This topic will explain you how wait and weight well control controls bottom pressure constant.
There are 2 steps that must be took into consideration separately. The first one is when kill
weight mud is displaced to the bit and the second one is when the kill weight mud from bit to
surface.
Once kill weight mud is mixed and displaced into drill pipe, drill pipe pressure will be decreased
due to increasing in hydrostatic pressure. In order to control bottom hole pressure, a drill pipe
pressure schedule must be developed and followed until kill mud weight to the bit.
Where:
CP is casing pressure.
At drillpipe side:
At casing side:
Frictional P in annulus had minimal effect on bottom hole pressure due to slow flow rate while
killing the well.
Once the kill weight mud comes out of the bit, there is one single column of hydrostatic in the
drillstring. Therefore, in order to maintain bottom hole pressure constant, drill pipe pressure
must be maintained while displacing.
Conclusion:
• Use the drill pipe pressure schedule to control constant bottom hole pressure while displacing
kill weight mud to the bit.
• After kill mud out of the bit, maintain drill pipe pressure until circulation complete.