100%(3)100% ont trouvé ce document utile (3 votes)
10K vues5 pages
This Schedule of Rates shall form part of the contract for the' erection and completion of. '". The tenderer shall insert in the space provided against each item the percentage increase or decrease which he requires to be applied to the rates in this schedule. Rates for excavation (including excavation of drainage) are to include for keeping all excavations free from water, mud, etc. By pumping or bailing if required and for planking and strutting, levelling, ramming or preparing
This Schedule of Rates shall form part of the contract for the' erection and completion of. '". The tenderer shall insert in the space provided against each item the percentage increase or decrease which he requires to be applied to the rates in this schedule. Rates for excavation (including excavation of drainage) are to include for keeping all excavations free from water, mud, etc. By pumping or bailing if required and for planking and strutting, levelling, ramming or preparing
Droits d'auteur :
Attribution Non-Commercial (BY-NC)
Formats disponibles
Téléchargez comme PDF, TXT ou lisez en ligne sur Scribd
This Schedule of Rates shall form part of the contract for the' erection and completion of. '". The tenderer shall insert in the space provided against each item the percentage increase or decrease which he requires to be applied to the rates in this schedule. Rates for excavation (including excavation of drainage) are to include for keeping all excavations free from water, mud, etc. By pumping or bailing if required and for planking and strutting, levelling, ramming or preparing
Droits d'auteur :
Attribution Non-Commercial (BY-NC)
Formats disponibles
Téléchargez comme PDF, TXT ou lisez en ligne sur Scribd
Project Title: Cyberjaya 5-Storey Bus Terminal Project Subject: Road Works Person in Charge: Shanggara A/L Balu Date: 7/3/2021 No - Description Unit Quantity Rate (RM) Amount (RM)