Vous êtes sur la page 1sur 7

St.

Elizabeth Ann Seton Parish















 

  
  

 

 









FOR PERMIT REVIEW ONLY


NOT FOR CONSTRUCTION

St. Elizabeth Ann


Seton Parish
NORTHAMPTON, MA

Existing Conditions



0 10'
SCALE
1" = 20'

20' 40'










RELOACTED
RIP-RAP UTILITY POLE 12'x10' CONC.
SLOPE DUMPSTER PAD
WOOD GATE &
LOAM & SEED 10'x16' WOOD

23'-6"
ENCLOSURE;
SEE DETAIL

3'
LOAM & SEED
TRANSF.
8'-9" BIT. CONC.
WOOD
TYP

TYP
BERM

18'
9' GUARDRAIL 27
THIS
210LF±
ROW

9'-6"

LOAM & SEED

60'
1 RA (FOR PHASE 1) 5' 1 UP
(Phase 2)
6 ICC
(Phase 2) SLOPED GR.
CURB
FOR PERMIT REVIEW ONLY

16'
ACCESS. 9'-2"
2 QC
CURB RAMP TYP 1 UP
NOT FOR CONSTRUCTION
3 TP
THIS 9
ROW
(Phase 2) (PHASE 1 WALK)
25' 4 JS

22'
17
1 TP
(PHASE 2
(PHASE 1 ACCESSIBLE LIGHT POLE,
3 RA PARKING)
LIMIT OF TYP.
3 IT SIDEWALK)
1 AF

1 TCC 8 TM
ADD GRATES TO
(REMOVE BASEMENT WINDOWS
ALL PINES)
RENOVATED
St. Elizabeth Ann
ENTRY
4 IT
Seton Parish

8'-6"
18'
6'
TYP
EXISTING 1 CB

6'

TYP
1 RA 12

9'
NORTHAMPTON, MA

8'-6"

8'-6"
EXISTING
5' 21'-10"

6'
3 PBB
1 RA

8'-6"
1 CB 60'
4 IT

CONCRETE DETENTION BASIN


WALK &
1 TCC CURB A/C UNITS
60' 60'

1 CN 5' CONCRETE
WALK &
VM CURB
8'

3 RA ACCESS.
8'

CURB RAMP

EX. RAMP
ACCESS.

  9 IT CURB RAMP

8'
8'



1 QC

5'
ANNUALS

6'

8'
BOLLARD w/
1 PBB 1 TCC RELOCATED RELOCATED ACCESS. PKG
6 TM BIKE SIGN (4 TOTAL) DETENTION BASIN
SACRED HEART ST. MARY'S

8'
LOOPS CL
STATUE STATUE

ROW
15'

THIS
8'-9"
TYP
8'
1 CN BRICK 1 CN
BRICK
 PLAZA
1 PBB
ACCESS. 17
2 RS PLAZA 2 RS
38 SLOPED GR. 1 AF

8'
1 APD VM VM
CURB RAMP CURB
1 PP
BOLLARD
8'

18'-6"
LIGHT, TYP.
2.5-3" cal.
2.5-3" cal. 1 CB VM VM
16 R0
BIT. CONC.
Layout & Planting
21 CT 1 CB
2.5-3" cal.
CONCRETE ANNUALS ANNUALS
2 UP
BERM
Plan
STEPS 22'
3'-4" 4 JS
(6 RISERS) LOAM & SEED 26 TM CONCRETE
7'
22'-4"
2-2.5" cal. STEPS
SLOPED RELOCATED 6'
1.5-2" cal. (2 RISERS)
GR. CURB SCHOOL MONUMENT

ZONE LINE URC


CB
6-7'
R= LOAM & SEED
20'
28'-7" 5' 5'
LOAM &
FORM CURB
CONCRETE SEED

5'
3 gallon OH
EXISTING TO TRANSITION
31'-2"

OH WALK 24
24-30" OH
CONCRETE TO SLOPED
OH
OH
24-30" OH
STEPS
OH
24' (5 RISERS) SLOPED
24-30" OH (REMOVE
LOAM & SEED GR. CURB EXISTING
5'

OH
Flats/10" o.c OH TREE) 1 APD
OH

7-8' OH
OH
EXISTING 6 ICC LOCATION (REMOVE)

OH
18-24" OH
12 CT
OH FOR NEW
24-30" SIGN
10

OH

OH
18-24" OH
OH

24-30"
OH
OH
24'
OH
OH
24-30" OH
OH
3 gallon OH
OH

3 gallon
OH

SAWCUT/REPAIR
SIDEWALK/CURB CUT
PER CITY SPEC.


RECONSTRUCTION
OH

PER CITY SPEC., TYP.


OH



 
1. All areas disturbed from construction activity to
be raked, smoothed, fertilized and seeded with 
perennial turfgrasses unless otherwise noted. 

2. All sidewalks/walkways and curb ramps shall 
conform to the Massachusetts Architectural Access
Board's (AAB) requirements. Sidewalk/walkway
cross-slope is 1.5 % minimum, 2.0% maximum.
Slopes shall not exceed 2% across any accessible
parking space or adjacent aisles.

3. All materials and construction methods shall 135 CATCH BASIN


conform to the applicable construction standards RIM 136.55
and specifications of the City and the OUT 133.85
Massachusetts Department of Transporation. 138

140
E E E E E E
4. Utilities indicated on these plans (water, sanitary,
sewer, gas, electric) are schematic in nature. DMH

E
52 RIM 136.92

%
LF

0.5
5. Do not scale drawings for quantity take-offs or 10" HDPE FEO CATCH BASIN 12
"H IN(3) 133.65

@
INV 135.35' RIM 136.95 DP
construction. Use written dimensions only E@ OUT 133.60

PE
13

13
OUT 133.95

9
0.6

HD
8
%

2"
CATCH BASIN

F1
RIM 136.70

32L
OUT 133.85
22LF
13 12" HD
7 @ 1% PE

E
14
0
13
9 139
141

E
115LF
FOR PERMIT REVIEW ONLY

E
10"
NOT FOR CONSTRUCTION

0
HDPE

14
W
W

8" PVC @0.5%

@
G

0.5%

E
G
G G G G G
G

W
G
141

E
W

W
DRY WELL 1

G
BOTTOM 137.00 13
8
TOP 138.35

E
PIPE INV. 137.00
DRAIN BASIN

G
RIM 139.75

W
OUT 137.75

SS
CONNECT TO DRY

G
31LF 10" PVC @ 0.5%
E WELL AT 136.00,
TYP. OF 3 St. Elizabeth Ann

G
Seton Parish

W
8"
CONNECT TO DRY PV
C@ DETENTION BASIN

SS
WELL AT 137.00, 0.5
% BOTTOM 132.50

G
TYP. OF 3
TOP 136.55

139
G
NORTHAMPTON, MA

W
SS

G
CATCH BASIN DRY WELL 2
RIM 138.90 BOTTOM 135.00
OUT 135.65 TOP 137.35

W
PIPE INV. 136.00
55LF 10" PVC @ 0.5%

13
9
SS

67LF 12" HDPE @2.6%


140

8" HDPE @ 0.5%


G

W
SS
OCS 1 OCS
RIM 139.98

G
RIM 139.65
IN 137.00 IN 136.35
OUT 135.50 OUT 133.35

W
RO G
OF
EM 40
LF
DMH(5'Ø)
ERG
80LF ENC 12 RIM 138.95
10" Y R "H
OU DP IN(4) 133.90
G

SS
PVC E
@ 1% TE @ OUT 133.80
SS
4%
OCS 3
W
G

RIM 139.60
SS
140 IN 133.00
%

55LF 12" HDPE @


0.5
@ OUT 133.00
G

E
SLOPE WALK/ DP SWTC1-STC900
"H
SS

CURB TO GRADE 12 RIM 139.50


LF
W

63 IN 132.95

SS
G

OUT 132.87
SS

0.5%
G

SS

141
139
W
G

SS

CATCH BASIN SS
DMH
G

RIM 138.80 RIM 139.60


138
OUT 134.70 IN 133.45
13
7
Grading & Drainage
W

SS DMH
(12" HDPE) OUT 133.35
G

30 RIM 137.27

8
LF
Plan

13
12 IN(2) 133.65
138 "H
DP
SS

E
OUT 133.55

E
G

DP
0.6

"H
OH %

%
12
W

SS
OH

0.8
LF
OH

@
G

25
OH
OH
SS
OH
OH
136

2.7%
G

OH
OH SS
CATCH BASIN CATCH BASIN
OH
RIM 136.75

@
RIM 136.55
W

OH

HDPE
OH
OH
OUT 133.85 136 OUT 133.85
OH SS

OH

12"
OH
OH

125LF
OH SS
OH
OH
OH
OH
OH
OH
OH
OH
OH 
OH

SS
OH
OH
OH
OH

EX. DMH


OH

RIM 138.65
CORE NEW INV. AT 129.50
54" OUT 120.35








OCS 1 138.35'
OCS 2 137.35'
OCS 3 136.55'

OCS 3*
7.5" ORIFICE
AT INV. 133.00'

12" HDPE
SEE PLANS
FOR INV.

FOR PERMIT REVIEW ONLY

        NOT FOR CONSTRUCTION


   
   

St. Elizabeth Ann


Seton Parish
NORTHAMPTON, MA

     


 
   

88.00'

BOLLARD TYPE
TYP.
6.00'

6.00'
Details
6.00' 3.42'* O.C.
1.37'

4.2'
2.33'

0.5' BEDDING*
3.42'*
O.C.

SECTION C-C

POLE TYPE

 


CL LATERAL
CL LATERAL

6" BEDDING
6" BEDDING*

6.00' 6.00'
SECTION A-A
TYP. TYP. SECTION B-B

*NOTE: CENTER-TO-CENTER DIMENSION BASED ON ADS N-12 SYSTEM COMPONENTS.

   
 
 