCP09-A-14a GT/HRSG PRS Crane #10 28-Mar-10 22-Apr-10
1028 P09. Crane/Hoist CCC09-A CCP09-A-14b GT/HRSG PRS Crane #20
1029 P09. Crane/Hoist CCC09-A CCP09-A-14c GT/HRSG PRS Crane #30
1030 P09. Crane/Hoist CCC09-A CCP09-A-15a CCW Pump Hoist #10
1031 P09. Crane/Hoist CCC09-A CCP09-A-15b CCW Pump Hoist #20
1032 P09. Crane/Hoist CCC09-A CCP09-A-15c CCW Pump Hoist #30
1033 P09. Crane/Hoist CCC09-A CCP09-A-16a Make-up Water Pump Hoist
1034 P09. Crane/Hoist CCC09-A CCP09-A-16b Demiwater Plant Hoist
1035 P09. Crane/Hoist CCC09-A CCP09-A-17a DFO Pump A Hoist
1036 P09. Crane/Hoist CCC09-A CCP09-A-17b DFO Pump B Hoist
1037 P09. Crane/Hoist CCC09-A CCP09-A-17c DFO Return Pump Hoist
1038 P09. Crane/Hoist CCC09-A CCP09-A-17d DFO Booster Pump Hoist
1039 P09. Crane/Hoist CCC09-A CCP09-A-18 Chilled Water Pump Hoist
1040 P09. Crane/Hoist CCC09-A CCP09-A-19a GCB #11 Hoist
1041 P09. Crane/Hoist CCC09-A CCP09-A-19b GCB #12 Hoist
1042 P09. Crane/Hoist CCC09-A CCP09-A-19c GCB #21 Hoist
1043 P09. Crane/Hoist CCC09-A CCP09-A-19d GCB #22 Hoist
1044 P09. Crane/Hoist CCC09-A CCP09-A-19e GCB #31 Hoist
1045 P09. Crane/Hoist CCC09-A CCP09-A-19f GCB #32 Hoist
1046 P09. Crane/Hoist CCC09-A CCP09-A-20a GT Workshop Crane #10
1047 P09. Crane/Hoist CCC09-A CCP09-A-20b GT Workshop Crane #20
1048 P09. Crane/Hoist CCC09-A CCP09-A-20c GT Workshop Crane #30
1049 P10. WS EQUIP CCC10-A CCP10-A-01 Mechanical Workshop Equipment
1050 P10. WS EQUIP CCC10-A CCP10-A-02 Instrument & Control Workshop
1051 P11. DG Sys CCC11-A CCP11-A-01 Emergency Diesel Generator 1 for BL 1 23-Aug-10
1052 P11. DG Sys CCC11-A CCP11-A-02 Emergency Diesel Generator 2 for BL 1 23-Aug-10
1053 P11. DG Sys CCC11-B CCP11-B-01 Emergency Diesel Generator 1 for BL 2
1054 P11. DG Sys CCC11-B CCP11-B-02 Emergency Diesel Generator 2 for BL 2
1055 P11. DG Sys CCC11-C CCP11-C-01 Emergency Diesel Generator 1 for BL 3
1056 P11. DG Sys CCC11-C CCP11-C-02 Emergency Diesel Generator 2 for BL 3
1057 P11. DG Sys CCC11-D CCP11-D-01 Emergency Diesel Generator 1 for Common
1058 P11. DG Sys CCC11-D CCP11-D-02 Emergency Diesel Generator 2 for Common
1059 P11. DG Sys CCC11-E CCP11-E-01 Black Start Diesel Generator #1
1060 P11. DG Sys CCC11-E CCP11-E-02 Black Start Diesel Generator #2
1061 P11. DG Sys CCC11-E CCP11-E-03 Black Start Diesel Generator #3
1062 P11. DG Sys CCC11-E CCP11-E-04 Black Start Diesel Generator #4
1063 P16. HVAC CCC16-A CCP16-A-01-a Gate House
1064 P16. HVAC CCC16-A CCP16-A-01-b Gate House LV Switchgear
1065 P16. HVAC CCC16-A CCP16-A-01-c Gate House DDC System

45/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

1066 P16. HVAC CCC16-A CCP16-A-02-a Main Gate - JAP


1067 P16. HVAC CCC16-A CCP16-A-02-b Main Gate - JAP LV Switchgear
1068 P16. HVAC CCC16-A CCP16-A-02-c Main Gate - JAP DDC System
1069 P16. HVAC CCC16-A CCP16-A-03-a Central Electrical & Mechanical Workshop
1070 P16. HVAC CCC16-A CCP16-A-03-b Central Electrical & Mechanical Workshop LV Switchgear
1071 P16. HVAC CCC16-A CCP16-A-03-c Central Electrical & Mechanical Workshop DDC System
1072 P16. HVAC CCC16-A CCP16-A-04-a Mechanical & Electrical Storage
1073 P16. HVAC CCC16-A CCP16-A-04-b Mechanical & Electrical Storage LV Switechgear
1074 P16. HVAC CCC16-A CCP16-A-04-c Mechanical & Electrical Storage DDC System
1075 P16. HVAC CCC16-A CCP16-A-05-a Heat Treatment / Sand Blasting Workshop
1076 P16. HVAC CCC16-A CCP16-A-06-a Carpenter Workshop
1077 P16. HVAC CCC16-A CCP16-A-06-b Carpenter Workshop LV Switchgear
1078 P16. HVAC CCC16-A CCP16-A-06-c Carpenter Workshop DDC System
1079 P16. HVAC CCC16-A CCP16-A-07-a Common Switchgear Building
1080 P16. HVAC CCC16-A CCP16-A-07-b Common Switchgear Building LV Switchgear
1081 P16. HVAC CCC16-A CCP16-A-07-c Common Switchgear Building DDC System
1082 P16. HVAC CCC16-A CCP16-A-08-a Central Control Building
1083 P16. HVAC CCC16-A CCP16-A-08-b Central Control Building LV Switchgear
1084 P16. HVAC CCC16-A CCP16-A-08-c Central Control Building DDC System
1085 P16. HVAC CCC16-A CCP16-A-09a-1 Chemical Dosing House #1
1086 P16. HVAC CCC16-A CCP16-A-09a-2 Chemical Dosing House #1 LV Switchgear
1087 P16. HVAC CCC16-A CCP16-A-09a-3 Chemical Dosing House #1 DDC System
1088 P16. HVAC CCC16-A CCP16-A-09b-1 Chemical Dosing House #2
1089 P16. HVAC CCC16-A CCP16-A-09b-2 Chemical Dosing House #2 LV Switchgear
1090 P16. HVAC CCC16-A CCP16-A-09b-3 Chemical Dosing House #2 DDC System
1091 P16. HVAC CCC16-A CCP16-A-09c-1 Chemical Dosing House #3
1092 P16. HVAC CCC16-A CCP16-A-09c-2 Chemical Dosing House #3 LV Switchgear
1093 P16. HVAC CCC16-A CCP16-A-09c-3 Chemical Dosing House #3 DDC System
1094 P16. HVAC CCC16-A CCP16-A-10a-1 STG Building #10
1095 P16. HVAC CCC16-A CCP16-A-10a-2 STG Building #10 LV Switchgear
1096 P16. HVAC CCC16-A CCP16-A-10a-3 STG Building #10 DDC System
1097 P16. HVAC CCC16-A CCP16-A-10b-1 STG Building #20
1098 P16. HVAC CCC16-A CCP16-A-10b-2 STG Building #20 LV Switchgear
1099 P16. HVAC CCC16-A CCP16-A-10b-3 STG Building #20 DDC System
1100 P16. HVAC CCC16-A CCP16-A-10c-1 STG Building #30
1101 P16. HVAC CCC16-A CCP16-A-10c-2 STG Building #30 LV Switchgear
1102 P16. HVAC CCC16-A CCP16-A-10c-3 STG Building #30 DDC System
1103 P16. HVAC CCC16-A CCP16-A-11a-1 GTG Building #10
1104 P16. HVAC CCC16-A CCP16-A-11a-2 GTG Building #10 LV Switchgear
1105 P16. HVAC CCC16-A CCP16-A-11a-3 GTG Building #10 DDC System
1106 P16. HVAC CCC16-A CCP16-A-11b-1 GTG Building #20

46/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

1107 P16. HVAC CCC16-A CCP16-A-11b-2 GTG Building #20 LV Switchgear


1108 P16. HVAC CCC16-A CCP16-A-11b-3 GTG Building #20 DDC System
1109 P16. HVAC CCC16-A CCP16-A-11c-1 GTG Building #30
1110 P16. HVAC CCC16-A CCP16-A-11c-2 GTG Building #30 LV Switchgear
1111 P16. HVAC CCC16-A CCP16-A-11c-3 GTG Building #30 DDC System
1112 P16. HVAC CCC16-A CCP16-A-12a LEB for Carpenter Workshop
1113 P16. HVAC CCC16-A CCP16-A-12b LEB for Carpenter Workshop LV Switchgear
1114 P16. HVAC CCC16-A CCP16-A-12c LEB for Carpenter Workshop DDC System
1115 P16. HVAC CCC16-A CCP16-A-13a Black Start & Emergency Diesel Generator (Common) Building
1116 P16. HVAC CCC16-A CCP16-A-13b Black Start & Emergency Diesel Generator (Common) Building LV Switchgear
1117 P16. HVAC CCC16-A CCP16-A-13c Black Start & Emergency Diesel Generator (Common) Building DDC System
1118 P16. HVAC CCC16-A CCP16-A-14a-1 Emergency Diesel Generator Building #10
1119 P16. HVAC CCC16-A CCP16-A-14a-2 Emergency Diesel Generator Building #10 LV Switchgear
1120 P16. HVAC CCC16-A CCP16-A-14a-3 Emergency Diesel Generator Building #10 DDC System
1121 P16. HVAC CCC16-A CCP16-A-14b-1 Emergency Diesel Generator Building #20
1122 P16. HVAC CCC16-A CCP16-A-14b-2 Emergency Diesel Generator Building #20 LV Switchgear
1123 P16. HVAC CCC16-A CCP16-A-14b-3 Emergency Diesel Generator Building #20 DDC System
1124 P16. HVAC CCC16-A CCP16-A-14c-1 Emergency Diesel Generator Building #30
1125 P16. HVAC CCC16-A CCP16-A-14c-2 Emergency Diesel Generator Building #30 LV Switchgear
1126 P16. HVAC CCC16-A CCP16-A-14c-3 Emergency Diesel Generator Building #30 DDC System
1127 P16. HVAC CCC16-A CCP16-A-15a-1 LEB for HRSG #11
1128 P16. HVAC CCC16-A CCP16-A-15a-2 LEB for HRSG #11 LV Swithcgear
1129 P16. HVAC CCC16-A CCP16-A-15a-3 LEB for HRSG #11 DDC System
1130 P16. HVAC CCC16-A CCP16-A-15b-1 LEB for HRSG #12
1131 P16. HVAC CCC16-A CCP16-A-15b-2 LEB for HRSG #12 LV Swithcgear
1132 P16. HVAC CCC16-A CCP16-A-15b-3 LEB for HRSG #12 DDC System
1133 P16. HVAC CCC16-A CCP16-A-15c-1 LEB for HRSG #21
1134 P16. HVAC CCC16-A CCP16-A-15c-2 LEB for HRSG #21 LV Swithcgear
1135 P16. HVAC CCC16-A CCP16-A-15c-3 LEB for HRSG #21 DDC System
1136 P16. HVAC CCC16-A CCP16-A-15d-1 LEB for HRSG #22
1137 P16. HVAC CCC16-A CCP16-A-15d-2 LEB for HRSG #22 LV Swithcgear
1138 P16. HVAC CCC16-A CCP16-A-15d-3 LEB for HRSG #22 DDC System
1139 P16. HVAC CCC16-A CCP16-A-15e-1 LEB for HRSG #31
1140 P16. HVAC CCC16-A CCP16-A-15e-2 LEB for HRSG #31 LV Swithcgear
1141 P16. HVAC CCC16-A CCP16-A-15e-3 LEB for HRSG #31 DDC System
1142 P16. HVAC CCC16-A CCP16-A-15f-1 LEB for HRSG #32
1143 P16. HVAC CCC16-A CCP16-A-15f-2 LEB for HRSG #32 LV Swithcgear
1144 P16. HVAC CCC16-A CCP16-A-15f-3 LEB for HRSG #32 DDC System
1145 P16. HVAC CCC16-A CCP16-A-16a-1 LEB for GTG #11
1146 P16. HVAC CCC16-A CCP16-A-16a-2 LEB for GTG #11 LV Switchgear
1147 P16. HVAC CCC16-A CCP16-A-16a-3 LEB for GTG #11 DDC System

47/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

1148 P16. HVAC CCC16-A CCP16-A-16b-1 LEB for GTG #12


1149 P16. HVAC CCC16-A CCP16-A-16b-2 LEB for GTG #12 LV Switchgear
1150 P16. HVAC CCC16-A CCP16-A-16b-3 LEB for GTG #12 DDC System
1151 P16. HVAC CCC16-A CCP16-A-16c-1 LEB for GTG #21
1152 P16. HVAC CCC16-A CCP16-A-16c-2 LEB for GTG #21 LV Switchgear
1153 P16. HVAC CCC16-A CCP16-A-16c-3 LEB for GTG #21 DDC System
1154 P16. HVAC CCC16-A CCP16-A-16d-1 LEB for GTG #22
1155 P16. HVAC CCC16-A CCP16-A-16d-2 LEB for GTG #22 LV Switchgear
1156 P16. HVAC CCC16-A CCP16-A-16d-3 LEB for GTG #22 DDC System
1157 P16. HVAC CCC16-A CCP16-A-16e-1 LEB for GTG #31
1158 P16. HVAC CCC16-A CCP16-A-16e-2 LEB for GTG #31 LV Switchgear
1159 P16. HVAC CCC16-A CCP16-A-16e-3 LEB for GTG #31 DDC System
1160 P16. HVAC CCC16-A CCP16-A-16f-1 LEB for GTG #32
1161 P16. HVAC CCC16-A CCP16-A-16f-2 LEB for GTG #32 LV Switchgear
1162 P16. HVAC CCC16-A CCP16-A-16f-3 LEB for GTG #32 DDC System
1163 P16. HVAC CCC16-A CCP16-A-17a Fire Fighting Water Pump House
1164 P16. HVAC CCC16-A CCP16-A-17b Fire Fighting Water Pump House LV Switchgear
1165 P16. HVAC CCC16-A CCP16-A-17c Fire Fighting Water Pump House DDC System
1166 P16. HVAC CCC16-A CCP16-A-18a Fire Fighting Station
1167 P16. HVAC CCC16-A CCP16-A-18b Fire Fighting Station LV Switchgear
1168 P16. HVAC CCC16-A CCP16-A-18c Fire Fighting Station DDC System
1169 P16. HVAC CCC16-A CCP16-A-19a Central HVAC Building
1170 P16. HVAC CCC16-A CCP16-A-19b Central HVAC Building LV Switchgear
1171 P16. HVAC CCC16-A CCP16-A-19c Central HVAC Building DDC System
1172 P16. HVAC CCC16-A CCP16-A-20a Demineralization Water Plant
1173 P16. HVAC CCC16-A CCP16-A-20b Demineralization Water Plant LV Switchgear
1174 P16. HVAC CCC16-A CCP16-A-20c Demineralization Water Plant DDC System
1175 P16. HVAC CCC16-A CCP16-A-21a Compressed Air Station
1176 P16. HVAC CCC16-A CCP16-A-21b Compressed Air Station LV Switchgear
1177 P16. HVAC CCC16-A CCP16-A-21c Compressed Air Station DDC System
1178 P16. HVAC CCC16-A CCP16-A-22a Waste Water Treatment Building
1179 P16. HVAC CCC16-A CCP16-A-22b Waste Water Treatment Building LV Switchgear
1180 P16. HVAC CCC16-A CCP16-A-22c Waste Water Treatment Building DDC System
1181 P16. HVAC CCC16-A CCP16-A-23a Sewage Treatment Building
1182 P16. HVAC CCC16-A CCP16-A-23b Sewage Treatment Building LV Switchgear
1183 P16. HVAC CCC16-A CCP16-A-23c Sewage Treatment Building DDC System
1184 P16. HVAC CCC16-A CCP16-A-24a Chemical Storage Building for Desal Plant
1185 P16. HVAC CCC16-A CCP16-A-24b Chemical Storage Building for Desal Plant LV Switchgear
1186 P16. HVAC CCC16-A CCP16-A-24c Chemical Storage Building for Desal Plant DDC System
1187 P16. HVAC CCC16-A CCP16-A-25a LEB D.F.O Forwarding Station
1188 P16. HVAC CCC16-A CCP16-A-25b LEB D.F.O Forwarding Station LV Switchgear

48/119
Construction Completion Package List
(M & E EQ + Cable / I&C) 8-Dec-21
Numbering Approve Date Commissioning
No. PKG. No. System Description
Group CCC No. Mech Elect (CCC Accept)

1189 P16. HVAC CCC16-A CCP16-A-25c LEB D.F.O Forwarding Station DDC System
1190 P16. HVAC CCC16-A CCP16-A-26a Foam Station
1191 P16. HVAC CCC16-A CCP16-A-26b Foam Station LV Switchgear
1192 P16. HVAC CCC16-A CCP16-A-26c Foam Station DDC System
1193 P16. HVAC CCC16-A CCP16-A-27a LEB for GPRS
1194 P16. HVAC CCC16-A CCP16-A-27b LEB for GPRS LV Switchgear
1195 P16. HVAC CCC16-A CCP16-A-27c LEB for GPRS DDC System
1196 P16. HVAC CCC16-A CCP16-A-28a LEB for M&E Workshop
1197 P16. HVAC CCC16-A CCP16-A-28b LEB for M&E Workshop LV Switchgear
1198 P16. HVAC CCC16-A CCP16-A-28c LEB for M&E Workshop DDC System
1199 P16. HVAC CCC16-A CCP16-A-29a-1 Control Room for Fuel Gas System #1
1200 P16. HVAC CCC16-A CCP16-A-29a-2 Control Room for Fuel Gas System #1 LV Switchgear
1201 P16. HVAC CCC16-A CCP16-A-29a-3 Control Room for Fuel Gas System #1 DDC System
1202 P16. HVAC CCC16-A CCP16-A-29b-1 Control Room for Fuel Gas System #2
1203 P16. HVAC CCC16-A CCP16-A-29b-2 Control Room for Fuel Gas System #2 LV Switchgear
1204 P16. HVAC CCC16-A CCP16-A-29b-3 Control Room for Fuel Gas System #2 DDC System
1205 P16. HVAC CCC16-A CCP16-A-29c-1 Control Room for Fuel Gas System #3
1206 P16. HVAC CCC16-A CCP16-A-29c-2 Control Room for Fuel Gas System #3 LV Switchgear
1207 P16. HVAC CCC16-A CCP16-A-29c-3 Control Room for Fuel Gas System #3 DDC System
1208 P16. HVAC CCC16-A CCP16-A-29d Gas Compressor Station 10
1209 P16. HVAC CCC16-A CCP16-A-29e Gas Compressor Station 20
1210 P16. HVAC CCC16-A CCP16-A-29f Gas Compressor Station 30
1211 P16. HVAC CCC16-A CCP16-A-30a HVAC Chiller Plant MCC & TR Building
1212 P16. HVAC CCC16-A CCP16-A-30b HVAC Chiller Plant MCC & TR Building LV Switchgear(for Room)
1213 P16. HVAC CCC16-A CCP16-A-30c HVAC Chiller Plant MCC & TR Building DDC System
1214 P16. HVAC CCC16-A CCP16-A-30d 380V LV Switchgear -1 (for Chiller)
1215 P16. HVAC CCC16-A CCP16-A-30e 380V LV Switchgear -2 (for Chiller)
1216 P16. HVAC CCC16-A CCP16-A-30f 380V LV Switchgear -3 (for Chiller)
1217 P16. HVAC CCC16-A CCP16-A-30g 380V LV Switchgear -4 (for Chiller)
1218 P16. HVAC CCC16-A CCP16-A-30h 380V LV Switchgear -5 (for Chiller)
1219 P16. HVAC CCC16-A CCP16-A-30i 380V LV Switchgear -6 (for Chiller)
1220 P16. HVAC CCC16-A CCP16-A-30j 380V LV Switchgear -7 (for Chiller)
1221 P16. HVAC CCC16-A CCP16-A-30k 380V LV Switchgear -8 (for Chiller)
1222 P16. HVAC CCC16-A CCP16-A-31a LEB Fire Fighting Water Pump House
1223 P16. HVAC CCC16-A CCP16-A-31b LEB Fire Fighting Water Pump House LV Switchgear
1224 P16. HVAC CCC16-A CCP16-A-31c LEB Fire Fighting Water Pump House DDC System

CANCEL 37 PKG
Approved CCP Q'ty 294

49/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)

CCP12-A-01 GTG 11KV Unit Board MV Switchgear System LER for GTG GF
1 P12. ELEC. Sys CCC12-A CCP12-A-01a GTG #11 11KV Unit Board MV Switchgear-1 9-Mar-09 27-May-09
2 P12. ELEC. Sys CCC12-A CCP12-A-01b GTG #11 11KV Unit Board MV Switchgear-2 9-Mar-09 27-May-09
3 P12. ELEC. Sys CCC12-A CCP12-A-01c GTG #12 11KV Unit Board MV Switchgear-1 7-Dec-09 8-Dec-09
4 P12. ELEC. Sys CCC12-A CCP12-A-01d GTG #12 11KV Unit Board MV Switchgear-2 7-Dec-09 8-Dec-09
5 P12. ELEC. Sys CCC12-A CCP12-A-01f GTG #21 11KV Unit Board MV Switchgear-1 25-May-10 26-May-10
6 P12. ELEC. Sys CCC12-A CCP12-A-01h GTG #21 11KV Unit Board MV Switchgear-2 25-May-10 26-May-10
7 P12. ELEC. Sys CCC12-A CCP12-A-01i GTG #22 11KV Unit Board MV Switchgear-1 24-Aug-10
8 P12. ELEC. Sys CCC12-A CCP12-A-01j GTG #22 11KV Unit Board MV Switchgear-2 24-Aug-10
9 P12. ELEC. Sys CCC12-A CCP12-A-01k GTG #31 11KV Unit Board MV Switchgear-1
10 P12. ELEC. Sys CCC12-A CCP12-A-01l GTG #31 11KV Unit Board MV Switchgear-2
11 P12. ELEC. Sys CCC12-A CCP12-A-01e GTG #32 11KV Unit Board MV Switchgear-1
12 P12. ELEC. Sys CCC12-A CCP12-A-01g GTG #32 11KV Unit Board MV Switchgear-2
CCP12-A-02 GTG -380V GTG Essential Board LV Switchgear System LER for GTG GF
13 P12. ELEC. Sys CCC12-A CCP12-A-02a GTG #11 380V GTG Essential Board LV Switchgear-1 20-Jul-09 20-Jul-09
14 P12. ELEC. Sys CCC12-A CCP12-A-02b GTG #11 380V GTG Essential Board LV Switchgear-2 20-Jul-09 20-Jul-09
15 P12. ELEC. Sys CCC12-A CCP12-A-02c GTG #12 380V GTG Essential Board LV Switchgear-1 19-Nov-09 24-Nov-09
16 P12. ELEC. Sys CCC12-A CCP12-A-02d GTG #12 380V GTG Essential Board LV Switchgear-2 19-Nov-09 24-Nov-09
17 P12. ELEC. Sys CCC12-A CCP12-A-02e GTG #21 380V GTG Essential Board LV Switchgear-1 25-May-10 26-May-10
18 P12. ELEC. Sys CCC12-A CCP12-A-02f GTG #21 380V GTG Essential Board LV Switchgear-2 25-May-10 26-May-10
19 P12. ELEC. Sys CCC12-A CCP12-A-02g GTG #22 380V GTG Essential Board LV Switchgear-1 29-Jul-10 4-Aug-10
20 P12. ELEC. Sys CCC12-A CCP12-A-02h GTG #22 380V GTG Essential Board LV Switchgear-2 29-Jul-10 4-Aug-10
21 P12. ELEC. Sys CCC12-A CCP12-A-02i GTG #31 380V GTG Essential Board LV Switchgear-1
22 P12. ELEC. Sys CCC12-A CCP12-A-02j GTG #31 380V GTG Essential Board LV Switchgear-2
23 P12. ELEC. Sys CCC12-A CCP12-A-02k GTG #32 380V GTG Essential Board LV Switchgear-1
24 P12. ELEC. Sys CCC12-A CCP12-A-02l GTG #32 380V GTG Essential Board LV Switchgear-2
CCP12-A-03 GTG -380V GTG Normal Board LV Switchgear System LER for GTG GF
25 P12. ELEC. Sys CCC12-A CCP12-A-03a GTG #11 380V GTG Normal Board LV Switchgear -1 20-Jul-09 20-Jul-09
26 P12. ELEC. Sys CCC12-A CCP12-A-03b GTG #11 380V GTG Normal Board LV Switchgear -2 20-Jul-09 20-Jul-09
27 P12. ELEC. Sys CCC12-A CCP12-A-03c GTG #12 380V GTG Normal Board LV Switchgear -1 19-Nov-09 24-Nov-09
28 P12. ELEC. Sys CCC12-A CCP12-A-03d GTG #12 380V GTG Normal Board LV Switchgear -2 19-Nov-09 24-Nov-09
29 P12. ELEC. Sys CCC12-A CCP12-A-03e GTG #21 380V GTG Normal Board LV Switchgear -1 25-May-10 26-May-10

50/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
30 P12. ELEC. Sys CCC12-A CCP12-A-03f GTG #21 380V GTG Normal Board LV Switchgear -2 25-May-10 26-May-10
31 P12. ELEC. Sys CCC12-A CCP12-A-03g GTG #22 380V GTG Normal Board LV Switchgear -1 29-Jul-10 4-Aug-10
32 P12. ELEC. Sys CCC12-A CCP12-A-03h GTG #22 380V GTG Normal Board LV Switchgear -2 29-Jul-10 4-Aug-10
33 P12. ELEC. Sys CCC12-A CCP12-A-03i GTG #31 380V GTG Normal Board LV Switchgear -1
34 P12. ELEC. Sys CCC12-A CCP12-A-03j GTG #31 380V GTG Normal Board LV Switchgear -2
35 P12. ELEC. Sys CCC12-A CCP12-A-03k GTG #32 380V GTG Normal Board LV Switchgear -1
36 P12. ELEC. Sys CCC12-A CCP12-A-03l GTG #32 380V GTG Normal Board LV Switchgear -2
CCP12-A-04 GTG -LV Switchgear Transformer System LER for GTG GF
37 P12. ELEC. Sys CCC12-A CCP12-A-04a GTG #11 Transformer LV Switchgear-1 11-May-09 27-May-09
38 P12. ELEC. Sys CCC12-A CCP12-A-04b GTG #11 Transformer LV Switchgear-2 11-May-09 27-May-09
39 P12. ELEC. Sys CCC12-A CCP12-A-04c GTG #12 Transformer LV Switchgear-1 12-Nov-09 14-Nov-09
40 P12. ELEC. Sys CCC12-A CCP12-A-04d GTG #12 Transformer LV Switchgear-2 12-Nov-09 14-Nov-09
41 P12. ELEC. Sys CCC12-A CCP12-A-04e GTG #21 Transformer LV Switchgear-1 16-May-10 17-May-10
42 P12. ELEC. Sys CCC12-A CCP12-A-04f GTG #21 Transformer LV Switchgear-2 16-May-10 17-May-10
43 P12. ELEC. Sys CCC12-A CCP12-A-04g GTG #22 Transformer LV Switchgear-1 11-Jul-10 14-Jul-10
44 P12. ELEC. Sys CCC12-A CCP12-A-04h GTG #22 Transformer LV Switchgear-2 11-Jul-10 14-Jul-10
45 P12. ELEC. Sys CCC12-A CCP12-A-04i GTG #31 Transformer LV Switchgear-1
46 P12. ELEC. Sys CCC12-A CCP12-A-04j GTG #31 Transformer LV Switchgear-2
47 P12. ELEC. Sys CCC12-A CCP12-A-04k GTG #32 Transformer LV Switchgear-1
48 P12. ELEC. Sys CCC12-A CCP12-A-04l GTG #32 Transformer LV Switchgear-2
CCP12-A-05 GTG 220V DC Battery System LER for GTG GF
49 P12. ELEC. Sys CCC12-A CCP12-A-05a GTG #11 220V DC Battery -1 4-May-09 27-May-09
50 P12. ELEC. Sys CCC12-A CCP12-A-05b GTG #11 220V DC Battery -2 4-May-09 27-May-09
51 P12. ELEC. Sys CCC12-A CCP12-A-05c GTG #12 220V DC Battery -1 3-Nov-09 4-Nov-09
52 P12. ELEC. Sys CCC12-A CCP12-A-05d GTG #12 220V DC Battery -2 3-Nov-09 4-Nov-09
53 P12. ELEC. Sys CCC12-A CCP12-A-05e GTG #21 220V DC Battery -1 25-Mar-10 10-Apr-10
54 P12. ELEC. Sys CCC12-A CCP12-A-05f GTG #21 220V DC Battery -2 25-Mar-10 10-Apr-10
55 P12. ELEC. Sys CCC12-A CCP12-A-05g GTG #22 220V DC Battery -1 19-Jul-10 4-Aug-10
56 P12. ELEC. Sys CCC12-A CCP12-A-05h GTG #22 220V DC Battery -2 19-Jul-10 4-Aug-10
57 P12. ELEC. Sys CCC12-A CCP12-A-05i GTG #31 220V DC Battery -1
58 P12. ELEC. Sys CCC12-A CCP12-A-05j GTG #31 220V DC Battery -2
59 P12. ELEC. Sys CCC12-A CCP12-A-05k GTG #32 220V DC Battery -1
60 P12. ELEC. Sys CCC12-A CCP12-A-05l GTG #32 220V DC Battery -2

51/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)

CCP12-A-06 GTG 110V DC Battery System LER for GTG GF


61 P12. ELEC. Sys CCC12-A CCP12-A-06a GTG #11 110V DC Battery -1 4-May-09 4-May-09
62 P12. ELEC. Sys CCC12-A CCP12-A-06b GTG #11 110V DC Battery -2 4-May-09 4-May-09
63 P12. ELEC. Sys CCC12-A CCP12-A-06c GTG #12 110V DC Battery -1 3-Nov-09 4-Nov-09
64 P12. ELEC. Sys CCC12-A CCP12-A-06d GTG #12 110V DC Battery -2 3-Nov-09 4-Nov-09
65 P12. ELEC. Sys CCC12-A CCP12-A-06e GTG #21 110V DC Battery -1 25-Mar-10 10-Apr-10
66 P12. ELEC. Sys CCC12-A CCP12-A-06f GTG #21 110V DC Battery -2 25-Mar-10 10-Apr-10
67 P12. ELEC. Sys CCC12-A CCP12-A-06g GTG #22 110V DC Battery -1 19-Jul-10 4-Aug-10
68 P12. ELEC. Sys CCC12-A CCP12-A-06h GTG #22 110V DC Battery -2 19-Jul-10 4-Aug-10
69 P12. ELEC. Sys CCC12-A CCP12-A-06i GTG #31 110V DC Battery -1
70 P12. ELEC. Sys CCC12-A CCP12-A-06j GTG #31 110V DC Battery -2
71 P12. ELEC. Sys CCC12-A CCP12-A-06k GTG #32 110V DC Battery -1
72 P12. ELEC. Sys CCC12-A CCP12-A-06l GTG #32 110V DC Battery -2
CCP12-A-07 GTG - Fault Monitoring System LER for GTG FF
73 P12. ELEC. Sys CCC12-A CCP12-A-07a GTG #11 Fault Monitoring System
74 P12. ELEC. Sys CCC12-A CCP12-A-07b GTG #12 Fault Monitoring System Cancel
75 P12. ELEC. Sys CCC12-A CCP12-A-07c GTG #21 Fault Monitoring System
76 P12. ELEC. Sys CCC12-A CCP12-A-07d GTG #22 Fault Monitoring System Cancel
77 P12. ELEC. Sys CCC12-A CCP12-A-07e GTG #31 Fault Monitoring System
78 P12. ELEC. Sys CCC12-A CCP12-A-07f GTG #32 Fault Monitoring System Cancel
CCP12-A-08 GTG - 220V DC Distribution System LER for GTG FF
79 P12. ELEC. Sys CCC12-A CCP12-A-08a GTG #11 220V DC Distribution -1 4-May-09 4-May-09
80 P12. ELEC. Sys CCC12-A CCP12-A-08b GTG #11 220V DC Distribution -2 4-May-09 4-May-09
81 P12. ELEC. Sys CCC12-A CCP12-A-08c GTG #12 220V DC Distribution -1 3-Dec-09 15-Dec-09
82 P12. ELEC. Sys CCC12-A CCP12-A-08d GTG #12 220V DC Distribution -2 3-Dec-09 15-Dec-09
83 P12. ELEC. Sys CCC12-A CCP12-A-08e GTG #21 220V DC Distribution -1 10-May-10 11-May-10
84 P12. ELEC. Sys CCC12-A CCP12-A-08f GTG #21 220V DC Distribution -2 10-May-10 11-May-10
85 P12. ELEC. Sys CCC12-A CCP12-A-08g GTG #22 220V DC Distribution -1 29-Jul-10 1-Aug-10
86 P12. ELEC. Sys CCC12-A CCP12-A-08h GTG #22 220V DC Distribution -2 29-Jul-10 1-Aug-10
87 P12. ELEC. Sys CCC12-A CCP12-A-08i GTG #31 220V DC Distribution -1
88 P12. ELEC. Sys CCC12-A CCP12-A-08j GTG #31 220V DC Distribution -2
89 P12. ELEC. Sys CCC12-A CCP12-A-08k GTG #32 220V DC Distribution -1

52/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
90 P12. ELEC. Sys CCC12-A CCP12-A-08l GTG #32 220V DC Distribution -2
CCP12-A-09 GTG - 110V DC Distribution System LER for GTG FF
91 P12. ELEC. Sys CCC12-A CCP12-A-09a GTG #11 110V DC Distribution -1 4-May-09 4-May-09
92 P12. ELEC. Sys CCC12-A CCP12-A-09b GTG #11 110V DC Distribution -2 4-May-09 4-May-09
93 P12. ELEC. Sys CCC12-A CCP12-A-09c GTG #12 110V DC Distribution -1 3-Dec-09 15-Dec-09
94 P12. ELEC. Sys CCC12-A CCP12-A-09d GTG #12 110V DC Distribution -2 3-Dec-09 15-Dec-09
95 P12. ELEC. Sys CCC12-A CCP12-A-09e GTG #21 110V DC Distribution -1 10-May-10 11-May-10
96 P12. ELEC. Sys CCC12-A CCP12-A-09f GTG #21 110V DC Distribution -2 10-May-10 11-May-10
97 P12. ELEC. Sys CCC12-A CCP12-A-09g GTG #22 110V DC Distribution -1 29-Jul-10 1-Aug-10
98 P12. ELEC. Sys CCC12-A CCP12-A-09h GTG #22 110V DC Distribution -2 29-Jul-10 1-Aug-10
99 P12. ELEC. Sys CCC12-A CCP12-A-09i GTG #31 110V DC Distribution -1
100 P12. ELEC. Sys CCC12-A CCP12-A-09j GTG #31 110V DC Distribution -2
101 P12. ELEC. Sys CCC12-A CCP12-A-09k GTG #32 110V DC Distribution -1
102 P12. ELEC. Sys CCC12-A CCP12-A-09l GTG #32 110V DC Distribution -2
CCP12-A-10 GTG - 220V Safe AC Distribution System LER for GTG FF
103 P12. ELEC. Sys CCC12-A CCP12-A-10a GTG #11 220V Safe AC Distribution-1 4-May-09 4-May-09
104 P12. ELEC. Sys CCC12-A CCP12-A-10b GTG #11 220V Safe AC Distribution-2 4-May-09 4-May-09
105 P12. ELEC. Sys CCC12-A CCP12-A-10c GTG #12 220V Safe AC Distribution-1 3-Dec-09 15-Dec-09
106 P12. ELEC. Sys CCC12-A CCP12-A-10d GTG #12 220V Safe AC Distribution-2 3-Dec-09 15-Dec-09
107 P12. ELEC. Sys CCC12-A CCP12-A-10e GTG #21 220V Safe AC Distribution-1 10-May-10 11-May-10
108 P12. ELEC. Sys CCC12-A CCP12-A-10f GTG #21 220V Safe AC Distribution-2 10-May-10 11-May-10
109 P12. ELEC. Sys CCC12-A CCP12-A-10g GTG #22 220V Safe AC Distribution-1 29-Jul-10 1-Aug-10
110 P12. ELEC. Sys CCC12-A CCP12-A-10h GTG #22 220V Safe AC Distribution-2 29-Jul-10 1-Aug-10
111 P12. ELEC. Sys CCC12-A CCP12-A-10i GTG #31 220V Safe AC Distribution-1
112 P12. ELEC. Sys CCC12-A CCP12-A-10j GTG #31 220V Safe AC Distribution-2
113 P12. ELEC. Sys CCC12-A CCP12-A-10k GTG #32 220V Safe AC Distribution-1
114 P12. ELEC. Sys CCC12-A CCP12-A-10l GTG #32 220V Safe AC Distribution-2
CCP12-A-11 GTG - 220V DC Battery Charger System LER for GTG FF
115 P12. ELEC. Sys CCC12-A CCP12-A-11a GTG #11 220V DC Battery Charger-1 20-Apr-09 27-May-09
116 P12. ELEC. Sys CCC12-A CCP12-A-11b GTG #11 220V DC Battery Charger-2 20-Apr-09 27-May-09
117 P12. ELEC. Sys CCC12-A CCP12-A-11c GTG #12 220V DC Battery Charger-1 19-Nov-09 24-Nov-09
118 P12. ELEC. Sys CCC12-A CCP12-A-11d GTG #12 220V DC Battery Charger-2 19-Nov-09 24-Nov-09
119 P12. ELEC. Sys CCC12-A CCP12-A-11e GTG #21 220V DC Battery Charger-1 9-May-10 10-May-10

53/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
120 P12. ELEC. Sys CCC12-A CCP12-A-11f GTG #21 220V DC Battery Charger-2 9-May-10 10-May-10
121 P12. ELEC. Sys CCC12-A CCP12-A-11g GTG #22 220V DC Battery Charger-1 29-Jul-10 1-Aug-10
122 P12. ELEC. Sys CCC12-A CCP12-A-11h GTG #22 220V DC Battery Charger-2 29-Jul-10 1-Aug-10
123 P12. ELEC. Sys CCC12-A CCP12-A-11i GTG #31 220V DC Battery Charger-1
124 P12. ELEC. Sys CCC12-A CCP12-A-11j GTG #31 220V DC Battery Charger-2
125 P12. ELEC. Sys CCC12-A CCP12-A-11k GTG #32 220V DC Battery Charger-1
126 P12. ELEC. Sys CCC12-A CCP12-A-11l GTG #32 220V DC Battery Charger-2
CCP12-A-12 GTG - 110V DC Battery Charger System LER for GTG FF
127 P12. ELEC. Sys CCC12-A CCP12-A-12a GTG #11 110V DC Battery Charger-1 20-Apr-09 27-May-09
128 P12. ELEC. Sys CCC12-A CCP12-A-12b GTG #11 110V DC Battery Charger-2 20-Apr-09 27-May-09
129 P12. ELEC. Sys CCC12-A CCP12-A-12c GTG #12 110V DC Battery Charger-1 19-Nov-09 24-Nov-09
130 P12. ELEC. Sys CCC12-A CCP12-A-12d GTG #12 110V DC Battery Charger-2 19-Nov-09 24-Nov-09
131 P12. ELEC. Sys CCC12-A CCP12-A-12e GTG #21 110V DC Battery Charger-1 9-May-10 10-May-10
132 P12. ELEC. Sys CCC12-A CCP12-A-12f GTG #21 110V DC Battery Charger-2 9-May-10 10-May-10
133 P12. ELEC. Sys CCC12-A CCP12-A-12g GTG #22 110V DC Battery Charger-1 29-Jul-10 1-Aug-10
134 P12. ELEC. Sys CCC12-A CCP12-A-12h GTG #22 110V DC Battery Charger-2 29-Jul-10 1-Aug-10
135 P12. ELEC. Sys CCC12-A CCP12-A-12i GTG #31 110V DC Battery Charger-1
136 P12. ELEC. Sys CCC12-A CCP12-A-12j GTG #31 110V DC Battery Charger-2
137 P12. ELEC. Sys CCC12-A CCP12-A-12k GTG #32 110V DC Battery Charger-1
138 P12. ELEC. Sys CCC12-A CCP12-A-12l GTG #32 110V DC Battery Charger-2
CCP12-A-13 GTG - 220V DC /24 DC Converter System LER for GTG FF
139 P12. ELEC. Sys CCC12-A CCP12-A-13a GTG #11 220V DC /24 DC Converter -1 20-Apr-09 27-May-09
140 P12. ELEC. Sys CCC12-A CCP12-A-13b GTG #11 220V DC /24 DC Converter -2 20-Apr-09 27-May-09
141 P12. ELEC. Sys CCC12-A CCP12-A-13c GTG #12 220V DC /24 DC Converter -1 19-Nov-09 24-Nov-09
142 P12. ELEC. Sys CCC12-A CCP12-A-13d GTG #12 220V DC /24 DC Converter -2 19-Nov-09 24-Nov-09
143 P12. ELEC. Sys CCC12-A CCP12-A-13e GTG #21 220V DC /24 DC Converter -1 9-May-10 10-May-10
144 P12. ELEC. Sys CCC12-A CCP12-A-13f GTG #21 220V DC /24 DC Converter -2 9-May-10 10-May-10
145 P12. ELEC. Sys CCC12-A CCP12-A-13g GTG #22 220V DC /24 DC Converter -1 29-Jul-10 1-Aug-10
146 P12. ELEC. Sys CCC12-A CCP12-A-13h GTG #22 220V DC /24 DC Converter -2 29-Jul-10 1-Aug-10
147 P12. ELEC. Sys CCC12-A CCP12-A-13i GTG #21 220V DC /24 DC Converter -1
148 P12. ELEC. Sys CCC12-A CCP12-A-13j GTG #31 220V DC /24 DC Converter -2
149 P12. ELEC. Sys CCC12-A CCP12-A-13k GTG #32 220V DC /24 DC Converter -1
150 P12. ELEC. Sys CCC12-A CCP12-A-13l GTG #32 220V DC /24 DC Converter -2

54/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)

CCP12-A-14 GTG - 220V Safe AC Inverter System LER for GTG FF


151 P12. ELEC. Sys CCC12-A CCP12-A-14a GTG #11 220V Safe AC Inverter -1 20-Apr-09 27-May-09
152 P12. ELEC. Sys CCC12-A CCP12-A-14b GTG #11 220V Safe AC Inverter -2 20-Apr-09 27-May-09
153 P12. ELEC. Sys CCC12-A CCP12-A-14c GTG #12 220V Safe AC Inverter -1 19-Nov-09 24-Nov-09
154 P12. ELEC. Sys CCC12-A CCP12-A-14d GTG #12 220V Safe AC Inverter -2 19-Nov-09 24-Nov-09
155 P12. ELEC. Sys CCC12-A CCP12-A-14e GTG #21 220V Safe AC Inverter -1 9-May-10 10-May-10
156 P12. ELEC. Sys CCC12-A CCP12-A-14f GTG #21 220V Safe AC Inverter -2 9-May-10 10-May-10
157 P12. ELEC. Sys CCC12-A CCP12-A-14g GTG #22 220V Safe AC Inverter -1 29-Jul-10 1-Aug-10
158 P12. ELEC. Sys CCC12-A CCP12-A-14h GTG #22 220V Safe AC Inverter -2 29-Jul-10 1-Aug-10
159 P12. ELEC. Sys CCC12-A CCP12-A-14i GTG #31 220V Safe AC Inverter -1
160 P12. ELEC. Sys CCC12-A CCP12-A-14j GTG #31 220V Safe AC Inverter -2
161 P12. ELEC. Sys CCC12-A CCP12-A-14k GTG #32 220V Safe AC Inverter -1
162 P12. ELEC. Sys CCC12-A CCP12-A-14l GTG #32 220V Safe AC Inverter -2
CCP12-A-15 GTG GIL Local Control Panel System LER for GTG FF
163 P12. ELEC. Sys CCC12-A CCP12-A-15a GTG #11 GIL Local Control Panel 20-May-09 24-May-09
164 P12. ELEC. Sys CCC12-A CCP12-A-15b GTG #12 GIL Local Control Panel 10-Sep-09 13-Sep-09
165 P12. ELEC. Sys CCC12-A CCP12-A-15c GTG #21 GIL Local Control Panel 9-May-10 10-May-10
166 P12. ELEC. Sys CCC12-A CCP12-A-15d GTG #22 GIL Local Control Panel 25-Aug-10
167 P12. ELEC. Sys CCC12-A CCP12-A-15e GTG #31 GIL Local Control Panel
168 P12. ELEC. Sys CCC12-A CCP12-A-15f GTG #32 GIL Local Control Panel
GIL PDM System
169 P12. ELEC. Sys CCC12-A CCP12-A-15g Radial Control Cabinet-1a 19-May-09 24-May-09
170 P12. ELEC. Sys CCC12-A CCP12-A-15h Radial Control Cabinet-1b 19-May-09 24-May-09
171 P12. ELEC. Sys CCC12-A CCP12-A-15i Radial Control Cabinet-2a 19-May-09 24-May-09
172 P12. ELEC. Sys CCC12-A CCP12-A-15j Radial Control Cabinet-2b 19-May-09 24-May-09
173 P12. ELEC. Sys CCC12-A CCP12-A-15k Radial Control Cabinet-3 19-May-09 24-May-09
174 P12. ELEC. Sys CCC12-A CCP12-A-15l Radial Distribution Cabinet-1 19-May-09 24-May-09
175 P12. ELEC. Sys CCC12-A CCP12-A-15m Radial Distribution Cabinet-2 19-May-09 24-May-09
176 P12. ELEC. Sys CCC12-A CCP12-A-15n Radial Distribution Cabinet-3 (LER GTG #11 FF) 19-May-09 24-May-09
177 P12. ELEC. Sys CCC12-A CCP12-A-15o Radial Distribution Cabinet-4 (LER GTG #22 FF)
178 P12. ELEC. Sys CCC12-A CCP12-A-15p Radial Distribution Cabinet-5 (CCB FF)
179 P12. ELEC. Sys CCC12-A CCP12-A-15q Panel PC for ARC and Gas Moritoring (CCR)
CCP12-A-16 GTG GIL System

55/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
180 P12. ELEC. Sys CCC12-A CCP12-A-16a GTG #11 GIL 7-Jun-09 19-Aug-09
181 P12. ELEC. Sys CCC12-A CCP12-A-16b GTG #12 GIL 2-Nov-09 22-Feb-10
182 P12. ELEC. Sys CCC12-A CCP12-A-16c GTG #21 GIL 29-Jul-10
183 P12. ELEC. Sys CCC12-A CCP12-A-16d GTG #22 GIL
184 P12. ELEC. Sys CCC12-A CCP12-A-16e GTG #31 GIL
185 P12. ELEC. Sys CCC12-A CCP12-A-16f GTG #32 GIL
CCP12-A-17 GTG Unit Step-up Transformer System GT TR Area
185 P12. ELEC. Sys CCC12-A CCP12-A-17a GTG #11 Unit Step-up Transformer (147/249/311MVA) 17-May-09 24-May-09
186 P12. ELEC. Sys CCC12-A CCP12-A-17b GTG #12 Unit Step-up Transformer (147/249/311MVA) 25-Oct-09 25-Oct-09
187 P12. ELEC. Sys CCC12-A CCP12-A-17c GTG #21 Unit Step-up Transformer (147/249/311MVA) 2-Jun-10 3-Jun-10
188 P12. ELEC. Sys CCC12-A CCP12-A-17d GTG #22 Unit Step-up Transformer (147/249/311MVA) 7-Sep-10
189 P12. ELEC. Sys CCC12-A CCP12-A-17e GTG #31 Unit Step-up Transformer (147/249/311MVA)
190 P12. ELEC. Sys CCC12-A CCP12-A-17f GTG #32 Unit Step-up Transformer (147/249/311MVA)
CCP12-A-18 GTG Unit Aux Transformer System GT TR Area
191 P12. ELEC. Sys CCC12-A CCP12-A-18a GTG #11 Unit Aux Transformer (33/55MVA) 17-May-09 24-May-09
192 P12. ELEC. Sys CCC12-A CCP12-A-18b GTG #12 Unit Aux Transformer (33/55MVA) 24-Jan-10 26-Jan-10
193 P12. ELEC. Sys CCC12-A CCP12-A-18c GTG #21 Unit Aux Transformer (33/55MVA) 2-Jun-10 3-Jun-10
194 P12. ELEC. Sys CCC12-A CCP12-A-18d GTG #22 Unit Aux Transformer (33/55MVA) 7-Sep-10
195 P12. ELEC. Sys CCC12-A CCP12-A-18e GTG #31 Unit Aux Transformer (33/55MVA)
196 P12. ELEC. Sys CCC12-A CCP12-A-18f GTG #32 Unit Aux Transformer (33/55MVA)
CCP12-A-19 GTG Unit Aux Transformer System (39/65MVA) Desal Plant GT TR Area
197 P12. ELEC. Sys CCC12-A CCP12-A-19a GTG #11 Unit Aux Transformer (39/65MVA) 17-May-09 24-May-09
198 P12. ELEC. Sys CCC12-A CCP12-A-19b GTG #12 Unit Aux Transformer (39/65MVA) 24-Jan-10 26-Jan-10
199 P12. ELEC. Sys CCC12-A CCP12-A-19c GTG #21 Unit Aux Transformer (39/65MVA) 2-Jun-10 3-Jun-10
200 P12. ELEC. Sys CCC12-A CCP12-A-19d GTG #22 Unit Aux Transformer (39/65MVA)
201 P12. ELEC. Sys CCC12-A CCP12-A-19e GTG #31 Unit Aux Transformer (39/65MVA)
202 P12. ELEC. Sys CCC12-A CCP12-A-19f GTG #32 Unit Aux Transformer (39/65MVA)
CCP12-A-20 GTG Unit UAT AVR & OLTC Control Panel LER for GTG FF
203 P12. ELEC. Sys CCC12-A CCP12-A-20a GTG #11 UAT-1 AVR & OLTC Control Panel 16-Jun-09 17-Jun-09
204 P12. ELEC. Sys CCC12-A CCP12-A-20b GTG #11 UAT-2 AVR & OLTC Control Panel 16-Jun-09 17-Jun-09
205 P12. ELEC. Sys CCC12-A CCP12-A-20c GTG #12 UAT-1 AVR & OLTC Control Panel 27-Dec-09 12-Jan-10
206 P12. ELEC. Sys CCC12-A CCP12-A-20d GTG #12 UAT-2 AVR & OLTC Control Panel 27-Dec-09 12-Jan-10
207 P12. ELEC. Sys CCC12-A CCP12-A-20e GTG #21 UAT-1 AVR & OLTC Control Panel 9-May-10 3-Jun-10

56/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
208 P12. ELEC. Sys CCC12-A CCP12-A-20f GTG #21 UAT-2 AVR & OLTC Control Panel 9-May-10 3-Jun-10
209 P12. ELEC. Sys CCC12-A CCP12-A-20g GTG #22 UAT-1 AVR & OLTC Control Panel 19-Aug-10
210 P12. ELEC. Sys CCC12-A CCP12-A-20h GTG #22 UAT-2 AVR & OLTC Control Panel 19-Aug-10
211 P12. ELEC. Sys CCC12-A CCP12-A-20i GTG #31 UAT-1 AVR & OLTC Control Panel
212 P12. ELEC. Sys CCC12-A CCP12-A-20j GTG #31 UAT-2 AVR & OLTC Control Panel
213 P12. ELEC. Sys CCC12-A CCP12-A-20k GTG #32 UAT-1 AVR & OLTC Control Panel
214 P12. ELEC. Sys CCC12-A CCP12-A-20l GTG #32 UAT-2 AVR & OLTC Control Panel
CCP12-A-21 GTG PCC System LER for GTG FF
215 P12. ELEC. Sys CCC12-A CCP12-A-21a GTG #11 PCC 15-Mar-09 12-May-09
216 P12. ELEC. Sys CCC12-A CCP12-A-21b GTG #12 PCC 6-Jan-10 12-Jan-10
217 P12. ELEC. Sys CCC12-A CCP12-A-21c GTG #21 PCC 27-Jun-10
218 P12. ELEC. Sys CCC12-A CCP12-A-21d GTG #22 PCC 22-Aug-10
219 P12. ELEC. Sys CCC12-A CCP12-A-21e GTG #31 PCC
220 P12. ELEC. Sys CCC12-A CCP12-A-21f GTG #32 PCC
CCP12-A-22 GTG SFC(4200KVA) & EXC(1600KVA) Transformer System LER for GTG GF
221 P12. ELEC. Sys CCC12-A CCP12-A-22a GTG #11 SFC(4200KVA) EXC(1600KVA) Transformer 1-Oct-09 7-Oct-09
222 P12. ELEC. Sys CCC12-A CCP12-A-22b GTG #12 SFC(4200KVA) EXC(1600KVA) Transformer 9-Feb-10 14-Feb-10
223 P12. ELEC. Sys CCC12-A CCP12-A-22c GTG #21 SFC(4200KVA) EXC(1600KVA) Transformer 9-Jun-10 12-Jun-10
224 P12. ELEC. Sys CCC12-A CCP12-A-22d GTG #22 SFC(4200KVA) EXC(1600KVA) Transformer
225 P12. ELEC. Sys CCC12-A CCP12-A-22e GTG #31 SFC(4200KVA) EXC(1600KVA) Transformer
226 P12. ELEC. Sys CCC12-A CCP12-A-22f GTG #32 SFC(4200KVA) EXC(1600KVA) Transformer
CCP12-A-23 11KV Station Service Board MV Switchgear System CSB GF
227 P12. ELEC. Sys CCC12-A CCP12-A-23a 11KV Station Service Board MV Switchgear System -1 6-Apr-09 27-May-09
228 P12. ELEC. Sys CCC12-A CCP12-A-23b 11KV Station Service Board MV Switchgear System -2 6-Apr-09 26-May-09
CCP12-A-24 380V Control BLDG Switch Board LV Switchgear System CSB GF
229 P12. ELEC. Sys CCC12-A CCP12-A-24a 380V Control BLDG Switch Board LV Switchgear-1 9-Apr-09 29-Aug-09
230 P12. ELEC. Sys CCC12-A CCP12-A-24b 380V Control BLDG Switch Board LV Switchgear-2 9-Apr-09 27-May-09
CCP12-A-25 380V Control BLDG Switch Essential Board LV Switchgear System CSB GF
231 P12. ELEC. Sys CCC12-A CCP12-A-25a 380V Control BLDG Switch Essential Board LV Switchgear-1 9-Apr-09 27-May-09
232 P12. ELEC. Sys CCC12-A CCP12-A-25b 380V Control BLDG Switch Essential Board LV Switchgear -2 9-Apr-09 27-May-09
CCP12-A-26 380V Station Switch Essential Board LV Switchgear System CSB GF
233 P12. ELEC. Sys CCC12-A CCP12-A-26a 380V Station Switch Essential Board LV Switchgear-1 9-Apr-09 27-May-09

57/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
234 P12. ELEC. Sys CCC12-A CCP12-A-26b 380V Station Switch Essential Board LV Switchgear-2 9-Apr-09 27-May-09
CCP12-A-27 380V Station Switch Board LV Switchgear System CSB GF
235 P12. ELEC. Sys CCC12-A CCP12-A-27a 380V Station Switch Board LV Switchgear-1 9-Apr-09 27-May-09
236 P12. ELEC. Sys CCC12-A CCP12-A-27b 380V Station Switch Board LV Switchgear-2 9-Apr-09 27-May-09
CCP12-A-28 380V Station Essential Service Board LV Switchgear System CSB GF
237 P12. ELEC. Sys CCC12-A CCP12-A-28a 380V Station Essential Service Board LV Switchgear -1 9-Apr-09 27-May-09
238 P12. ELEC. Sys CCC12-A CCP12-A-28b 380V Station Essential Service Board LV Switchgear -2 9-Apr-09 27-May-09
CCP12-A-29 LV Switchgear Transformer System CSB GF
239 P12. ELEC. Sys CCC12-A CCP12-A-29a LV Transformer Switchgear 20-May-09 27-May-09
240 P12. ELEC. Sys CCC12-A CCP12-A-29b LV Transformer Switchgear 20-May-09 27-May-09
241 P12. ELEC. Sys CCC12-A CCP12-A-29c LV Transformer Switchgear 20-May-09 27-May-09
242 P12. ELEC. Sys CCC12-A CCP12-A-29d LV Transformer Switchgear 18-Oct-09 18-Oct-09
CCP12-A-30 220V DC Battery System CSB FF
243 P12. ELEC. Sys CCC12-A CCP12-A-30a 220V DC Battery -1 1-Jul-09 2-Jul-09
244 P12. ELEC. Sys CCC12-A CCP12-A-30b 220V DC Battery -2 1-Jul-09 2-Jul-09
CCP12-A-31 110V DC Battery System CSB FF
245 P12. ELEC. Sys CCC12-A CCP12-A-31a 110V DC Battery -1 1-Jul-09 2-Jul-09
246 P12. ELEC. Sys CCC12-A CCP12-A-31b 110V DC Battery -2 1-Jul-09 2-Jul-09
CCP12-A-32 24V DC Distribution System CSB FF
247 P12. ELEC. Sys CCC12-A CCP12-A-32a 24V DC Distribution Panel-1 5-Jul-09 22-Jul-09
248 P12. ELEC. Sys CCC12-A CCP12-A-32b 24V DC Distribution Panel -2 5-Jul-09 22-Jul-09
CCP12-A-33 110V DC Distribution System CSB FF
249 P12. ELEC. Sys CCC12-A CCP12-A-33a 110V DC Distribution Panel -1 5-Jul-09 22-Jul-09
250 P12. ELEC. Sys CCC12-A CCP12-A-33b 110V DC Distribution Panel -2 5-Jul-09 22-Jul-09
CCP12-A-34 220V DC Distribution System CSB FF
251 P12. ELEC. Sys CCC12-A CCP12-A-34a 220V DC Distribution Panel -1 5-Jul-09 22-Jul-09
252 P12. ELEC. Sys CCC12-A CCP12-A-34b 220V DC Distribution Panel -2 5-Jul-09 22-Jul-09
CCP12-A-35 220V Safe AC Distribution System CSB FF
253 P12. ELEC. Sys CCC12-A CCP12-A-35a 220V Safe AC Distribution Panel -1 5-Jul-09 22-Jul-09
254 P12. ELEC. Sys CCC12-A CCP12-A-35b 220V Safe AC Distribution Panel- 2 5-Jul-09 22-Jul-09
CCP12-A-36 220V DC Battery Charger System CSB FF
255 P12. ELEC. Sys CCC12-A CCP12-A-36a 220V DC Battery Charger-1 10-May-09 27-May-09
256 P12. ELEC. Sys CCC12-A CCP12-A-36b 220V DC Battery Charger-2 7-May-09 27-May-09

58/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)

CCP12-A-37 110V DC Battery Charger System CSB FF


257 P12. ELEC. Sys CCC12-A CCP12-A-37a 110V DC Battery Charger -1 10-May-09 27-May-09
258 P12. ELEC. Sys CCC12-A CCP12-A-37b 110V DC Battery Charger -2 10-May-09 27-May-09
CCP12-A-38 220V DC/ 24 DC Converter System CSB FF
259 P12. ELEC. Sys CCC12-A CCP12-A-38a 220V DC/ 24 DC Converter-1 10-May-09 27-May-09
260 P12. ELEC. Sys CCC12-A CCP12-A-38b 220V DC/ 24 DC Converter-2 10-May-09 27-May-09
CCP12-A-39 220V Safe AC Inverter System CSB FF
261 P12. ELEC. Sys CCC12-A CCP12-A-39a 220V Safe AC Inverter-1 10-May-09 27-May-09
262 P12. ELEC. Sys CCC12-A CCP12-A-39b 220V Safe AC Inverter-2 10-May-09 27-May-09
263 P12. ELEC. Sys CCC12-A CCP12-A-40 Fault Monitoring System (CSB GF)
CCP12-A-41 220V DC Distribution Panel System CCB GF
264 P12. ELEC. Sys CCC12-A CCP12-A-41a 220V DC Distribution Panel -1 6-Apr-09 27-May-09
265 P12. ELEC. Sys CCC12-A CCP12-A-41b 220V DC Distribution Panel -2 6-Apr-09 27-May-09
CCP12-A-42 24V DC Distribution Panel System CCB GF
266 P12. ELEC. Sys CCC12-A CCP12-A-42a 24V DC Distribution Panel-1 6-Apr-09 27-May-09
267 P12. ELEC. Sys CCC12-A CCP12-A-42b 24V DC Distribution Panel -2 6-Apr-09 27-May-09
CCP12-A-43 220V Safe AC Distribution System CCB GF
268 P12. ELEC. Sys CCC12-A CCP12-A-43a 220V Safe AC Distribution-1 6-Apr-09 27-May-09
269 P12. ELEC. Sys CCC12-A CCP12-A-43b 220V Safe AC Distribution-2 6-Apr-09 27-May-09
CCP12-A-44 220V DC Battery Charger System CCB GF
270 P12. ELEC. Sys CCC12-A CCP12-A-44a 220V DC Battery Charger-1 7-May-09 27-May-09
271 P12. ELEC. Sys CCC12-A CCP12-A-44b 220V DC Battery Charger-2 10-May-09 27-May-09
CCP12-A-45 220V DC Battery System CCB GF
272 P12. ELEC. Sys CCC12-A CCP12-A-45a 220V DC Battery -1 10-Jun-09 10-Jun-09
273 P12. ELEC. Sys CCC12-A CCP12-A-45b 220V DC Battery -2 10-Jun-09 10-Jun-09
CCP12-A-46 220V DC/ 24 DC Converter System CCB GF
274 P12. ELEC. Sys CCC12-A CCP12-A-46a 220V DC/ 24 DC Converter-1 10-May-09 27-May-09
275 P12. ELEC. Sys CCC12-A CCP12-A-46b 220V DC/ 24 DC Converter-2 10-May-09 27-May-09
276 P12. ELEC. Sys CCC12-A CCP12-A-46c Fault Monitoring System
CCP12-A-47 220V Safe AC Inverter System CCB GF
277 P12. ELEC. Sys CCC12-A CCP12-A-47a 220V Safe AC Inverter-1 10-May-09 27-May-09
278 P12. ELEC. Sys CCC12-A CCP12-A-47b 220V Safe AC Inverter-2 10-May-09 27-May-09

59/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)

CCP12-A-48 380V Fuel Oil Switch Board LV Switchgear System LEB DFO GF
279 P12. ELEC. Sys CCC12-A CCP12-A-48a 380V Fuel Oil Switch Board LV Switchgear
280 P12. ELEC. Sys CCC12-A CCP12-A-48b 380V Fuel Oil Switch Board LV Switchgear
CCP12-A-49 380V Fuel Oil Switch Board LV Switchgear System LEB DFO GF
281 P12. ELEC. Sys CCC12-A CCP12-A-49a 380V Fuel Oil Switch Board LV Switchgear-1
282 P12. ELEC. Sys CCC12-A CCP12-A-49b 380V Fuel Oil Switch Board LV Switchgear-2
CCP12-A-50 Transformer LV Switchgear System LEB DFO GF
283 P12. ELEC. Sys CCC12-A CCP12-A-50a Transformer LV Switchgear-1
284 P12. ELEC. Sys CCC12-A CCP12-A-50b Transformer LV Switchgear-2
CCP12-A-51 220V DC Battery System LEB DFO GF
285 P12. ELEC. Sys CCC12-A CCP12-A-51a 220V DC Battery-1
286 P12. ELEC. Sys CCC12-A CCP12-A-51b 220V DC Battery-2
CCP12-A-52 110V DC Battery System LEB DFO GF
287 P12. ELEC. Sys CCC12-A CCP12-A-52a 110V DC Battery -1
288 P12. ELEC. Sys CCC12-A CCP12-A-52b 110V DC Battery -2
CCP12-A-53 220V DC Distribution Panel System LEB DFO FF
289 P12. ELEC. Sys CCC12-A CCP12-A-53a 220V DC Distribution Panel -1
290 P12. ELEC. Sys CCC12-A CCP12-A-53b 220V DC Distribution Panel -2
CCP12-A-54 24V DC Distribution Panel System LEB DFO FF
291 P12. ELEC. Sys CCC12-A CCP12-A-54a 24V DC Distribution Panel-1
292 P12. ELEC. Sys CCC12-A CCP12-A-54b 24V DC Distribution Panel-2
CCP12-A-55 220V Safe AC Distribution Panel System LEB DFO FF
293 P12. ELEC. Sys CCC12-A CCP12-A-55a 220V Safe AC Distribution Panel -1
294 P12. ELEC. Sys CCC12-A CCP12-A-55b 220V Safe AC Distribution Panel- 2
CCP12-A-56 110V DC Distribution System LEB DFO FF
295 P12. ELEC. Sys CCC12-A CCP12-A-56a 110V DC Distribution -1
296 P12. ELEC. Sys CCC12-A CCP12-A-56b 110V DC Distribution -2
CCP12-A-57 220V DC Battery Charger System LEB DFO FF
297 P12. ELEC. Sys CCC12-A CCP12-A-57a 220V DC Battery Charger-1
298 P12. ELEC. Sys CCC12-A CCP12-A-57b 220V DC Battery Charger-2
CCP12-A-58 110V DC Battery Charger System LEB DFO FF
299 P12. ELEC. Sys CCC12-A CCP12-A-58a 110V DC Battery Charger-1

60/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
300 P12. ELEC. Sys CCC12-A CCP12-A-58b 110V DC Battery Charger-2
CCP12-A-59 220V DC / 24 DC Converter System LEB DFO FF
301 P12. ELEC. Sys CCC12-A CCP12-A-59a 220V DC/ 24 DC Converter-1
302 P12. ELEC. Sys CCC12-A CCP12-A-59b 220V DC/ 24 DC Converter-2
CCP12-A-60 220V Safe AC Inverter System LEB DFO FF
303 P12. ELEC. Sys CCC12-A CCP12-A-60a 220V Safe AC Inverter-1
304 P12. ELEC. Sys CCC12-A CCP12-A-60b 220V Safe AC Inverter-2
CCP12-A-61 380V Essential Board LV Switchgear System LEB EDG 1 GF
305 P12. ELEC. Sys CCC12-A CCP12-A-61a 380V EDG Essential Board LV Switchgear-1 28-Jul-10 29-Jul-10
306 P12. ELEC. Sys CCC12-A CCP12-A-61b 380V EDG Essential Board LV Switchgear-2 28-Jul-10 29-Jul-10
307 P12. ELEC. Sys CCC12-A CCP12-A-61c EDG Electrical System Block 1
CCP12-A-62 380V Essential Board LV Switchgear System LEB EDG 2 GF
308 P12. ELEC. Sys CCC12-A CCP12-A-62a 380V EDG Essential Board LV Switchgear-1
309 P12. ELEC. Sys CCC12-A CCP12-A-62b 380V EDG Essential Board LV Switchgear-2
310 P12. ELEC. Sys CCC12-A CCP12-A-62c EDG Electrical System Block 2
CCP12-A-63 380V Essential Board LV Switchgear System LEB EDG 3 GF
311 P12. ELEC. Sys CCC12-A CCP12-A-63a 380V EDG Essential Board LV Switchgear-1
312 P12. ELEC. Sys CCC12-A CCP12-A-63b 380V EDG Essential Board LV Switchgear-2
313 P12. ELEC. Sys CCC12-A CCP12-A-63c EDG Electrical System Block 3
CCP12-A-64 380V Fuel Gas Switch Board LV Switchgear System LEB GPRS GF
314 P12. ELEC. Sys CCC12-A CCP12-A-64a 380V Fuel Gas Switch Board LV Switchgear -1 8-Apr-09 19-Jul-09
315 P12. ELEC. Sys CCC12-A CCP12-A-64b 380V Fuel Gas Switch Board LV Switchgear -2 8-Apr-09 19-Jul-09
CCP12-A-65 380V Fuel Gas Switch Essential Board LV Switchgear System LEB GPRS GF
316 P12. ELEC. Sys CCC12-A CCP12-A-65a 380V Fuel Gas Switch Essential Board LV Switchgear-1 9-Apr-09 19-Jul-09
317 P12. ELEC. Sys CCC12-A CCP12-A-65b 380V Fuel Gas Switch Essential Board LV Switchgear-2 9-Apr-09 19-Jul-09
CCP12-A-66 220V DC Battery System LEB GPRS GF
318 P12. ELEC. Sys CCC12-A CCP12-A-66a 220V DC Battery-1 10-Sep-09 13-Sep-09
319 P12. ELEC. Sys CCC12-A CCP12-A-66b 220V DC Battery-2 10-Sep-09 13-Sep-09
CCP12-A-67 110V DC Battery System LEB GPRS GF
320 P12. ELEC. Sys CCC12-A CCP12-A-67a 110V DC Battery -1 10-Sep-09 13-Sep-09
321 P12. ELEC. Sys CCC12-A CCP12-A-67b 110V DC Battery -2 10-Sep-09 13-Sep-09
CCP12-A-68 Transformer LV SwitchGear System LEB GPRS GF
322 P12. ELEC. Sys CCC12-A CCP12-A-68a Transformer LV Switchgear-1 11-May-09 27-May-09

61/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
323 P12. ELEC. Sys CCC12-A CCP12-A-68b Transformer LV Switchgear-2 11-May-09 27-May-09
CCP12-A-69 220V DC Distribution Panel System LEB GPRS FF
324 P12. ELEC. Sys CCC12-A CCP12-A-69a 220V DC Distribution Panel -1 27-Aug-09 29-Aug-09
325 P12. ELEC. Sys CCC12-A CCP12-A-69b 220V DC Distribution Panel -2 27-Aug-09 29-Aug-09
CCP12-A-70 110V DC Distribution Panel System LEB GPRS FF
326 P12. ELEC. Sys CCC12-A CCP12-A-70a 110V DC Distribution Panel -1 27-Aug-09 29-Aug-09
327 P12. ELEC. Sys CCC12-A CCP12-A-70b 110V DC Distribution Panel -2 27-Aug-09 29-Aug-09
CCP12-A-71 24V DC Distribution Panel System LEB GPRS FF
328 P12. ELEC. Sys CCC12-A CCP12-A-71a 24V DC Distribution Panel -1 27-Aug-09 29-Aug-09
329 P12. ELEC. Sys CCC12-A CCP12-A-71b 24V DC Distribution Panel -2 27-Aug-09 29-Aug-09
CCP12-A-72 220V Safe AC Distribution System LEB GPRS FF
330 P12. ELEC. Sys CCC12-A CCP12-A-72a 220V Safe AC Distribution Panel -1 6-Oct-09 6-Oct-09
331 P12. ELEC. Sys CCC12-A CCP12-A-72b 220V Safe AC Distribution Panel- 2 25-Oct-09 25-Oct-09
CCP12-A-73 220V DC Battery Charger System LEB GPRS FF
332 P12. ELEC. Sys CCC12-A CCP12-A-73a 220V DC Battery Charger-1 3-Sep-09 6-Sep-09
333 P12. ELEC. Sys CCC12-A CCP12-A-73b 220V DC Battery Charger-2 3-Sep-09 6-Sep-09
CCP12-A-74 110V DC Battery Charger System LEB GPRS FF
334 P12. ELEC. Sys CCC12-A CCP12-A-74a 110V DC Battery Charger-1 3-Sep-09 6-Sep-09
335 P12. ELEC. Sys CCC12-A CCP12-A-74b 110V DC Battery Charger-2 3-Sep-09 6-Sep-09
CCP12-A-75 220V DC/ 24 DC Converter System LEB GPRS FF
336 P12. ELEC. Sys CCC12-A CCP12-A-75a 220V DC/ 24 DC Converter-1 3-Sep-09 6-Sep-09
337 P12. ELEC. Sys CCC12-A CCP12-A-75b 220V DC/ 24 DC Converter-2 3-Sep-09 6-Sep-09
CCP12-A-76 220V Safe AC Inverter System LEB GPRS FF
338 P12. ELEC. Sys CCC12-A CCP12-A-76a 220V Safe AC Inverter-1 3-Sep-09 6-Sep-09
339 P12. ELEC. Sys CCC12-A CCP12-A-76b 220V Safe AC Inverter-2 3-Sep-09 6-Sep-09
CCP12-A-77 GTG-11KV Unit Board (MSF) MV Switchgear System LEB HRSG GF
340 P12. ELEC. Sys CCC12-A CCP12-A-77a 11KV Unit Board #11 (MSF) MV Switchgear 21-Jun-09 21-Jun-09
341 P12. ELEC. Sys CCC12-A CCP12-A-77b 11KV Unit Board #12 (MSF) MV Switchgear 11-Mar-10 16-Mar-10
342 P12. ELEC. Sys CCC12-A CCP12-A-77c 11KV Unit Board #21 (MSF) MV Switchgear 5-Sep-10
343 P12. ELEC. Sys CCC12-A CCP12-A-77d 11KV Unit Board #22 (MSF) MV Switchgear
344 P12. ELEC. Sys CCC12-A CCP12-A-77e 11KV Unit Board #31 (MSF) MV Switchgear
345 P12. ELEC. Sys CCC12-A CCP12-A-77f 11KV Unit Board #32 (MSF) MV Switchgear
CCP12-A-78 380V HRSG Board LV Switchgear System LEB HRSG FF

62/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
346 P12. ELEC. Sys CCC12-A CCP12-A-78a 380V HRSG #11 Board LV Switchgear -1 10-May-10 11-May-10
347 P12. ELEC. Sys CCC12-A CCP12-A-78b 380V HRSG #12 Board LV Switchgear -1 28-Jul-10 29-Jul-10
348 P12. ELEC. Sys CCC12-A CCP12-A-78c 380V HRSG #21 Board LV Switchgear -1
349 P12. ELEC. Sys CCC12-A CCP12-A-78d 380V HRSG #22 Board LV Switchgear -1
350 P12. ELEC. Sys CCC12-A CCP12-A-78e 380V HRSG #31 Board LV Switchgear -1
351 P12. ELEC. Sys CCC12-A CCP12-A-78f 380V HRSG #32 Board LV Switchgear -1
CCP12-A-79 380V HRSG Essential Board LV Switchgear System LEB HRSG FF
352 P12. ELEC. Sys CCC12-A CCP12-A-79a 380V HRSG #11 Essential Board LV Switchgear -1 10-May-10 11-May-10
353 P12. ELEC. Sys CCC12-A CCP12-A-79b 380V HRSG #12 Essential Board LV Switchgear -1 28-Jul-10 29-Jul-10
354 P12. ELEC. Sys CCC12-A CCP12-A-79c 380V HRSG #21 Essential Board LV Switchgear -1
355 P12. ELEC. Sys CCC12-A CCP12-A-79d 380V HRSG #22 Essential Board LV Switchgear -1
356 P12. ELEC. Sys CCC12-A CCP12-A-79e 380V HRSG #31 Essential Board LV Switchgear -1
357 P12. ELEC. Sys CCC12-A CCP12-A-79f 380V HRSG #32 Essential Board LV Switchgear -1
CCP12-A-80 380V HRSG Board LV Switchgear System LEB HRSG SF
358 P12. ELEC. Sys CCC12-A CCP12-A-80a 380V HRSG #11 Board LV Switchgear -2 10-May-10 11-May-10
359 P12. ELEC. Sys CCC12-A CCP12-A-80b 380V HRSG #12 Board LV Switchgear -2 28-Jul-10 29-Jul-10
360 P12. ELEC. Sys CCC12-A CCP12-A-80c 380V HRSG #21 Board LV Switchgear -2
361 P12. ELEC. Sys CCC12-A CCP12-A-80d 380V HRSG #22 Board LV Switchgear -2
362 P12. ELEC. Sys CCC12-A CCP12-A-80e 380V HRSG #31 Board LV Switchgear -2
363 P12. ELEC. Sys CCC12-A CCP12-A-80f 380V HRSG #32 Board LV Switchgear -2
CCP12-A-81 380V HRSG Essential Board LV Switchgear System LEB HRSG SF
364 P12. ELEC. Sys CCC12-A CCP12-A-81a 380V HRSG #11 Essential Board LV Switchgear -2 10-May-10 11-May-10
365 P12. ELEC. Sys CCC12-A CCP12-A-81b 380V HRSG #12 Essential Board LV Switchgear -2 28-Jul-10 29-Jul-10
366 P12. ELEC. Sys CCC12-A CCP12-A-81c 380V HRSG #21 Essential Board LV Switchgear -2
367 P12. ELEC. Sys CCC12-A CCP12-A-81d 380V HRSG #22 Essential Board LV Switchgear -2
368 P12. ELEC. Sys CCC12-A CCP12-A-81e 380V HRSG #31 Essential Board LV Switchgear -2
369 P12. ELEC. Sys CCC12-A CCP12-A-81f 380V HRSG #32 Essential Board LV Switchgear -2
CCP12-A-82 11KV Chiller Service Board MV Switchgear System LEB HVAC GF
370 P12. ELEC. Sys CCC12-A CCP12-A-82a 11KV Chiller Service Board MV Switchgear -1
371 P12. ELEC. Sys CCC12-A CCP12-A-82b 11KV Chiller Service Board MV Switchgear -2
CCP12-A-83 380V Chiller Area Switch Board LV Switchgear System LEB HVAC GF
372 P12. ELEC. Sys CCC12-A CCP12-A-83a 380V Chiller Area Switch Board LV Switchgear-1
373 P12. ELEC. Sys CCC12-A CCP12-A-83b 380V Chiller Area Switch Board LV Switchgear-2

63/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)

CCP12-A-84 380V Chiller Area Essential Switch Board LV Switchgear System LEB HVAC GF
374 P12. ELEC. Sys CCC12-A CCP12-A-84a 380V Chiller Area Essential Switch Board LV Switchgear-1
375 P12. ELEC. Sys CCC12-A CCP12-A-84b 380V Chiller Area Essential Switch Board LV Switchgear-2
CCP12-A-85 220V DC Battery System LEB HVAC GF
376 P12. ELEC. Sys CCC12-A CCP12-A-85a 220V DC Battery-1 3-Aug-10
377 P12. ELEC. Sys CCC12-A CCP12-A-85b 220V DC Battery-2 3-Aug-10
CCP12-A-86 110V DC Battery System LEB HVAC GF
378 P12. ELEC. Sys CCC12-A CCP12-A-86a 110V DC Battery-1 3-Aug-10
379 P12. ELEC. Sys CCC12-A CCP12-A-86b 110V DC Battery-2 3-Aug-10
CCP12-A-87 Transformer LV SwitchGear System LEB HVAC GF
380 P12. ELEC. Sys CCC12-A CCP12-A-87a Transformer LV Switchgear-1
381 P12. ELEC. Sys CCC12-A CCP12-A-87b Transformer LV Switchgear-2
CCP12-A-88 220V Safe AC Distribution System LEB HVAC MF
382 P12. ELEC. Sys CCC12-A CCP12-A-88a 220V Safe AC Distribution Panel -1 3-Aug-10 4-Aug-10
383 P12. ELEC. Sys CCC12-A CCP12-A-88b 220V Safe AC Distribution Panel- 2 3-Aug-10 4-Aug-10
CCP12-A-89 220V DC Distribution System LEB HVAC MF
384 P12. ELEC. Sys CCC12-A CCP12-A-89a 220V DC Distribution Panel -1 3-Aug-10 4-Aug-10
385 P12. ELEC. Sys CCC12-A CCP12-A-89b 220V DC Distribution Panel -2 3-Aug-10 4-Aug-10
CCP12-A-90 110V DC Distribution System LEB HVAC MF
386 P12. ELEC. Sys CCC12-A CCP12-A-90a 110V DC Distribution Panel -1 3-Aug-10 4-Aug-10
387 P12. ELEC. Sys CCC12-A CCP12-A-90b 110V DC Distribution Panel -2 3-Aug-10 4-Aug-10
CCP12-A-91 220V Safe AC Inverter System LEB HVAC MF
388 P12. ELEC. Sys CCC12-A CCP12-A-91a 220V Safe AC Inverter-1 3-Aug-10 7-Aug-10
389 P12. ELEC. Sys CCC12-A CCP12-A-91b 220V Safe AC Inverter-2 3-Aug-10 7-Aug-10
CCP12-A-92 220V DC Battery Charger System LEB HVAC MF
390 P12. ELEC. Sys CCC12-A CCP12-A-92a 220V DC Battery Charger-1 3-Aug-10 7-Aug-10
391 P12. ELEC. Sys CCC12-A CCP12-A-92b 220V DC Battery Charger-2 3-Aug-10 7-Aug-10
CCP12-A-93 110V DC Battery Charger System LEB HVAC MF
392 P12. ELEC. Sys CCC12-A CCP12-A-93a 110V DC Battery Charger-1 3-Aug-10 7-Aug-10
393 P12. ELEC. Sys CCC12-A CCP12-A-93b 110V DC Battery Charger-2 3-Aug-10 7-Aug-10
CCP12-A-94 380V Fire fighting Switch Board LV Switchgear System LEB FF P/H GF
394 P12. ELEC. Sys CCC12-A CCP12-A-94a 380V Fire fighting Switch Board LV Switchgea-1 4-May-10 5-May-10
395 P12. ELEC. Sys CCC12-A CCP12-A-94b 380V Fire fighting Switch Board LV Switchgea-2 4-May-10 5-May-10

64/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)

CCP12-A-95 380V Fire fighting Switch Essential Board LV Switchgear System LEB FF P/H GF
396 P12. ELEC. Sys CCC12-A CCP12-A-95a 380V Fire fighting Switch Essential Board LV Switchgear-1 4-May-10 5-May-10
397 P12. ELEC. Sys CCC12-A CCP12-A-95b 380V Fire fighting Switch Essential Board LV Switchgear-2 4-May-10 5-May-10
CCP12-A-96 220V Safe AC Distribution System LEB FF P/H GF
398 P12. ELEC. Sys CCC12-A CCP12-A-96a 220V Safe AC Distribution Panel -1 9-May-10 10-May-10
399 P12. ELEC. Sys CCC12-A CCP12-A-96b 220V Safe AC Distribution Panel- 2 9-May-10 10-May-10
CCP12-A-97 Transformer LV SwitchGear System LEB FF P/H GF
400 P12. ELEC. Sys CCC12-A CCP12-A-97a Transformer LV Switchgear-1 9-May-10 10-May-10
401 P12. ELEC. Sys CCC12-A CCP12-A-97b Transformer LV Switchgear-2 9-May-10 10-May-10
CCP12-A-98 380V STG Normal Board LV Switchgear System LER for STG OF
402 P12. ELEC. Sys CCC12-A CCP12-A-98a 380V STG #10 Normal Board LV Switchgear-1
403 P12. ELEC. Sys CCC12-A CCP12-A-98b 380V STG #10 Normal Board LV Switchgear-2
404 P12. ELEC. Sys CCC12-A CCP12-A-98c 380V STG #20 Normal Board LV Switchgear-1
405 P12. ELEC. Sys CCC12-A CCP12-A-98d 380V STG #20 Normal Board LV Switchgear-2
406 P12. ELEC. Sys CCC12-A CCP12-A-98e 380V STG #30 Normal Board LV Switchgear-1
407 P12. ELEC. Sys CCC12-A CCP12-A-98f 380V STG #30 Normal Board LV Switchgear-2
CCP12-A-99 380V STG Essential Board LV Switchgear System LER for STG OF
408 P12. ELEC. Sys CCC12-A CCP12-A-99a 380V STG #10 Essential Board LV Switchgear-1
409 P12. ELEC. Sys CCC12-A CCP12-A-99b 380V STG #10 Essential Board LV Switchgear-2
410 P12. ELEC. Sys CCC12-A CCP12-A-99c 380V STG #20 Essential Board LV Switchgear-1
411 P12. ELEC. Sys CCC12-A CCP12-A-99d 380V STG #20 Essential Board LV Switchgear-2
412 P12. ELEC. Sys CCC12-A CCP12-A-99e 380V STG #30 Essential Board LV Switchgear-1
413 P12. ELEC. Sys CCC12-A CCP12-A-99f 380V STG #30 Essential Board LV Switchgear-2
CCP12-A-100 Transformer LV Switchgear System LER for STG OF
414 P12. ELEC. Sys CCC12-A CCP12-A-100a STG #10 Transformer LV Switchgear-1
415 P12. ELEC. Sys CCC12-A CCP12-A-100b STG #10 Transformer LV Switchgear-2
416 P12. ELEC. Sys CCC12-A CCP12-A-100c STG #10 Transformer LV Switchgear-1
417 P12. ELEC. Sys CCC12-A CCP12-A-100d STG #10 Transformer LV Switchgear-2
418 P12. ELEC. Sys CCC12-A CCP12-A-100e STG #10 Transformer LV Switchgear-1
419 P12. ELEC. Sys CCC12-A CCP12-A-100f STG #10 Transformer LV Switchgear-2
CCP12-A-101 220V DC Distribution System LER for STG MF
420 P12. ELEC. Sys CCC12-A CCP12-A-101a STG #10 220V DC Distribution Panel -1
421 P12. ELEC. Sys CCC12-A CCP12-A-101b STG #10 220V DC Distribution Panel -2

65/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
422 P12. ELEC. Sys CCC12-A CCP12-A-101c STG #10 220V DC Distribution Panel -1
423 P12. ELEC. Sys CCC12-A CCP12-A-101d STG #10 220V DC Distribution Panel -2
424 P12. ELEC. Sys CCC12-A CCP12-A-101e STG #10 220V DC Distribution Panel -1
425 P12. ELEC. Sys CCC12-A CCP12-A-101f STG #10 220V DC Distribution Panel -2
CCP12-A-102 110V DC Distribution System LER for STG MF
426 P12. ELEC. Sys CCC12-A CCP12-A-102a STG #10 110V DC Distribution Panel -1
427 P12. ELEC. Sys CCC12-A CCP12-A-102b STG #10 110V DC Distribution Panel -2
428 P12. ELEC. Sys CCC12-A CCP12-A-102c STG #10 110V DC Distribution Panel -1
429 P12. ELEC. Sys CCC12-A CCP12-A-102d STG #10 110V DC Distribution Panel -2
430 P12. ELEC. Sys CCC12-A CCP12-A-102e STG #10 110V DC Distribution Panel -1
431 P12. ELEC. Sys CCC12-A CCP12-A-102f STG #10 110V DC Distribution Panel -2
CCP12-A-103 24V DC Distribution System LER for STG MF
432 P12. ELEC. Sys CCC12-A CCP12-A-103a STG #10 24V DC Distribution Panel -1
433 P12. ELEC. Sys CCC12-A CCP12-A-103b STG #10 24V DC Distribution Panel -2
434 P12. ELEC. Sys CCC12-A CCP12-A-103c STG #10 24V DC Distribution Panel -1
435 P12. ELEC. Sys CCC12-A CCP12-A-103d STG #10 24V DC Distribution Panel -2
436 P12. ELEC. Sys CCC12-A CCP12-A-103e STG #10 24V DC Distribution Panel -1
437 P12. ELEC. Sys CCC12-A CCP12-A-103f STG #10 24V DC Distribution Panel -2
CCP12-A-104 220V Safe AC Distribution System LER for STG MF
438 P12. ELEC. Sys CCC12-A CCP12-A-104a STG #10 220V Safe AC Distribution Panel -1
439 P12. ELEC. Sys CCC12-A CCP12-A-104b STG #10 220V Safe AC Distribution Panel -2
440 P12. ELEC. Sys CCC12-A CCP12-A-104c STG #10 220V Safe AC Distribution Panel -1
441 P12. ELEC. Sys CCC12-A CCP12-A-104d STG #10 220V Safe AC Distribution Panel -2
442 P12. ELEC. Sys CCC12-A CCP12-A-104e STG #10 220V Safe AC Distribution Panel -1
443 P12. ELEC. Sys CCC12-A CCP12-A-104f STG #10 220V Safe AC Distribution Panel -2
CCP12-A-105 220V Safe AC Inverter System LER for STG MF
444 P12. ELEC. Sys CCC12-A CCP12-A-105a STG #10 220V Safe AC Inverter-1
445 P12. ELEC. Sys CCC12-A CCP12-A-105b STG #10 220V Safe AC Inverter-2
446 P12. ELEC. Sys CCC12-A CCP12-A-105c STG #10 220V Safe AC Inverter-1
447 P12. ELEC. Sys CCC12-A CCP12-A-105d STG #10 220V Safe AC Inverter-2
448 P12. ELEC. Sys CCC12-A CCP12-A-105e STG #10 220V Safe AC Inverter-1
449 P12. ELEC. Sys CCC12-A CCP12-A-105f STG #10 220V Safe AC Inverter-2
CCP12-A-106 220V DC Battery Charger System LER for STG MF

66/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
450 P12. ELEC. Sys CCC12-A CCP12-A-106a STG #10 220V DC Battery Charger-1
451 P12. ELEC. Sys CCC12-A CCP12-A-106b STG #10 220V DC Battery Charger-2
452 P12. ELEC. Sys CCC12-A CCP12-A-106c STG #10 220V DC Battery Charger-1
453 P12. ELEC. Sys CCC12-A CCP12-A-106d STG #10 220V DC Battery Charger-2
454 P12. ELEC. Sys CCC12-A CCP12-A-106e STG #10 220V DC Battery Charger-1
455 P12. ELEC. Sys CCC12-A CCP12-A-106f STG #10 220V DC Battery Charger-2
CCP12-A-107 110V DC Battery Charger System LER for STG MF
456 P12. ELEC. Sys CCC12-A CCP12-A-107a STG #10 110V DC Battery Charger-1
457 P12. ELEC. Sys CCC12-A CCP12-A-107b STG #10 110V DC Battery Charger-2
458 P12. ELEC. Sys CCC12-A CCP12-A-107c STG #10 110V DC Battery Charger-1
459 P12. ELEC. Sys CCC12-A CCP12-A-107d STG #10 110V DC Battery Charger-2
460 P12. ELEC. Sys CCC12-A CCP12-A-107e STG #10 110V DC Battery Charger-1
461 P12. ELEC. Sys CCC12-A CCP12-A-107f STG #10 110V DC Battery Charger-2
CCP12-A-108 220V DC/ 24 DC Converter System LER for STG MF
462 P12. ELEC. Sys CCC12-A CCP12-A-108a STG #10 220V DC/ 24 DC Converter-1
463 P12. ELEC. Sys CCC12-A CCP12-A-108b STG #10 220V DC/ 24 DC Converter-2
464 P12. ELEC. Sys CCC12-A CCP12-A-108c STG #10 220V DC/ 24 DC Converter-1
465 P12. ELEC. Sys CCC12-A CCP12-A-108d STG #10 220V DC/ 24 DC Converter-2
466 P12. ELEC. Sys CCC12-A CCP12-A-108e STG #10 220V DC/ 24 DC Converter-1
467 P12. ELEC. Sys CCC12-A CCP12-A-108f STG #10 220V DC/ 24 DC Converter-2
CCP12-A-109 220V DC Battery System LER for STG MF
468 P12. ELEC. Sys CCC12-A CCP12-A-109a STG #10 220V DC Battery -1
469 P12. ELEC. Sys CCC12-A CCP12-A-109b STG #10 220V DC Battery -2
470 P12. ELEC. Sys CCC12-A CCP12-A-109c STG #10 220V DC Battery -1
471 P12. ELEC. Sys CCC12-A CCP12-A-109d STG #10 220V DC Battery -2
472 P12. ELEC. Sys CCC12-A CCP12-A-109e STG #10 220V DC Battery -1
473 P12. ELEC. Sys CCC12-A CCP12-A-109f STG #10 220V DC Battery -2
CCP12-A-110 110V DC Battery System LER for STG MF
474 P12. ELEC. Sys CCC12-A CCP12-A-110a STG #10 110V DC Battery -1
475 P12. ELEC. Sys CCC12-A CCP12-A-110b STG #10 110V DC Battery -2
476 P12. ELEC. Sys CCC12-A CCP12-A-110c STG #10 110V DC Battery -1
477 P12. ELEC. Sys CCC12-A CCP12-A-110d STG #10 110V DC Battery -2
478 P12. ELEC. Sys CCC12-A CCP12-A-110e STG #10 110V DC Battery -1

67/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
479 P12. ELEC. Sys CCC12-A CCP12-A-110f STG #10 110V DC Battery -2
CCP12-A-111 STG GIL Local Control Panel System LER for STG MF
480 P12. ELEC. Sys CCC12-A CCP12-A-111a STG #10 GIL Local Control Panel
481 P12. ELEC. Sys CCC12-A CCP12-A-111b STG #20 GIL Local Control Panel
482 P12. ELEC. Sys CCC12-A CCP12-A-111c STG #30 GIL Local Control Panel
CCP12-A-112 STG GIL System LER for STG MF
483 P12. ELEC. Sys CCC12-A CCP12-A-112a STG #10 GIL
484 P12. ELEC. Sys CCC12-A CCP12-A-112b STG #20 GIL
485 P12. ELEC. Sys CCC12-A CCP12-A-112c STG #30 GIL
CCP12-A-113 STG Control System LER for STG MF
486 P12. ELEC. Sys CCC12-A CCP12-A-113a STG #10 Control Power
487 P12. ELEC. Sys CCC12-A CCP12-A-113b STG #20 Control Power
488 P12. ELEC. Sys CCC12-A CCP12-A-113c STG #30 Control Power
CCP12-A-114 STG Unit Step-up Transformer System (147/249/311MVA) LER for STG MF
489 P12. ELEC. Sys CCC12-A CCP12-A-114a STG #10 Step-up Transformer
490 P12. ELEC. Sys CCC12-A CCP12-A-114b STG #20 Step-up Transformer
491 P12. ELEC. Sys CCC12-A CCP12-A-114c STG #30 Step-up Transformer
CCP12-A-115 STG EXC(1773KVA) Transformer System LER for STG MF
492 P12. ELEC. Sys CCC12-A CCP12-A-115a STG #10 EXC(1773KVA) Transformer
493 P12. ELEC. Sys CCC12-A CCP12-A-115b STG #20 EXC(1773KVA) Transformer
494 P12. ELEC. Sys CCC12-A CCP12-A-115c STG #30 EXC(1773KVA) Transformer

Package Equipment
CCP12-A-116 Demineralised Water Plant
495 P12. ELEC. Sys CCC12-A CCP12-A-116 380V LV SwitchgearBoard LV Switchgear 24-Aug-10
496 P12. ELEC. Sys CCC12-A CCP12-A-116b 380V LV SwitchgearBoard LV Switchgear-2 Cancel
CCP12-A-117 Sewage Treatment Plant
497 P12. ELEC. Sys CCC12-A CCP12-A-117a 380V LV SwitchgearBoard LV Switchgear-1
498 P12. ELEC. Sys CCC12-A CCP12-A-117b 380V LV SwitchgearBoard LV Switchgear-2
CCP12-A-118 Waste Water Treatment Plant
499 P12. ELEC. Sys CCC12-A CCP12-A-118a 380V LV SwitchgearBoard LV Switchgear-1
500 P12. ELEC. Sys CCC12-A CCP12-A-118b 380V LV SwitchgearBoard LV Switchgear-2
CCP12-A-119 Compressed Air Building

68/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
501 P12. ELEC. Sys CCC12-A CCP12-A-119a 380V LV SwitchgearBoard LV Switchgear-1 15-Mar-10 16-Mar-10
502 P12. ELEC. Sys CCC12-A CCP12-A-119b 380V LV SwitchgearBoard LV Switchgear-2 15-Mar-10 16-Mar-10
503 P12. ELEC. Sys CCC12-A CCP12-A-119c 380V LV SwitchgearBoard LV Switchgear-3 15-Mar-10 16-Mar-10
504 P12. ELEC. Sys CCC12-A CCP12-A-119d 380V LV SwitchgearBoard LV Switchgear-4 15-Mar-10 16-Mar-10
CCP12-A-120 BSDG & Common EDG
505 P12. ELEC. Sys CCC12-A CCP12-A-120a 380V LV SwitchgearBoard LV Switchgear-1
506 P12. ELEC. Sys CCC12-A CCP12-A-120b 380V LV SwitchgearBoard LV Switchgear-2
507 P12. ELEC. Sys CCC12-A CCP12-A-120c BSDG Electrical System Common
508 P12. ELEC. Sys CCC12-A CCP12-A-120d EDG Electrical System Common

Lighting & Communication System


CCP12-A-121 GTG Building
509 P12. ELEC. Sys CCC12-A CCP12-A-121a GTG #11 Normal lighting Panel
510 P12. ELEC. Sys CCC12-A CCP12-A-121b GTG #11 Essential lighting Panel
511 P12. ELEC. Sys CCC12-A CCP12-A-121c GTG #11 Communication System
512 P12. ELEC. Sys CCC12-A CCP12-A-121d GTG #12 Normal lighting Panel
513 P12. ELEC. Sys CCC12-A CCP12-A-121e GTG #12 Essential lighting Panel
514 P12. ELEC. Sys CCC12-A CCP12-A-121f GTG #12 Communication System
515 P12. ELEC. Sys CCC12-A CCP12-A-121g GTG #21 Normal lighting Panel
516 P12. ELEC. Sys CCC12-A CCP12-A-121h GTG #21 Essential lighting Panel
517 P12. ELEC. Sys CCC12-A CCP12-A-121i GTG #21 Communication System
518 P12. ELEC. Sys CCC12-A CCP12-A-121j GTG #22 Normal lighting Panel
519 P12. ELEC. Sys CCC12-A CCP12-A-121k GTG #22 Essential lighting Panel
520 P12. ELEC. Sys CCC12-A CCP12-A-121l GTG #22 Communication System
521 P12. ELEC. Sys CCC12-A CCP12-A-121m GTG #31 Normal lighting Panel
522 P12. ELEC. Sys CCC12-A CCP12-A-121n GTG #31 Essential lighting Panel
523 P12. ELEC. Sys CCC12-A CCP12-A-121o GTG #31 Communication System
524 P12. ELEC. Sys CCC12-A CCP12-A-121p GTG #32 Normal lighting Panel
525 P12. ELEC. Sys CCC12-A CCP12-A-121q GTG #32 Essential lighting Panel
526 P12. ELEC. Sys CCC12-A CCP12-A-121r GTG #32 Communication System
CCP12-A-122 LEB for GTG
527 P12. ELEC. Sys CCC12-A CCP12-A-122a GTG #11 Normal lighting Panel
528 P12. ELEC. Sys CCC12-A CCP12-A-122b GTG #11 Essential lighting Panel

69/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
529 P12. ELEC. Sys CCC12-A CCP12-A-122c GTG #11 LEB Communication System
530 P12. ELEC. Sys CCC12-A CCP12-A-122d GTG #12 Normal lighting Panel
531 P12. ELEC. Sys CCC12-A CCP12-A-122e GTG #12 Essential lighting Panel
532 P12. ELEC. Sys CCC12-A CCP12-A-122f GTG #12 LEB Communication System
533 P12. ELEC. Sys CCC12-A CCP12-A-122g GTG #21 Normal lighting Panel
534 P12. ELEC. Sys CCC12-A CCP12-A-122h GTG #21 Essential lighting Panel
535 P12. ELEC. Sys CCC12-A CCP12-A-122i GTG #21 LEB Communication System
536 P12. ELEC. Sys CCC12-A CCP12-A-122j GTG #22 Normal lighting Panel
537 P12. ELEC. Sys CCC12-A CCP12-A-122k GTG #22 Essential lighting Panel
538 P12. ELEC. Sys CCC12-A CCP12-A-122l GTG #22 LEB Communication System
539 P12. ELEC. Sys CCC12-A CCP12-A-122m GTG #31 Normal lighting Panel
540 P12. ELEC. Sys CCC12-A CCP12-A-122n GTG #31 Essential lighting Panel
541 P12. ELEC. Sys CCC12-A CCP12-A-122o GTG #31 LEB Communication System
542 P12. ELEC. Sys CCC12-A CCP12-A-122p GTG #32 Normal lighting Panel
543 P12. ELEC. Sys CCC12-A CCP12-A-122q GTG #32 Essential lighting Panel
544 P12. ELEC. Sys CCC12-A CCP12-A-122r GTG #32 LEB Communication System
CCP12-A-123 Common Switchgear Building
545 P12. ELEC. Sys CCC12-A CCP12-A-123a Normal lighting Panel(GF)
546 P12. ELEC. Sys CCC12-A CCP12-A-123b Essential lighting Panel
547 P12. ELEC. Sys CCC12-A CCP12-A-123c Normal lighting Panel(FF)
548 P12. ELEC. Sys CCC12-A CCP12-A-123d Essential lighting Panel
549 P12. ELEC. Sys CCC12-A CCP12-A-123e Communication System
CCP12-A-124 Central Control Building
550 P12. ELEC. Sys CCC12-A CCP12-A-124a Normal lighting Panel (GF)
551 P12. ELEC. Sys CCC12-A CCP12-A-124b Essential lighting Panel
552 P12. ELEC. Sys CCC12-A CCP12-A-124c Normal lighting Panel (FF)
553 P12. ELEC. Sys CCC12-A CCP12-A-124d Essential lighting Panel
554 P12. ELEC. Sys CCC12-A CCP12-A-124e Normal lighting Panel (SF)
555 P12. ELEC. Sys CCC12-A CCP12-A-124f Essential lighting Panel
556 P12. ELEC. Sys CCC12-A CCP12-A-124g Communication System
CCP12-A-125 Emergency DG Building Block1
557 P12. ELEC. Sys CCC12-A CCP12-A-125a Normal lighting Panel
558 P12. ELEC. Sys CCC12-A CCP12-A-125b Essential lighting Panel

70/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
559 P12. ELEC. Sys CCC12-A CCP12-A-125c Communication System
CCP12-A-126 Emergency DG Building Block2
560 P12. ELEC. Sys CCC12-A CCP12-A-126a Normal lighting Panel
561 P12. ELEC. Sys CCC12-A CCP12-A-126b Essential lighting Panel
562 P12. ELEC. Sys CCC12-A CCP12-A-126c Communication System
CCP12-A-127 Emergency DG Building Block3
563 P12. ELEC. Sys CCC12-A CCP12-A-127a Normal lighting Panel
564 P12. ELEC. Sys CCC12-A CCP12-A-127b Essential lighting Panel
565 P12. ELEC. Sys CCC12-A CCP12-A-127c Communication System
CCP12-A-128 LEB for HRSG #11
566 P12. ELEC. Sys CCC12-A CCP12-A-128a Normal lighting Panel
567 P12. ELEC. Sys CCC12-A CCP12-A-128b Essential lighting Panel
568 P12. ELEC. Sys CCC12-A CCP12-A-128c Communication System
CCP12-A-129 LEB for HRSG #12
569 P12. ELEC. Sys CCC12-A CCP12-A-129a Normal lighting Panel
570 P12. ELEC. Sys CCC12-A CCP12-A-129b Essential lighting Panel
571 P12. ELEC. Sys CCC12-A CCP12-A-129c Communication System
CCP12-A-130 LEB for HRSG #21
572 P12. ELEC. Sys CCC12-A CCP12-A-130a Normal lighting Panel
573 P12. ELEC. Sys CCC12-A CCP12-A-130b Essential lighting Panel
574 P12. ELEC. Sys CCC12-A CCP12-A-130c Communication System
CCP12-A-131 LEB for HRSG #22
575 P12. ELEC. Sys CCC12-A CCP12-A-131a Normal lighting Panel
576 P12. ELEC. Sys CCC12-A CCP12-A-131b Essential lighting Panel
577 P12. ELEC. Sys CCC12-A CCP12-A-131c Communication System
CCP12-A-132 LEB for HRSG #31
578 P12. ELEC. Sys CCC12-A CCP12-A-132a Normal lighting Panel
579 P12. ELEC. Sys CCC12-A CCP12-A-132b Essential lighting Panel
580 P12. ELEC. Sys CCC12-A CCP12-A-132c Communication System
CCP12-A-133 LEB for HRSG #32
581 P12. ELEC. Sys CCC12-A CCP12-A-133a Normal lighting Panel
582 P12. ELEC. Sys CCC12-A CCP12-A-133b Essential lighting Panel
583 P12. ELEC. Sys CCC12-A CCP12-A-133c Communication System

71/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)

CCP12-A-134 LEB for Central HVAC BLDG / M&E Storage BLDG


584 P12. ELEC. Sys CCC12-A CCP12-A-134a Normal lighting Panel
585 P12. ELEC. Sys CCC12-A CCP12-A-134b Essential lighting Panel
586 P12. ELEC. Sys CCC12-A CCP12-A-134c Communication System
CCP12-A-135 LER for GPRS Block 1
587 P12. ELEC. Sys CCC12-A CCP12-A-135a Normal lighting Panel
588 P12. ELEC. Sys CCC12-A CCP12-A-135b Essential lighting Panel
589 P12. ELEC. Sys CCC12-A CCP12-A-135c Communication System
590 P12. ELEC. Sys CCC12-A CCP12-A-135d CVDC Panel 3-Sep-09 6-Sep-09
591 P12. ELEC. Sys CCC12-A CCP12-A-135e L&ADC Panel 3-Sep-09 6-Sep-09
CCP12-A-136 LEB for F.F Water Pump house
592 P12. ELEC. Sys CCC12-A CCP12-A-136a Normal lighting Panel
593 P12. ELEC. Sys CCC12-A CCP12-A-136b Essential lighting Panel
594 P12. ELEC. Sys CCC12-A CCP12-A-136c Communication System
CCP12-A-137 STG Block 10
595 P12. ELEC. Sys CCC12-A CCP12-A-137a Normal lighting Panel
596 P12. ELEC. Sys CCC12-A CCP12-A-137b Essential lighting Panel
597 P12. ELEC. Sys CCC12-A CCP12-A-137c Communication System
CCP12-A-138 STG Block 20
598 P12. ELEC. Sys CCC12-A CCP12-A-138a Normal lighting Panel
599 P12. ELEC. Sys CCC12-A CCP12-A-138b Essential lighting Panel
600 P12. ELEC. Sys CCC12-A CCP12-A-138c Communication System
CCP12-A-139 STG Block 30
601 P12. ELEC. Sys CCC12-A CCP12-A-139a Normal lighting Panel
602 P12. ELEC. Sys CCC12-A CCP12-A-139b Essential lighting Panel
603 P12. ELEC. Sys CCC12-A CCP12-A-139c Communication System
CCP12-A-140 Black Start & Common EDG
604 P12. ELEC. Sys CCC12-A CCP12-A-140a Normal lighting Panel
605 P12. ELEC. Sys CCC12-A CCP12-A-140b Essential lighting Panel
606 P12. ELEC. Sys CCC12-A CCP12-A-140c Communication System
CCP12-A-141 Waste Water Treatment Plant
607 P12. ELEC. Sys CCC12-A CCP12-A-141a Normal lighting Panel
608 P12. ELEC. Sys CCC12-A CCP12-A-141b Essential lighting Panel

72/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
609 P12. ELEC. Sys CCC12-A CCP12-A-141c Communication System
CCP12-A-142 Air Compressor Station
610 P12. ELEC. Sys CCC12-A CCP12-A-142a Normal lighting Panel
611 P12. ELEC. Sys CCC12-A CCP12-A-142b Essential lighting Panel
612 P12. ELEC. Sys CCC12-A CCP12-A-142c Communication System
CCP12-A-143 Fire Fighting Pump House
613 P12. ELEC. Sys CCC12-A CCP12-A-143a Normal lighting Panel
614 P12. ELEC. Sys CCC12-A CCP12-A-143b Essential lighting Panel
615 P12. ELEC. Sys CCC12-A CCP12-A-143c Communication System
CCP12-A-144 Central HVAC BLDG
616 P12. ELEC. Sys CCC12-A CCP12-A-144a Normal lighting Panel
617 P12. ELEC. Sys CCC12-A CCP12-A-144b Essential lighting Panel
618 P12. ELEC. Sys CCC12-A CCP12-A-144c Communication System
CCP12-A-145 LEB for DFO
619 P12. ELEC. Sys CCC12-A CCP12-A-145a Normal lighting Panel
620 P12. ELEC. Sys CCC12-A CCP12-A-145b Essential lighting Panel
621 P12. ELEC. Sys CCC12-A CCP12-A-145c Communication System
CCP12-A-146 LER for GPRS Block 20
622 P12. ELEC. Sys CCC12-A CCP12-A-146a Normal lighting Panel
623 P12. ELEC. Sys CCC12-A CCP12-A-146b Essential lighting Panel
624 P12. ELEC. Sys CCC12-A CCP12-A-146c Communication System
625 P12. ELEC. Sys CCC12-A CCP12-A-146d CVDC Panel 25-Aug-10
626 P12. ELEC. Sys CCC12-A CCP12-A-146e L&ADC Panel 19-Aug-10
CCP12-A-147 LER for GPRS Block 30
627 P12. ELEC. Sys CCC12-A CCP12-A-147a Normal lighting Panel
628 P12. ELEC. Sys CCC12-A CCP12-A-147b Essential lighting Panel
629 P12. ELEC. Sys CCC12-A CCP12-A-147c Communication System
630 P12. ELEC. Sys CCC12-A CCP12-A-147d CVDC Panel
631 P12. ELEC. Sys CCC12-A CCP12-A-147e L&ADC Panel
CCP12-A-148 Deminralized Water Plant
632 P12. ELEC. Sys CCC12-A CCP12-A-148a Normal lighting Panel
633 P12. ELEC. Sys CCC12-A CCP12-A-148b Essential lighting Panel
634 P12. ELEC. Sys CCC12-A CCP12-A-148c Communication System

73/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
CCP12-A-149 Carpenter Workshop Building
635 P12. ELEC. Sys CCC12-A CCP12-A-149a Normal lighting Panel
636 P12. ELEC. Sys CCC12-A CCP12-A-149b Essential lighting Panel
637 P12. ELEC. Sys CCC12-A CCP12-A-149c Communication System
CCP12-A-150 HRSG #11
638 P12. ELEC. Sys CCC12-A CCP12-A-150a Normal lighting Panel
639 P12. ELEC. Sys CCC12-A CCP12-A-150b Essential lighting Panel
640 P12. ELEC. Sys CCC12-A CCP12-A-150c Communication System
CCP12-A-151 HRSG #12
641 P12. ELEC. Sys CCC12-A CCP12-A-151a Normal lighting Panel
642 P12. ELEC. Sys CCC12-A CCP12-A-151b Essential lighting Panel
643 P12. ELEC. Sys CCC12-A CCP12-A-151c Communication System
CCP12-A-152 HRSG #21
644 P12. ELEC. Sys CCC12-A CCP12-A-152a Normal lighting Panel
645 P12. ELEC. Sys CCC12-A CCP12-A-152b Essential lighting Panel
646 P12. ELEC. Sys CCC12-A CCP12-A-152c Communication System
CCP12-A-153 HRSG #22
647 P12. ELEC. Sys CCC12-A CCP12-A-153a Normal lighting Panel
648 P12. ELEC. Sys CCC12-A CCP12-A-153b Essential lighting Panel
649 P12. ELEC. Sys CCC12-A CCP12-A-153c Communication System
CCP12-A-154 HRSG #31
650 P12. ELEC. Sys CCC12-A CCP12-A-154a Normal lighting Panel
651 P12. ELEC. Sys CCC12-A CCP12-A-154b Essential lighting Panel
652 P12. ELEC. Sys CCC12-A CCP12-A-154c Communication System
CCP12-A-155 HRSG #32
653 P12. ELEC. Sys CCC12-A CCP12-A-155a Normal lighting Panel
654 P12. ELEC. Sys CCC12-A CCP12-A-155b Essential lighting Panel
655 P12. ELEC. Sys CCC12-A CCP12-A-155c Communication System
CCP12-A-156 LEB for GPRS
656 P12. ELEC. Sys CCC12-A CCP12-A-156a Normal lighting Panel
657 P12. ELEC. Sys CCC12-A CCP12-A-156b Essential lighting Panel
658 P12. ELEC. Sys CCC12-A CCP12-A-156c Communication System
CCP12-A-157 Fire Fighting Station

74/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
659 P12. ELEC. Sys CCC12-A CCP12-A-157a Normal lighting Panel
660 P12. ELEC. Sys CCC12-A CCP12-A-157b Essential lighting Panel
661 P12. ELEC. Sys CCC12-A CCP12-A-157c Communication System
CCP12-A-158 Chemical Storage Building for Desal Plant
662 P12. ELEC. Sys CCC12-A CCP12-A-158a Normal lighting Panel
663 P12. ELEC. Sys CCC12-A CCP12-A-158b Essential lighting Panel
664 P12. ELEC. Sys CCC12-A CCP12-A-158c Communication System
CCP12-A-159 Road Lighting System
665 P12. ELEC. Sys CCC12-A CCP12-A-159a Road lighting (00BLL01)
666 P12. ELEC. Sys CCC12-A CCP12-A-159b Road lighting (00BLL02)
667 P12. ELEC. Sys CCC12-A CCP12-A-159c Road lighting (00BLL03)
668 P12. ELEC. Sys CCC12-A CCP12-A-159d Road lighting (00BLL04)
669 P12. ELEC. Sys CCC12-A CCP12-A-159e Road lighting (00BLL05)
670 P12. ELEC. Sys CCC12-A CCP12-A-159f Road lighting (00BLL06)
671 P12. ELEC. Sys CCC12-A CCP12-A-159g Road lighting (00BLL07)
672 P12. ELEC. Sys CCC12-A CCP12-A-159h Road lighting (00BLL32)
673 P12. ELEC. Sys CCC12-A CCP12-A-159i Road lighting (00BLL33)
CCP12-A-160 Central Mechanical & Electrical Workshop
674 P12. ELEC. Sys CCC12-A CCP12-A-160a Normal Lighting(GF)
675 P12. ELEC. Sys CCC12-A CCP12-A-160b Essential Lighting(GF)
676 P12. ELEC. Sys CCC12-A CCP12-A-160c Normal Lighting(FF)
677 P12. ELEC. Sys CCC12-A CCP12-A-160d Essential Lighting(FF)
678 P12. ELEC. Sys CCC12-A CCP12-A-160e Communication System
CCP12-A-161 Mechanical & Electrical Storage Building
679 P12. ELEC. Sys CCC12-A CCP12-A-161a Mechanical & Electrical Storage Building(GF)
680 P12. ELEC. Sys CCC12-A CCP12-A-161b Mechanical & Electrical Storage Building(FF)
681 P12. ELEC. Sys CCC12-A CCP12-A-161c Communication System
CCP12-A-162 Gate House M Station
682 P12. ELEC. Sys CCC12-A CCP12-A-162a Normal Lighting
683 P12. ELEC. Sys CCC12-A CCP12-A-162b Essential Lighting
684 P12. ELEC. Sys CCC12-A CCP12-A-162c Communication System
CCP12-A-163 Main Gate JAP
685 P12. ELEC. Sys CCC12-A CCP12-A-163a Normal Lighting

75/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
686 P12. ELEC. Sys CCC12-A CCP12-A-163b Essential Lighting
CCP12-A-164 DFO Tank Area
687 P12. ELEC. Sys CCC12-A CCP12-A-164a DFO Tank Area-1
688 P12. ELEC. Sys CCC12-A CCP12-A-164b DFO Tank Area-2
CCP12-A-165 Chemical Dosing House
689 P12. ELEC. Sys CCC12-A CCP12-A-165a1 Lighting for Chemical Dosing House for block 10
690 P12. ELEC. Sys CCC12-A CCP12-A-165a2 Communication for Chemical Dosing House for block 10
691 P12. ELEC. Sys CCC12-A CCP12-A-165b1 Lighting for Chemical Dosing House for block 20
692 P12. ELEC. Sys CCC12-A CCP12-A-165b2 Communication for Chemical Dosing House for block 20
693 P12. ELEC. Sys CCC12-A CCP12-A-165c1 Lighting for Chemical Dosing House for block 30
694 P12. ELEC. Sys CCC12-A CCP12-A-165c2 Communication for Chemical Dosing House for block 30

Earthing
695 P12. ELEC. Sys CCC12-A CCP12-A-171 Earthing for Plant Common
696 P12. ELEC. Sys CCC12-A CCP12-A-172 Earthing for Block 10
697 P12. ELEC. Sys CCC12-A CCP12-A-173 Earthing for Block 20
698 P12. ELEC. Sys CCC12-A CCP12-A-174 Earthing for Block 30

Cable Tray
699 P12. ELEC. Sys CCC12-A CCP12-A-181 Tray for Plant Common
700 P12. ELEC. Sys CCC12-A CCP12-A-182 Tray for Block 10
701 P12. ELEC. Sys CCC12-A CCP12-A-183 Tray for Block 20
702 P12. ELEC. Sys CCC12-A CCP12-A-184 Tray for Block 30

Additional System
CCP12-A-201 GTG - 24V DC Distribution System LEB GTG FF
703 P12. ELEC. Sys CCC12-A CCP12-A-201a GTG #11 24V DC Distribution -1 4-May-09 27-May-09

76/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
704 P12. ELEC. Sys CCC12-A CCP12-A-201b GTG #11 24V DC Distribution -2 4-May-09 27-May-09
705 P12. ELEC. Sys CCC12-A CCP12-A-201c GTG #12 24V DC Distribution -1 3-Dec-09 15-Dec-09
706 P12. ELEC. Sys CCC12-A CCP12-A-201d GTG #12 24V DC Distribution -2 3-Dec-09 15-Dec-09
707 P12. ELEC. Sys CCC12-A CCP12-A-201e GTG #21 24V DC Distribution -1 10-May-10 11-May-10
708 P12. ELEC. Sys CCC12-A CCP12-A-201f GTG #21 24V DC Distribution -2 10-May-10 11-May-10
709 P12. ELEC. Sys CCC12-A CCP12-A-201g GTG #22 24V DC Distribution -1 29-Jul-10 1-Aug-10
710 P12. ELEC. Sys CCC12-A CCP12-A-201h GTG #22 24V DC Distribution -2 29-Jul-10 1-Aug-10
711 P12. ELEC. Sys CCC12-A CCP12-A-201i GTG #31 24V DC Distribution -1
712 P12. ELEC. Sys CCC12-A CCP12-A-201j GTG #31 24V DC Distribution -2
713 P12. ELEC. Sys CCC12-A CCP12-A-201k GTG #32 24V DC Distribution -1
714 P12. ELEC. Sys CCC12-A CCP12-A-201l GTG #32 24V DC Distribution -2
CCP12-A-202 Fuel Gas Compressor Control System GPRS CONT RM
715 P12. ELEC. Sys CCC12-A CCP12-A-202a 380V LV SwitchgearBoard LV Switchgear (GEA) Block-1 3-Sep-09 6-Sep-09
716 P12. ELEC. Sys CCC12-A CCP12-A-202b 380V LV SwitchgearBoard LV Switchgear (PGI) Block-1 24-Jun-09 28-Jun-09
717 P12. ELEC. Sys CCC12-A CCP12-A-202c 380V LV SwitchgearBoard LV Switchgear (GEA) Block-2 25-Jul-10 27-Jul-10
718 P12. ELEC. Sys CCC12-A CCP12-A-202d 380V LV SwitchgearBoard LV Switchgear (PGI) Block-2 25-Jul-10 27-Jul-10
719 P12. ELEC. Sys CCC12-A CCP12-A-202e 380V LV SwitchgearBoard LV Switchgear (GEA) Block-3
720 P12. ELEC. Sys CCC12-A CCP12-A-202f 380V LV SwitchgearBoard LV Switchgear (PGI) Block-3
CCP12-A-203 High Speed Bus Transfer System
721 P12. ELEC. Sys CCC12-A CCP12-A-203a GTG #11 HSBT Panel 15-Dec-09 12-Jan-10
722 P12. ELEC. Sys CCC12-A CCP12-A-203b HRSG #11 HSBT Panel 6-May-10 9-May-10
723 P12. ELEC. Sys CCC12-A CCP12-A-203c GTG #12 HSBT Panel 1-Apr-10 10-Apr-10
724 P12. ELEC. Sys CCC12-A CCP12-A-203d GTG #21 HSBT Panel
725 P12. ELEC. Sys CCC12-A CCP12-A-203e HRSG #21 HSBT Panel
726 P12. ELEC. Sys CCC12-A CCP12-A-203f GTG #22 HSBT Panel
727 P12. ELEC. Sys CCC12-A CCP12-A-203g GTG #31 HSBT Panel
728 P12. ELEC. Sys CCC12-A CCP12-A-203h HRSG #31 HSBT Panel
729 P12. ELEC. Sys CCC12-A CCP12-A-203i GTG #32 HSBT Panel
730 P12. ELEC. Sys CCC12-A CCP12-A-203j CSB HSBT Panel
731 P12. ELEC. Sys CCC12-A CCP12-A-203k LEB CHB HSBT Panel
CCP12-A-204 Chemical Dosing System
732 P12. ELEC. Sys CCC12-A CCP12-A-204a 380V Dosing MCC Block1 11-Jan-10 12-Jan-10
733 P12. ELEC. Sys CCC12-A CCP12-A-204b Auto Stroke Power Distribution Panel Block1 11-Jan-10 12-Jan-10

77/119
Construction Completion Package List
(Electrical EQ + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description
Group CCC No Date (CCC Accept)
734 P12. ELEC. Sys CCC12-A CCP12-A-204c 380V Dosing MCC Block2
735 P12. ELEC. Sys CCC12-A CCP12-A-204d Auto Stroke Power Distribution Panel Block2
736 P12. ELEC. Sys CCC12-A CCP12-A-204e 380V Dosing MCC Block3
737 P12. ELEC. Sys CCC12-A CCP12-A-204f Auto Stroke Power Distribution Panel Block3
CCP12-A-205 Central HVAC & Chiller Plant
738 P12. ELEC. Sys CCC12-A CCP12-A-205a LV Transformer for Chiller Plant
739 P12. ELEC. Sys CCC12-A CCP12-A-205b LV Transformer for Chiller Plant
740 P12. ELEC. Sys CCC12-A CCP12-A-205c LV Transformer for Chiller Plant
741 P12. ELEC. Sys CCC12-A CCP12-A-205d LV Transformer for Chiller Plant
742 P12. ELEC. Sys CCC12-A CCP12-A-205e LV Transformer for Chiller Plant
743 P12. ELEC. Sys CCC12-A CCP12-A-205f LV Transformer for Chiller Plant
744 P12. ELEC. Sys CCC12-A CCP12-A-205g LV Transformer for Chiller Plant
745 P12. ELEC. Sys CCC12-A CCP12-A-205h LV Transformer for Chiller Plant
746 P12. ELEC. Sys CCC12-A CCP12-A-205i LV Transformer for Chiller Plant
747 P12. ELEC. Sys CCC12-A CCP12-A-205j LV Transformer for Chiller Plant
748 P12. ELEC. Sys CCC12-A CCP12-A-205k LV Transformer for Chiller Plant
749 P12. ELEC. Sys CCC12-A CCP12-A-205l LV Transformer for Chiller Plant
750 P12. ELEC. Sys CCC12-A CCP12-A-205m LV Transformer for Chiller Plant
751 P12. ELEC. Sys CCC12-A CCP12-A-205n LV Transformer for Chiller Plant
752 P12. ELEC. Sys CCC12-A CCP12-A-205o LV Transformer for Chiller Plant
753 P12. ELEC. Sys CCC12-A CCP12-A-205p LV Transformer for Chiller Plant
754 P12. ELEC. Sys CCC12-A CCP12-A-205q LV Transformer for Central HVAC & MCC
755 P12. ELEC. Sys CCC12-A CCP12-A-205r LV Transformer for Central HVAC & MCC
CCP12-A-206 AVR & OLTC Control Panel STG OF
756 P12. ELEC. Sys CCC12-A CCP12-A-206a STG 10 AVR & OLTC Control Panel
757 P12. ELEC. Sys CCC12-A CCP12-A-206b STG 20 AVR & OLTC Control Panel
758 P12. ELEC. Sys CCC12-A CCP12-A-206c STG 30 AVR & OLTC Control Panel

CANCEL 4 PKG
Approved CCP Q'ty 284

78/119
LEB GTG GF
LEB HRSG GF
LEB GTG GF
LEB GTG GF
LEB HRSG GF
LEB GTG GF
LEB GTG GF
LEB HRSG GF
LEB GTG GF
CSB GF
LEB CHB/Carpenter

79/119
Construction Completion Package List
( I & C + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description Location
Group CCC No Date (CCC Accept)
1 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-01 LER for GTG #11 DCS 18-Jun-09 21-Jun-09 LER for GTG
2 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-01a GTG #11 DCS Aus Cabinet(11CJV71) 10-Sep-09 10-Sep-09
3 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-02 LER for GTG #12 DCS 24-Jan-10 25-Jan-10
4 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-03 LER for GTG #21 DCS 20-Jun-10 21-Jun-10
5 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-04 LER for GTG #22 DCS
6 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-05 LER for GTG #31 DCS
7 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-06 LER for GTG #32 DCS
8 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-07 LER for STG #10 DCS
9 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-08 LER for STG #20 DCS
10 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-09 LER for STG #30 DCS
11 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-10 Common Electrical DCS System 29-Jun-09 29-Jun-09 CSB
12 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-11 Electrical Control Desk CCB FF
13 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-12 Large Screen Display for Electrical CCB FF
CCP14.1-A-13 Block #10 DCS System CCB GF
14 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-13a Block #10 DCS System(10CJV61,10CVA61) 2-Jun-10 6-Jun-10
15 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-13b Lan Cabinet for Block 10 (HRSG)
CCP14.1-A-14 Block #20 DCS System
16 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-14a Lan Cabinet for Block 20 18-Jul-10 20-Jul-10
CCP14.1-A-15 Block #30 DCS System
17 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-15a Lan Cabinet for Block 30 18-Jul-10 20-Jul-10
18 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-16 Common Service Control Desk CCB FF
19 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-17 Large Screen Display for Common
20 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-18 Emergency Pushbutton for CSCD
21 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-19 Router Set

80/119
Construction Completion Package List
( I & C + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description Location
Group CCC No Date (CCC Accept)
CCP14.1-A-20 Common DCS System CCB GF
22 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-20a Common DCS System 27-Apr-09 5-May-09
23 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-20b APS & Win-TS Cabinet (10CRR11/20CRR11/10CRR21,22) 27-Sep-09 28-Sep-09
24 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-20c GTCS Metering Panel 10-Sep-09 10-Sep-09
25 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-20f GPS Antenna for DCS Master Clock
26 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-21 Application Server for Electrical System (00CRR96) CCB GF
27 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-22 Power Control 10 Desk CCB FF
28 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-23 Large Screen Display for Block 10
29 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-24 Emergency Pushbutton for Block 10
30 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-25 Power Control 20 Desk
31 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-26 Large Screen Display for Block 20
32 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-27 Emergency Pushbutton for Block 20
33 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-28 Power Control 30 Desk
34 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-29 Large Screen Display for Block 30
35 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-30 Emergency Pushbutton for Block 30
36 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-31 Engineering & Diagnostics Desk for Common
37 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-31a Common Digital Indicator
38 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-32 Engineering & Diagnostics Desk for Block 10
39 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-33 Engineering & Diagnostics Desk for Block 20
40 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-34 Engineering & Diagnostics Desk for Block 30
41 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-35 Supervisor OS
42 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-36 Shift Supervisor OS
43 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-37 PMS Server
44 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-38 PMS Engine

81/119
Construction Completion Package List
( I & C + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description Location
Group CCC No Date (CCC Accept)
45 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-38a Gas & ARC Monitoring for GIL
CCP14.1-A-39 LER for HRSG #11 DCS LER for HRSG TF

46 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-39a AUS & Marshalling Cabinet for Diverter Damper & HRSG 11 24-Sep-09 28-Sep-09
47 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-39b AUS & Marshalling Cabinet for Chemical Dosing & HRSG 11 16-Jan-10 17-Jan-10
48 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-39c AUS & Marshalling Cabinet for BMS 11 18-Aug-10
49 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-39d AUS & Marshalling Cabinet for BPS 11 23-Aug-10
50 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-39e VMS Panel HRSG 11 18-Aug-10
CCP14.1-A-40 LER for HRSG #12 DCS 21-Apr-10 22-Apr-10
51 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-40a AUS & Marshalling Cabinet for Diverter Damper & HRSG 12 21-Apr-10 22-Apr-10
52 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-40b AUS & Marshalling Cabinet for Chemical Dosing & HRSG 12
53 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-40c AUS & Marshalling Cabinet for BMS 12
54 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-40d AUS & Marshalling Cabinet for BPS 12
55 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-40e VMS Panel HRSG 12
CCP14.1-A-41 LER for HRSG #21 DCS
56 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-41a AUS & Marshalling Cabinet for Diverter Damper & HRSG 21
57 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-41b AUS & Marshalling Cabinet for Chemical Dosing & HRSG 21
58 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-41c AUS & Marshalling Cabinet for BMS 21
59 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-41d AUS & Marshalling Cabinet for BPS 21
60 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-41e VMS Panel HRSG 21
CCP14.1-A-42 LER for HRSG #22 DCS
61 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-42a AUS & Marshalling Cabinet for Diverter Damper & HRSG 22
62 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-42b AUS & Marshalling Cabinet for Chemical Dosing & HRSG 22
63 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-42c AUS & Marshalling Cabinet for BMS 22
64 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-42d AUS & Marshalling Cabinet for BPS 22

82/119
Construction Completion Package List
( I & C + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description Location
Group CCC No Date (CCC Accept)
65 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-42e VMS Panel HRSG 22
CCP14.1-A-43 LER for HRSG #31 DCS
66 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-43a AUS & Marshalling Cabinet for Diverter Damper & HRSG 31
67 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-43b AUS & Marshalling Cabinet for Chemical Dosing & HRSG 31
68 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-43c AUS & Marshalling Cabinet for BMS 31
69 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-43d AUS & Marshalling Cabinet for BPS 31
70 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-43e VMS Panel HRSG 31
CCP14.1-A-44 LER for HRSG #32 DCS
71 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-44a AUS & Marshalling Cabinet for Diverter Damper & HRSG 32
72 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-44b AUS & Marshalling Cabinet for Chemical Dosing & HRSG 32
73 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-44c AUS & Marshalling Cabinet for BMS 32
74 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-44d AUS & Marshalling Cabinet for BPS 32
75 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-44e VMS Panel HRSG 32
LER for Fuel Gas DCS
76 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-45 LER for Fuel GAS #11 & Common DCS 28-May-09 1-Jun-09 GPRS CONT RM

77 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-46a LER for Fuel GAS #12 DCS 29-Jul-09 30-Jul-09
78 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-46b LER for Fuel GAS #11,12 Marshaling & Vib Mon CAB 18-Nov-09 19-Nov-09
79 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-46c LER for Fuel GAS #11,12 Fiscal metering Panel 29-Jul-09 30-Jul-09
80 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-46d LER for Fuel GAS #11,12 ESDV Panel 29-Jul-09 30-Jul-09
81 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-47 LER for Fuel GAS #21 DCS 10-Aug-10
82 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-48a LER for Fuel GAS #22 DCS 15-Aug-10
83 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-48b LER for Fuel GAS #21,22 Marshaling & Vib Mon CAB 1-Sep-10
84 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-48c LER for Fuel GAS #21,22 Fiscal metering Panel 1-Sep-10 7-Sep-10
85 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-48d LER for Fuel GAS #21,22 ESDV Panel 18-Aug-10

83/119
Construction Completion Package List
( I & C + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description Location
Group CCC No Date (CCC Accept)
86 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-49 LER for Fuel GAS #31 DCS
87 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-50a LER for Fuel GAS #32 DCS
88 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-50b LER for Fuel GAS #31,32 Marshaling & Vib Mon CAB
89 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-50c LER for Fuel GAS #31,32 Fiscal metering Panel
90 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-50d LER for Fuel GAS #31,32 ESDV Panel
91 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-51 Fuel GAS #11/12 Control Desk
92 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-52 Fuel GAS #21/22 Control Desk
93 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-53 Fuel GAS #31/32 Control Desk
94 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-54 LER for D.F.O DCS
95 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-55 LER for WWT DCS
96 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-56 LER for Air Compressor DCS 13-May-10
97 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-57 Air Compressor Control Desk
98 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-58 LER for DEMI.Water Treatment DCS
99 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-59 DEMI. Water Control Desk
CCP14.1-A-60 Common Clock System
100 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-60a Central Control Building 15-Jun-10
101 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-60b Common Switchgear Building
102 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-60c LEB for GPRS
103 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-60d BSDG Building
104 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-60e LER for DFO Forwarding Station
105 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-60f Waste Water Treatment Area
106 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-60g Central HVAC Building
107 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-60h M&E Storage Building
108 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-60i LEB for ME Storage BLDG & Carpenter Workshop

84/119
Construction Completion Package List
( I & C + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description Location
Group CCC No Date (CCC Accept)
109 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-60j Carpenter Workshop
110 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-60k Fire Fighting Station
111 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-60l Compressed Air Station
112 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-60m Demineralised Water Plant
113 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-60n LEB for F/F Water Pumphouse
114 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-60o Central M/E Workshop
115 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-60p Main Gate
116 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-60q Gate House
CCP14.1-A-61 Block 10 Clock System
117 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-61a LEB for GTG11
118 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-61b LEB for GTG12
119 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-61c LEB HRSG 11
120 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-61d LEB HRSG 12
121 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-61e STG Unit 10
122 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-61f Chemical Dosing House 10
123 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-61g EDG for Block 10
CCP14.1-A-62 Block 20 Clock System
124 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-62a LEB for GTG21
125 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-62b LEB for GTG22
126 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-62c LEB HRSG 21
127 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-62d LEB HRSG 22
128 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-62e STG Unit 20
129 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-62f Chemical Dosing House 20
130 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-62g EDG for Block 20

85/119
Construction Completion Package List
( I & C + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description Location
Group CCC No Date (CCC Accept)
CCP14.1-A-63 Block 3 Clock System
131 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-63a LEB for GTG31
132 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-63b LEB for GTG32
133 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-63c LEB HRSG 31
134 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-63d LEB HRSG 32
135 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-63e STG Unit 30
136 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-63f Chemical Dosing House 30
137 P14.1 I&C. Sys CCC14.1-A CCP14.1-A-63g EDG for Block 30
138 P14.2. CEMS CCC14.2-A CCP14.2-A-01 GTG #11 Bypass Stack CEMS 27-Sep-09 28-Sep-09
139 P14.2. CEMS CCC14.2-A CCP14.2-A-02 HRSG #11 Main Stack CEMS 31-Aug-10 14-Sep-10
140 P14.2. CEMS CCC14.2-A CCP14.2-A-03 GTG #12 Bypass Stack CEMS 4-May-10
141 P14.2. CEMS CCC14.2-A CCP14.2-A-04 HRSG #12 Main Stack CEMS
142 P14.2. CEMS CCC14.2-A CCP14.2-A-05 GTG #21 Bypass Stack CEMS
143 P14.2. CEMS CCC14.2-A CCP14.2-A-06 HRSG #21 Main Stack CEMS
144 P14.2. CEMS CCC14.2-A CCP14.2-A-07 GTG #22 Bypass Stack CEMS
145 P14.2. CEMS CCC14.2-A CCP14.2-A-08 HRSG #22 Main Stack CEMS
146 P14.2. CEMS CCC14.2-A CCP14.2-A-09 GTG #31 Bypass Stack CEMS
147 P14.2. CEMS CCC14.2-A CCP14.2-A-10 HRSG #31 Main Stack CEMS
148 P14.2. CEMS CCC14.2-A CCP14.2-A-11 GTG #32 Bypass Stack CEMS
149 P14.2. CEMS CCC14.2-A CCP14.2-A-12 HRSG #32 Main Stack CEMS
CCP14.2-A-13 Aux. Boiler #1 CEMS
150 P14.2. CEMS CCC14.2-A CCP14.2-A-13a Lan Cabinet for Block 10 (10CRR35) 1-Oct-09 6-Oct-09
151 P14.2. CEMS CCC14.2-A CCP14.2-A-13b Aux. Boiler #1 CEMS 2-Mar-10 2-Mar-10
CCP14.2-A-14 Aux. Boiler #2 CEMS

86/119
Construction Completion Package List
( I & C + Cable) 8-Dec-21
Numbering Approve Commissioning
No. PKG No. System Description Location
Group CCC No Date (CCC Accept)
152 P14.2. CEMS CCC14.2-A CCP14.2-A-14a Lan Cabinet for Block 10
153 P14.2. CEMS CCC14.2-A CCP14.2-A-14b Aux. Boiler #2 CEMS 24-Aug-10

CANCEL 1 PKG
Approved CCP Q'ty 36

87/119
88/119
89/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date

Power Block 10
1 P15. Civil Works CCC15 CCP15-B1-01 Gas Turbine Building 10
2 P15. Civil Works CCC15 CCP15-B1-02 Local Electrical Building for GTG 11
3 P15. Civil Works CCC15 CCP15-B1-03 Local Electrical Building for GTG 12
4 P15. Civil Works CCC15 CCP15-B1-04 Chemical Dosing House 10
5 P15. Civil Works CCC15 CCP15-B1-05 Local Electrical Building for HRSG 11
6 P15. Civil Works CCC15 CCP15-B1-06 Local Electrical Building for HRSG 12
7 P15. Civil Works CCC15 CCP15-B1-07 N2 Gas Station 10
8 P15. Civil Works CCC15 CCP15-B1-08 Feed Water Pump Sunshade 11
9 P15. Civil Works CCC15 CCP15-B1-09 Feed Water Pump Sunshade 12
10 P15. Civil Works CCC15 CCP15-B1-10 CCW Heat Exchanger, Pump 10
11 P15. Civil Works CCC15 CCP15-B1-11 Emergency Diesel Generator Building 10
12 P15. Civil Works CCC15 CCP15-B1-12 GTG Step Up & Aux. Transformer Shelter 11
13 P15. Civil Works CCC15 CCP15-B1-13 GTG Step Up & Aux. Transformer Shelter 12
14 P15. Civil Works CCC15 CCP15-B1-14 Steam Turbine Building 10
15 P15. Civil Works CCC15 CCP15-B1-15 STG Unit Step Up Transformer Shelter 10
16 P15. Civil Works CCC15 CCP15-B1-16 Clean & Dirty Lube Oil Tank FDN for STG 10
17 P15. Civil Works CCC15 CCP15-B1-17 Generator Fin Fan Cooler FDN 10
18 P15. Civil Works CCC15 CCP15-B1-18 Lube Oil Fin Fan Cooler FDN 11
19 P15. Civil Works CCC15 CCP15-B1-19 Lube Oil Fin Fan Cooler FDN 12
20 P15. Civil Works CCC15 CCP15-B1-20 Seal Pit 10
21 P15. Civil Works CCC15 CCP15-B1-21 Clean Drain Flash Vessel FDN 10
22 P15. Civil Works CCC15 CCP15-B1-22 Sampling Rack Container FDN 10
23 P15. Civil Works CCC15 CCP15-B1-23 HRSG FDN 11
24 P15. Civil Works CCC15 CCP15-B1-24 HRSG FDN 12
25 P15. Civil Works CCC15 CCP15-B1-25 Ignition Gas Tank FDN 11, 12
26 P15. Civil Works CCC15 CCP15-B1-26 Pipe Rack & FDN for Block 10
27 P15. Civil Works CCC15 CCP15-B1-27 Sewage & Drainage Facility for Block 10
28 P15. Civil Works CCC15 CCP15-B1-28 Road & Pavement for Block 10
29 P15. Civil Works CCC15 CCP15-B1-29 Road Lighting FDN for Block 10
30 P15. Civil Works CCC15 CCP15-B1-30 GIL FDN Block 10
31 P15. Civil Works CCC15 CCP15-B1-30a Cable Trench for Block 10
32 P15. Civil Works CCC15 CCP15-B1-30b Pipe Trench for Block 10
GPRS Block 10
33 P15. Civil Works CCC15 CCP15-B1-31 Gas Compressor Station 10 (F3)
34 P15. Civil Works CCC15 CCP15-B1-32 GT Fuel Changeover PRS 10 (F1)
35 P15. Civil Works CCC15 CCP15-B1-33 Gas Heater with Shelter 10 (F7, F12)
36 P15. Civil Works CCC15 CCP15-B1-34 GPRS for GT & HRSG 10 (F5, F6)

90/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
37 P15. Civil Works CCC15 CCP15-B1-35 ESDV Skid FDN 10 (F8)
38 P15. Civil Works CCC15 CCP15-B1-36 Fuel Gas Booster Compressor FDN (F4)
39 P15. Civil Works CCC15 CCP15-B1-37 LER for GPRS 10 (Control Room)
40 P15. Civil Works CCC15 CCP15-B1-38 N2 Generation Room 10
41 P15. Civil Works CCC15 CCP15-B1-39 Ground Flare FDN (F10)
42 P15. Civil Works CCC15 CCP15-B1-40 Pipe Rack & FDN for GPRS 10
43 P15. Civil Works CCC15 CCP15-B1-41 Sewage & Drainage Facility for GPRS 10, 20, 30
44 P15. Civil Works CCC15 CCP15-B1-42 Road & Pavement for GPRS 10, 20, 30
45 P15. Civil Works CCC15 CCP15-B1-43 Road Lighting FDN for GPRS 10, 20, 30
46 P15. Civil Works CCC15 CCP15-B1-43a HP Gas Buffer Foundation (F2)
47 P15. Civil Works CCC15 CCP15-B1-43b Condensate Tank & Pump Foundation (F9)
48 P15. Civil Works CCC15 CCP15-B1-43c N2 Gas Rack Foundation (F11)
Power Block 20
49 P15. Civil Works CCC15 CCP15-B2-01 Gas Turbine Building 20
50 P15. Civil Works CCC15 CCP15-B2-02 Local Electrical Building for GTG 21
51 P15. Civil Works CCC15 CCP15-B2-03 Local Electrical Building for GTG 22
52 P15. Civil Works CCC15 CCP15-B2-04 Chemical Dosing House 20
53 P15. Civil Works CCC15 CCP15-B2-05 Local Electrical Building for HRSG 21
54 P15. Civil Works CCC15 CCP15-B2-06 Local Electrical Building for HRSG 22
55 P15. Civil Works CCC15 CCP15-B2-07 N2 Gas Station 20
56 P15. Civil Works CCC15 CCP15-B2-08 Feed Water Pump Sunshade 21
57 P15. Civil Works CCC15 CCP15-B2-09 Feed Water Pump Sunshade 22
58 P15. Civil Works CCC15 CCP15-B2-10 CCW Heat Exchanger, Pump 20
59 P15. Civil Works CCC15 CCP15-B2-11 Emergency Diesel Generator Building 20
60 P15. Civil Works CCC15 CCP15-B2-12 GTG Step Up & Aux. Transformer Shelter 21
61 P15. Civil Works CCC15 CCP15-B2-13 GTG Step Up & Aux. Transformer Shelter 22
62 P15. Civil Works CCC15 CCP15-B2-14 Steam Turbine Building 20
63 P15. Civil Works CCC15 CCP15-B2-15 STG Unit Step Up Transformer Shelter 20
64 P15. Civil Works CCC15 CCP15-B2-16 Clean & Dirty Lube Oil Tank FDN for STG 20
65 P15. Civil Works CCC15 CCP15-B2-17 Generator Fin Fan Cooler FDN 20
66 P15. Civil Works CCC15 CCP15-B2-18 Lube Oil Fin Fan Cooler FDN 21
67 P15. Civil Works CCC15 CCP15-B2-19 Lube Oil Fin Fan Cooler FDN 22
68 P15. Civil Works CCC15 CCP15-B2-20 Seal Pit 20
69 P15. Civil Works CCC15 CCP15-B2-21 Clean Drain Flash Vessel FDN 20
70 P15. Civil Works CCC15 CCP15-B2-22 Sampling Rack Container FDN 20
71 P15. Civil Works CCC15 CCP15-B2-23 HRSG FDN 21
72 P15. Civil Works CCC15 CCP15-B2-24 HRSG FDN 22
73 P15. Civil Works CCC15 CCP15-B2-25 Ignition Gas Tank FDN 21, 22

91/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
74 P15. Civil Works CCC15 CCP15-B2-26 Pipe Rack & FDN for Block 20
75 P15. Civil Works CCC15 CCP15-B2-27 Sewage & Drainage Facility for Block 20
76 P15. Civil Works CCC15 CCP15-B2-28 Road & Pavement for Block 20
77 P15. Civil Works CCC15 CCP15-B2-29 Road Lighting FDN for Block 20
78 P15. Civil Works CCC15 CCP15-B2-30 GIL FDN Block 20
79 P15. Civil Works CCC15 CCP15-B2-30a Cable Trench for Block 20
80 P15. Civil Works CCC15 CCP15-B2-30b Pipe Trench for Block 20
GPRS Block 20
81 P15. Civil Works CCC15 CCP15-B2-31 Gas Compressor Station 20 (F3)
82 P15. Civil Works CCC15 CCP15-B2-32 GT Fuel Changeover PRS 20 (F1)
83 P15. Civil Works CCC15 CCP15-B2-33 Gas Heater with Shelter 20 (F7, F12)
84 P15. Civil Works CCC15 CCP15-B2-34 GPRS for GT & HRSG 20 (F5, F6)
85 P15. Civil Works CCC15 CCP15-B2-35 ESDV Skid 20 (F8)
86 P15. Civil Works CCC15 CCP15-B2-36 LER for GPRS 20 (Control Room)
87 P15. Civil Works CCC15 CCP15-B2-37 N2 Generation Room 20
88 P15. Civil Works CCC15 CCP15-B2-38 Pipe Rack & FDN for GPRS 20
89 P15. Civil Works CCC15 CCP15-B2-38a HP Gas Buffer Foundation (F2)
90 P15. Civil Works CCC15 CCP15-B2-38b N2 Gas Rack Foundation (F11)
Power Block 30
91 P15. Civil Works CCC15 CCP15-B3-01 Gas Turbine Building 30
92 P15. Civil Works CCC15 CCP15-B3-02 Local Electrical Building for GTG 31
93 P15. Civil Works CCC15 CCP15-B3-03 Local Electrical Building for GTG 32
94 P15. Civil Works CCC15 CCP15-B3-04 Chemical Dosing House 30
95 P15. Civil Works CCC15 CCP15-B3-05 Local Electrical Building for HRSG 31
96 P15. Civil Works CCC15 CCP15-B3-06 Local Electrical Building for HRSG 32
97 P15. Civil Works CCC15 CCP15-B3-07 N2 Gas Station 30
98 P15. Civil Works CCC15 CCP15-B3-08 Feed Water Pump Sunshade 31
99 P15. Civil Works CCC15 CCP15-B3-09 Feed Water Pump Sunshade 32
100 P15. Civil Works CCC15 CCP15-B3-10 CCW Heat Exchanger, Pump 30
101 P15. Civil Works CCC15 CCP15-B3-11 Emergency Diesel Generator Building 30
102 P15. Civil Works CCC15 CCP15-B3-12 GTG Step Up & Aux. Transformer Shelter 31
103 P15. Civil Works CCC15 CCP15-B3-13 GTG Step Up & Aux. Transformer Shelter 32
104 P15. Civil Works CCC15 CCP15-B3-14 Steam Turbine Building 30
105 P15. Civil Works CCC15 CCP15-B3-15 STG Unit Step Up Transformer Shelter 30
106 P15. Civil Works CCC15 CCP15-B3-16 Clean & Dirty Lube Oil Tank FDN for STG 30
107 P15. Civil Works CCC15 CCP15-B3-17 Generator Fin Fan Cooler FDN 30
108 P15. Civil Works CCC15 CCP15-B3-18 Lube Oil Fin Fan Cooler FDN 31
109 P15. Civil Works CCC15 CCP15-B3-19 Lube Oil Fin Fan Cooler FDN 32

92/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
110 P15. Civil Works CCC15 CCP15-B3-20 Seal Pit 30
111 P15. Civil Works CCC15 CCP15-B3-21 Clean Drain Flash Vessel FDN 30
112 P15. Civil Works CCC15 CCP15-B3-22 Sampling Rack Container FDN 30
113 P15. Civil Works CCC15 CCP15-B3-23 HRSG FDN 31
114 P15. Civil Works CCC15 CCP15-B3-24 HRSG FDN 32
115 P15. Civil Works CCC15 CCP15-B3-25 Ignition Gas Tank FDN 31, 32
116 P15. Civil Works CCC15 CCP15-B3-26 Pipe Rack & FDN for Block 30
117 P15. Civil Works CCC15 CCP15-B3-27 Sewage & Drainage Facility for Block 30
118 P15. Civil Works CCC15 CCP15-B3-28 Road & Pavement for Block 30
119 P15. Civil Works CCC15 CCP15-B3-29 Road Lighting FDN for Block 30
120 P15. Civil Works CCC15 CCP15-B3-30 GIL FDN for Block 30
121 P15. Civil Works CCC15 CCP15-B3-30a Cable Trench for Block 30
122 P15. Civil Works CCC15 CCP15-B3-30b Pipe Trench for Block 30
GPRS Block 30
123 P15. Civil Works CCC15 CCP15-B3-31 Gas Compressor Station 30
124 P15. Civil Works CCC15 CCP15-B3-32 GT Fuel Changeover PRS 30
125 P15. Civil Works CCC15 CCP15-B3-33 Gas Heater with Shelter 30
126 P15. Civil Works CCC15 CCP15-B3-34 GPRS for GT & HRSG 30
127 P15. Civil Works CCC15 CCP15-B3-35 ESDV Skid FDN 30
128 P15. Civil Works CCC15 CCP15-B3-36 LER for GPRS 30
129 P15. Civil Works CCC15 CCP15-B3-37 N2 Generation Room 30
130 P15. Civil Works CCC15 CCP15-B3-38 Pipe Rack & FDN for GPRS 30
131 P15. Civil Works CCC15 CCP15-B3-38a HP Gas Buffer Foundation (F2)
132 P15. Civil Works CCC15 CCP15-B3-38b N2 Gas Rack Foundation (F11)
Common Area
133 P15. Civil Works CCC15 CCP15-B0-01 Central Control Building
134 P15. Civil Works CCC15 CCP15-B0-02 Common Switchgear Building
135 P15. Civil Works CCC15 CCP15-B0-03 Compressed Air Station & Shelter
136 P15. Civil Works CCC15 CCP15-B0-04 Demineralized Water Plant
137 P15. Civil Works CCC15 CCP15-B0-05 Chemical Storage Tank & Neutralization Pit
138 P15. Civil Works CCC15 CCP15-B0-06 Central HVAC Building
139 P15. Civil Works CCC15 CCP15-B0-07 Fire Fighting Water Pump House
140 P15. Civil Works CCC15 CCP15-B0-08 LEB for GPRS
141 P15. Civil Works CCC15 CCP15-B0-09 LEB for Fire Fighting Pump House
142 P15. Civil Works CCC15 CCP15-B0-10 LEB for Central HVAC Building
143 P15. Civil Works CCC15 CCP15-B0-11 LEB for DFO Forwarding Station
144 P15. Civil Works CCC15 CCP15-B0-12 LEB for Carpenter Workshop
145 P15. Civil Works CCC15 CCP15-B0-13 LEB for M&E Workshop
93/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
146 P15. Civil Works CCC15 CCP15-B0-14 HVAC Chiller Plant MCC & TR Building
147 P15. Civil Works CCC15 CCP15-B0-15 Black Start Diesel Generator, EDG Common
148 P15. Civil Works CCC15 CCP15-B0-16 DFO Tank Farm Area (#1~6)
149 P15. Civil Works CCC15 CCP15-B0-17 DFO Tank Farm Area (JAPS)
150 P15. Civil Works CCC15 CCP15-B0-18 DFO Recirculation Tank & Pump FDN
151 P15. Civil Works CCC15 CCP15-B0-19 Makeup Water Storage Tank FDN & Distilate Water Buffer Tank
152 P15. Civil Works CCC15 CCP15-B0-20 Makeup Water Pump FDN
153 P15. Civil Works CCC15 CCP15-B0-21 Chemical Storage Building for Desal
154 P15. Civil Works CCC15 CCP15-B0-22 Sweage Treatment Building
155 P15. Civil Works CCC15 CCP15-B0-23 Waste Water Treatment Building
156 P15. Civil Works CCC15 CCP15-B0-24 Foam Station
157 P15. Civil Works CCC15 CCP15-B0-25 DFO Forwarding Station
158 P15. Civil Works CCC15 CCP15-B0-26 DFO Forwarding Station for JBL Complex
159 P15. Civil Works CCC15 CCP15-B0-27 Slop Oil Pump Shelter
160 P15. Civil Works CCC15 CCP15-B0-28 DFO Unloading Station
161 P15. Civil Works CCC15 CCP15-B0-29 Fire Fighting Station
162 P15. Civil Works CCC15 CCP15-B0-30 Water Basin
163 P15. Civil Works CCC15 CCP15-B0-31 Gate House
164 P15. Civil Works CCC15 CCP15-B0-32 Main Gate for JAPS
165 P15. Civil Works CCC15 CCP15-B0-33 Central Mech & Elect Workshop
166 P15. Civil Works CCC15 CCP15-B0-34 Mechnical & Electrical Storage
167 P15. Civil Works CCC15 CCP15-B0-35 Outdoor Storage
168 P15. Civil Works CCC15 CCP15-B0-36 Carpenter Workshop
169 P15. Civil Works CCC15 CCP15-B0-37 Covered Parking Place
170 P15. Civil Works CCC15 CCP15-B0-38 Electrical Manholes
171 P15. Civil Works CCC15 CCP15-B0-39 Duct Banks
172 P15. Civil Works CCC15 CCP15-B0-40 Cable Trench
173 P15. Civil Works CCC15 CCP15-B0-41 Pipe Trench
174 P15. Civil Works CCC15 CCP15-B0-42 Fence
175 P15. Civil Works CCC15 CCP15-B0-43 Watch Tower
176 P15. Civil Works CCC15 CCP15-B0-44 Underground Manholes
177 P15. Civil Works CCC15 CCP15-B0-45 Culverts & Access Bridges
178 P15. Civil Works CCC15 CCP15-B0-46 Gas Line Foundations
179 P15. Civil Works CCC15 CCP15-B0-47 Gas Insulated Line Foundations (GIL)
180 P15. Civil Works CCC15 CCP15-B0-48 Gas Chromatograph
181 P15. Civil Works CCC15 CCP15-B0-49 Filter for Aux. Boiler DFO Pump & Accumulator for Aux. Boiler DFO Pump

94/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
182 P15. Civil Works CCC15 CCP15-B0-50 Waste Water Collecting & Monitoring Basin
183 P15. Civil Works CCC15 CCP15-B0-51 Road Lighting Foundation
184 P15. Civil Works CCC15 CCP15-B0-52 Retaining Wall
Approved CCP Q'ty 0

95/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date

Power Block 10
1 P15. Civil Works CCC15 CCP15-B1-01 Gas Turbine Building 10 Initial
2 P15. Civil Works CCC15 CCP15-B1-02 Local Electrical Building for GTG 11 Initial
3 P15. Civil Works CCC15 CCP15-B1-03 Local Electrical Building for GTG 12 Initial
4 P15. Civil Works CCC15 CCP15-B1-04 Chemical Dosing House 10 Initial
5 P15. Civil Works CCC15 CCP15-B1-05 Local Electrical Building for HRSG 11 Initial
6 P15. Civil Works CCC15 CCP15-B1-06 Local Electrical Building for HRSG 12 Initial
7 P15. Civil Works CCC15 CCP15-B1-07 N2 Gas Station 10
8 P15. Civil Works CCC15 CCP15-B1-08 Feed Water Pump Sunshade 11
9 P15. Civil Works CCC15 CCP15-B1-09 Feed Water Pump Sunshade 12
10 P15. Civil Works CCC15 CCP15-B1-10 CCW Heat Exchanger, Pump 10
11 P15. Civil Works CCC15 CCP15-B1-11 Emergency Diesel Generator Building 10 Initial
12 P15. Civil Works CCC15 CCP15-B1-12 GTG Step Up & Aux. Transformer Shelter 11 Final
13 P15. Civil Works CCC15 CCP15-B1-13 GTG Step Up & Aux. Transformer Shelter 12
14 P15. Civil Works CCC15 CCP15-B1-14 Steam Turbine Building 10
15 P15. Civil Works CCC15 CCP15-B1-15 STG Unit Step Up Transformer Shelter 10
16 P15. Civil Works CCC15 CCP15-B1-16 Clean & Dirty Lube Oil Tank FDN for STG 10
17 P15. Civil Works CCC15 CCP15-B1-17 Generator Fin Fan Cooler FDN 10
18 P15. Civil Works CCC15 CCP15-B1-18 Lube Oil Fin Fan Cooler FDN 11
19 P15. Civil Works CCC15 CCP15-B1-19 Lube Oil Fin Fan Cooler FDN 12
20 P15. Civil Works CCC15 CCP15-B1-20 Seal Pit 10
21 P15. Civil Works CCC15 CCP15-B1-21 Clean Drain Flash Vessel FDN 10
22 P15. Civil Works CCC15 CCP15-B1-22 Sampling Rack Container FDN 10
23 P15. Civil Works CCC15 CCP15-B1-23 HRSG FDN 11
24 P15. Civil Works CCC15 CCP15-B1-24 HRSG FDN 12
25 P15. Civil Works CCC15 CCP15-B1-25 Ignition Gas Tank FDN 11, 12
26 P15. Civil Works CCC15 CCP15-B1-26 Pipe Rack & FDN for Block 10
27 P15. Civil Works CCC15 CCP15-B1-27 Sewage & Drainage Facility for Block 10
28 P15. Civil Works CCC15 CCP15-B1-28 Road & Pavement for Block 10
29 P15. Civil Works CCC15 CCP15-B1-29 Road Lighting FDN for Block 10
30 P15. Civil Works CCC15 CCP15-B1-30 GIL FDN Block 10
31 P15. Civil Works CCC15 CCP15-B1-30a Cable Trench for Block 10
32 P15. Civil Works CCC15 CCP15-B1-30b Pipe Trench for Block 10
GPRS Block 10
33 P15. Civil Works CCC15 CCP15-B1-31 Gas Compressor Station 10 (F3) Initial
34 P15. Civil Works CCC15 CCP15-B1-32 GT Fuel Changeover PRS 10 (F1)
35 P15. Civil Works CCC15 CCP15-B1-33 Gas Heater with Shelter 10 (F7, F12)
36 P15. Civil Works CCC15 CCP15-B1-34 GPRS for GT & HRSG 10 (F5, F6)

96/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
37 P15. Civil Works CCC15 CCP15-B1-35 ESDV Skid FDN 10 (F8)
38 P15. Civil Works CCC15 CCP15-B1-36 Fuel Gas Booster Compressor FDN (F4)
39 P15. Civil Works CCC15 CCP15-B1-37 LER for GPRS 10 (Control Room)
40 P15. Civil Works CCC15 CCP15-B1-38 N2 Generation Room 10
41 P15. Civil Works CCC15 CCP15-B1-39 Ground Flare FDN (F10)
42 P15. Civil Works CCC15 CCP15-B1-40 Pipe Rack & FDN for GPRS 10
43 P15. Civil Works CCC15 CCP15-B1-41 Sewage & Drainage Facility for GPRS 10, 20, 30
44 P15. Civil Works CCC15 CCP15-B1-42 Road & Pavement for GPRS 10, 20, 30
45 P15. Civil Works CCC15 CCP15-B1-43 Road Lighting FDN for GPRS 10, 20, 30
46 P15. Civil Works CCC15 CCP15-B1-43a HP Gas Buffer Foundation (F2)
47 P15. Civil Works CCC15 CCP15-B1-43b Condensate Tank & Pump Foundation (F9)
48 P15. Civil Works CCC15 CCP15-B1-43c N2 Gas Rack Foundation (F11)
Power Block 20
49 P15. Civil Works CCC15 CCP15-B2-01 Gas Turbine Building 20
50 P15. Civil Works CCC15 CCP15-B2-02 Local Electrical Building for GTG 21
51 P15. Civil Works CCC15 CCP15-B2-03 Local Electrical Building for GTG 22
52 P15. Civil Works CCC15 CCP15-B2-04 Chemical Dosing House 20
53 P15. Civil Works CCC15 CCP15-B2-05 Local Electrical Building for HRSG 21 Initial
54 P15. Civil Works CCC15 CCP15-B2-06 Local Electrical Building for HRSG 22
55 P15. Civil Works CCC15 CCP15-B2-07 N2 Gas Station 20
56 P15. Civil Works CCC15 CCP15-B2-08 Feed Water Pump Sunshade 21
57 P15. Civil Works CCC15 CCP15-B2-09 Feed Water Pump Sunshade 22
58 P15. Civil Works CCC15 CCP15-B2-10 CCW Heat Exchanger, Pump 20
59 P15. Civil Works CCC15 CCP15-B2-11 Emergency Diesel Generator Building 20
60 P15. Civil Works CCC15 CCP15-B2-12 GTG Step Up & Aux. Transformer Shelter 21
61 P15. Civil Works CCC15 CCP15-B2-13 GTG Step Up & Aux. Transformer Shelter 22
62 P15. Civil Works CCC15 CCP15-B2-14 Steam Turbine Building 20
63 P15. Civil Works CCC15 CCP15-B2-15 STG Unit Step Up Transformer Shelter 20
64 P15. Civil Works CCC15 CCP15-B2-16 Clean & Dirty Lube Oil Tank FDN for STG 20
65 P15. Civil Works CCC15 CCP15-B2-17 Generator Fin Fan Cooler FDN 20
66 P15. Civil Works CCC15 CCP15-B2-18 Lube Oil Fin Fan Cooler FDN 21
67 P15. Civil Works CCC15 CCP15-B2-19 Lube Oil Fin Fan Cooler FDN 22
68 P15. Civil Works CCC15 CCP15-B2-20 Seal Pit 20
69 P15. Civil Works CCC15 CCP15-B2-21 Clean Drain Flash Vessel FDN 20
70 P15. Civil Works CCC15 CCP15-B2-22 Sampling Rack Container FDN 20
71 P15. Civil Works CCC15 CCP15-B2-23 HRSG FDN 21
72 P15. Civil Works CCC15 CCP15-B2-24 HRSG FDN 22
73 P15. Civil Works CCC15 CCP15-B2-25 Ignition Gas Tank FDN 21, 22

97/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
74 P15. Civil Works CCC15 CCP15-B2-26 Pipe Rack & FDN for Block 20
75 P15. Civil Works CCC15 CCP15-B2-27 Sewage & Drainage Facility for Block 20
76 P15. Civil Works CCC15 CCP15-B2-28 Road & Pavement for Block 20
77 P15. Civil Works CCC15 CCP15-B2-29 Road Lighting FDN for Block 20
78 P15. Civil Works CCC15 CCP15-B2-30 GIL FDN Block 20
79 P15. Civil Works CCC15 CCP15-B2-30a Cable Trench for Block 20
80 P15. Civil Works CCC15 CCP15-B2-30b Pipe Trench for Block 20
GPRS Block 20
81 P15. Civil Works CCC15 CCP15-B2-31 Gas Compressor Station 20 (F3)
82 P15. Civil Works CCC15 CCP15-B2-32 GT Fuel Changeover PRS 20 (F1)
83 P15. Civil Works CCC15 CCP15-B2-33 Gas Heater with Shelter 20 (F7, F12)
84 P15. Civil Works CCC15 CCP15-B2-34 GPRS for GT & HRSG 20 (F5, F6)
85 P15. Civil Works CCC15 CCP15-B2-35 ESDV Skid 20 (F8)
86 P15. Civil Works CCC15 CCP15-B2-36 LER for GPRS 20 (Control Room)
87 P15. Civil Works CCC15 CCP15-B2-37 N2 Generation Room 20
88 P15. Civil Works CCC15 CCP15-B2-38 Pipe Rack & FDN for GPRS 20
89 P15. Civil Works CCC15 CCP15-B2-38a HP Gas Buffer Foundation (F2)
90 P15. Civil Works CCC15 CCP15-B2-38b N2 Gas Rack Foundation (F11)
Power Block 30
91 P15. Civil Works CCC15 CCP15-B3-01 Gas Turbine Building 30
92 P15. Civil Works CCC15 CCP15-B3-02 Local Electrical Building for GTG 31
93 P15. Civil Works CCC15 CCP15-B3-03 Local Electrical Building for GTG 32
94 P15. Civil Works CCC15 CCP15-B3-04 Chemical Dosing House 30
95 P15. Civil Works CCC15 CCP15-B3-05 Local Electrical Building for HRSG 31
96 P15. Civil Works CCC15 CCP15-B3-06 Local Electrical Building for HRSG 32
97 P15. Civil Works CCC15 CCP15-B3-07 N2 Gas Station 30
98 P15. Civil Works CCC15 CCP15-B3-08 Feed Water Pump Sunshade 31
99 P15. Civil Works CCC15 CCP15-B3-09 Feed Water Pump Sunshade 32
100 P15. Civil Works CCC15 CCP15-B3-10 CCW Heat Exchanger, Pump 30
101 P15. Civil Works CCC15 CCP15-B3-11 Emergency Diesel Generator Building 30
102 P15. Civil Works CCC15 CCP15-B3-12 GTG Step Up & Aux. Transformer Shelter 31
103 P15. Civil Works CCC15 CCP15-B3-13 GTG Step Up & Aux. Transformer Shelter 32
104 P15. Civil Works CCC15 CCP15-B3-14 Steam Turbine Building 30
105 P15. Civil Works CCC15 CCP15-B3-15 STG Unit Step Up Transformer Shelter 30
106 P15. Civil Works CCC15 CCP15-B3-16 Clean & Dirty Lube Oil Tank FDN for STG 30
107 P15. Civil Works CCC15 CCP15-B3-17 Generator Fin Fan Cooler FDN 30
108 P15. Civil Works CCC15 CCP15-B3-18 Lube Oil Fin Fan Cooler FDN 31
109 P15. Civil Works CCC15 CCP15-B3-19 Lube Oil Fin Fan Cooler FDN 32

98/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
110 P15. Civil Works CCC15 CCP15-B3-20 Seal Pit 30
111 P15. Civil Works CCC15 CCP15-B3-21 Clean Drain Flash Vessel FDN 30
112 P15. Civil Works CCC15 CCP15-B3-22 Sampling Rack Container FDN 30
113 P15. Civil Works CCC15 CCP15-B3-23 HRSG FDN 31
114 P15. Civil Works CCC15 CCP15-B3-24 HRSG FDN 32
115 P15. Civil Works CCC15 CCP15-B3-25 Ignition Gas Tank FDN 31, 32
116 P15. Civil Works CCC15 CCP15-B3-26 Pipe Rack & FDN for Block 30
117 P15. Civil Works CCC15 CCP15-B3-27 Sewage & Drainage Facility for Block 30
118 P15. Civil Works CCC15 CCP15-B3-28 Road & Pavement for Block 30
119 P15. Civil Works CCC15 CCP15-B3-29 Road Lighting FDN for Block 30
120 P15. Civil Works CCC15 CCP15-B3-30 GIL FDN for Block 30
121 P15. Civil Works CCC15 CCP15-B3-30a Cable Trench for Block 30
122 P15. Civil Works CCC15 CCP15-B3-30b Pipe Trench for Block 30
GPRS Block 30
123 P15. Civil Works CCC15 CCP15-B3-31 Gas Compressor Station 30
124 P15. Civil Works CCC15 CCP15-B3-32 GT Fuel Changeover PRS 30
125 P15. Civil Works CCC15 CCP15-B3-33 Gas Heater with Shelter 30
126 P15. Civil Works CCC15 CCP15-B3-34 GPRS for GT & HRSG 30
127 P15. Civil Works CCC15 CCP15-B3-35 ESDV Skid FDN 30
128 P15. Civil Works CCC15 CCP15-B3-36 LER for GPRS 30
129 P15. Civil Works CCC15 CCP15-B3-37 N2 Generation Room 30
130 P15. Civil Works CCC15 CCP15-B3-38 Pipe Rack & FDN for GPRS 30
131 P15. Civil Works CCC15 CCP15-B3-38a HP Gas Buffer Foundation (F2)
132 P15. Civil Works CCC15 CCP15-B3-38b N2 Gas Rack Foundation (F11)
Common Area
133 P15. Civil Works CCC15 CCP15-B0-01 Central Control Building Initial
134 P15. Civil Works CCC15 CCP15-B0-02 Common Switchgear Building Initial
135 P15. Civil Works CCC15 CCP15-B0-03 Compressed Air Station & Shelter Initial
136 P15. Civil Works CCC15 CCP15-B0-04 Demineralized Water Plant Initial
137 P15. Civil Works CCC15 CCP15-B0-05 Chemical Storage Tank & Neutralization Pit Initial
138 P15. Civil Works CCC15 CCP15-B0-06 Central HVAC Building
139 P15. Civil Works CCC15 CCP15-B0-07 Fire Fighting Water Pump House
140 P15. Civil Works CCC15 CCP15-B0-08 LEB for GPRS Initial
141 P15. Civil Works CCC15 CCP15-B0-09 LEB for Fire Fighting Pump House Initial
142 P15. Civil Works CCC15 CCP15-B0-10 LEB for Central HVAC Building
143 P15. Civil Works CCC15 CCP15-B0-11 LEB for DFO Forwarding Station Initial
144 P15. Civil Works CCC15 CCP15-B0-12 LEB for Carpenter Workshop
145 P15. Civil Works CCC15 CCP15-B0-13 LEB for M&E Workshop
99/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
146 P15. Civil Works CCC15 CCP15-B0-14 HVAC Chiller Plant MCC & TR Building
147 P15. Civil Works CCC15 CCP15-B0-15 Black Start Diesel Generator, EDG Common
148 P15. Civil Works CCC15 CCP15-B0-16 DFO Tank Farm Area (#1~6)
149 P15. Civil Works CCC15 CCP15-B0-17 DFO Tank Farm Area (JAPS)
150 P15. Civil Works CCC15 CCP15-B0-18 DFO Recirculation Tank & Pump FDN
151 P15. Civil Works CCC15 CCP15-B0-19 Makeup Water Storage Tank FDN & Distilate Water Buffer Tank Initial
152 P15. Civil Works CCC15 CCP15-B0-20 Makeup Water Pump FDN Initial
153 P15. Civil Works CCC15 CCP15-B0-21 Chemical Storage Building for Desal
154 P15. Civil Works CCC15 CCP15-B0-22 Sweage Treatment Building
155 P15. Civil Works CCC15 CCP15-B0-23 Waste Water Treatment Building
156 P15. Civil Works CCC15 CCP15-B0-24 Foam Station Final
157 P15. Civil Works CCC15 CCP15-B0-25 DFO Forwarding Station
158 P15. Civil Works CCC15 CCP15-B0-26 DFO Forwarding Station for JBL Complex
159 P15. Civil Works CCC15 CCP15-B0-27 Slop Oil Pump Shelter
160 P15. Civil Works CCC15 CCP15-B0-28 DFO Unloading Station
161 P15. Civil Works CCC15 CCP15-B0-29 Fire Fighting Station
162 P15. Civil Works CCC15 CCP15-B0-30 Water Basin
163 P15. Civil Works CCC15 CCP15-B0-31 Gate House
164 P15. Civil Works CCC15 CCP15-B0-32 Main Gate for JAPS
165 P15. Civil Works CCC15 CCP15-B0-33 Central Mech & Elect Workshop
166 P15. Civil Works CCC15 CCP15-B0-34 Mechnical & Electrical Storage
167 P15. Civil Works CCC15 CCP15-B0-35 Outdoor Storage
168 P15. Civil Works CCC15 CCP15-B0-36 Carpenter Workshop
169 P15. Civil Works CCC15 CCP15-B0-37 Covered Parking Place
170 P15. Civil Works CCC15 CCP15-B0-38 Electrical Manholes
171 P15. Civil Works CCC15 CCP15-B0-39 Duct Banks
172 P15. Civil Works CCC15 CCP15-B0-40 Cable Trench
173 P15. Civil Works CCC15 CCP15-B0-41 Pipe Trench
174 P15. Civil Works CCC15 CCP15-B0-42 Fence
175 P15. Civil Works CCC15 CCP15-B0-43 Watch Tower
176 P15. Civil Works CCC15 CCP15-B0-44 Underground Manholes
177 P15. Civil Works CCC15 CCP15-B0-45 Culverts & Access Bridges
178 P15. Civil Works CCC15 CCP15-B0-46 Gas Line Foundations
179 P15. Civil Works CCC15 CCP15-B0-47 Gas Insulated Line Foundations (GIL)
180 P15. Civil Works CCC15 CCP15-B0-48 Gas Chromatograph
181 P15. Civil Works CCC15 CCP15-B0-49 Filter for Aux. Boiler DFO Pump & Accumulator for Aux. Boiler DFO Pump

100/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
182 P15. Civil Works CCC15 CCP15-B0-50 Waste Water Collecting & Monitoring Basin
183 P15. Civil Works CCC15 CCP15-B0-51 Road Lighting Foundation
184 P15. Civil Works CCC15 CCP15-B0-52 Retaining Wall
Approved CCP Q'ty 0

101/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date

Power Block 10
1 P15. Civil Works CCC15 CCP15-B1-01 Gas Turbine Building 10 Final
2 P15. Civil Works CCC15 CCP15-B1-02 Local Electrical Building for GTG 11 Final
3 P15. Civil Works CCC15 CCP15-B1-03 Local Electrical Building for GTG 12
4 P15. Civil Works CCC15 CCP15-B1-04 Chemical Dosing House 10
5 P15. Civil Works CCC15 CCP15-B1-05 Local Electrical Building for HRSG 11
6 P15. Civil Works CCC15 CCP15-B1-06 Local Electrical Building for HRSG 12
7 P15. Civil Works CCC15 CCP15-B1-07 N2 Gas Station 10 Final
8 P15. Civil Works CCC15 CCP15-B1-08 Feed Water Pump Sunshade 11
9 P15. Civil Works CCC15 CCP15-B1-09 Feed Water Pump Sunshade 12
10 P15. Civil Works CCC15 CCP15-B1-10 CCW Heat Exchanger, Pump 10
11 P15. Civil Works CCC15 CCP15-B1-11 Emergency Diesel Generator Building 10
12 P15. Civil Works CCC15 CCP15-B1-12 GTG Step Up & Aux. Transformer Shelter 11
13 P15. Civil Works CCC15 CCP15-B1-13 GTG Step Up & Aux. Transformer Shelter 12
14 P15. Civil Works CCC15 CCP15-B1-14 Steam Turbine Building 10
15 P15. Civil Works CCC15 CCP15-B1-15 STG Unit Step Up Transformer Shelter 10
16 P15. Civil Works CCC15 CCP15-B1-16 Clean & Dirty Lube Oil Tank FDN for STG 10
17 P15. Civil Works CCC15 CCP15-B1-17 Generator Fin Fan Cooler FDN 10
18 P15. Civil Works CCC15 CCP15-B1-18 Lube Oil Fin Fan Cooler FDN 11
19 P15. Civil Works CCC15 CCP15-B1-19 Lube Oil Fin Fan Cooler FDN 12
20 P15. Civil Works CCC15 CCP15-B1-20 Seal Pit 10
21 P15. Civil Works CCC15 CCP15-B1-21 Clean Drain Flash Vessel FDN 10
22 P15. Civil Works CCC15 CCP15-B1-22 Sampling Rack Container FDN 10
23 P15. Civil Works CCC15 CCP15-B1-23 HRSG FDN 11
24 P15. Civil Works CCC15 CCP15-B1-24 HRSG FDN 12
25 P15. Civil Works CCC15 CCP15-B1-25 Ignition Gas Tank FDN 11, 12
26 P15. Civil Works CCC15 CCP15-B1-26 Pipe Rack & FDN for Block 10 Final
27 P15. Civil Works CCC15 CCP15-B1-27 Sewage & Drainage Facility for Block 10
28 P15. Civil Works CCC15 CCP15-B1-28 Road & Pavement for Block 10
29 P15. Civil Works CCC15 CCP15-B1-29 Road Lighting FDN for Block 10
30 P15. Civil Works CCC15 CCP15-B1-30 GIL FDN Block 10
31 P15. Civil Works CCC15 CCP15-B1-30a Cable Trench for Block 10
32 P15. Civil Works CCC15 CCP15-B1-30b Pipe Trench for Block 10
GPRS Block 10
33 P15. Civil Works CCC15 CCP15-B1-31 Gas Compressor Station 10 (F3)
34 P15. Civil Works CCC15 CCP15-B1-32 GT Fuel Changeover PRS 10 (F1)
35 P15. Civil Works CCC15 CCP15-B1-33 Gas Heater with Shelter 10 (F7, F12) Final
36 P15. Civil Works CCC15 CCP15-B1-34 GPRS for GT & HRSG 10 (F5, F6) Final

102/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
37 P15. Civil Works CCC15 CCP15-B1-35 ESDV Skid FDN 10 (F8)
38 P15. Civil Works CCC15 CCP15-B1-36 Fuel Gas Booster Compressor FDN (F4)
39 P15. Civil Works CCC15 CCP15-B1-37 LER for GPRS 10 (Control Room)
40 P15. Civil Works CCC15 CCP15-B1-38 N2 Generation Room 10
41 P15. Civil Works CCC15 CCP15-B1-39 Ground Flare FDN (F10)
42 P15. Civil Works CCC15 CCP15-B1-40 Pipe Rack & FDN for GPRS 10 Final
43 P15. Civil Works CCC15 CCP15-B1-41 Sewage & Drainage Facility for GPRS 10, 20, 30
44 P15. Civil Works CCC15 CCP15-B1-42 Road & Pavement for GPRS 10, 20, 30
45 P15. Civil Works CCC15 CCP15-B1-43 Road Lighting FDN for GPRS 10, 20, 30
46 P15. Civil Works CCC15 CCP15-B1-43a HP Gas Buffer Foundation (F2)
47 P15. Civil Works CCC15 CCP15-B1-43b Condensate Tank & Pump Foundation (F9)
48 P15. Civil Works CCC15 CCP15-B1-43c N2 Gas Rack Foundation (F11)
Power Block 20
49 P15. Civil Works CCC15 CCP15-B2-01 Gas Turbine Building 20 Final
50 P15. Civil Works CCC15 CCP15-B2-02 Local Electrical Building for GTG 21
51 P15. Civil Works CCC15 CCP15-B2-03 Local Electrical Building for GTG 22
52 P15. Civil Works CCC15 CCP15-B2-04 Chemical Dosing House 20
53 P15. Civil Works CCC15 CCP15-B2-05 Local Electrical Building for HRSG 21
54 P15. Civil Works CCC15 CCP15-B2-06 Local Electrical Building for HRSG 22
55 P15. Civil Works CCC15 CCP15-B2-07 N2 Gas Station 20 Final
56 P15. Civil Works CCC15 CCP15-B2-08 Feed Water Pump Sunshade 21
57 P15. Civil Works CCC15 CCP15-B2-09 Feed Water Pump Sunshade 22
58 P15. Civil Works CCC15 CCP15-B2-10 CCW Heat Exchanger, Pump 20
59 P15. Civil Works CCC15 CCP15-B2-11 Emergency Diesel Generator Building 20
60 P15. Civil Works CCC15 CCP15-B2-12 GTG Step Up & Aux. Transformer Shelter 21
61 P15. Civil Works CCC15 CCP15-B2-13 GTG Step Up & Aux. Transformer Shelter 22
62 P15. Civil Works CCC15 CCP15-B2-14 Steam Turbine Building 20
63 P15. Civil Works CCC15 CCP15-B2-15 STG Unit Step Up Transformer Shelter 20
64 P15. Civil Works CCC15 CCP15-B2-16 Clean & Dirty Lube Oil Tank FDN for STG 20
65 P15. Civil Works CCC15 CCP15-B2-17 Generator Fin Fan Cooler FDN 20
66 P15. Civil Works CCC15 CCP15-B2-18 Lube Oil Fin Fan Cooler FDN 21
67 P15. Civil Works CCC15 CCP15-B2-19 Lube Oil Fin Fan Cooler FDN 22
68 P15. Civil Works CCC15 CCP15-B2-20 Seal Pit 20
69 P15. Civil Works CCC15 CCP15-B2-21 Clean Drain Flash Vessel FDN 20
70 P15. Civil Works CCC15 CCP15-B2-22 Sampling Rack Container FDN 20
71 P15. Civil Works CCC15 CCP15-B2-23 HRSG FDN 21
72 P15. Civil Works CCC15 CCP15-B2-24 HRSG FDN 22
73 P15. Civil Works CCC15 CCP15-B2-25 Ignition Gas Tank FDN 21, 22

103/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
74 P15. Civil Works CCC15 CCP15-B2-26 Pipe Rack & FDN for Block 20 Final
75 P15. Civil Works CCC15 CCP15-B2-27 Sewage & Drainage Facility for Block 20
76 P15. Civil Works CCC15 CCP15-B2-28 Road & Pavement for Block 20
77 P15. Civil Works CCC15 CCP15-B2-29 Road Lighting FDN for Block 20
78 P15. Civil Works CCC15 CCP15-B2-30 GIL FDN Block 20
79 P15. Civil Works CCC15 CCP15-B2-30a Cable Trench for Block 20
80 P15. Civil Works CCC15 CCP15-B2-30b Pipe Trench for Block 20
GPRS Block 20
81 P15. Civil Works CCC15 CCP15-B2-31 Gas Compressor Station 20 (F3)
82 P15. Civil Works CCC15 CCP15-B2-32 GT Fuel Changeover PRS 20 (F1) Final
83 P15. Civil Works CCC15 CCP15-B2-33 Gas Heater with Shelter 20 (F7, F12) Final
84 P15. Civil Works CCC15 CCP15-B2-34 GPRS for GT & HRSG 20 (F5, F6) Final
85 P15. Civil Works CCC15 CCP15-B2-35 ESDV Skid 20 (F8) Final
86 P15. Civil Works CCC15 CCP15-B2-36 LER for GPRS 20 (Control Room)
87 P15. Civil Works CCC15 CCP15-B2-37 N2 Generation Room 20
88 P15. Civil Works CCC15 CCP15-B2-38 Pipe Rack & FDN for GPRS 20 Final
89 P15. Civil Works CCC15 CCP15-B2-38a HP Gas Buffer Foundation (F2)
90 P15. Civil Works CCC15 CCP15-B2-38b N2 Gas Rack Foundation (F11)
Power Block 30
91 P15. Civil Works CCC15 CCP15-B3-01 Gas Turbine Building 30 Final
92 P15. Civil Works CCC15 CCP15-B3-02 Local Electrical Building for GTG 31
93 P15. Civil Works CCC15 CCP15-B3-03 Local Electrical Building for GTG 32
94 P15. Civil Works CCC15 CCP15-B3-04 Chemical Dosing House 30
95 P15. Civil Works CCC15 CCP15-B3-05 Local Electrical Building for HRSG 31
96 P15. Civil Works CCC15 CCP15-B3-06 Local Electrical Building for HRSG 32
97 P15. Civil Works CCC15 CCP15-B3-07 N2 Gas Station 30 Final
98 P15. Civil Works CCC15 CCP15-B3-08 Feed Water Pump Sunshade 31
99 P15. Civil Works CCC15 CCP15-B3-09 Feed Water Pump Sunshade 32
100 P15. Civil Works CCC15 CCP15-B3-10 CCW Heat Exchanger, Pump 30
101 P15. Civil Works CCC15 CCP15-B3-11 Emergency Diesel Generator Building 30
102 P15. Civil Works CCC15 CCP15-B3-12 GTG Step Up & Aux. Transformer Shelter 31
103 P15. Civil Works CCC15 CCP15-B3-13 GTG Step Up & Aux. Transformer Shelter 32
104 P15. Civil Works CCC15 CCP15-B3-14 Steam Turbine Building 30
105 P15. Civil Works CCC15 CCP15-B3-15 STG Unit Step Up Transformer Shelter 30
106 P15. Civil Works CCC15 CCP15-B3-16 Clean & Dirty Lube Oil Tank FDN for STG 30
107 P15. Civil Works CCC15 CCP15-B3-17 Generator Fin Fan Cooler FDN 30
108 P15. Civil Works CCC15 CCP15-B3-18 Lube Oil Fin Fan Cooler FDN 31
109 P15. Civil Works CCC15 CCP15-B3-19 Lube Oil Fin Fan Cooler FDN 32

104/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
110 P15. Civil Works CCC15 CCP15-B3-20 Seal Pit 30
111 P15. Civil Works CCC15 CCP15-B3-21 Clean Drain Flash Vessel FDN 30
112 P15. Civil Works CCC15 CCP15-B3-22 Sampling Rack Container FDN 30
113 P15. Civil Works CCC15 CCP15-B3-23 HRSG FDN 31
114 P15. Civil Works CCC15 CCP15-B3-24 HRSG FDN 32
115 P15. Civil Works CCC15 CCP15-B3-25 Ignition Gas Tank FDN 31, 32
116 P15. Civil Works CCC15 CCP15-B3-26 Pipe Rack & FDN for Block 30 Final
117 P15. Civil Works CCC15 CCP15-B3-27 Sewage & Drainage Facility for Block 30
118 P15. Civil Works CCC15 CCP15-B3-28 Road & Pavement for Block 30
119 P15. Civil Works CCC15 CCP15-B3-29 Road Lighting FDN for Block 30
120 P15. Civil Works CCC15 CCP15-B3-30 GIL FDN for Block 30
121 P15. Civil Works CCC15 CCP15-B3-30a Cable Trench for Block 30
122 P15. Civil Works CCC15 CCP15-B3-30b Pipe Trench for Block 30
GPRS Block 30
123 P15. Civil Works CCC15 CCP15-B3-31 Gas Compressor Station 30
124 P15. Civil Works CCC15 CCP15-B3-32 GT Fuel Changeover PRS 30
125 P15. Civil Works CCC15 CCP15-B3-33 Gas Heater with Shelter 30
126 P15. Civil Works CCC15 CCP15-B3-34 GPRS for GT & HRSG 30
127 P15. Civil Works CCC15 CCP15-B3-35 ESDV Skid FDN 30
128 P15. Civil Works CCC15 CCP15-B3-36 LER for GPRS 30
129 P15. Civil Works CCC15 CCP15-B3-37 N2 Generation Room 30
130 P15. Civil Works CCC15 CCP15-B3-38 Pipe Rack & FDN for GPRS 30 Final
131 P15. Civil Works CCC15 CCP15-B3-38a HP Gas Buffer Foundation (F2)
132 P15. Civil Works CCC15 CCP15-B3-38b N2 Gas Rack Foundation (F11)
Common Area
133 P15. Civil Works CCC15 CCP15-B0-01 Central Control Building
134 P15. Civil Works CCC15 CCP15-B0-02 Common Switchgear Building
135 P15. Civil Works CCC15 CCP15-B0-03 Compressed Air Station & Shelter
136 P15. Civil Works CCC15 CCP15-B0-04 Demineralized Water Plant
137 P15. Civil Works CCC15 CCP15-B0-05 Chemical Storage Tank & Neutralization Pit Final
138 P15. Civil Works CCC15 CCP15-B0-06 Central HVAC Building Final
139 P15. Civil Works CCC15 CCP15-B0-07 Fire Fighting Water Pump House
140 P15. Civil Works CCC15 CCP15-B0-08 LEB for GPRS
141 P15. Civil Works CCC15 CCP15-B0-09 LEB for Fire Fighting Pump House
142 P15. Civil Works CCC15 CCP15-B0-10 LEB for Central HVAC Building
143 P15. Civil Works CCC15 CCP15-B0-11 LEB for DFO Forwarding Station
144 P15. Civil Works CCC15 CCP15-B0-12 LEB for Carpenter Workshop
145 P15. Civil Works CCC15 CCP15-B0-13 LEB for M&E Workshop
105/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
146 P15. Civil Works CCC15 CCP15-B0-14 HVAC Chiller Plant MCC & TR Building
147 P15. Civil Works CCC15 CCP15-B0-15 Black Start Diesel Generator, EDG Common Final
148 P15. Civil Works CCC15 CCP15-B0-16 DFO Tank Farm Area (#1~6)
149 P15. Civil Works CCC15 CCP15-B0-17 DFO Tank Farm Area (JAPS)
150 P15. Civil Works CCC15 CCP15-B0-18 DFO Recirculation Tank & Pump FDN
151 P15. Civil Works CCC15 CCP15-B0-19 Makeup Water Storage Tank FDN & Distilate Water Buffer Tank
152 P15. Civil Works CCC15 CCP15-B0-20 Makeup Water Pump FDN Final
153 P15. Civil Works CCC15 CCP15-B0-21 Chemical Storage Building for Desal
154 P15. Civil Works CCC15 CCP15-B0-22 Sweage Treatment Building
155 P15. Civil Works CCC15 CCP15-B0-23 Waste Water Treatment Building
156 P15. Civil Works CCC15 CCP15-B0-24 Foam Station
157 P15. Civil Works CCC15 CCP15-B0-25 DFO Forwarding Station
158 P15. Civil Works CCC15 CCP15-B0-26 DFO Forwarding Station for JBL Complex
159 P15. Civil Works CCC15 CCP15-B0-27 Slop Oil Pump Shelter
160 P15. Civil Works CCC15 CCP15-B0-28 DFO Unloading Station Final
161 P15. Civil Works CCC15 CCP15-B0-29 Fire Fighting Station
162 P15. Civil Works CCC15 CCP15-B0-30 Water Basin
163 P15. Civil Works CCC15 CCP15-B0-31 Gate House
164 P15. Civil Works CCC15 CCP15-B0-32 Main Gate for JAPS
165 P15. Civil Works CCC15 CCP15-B0-33 Central Mech & Elect Workshop
166 P15. Civil Works CCC15 CCP15-B0-34 Mechnical & Electrical Storage
167 P15. Civil Works CCC15 CCP15-B0-35 Outdoor Storage
168 P15. Civil Works CCC15 CCP15-B0-36 Carpenter Workshop
169 P15. Civil Works CCC15 CCP15-B0-37 Covered Parking Place
170 P15. Civil Works CCC15 CCP15-B0-38 Electrical Manholes
171 P15. Civil Works CCC15 CCP15-B0-39 Duct Banks
172 P15. Civil Works CCC15 CCP15-B0-40 Cable Trench
173 P15. Civil Works CCC15 CCP15-B0-41 Pipe Trench
174 P15. Civil Works CCC15 CCP15-B0-42 Fence
175 P15. Civil Works CCC15 CCP15-B0-43 Watch Tower
176 P15. Civil Works CCC15 CCP15-B0-44 Underground Manholes
177 P15. Civil Works CCC15 CCP15-B0-45 Culverts & Access Bridges
178 P15. Civil Works CCC15 CCP15-B0-46 Gas Line Foundations
179 P15. Civil Works CCC15 CCP15-B0-47 Gas Insulated Line Foundations (GIL)
180 P15. Civil Works CCC15 CCP15-B0-48 Gas Chromatograph
181 P15. Civil Works CCC15 CCP15-B0-49 Filter for Aux. Boiler DFO Pump & Accumulator for Aux. Boiler DFO Pump

106/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
182 P15. Civil Works CCC15 CCP15-B0-50 Waste Water Collecting & Monitoring Basin
183 P15. Civil Works CCC15 CCP15-B0-51 Road Lighting Foundation
184 P15. Civil Works CCC15 CCP15-B0-52 Retaining Wall
Approved CCP Q'ty 0

107/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date

Power Block 10
1 P15. Civil Works CCC15 CCP15-B1-01 Gas Turbine Building 10
2 P15. Civil Works CCC15 CCP15-B1-02 Local Electrical Building for GTG 11
3 P15. Civil Works CCC15 CCP15-B1-03 Local Electrical Building for GTG 12
4 P15. Civil Works CCC15 CCP15-B1-04 Chemical Dosing House 10
5 P15. Civil Works CCC15 CCP15-B1-05 Local Electrical Building for HRSG 11
6 P15. Civil Works CCC15 CCP15-B1-06 Local Electrical Building for HRSG 12
7 P15. Civil Works CCC15 CCP15-B1-07 N2 Gas Station 10
8 P15. Civil Works CCC15 CCP15-B1-08 Feed Water Pump Sunshade 11
9 P15. Civil Works CCC15 CCP15-B1-09 Feed Water Pump Sunshade 12
10 P15. Civil Works CCC15 CCP15-B1-10 CCW Heat Exchanger, Pump 10
11 P15. Civil Works CCC15 CCP15-B1-11 Emergency Diesel Generator Building 10
12 P15. Civil Works CCC15 CCP15-B1-12 GTG Step Up & Aux. Transformer Shelter 11
13 P15. Civil Works CCC15 CCP15-B1-13 GTG Step Up & Aux. Transformer Shelter 12
14 P15. Civil Works CCC15 CCP15-B1-14 Steam Turbine Building 10
15 P15. Civil Works CCC15 CCP15-B1-15 STG Unit Step Up Transformer Shelter 10
16 P15. Civil Works CCC15 CCP15-B1-16 Clean & Dirty Lube Oil Tank FDN for STG 10
17 P15. Civil Works CCC15 CCP15-B1-17 Generator Fin Fan Cooler FDN 10
18 P15. Civil Works CCC15 CCP15-B1-18 Lube Oil Fin Fan Cooler FDN 11
19 P15. Civil Works CCC15 CCP15-B1-19 Lube Oil Fin Fan Cooler FDN 12
20 P15. Civil Works CCC15 CCP15-B1-20 Seal Pit 10
21 P15. Civil Works CCC15 CCP15-B1-21 Clean Drain Flash Vessel FDN 10
22 P15. Civil Works CCC15 CCP15-B1-22 Sampling Rack Container FDN 10
23 P15. Civil Works CCC15 CCP15-B1-23 HRSG FDN 11
24 P15. Civil Works CCC15 CCP15-B1-24 HRSG FDN 12
25 P15. Civil Works CCC15 CCP15-B1-25 Ignition Gas Tank FDN 11, 12
26 P15. Civil Works CCC15 CCP15-B1-26 Pipe Rack & FDN for Block 10
27 P15. Civil Works CCC15 CCP15-B1-27 Sewage & Drainage Facility for Block 10
28 P15. Civil Works CCC15 CCP15-B1-28 Road & Pavement for Block 10
29 P15. Civil Works CCC15 CCP15-B1-29 Road Lighting FDN for Block 10
30 P15. Civil Works CCC15 CCP15-B1-30 GIL FDN Block 10
31 P15. Civil Works CCC15 CCP15-B1-30a Cable Trench for Block 10
32 P15. Civil Works CCC15 CCP15-B1-30b Pipe Trench for Block 10
GPRS Block 10
33 P15. Civil Works CCC15 CCP15-B1-31 Gas Compressor Station 10 (F3)
34 P15. Civil Works CCC15 CCP15-B1-32 GT Fuel Changeover PRS 10 (F1)
35 P15. Civil Works CCC15 CCP15-B1-33 Gas Heater with Shelter 10 (F7, F12)
36 P15. Civil Works CCC15 CCP15-B1-34 GPRS for GT & HRSG 10 (F5, F6)

108/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
37 P15. Civil Works CCC15 CCP15-B1-35 ESDV Skid FDN 10 (F8)
38 P15. Civil Works CCC15 CCP15-B1-36 Fuel Gas Booster Compressor FDN (F4)
39 P15. Civil Works CCC15 CCP15-B1-37 LER for GPRS 10 (Control Room)
40 P15. Civil Works CCC15 CCP15-B1-38 N2 Generation Room 10
41 P15. Civil Works CCC15 CCP15-B1-39 Ground Flare FDN (F10)
42 P15. Civil Works CCC15 CCP15-B1-40 Pipe Rack & FDN for GPRS 10
43 P15. Civil Works CCC15 CCP15-B1-41 Sewage & Drainage Facility for GPRS 10, 20, 30
44 P15. Civil Works CCC15 CCP15-B1-42 Road & Pavement for GPRS 10, 20, 30
45 P15. Civil Works CCC15 CCP15-B1-43 Road Lighting FDN for GPRS 10, 20, 30
46 P15. Civil Works CCC15 CCP15-B1-43a HP Gas Buffer Foundation (F2)
47 P15. Civil Works CCC15 CCP15-B1-43b Condensate Tank & Pump Foundation (F9)
48 P15. Civil Works CCC15 CCP15-B1-43c N2 Gas Rack Foundation (F11)
Power Block 20
49 P15. Civil Works CCC15 CCP15-B2-01 Gas Turbine Building 20
50 P15. Civil Works CCC15 CCP15-B2-02 Local Electrical Building for GTG 21
51 P15. Civil Works CCC15 CCP15-B2-03 Local Electrical Building for GTG 22
52 P15. Civil Works CCC15 CCP15-B2-04 Chemical Dosing House 20
53 P15. Civil Works CCC15 CCP15-B2-05 Local Electrical Building for HRSG 21
54 P15. Civil Works CCC15 CCP15-B2-06 Local Electrical Building for HRSG 22
55 P15. Civil Works CCC15 CCP15-B2-07 N2 Gas Station 20
56 P15. Civil Works CCC15 CCP15-B2-08 Feed Water Pump Sunshade 21
57 P15. Civil Works CCC15 CCP15-B2-09 Feed Water Pump Sunshade 22
58 P15. Civil Works CCC15 CCP15-B2-10 CCW Heat Exchanger, Pump 20
59 P15. Civil Works CCC15 CCP15-B2-11 Emergency Diesel Generator Building 20
60 P15. Civil Works CCC15 CCP15-B2-12 GTG Step Up & Aux. Transformer Shelter 21
61 P15. Civil Works CCC15 CCP15-B2-13 GTG Step Up & Aux. Transformer Shelter 22
62 P15. Civil Works CCC15 CCP15-B2-14 Steam Turbine Building 20
63 P15. Civil Works CCC15 CCP15-B2-15 STG Unit Step Up Transformer Shelter 20
64 P15. Civil Works CCC15 CCP15-B2-16 Clean & Dirty Lube Oil Tank FDN for STG 20
65 P15. Civil Works CCC15 CCP15-B2-17 Generator Fin Fan Cooler FDN 20
66 P15. Civil Works CCC15 CCP15-B2-18 Lube Oil Fin Fan Cooler FDN 21
67 P15. Civil Works CCC15 CCP15-B2-19 Lube Oil Fin Fan Cooler FDN 22
68 P15. Civil Works CCC15 CCP15-B2-20 Seal Pit 20
69 P15. Civil Works CCC15 CCP15-B2-21 Clean Drain Flash Vessel FDN 20
70 P15. Civil Works CCC15 CCP15-B2-22 Sampling Rack Container FDN 20
71 P15. Civil Works CCC15 CCP15-B2-23 HRSG FDN 21
72 P15. Civil Works CCC15 CCP15-B2-24 HRSG FDN 22
73 P15. Civil Works CCC15 CCP15-B2-25 Ignition Gas Tank FDN 21, 22

109/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
74 P15. Civil Works CCC15 CCP15-B2-26 Pipe Rack & FDN for Block 20
75 P15. Civil Works CCC15 CCP15-B2-27 Sewage & Drainage Facility for Block 20
76 P15. Civil Works CCC15 CCP15-B2-28 Road & Pavement for Block 20
77 P15. Civil Works CCC15 CCP15-B2-29 Road Lighting FDN for Block 20
78 P15. Civil Works CCC15 CCP15-B2-30 GIL FDN Block 20
79 P15. Civil Works CCC15 CCP15-B2-30a Cable Trench for Block 20
80 P15. Civil Works CCC15 CCP15-B2-30b Pipe Trench for Block 20
GPRS Block 20
81 P15. Civil Works CCC15 CCP15-B2-31 Gas Compressor Station 20 (F3)
82 P15. Civil Works CCC15 CCP15-B2-32 GT Fuel Changeover PRS 20 (F1)
83 P15. Civil Works CCC15 CCP15-B2-33 Gas Heater with Shelter 20 (F7, F12)
84 P15. Civil Works CCC15 CCP15-B2-34 GPRS for GT & HRSG 20 (F5, F6)
85 P15. Civil Works CCC15 CCP15-B2-35 ESDV Skid 20 (F8)
86 P15. Civil Works CCC15 CCP15-B2-36 LER for GPRS 20 (Control Room)
87 P15. Civil Works CCC15 CCP15-B2-37 N2 Generation Room 20
88 P15. Civil Works CCC15 CCP15-B2-38 Pipe Rack & FDN for GPRS 20
89 P15. Civil Works CCC15 CCP15-B2-38a HP Gas Buffer Foundation (F2)
90 P15. Civil Works CCC15 CCP15-B2-38b N2 Gas Rack Foundation (F11)
Power Block 30
91 P15. Civil Works CCC15 CCP15-B3-01 Gas Turbine Building 30
92 P15. Civil Works CCC15 CCP15-B3-02 Local Electrical Building for GTG 31
93 P15. Civil Works CCC15 CCP15-B3-03 Local Electrical Building for GTG 32
94 P15. Civil Works CCC15 CCP15-B3-04 Chemical Dosing House 30
95 P15. Civil Works CCC15 CCP15-B3-05 Local Electrical Building for HRSG 31
96 P15. Civil Works CCC15 CCP15-B3-06 Local Electrical Building for HRSG 32
97 P15. Civil Works CCC15 CCP15-B3-07 N2 Gas Station 30
98 P15. Civil Works CCC15 CCP15-B3-08 Feed Water Pump Sunshade 31
99 P15. Civil Works CCC15 CCP15-B3-09 Feed Water Pump Sunshade 32
100 P15. Civil Works CCC15 CCP15-B3-10 CCW Heat Exchanger, Pump 30
101 P15. Civil Works CCC15 CCP15-B3-11 Emergency Diesel Generator Building 30
102 P15. Civil Works CCC15 CCP15-B3-12 GTG Step Up & Aux. Transformer Shelter 31
103 P15. Civil Works CCC15 CCP15-B3-13 GTG Step Up & Aux. Transformer Shelter 32
104 P15. Civil Works CCC15 CCP15-B3-14 Steam Turbine Building 30
105 P15. Civil Works CCC15 CCP15-B3-15 STG Unit Step Up Transformer Shelter 30
106 P15. Civil Works CCC15 CCP15-B3-16 Clean & Dirty Lube Oil Tank FDN for STG 30
107 P15. Civil Works CCC15 CCP15-B3-17 Generator Fin Fan Cooler FDN 30
108 P15. Civil Works CCC15 CCP15-B3-18 Lube Oil Fin Fan Cooler FDN 31
109 P15. Civil Works CCC15 CCP15-B3-19 Lube Oil Fin Fan Cooler FDN 32

110/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
110 P15. Civil Works CCC15 CCP15-B3-20 Seal Pit 30
111 P15. Civil Works CCC15 CCP15-B3-21 Clean Drain Flash Vessel FDN 30
112 P15. Civil Works CCC15 CCP15-B3-22 Sampling Rack Container FDN 30
113 P15. Civil Works CCC15 CCP15-B3-23 HRSG FDN 31
114 P15. Civil Works CCC15 CCP15-B3-24 HRSG FDN 32
115 P15. Civil Works CCC15 CCP15-B3-25 Ignition Gas Tank FDN 31, 32
116 P15. Civil Works CCC15 CCP15-B3-26 Pipe Rack & FDN for Block 30
117 P15. Civil Works CCC15 CCP15-B3-27 Sewage & Drainage Facility for Block 30
118 P15. Civil Works CCC15 CCP15-B3-28 Road & Pavement for Block 30
119 P15. Civil Works CCC15 CCP15-B3-29 Road Lighting FDN for Block 30
120 P15. Civil Works CCC15 CCP15-B3-30 GIL FDN for Block 30
121 P15. Civil Works CCC15 CCP15-B3-30a Cable Trench for Block 30
122 P15. Civil Works CCC15 CCP15-B3-30b Pipe Trench for Block 30
GPRS Block 30
123 P15. Civil Works CCC15 CCP15-B3-31 Gas Compressor Station 30
124 P15. Civil Works CCC15 CCP15-B3-32 GT Fuel Changeover PRS 30
125 P15. Civil Works CCC15 CCP15-B3-33 Gas Heater with Shelter 30
126 P15. Civil Works CCC15 CCP15-B3-34 GPRS for GT & HRSG 30
127 P15. Civil Works CCC15 CCP15-B3-35 ESDV Skid FDN 30
128 P15. Civil Works CCC15 CCP15-B3-36 LER for GPRS 30
129 P15. Civil Works CCC15 CCP15-B3-37 N2 Generation Room 30
130 P15. Civil Works CCC15 CCP15-B3-38 Pipe Rack & FDN for GPRS 30
131 P15. Civil Works CCC15 CCP15-B3-38a HP Gas Buffer Foundation (F2)
132 P15. Civil Works CCC15 CCP15-B3-38b N2 Gas Rack Foundation (F11)
Common Area
133 P15. Civil Works CCC15 CCP15-B0-01 Central Control Building
134 P15. Civil Works CCC15 CCP15-B0-02 Common Switchgear Building
135 P15. Civil Works CCC15 CCP15-B0-03 Compressed Air Station & Shelter
136 P15. Civil Works CCC15 CCP15-B0-04 Demineralized Water Plant
137 P15. Civil Works CCC15 CCP15-B0-05 Chemical Storage Tank & Neutralization Pit
138 P15. Civil Works CCC15 CCP15-B0-06 Central HVAC Building
139 P15. Civil Works CCC15 CCP15-B0-07 Fire Fighting Water Pump House
140 P15. Civil Works CCC15 CCP15-B0-08 LEB for GPRS
141 P15. Civil Works CCC15 CCP15-B0-09 LEB for Fire Fighting Pump House
142 P15. Civil Works CCC15 CCP15-B0-10 LEB for Central HVAC Building
143 P15. Civil Works CCC15 CCP15-B0-11 LEB for DFO Forwarding Station
144 P15. Civil Works CCC15 CCP15-B0-12 LEB for Carpenter Workshop
145 P15. Civil Works CCC15 CCP15-B0-13 LEB for M&E Workshop
111/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
146 P15. Civil Works CCC15 CCP15-B0-14 HVAC Chiller Plant MCC & TR Building
147 P15. Civil Works CCC15 CCP15-B0-15 Black Start Diesel Generator, EDG Common
148 P15. Civil Works CCC15 CCP15-B0-16 DFO Tank Farm Area (#1~6)
149 P15. Civil Works CCC15 CCP15-B0-17 DFO Tank Farm Area (JAPS)
150 P15. Civil Works CCC15 CCP15-B0-18 DFO Recirculation Tank & Pump FDN
151 P15. Civil Works CCC15 CCP15-B0-19 Makeup Water Storage Tank FDN & Distilate Water Buffer Tank
152 P15. Civil Works CCC15 CCP15-B0-20 Makeup Water Pump FDN
153 P15. Civil Works CCC15 CCP15-B0-21 Chemical Storage Building for Desal
154 P15. Civil Works CCC15 CCP15-B0-22 Sweage Treatment Building
155 P15. Civil Works CCC15 CCP15-B0-23 Waste Water Treatment Building
156 P15. Civil Works CCC15 CCP15-B0-24 Foam Station
157 P15. Civil Works CCC15 CCP15-B0-25 DFO Forwarding Station
158 P15. Civil Works CCC15 CCP15-B0-26 DFO Forwarding Station for JBL Complex
159 P15. Civil Works CCC15 CCP15-B0-27 Slop Oil Pump Shelter
160 P15. Civil Works CCC15 CCP15-B0-28 DFO Unloading Station
161 P15. Civil Works CCC15 CCP15-B0-29 Fire Fighting Station
162 P15. Civil Works CCC15 CCP15-B0-30 Water Basin
163 P15. Civil Works CCC15 CCP15-B0-31 Gate House
164 P15. Civil Works CCC15 CCP15-B0-32 Main Gate for JAPS
165 P15. Civil Works CCC15 CCP15-B0-33 Central Mech & Elect Workshop
166 P15. Civil Works CCC15 CCP15-B0-34 Mechnical & Electrical Storage
167 P15. Civil Works CCC15 CCP15-B0-35 Outdoor Storage
168 P15. Civil Works CCC15 CCP15-B0-36 Carpenter Workshop
169 P15. Civil Works CCC15 CCP15-B0-37 Covered Parking Place
170 P15. Civil Works CCC15 CCP15-B0-38 Electrical Manholes
171 P15. Civil Works CCC15 CCP15-B0-39 Duct Banks
172 P15. Civil Works CCC15 CCP15-B0-40 Cable Trench
173 P15. Civil Works CCC15 CCP15-B0-41 Pipe Trench
174 P15. Civil Works CCC15 CCP15-B0-42 Fence
175 P15. Civil Works CCC15 CCP15-B0-43 Watch Tower
176 P15. Civil Works CCC15 CCP15-B0-44 Underground Manholes
177 P15. Civil Works CCC15 CCP15-B0-45 Culverts & Access Bridges
178 P15. Civil Works CCC15 CCP15-B0-46 Gas Line Foundations
179 P15. Civil Works CCC15 CCP15-B0-47 Gas Insulated Line Foundations (GIL)
180 P15. Civil Works CCC15 CCP15-B0-48 Gas Chromatograph
181 P15. Civil Works CCC15 CCP15-B0-49 Filter for Aux. Boiler DFO Pump & Accumulator for Aux. Boiler DFO Pump

112/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
182 P15. Civil Works CCC15 CCP15-B0-50 Waste Water Collecting & Monitoring Basin
183 P15. Civil Works CCC15 CCP15-B0-51 Road Lighting Foundation
184 P15. Civil Works CCC15 CCP15-B0-52 Retaining Wall
Approved CCP Q'ty 0

113/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date

Power Block 10
1 P15. Civil Works CCC15 CCP15-B1-01 Gas Turbine Building 10 Initial
2 P15. Civil Works CCC15 CCP15-B1-02 Local Electrical Building for GTG 11 Initial
3 P15. Civil Works CCC15 CCP15-B1-03 Local Electrical Building for GTG 12 Initial
4 P15. Civil Works CCC15 CCP15-B1-04 Chemical Dosing House 10 Initial
5 P15. Civil Works CCC15 CCP15-B1-05 Local Electrical Building for HRSG 11 Initial
6 P15. Civil Works CCC15 CCP15-B1-06 Local Electrical Building for HRSG 12 Initial
7 P15. Civil Works CCC15 CCP15-B1-07 N2 Gas Station 10
8 P15. Civil Works CCC15 CCP15-B1-08 Feed Water Pump Sunshade 11
9 P15. Civil Works CCC15 CCP15-B1-09 Feed Water Pump Sunshade 12
10 P15. Civil Works CCC15 CCP15-B1-10 CCW Heat Exchanger, Pump 10
11 P15. Civil Works CCC15 CCP15-B1-11 Emergency Diesel Generator Building 10 Initial
12 P15. Civil Works CCC15 CCP15-B1-12 GTG Step Up & Aux. Transformer Shelter 11 Final
13 P15. Civil Works CCC15 CCP15-B1-13 GTG Step Up & Aux. Transformer Shelter 12
14 P15. Civil Works CCC15 CCP15-B1-14 Steam Turbine Building 10
15 P15. Civil Works CCC15 CCP15-B1-15 STG Unit Step Up Transformer Shelter 10
16 P15. Civil Works CCC15 CCP15-B1-16 Clean & Dirty Lube Oil Tank FDN for STG 10
17 P15. Civil Works CCC15 CCP15-B1-17 Generator Fin Fan Cooler FDN 10
18 P15. Civil Works CCC15 CCP15-B1-18 Lube Oil Fin Fan Cooler FDN 11
19 P15. Civil Works CCC15 CCP15-B1-19 Lube Oil Fin Fan Cooler FDN 12
20 P15. Civil Works CCC15 CCP15-B1-20 Seal Pit 10
21 P15. Civil Works CCC15 CCP15-B1-21 Clean Drain Flash Vessel FDN 10
22 P15. Civil Works CCC15 CCP15-B1-22 Sampling Rack Container FDN 10
23 P15. Civil Works CCC15 CCP15-B1-23 HRSG FDN 11
24 P15. Civil Works CCC15 CCP15-B1-24 HRSG FDN 12
25 P15. Civil Works CCC15 CCP15-B1-25 Ignition Gas Tank FDN 11, 12
26 P15. Civil Works CCC15 CCP15-B1-26 Pipe Rack & FDN for Block 10
27 P15. Civil Works CCC15 CCP15-B1-27 Sewage & Drainage Facility for Block 10
28 P15. Civil Works CCC15 CCP15-B1-28 Road & Pavement for Block 10
29 P15. Civil Works CCC15 CCP15-B1-29 Road Lighting FDN for Block 10
30 P15. Civil Works CCC15 CCP15-B1-30 GIL FDN Block 10
31 P15. Civil Works CCC15 CCP15-B1-30a Cable Trench for Block 10 NEW
32 P15. Civil Works CCC15 CCP15-B1-30b Pipe Trench for Block 10 NEW
GPRS Block 10
33 P15. Civil Works CCC15 CCP15-B1-31 Gas Compressor Station 10 (F3) Initial
34 P15. Civil Works CCC15 CCP15-B1-32 GT Fuel Changeover PRS 10 (F1)
35 P15. Civil Works CCC15 CCP15-B1-33 Gas Heater with Shelter 10 (F7, F12)
36 P15. Civil Works CCC15 CCP15-B1-34 GPRS for GT & HRSG 10 (F5, F6)

114/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
37 P15. Civil Works CCC15 CCP15-B1-35 ESDV Skid FDN 10 (F8)
38 P15. Civil Works CCC15 CCP15-B1-36 Fuel Gas Booster Compressor FDN (F4)
39 P15. Civil Works CCC15 CCP15-B1-37 LER for GPRS 10 (Control Room)
40 P15. Civil Works CCC15 CCP15-B1-38 N2 Generation Room 10
41 P15. Civil Works CCC15 CCP15-B1-39 Ground Flare FDN (F10)
42 P15. Civil Works CCC15 CCP15-B1-40 Pipe Rack & FDN for GPRS 10
43 P15. Civil Works CCC15 CCP15-B1-41 Sewage & Drainage Facility for GPRS 10, 20, 30
44 P15. Civil Works CCC15 CCP15-B1-42 Road & Pavement for GPRS 10, 20, 30
45 P15. Civil Works CCC15 CCP15-B1-43 Road Lighting FDN for GPRS 10, 20, 30 NEW
46 P15. Civil Works CCC15 CCP15-B1-43a HP Gas Buffer Foundation (F2) NEW
47 P15. Civil Works CCC15 CCP15-B1-43b Condensate Tank & Pump Foundation (F9) NEW
48 P15. Civil Works CCC15 CCP15-B1-43c N2 Gas Rack Foundation (F11) NEW
Power Block 20
49 P15. Civil Works CCC15 CCP15-B2-01 Gas Turbine Building 20
50 P15. Civil Works CCC15 CCP15-B2-02 Local Electrical Building for GTG 21
51 P15. Civil Works CCC15 CCP15-B2-03 Local Electrical Building for GTG 22
52 P15. Civil Works CCC15 CCP15-B2-04 Chemical Dosing House 20
53 P15. Civil Works CCC15 CCP15-B2-05 Local Electrical Building for HRSG 21 Initial
54 P15. Civil Works CCC15 CCP15-B2-06 Local Electrical Building for HRSG 22
55 P15. Civil Works CCC15 CCP15-B2-07 N2 Gas Station 20
56 P15. Civil Works CCC15 CCP15-B2-08 Feed Water Pump Sunshade 21
57 P15. Civil Works CCC15 CCP15-B2-09 Feed Water Pump Sunshade 22
58 P15. Civil Works CCC15 CCP15-B2-10 CCW Heat Exchanger, Pump 20
59 P15. Civil Works CCC15 CCP15-B2-11 Emergency Diesel Generator Building 20
60 P15. Civil Works CCC15 CCP15-B2-12 GTG Step Up & Aux. Transformer Shelter 21
61 P15. Civil Works CCC15 CCP15-B2-13 GTG Step Up & Aux. Transformer Shelter 22
62 P15. Civil Works CCC15 CCP15-B2-14 Steam Turbine Building 20
63 P15. Civil Works CCC15 CCP15-B2-15 STG Unit Step Up Transformer Shelter 20
64 P15. Civil Works CCC15 CCP15-B2-16 Clean & Dirty Lube Oil Tank FDN for STG 20
65 P15. Civil Works CCC15 CCP15-B2-17 Generator Fin Fan Cooler FDN 20
66 P15. Civil Works CCC15 CCP15-B2-18 Lube Oil Fin Fan Cooler FDN 21
67 P15. Civil Works CCC15 CCP15-B2-19 Lube Oil Fin Fan Cooler FDN 22
68 P15. Civil Works CCC15 CCP15-B2-20 Seal Pit 20
69 P15. Civil Works CCC15 CCP15-B2-21 Clean Drain Flash Vessel FDN 20
70 P15. Civil Works CCC15 CCP15-B2-22 Sampling Rack Container FDN 20
71 P15. Civil Works CCC15 CCP15-B2-23 HRSG FDN 21
72 P15. Civil Works CCC15 CCP15-B2-24 HRSG FDN 22
73 P15. Civil Works CCC15 CCP15-B2-25 Ignition Gas Tank FDN 21, 22

115/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
74 P15. Civil Works CCC15 CCP15-B2-26 Pipe Rack & FDN for Block 20
75 P15. Civil Works CCC15 CCP15-B2-27 Sewage & Drainage Facility for Block 20
76 P15. Civil Works CCC15 CCP15-B2-28 Road & Pavement for Block 20
77 P15. Civil Works CCC15 CCP15-B2-29 Road Lighting FDN for Block 20
78 P15. Civil Works CCC15 CCP15-B2-30 GIL FDN Block 20
79 P15. Civil Works CCC15 CCP15-B2-30a Cable Trench for Block 20 NEW
80 P15. Civil Works CCC15 CCP15-B2-30b Pipe Trench for Block 20 NEW
GPRS Block 20
81 P15. Civil Works CCC15 CCP15-B2-31 Gas Compressor Station 20 (F3)
82 P15. Civil Works CCC15 CCP15-B2-32 GT Fuel Changeover PRS 20 (F1)
83 P15. Civil Works CCC15 CCP15-B2-33 Gas Heater with Shelter 20 (F7, F12)
84 P15. Civil Works CCC15 CCP15-B2-34 GPRS for GT & HRSG 20 (F5, F6)
85 P15. Civil Works CCC15 CCP15-B2-35 ESDV Skid 20 (F8)
86 P15. Civil Works CCC15 CCP15-B2-36 LER for GPRS 20 (Control Room)
87 P15. Civil Works CCC15 CCP15-B2-37 N2 Generation Room 20
88 P15. Civil Works CCC15 CCP15-B2-38 Pipe Rack & FDN for GPRS 20
89 P15. Civil Works CCC15 CCP15-B2-38a HP Gas Buffer Foundation (F2) NEW
90 P15. Civil Works CCC15 CCP15-B2-38b N2 Gas Rack Foundation (F11) NEW
Power Block 30
91 P15. Civil Works CCC15 CCP15-B3-01 Gas Turbine Building 30
92 P15. Civil Works CCC15 CCP15-B3-02 Local Electrical Building for GTG 31
93 P15. Civil Works CCC15 CCP15-B3-03 Local Electrical Building for GTG 32
94 P15. Civil Works CCC15 CCP15-B3-04 Chemical Dosing House 30
95 P15. Civil Works CCC15 CCP15-B3-05 Local Electrical Building for HRSG 31
96 P15. Civil Works CCC15 CCP15-B3-06 Local Electrical Building for HRSG 32
97 P15. Civil Works CCC15 CCP15-B3-07 N2 Gas Station 30
98 P15. Civil Works CCC15 CCP15-B3-08 Feed Water Pump Sunshade 31
99 P15. Civil Works CCC15 CCP15-B3-09 Feed Water Pump Sunshade 32
100 P15. Civil Works CCC15 CCP15-B3-10 CCW Heat Exchanger, Pump 30
101 P15. Civil Works CCC15 CCP15-B3-11 Emergency Diesel Generator Building 30
102 P15. Civil Works CCC15 CCP15-B3-12 GTG Step Up & Aux. Transformer Shelter 31
103 P15. Civil Works CCC15 CCP15-B3-13 GTG Step Up & Aux. Transformer Shelter 32
104 P15. Civil Works CCC15 CCP15-B3-14 Steam Turbine Building 30
105 P15. Civil Works CCC15 CCP15-B3-15 STG Unit Step Up Transformer Shelter 30
106 P15. Civil Works CCC15 CCP15-B3-16 Clean & Dirty Lube Oil Tank FDN for STG 30
107 P15. Civil Works CCC15 CCP15-B3-17 Generator Fin Fan Cooler FDN 30
108 P15. Civil Works CCC15 CCP15-B3-18 Lube Oil Fin Fan Cooler FDN 31
109 P15. Civil Works CCC15 CCP15-B3-19 Lube Oil Fin Fan Cooler FDN 32

116/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
110 P15. Civil Works CCC15 CCP15-B3-20 Seal Pit 30
111 P15. Civil Works CCC15 CCP15-B3-21 Clean Drain Flash Vessel FDN 30
112 P15. Civil Works CCC15 CCP15-B3-22 Sampling Rack Container FDN 30
113 P15. Civil Works CCC15 CCP15-B3-23 HRSG FDN 31
114 P15. Civil Works CCC15 CCP15-B3-24 HRSG FDN 32
115 P15. Civil Works CCC15 CCP15-B3-25 Ignition Gas Tank FDN 31, 32
116 P15. Civil Works CCC15 CCP15-B3-26 Pipe Rack & FDN for Block 30
117 P15. Civil Works CCC15 CCP15-B3-27 Sewage & Drainage Facility for Block 30
118 P15. Civil Works CCC15 CCP15-B3-28 Road & Pavement for Block 30
119 P15. Civil Works CCC15 CCP15-B3-29 Road Lighting FDN for Block 30
120 P15. Civil Works CCC15 CCP15-B3-30 GIL FDN for Block 30
121 P15. Civil Works CCC15 CCP15-B3-30a Cable Trench for Block 30 NEW
122 P15. Civil Works CCC15 CCP15-B3-30b Pipe Trench for Block 30 NEW
GPRS Block 30
123 P15. Civil Works CCC15 CCP15-B3-31 Gas Compressor Station 30
124 P15. Civil Works CCC15 CCP15-B3-32 GT Fuel Changeover PRS 30
125 P15. Civil Works CCC15 CCP15-B3-33 Gas Heater with Shelter 30
126 P15. Civil Works CCC15 CCP15-B3-34 GPRS for GT & HRSG 30
127 P15. Civil Works CCC15 CCP15-B3-35 ESDV Skid FDN 30
128 P15. Civil Works CCC15 CCP15-B3-36 LER for GPRS 30
129 P15. Civil Works CCC15 CCP15-B3-37 N2 Generation Room 30
130 P15. Civil Works CCC15 CCP15-B3-38 Pipe Rack & FDN for GPRS 30
131 P15. Civil Works CCC15 CCP15-B3-38a HP Gas Buffer Foundation (F2) NEW
132 P15. Civil Works CCC15 CCP15-B3-38b N2 Gas Rack Foundation (F11) NEW
Common Area
133 P15. Civil Works CCC15 CCP15-B0-01 Central Control Building Initial
134 P15. Civil Works CCC15 CCP15-B0-02 Common Switchgear Building Initial
135 P15. Civil Works CCC15 CCP15-B0-03 Compressed Air Station & Shelter Initial
136 P15. Civil Works CCC15 CCP15-B0-04 Demineralized Water Plant Initial
137 P15. Civil Works CCC15 CCP15-B0-05 Chemical Storage Tank & Neutralization Pit Initial
138 P15. Civil Works CCC15 CCP15-B0-06 Central HVAC Building
139 P15. Civil Works CCC15 CCP15-B0-07 Fire Fighting Water Pump House
140 P15. Civil Works CCC15 CCP15-B0-08 LEB for GPRS Initial
141 P15. Civil Works CCC15 CCP15-B0-09 LEB for Fire Fighting Pump House Initial
142 P15. Civil Works CCC15 CCP15-B0-10 LEB for Central HVAC Building
143 P15. Civil Works CCC15 CCP15-B0-11 LEB for DFO Forwarding Station Initial
144 P15. Civil Works CCC15 CCP15-B0-12 LEB for Carpenter Workshop
145 P15. Civil Works CCC15 CCP15-B0-13 LEB for M&E Workshop
117/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
146 P15. Civil Works CCC15 CCP15-B0-14 HVAC Chiller Plant MCC & TR Building
147 P15. Civil Works CCC15 CCP15-B0-15 Black Start Diesel Generator, EDG Common
148 P15. Civil Works CCC15 CCP15-B0-16 DFO Tank Farm Area (#1~6)
149 P15. Civil Works CCC15 CCP15-B0-17 DFO Tank Farm Area (JAPS)
150 P15. Civil Works CCC15 CCP15-B0-18 DFO Recirculation Tank & Pump FDN
151 P15. Civil Works CCC15 CCP15-B0-19 Makeup Water Storage Tank FDN & Distilate Water Buffer Tank Initial
152 P15. Civil Works CCC15 CCP15-B0-20 Makeup Water Pump FDN Initial
153 P15. Civil Works CCC15 CCP15-B0-21 Chemical Storage Building for Desal
154 P15. Civil Works CCC15 CCP15-B0-22 Sweage Treatment Building
155 P15. Civil Works CCC15 CCP15-B0-23 Waste Water Treatment Building
156 P15. Civil Works CCC15 CCP15-B0-24 Foam Station Final
157 P15. Civil Works CCC15 CCP15-B0-25 DFO Forwarding Station
158 P15. Civil Works CCC15 CCP15-B0-26 DFO Forwarding Station for JBL Complex
159 P15. Civil Works CCC15 CCP15-B0-27 Slop Oil Pump Shelter
160 P15. Civil Works CCC15 CCP15-B0-28 DFO Unloading Station
161 P15. Civil Works CCC15 CCP15-B0-29 Fire Fighting Station
162 P15. Civil Works CCC15 CCP15-B0-30 Water Basin
163 P15. Civil Works CCC15 CCP15-B0-31 Gate House
164 P15. Civil Works CCC15 CCP15-B0-32 Main Gate for JAPS
165 P15. Civil Works CCC15 CCP15-B0-33 Central Mech & Elect Workshop
166 P15. Civil Works CCC15 CCP15-B0-34 Mechnical & Electrical Storage
167 P15. Civil Works CCC15 CCP15-B0-35 Outdoor Storage
168 P15. Civil Works CCC15 CCP15-B0-36 Carpenter Workshop
169 P15. Civil Works CCC15 CCP15-B0-37 Covered Parking Place
170 P15. Civil Works CCC15 CCP15-B0-38 Electrical Manholes
171 P15. Civil Works CCC15 CCP15-B0-39 Duct Banks
172 P15. Civil Works CCC15 CCP15-B0-40 Cable Trench
173 P15. Civil Works CCC15 CCP15-B0-41 Pipe Trench NEW
174 P15. Civil Works CCC15 CCP15-B0-42 Fence NEW
175 P15. Civil Works CCC15 CCP15-B0-43 Watch Tower NEW
176 P15. Civil Works CCC15 CCP15-B0-44 Underground Manholes NEW
177 P15. Civil Works CCC15 CCP15-B0-45 Culverts & Access Bridges NEW
178 P15. Civil Works CCC15 CCP15-B0-46 Gas Line Foundations NEW
179 P15. Civil Works CCC15 CCP15-B0-47 Gas Insulated Line Foundations (GIL) NEW
180 P15. Civil Works CCC15 CCP15-B0-48 Gas Chromatograph NEW
181 P15. Civil Works CCC15 CCP15-B0-49 Filter for Aux. Boiler DFO Pump & Accumulator for Aux. Boiler DFO Pump NEW

118/119
Construction Completion Package List
(Civil + Architecture) 8-Mar-11
Numbering Approved
No. PKG. No. System Activity Punch Status
Group CCC No Date
182 P15. Civil Works CCC15 CCP15-B0-50 Waste Water Collecting & Monitoring Basin NEW
183 P15. Civil Works CCC15 CCP15-B0-51 Road Lighting Foundation NEW
184 P15. Civil Works CCC15 CCP15-B0-52 Retaining Wall NEW
Approved CCP Q'ty 0