Vous êtes sur la page 1sur 21

Whit's Knits: Pom Pom Peds

Here's a quick knit perfect for both beginning sock knitters 
and short attention span knitters. These guys are all the fun 
parts of knitting socks, cutting right to the chase of heels 
and toes!

A l l   o r i g i n a l   i m a g e s   a n d   t e x t   o n   t h i s   w e b s i t e  a r e   c o p y r i g h t   a n d   t h e  p r o p er t y   o f   p u r l   a n d   p u r l s o h o . c o m .  A l l   r i g h t s   r e s e r v e d .  

http://www.purlbee.com/pom-pom-peds/
I used Hand Jive's Nature's Palette fingering weight yarn. 
Not only 100% organic merino wool, Nature's Palette is also 
beautifully dyed with natural plant materials. The colors are 
soft and wild, straight from nature. Picking colors feels like 
picking flowers! --Whitney

http://www.purlbee.com/pom-pom-peds/
 

Po st e d   o n  A p r il  1 4 ,  2 0 0 8 b y  p u r l b e e | 1 C o m m e n t

Pom Pom Peds - Materials

http://www.purlbee.com/pom-pom-peds/
 2 skeins of Hand Jive's Nature's Palette 100% merino 

wool. These colors are Coral and Walnut. Please note 
that to make 2 pairs of socks you will probably need
all 185 yards of these skeins, so be careful 
substituting...
 1 set of US #2 double pointed needles. I used  Crystal

Palace's 6 inch bamboo needles.
 1 Susan Bates Pom Pom Maker (Optional - you can 

also make pom poms with a handmade cardboard 
template.)

http://www.purlbee.com/pom-pom-peds/
Po st e d   o n  A p r il  1 4 ,  2 0 0 8 b y  p u r l b e e | 1 C o m m e n t

Pom Pom Peds - The Pattern

Gauge

8 stitches = 1 inch in stockinette stitch (See our Circular 
Gauge Tutorial for tips on knitting an accurate gauge for in-
the-round projects.) 

Finished Size

Fit most women - 7 1/2 inches in circumference and 
adjustable length

The Cuff

With the Contrast Color, cast on 60 stitches to three double 
pointed needles.

Round 1: *K1, p1, repeat from * to end of round.

Repeat Round 1 five more times.

Change to the Main Color and knit 3 rounds.

The Heel Flap

Knit 15 stitches and turn the work so the purl side of the 
fabric is facing you.

http://www.purlbee.com/pom-pom-peds/
Purl 30 stitches. (The 30 stitches that you just purled are 
the beginning of the heel flap. For this section, you will be 
working back and forth on just these 30 stitches.)

Arrange the stitches so that the 30 heel flap stitches are on 
one needle. Put the remaining stitches on hold on two 
needles (15 stitches each).  

http://www.purlbee.com/pom-pom-peds/
(Again, work the following rows back and forth, turning the 
work between each row.)

Row 1 (right side): *Slip 1 purlwise, k1, repeat from * to 
end of 30 stitches.

Row 2 (wrong side): Slip 1 purlwise, purl to end of 30 
stitches.

Repeat Rows 1 and 2 fifteen more times.

http://www.purlbee.com/pom-pom-peds/
 

Turning the Heel

Still just working the heel flap stitches: 

Row 1 (right side): K17, ssk, k1, turn the work so the wrong 
side is facing you and there are 19 stitches on the left 
needle and 10 stitches on the right needle. 

Row 2 (wrong side): Slip 1 purlwise, p5, p2tog, p1, turn the
work. (18 stitches on the left needle and 10 stitches on the 
right needle)

Row 3: Slip 1 purlwise, knit to 1 stitch before the gap, ssk 
(with the stitch before the gap and the stitch after the gap), 
k1, turn.

Here's the so-called "gap":

http://www.purlbee.com/pom-pom-peds/
Row 4: Slip 1 purlwise, purl to 1 stitch before the gap, 
p2tog, p1, turn.

Repeat Rows 3 and 4 until all the heel stitches have been 
worked and 18 stitches remain on the needle. 

Magic!:

http://www.purlbee.com/pom-pom-peds/
 

The Gusset

Knit across the 18 heel stitches.

With the same needle (now called "needle #1"), pick up 17 
stitches along the heel flap. (35 stitches)

http://www.purlbee.com/pom-pom-peds/
With a new needle (needle #2), knit across the 30 stitches 
that have been on hold.

http://www.purlbee.com/pom-pom-peds/
With a new needle (needle #3), pick up 17 stitches along 
the other side of the heel flap.

http://www.purlbee.com/pom-pom-peds/
Still with needle #3, knit 9 stitches from needle #1. 

Now there are 26 stitches on needle #1, 30 stitches on 
needle #2, and 26 stitches on needle #3. Needle #1 is the 
beginning of the round (at the middle of the heel).

http://www.purlbee.com/pom-pom-peds/
Round 1: Needle #1 - knit to last 3 stitches, k2tog, k1. 
Needle #2 - knit all the stitches. Needle #3 - k1, ssk, knit 
to end.

Round 2: Knit.

Repeat Rounds 1 and 2 until 60 total stitches remain.

http://www.purlbee.com/pom-pom-peds/
 

The Foot

Knit evenly until the piece measures 2 inches less than the 
desired final length, measuring from the back edge of the 
heel.

http://www.purlbee.com/pom-pom-peds/
Here's a guideline for final sock lengths:

   US size 6 shoe (European 37) = 9 inches

   US size 7 shoe (38) = 9 1/4 inches

   US size 8 shoe (39) = 9 5/8 inches

   US size 9 shoe (40) = 10 inches

I'm making socks to fit a size 7 shoe, so I knit the foot until
it measures 7 1/4 inches (9 1/4 inches - 2 inches).

http://www.purlbee.com/pom-pom-peds/
The Toe

Round 1: Needle #1 - knit to last 3 stitches, k2tog, k1. 
Needle #2 - K1, ssk, knit to last 3 stitches, k2tog, k1. 
Needle #3 - k1, ssk, knit to end.

Round 2: Knit.

Repeat Rounds 1 and 2 until 32 total stitches remain.

Then, repeat Round 1 until 12 total stitches remain.

With Needle #3, knit the 3 stitches from Needle #1 so that 
there are 6 stitches on each of two needles.

Use the Kitchener Stitch to close the toe. 

http://www.purlbee.com/pom-pom-peds/
 

The Pom Poms

I used the Susan Bates Pom Pom Maker to make the 


smallest size pom poms. (Please visit our Pom Pom
Tutorial if you need help with your pom pom maker.)

http://www.purlbee.com/pom-pom-peds/
 

When you tie the pom pom in half leave generous tails so 
that you can use them to sew the pom pom to the top back 
of the ped. Bring the tails to the inside of the ped, tie a 
knot (yes, a knot!), and very thoroughly weave the ends in 
to the cuff.

http://www.purlbee.com/pom-pom-peds/
Now switch the colors and make another pair!

http://www.purlbee.com/pom-pom-peds/
 

Po st e d   o n  A p r il  1 4 ,  2 0 0 8 b y  p u r l b e e | 2 3 C o m m e n t s

http://www.purlbee.com/pom-pom-peds/

Vous aimerez peut-être aussi