CLIENT KONSORTIUM ABASS SDN BHD PROJECT UPGRADING LIGHTNING PROTECTION SYSTEM LOCATION BALANCING RESERVOIR TITLE ITEM

A LIGHTNING & EARTHING INSTALLATION DETAILS DESCRIPTION Copper tape installation : - tokai 25mmx3mm Ground Level Line 3 panel to point C line 5 panel to point B Pump panel to point D Point C to Point E Point E to Point J Point J to Putrajaya Panel Point I to Point K Point F to Point G Ponit G to Point H ESE Pole Inner Pole Ground Pole to Line G-F Panel 1-3 Panel 1 to panel 2 Panel 3 to Point A Panel 3 to Ground Roof (Switch Room) Air terminal ring Ring to Test Point Total installation B 1 a 2 a Air terminal Installation Lightning Pole (15m) Alltec ESE TSP60 Roof Switch Room Tokai 500mmx15mm Air terminal c/w base Total installation B Earthing Point UNIT QUANTITY

1 a b c d e f g h i 2 a b 3 a b c 4 a b

m m m m m m m m m

12 9 25 32 62 115 7 12 4

m m

15 2

m m m

24 9 7

m m

26 3 364

nos

nos

4 5

CLIENT KONSORTIUM ABASS SDN BHD PROJECT UPGRADING LIGHTNING PROTECTION SYSTEM LOCATION BALANCING RESERVOIR TITLE ITEM 1 a b c d e f G LIGHTNING & EARTHING INSTALLATION DETAILS DESCRIPTION Earth Chamber (SAG- HEAVY DUTY) Point A Point N Point L Point G Point H Point K Point O Total installation Earth Rod Point A Point N Point L Point G Point H Point K Point O Total installation Rod Coupler Point A Point N Point L Point G Point H Point K Point O Total installation Termination Cadweld Termination (Erico) Ground ESE to Link F-G Point A Point B Point D Point F Point G Point H Point I Point J UNIT QUANTITY nos nos nos nos nos nos nos 1 1 1 1 1 1 1 6

2 a b c d e f G

nos nos nos nos nos nos nos

3 3 3 3 3 0 3 15

3 a b c d e f G

nos nos nos nos nos nos nos

2 2 2 2 2 0 2 12

C 1 a b c d e f g h i

nos nos nos nos nos nos nos nos nos

1 1 1 1 1 1 1 1 1

CLIENT KONSORTIUM ABASS SDN BHD PROJECT UPGRADING LIGHTNING PROTECTION SYSTEM LOCATION BALANCING RESERVOIR TITLE ITEM j k l m n LIGHTNING & EARTHING INSTALLATION DETAILS DESCRIPTION Point K Point L Point M Point N Point O Total installation D 1 Pole Highmast Pole 15m Total installation UNIT QUANTITY nos 1 nos 1 nos 1 nos 1 nos 1 14

1 1

REMARKS

REMARKS

Existing

Existing

REMARKS

Bq 10m pole

CLIENT KONSORTIUM ABASS SDN BHD PROJECT UPGRADING LIGHTNING PROTECTION SYSTEM LOCATION GENSET TITLE ITEM A 1 a b c 2 a LIGHTNING & EARTHING INSTALLATION DETAILS DESCRIPTION Copper tape installation : - tokai 25mmx3mm Ground Level Point A to B Point B to C Point D to E ESE Pole 3M (Roof) ESE point to Point A Total installation B 1 a Air terminal Installation Lightning Pole (15m) Alltec ESE TSP60 Total installation B 1 a b c d Earthing Point Earth Chamber (SAG- HEAVY DUTY) Point B Point C Point D Point E Total installation 2 a b c d Earth Rod Point B Point C Point D Point E Total installation UNIT QUANTITY

m m m

0 5 3

4.5 12.5

nos

1 1

nos nos nos nos

0 1 0 1 2

nos nos nos nos

0 3 0 3 6

3 a b c d

Rod Coupler Point B Point C Point D Point E Total installation Termination Cadweld Termination (Erico) Point A Point B Point C Point D Point E Point F Total installation

nos nos nos nos

0 2 0 2 4

C 1 a b c d e g

nos nos nos nos nos nos

1 1 1 1 1 1 6

D 1

Pole Galvanised Pole 3m Total installation

1 1

REMARKS

Existing Tape

Exisiting Exisiting

Exisiting Exisiting

Exisiting Exisiting

Bq 2m pole

CLIENT KONSORTIUM ABASS SDN BHD PROJECT UPGRADING LIGHTNING PROTECTION SYSTEM LOCATION FLOWMETER ROOM TITLE ITEM A 1 a b c d e 2 a LIGHTNING & EARTHING INSTALLATION DETAILS DESCRIPTION Copper tape installation : - tokai 25mmx3mm Ground Level Point A to C Point B to D Point C to Internal PA System Point D to E Point F to G ESE Pole 2 M (Water tank) ESE point to Point G UNIT QUANTITY

m m m m m

5.6 13 4 12 11

22

3 a

Roof (Surau) Point M to L Total installation

7 74.6

B 1 a 2 a

Air terminal Installation Lightning Pole (15m) Alltec ESE TSP60 Roof (Surau) Tokai 500mmx16mm Air terminal c/w base Total installation

nos

nos

5 6

B 1 a b c d e f

Earthing Point Earth Chamber (SAG- HEAVY DUTY) Point A Point B Point D Point F Point G Point I Total installation

nos nos nos nos nos nos

1 0 0 1 1 1 4

2 a b c d e f

Earth Rod Point A Point B Point D Point F Point G Point I Total installation Rod Coupler Point A Point B Point D Point F Point G Point I Total installation Termination Cadweld Termination (Erico) Point A Point B Point C Point D Point E Point F Point G Point I Total installation

nos nos nos nos nos nos

3 0 0 3 3 3 12

3 a b c d e f

nos nos nos nos nos nos

2 0 0 2 2 2 8

C 1 b c d e f g h i

nos nos nos nos nos nos nos nos

1 1 1 1 1 1 1 1 8

REMARKS

Exisiting Exisiting

Exisiting Exisiting

Exisiting Exisiting

CLIENT KONSORTIUM ABASS SDN BHD PROJECT UPGRADING LIGHTNING PROTECTION SYSTEM LOCATION SURAU / WATER TANK TITLE ITEM A 1 a b c d e 2 a LIGHTNING & EARTHING INSTALLATION DETAILS DESCRIPTION Copper tape installation : - tokai 25mmx3mm Ground Level Point A to B Point B to D Point C to Internal PA System Point D to E Point F to G ESE Pole 2 M (Water tank) ESE point to Point G UNIT QUANTITY

m m m m m

5 13 4 12 13

26

3 a

Roof (Surau) Point M to L Total installation

7 80

B 1 a 2 a

Air terminal Installation Lightning Pole (15m) Alltec ESE TSP60 Roof (Surau) Tokai 500mmx16mm Air terminal c/w base Total installation

nos

nos

1 2

B 1 a b c d e f

Earthing Point Earth Chamber (SAG- HEAVY DUTY) Point A Point B Point D Point F Point G Point I Total installation

nos nos nos nos nos nos

1 0 0 1 1 1 4

2 a b c d e f

Earth Rod Point A Point B Point D Point F Point G Point I Total installation Rod Coupler Point A Point B Point D Point F Point G Point I Total installation Termination Cadweld Termination (Erico) Point A Point B Point C Point D Point E Point F Point G Point I Total installation

nos nos nos nos nos nos

3 0 0 3 3 3 12

3 a b c d e f

nos nos nos nos nos nos

2 0 0 2 2 2 8

C 1 b c d e f g h i

nos nos nos nos nos nos nos nos

1 1 1 1 1 1 1 1 8

D 1

Pole Galvanised Pole 2m Total installation

1 1

REMARKS

Exisiting Exisiting

Exisiting Exisiting

Exisiting Exisiting

CLIENT KONSORTIUM ABASS SDN BHD PROJECT UPGRADING LIGHTNING PROTECTION SYSTEM LOCATION CHLORINATION BUILDING TITLE ITEM A 1 a LIGHTNING & EARTHING INSTALLATION DETAILS DESCRIPTION Copper tape installation : - tokai 25mmx3mm Chlorination Control Room bonding of each panel inside Total installation UNIT QUANTITY

12 12

B 1 a b

Termination Cadweld Termination (Erico) Point A Point B Total installation

nos nos

1 1 2

REMARKS

CLIENT KONSORTIUM ABASS SDN BHD PROJECT UPGRADING LIGHTNING PROTECTION SYSTEM LOCATION RAW WATER PUMPING STATION TITLE ITEM A 1 a LIGHTNING & EARTHING INSTALLATION DETAILS DESCRIPTION Copper tape installation : - cable 35mmx1C Ground Level Busbar to PABX Total installation B 1 a b PABX lightning protection Protection of Power Supply Novaris Plug-in Surge filter (model no: PP13B2-19-SSP) Novaris Telephone Surge Protector UNIT QUANTITY

5 5

nos nos

2 40

Total installation

42

REMARKS

replace copper tape

1 unit standby 2 unit standby each unit cover up to 10 pr telephone line

KONSORTIUM ABASS SDN CLIENT BHD PROJECT UPGRADING LIGHTNING PROTECTION SYSTEM LOCATION ALL TITLE LIGHTNING & EARTHING INSTALLATION DETAILS

SUBTITLEINSTALLATION SUMMARY No Work Description Installati Contrac Quantit on t y Varies Quantity Quantit y

Copper tape installation : 1 3 4 2 5 6 BALANCING RESERVOIR GENSET FLOWMETER ROOM SURAU / WATER TANK CHLORINATION BUILDING RAW WATER PUMPING STATION 364 12.5 74.6 80 12 5 361 21 50 65 60 5 3 -8.5 24.6 15 -48 0

Total Air terminal Installation a 1 2 3 Alltec ESE TSP60 BALANCING RESERVOIR SURAU / WATER TANK GENSET

548.1

562

-13.9

1 1

1 1

0 0

2 Tokai 500mmx15mm Air terminal c/w base BALANCING RESERVOIR SURAU / WATER TANK FLOWMETER ROOM Total Earth Chamber (SAG- HEAVY DUTY) 1 BALANCING RESERVOIR 6 4 1 5 12

b 1 2 3

4 1 4 11

0 0 1 1

-2

No

Work Description

2 3 4

GENSET FLOWMETER ROOM SURAU / WATER TANK Total

Installati Contrac Quantit t on y Varies Quantity Quantit y 2 2 0 4 2 2 4 4 0 16 16 0

Earth Rod BALANCING RESERVOIR GENSET FLOWMETER ROOM SURAU / WATER TANK Total Termination BALANCING RESERVOIR GENSET FLOWMETER ROOM SURAU / WATER TANK CHLORINATION BUILDING 14 6 8 8 2 8 2 2 2 2 6 4 6 6 0 15 6 12 12 45 40 6 6 20 72 -25 0 6 -8 -27

Total PABX lightning protection Novaris Plug-in Surge filter (model no: PP13B2-19-SSP) RAW WATER PUMPING STATION Total Novaris Telephone Surge Protector RAW WATER PUMPING STATION Total Pole

24

16

2 2

2 2

0 0

40 40

22 22

18 18

No

Work Description

Installati Contrac Quantit t on y Varies Quantity Quantit y 1 1 1 3 1 1 1 3 0 0 0 0

BALANCING RESERVOIR GENSET SURAU / WATER TANK Total

Remarks

+/-6.5 coil of copper tape used (1 coil= 84m)

Remarks

cadweld connection

(1 unit 10pr) 4 unit KP10

Remarks

Bq spec 10m, installed 15m Bq spec 2m, installed 3m 2 m pole