A LIGHTNING & EARTHING INSTALLATION DETAILS DESCRIPTION Copper tape installation : - tokai 25mmx3mm Ground Level Line 3 panel to point C line 5 panel to point B Pump panel to point D Point C to Point E Point E to Point J Point J to Putrajaya Panel Point I to Point K Point F to Point G Ponit G to Point H ESE Pole Inner Pole Ground Pole to Line G-F Panel 1-3 Panel 1 to panel 2 Panel 3 to Point A Panel 3 to Ground Roof (Switch Room) Air terminal ring Ring to Test Point Total installation B 1 a 2 a Air terminal Installation Lightning Pole (15m) Alltec ESE TSP60 Roof Switch Room Tokai 500mmx15mm Air terminal c/w base Total installation B Earthing Point UNIT QUANTITY
1 a b c d e f g h i 2 a b 3 a b c 4 a b
m m m m m m m m m
12 9 25 32 62 115 7 12 4
m m
15 2
m m m
24 9 7
m m
26 3 364
nos
nos
4 5
CLIENT KONSORTIUM ABASS SDN BHD PROJECT UPGRADING LIGHTNING PROTECTION SYSTEM LOCATION BALANCING RESERVOIR TITLE ITEM 1 a b c d e f G LIGHTNING & EARTHING INSTALLATION DETAILS DESCRIPTION Earth Chamber (SAG- HEAVY DUTY) Point A Point N Point L Point G Point H Point K Point O Total installation Earth Rod Point A Point N Point L Point G Point H Point K Point O Total installation Rod Coupler Point A Point N Point L Point G Point H Point K Point O Total installation Termination Cadweld Termination (Erico) Ground ESE to Link F-G Point A Point B Point D Point F Point G Point H Point I Point J UNIT QUANTITY nos nos nos nos nos nos nos 1 1 1 1 1 1 1 6
2 a b c d e f G
3 3 3 3 3 0 3 15
3 a b c d e f G
2 2 2 2 2 0 2 12
C 1 a b c d e f g h i
1 1 1 1 1 1 1 1 1
CLIENT KONSORTIUM ABASS SDN BHD PROJECT UPGRADING LIGHTNING PROTECTION SYSTEM LOCATION BALANCING RESERVOIR TITLE ITEM j k l m n LIGHTNING & EARTHING INSTALLATION DETAILS DESCRIPTION Point K Point L Point M Point N Point O Total installation D 1 Pole Highmast Pole 15m Total installation UNIT QUANTITY nos 1 nos 1 nos 1 nos 1 nos 1 14
1 1
REMARKS
REMARKS
Existing
Existing
REMARKS
Bq 10m pole
CLIENT KONSORTIUM ABASS SDN BHD PROJECT UPGRADING LIGHTNING PROTECTION SYSTEM LOCATION GENSET TITLE ITEM A 1 a b c 2 a LIGHTNING & EARTHING INSTALLATION DETAILS DESCRIPTION Copper tape installation : - tokai 25mmx3mm Ground Level Point A to B Point B to C Point D to E ESE Pole 3M (Roof) ESE point to Point A Total installation B 1 a Air terminal Installation Lightning Pole (15m) Alltec ESE TSP60 Total installation B 1 a b c d Earthing Point Earth Chamber (SAG- HEAVY DUTY) Point B Point C Point D Point E Total installation 2 a b c d Earth Rod Point B Point C Point D Point E Total installation UNIT QUANTITY
m m m
0 5 3
4.5 12.5
nos
1 1
0 1 0 1 2
0 3 0 3 6
3 a b c d
Rod Coupler Point B Point C Point D Point E Total installation Termination Cadweld Termination (Erico) Point A Point B Point C Point D Point E Point F Total installation
0 2 0 2 4
C 1 a b c d e g
1 1 1 1 1 1 6
D 1
1 1
REMARKS
Existing Tape
Exisiting Exisiting
Exisiting Exisiting
Exisiting Exisiting
Bq 2m pole
CLIENT KONSORTIUM ABASS SDN BHD PROJECT UPGRADING LIGHTNING PROTECTION SYSTEM LOCATION FLOWMETER ROOM TITLE ITEM A 1 a b c d e 2 a LIGHTNING & EARTHING INSTALLATION DETAILS DESCRIPTION Copper tape installation : - tokai 25mmx3mm Ground Level Point A to C Point B to D Point C to Internal PA System Point D to E Point F to G ESE Pole 2 M (Water tank) ESE point to Point G UNIT QUANTITY
m m m m m
5.6 13 4 12 11
22
3 a
7 74.6
B 1 a 2 a
Air terminal Installation Lightning Pole (15m) Alltec ESE TSP60 Roof (Surau) Tokai 500mmx16mm Air terminal c/w base Total installation
nos
nos
5 6
B 1 a b c d e f
Earthing Point Earth Chamber (SAG- HEAVY DUTY) Point A Point B Point D Point F Point G Point I Total installation
1 0 0 1 1 1 4
2 a b c d e f
Earth Rod Point A Point B Point D Point F Point G Point I Total installation Rod Coupler Point A Point B Point D Point F Point G Point I Total installation Termination Cadweld Termination (Erico) Point A Point B Point C Point D Point E Point F Point G Point I Total installation
3 0 0 3 3 3 12
3 a b c d e f
2 0 0 2 2 2 8
C 1 b c d e f g h i
1 1 1 1 1 1 1 1 8
REMARKS
Exisiting Exisiting
Exisiting Exisiting
Exisiting Exisiting
CLIENT KONSORTIUM ABASS SDN BHD PROJECT UPGRADING LIGHTNING PROTECTION SYSTEM LOCATION SURAU / WATER TANK TITLE ITEM A 1 a b c d e 2 a LIGHTNING & EARTHING INSTALLATION DETAILS DESCRIPTION Copper tape installation : - tokai 25mmx3mm Ground Level Point A to B Point B to D Point C to Internal PA System Point D to E Point F to G ESE Pole 2 M (Water tank) ESE point to Point G UNIT QUANTITY
m m m m m
5 13 4 12 13
26
3 a
7 80
B 1 a 2 a
Air terminal Installation Lightning Pole (15m) Alltec ESE TSP60 Roof (Surau) Tokai 500mmx16mm Air terminal c/w base Total installation
nos
nos
1 2
B 1 a b c d e f
Earthing Point Earth Chamber (SAG- HEAVY DUTY) Point A Point B Point D Point F Point G Point I Total installation
1 0 0 1 1 1 4
2 a b c d e f
Earth Rod Point A Point B Point D Point F Point G Point I Total installation Rod Coupler Point A Point B Point D Point F Point G Point I Total installation Termination Cadweld Termination (Erico) Point A Point B Point C Point D Point E Point F Point G Point I Total installation
3 0 0 3 3 3 12
3 a b c d e f
2 0 0 2 2 2 8
C 1 b c d e f g h i
1 1 1 1 1 1 1 1 8
D 1
1 1
REMARKS
Exisiting Exisiting
Exisiting Exisiting
Exisiting Exisiting
CLIENT KONSORTIUM ABASS SDN BHD PROJECT UPGRADING LIGHTNING PROTECTION SYSTEM LOCATION CHLORINATION BUILDING TITLE ITEM A 1 a LIGHTNING & EARTHING INSTALLATION DETAILS DESCRIPTION Copper tape installation : - tokai 25mmx3mm Chlorination Control Room bonding of each panel inside Total installation UNIT QUANTITY
12 12
B 1 a b
nos nos
1 1 2
REMARKS
CLIENT KONSORTIUM ABASS SDN BHD PROJECT UPGRADING LIGHTNING PROTECTION SYSTEM LOCATION RAW WATER PUMPING STATION TITLE ITEM A 1 a LIGHTNING & EARTHING INSTALLATION DETAILS DESCRIPTION Copper tape installation : - cable 35mmx1C Ground Level Busbar to PABX Total installation B 1 a b PABX lightning protection Protection of Power Supply Novaris Plug-in Surge filter (model no: PP13B2-19-SSP) Novaris Telephone Surge Protector UNIT QUANTITY
5 5
nos nos
2 40
Total installation
42
REMARKS
KONSORTIUM ABASS SDN CLIENT BHD PROJECT UPGRADING LIGHTNING PROTECTION SYSTEM LOCATION ALL TITLE LIGHTNING & EARTHING INSTALLATION DETAILS
SUBTITLEINSTALLATION SUMMARY No Work Description Installati Contrac Quantit on t y Varies Quantity Quantit y
Copper tape installation : 1 3 4 2 5 6 BALANCING RESERVOIR GENSET FLOWMETER ROOM SURAU / WATER TANK CHLORINATION BUILDING RAW WATER PUMPING STATION 364 12.5 74.6 80 12 5 361 21 50 65 60 5 3 -8.5 24.6 15 -48 0
Total Air terminal Installation a 1 2 3 Alltec ESE TSP60 BALANCING RESERVOIR SURAU / WATER TANK GENSET
548.1
562
-13.9
1 1
1 1
0 0
2 Tokai 500mmx15mm Air terminal c/w base BALANCING RESERVOIR SURAU / WATER TANK FLOWMETER ROOM Total Earth Chamber (SAG- HEAVY DUTY) 1 BALANCING RESERVOIR 6 4 1 5 12
b 1 2 3
4 1 4 11
0 0 1 1
-2
No
Work Description
2 3 4
Earth Rod BALANCING RESERVOIR GENSET FLOWMETER ROOM SURAU / WATER TANK Total Termination BALANCING RESERVOIR GENSET FLOWMETER ROOM SURAU / WATER TANK CHLORINATION BUILDING 14 6 8 8 2 8 2 2 2 2 6 4 6 6 0 15 6 12 12 45 40 6 6 20 72 -25 0 6 -8 -27
Total PABX lightning protection Novaris Plug-in Surge filter (model no: PP13B2-19-SSP) RAW WATER PUMPING STATION Total Novaris Telephone Surge Protector RAW WATER PUMPING STATION Total Pole
24
16
2 2
2 2
0 0
40 40
22 22
18 18
No
Work Description
Remarks
Remarks
cadweld connection
Remarks