Architect
General Contractor
Mechanical Engineer
Structural Engineer
Other Engineers
Mechanical Sub
Electrical Sub
Other Subs
OWNER
Architect
General Contractor
( Early Involvement )
- OR Sub Contractor
Civil Engineer
Structural Engineer
M echanical Engineer
Electrical Engineer
M echanical Subcontractor
Electrical Subcontractor
General Contractor
Design Phases
Concept Schematic Design Design Development Construction Documents Bidding Construction Administration
Determining Fees
Projects with Well-Defined Scopes Selections Can be Made Based on Price Design Costs (if any) are Included Projects with less well-defined scopes Selections Made Based on Qualifications Design Fees are Negotiated Usually Requires a Fee Proposal
Fee Structures
Fixed Fee Percent of Construction Time & Expense Using Multiplier Time & Expense Using Rate Schedule