Vous êtes sur la page 1sur 164
at NATIONAL HIGHWAYS AUTHORITY OF INDIA ENVIRONMENTAL IMPACT ASSESSMENT FOR cae ee ONS NT ae Te BORDER TO DHULE OF NH-3 EN ce) as TECHNOGEM CONSULTANTS PVT. LTD. CONSULTING ENGINEERS 101-08, Geer Thane 4) Tel Ho Building, Opp. Raheja ¢ 804 Emat ID ‘techno Fax No dens, LBS Maig, fin ail. caer gee rmererece Consuit ces for Feasbly Study and Detaled 7 Smaart acm oars Peli Pret Roar inthe State of Maharashtra Under NHDP Phase Ill Programme fume (EIA) Content CHAPTERS: 1. Introduction 44 to 1-11 2. Project Description 244 to 2-30 3. Basefine Status 341 to 3.46 4. Impact Assessment & Mitigation Measures 441 to 4-43 5. Environment Management Plan 5-1 105-6 6 Land Acquisition And Reseltiement Action Plan 6-1 06-15 LIST OF FIGURES 1.1 Index Map showing Project Road 13 24 Strip plan of Road Alignment 2419 2.2 Typical Cross section of Type-I 2-20 2.3 Typical Cross section of Type-tl 221 2.4 — Typleal Cross section of Type-lIl 2-22 25 Typical Cross section of Type-V 2.23 26 Palasner bypass 2:24 27 Geometrical Improvement 184.000 to 186,000 2.28 2.8 New Alignment bypassing Aner Dam Wild’Life Sanctuary, 2-26 Km 187.800 to 195.000 2.9 Geometrical improvements near Sugar Factory at 2.27 Dahiwad Km 195.800 to 187.000 2.10 Dahiwad Bypass Km 197.700 to 199.300 2-28 2.41 Bypass outside Nardana Town Km 226.260 to 229.800 2:29 including New 3-lane ROB and Approaches 2.12 Bypass outside submergence of Jamphal Irrigation dam, 2-30 Kim 236/200 to 239/800 3.1 Sampling Locations of Baseline Data Generation 33 3.2 Wind rose ~ Project site a7 3.3. Aner Dam Wildlife Sanctuary showing Project Road 334 4.41 Location of Borrow Pits and Quany sites 43 4.2 Predicted Concentrations of CO for MP-Nardana Section 4-20 TECHNOGEM CONSULTANTS PVT.LTD. t vr eee Consutancy Services for Feasibility Study and Detaled Project Report for 4 16 tanning torn MP J Maharasblra Border Dhule (length 97.5 Km) of NH-3 ‘nthe Stato of Maharashtra Under NHDP Phase Ill Programme 4.3 Predicted Concentrations of CO for Nardana-Dhule Section 4.4 Predicted Concentrations of NO for MP-Nardana Section 4.5 Predicted Concentrations of NO for Nardana-Dhule Section 4.6 Predicted Noise Levels for MP-Nardana Section 47 Predicted Noise Levels for Nardana-Dhule Section LIST OF TABLES 4.4 Key Environmental Legislation 4.2. National Ambient Air Quality Standards 4.3. National Ambient Noise Standards 1.4 Environmental Attributes Covered Under Field Studies 1.5 Environmental Attributes Covered under Secondary Data 2.1 Details of Junctions 2.2 Project Length Passing In Forest Area 23° TrafficinP.C.U. 2.4 Traffic Volume Surveys 2.5 Summary of Average Daily Traffic (ADT) 2.6 Composition of Traffic 27 Peak Hour Traffic Volume 2.8 Capacity improvement of Project road 29 Projected Traffic for Next 20 Years 2.10 Proposed Bypasses / New Alignments / Geometrical improvernents Proposed 3.1. Methodology of Data Generation 3.2A Climatological Data — Agrometecrology Dhule (Period: 1998-02) 3.28 Tahsil-wise Rainfall Data 3.3. Meteorological Data Recorded at Project Site 3.4 Monitored Parameters and Frequency of Sampling 3.8 Techniques Used For Ambient Air Quality Monitoring 3.6 Ambient Air Quality Data 3.7 Ground Water Analysis: Preliminary Project Report Volume—1v (EIAY 4-24 4-22 4-23 4-32 4-33 1-4 16 7 18 19 24 23 24 26 26 27 29 240 244 214 a4 35 35 38 38 3-10 342 ‘TECHNOGEM CONSULTANTS PVT. LTD.

Vous aimerez peut-être aussi