Vous êtes sur la page 1sur 2

STEPHEN A.

GREEN
706 East Fireline Road, Palmerton PA 18071 (610) 577-6072
sg6e1d8a@westpost.net

PROFILE

Bachelor of Science in Civil Engineering with three summers and one


full year of civil engineering experience. Proficient in AutoCAD as
well as MS Office. Seeking a full-time civil engineering position.

EDUCATION

PENNSYLVANIA COLLEGE OF TECHNOLOGY, WILLIAMSPORT, PENNSYLVANIA


_BACHELOR OF SCIENCE, CIVIL ENGINEERING TECHNOLOGY__,__ _Graduated:
May 2008
*
_Completed Courses_: Steel & Concrete Design, Highway and Road
Design, Transportation Engineering

ENGINEERING EXPERIENCE

MCTISH KUNKEL & ASSOCIATES, ALLENTOWN, PENNSYLVANIA


_CONSTRUCTION INSPECTOR_, April 2009 a" Present
*
Main structural inspector monitoring the S.R. 202 PA Turnpike bridge
demolition and construction project.
*
Performed concrete and rebar quantity calculations, estimates and
payment for completed work.
*
Provided daily reports on completed activities, labor and equipment,
as well as quality control
WHITING TURNER CONTRACTING COMPANY, ALLENTOWN, PENNSYLVANIA
_PROJECT MANAGEMENT INTERN__,_ February 2008 a" June 2008
*
Reviewed and created cost estimates for building demolition to
prepare for future renovation plans.
*
Verified contractor billing statements, analyzed plans for any
utility conflicts and made recommendations for removal and
relocation.

PENNSYLVANIA DOT, ALLENTOWN, PENNSYLVANIA


_CIVIL ENGINEERING INTERN_, May 2006 a" July 2006
*
Inspector on S.R. 222 Bypass and was responsible for monitoring
contractor operations, interfacing with other Penn DOT inspectors,
placement of bituminous subbase, base and binder course construction
and quantity calculations.

*
Inspector on S.R. 380 ramp resurfacing project and was responsible
for contractor's testing procedures, concrete slump tests,
temperature checks and concrete cylinder breaks.

*
Verified thickness of subbase layers, ensured conformance of
materials to plans and specifications.

N.D. REMY & ASSOCIATES, ALLENTOWN, PENNSYLVANIA


_ENGINEERING INTERN_, May 2005 a" August 2005
*
Performed field work gathering survey data utilizing GIS
technologies for various projects.

*
Developed layout plans using AutoCAD to plot the acquired survey
information.

Vous aimerez peut-être aussi