Rate Analysis Summary ( Construction)


District (02) Attock
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

SM

0.53

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

5.14

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

15.07

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.87

9.36

0.88

27.12

135.58

258.13

1.97

68.79

343.96

60.28

1,032.53

7.89

275.18

1,375.88

CM

1.74

59.42

15.29

76.45

COMPACTION OF NATURAL GROUND

SM

0.24

5.92

1.70

8.48

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.75

86.79

22.39

111.93

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

85.73

193.76

46.20

81.42

407.11

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

12.29

214.84

56.78

283.91

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

8.04

167.12

43.79

218.95

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.25

78.63

20.22

101.10

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

85.73

193.76

46.20

81.42

407.11

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

13.63

199.88

53.38

266.89

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

6.19

167.24

43.36

216.79

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.70

89.04

0.31

23.51

117.56

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW WATER LEVEL

CM

44.17

165.86

53.31

65.84

329.18

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

75.73

258.51

30.80

91.26

456.30

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

64.62

193.04

64.42

322.08

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

38.95

160.37

49.83

249.15

107 d

GRANULAR BACK FILL

CM

24.19

83.07

267.85

93.78

468.89

107 e

COMMON BACK FILL

CM

18.71

37.31

4.13

15.04

75.19

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN COMMON MATERIAL

CM

4.74

106.71

4.13

28.90

144.48

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN HARD ROCK


MATERIAL

CM

14.13

302.97

48.81

91.48

457.39

108 bii

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN MEDIUM ROCK


MATERIAL

CM

10.60

268.11

1.96

70.17

350.84

108 biii

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION IN SOFT ROCK


MATERIAL

CM

9.42

238.60

62.01

310.03

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION IN COMMON MATERIAL

CM

5.52

112.14

6.81

31.12

155.59

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN COMMON


MATERIAL

CM

4.27

46.31

4.13

13.68

68.39

101

CLEARING AND GRUBBING

102 a

Page 1 / 245

OH-PROFIT

0.62

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (02) Attock
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL EXCAVATION IN ANY TYPE OF


ROCK MATERIAL

CM

10.18

73.87

2.45

21.63

108.13

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.95

16.84

1.18

4.74

23.71

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY FILL

SM

0.68

10.31

0.63

2.91

14.53

110

IMPROVED SUB-GRADE

CM

6.93

75.50

55.21

34.41

172.05

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.58

9.38

0.64

2.65

13.25

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.87

9.92

0.74

2.88

14.41

201

GRANULAR SUB-BASE

CM

5.57

106.91

344.35

114.21

571.04

202

AGGREGATE BASE

CM

6.37

132.11

483.45

155.48

777.41

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

53.64

916.98

3,240.29

1,052.73

5,263.64

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

55.36

916.98

3,479.95

1,113.07

5,565.36

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

59.20

957.74

3,234.86

1,062.95

5,314.75

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

59.20

954.75

3,561.74

1,143.92

5,719.61

204 b

CEMENT STABILIZED BASE

CM

19.84

272.73

525.74

204.58

1,022.89

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

164.86

568.44

21,715.80

5,612.28

28,061.38

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

164.86

568.44

22,602.83

5,834.03

29,170.16

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

72.01

55.65

512.14

159.95

799.75

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

107.09

1,408.67

2,944.26

1,115.01

5,575.03

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE CLASS B

CM

79.99

66.68

402.70

137.34

686.71

207 a

DEEP PATCHING (0-15 cm)

SM

1.18

30.14

1.02

8.09

40.43

207 b

DEEP PATCHING (16-30 cm)

SM

1.18

26.47

1.02

7.17

35.84

208

REINSTATEMENT OF ROAD SURFACE

SM

1.25

37.00

0.45

9.68

48.38

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.34

70.82

0.55

18.18

90.89

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.27

14.16

0.11

3.64

18.18

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.20

0.67

21.72

5.65

28.24

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.20

0.67

21.72

5.65

28.24

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.58

2.48

12.38

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.04

2.34

11.70

Page 2 / 245

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (02) Attock
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

304 a

SINGLE SURFACE TREATMENT

SM

0.52

4.16

42.16

11.71

58.55

304 b

DOUBLE SURFACE TREATMENT

SM

0.76

8.06

80.10

22.23

111.15

304 c

TRIPLE SURFACE TREATMENT

SM

1.27

11.08

95.28

26.91

134.54

304 d

SEAL COAT

SM

0.48

2.33

23.92

6.68

33.41

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

49.81

906.07

3,809.46

1,191.34

5,956.68

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

49.81

876.73

4,107.20

1,258.44

6,292.18

307 a

DENSE GRADED HOT BIT-MAC

CM

122.51

171.48

2,969.24

815.81

4,079.04

307 b

OPEN GRADED HOT BIT-MAC

CM

122.51

171.48

2,896.73

797.68

3,988.40

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

20.68

456.95

904.60

345.56

1,727.79

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

146.95

465.97

23,791.50

6,101.11

30,505.53

309 a

COLD MILLING, 0 - 30 mm

SM

0.65

16.87

7.54

6.27

31.33

309 b

COLD MILLING, 0 - 50 mm

SM

1.08

28.11

12.57

10.44

52.20

309 c

COLD MILLING, 0 - 70 mm

SM

1.63

42.16

18.85

15.66

78.30

401 ai

CONCRETE CLASS "A3" (Underground)

CM

362.21

643.62

2,969.71

993.89

4,969.43

401 aii CONCRETE CLASS "A3" (On ground)

CM

362.21

643.62

3,178.61

1,046.11

5,230.55

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

362.21

643.62

3,387.51

1,098.34

5,491.68

401 b

CONCRETE CLASS "B"

CM

472.49

407.09

2,230.60

777.55

3,887.73

401 ci

CONCRETE CLASS "C" (Underground)

CM

362.12

258.76

2,643.36

816.06

4,080.30

401 cii CONCRETE CLASS "C" (On ground)

CM

362.12

258.76

2,732.45

838.33

4,191.66

401 ciii CONCRETE CLASS "C" (Elevated)

CM

362.12

258.76

2,910.64

882.88

4,414.40

401 d

CONCRETE CLASS "D1"

CM

563.63

810.64

3,841.15

1,303.86

6,519.28

401 e

CONCRETE CLASS "Y"

CM

794.90

258.76

3,257.66

1,077.83

5,389.15

401 f

LEAN CONCRETE

CM

319.81

252.12

1,777.95

587.47

2,937.35

401 gi

PRECAST CONCRETE CLASS "A"

CM

1,246.16

468.57

3,751.06

1,366.45

6,832.24

401 gii PRECAST CONCRETE CLASS "B"

CM

1,246.16

468.57

3,389.25

1,276.00

6,379.98

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,081.48

42,572.95

10,913.61

54,568.04

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,081.48

44,672.95

11,438.61

57,193.04

Page 3 / 245

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (02) Attock
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

892.74

2,335.68

37,856.95

10,271.34

51,356.71

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN ALL RESPECT

TON

1,974.00

6,882.66

80,757.49

22,403.54

112,017.69

405 b

LAUNCHING OF GIRDER

TON

46.72

403.69

112.60

563.01

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

SM

81.58

189.66

67.81

339.05

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH BITUMASTIC JOINT SEAL

SM

81.58

198.37

69.99

349.94

406 c

STEEL EXPANSION JOINTS

KG

6.70

11.61

61.72

20.01

100.04

406 d

WATER STOPS 6" SIZE

66.94

310.31

94.31

471.56

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

28.83

1,412.55

360.35

1,801.73

406 g

STEEL OR METAL BEARING DEVICES

KG

14.73

30.66

81.99

31.85

159.23

251.05

847.08

561.98

415.03

2,075.14

376.57

1,270.62

842.97

622.54

3,112.70

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN NORMAL SOIL

376.57

1,270.62

647.61

573.70

2,868.50

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING ONLY) IN GRAVEL STRATA

627.62

2,117.70

804.35

887.42

4,437.09

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN NORMAL SOIL

537.96

1,815.17

748.37

775.38

3,876.88

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING ONLY) IN GRAVEL SOIL

941.43

3,176.55

1,051.84

1,292.46

6,462.28

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN NORMAL SOIL
407 d2

CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING ONLY) IN GRAVEL


STRATA

407 h

PILE LOAD TEST UP TO 120 TON

EACH

16,232.16

19,990.40

70,987.00

26,802.39

134,011.95

407 i

PILE LOAD TEST UP TO 240 TON

EACH

33,045.12

19,990.40

141,974.00

48,752.38

243,761.90

407 j

PILE LOAD TEST UP TO 360 TON

EACH

49,316.16

19,990.40

212,961.00

70,566.89

352,834.45

407 k

CONFIRMATORY BORING (NX SIZE)

151.42

826.61

5.16

245.80

1,228.99

410

BRICK WORK

CM

235.76

142.50

1,963.25

585.38

2,926.89

411 a

STONE MASONRY RANDOM DRY

CM

248.36

56.01

424.51

182.22

911.10

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

297.54

84.89

1,145.94

382.09

1,910.46

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

343.40

56.01

473.02

218.11

1,090.54

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

389.26

84.89

1,199.98

418.53

2,092.66

411 g

ROLL POINTING

SM

50.07

5.78

45.67

25.38

126.90

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

519.30

134.30

1,128.60

445.55

2,227.75

Page 4 / 245

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (02) Attock
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

170.66

230.36

365.55

191.64

958.21

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

167.11

297.19

470.73

233.76

1,168.79

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

160.15

514.83

580.63

313.90

1,569.51

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

169.46

639.81

870.68

419.99

2,099.94

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

195.15

704.13

1,175.72

518.75

2,593.75

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

240.60

868.93

1,772.27

720.45

3,602.25

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

311.36

961.94

2,217.62

872.73

4,363.65

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

367.96

1,168.07

3,095.80

1,157.96

5,789.79

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

434.54

1,362.74

4,693.40

1,622.67

8,113.35

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

170.66

263.77

386.81

205.31

1,026.55

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

167.11

297.19

503.53

241.96

1,209.79

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

156.21

514.83

606.87

319.48

1,597.39

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

169.46

639.81

930.39

434.92

2,174.58

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

195.15

704.13

1,641.80

635.27

3,176.35

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

240.60

868.93

2,234.75

836.07

4,180.35

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

311.36

961.94

2,847.38

1,030.17

5,150.85

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

367.96

1,168.07

3,721.77

1,314.45

6,572.25

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

434.54

1,362.74

5,125.49

1,730.69

8,653.46

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

65.84

68.08

258.36

98.07

490.35

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CONCRETE PIPE CULVERT

CM

532.58

309.47

2,282.82

781.22

3,906.09

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.76

75.81

19.89

99.46

507 b

ROCK FILL IN GABIONS

CM

72.79

315.00

96.95

484.74

508 a

BRICK PAVING (SINGLE COURSE)

SM

80.09

15.80

152.26

62.04

310.19

508 b

BRICK PAVING (DOUBLE COURSE)

SM

143.45

15.80

302.19

115.36

576.80

509 a

RIP RAP CLASS "A"

CM

343.83

353.14

174.24

871.21

509 b

RIP RAP CLASS "B"

CM

332.76

350.31

170.77

853.84

509 c

RIP RAP CLASS "C"

CM

334.82

353.14

171.99

859.95

Page 5 / 245

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (02) Attock
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

509 d

GROUTED RIP RAP CLASS "A"

CM

387.43

35.09

1,278.95

425.37

2,126.84

509 e

GROUTED RIP RAP CLASS "B"

CM

373.66

28.07

1,180.34

395.52

1,977.59

509 f

GROUTED RIP RAP CLASS "C"

CM

369.43

23.39

1,199.31

398.03

1,990.16

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT REINFORCEMENT)

CM

572.55

181.56

2,647.63

850.44

4,252.18

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

36.46

115.89

268.10

105.11

525.56

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

79.18

194.57

68.44

342.19

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

108.35

35.01

57.39

50.19

250.94

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

138.69

44.81

73.45

64.24

321.19

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

175.38

91.01

230.58

124.24

621.21

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

219.22

113.77

288.23

155.31

776.53

603

BRICK EDGING

6.38

24.00

7.60

37.98

605 a

CONCRETE BEAM GUARDRAIL

55.41

14.67

415.46

121.39

606.93

605 c

CONCRETE POST FOR GUARDRAIL

68.04

13.10

410.38

122.88

614.40

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

172.63

128.42

4,667.99

1,242.26

6,211.30

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

50.14

192.63

6,828.04

1,767.70

8,838.51

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

172.63

272.87

8,432.27

2,219.44

11,097.21

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

584.87

304.65

15,508.53

4,099.51

20,497.56

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

116.97

60.93

7,006.18

1,796.02

8,980.10

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,029.65

318.37

1,591.86

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,544.47

447.08

2,235.39

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

1.85

2.85

15.38

5.02

25.10

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

0.62

1.27

30.30

8.05

40.24

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

1.85

2.85

20.53

6.31

31.54

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

0.62

1.27

40.41

10.58

52.88

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M ARROWS

EACH

50.24

148.64

49.72

248.60

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M ARROWS

EACH

50.24

381.84

108.02

540.10

2.31

21.40

6.82

34.09

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 15 cm WIDTH

Page 6 / 245

3.56

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (02) Attock
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 15 cm WIDTH

2.31

4.75

51.71

14.69

73.46

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF 20 cm WIDTH

2.31

3.56

28.53

8.60

43.00

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF 20 cm WIDTH

2.31

4.75

68.95

19.00

95.01

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M ARROWS

EACH

50.24

206.60

64.21

321.05

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M ARROWS

EACH

50.24

652.07

175.58

877.89

608 n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP

EACH

41.73

99.09

35.21

176.03

608 n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP

EACH

41.73

254.95

74.17

370.85

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

41.73

137.73

44.87

224.33

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

41.73

435.37

119.28

596.38

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - SINGLE)

EACH

6.50

46.68

167.54

55.18

275.90

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - DOUBLE)

EACH

6.50

46.68

202.54

63.93

319.65

610 b

RIGHT OF WAY MARKER

EACH

78.36

60.88

204.01

85.81

429.06

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

461.81

476.40

1,363.38

575.40

2,876.99

610 d

TEN KILOMETRE POST

EACH

895.27

952.79

2,977.77

1,206.46

6,032.29

Page 7 / 245

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (04) Bahawalnagar
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.46

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.53

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

13.19

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.86

9.28

0.88

26.96

134.81

258.13

1.97

68.32

341.61

52.74

1,032.53

7.89

273.29

1,366.45

CM

1.53

59.42

15.24

76.19

COMPACTION OF NATURAL GROUND

SM

0.22

5.92

1.69

8.45

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.54

86.79

22.33

111.66

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

76.72

193.76

46.20

79.17

395.85

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

10.87

214.84

56.43

282.14

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.13

167.12

43.56

217.81

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.08

78.63

20.18

100.89

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

76.72

193.76

46.20

79.17

395.85

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

12.22

199.88

53.03

265.13

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.47

167.24

43.18

215.89

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.26

89.04

0.31

23.40

117.01

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

38.79

165.86

53.31

64.49

322.45

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

67.88

258.51

30.80

89.30

446.49

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

57.80

193.04

62.71

313.55

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

34.91

160.37

48.82

244.10

107 d

GRANULAR BACK FILL

CM

21.41

83.07

324.04

107.13

535.65

107 e

COMMON BACK FILL

CM

16.26

37.31

4.13

14.43

72.13

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.24

106.71

4.13

28.77

143.85

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

12.52

302.97

48.81

91.08

455.38

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

9.39

268.11

1.96

69.87

349.33

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

8.35

238.60

61.74

308.69

CM

4.90

112.14

30.96

154.81

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 8 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (04) Bahawalnagar
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

3.79

46.31

4.13

13.56

67.79

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

8.99

73.87

2.45

21.33

106.64

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.85

16.84

1.18

4.72

23.59

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.61

10.31

0.63

2.89

14.44

110

IMPROVED SUB-GRADE

CM

6.16

75.50

50.19

32.96

164.81

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.52

9.38

0.64

2.64

13.18

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.77

9.92

0.74

2.86

14.29

201

GRANULAR SUB-BASE

CM

4.96

106.91

542.45

163.58

817.90

202

AGGREGATE BASE

CM

5.75

132.11

681.92

204.95

1,024.73

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

47.01

916.98

3,549.31

1,128.33

5,641.63

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

48.60

916.98

3,774.92

1,185.13

5,925.63

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

51.94

957.74

3,543.83

1,138.38

5,691.89

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

51.94

954.75

3,856.68

1,215.84

6,079.21

204 b

CEMENT STABILIZED BASE

CM

17.80

272.73

831.27

280.45

1,402.25

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

147.22

568.44

22,378.80

5,773.62

28,868.08

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

147.22

568.44

23,297.33

6,003.25

30,016.24

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

62.18

55.65

722.37

210.05

1,050.25

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

94.60

1,408.67

3,237.94

1,185.30

5,926.51

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

69.04

66.68

619.49

188.80

944.01

207 a

DEEP PATCHING (0-15 cm)

SM

1.05

30.14

1.02

8.05

40.26

207 b

DEEP PATCHING (16-30 cm)

SM

1.05

26.47

1.02

7.14

35.68

208

REINSTATEMENT OF ROAD SURFACE

SM

1.12

37.00

0.45

9.64

48.21

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.21

70.82

0.55

18.15

90.73

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.24

14.16

0.11

3.63

18.14

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.18

0.67

22.39

5.81

29.05

Page 9 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (04) Bahawalnagar
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.18

0.67

22.39

5.81

29.05

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.84

2.54

12.69

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.32

2.41

12.04

304 a

SINGLE SURFACE TREATMENT

SM

0.47

4.16

44.93

12.39

61.95

304 b

DOUBLE SURFACE TREATMENT

SM

0.69

8.06

86.58

23.83

119.16

304 c

TRIPLE SURFACE TREATMENT

SM

1.15

11.08

103.87

29.03

145.13

304 d

SEAL COAT

SM

0.44

2.33

25.23

7.00

35.00

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

43.90

906.07

4,121.43

1,267.85

6,339.25

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

43.90

876.73

4,439.92

1,340.14

6,700.69

307 a

DENSE GRADED HOT BIT-MAC

CM

107.62

171.48

3,257.26

884.09

4,420.45

307 b

OPEN GRADED HOT BIT-MAC

CM

107.62

171.48

3,172.12

862.81

4,314.03

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

18.24

456.95

958.35

358.39

1,791.93

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

130.59

465.97

24,454.50

6,262.77

31,313.83

309 a

COLD MILLING, 0 - 30 mm

SM

0.59

16.87

7.54

6.25

31.25

309 b

COLD MILLING, 0 - 50 mm

SM

0.98

28.11

12.57

10.42

52.08

309 c

COLD MILLING, 0 - 70 mm

SM

1.47

42.16

18.85

15.62

78.10

401 ai

CONCRETE CLASS "A3" (Underground)

CM

316.28

643.62

3,294.01

1,063.48

5,317.39

401 aii CONCRETE CLASS "A3" (On ground)

CM

316.28

643.62

3,502.91

1,115.70

5,578.51

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

316.28

643.62

3,920.71

1,220.15

6,100.76

401 b

CONCRETE CLASS "B"

CM

414.70

407.09

2,533.86

838.91

4,194.56

401 ci

CONCRETE CLASS "C" (Underground)

CM

313.89

258.76

2,992.91

891.39

4,456.95

401 cii CONCRETE CLASS "C" (On ground)

CM

313.89

258.76

3,082.01

913.67

4,568.33

401 ciii CONCRETE CLASS "C" (Elevated)

CM

313.89

258.76

3,260.20

958.21

4,791.06

401 d

CONCRETE CLASS "D1"

CM

488.52

810.64

4,152.65

1,362.95

6,814.76

401 e

CONCRETE CLASS "Y"

CM

685.24

258.76

3,571.93

1,128.98

5,644.91

401 f

LEAN CONCRETE

CM

276.78

252.12

2,074.09

650.75

3,253.74

Page 10 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (04) Bahawalnagar
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,075.73

468.57

4,104.40

1,412.18

7,060.88

401 gii PRECAST CONCRETE CLASS "B"

CM

1,075.73

468.57

3,709.80

1,313.53

6,567.63

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

941.33

42,777.07

10,929.60

54,648.00

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

941.33

44,877.07

11,454.60

57,273.00

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

793.65

2,335.68

37,251.97

10,095.33

50,476.63

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,895.98

6,882.66

80,761.84

22,385.12

111,925.60

405 b

LAUNCHING OF GIRDER

TON

45.10

403.69

112.20

560.99

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

70.63

188.18

64.70

323.51

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

70.63

197.44

67.02

335.09

406 c

STEEL EXPANSION JOINTS

KG

5.95

11.61

60.89

19.61

98.06

406 d

WATER STOPS 6" SIZE

57.89

309.01

91.73

458.63

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

25.03

1,412.70

359.43

1,797.16

406 g

STEEL OR METAL BEARING DEVICES

KG

13.30

30.66

81.24

31.30

156.50

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

243.12

847.08

626.75

429.24

2,146.19

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

364.68

1,270.62

940.12

643.86

3,219.28

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

364.68

1,270.62

710.39

586.42

2,932.11

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

607.81

2,117.70

863.14

897.16

4,485.81

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

520.98

1,815.17

808.59

786.19

3,930.93

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

911.71

3,176.55

1,114.25

1,300.63

6,503.14

407 h

PILE LOAD TEST UP TO 120 TON

EACH

14,037.18

19,990.40

69,433.80

25,865.35

129,326.73

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,492.38

19,990.40

138,867.60

46,837.60

234,187.98

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,383.58

19,990.40

208,301.40

67,668.85

338,344.23

407 k

CONFIRMATORY BORING (NX SIZE)

139.40

826.61

5.16

242.79

1,213.96

410

BRICK WORK

CM

202.88

142.50

2,094.87

610.06

3,050.31

411 a

STONE MASONRY RANDOM DRY

CM

213.88

56.01

563.58

208.37

1,041.84

Page 11 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (04) Bahawalnagar
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

256.04

84.89

1,385.28

431.55

2,157.76

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

295.34

56.01

622.61

243.49

1,217.45

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

334.64

84.89

1,427.03

461.64

2,308.20

411 g

ROLL POINTING

SM

42.96

5.78

47.44

24.05

120.23

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

446.10

134.30

1,355.65

484.01

2,420.06

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

147.52

230.36

368.89

186.69

933.46

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

144.23

297.19

474.73

229.04

1,145.19

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

138.90

514.83

585.24

309.74

1,548.71

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

146.73

639.81

876.10

415.66

2,078.30

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

169.44

704.13

1,181.14

513.68

2,568.39

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

209.39

868.93

1,780.16

714.62

3,573.10

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

270.97

961.94

2,225.59

864.63

4,323.13

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

320.35

1,168.07

3,105.47

1,148.47

5,742.36

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

378.25

1,362.74

4,704.68

1,611.42

8,057.09

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

147.52

263.77

392.90

201.05

1,005.24

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

144.23

297.19

507.53

237.24

1,186.19

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

135.53

514.83

611.48

315.46

1,577.30

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

146.73

639.81

934.58

430.28

2,151.40

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

169.44

704.13

1,647.95

630.38

3,151.90

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

209.39

868.93

2,242.64

830.24

4,151.20

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

270.97

961.94

2,855.35

1,022.07

5,110.33

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

320.35

1,168.07

3,731.43

1,304.96

6,524.81

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

378.25

1,362.74

5,136.77

1,719.44

8,597.20

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

57.44

68.08

237.18

90.68

453.38

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

465.47

309.47

2,587.19

840.53

4,202.66

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.30

77.80

20.28

101.38

Page 12 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (04) Bahawalnagar
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

63.05

493.62

139.17

695.84

508 a

BRICK PAVING (SINGLE COURSE)

SM

69.00

15.80

157.02

60.46

302.28

508 b

BRICK PAVING (DOUBLE COURSE)

SM

123.30

15.80

311.90

112.75

563.75

509 a

RIP RAP CLASS "A"

CM

296.09

492.20

197.07

985.36

509 b

RIP RAP CLASS "B"

CM

286.31

488.26

193.64

968.21

509 c

RIP RAP CLASS "C"

CM

287.90

492.20

195.03

975.13

509 d

GROUTED RIP RAP CLASS "A"

CM

326.65

35.09

1,544.32

476.52

2,382.58

509 e

GROUTED RIP RAP CLASS "B"

CM

314.79

28.07

1,431.36

443.56

2,217.78

509 f

GROUTED RIP RAP CLASS "C"

CM

310.93

23.39

1,458.66

448.25

2,241.23

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

494.23

181.56

2,947.03

905.71

4,528.53

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

31.63

115.89

323.84

117.84

589.20

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

73.16

194.57

66.93

334.66

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

93.50

35.01

79.98

52.12

260.61

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

119.68

44.81

102.38

66.72

333.59

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

151.12

91.01

266.76

127.22

636.11

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

188.90

113.77

333.45

159.03

795.15

603

BRICK EDGING

5.51

24.96

7.62

38.09

605 a

CONCRETE BEAM GUARDRAIL

47.70

14.67

429.22

122.90

614.49

605 c

CONCRETE POST FOR GUARDRAIL

58.57

13.10

427.07

124.69

623.43

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

149.65

128.42

4,691.95

1,242.51

6,212.53

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

42.98

192.63

6,882.88

1,779.62

8,898.11

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

149.65

272.87

8,526.26

2,237.20

11,185.98

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

503.78

304.65

15,647.23

4,113.92

20,569.58

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

100.76

60.93

7,031.17

1,798.22

8,991.08

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,028.82

318.17

1,590.83

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,543.23

446.77

2,233.84

Page 13 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (04) Bahawalnagar
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.58

2.85

15.39

4.96

24.78

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.53

1.27

30.39

8.05

40.24

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.58

2.85

20.54

6.24

31.21

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.53

1.27

40.53

10.58

52.91

EACH

42.99

148.74

47.93

239.66

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

42.99

382.97

106.49

532.45

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

1.98

3.56

21.41

6.74

33.69

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

1.98

4.75

51.71

14.61

73.05

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

1.98

3.56

28.54

8.52

42.60

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

1.98

4.75

68.95

18.92

94.60

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

42.99

206.70

62.42

312.11

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

42.99

652.07

173.77

868.83

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

35.70

99.16

33.72

168.58

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

35.70

255.70

72.85

364.25

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

35.70

137.80

43.38

216.88

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

35.70

435.37

117.77

588.84

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

5.57

46.68

167.70

54.99

274.94

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

5.57

46.68

202.70

63.74

318.69

610 b

RIGHT OF WAY MARKER

EACH

67.50

60.88

217.88

86.57

432.83

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

397.83

476.40

1,474.68

587.23

2,936.14

610 d

TEN KILOMETRE POST

EACH

771.35

952.79

3,206.07

1,232.55

6,162.76

Page 14 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (05) Bahawalpur
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.54

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

5.31

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

15.45

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.88

9.38

0.88

27.16

135.79

258.13

1.97

68.89

344.44

61.79

1,032.53

7.89

275.55

1,377.76

CM

1.78

59.42

15.30

76.50

COMPACTION OF NATURAL GROUND

SM

0.25

5.92

1.70

8.49

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

3.01

86.79

22.45

112.25

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

90.03

193.76

46.20

82.50

412.49

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

12.68

214.84

56.88

284.40

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

8.30

167.12

43.86

219.28

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.46

78.63

20.27

101.36

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

90.03

193.76

46.20

82.50

412.49

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

14.35

199.88

53.56

267.79

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

6.38

167.24

43.41

217.03

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.97

89.04

0.31

23.58

117.90

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

43.77

165.86

53.31

65.74

328.68

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

79.73

258.51

30.80

92.26

461.30

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

67.86

193.04

65.23

326.13

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

41.00

160.37

50.34

251.71

107 d

GRANULAR BACK FILL

CM

25.15

83.07

359.89

117.03

585.14

107 e

COMMON BACK FILL

CM

19.02

37.31

4.13

15.12

75.58

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.95

106.71

4.13

28.95

144.74

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

14.63

302.97

48.81

91.60

458.01

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

10.97

268.11

1.96

70.26

351.30

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

9.75

238.60

62.09

310.44

CM

5.72

112.14

31.17

155.84

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 15 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (05) Bahawalpur
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

4.42

46.31

4.13

13.72

68.58

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

10.48

73.87

2.45

21.70

108.50

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

1.00

16.84

1.18

4.76

23.78

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.71

10.31

0.63

2.91

14.56

110

IMPROVED SUB-GRADE

CM

7.21

75.50

52.04

33.69

168.44

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.60

9.38

0.64

2.66

13.28

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.89

9.92

0.74

2.89

14.44

201

GRANULAR SUB-BASE

CM

5.80

106.91

527.08

159.95

799.74

202

AGGREGATE BASE

CM

6.79

132.11

639.97

194.72

973.59

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

55.01

916.98

3,510.09

1,120.52

5,602.60

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

56.89

916.98

3,736.73

1,177.65

5,888.25

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

60.71

957.74

3,504.75

1,130.80

5,654.00

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

60.71

954.75

3,818.86

1,208.58

6,042.90

204 b

CEMENT STABILIZED BASE

CM

20.97

272.73

782.52

269.06

1,345.28

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

171.65

568.44

22,480.80

5,805.22

29,026.11

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

171.65

568.44

21,660.72

5,600.20

28,001.01

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

72.55

55.65

677.92

201.53

1,007.65

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

110.67

1,408.67

3,188.73

1,177.02

5,885.09

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

80.62

66.68

581.59

182.22

911.11

207 a

DEEP PATCHING (0-15 cm)

SM

1.22

30.14

1.02

8.10

40.48

207 b

DEEP PATCHING (16-30 cm)

SM

1.22

26.47

1.02

7.18

35.89

208

REINSTATEMENT OF ROAD SURFACE

SM

1.32

37.00

0.45

9.69

48.46

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.40

70.82

0.55

18.19

90.96

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.28

14.16

0.11

3.64

18.19

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.21

0.67

22.49

5.84

29.21

Page 16 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (05) Bahawalpur
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.21

0.67

22.49

5.84

29.21

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.09

0.24

9.99

2.58

12.90

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.09

0.24

8.66

2.25

11.24

304 a

SINGLE SURFACE TREATMENT

SM

0.55

4.16

43.61

12.08

60.40

304 b

DOUBLE SURFACE TREATMENT

SM

0.81

8.06

82.92

22.95

114.74

304 c

TRIPLE SURFACE TREATMENT

SM

1.35

11.08

99.22

27.91

139.56

304 d

SEAL COAT

SM

0.51

2.33

25.10

6.99

34.93

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

51.41

906.07

4,087.30

1,261.20

6,305.98

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

51.41

876.73

4,405.35

1,333.37

6,666.86

307 a

DENSE GRADED HOT BIT-MAC

CM

126.18

171.48

3,229.28

881.74

4,408.68

307 b

OPEN GRADED HOT BIT-MAC

CM

126.18

171.48

3,139.20

859.22

4,296.08

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

21.41

456.95

927.29

351.41

1,757.06

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

151.94

465.97

24,454.50

6,268.10

31,340.51

309 a

COLD MILLING, 0 - 30 mm

SM

0.69

16.87

7.54

6.28

31.38

309 b

COLD MILLING, 0 - 50 mm

SM

1.15

28.11

12.57

10.46

52.29

309 c

COLD MILLING, 0 - 70 mm

SM

1.73

42.16

18.85

15.69

78.43

401 ai

CONCRETE CLASS "A3" (Underground)

CM

346.96

643.62

3,268.87

1,064.86

5,324.31

401 aii CONCRETE CLASS "A3" (On ground)

CM

346.96

643.62

3,477.78

1,117.09

5,585.45

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

346.96

643.62

3,895.58

1,221.54

6,107.70

401 b

CONCRETE CLASS "B"

CM

468.80

407.09

2,498.37

843.57

4,217.83

401 ci

CONCRETE CLASS "C" (Underground)

CM

345.51

258.76

2,956.53

890.20

4,451.00

401 cii CONCRETE CLASS "C" (On ground)

CM

345.51

258.76

3,045.62

912.47

4,562.36

401 ciii CONCRETE CLASS "C" (Elevated)

CM

345.51

258.76

3,223.82

957.02

4,785.11

401 d

CONCRETE CLASS "D1"

CM

526.75

810.64

4,136.61

1,368.50

6,842.50

401 e

CONCRETE CLASS "Y"

CM

736.24

258.76

3,553.13

1,137.03

5,685.16

401 f

LEAN CONCRETE

CM

314.93

252.12

2,035.50

650.64

3,253.19

Page 17 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (05) Bahawalpur
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,186.97

468.57

4,076.05

1,432.90

7,164.49

401 gii PRECAST CONCRETE CLASS "B"

CM

1,186.97

468.57

3,671.43

1,331.74

6,658.71

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,017.25

42,784.42

10,950.42

54,752.09

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,017.25

44,884.42

11,475.42

57,377.09

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

834.90

2,335.68

38,008.48

10,294.77

51,473.83

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

2,059.03

6,882.66

80,761.88

22,425.89

112,129.46

405 b

LAUNCHING OF GIRDER

TON

48.51

403.69

113.05

565.25

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

77.94

182.63

65.14

325.71

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

77.94

199.77

69.43

347.14

406 c

STEEL EXPANSION JOINTS

KG

6.23

11.61

61.89

19.93

99.66

406 d

WATER STOPS 6" SIZE

63.44

307.69

92.78

463.91

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

27.20

1,412.93

360.03

1,800.16

406 g

STEEL OR METAL BEARING DEVICES

KG

14.51

30.66

82.16

31.83

159.16

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

258.33

847.08

562.83

417.06

2,085.30

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

387.49

1,270.62

844.25

625.59

3,127.95

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

387.49

1,270.62

648.89

576.75

2,883.75

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

645.82

2,117.70

806.48

892.50

4,462.50

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

553.56

1,815.17

750.19

779.73

3,898.65

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

968.73

3,176.55

1,055.03

1,300.08

6,500.39

407 h

PILE LOAD TEST UP TO 120 TON

EACH

16,407.96

19,990.40

74,094.28

27,623.16

138,115.80

407 i

PILE LOAD TEST UP TO 240 TON

EACH

33,108.84

19,990.40

148,188.56

50,321.95

251,609.75

407 j

PILE LOAD TEST UP TO 360 TON

EACH

49,491.96

19,990.40

222,282.84

72,941.30

364,706.50

407 k

CONFIRMATORY BORING (NX SIZE)

153.76

826.61

5.16

246.38

1,231.91

410

BRICK WORK

CM

219.88

142.50

2,090.79

613.29

3,066.46

411 a

STONE MASONRY RANDOM DRY

CM

234.15

56.01

647.13

234.32

1,171.61

Page 18 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (05) Bahawalpur
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

281.23

84.89

1,463.04

457.29

2,286.45

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

322.88

56.01

713.44

273.08

1,365.41

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

364.53

84.89

1,514.41

490.96

2,454.79

411 g

ROLL POINTING

SM

45.93

5.78

47.39

24.78

123.88

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

488.26

134.30

1,443.04

516.40

2,582.00

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

170.10

230.36

368.79

192.31

961.56

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

166.20

297.19

474.60

234.50

1,172.49

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

159.95

514.83

585.08

314.97

1,574.83

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

169.28

639.81

875.92

421.25

2,106.26

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

195.94

704.13

1,180.96

520.26

2,601.29

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

241.84

868.93

1,779.92

722.67

3,613.36

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

312.97

961.94

2,225.40

875.08

4,375.39

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

371.41

1,168.07

3,105.24

1,161.18

5,805.90

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

436.81

1,362.74

4,704.41

1,625.99

8,129.95

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

170.10

263.77

392.47

206.59

1,032.93

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

166.20

297.19

507.40

242.70

1,213.49

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

156.01

514.83

611.32

320.54

1,602.70

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

169.28

639.81

934.43

435.88

2,179.40

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

195.94

704.13

1,647.80

636.97

3,184.84

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

241.84

868.93

2,242.40

838.29

4,191.46

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

312.97

961.94

2,855.16

1,032.52

5,162.59

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

371.41

1,168.07

3,731.20

1,317.67

6,588.35

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

436.81

1,362.74

5,136.50

1,734.01

8,670.06

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

67.11

68.08

300.73

108.98

544.90

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

520.83

309.47

2,552.15

845.61

4,228.06

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.68

77.80

20.37

101.85

Page 19 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (05) Bahawalpur
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

73.58

455.00

132.15

660.73

508 a

BRICK PAVING (SINGLE COURSE)

SM

76.29

15.80

159.67

62.94

314.70

508 b

BRICK PAVING (DOUBLE COURSE)

SM

135.44

15.80

316.66

116.98

584.88

509 a

RIP RAP CLASS "A"

CM

324.52

575.75

225.07

1,125.34

509 b

RIP RAP CLASS "B"

CM

313.94

571.14

221.27

1,106.35

509 c

RIP RAP CLASS "C"

CM

314.93

575.75

222.67

1,113.35

509 d

GROUTED RIP RAP CLASS "A"

CM

388.49

35.09

1,589.61

503.30

2,516.49

509 e

GROUTED RIP RAP CLASS "B"

CM

373.00

28.07

1,480.00

470.27

2,351.34

509 f

GROUTED RIP RAP CLASS "C"

CM

368.21

23.39

1,505.43

474.26

2,371.29

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

551.27

181.56

2,918.40

912.81

4,564.04

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

36.87

115.89

359.90

128.17

640.83

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

80.60

194.57

68.79

343.96

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

103.70

35.01

93.56

58.07

290.34

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

132.73

44.81

119.76

74.33

371.63

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

166.05

91.01

278.33

133.85

669.24

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

207.56

113.77

347.91

167.31

836.55

603

BRICK EDGING

6.21

24.96

7.79

38.96

605 a

CONCRETE BEAM GUARDRAIL

53.75

14.67

428.27

124.17

620.86

605 c

CONCRETE POST FOR GUARDRAIL

66.00

13.10

425.92

126.26

631.28

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

169.21

128.42

4,693.50

1,247.78

6,238.91

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

47.59

192.63

6,882.70

1,780.73

8,903.65

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

169.21

272.87

8,526.24

2,242.08

11,210.40

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

575.53

304.65

15,651.51

4,132.92

20,664.61

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

115.11

60.93

7,037.20

1,803.31

9,016.55

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,030.37

318.55

1,592.76

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,545.56

447.35

2,236.75

Page 20 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (05) Bahawalpur
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

2.15

2.85

15.40

5.10

25.50

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.72

1.27

30.48

8.12

40.59

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

2.15

2.85

20.56

6.39

31.95

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.72

1.27

40.65

10.66

53.30

EACH

48.05

148.85

49.23

246.13

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

48.05

384.09

108.04

540.18

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.69

3.56

21.42

6.92

34.59

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.69

4.75

51.71

14.79

73.94

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.69

3.56

28.56

8.70

43.51

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.69

4.75

68.95

19.10

95.49

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

48.05

206.81

63.72

318.58

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

48.05

652.07

175.03

875.15

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

40.80

99.23

35.01

175.04

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

40.80

256.45

74.31

371.56

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

40.80

137.87

44.67

223.34

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

40.80

435.37

119.04

595.21

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

6.12

46.68

167.71

55.13

275.64

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

6.12

46.68

202.71

63.88

319.39

610 b

RIGHT OF WAY MARKER

EACH

77.40

60.88

216.86

88.79

443.93

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

441.05

476.40

1,464.27

595.43

2,977.15

610 d

TEN KILOMETRE POST

EACH

857.96

952.79

3,189.40

1,250.04

6,250.19

Page 21 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (07) Bhakkar
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.40

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.05

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

11.64

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.84

9.20

0.88

26.84

134.21

258.13

1.97

67.94

339.68

46.55

1,032.53

7.89

271.74

1,358.71

CM

1.42

59.42

15.21

76.05

COMPACTION OF NATURAL GROUND

SM

0.20

5.92

1.69

8.43

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.52

86.79

22.33

111.64

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

73.94

193.76

46.20

78.48

392.38

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

10.39

214.84

56.31

281.54

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

6.89

167.12

43.50

217.51

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.06

78.63

20.17

100.86

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

73.94

193.76

46.20

78.48

392.38

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

11.78

199.88

52.92

264.58

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.26

167.24

43.13

215.63

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.22

89.04

0.31

23.39

116.96

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

37.82

165.86

53.31

64.25

321.24

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

65.45

258.51

30.80

88.69

443.45

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

55.62

193.04

62.17

310.83

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

33.66

160.37

48.51

242.54

107 d

GRANULAR BACK FILL

CM

19.54

83.07

295.68

99.57

497.86

107 e

COMMON BACK FILL

CM

14.13

37.31

4.13

13.89

69.46

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.11

106.71

4.13

28.74

143.69

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

11.86

302.97

48.81

90.91

454.55

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

8.89

268.11

1.96

69.74

348.70

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

7.90

238.60

61.63

308.13

CM

4.67

112.14

30.91

154.53

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 22 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (07) Bhakkar
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

3.67

46.31

4.13

13.53

67.64

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

8.43

73.87

2.45

21.19

105.94

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.82

16.84

1.18

4.71

23.55

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.58

10.31

0.63

2.88

14.40

110

IMPROVED SUB-GRADE

CM

5.80

75.50

53.37

33.67

168.34

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.49

9.38

0.64

2.63

13.14

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.73

9.92

0.74

2.85

14.24

201

GRANULAR SUB-BASE

CM

4.75

106.91

446.26

139.48

697.40

202

AGGREGATE BASE

CM

5.52

132.11

597.97

183.90

919.50

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

41.94

916.98

3,386.78

1,086.43

5,432.13

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

43.54

916.98

3,639.78

1,150.08

5,750.38

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

46.79

957.74

3,381.40

1,096.48

5,482.41

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

46.79

954.75

3,721.55

1,180.77

5,903.86

204 b

CEMENT STABILIZED BASE

CM

16.79

272.73

643.08

233.15

1,165.75

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

141.47

568.44

22,072.80

5,695.68

28,478.39

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

141.47

568.44

22,973.55

5,920.87

29,604.33

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

53.77

55.65

677.93

196.84

984.19

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

86.64

1,408.67

3,137.67

1,158.25

5,791.23

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

59.43

66.68

549.53

168.91

844.55

207 a

DEEP PATCHING (0-15 cm)

SM

1.01

30.14

1.02

8.04

40.21

207 b

DEEP PATCHING (16-30 cm)

SM

1.01

26.47

1.02

7.13

35.63

208

REINSTATEMENT OF ROAD SURFACE

SM

1.07

37.00

0.45

9.63

48.15

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.21

70.82

0.55

18.15

90.73

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.24

14.16

0.11

3.63

18.14

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.17

0.67

22.08

5.73

28.65

Page 23 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (07) Bhakkar
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.17

0.67

22.08

5.73

28.65

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.72

2.51

12.54

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.19

2.38

11.88

304 a

SINGLE SURFACE TREATMENT

SM

0.45

4.16

43.79

12.10

60.50

304 b

DOUBLE SURFACE TREATMENT

SM

0.66

8.06

84.35

23.27

116.34

304 c

TRIPLE SURFACE TREATMENT

SM

1.11

11.08

100.90

28.27

141.36

304 d

SEAL COAT

SM

0.42

2.33

24.37

6.78

33.90

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

39.76

906.07

3,964.56

1,227.60

6,137.99

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

39.76

876.73

4,266.21

1,295.68

6,478.38

307 a

DENSE GRADED HOT BIT-MAC

CM

95.86

171.48

3,091.63

839.74

4,198.71

307 b

OPEN GRADED HOT BIT-MAC

CM

95.86

171.48

3,047.82

828.79

4,143.95

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

16.41

456.95

943.08

354.11

1,770.55

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

124.83

465.97

24,148.50

6,184.83

30,924.13

309 a

COLD MILLING, 0 - 30 mm

SM

0.55

16.87

7.54

6.24

31.20

309 b

COLD MILLING, 0 - 50 mm

SM

0.92

28.11

12.57

10.40

52.00

309 c

COLD MILLING, 0 - 70 mm

SM

1.38

42.16

18.85

15.60

77.99

401 ai

CONCRETE CLASS "A3" (Underground)

CM

314.96

643.62

2,993.38

987.99

4,939.95

401 aii CONCRETE CLASS "A3" (On ground)

CM

314.96

643.62

3,202.28

1,040.22

5,201.08

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

314.96

643.62

3,620.08

1,144.67

5,723.33

401 b

CONCRETE CLASS "B"

CM

399.15

407.09

2,294.91

775.29

3,876.44

401 ci

CONCRETE CLASS "C" (Underground)

CM

306.35

258.76

2,716.44

820.39

4,101.94

401 cii CONCRETE CLASS "C" (On ground)

CM

306.35

258.76

2,805.54

842.66

4,213.31

401 ciii CONCRETE CLASS "C" (Elevated)

CM

306.35

258.76

2,983.73

887.21

4,436.05

401 d

CONCRETE CLASS "D1"

CM

491.68

810.64

3,885.29

1,296.90

6,484.51

401 e

CONCRETE CLASS "Y"

CM

686.75

258.76

3,270.77

1,054.07

5,270.35

401 f

LEAN CONCRETE

CM

253.37

252.12

1,836.45

585.49

2,927.43

Page 24 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (07) Bhakkar
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,033.27

468.57

3,770.57

1,318.10

6,590.51

401 gii PRECAST CONCRETE CLASS "B"

CM

1,033.27

468.57

3,467.37

1,242.30

6,211.51

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

952.05

42,573.21

10,881.32

54,406.58

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

952.05

44,673.21

11,406.32

57,031.58

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

793.12

2,335.68

37,884.40

10,253.30

51,266.50

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,905.43

6,882.66

80,756.19

22,386.07

111,930.35

405 b

LAUNCHING OF GIRDER

TON

45.29

403.69

112.25

561.23

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

68.79

183.41

63.05

315.25

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

68.79

199.02

66.95

334.76

406 c

STEEL EXPANSION JOINTS

KG

5.83

11.61

61.76

19.80

99.00

406 d

WATER STOPS 6" SIZE

56.27

308.50

91.19

455.96

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

25.29

1,412.96

359.56

1,797.81

406 g

STEEL OR METAL BEARING DEVICES

KG

12.43

30.66

82.03

31.28

156.40

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

243.10

847.08

556.51

411.67

2,058.36

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

364.65

1,270.62

834.77

617.51

3,087.55

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

364.65

1,270.62

639.41

568.67

2,843.35

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

607.76

2,117.70

790.68

879.04

4,395.18

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

520.93

1,815.17

736.66

768.19

3,840.95

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

911.64

3,176.55

1,031.34

1,279.88

6,399.41

407 h

PILE LOAD TEST UP TO 120 TON

EACH

12,118.38

19,990.40

69,433.80

25,385.65

126,928.23

407 i

PILE LOAD TEST UP TO 240 TON

EACH

24,172.38

19,990.40

138,867.60

45,757.60

228,787.98

407 j

PILE LOAD TEST UP TO 360 TON

EACH

35,928.78

19,990.40

208,301.40

66,055.15

330,275.73

407 k

CONFIRMATORY BORING (NX SIZE)

130.93

826.61

5.16

240.68

1,203.38

410

BRICK WORK

CM

199.10

142.50

2,015.55

589.29

2,946.44

411 a

STONE MASONRY RANDOM DRY

CM

208.11

56.01

508.88

193.25

966.25

Page 25 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (07) Bhakkar
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

246.81

84.89

1,169.28

375.25

1,876.23

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

286.41

56.01

564.13

226.64

1,133.19

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

326.01

84.89

1,247.13

414.51

2,072.54

411 g

ROLL POINTING

SM

42.78

5.78

44.72

23.32

116.60

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

429.51

134.30

1,175.75

434.89

2,174.45

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

130.67

230.36

363.81

181.21

906.05

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

127.38

297.19

468.63

223.30

1,116.50

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

125.66

514.83

578.14

304.66

1,523.29

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

131.41

639.81

867.79

409.75

2,048.76

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

151.94

704.13

1,172.83

507.23

2,536.13

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

189.32

868.93

1,768.15

706.60

3,533.00

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

245.01

961.94

2,213.61

855.14

4,275.70

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

287.86

1,168.07

3,090.92

1,136.71

5,683.56

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

342.37

1,362.74

4,687.71

1,598.21

7,991.03

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

130.67

263.77

382.86

194.33

971.63

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

127.38

297.19

501.43

231.50

1,157.50

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

122.82

514.83

604.38

310.51

1,552.54

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

131.41

639.81

928.13

424.84

2,124.19

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

151.94

704.13

1,638.70

623.69

3,118.46

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

189.32

868.93

2,230.63

822.22

4,111.10

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

245.01

961.94

2,843.37

1,012.58

5,062.90

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

287.86

1,168.07

3,716.89

1,293.21

6,466.03

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

342.37

1,362.74

5,119.80

1,706.23

8,531.14

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

50.90

68.08

237.18

89.04

445.20

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

451.21

309.47

2,348.02

777.18

3,885.88

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.21

75.81

19.76

98.78

Page 26 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (07) Bhakkar
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

54.92

396.67

112.90

564.49

508 a

BRICK PAVING (SINGLE COURSE)

SM

65.61

15.80

162.67

61.02

305.10

508 b

BRICK PAVING (DOUBLE COURSE)

SM

117.81

15.80

323.20

114.20

571.01

509 a

RIP RAP CLASS "A"

CM

285.37

437.50

180.72

903.59

509 b

RIP RAP CLASS "B"

CM

275.09

434.00

177.27

886.36

509 c

RIP RAP CLASS "C"

CM

277.24

437.50

178.69

893.43

509 d

GROUTED RIP RAP CLASS "A"

CM

309.36

35.09

1,370.56

428.75

2,143.76

509 e

GROUTED RIP RAP CLASS "B"

CM

298.79

28.07

1,270.51

399.34

1,996.71

509 f

GROUTED RIP RAP CLASS "C"

CM

294.89

23.39

1,290.37

402.16

2,010.81

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

465.15

181.56

2,718.75

841.37

4,206.83

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

27.87

115.89

295.63

109.85

549.24

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

68.36

194.57

65.73

328.66

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

89.12

35.01

71.09

48.81

244.03

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

114.07

44.81

91.00

62.47

312.35

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

145.75

91.01

233.89

117.66

588.31

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

182.19

113.77

292.36

147.08

735.40

603

BRICK EDGING

5.15

25.92

7.77

38.84

605 a

CONCRETE BEAM GUARDRAIL

43.56

14.67

416.28

118.63

593.14

605 c

CONCRETE POST FOR GUARDRAIL

53.48

13.10

411.32

119.48

597.38

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

140.73

128.42

4,688.85

1,239.50

6,197.50

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

41.04

192.63

6,844.31

1,769.50

8,847.48

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

140.73

272.87

8,458.32

2,217.98

11,089.90

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

452.30

304.65

15,547.97

4,076.23

20,381.15

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

90.46

60.93

7,014.50

1,791.47

8,957.36

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,029.78

318.41

1,592.03

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,544.66

447.13

2,235.63

Page 27 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (07) Bhakkar
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.48

2.85

15.40

4.93

24.66

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.49

1.27

30.44

8.05

40.25

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.48

2.85

20.55

6.22

31.10

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.49

1.27

40.60

10.59

52.95

EACH

45.48

148.81

48.57

242.86

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

45.48

383.63

107.28

536.39

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

1.85

3.56

21.42

6.71

33.54

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

1.85

4.75

51.71

14.58

72.89

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

1.85

3.56

28.55

8.49

42.45

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

1.85

4.75

68.95

18.89

94.44

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

45.48

206.77

63.06

315.31

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

45.48

652.07

174.39

871.94

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

37.38

99.20

34.15

170.73

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

37.38

256.14

73.38

366.90

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

37.38

137.84

43.81

219.03

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

37.38

435.37

118.19

590.94

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

5.50

46.68

167.50

54.92

274.60

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

5.50

46.68

202.50

63.67

318.35

610 b

RIGHT OF WAY MARKER

EACH

59.73

60.88

204.75

81.34

406.70

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

376.25

476.40

1,363.90

554.14

2,770.69

610 d

TEN KILOMETRE POST

EACH

725.50

952.79

2,989.86

1,167.04

5,835.19

Page 28 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (09) Chakwal
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.55

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

5.38

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

15.59

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.88

9.39

0.88

27.18

135.88

258.13

1.97

68.92

344.61

62.38

1,032.53

7.89

275.70

1,378.50

CM

1.83

59.42

15.31

76.56

COMPACTION OF NATURAL GROUND

SM

0.26

5.92

1.70

8.50

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

3.12

86.79

22.48

112.39

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

93.46

193.76

46.20

83.36

416.78

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

13.18

214.84

57.01

285.03

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

8.66

167.12

43.95

219.73

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.55

78.63

20.30

101.48

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

93.46

193.76

46.20

83.36

416.78

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

14.89

199.88

53.69

268.46

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

6.65

167.24

43.47

217.36

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

5.19

89.04

0.31

23.64

118.18

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

46.69

165.86

53.31

66.47

332.33

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

82.74

258.51

30.80

93.01

465.06

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

70.42

193.04

65.87

329.33

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

42.55

160.37

50.73

253.65

107 d

GRANULAR BACK FILL

CM

25.62

83.07

312.07

105.19

525.95

107 e

COMMON BACK FILL

CM

19.14

37.31

4.13

15.15

75.73

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

5.15

106.71

4.13

29.00

144.99

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

15.12

302.97

48.81

91.73

458.63

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

11.34

268.11

1.96

70.35

351.76

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

10.08

238.60

62.17

310.85

CM

5.93

112.14

31.22

156.10

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 29 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (09) Chakwal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

4.60

46.31

4.13

13.76

68.80

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

10.80

73.87

2.45

21.78

108.90

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

1.03

16.84

1.18

4.76

23.81

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.73

10.31

0.63

2.92

14.59

110

IMPROVED SUB-GRADE

CM

7.42

75.50

54.33

34.31

171.56

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.62

9.38

0.64

2.66

13.30

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.93

9.92

0.74

2.90

14.49

201

GRANULAR SUB-BASE

CM

6.00

106.91

360.12

118.26

591.29

202

AGGREGATE BASE

CM

7.00

132.11

556.42

173.88

869.41

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

55.72

916.98

3,310.22

1,070.73

5,353.65

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

57.68

916.98

3,549.90

1,131.14

5,655.70

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

61.69

957.74

3,304.88

1,081.08

5,405.39

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

61.69

954.75

3,631.41

1,161.96

5,809.81

204 b

CEMENT STABILIZED BASE

CM

21.55

272.73

601.82

224.03

1,120.13

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

177.75

568.44

21,715.80

5,615.50

28,077.49

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

177.75

568.44

22,604.35

5,837.64

29,188.18

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

73.02

55.65

589.43

179.53

897.63

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

112.91

1,408.67

3,027.95

1,137.38

5,686.91

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

81.03

66.68

464.44

153.04

765.19

207 a

DEEP PATCHING (0-15 cm)

SM

1.27

30.14

1.02

8.11

40.54

207 b

DEEP PATCHING (16-30 cm)

SM

1.27

26.47

1.02

7.19

35.95

208

REINSTATEMENT OF ROAD SURFACE

SM

1.36

37.00

0.45

9.70

48.51

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.47

70.82

0.55

18.21

91.05

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.29

14.16

0.11

3.64

18.20

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.22

0.67

21.72

5.65

28.26

Page 30 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (09) Chakwal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.21

0.67

21.72

5.65

28.25

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.09

0.24

9.58

2.48

12.39

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.09

0.24

9.04

2.34

11.71

304 a

SINGLE SURFACE TREATMENT

SM

0.57

4.16

42.62

11.84

59.19

304 b

DOUBLE SURFACE TREATMENT

SM

0.83

8.06

81.47

22.59

112.95

304 c

TRIPLE SURFACE TREATMENT

SM

1.40

11.08

97.20

27.42

137.10

304 d

SEAL COAT

SM

0.53

2.33

24.04

6.73

33.63

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

52.27

906.07

3,878.81

1,209.29

6,046.44

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

52.27

876.73

4,178.49

1,276.87

6,384.36

307 a

DENSE GRADED HOT BIT-MAC

CM

127.64

171.48

3,027.92

831.76

4,158.80

307 b

OPEN GRADED HOT BIT-MAC

CM

127.64

171.48

2,962.41

815.38

4,076.91

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

21.70

456.95

918.63

349.32

1,746.60

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

157.27

465.97

23,791.50

6,103.69

30,518.43

309 a

COLD MILLING, 0 - 30 mm

SM

0.71

16.87

7.54

6.28

31.40

309 b

COLD MILLING, 0 - 50 mm

SM

1.18

28.11

12.57

10.47

52.33

309 c

COLD MILLING, 0 - 70 mm

SM

1.77

42.16

18.85

15.70

78.48

401 ai

CONCRETE CLASS "A3" (Underground)

CM

381.11

643.62

3,003.76

1,007.12

5,035.61

401 aii CONCRETE CLASS "A3" (On ground)

CM

381.11

643.62

3,212.66

1,059.35

5,296.74

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

381.11

643.62

3,630.46

1,163.80

5,818.99

401 b

CM

498.57

407.09

2,277.26

795.73

3,978.65

401 c1 CONCRETE CLASS "C" (Underground)

CM

376.50

258.76

2,696.25

832.88

4,164.39

401 c2 CONCRETE CLASS "C" (On ground)

CM

376.50

258.76

2,785.35

855.15

4,275.76

401 c3 CONCRETE CLASS "C" (Elevated)

CM

376.50

258.76

2,963.54

899.70

4,498.50

401 d

CONCRETE CLASS "D1"

CM

588.37

810.64

3,874.09

1,318.28

6,591.38

401 e

CONCRETE CLASS "Y"

CM

823.77

258.76

3,285.59

1,092.03

5,460.15

401 f

LEAN CONCRETE

CM

328.35

252.12

1,824.64

601.28

3,006.39

CONCRETE CLASS "B"

Page 31 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (09) Chakwal
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,285.88

468.57

3,787.35

1,385.45

6,927.25

401 gii PRECAST CONCRETE CLASS "B"

CM

1,285.88

468.57

3,441.97

1,299.11

6,495.53

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,136.68

42,572.27

10,927.24

54,636.19

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,136.68

44,672.27

11,452.24

57,261.19

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

935.30

2,335.68

37,787.24

10,264.56

51,322.78

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

2,111.40

6,882.66

80,757.23

22,437.82

112,189.11

405 b

LAUNCHING OF GIRDER

TON

49.59

403.69

113.32

566.60

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

84.91

182.86

66.94

334.71

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

84.91

197.71

70.66

353.28

406 c

STEEL EXPANSION JOINTS

KG

6.93

11.61

61.66

20.05

100.25

406 d

WATER STOPS 6" SIZE

69.28

310.18

94.87

474.33

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

30.34

1,412.35

360.67

1,803.36

406 g

STEEL OR METAL BEARING DEVICES

KG

15.41

30.66

81.94

32.00

160.01

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

264.05

847.08

559.56

417.67

2,088.36

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

396.07

1,270.62

839.35

626.51

3,132.55

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

396.07

1,270.62

643.99

577.67

2,888.35

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

660.12

2,117.70

798.31

894.03

4,470.16

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

565.82

1,815.17

743.19

781.05

3,905.23

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

990.18

3,176.55

1,042.78

1,302.38

6,511.89

407 h

PILE LOAD TEST UP TO 120 TON

EACH

16,511.40

19,990.40

72,541.08

27,260.72

136,303.60

407 i

PILE LOAD TEST UP TO 240 TON

EACH

33,093.00

19,990.40

145,082.16

49,541.39

247,706.95

407 j

PILE LOAD TEST UP TO 360 TON

EACH

49,545.00

19,990.40

217,623.24

71,789.66

358,948.30

407 k

CONFIRMATORY BORING (NX SIZE)

155.55

826.61

5.16

246.83

1,234.15

410

BRICK WORK

CM

242.77

142.50

2,054.77

610.01

3,050.05

411 a

STONE MASONRY RANDOM DRY

CM

255.63

56.01

342.09

163.43

817.16

Page 32 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (09) Chakwal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

305.44

84.89

1,052.92

360.81

1,804.06

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

352.63

56.01

384.00

198.16

990.80

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

399.81

84.89

1,103.02

396.93

1,984.65

411 g

ROLL POINTING

SM

51.49

5.78

45.49

25.69

128.45

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

531.77

134.30

1,031.64

424.43

2,122.14

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

173.85

230.36

365.22

192.36

961.79

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

169.80

297.19

470.33

234.33

1,171.65

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

164.73

514.83

580.16

314.93

1,574.65

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

173.59

639.81

870.14

420.89

2,104.43

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

200.65

704.13

1,175.18

519.99

2,599.95

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

248.54

868.93

1,771.49

722.24

3,611.20

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

321.64

961.94

2,216.85

875.11

4,375.54

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

379.95

1,168.07

3,094.86

1,160.72

5,803.60

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

449.10

1,362.74

4,692.30

1,626.04

8,130.18

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

173.85

263.77

386.15

205.94

1,029.71

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

169.80

297.19

503.13

242.53

1,212.65

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

160.79

514.83

606.40

320.51

1,602.53

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

173.59

639.81

929.97

435.84

2,179.21

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

200.65

704.13

1,641.20

636.50

3,182.48

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

248.54

868.93

2,233.97

837.86

4,189.30

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

321.64

961.94

2,846.61

1,032.55

5,162.74

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

379.95

1,168.07

3,720.82

1,317.21

6,586.05

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

449.10

1,362.74

5,124.39

1,734.06

8,670.29

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

67.91

68.08

279.55

103.89

519.43

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

559.40

309.47

2,329.48

799.59

3,997.94

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.96

75.81

19.94

99.71

Page 33 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (09) Chakwal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

74.16

379.17

113.33

566.66

508 a

BRICK PAVING (SINGLE COURSE)

SM

82.16

15.80

164.44

65.60

328.00

508 b

BRICK PAVING (DOUBLE COURSE)

SM

146.82

15.80

326.38

122.25

611.25

509 a

RIP RAP CLASS "A"

CM

353.31

270.71

156.01

780.03

509 b

RIP RAP CLASS "B"

CM

341.37

268.55

152.48

762.40

509 c

RIP RAP CLASS "C"

CM

343.31

270.71

153.51

767.53

509 d

GROUTED RIP RAP CLASS "A"

CM

382.60

35.09

1,236.40

413.52

2,067.61

509 e

GROUTED RIP RAP CLASS "B"

CM

368.73

28.07

1,134.33

382.78

1,913.91

509 f

GROUTED RIP RAP CLASS "C"

CM

363.99

23.39

1,153.40

385.20

1,925.98

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

588.19

181.56

2,691.88

865.41

4,327.04

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

37.30

115.89

312.21

116.35

581.75

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

81.16

194.57

68.93

344.66

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

111.44

35.01

43.99

47.61

238.05

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

142.64

44.81

56.31

60.94

304.70

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

180.39

91.01

217.97

122.34

611.71

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

225.49

113.77

272.46

152.93

764.65

603

BRICK EDGING

6.56

25.92

8.12

40.60

605 a

CONCRETE BEAM GUARDRAIL

56.41

14.67

416.78

121.97

609.83

605 c

CONCRETE POST FOR GUARDRAIL

69.26

13.10

411.97

123.58

617.91

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

179.03

128.42

4,674.76

1,245.55

6,227.76

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

51.12

192.63

6,836.02

1,769.94

8,849.71

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

179.03

272.87

8,444.99

2,224.22

11,121.11

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

595.41

304.65

15,526.69

4,106.69

20,533.44

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

119.08

60.93

7,008.69

1,797.18

8,985.88

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,029.31

318.29

1,591.44

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,543.97

446.95

2,234.76

Page 34 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (09) Chakwal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.87

2.85

15.40

5.03

25.15

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.62

1.27

30.42

8.08

40.39

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.87

2.85

20.55

6.32

31.59

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.62

1.27

40.58

10.62

53.09

EACH

52.05

148.78

50.21

251.04

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

52.05

383.36

108.85

544.26

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.34

3.56

21.41

6.83

34.14

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.34

4.75

51.71

14.70

73.50

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.34

3.56

28.55

8.61

43.06

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.34

4.75

68.95

19.01

95.05

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

52.05

206.74

64.70

323.49

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

52.05

652.07

176.03

880.15

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

43.14

99.19

35.58

177.91

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

43.14

255.96

74.78

373.88

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

43.14

137.83

45.24

226.21

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

43.14

435.37

119.63

598.14

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

6.66

46.68

167.53

55.22

276.09

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

6.66

46.68

202.53

63.97

319.84

610 b

RIGHT OF WAY MARKER

EACH

79.43

60.88

205.38

86.42

432.11

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

473.27

476.40

1,374.21

580.97

2,904.85

610 d

TEN KILOMETRE POST

EACH

916.83

952.79

3,000.32

1,217.49

6,087.43

Page 35 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (11) Dera Ghazi Khan
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.48

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.75

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

13.69

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.86

9.30

0.88

27.02

135.09

258.13

1.97

68.45

342.24

54.77

1,032.53

7.89

273.80

1,368.99

CM

1.69

59.42

15.28

76.39

COMPACTION OF NATURAL GROUND

SM

0.24

5.92

1.70

8.48

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.84

86.79

22.41

112.04

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

81.75

193.76

46.20

80.43

402.14

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

11.36

214.84

56.55

282.75

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.50

167.12

43.66

218.28

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.32

78.63

20.24

101.19

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

81.75

193.76

46.20

80.43

402.14

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

12.96

199.88

53.21

266.05

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.75

167.24

43.25

216.24

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.78

89.04

0.31

23.53

117.66

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

42.89

165.86

53.31

65.52

327.58

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

72.02

258.51

30.80

90.33

451.66

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

60.92

193.04

63.49

317.45

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

37.04

160.37

49.35

246.76

107 d

GRANULAR BACK FILL

CM

22.30

83.07

230.93

84.08

420.38

107 e

COMMON BACK FILL

CM

16.80

37.31

4.13

14.56

72.80

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.51

106.71

4.13

28.84

144.19

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

13.28

302.97

48.81

91.27

456.33

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

9.96

268.11

1.96

70.01

350.04

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

8.85

238.60

61.86

309.31

CM

5.17

112.14

31.03

155.15

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 36 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (11) Dera Ghazi Khan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

4.09

46.31

4.13

13.63

68.16

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

9.57

73.87

2.45

21.47

107.36

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.91

16.84

1.18

4.73

23.66

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.67

10.31

0.63

2.90

14.51

110

IMPROVED SUB-GRADE

CM

6.49

75.50

54.33

34.08

170.40

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.57

9.38

0.64

2.65

13.24

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.84

9.92

0.74

2.88

14.38

201

GRANULAR SUB-BASE

CM

5.22

106.91

364.50

119.16

595.79

202

AGGREGATE BASE

CM

5.87

132.11

514.65

163.16

815.79

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

47.35

916.98

3,299.61

1,065.99

5,329.93

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

48.84

916.98

3,542.88

1,127.18

5,635.88

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

52.63

957.74

3,294.13

1,076.13

5,380.63

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

52.63

954.75

3,625.13

1,158.13

5,790.64

204 b

CEMENT STABILIZED BASE

CM

18.10

272.73

558.25

212.27

1,061.35

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

162.23

568.44

22,072.80

5,700.87

28,504.34

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

162.23

568.44

22,118.01

5,712.17

28,560.85

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

63.43

55.65

545.18

166.07

830.33

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

96.32

1,408.67

3,003.97

1,127.24

5,636.20

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

69.76

66.68

450.31

146.69

733.44

207 a

DEEP PATCHING (0-15 cm)

SM

1.16

30.14

1.02

8.08

40.40

207 b

DEEP PATCHING (16-30 cm)

SM

1.16

26.47

1.02

7.16

35.81

208

REINSTATEMENT OF ROAD SURFACE

SM

1.17

37.00

0.45

9.66

48.28

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.46

70.82

0.55

18.21

91.04

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.29

14.16

0.11

3.64

18.20

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.19

0.67

22.08

5.74

28.68

Page 37 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (11) Dera Ghazi Khan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.19

0.67

22.08

5.74

28.68

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.82

2.54

12.68

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

8.85

2.29

11.46

304 a

SINGLE SURFACE TREATMENT

SM

0.50

4.16

41.83

11.62

58.11

304 b

DOUBLE SURFACE TREATMENT

SM

0.72

8.06

78.82

21.90

109.50

304 c

TRIPLE SURFACE TREATMENT

SM

1.22

11.08

93.74

26.51

132.55

304 d

SEAL COAT

SM

0.46

2.33

24.97

6.94

34.70

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

44.17

906.07

3,876.60

1,206.71

6,033.55

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

44.17

876.73

4,179.32

1,275.06

6,375.28

307 a

DENSE GRADED HOT BIT-MAC

CM

107.59

171.48

3,034.76

828.46

4,142.29

307 b

OPEN GRADED HOT BIT-MAC

CM

107.59

171.48

2,963.76

810.71

4,053.54

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

18.09

456.95

893.60

342.16

1,710.80

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

146.74

465.97

24,148.50

6,190.30

30,951.51

309 a

COLD MILLING, 0 - 30 mm

SM

0.61

16.87

7.54

6.26

31.28

309 b

COLD MILLING, 0 - 50 mm

SM

1.01

28.11

12.57

10.42

52.11

309 c

COLD MILLING, 0 - 70 mm

SM

1.52

42.16

18.85

15.63

78.16

401 ai

CONCRETE CLASS "A3" (Underground)

CM

351.53

643.62

2,932.38

981.88

4,909.41

401 aii CONCRETE CLASS "A3" (On ground)

CM

351.53

643.62

3,141.28

1,034.11

5,170.54

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

351.53

643.62

3,559.08

1,138.56

5,692.79

401 b

CONCRETE CLASS "B"

CM

449.42

407.09

2,180.39

759.23

3,796.13

401 ci

CONCRETE CLASS "C" (Underground)

CM

348.72

258.76

2,608.91

804.10

4,020.49

401 cii CONCRETE CLASS "C" (On ground)

CM

348.72

258.76

2,698.00

826.37

4,131.85

401 ciii CONCRETE CLASS "C" (Elevated)

CM

348.72

258.76

2,876.20

870.92

4,354.60

401 d

CONCRETE CLASS "D1"

CM

554.52

810.64

3,827.00

1,298.04

6,490.20

401 e

CONCRETE CLASS "Y"

CM

783.45

258.76

3,231.29

1,068.38

5,341.88

401 f

LEAN CONCRETE

CM

296.12

252.12

1,720.42

567.17

2,835.83

Page 38 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (11) Dera Ghazi Khan
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,186.72

468.57

3,707.41

1,340.68

6,703.38

401 gii PRECAST CONCRETE CLASS "B"

CM

1,186.72

468.57

3,342.62

1,249.48

6,247.39

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,076.66

42,564.62

10,910.32

54,551.60

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,076.66

44,664.62

11,435.32

57,176.60

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

864.52

2,335.68

36,998.81

10,049.75

50,248.76

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,711.02

6,882.66

80,752.11

22,336.45

111,682.24

405 b

LAUNCHING OF GIRDER

TON

40.27

403.69

110.99

554.95

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

77.66

188.69

66.59

332.94

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

77.66

197.40

68.77

343.83

406 c

STEEL EXPANSION JOINTS

KG

6.45

11.61

60.61

19.67

98.34

406 d

WATER STOPS 6" SIZE

65.18

307.68

93.22

466.08

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

28.20

1,413.30

360.38

1,801.88

406 g

STEEL OR METAL BEARING DEVICES

KG

13.44

30.66

81.03

31.28

156.41

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

221.84

847.08

730.55

449.87

2,249.34

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

332.75

1,270.62

1,095.82

674.80

3,373.99

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

332.75

1,270.62

831.71

608.77

3,043.85

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

554.59

2,117.70

1,019.52

922.95

4,614.76

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

475.36

1,815.17

952.44

810.74

4,053.71

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

831.88

3,176.55

1,323.03

1,332.87

6,664.33

407 h

PILE LOAD TEST UP TO 120 TON

EACH

14,176.92

19,990.40

64,772.44

24,734.94

123,674.70

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,451.64

19,990.40

129,544.88

44,496.73

222,483.65

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,523.32

19,990.40

194,317.32

64,207.76

321,038.80

407 k

CONFIRMATORY BORING (NX SIZE)

130.66

826.61

5.16

240.61

1,203.04

410

BRICK WORK

CM

230.02

142.50

1,956.45

582.24

2,911.21

411 a

STONE MASONRY RANDOM DRY

CM

242.12

56.01

321.63

154.94

774.70

Page 39 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (11) Dera Ghazi Khan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

287.31

84.89

970.31

335.63

1,678.14

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

332.68

56.01

361.90

187.65

938.24

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

378.06

84.89

1,036.55

374.88

1,874.38

411 g

ROLL POINTING

SM

49.16

5.78

44.55

24.87

124.36

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

498.62

134.30

965.18

399.53

1,997.63

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

154.73

230.36

363.48

187.14

935.71

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

150.83

297.19

484.64

233.17

1,165.83

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

146.90

514.83

577.67

309.85

1,549.25

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

154.00

639.81

867.25

415.27

2,076.33

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

176.08

704.13

1,172.29

513.13

2,565.63

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

216.89

868.93

1,767.38

713.30

3,566.50

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

280.69

961.94

2,212.86

863.87

4,319.36

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

329.98

1,168.07

3,090.02

1,147.02

5,735.09

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

392.01

1,362.74

4,686.66

1,610.35

8,051.76

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

154.73

263.77

382.09

200.15

1,000.74

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

150.83

297.19

501.04

237.27

1,186.33

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

143.52

514.83

603.91

315.57

1,577.83

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

154.00

639.81

927.70

430.38

2,151.89

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

176.08

704.13

1,638.12

629.58

3,147.91

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

216.89

868.93

2,229.86

828.92

4,144.60

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

280.69

961.94

2,842.62

1,021.31

5,106.56

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

329.98

1,168.07

3,715.99

1,303.51

6,517.55

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

392.01

1,362.74

5,118.74

1,718.37

8,591.86

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

60.63

68.08

173.61

75.58

377.90

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

510.08

309.47

2,233.72

763.32

3,816.59

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.63

76.80

20.11

100.54

Page 40 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (11) Dera Ghazi Khan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

65.43

379.17

111.15

555.75

508 a

BRICK PAVING (SINGLE COURSE)

SM

75.87

15.80

154.37

61.51

307.55

508 b

BRICK PAVING (DOUBLE COURSE)

SM

136.25

15.80

307.13

114.80

573.98

509 a

RIP RAP CLASS "A"

CM

329.67

250.25

144.98

724.90

509 b

RIP RAP CLASS "B"

CM

318.04

248.25

141.57

707.86

509 c

RIP RAP CLASS "C"

CM

320.41

250.25

142.67

713.33

509 d

GROUTED RIP RAP CLASS "A"

CM

374.54

35.09

1,171.38

395.25

1,976.26

509 e

GROUTED RIP RAP CLASS "B"

CM

361.73

28.07

1,074.08

365.97

1,829.85

509 f

GROUTED RIP RAP CLASS "C"

CM

357.46

23.39

1,091.95

368.20

1,841.00

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

535.81

181.56

2,612.78

832.54

4,162.69

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

32.48

115.89

230.82

94.80

473.99

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

70.59

194.57

66.29

331.45

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

104.03

35.01

40.67

44.93

224.64

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

133.16

44.81

52.05

57.51

287.53

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

169.46

91.01

200.16

115.16

575.79

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

211.83

113.77

250.21

143.95

719.76

603

BRICK EDGING

6.05

24.96

7.75

38.76

605 a

CONCRETE BEAM GUARDRAIL

51.02

14.67

414.22

119.98

599.89

605 c

CONCRETE POST FOR GUARDRAIL

62.64

13.10

408.84

121.15

605.73

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

159.94

128.42

4,678.24

1,241.65

6,208.25

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

48.30

192.63

6,825.30

1,766.56

8,832.79

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

159.94

272.87

8,427.23

2,215.01

11,075.05

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

525.29

304.65

15,502.88

4,083.21

20,416.03

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

105.06

60.93

7,007.33

1,793.33

8,966.65

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,030.33

318.54

1,592.71

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,545.50

447.34

2,236.68

Page 41 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (11) Dera Ghazi Khan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.82

2.85

15.40

5.02

25.09

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.61

1.27

30.48

8.09

40.45

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.82

2.85

20.56

6.31

31.54

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.61

1.27

40.65

10.63

53.16

EACH

52.08

148.85

50.23

251.16

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

52.08

384.09

109.04

545.21

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.27

3.56

21.42

6.81

34.06

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.27

4.75

51.71

14.68

73.41

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.27

3.56

28.56

8.60

42.99

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.27

4.75

68.95

18.99

94.96

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

52.08

206.81

64.72

323.61

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

52.08

652.07

176.04

880.19

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

42.96

99.23

35.55

177.74

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

42.96

256.45

74.85

374.26

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

42.96

137.87

45.21

226.04

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

42.96

435.37

119.58

597.91

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

6.52

46.68

167.49

55.17

275.86

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

6.52

46.68

202.49

63.92

319.61

610 b

RIGHT OF WAY MARKER

EACH

70.52

60.88

202.59

83.50

417.49

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

438.36

476.40

1,344.96

564.93

2,824.65

610 d

TEN KILOMETRE POST

EACH

846.34

952.79

2,954.54

1,188.42

5,942.09

Page 42 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (16) Faisalabad
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.52

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

5.02

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

14.79

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.87

9.35

0.88

27.09

135.43

258.13

1.97

68.72

343.61

59.14

1,032.53

7.89

274.89

1,374.45

CM

1.70

59.42

15.28

76.40

COMPACTION OF NATURAL GROUND

SM

0.24

5.92

1.70

8.48

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.57

86.79

22.34

111.70

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

81.72

193.76

46.20

80.42

402.10

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

11.87

214.84

56.68

283.39

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.78

167.12

43.73

218.63

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.10

78.63

20.18

100.91

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

81.72

193.76

46.20

80.42

402.10

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

12.97

199.88

53.21

266.06

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.98

167.24

43.31

216.53

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.51

89.04

0.31

23.47

117.33

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

44.04

165.86

53.31

65.80

329.01

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

72.04

258.51

30.80

90.34

451.69

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

61.55

193.04

63.65

318.24

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

37.05

160.37

49.36

246.78

107 d

GRANULAR BACK FILL

CM

23.40

83.07

314.57

105.26

526.30

107 e

COMMON BACK FILL

CM

18.46

37.31

4.13

14.98

74.88

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.57

106.71

4.13

28.85

144.26

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

13.69

302.97

48.81

91.37

456.84

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

10.27

268.11

1.96

70.09

350.43

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

9.13

238.60

61.93

309.66

CM

5.35

112.14

31.08

155.38

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 43 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (16) Faisalabad
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

4.13

46.31

4.13

13.64

68.21

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

9.94

73.87

2.45

21.57

107.83

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.92

16.84

1.18

4.74

23.68

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.66

10.31

0.63

2.90

14.50

110

IMPROVED SUB-GRADE

CM

6.71

75.50

54.33

34.14

170.68

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.57

9.38

0.64

2.65

13.24

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.85

9.92

0.74

2.88

14.39

201

GRANULAR SUB-BASE

CM

5.38

106.91

437.31

137.40

687.00

202

AGGREGATE BASE

CM

6.02

132.11

545.98

171.03

855.14

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

52.64

916.98

3,350.72

1,080.09

5,400.43

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

54.23

916.98

3,584.96

1,139.04

5,695.21

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

58.10

957.74

3,345.47

1,090.33

5,451.64

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

58.10

954.75

3,667.01

1,169.97

5,849.83

204 b

CEMENT STABILIZED BASE

CM

18.91

272.73

628.89

230.13

1,150.66

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

160.24

568.44

21,970.80

5,674.87

28,374.35

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

160.24

568.44

22,880.46

5,902.29

29,511.43

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

71.50

55.65

578.38

176.38

881.91

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

104.52

1,408.67

3,041.38

1,138.64

5,693.21

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

79.37

66.68

486.48

158.13

790.66

207 a

DEEP PATCHING (0-15 cm)

SM

1.15

30.14

1.02

8.08

40.39

207 b

DEEP PATCHING (16-30 cm)

SM

1.15

26.47

1.02

7.16

35.80

208

REINSTATEMENT OF ROAD SURFACE

SM

1.18

37.00

0.45

9.66

48.29

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.31

70.82

0.55

18.17

90.85

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.26

14.16

0.11

3.63

18.16

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.19

0.67

21.98

5.71

28.55

Page 44 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (16) Faisalabad
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.19

0.67

21.98

5.71

28.55

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.68

2.50

12.50

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.15

2.37

11.84

304 a

SINGLE SURFACE TREATMENT

SM

0.50

4.16

43.14

11.95

59.75

304 b

DOUBLE SURFACE TREATMENT

SM

0.73

8.06

82.34

22.78

113.91

304 c

TRIPLE SURFACE TREATMENT

SM

1.22

11.08

98.22

27.63

138.15

304 d

SEAL COAT

SM

0.46

2.33

24.40

6.80

33.99

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

48.64

906.07

3,925.91

1,220.16

6,100.78

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

48.64

876.73

4,232.47

1,289.46

6,447.30

307 a

DENSE GRADED HOT BIT-MAC

CM

119.77

171.48

3,079.73

842.75

4,213.73

307 b

OPEN GRADED HOT BIT-MAC

CM

119.77

171.48

2,998.33

822.40

4,111.98

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

20.14

456.95

922.62

349.93

1,749.64

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

143.60

465.97

24,046.50

6,164.02

30,820.09

309 a

COLD MILLING, 0 - 30 mm

SM

0.62

16.87

7.54

6.26

31.29

309 b

COLD MILLING, 0 - 50 mm

SM

1.04

28.11

12.57

10.43

52.15

309 c

COLD MILLING, 0 - 70 mm

SM

1.56

42.16

18.85

15.64

78.21

401 ai

CONCRETE CLASS "A3" (Underground)

CM

365.71

643.62

3,046.90

1,014.06

5,070.29

401 aii CONCRETE CLASS "A3" (On ground)

CM

365.71

643.62

3,255.80

1,066.28

5,331.41

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

365.71

643.62

3,673.60

1,170.73

5,853.66

401 b

CONCRETE CLASS "B"

CM

468.95

407.09

2,299.33

793.84

3,969.21

401 ci

CONCRETE CLASS "C" (Underground)

CM

366.68

258.76

2,727.30

838.19

4,190.93

401 cii CONCRETE CLASS "C" (On ground)

CM

366.68

258.76

2,816.40

860.46

4,302.30

401 ciii CONCRETE CLASS "C" (Elevated)

CM

366.68

258.76

2,994.59

905.01

4,525.04

401 d

CONCRETE CLASS "D1"

CM

575.73

810.64

3,910.14

1,324.13

6,620.64

401 e

CONCRETE CLASS "Y"

CM

815.87

258.76

3,332.93

1,101.89

5,509.45

401 f

LEAN CONCRETE

CM

320.06

252.12

1,846.96

604.79

3,023.93

Page 45 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (16) Faisalabad
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,262.43

468.57

3,836.54

1,391.89

6,959.43

401 gii PRECAST CONCRETE CLASS "B"

CM

1,262.43

468.57

3,462.82

1,298.46

6,492.28

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,099.89

42,568.73

10,917.16

54,585.78

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,099.89

44,668.73

11,442.16

57,210.78

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

897.71

2,335.68

37,423.00

10,164.10

50,820.49

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,895.98

6,882.66

80,749.88

22,382.13

111,910.65

405 b

LAUNCHING OF GIRDER

TON

45.10

403.69

112.20

560.99

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

82.20

186.14

67.09

335.43

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

82.20

191.18

68.35

341.73

406 c

STEEL EXPANSION JOINTS

KG

6.74

11.61

61.28

19.91

99.54

406 d

WATER STOPS 6" SIZE

68.05

308.85

94.23

471.13

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

29.12

1,411.57

360.17

1,800.86

406 g

STEEL OR METAL BEARING DEVICES

KG

14.30

30.66

81.57

31.63

158.16

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

243.87

847.08

560.11

412.77

2,063.83

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

365.80

1,270.62

840.17

619.15

3,095.74

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

365.80

1,270.62

644.81

570.31

2,851.54

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

609.67

2,117.70

799.68

881.76

4,408.81

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

522.57

1,815.17

744.37

770.53

3,852.64

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

914.50

3,176.55

1,044.84

1,283.97

6,419.86

407 h

PILE LOAD TEST UP TO 120 TON

EACH

16,045.98

19,990.40

72,541.06

27,144.36

135,721.80

407 i

PILE LOAD TEST UP TO 240 TON

EACH

32,956.38

19,990.40

145,082.12

49,507.23

247,536.13

407 j

PILE LOAD TEST UP TO 360 TON

EACH

49,079.58

19,990.40

217,623.18

71,673.29

358,366.45

407 k

CONFIRMATORY BORING (NX SIZE)

148.70

826.61

5.16

245.12

1,225.59

410

BRICK WORK

CM

241.56

142.50

2,124.55

627.15

3,135.76

411 a

STONE MASONRY RANDOM DRY

CM

253.78

56.01

420.11

182.48

912.38

Page 46 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (16) Faisalabad
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

303.74

84.89

1,155.67

386.08

1,930.38

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

351.22

56.01

467.66

218.72

1,093.61

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

398.70

84.89

1,205.21

422.20

2,111.00

411 g

ROLL POINTING

SM

51.63

5.78

45.90

25.83

129.14

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

531.10

134.30

1,133.84

449.81

2,249.05

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

170.24

230.36

366.00

191.65

958.25

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

166.95

297.19

471.26

233.85

1,169.25

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

159.17

514.83

581.25

313.81

1,569.06

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

168.54

639.81

871.40

419.94

2,099.69

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

193.50

704.13

1,176.44

518.52

2,592.59

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

238.12

868.93

1,773.32

720.09

3,600.46

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

308.16

961.94

2,218.66

872.19

4,360.95

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

363.48

1,168.07

3,097.06

1,157.15

5,785.76

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

430.00

1,362.74

4,694.87

1,621.90

8,109.51

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

170.24

263.77

387.69

205.43

1,027.13

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

166.95

297.19

504.06

242.05

1,210.25

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

155.24

514.83

607.49

319.39

1,596.95

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

168.54

639.81

930.95

434.83

2,174.13

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

193.50

704.13

1,642.60

635.06

3,175.29

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

238.12

868.93

2,235.80

835.71

4,178.56

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

308.16

961.94

2,848.42

1,029.63

5,148.15

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

363.48

1,168.07

3,723.03

1,313.65

6,568.23

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

430.00

1,362.74

5,126.96

1,729.93

8,649.63

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

64.90

68.08

279.55

103.13

515.66

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

532.52

309.47

2,351.55

798.39

3,991.93

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.75

75.81

19.89

99.45

Page 47 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (16) Faisalabad
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

72.17

379.17

112.84

564.18

508 a

BRICK PAVING (SINGLE COURSE)

SM

81.40

15.80

170.09

66.82

334.11

508 b

BRICK PAVING (DOUBLE COURSE)

SM

146.36

15.80

337.68

124.96

624.80

509 a

RIP RAP CLASS "A"

CM

350.64

348.74

174.85

874.23

509 b

RIP RAP CLASS "B"

CM

339.47

345.95

171.36

856.78

509 c

RIP RAP CLASS "C"

CM

342.03

348.74

172.69

863.46

509 d

GROUTED RIP RAP CLASS "A"

CM

398.43

35.09

1,342.22

443.94

2,219.68

509 e

GROUTED RIP RAP CLASS "B"

CM

384.89

28.07

1,236.58

412.39

2,061.93

509 f

GROUTED RIP RAP CLASS "C"

CM

380.82

23.39

1,258.58

415.70

2,078.49

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

578.70

181.56

2,712.72

868.25

4,341.23

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

36.16

115.89

314.70

116.69

583.44

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

78.12

194.57

68.17

340.86

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

109.96

35.01

56.67

50.41

252.05

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

140.75

44.81

72.54

64.53

322.63

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

178.73

91.01

233.51

125.81

629.06

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

223.41

113.77

291.89

157.27

786.34

603

BRICK EDGING

6.42

26.88

8.33

41.63

605 a

CONCRETE BEAM GUARDRAIL

55.92

14.67

418.59

122.30

611.48

605 c

CONCRETE POST FOR GUARDRAIL

68.66

13.10

414.20

123.99

619.95

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

172.17

128.42

4,669.40

1,242.50

6,212.49

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

51.35

192.63

6,833.54

1,769.38

8,846.90

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

172.17

272.87

8,441.90

2,221.74

11,108.68

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

585.41

304.65

15,517.19

4,101.81

20,509.06

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

117.08

60.93

7,000.97

1,794.75

8,973.73

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,027.56

317.85

1,589.25

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,541.34

446.30

2,231.48

Page 48 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (16) Faisalabad
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.88

2.85

15.38

5.03

25.14

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.63

1.27

30.32

8.06

40.28

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.88

2.85

20.53

6.32

31.58

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.63

1.27

40.44

10.59

52.93

EACH

53.18

148.65

50.46

252.29

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

53.18

382.04

108.81

544.03

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.35

3.56

21.40

6.83

34.14

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.35

4.75

51.71

14.70

73.51

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.35

3.56

28.53

8.61

43.05

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.35

4.75

68.95

19.01

95.06

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

53.18

206.61

64.95

324.74

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

53.18

652.07

176.31

881.56

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

44.07

99.10

35.79

178.96

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

44.07

255.08

74.79

373.94

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

44.07

137.74

45.45

227.26

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

44.07

435.37

119.86

599.30

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

6.70

46.68

188.58

60.49

302.45

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

6.70

46.68

224.58

69.49

347.45

610 b

RIGHT OF WAY MARKER

EACH

78.53

60.88

207.34

86.69

433.44

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

468.90

476.40

1,390.79

584.02

2,920.11

610 d

TEN KILOMETRE POST

EACH

907.79

952.79

3,032.24

1,223.21

6,116.03

Page 49 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (17) Gujranwala
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.47

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.65

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

13.46

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.86

9.29

0.88

26.99

134.96

258.13

1.97

68.39

341.95

53.82

1,032.53

7.89

273.56

1,367.80

CM

1.61

59.42

15.26

76.29

COMPACTION OF NATURAL GROUND

SM

0.23

5.92

1.69

8.46

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.73

86.79

22.38

111.90

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

81.57

193.76

46.20

80.38

401.91

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

11.58

214.84

56.61

283.03

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.66

167.12

43.70

218.48

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.23

78.63

20.22

101.08

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

81.57

193.76

46.20

80.38

401.91

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

12.98

199.88

53.22

266.08

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.86

167.24

43.28

216.38

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.64

89.04

0.31

23.50

117.49

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

42.76

165.86

53.31

65.48

327.41

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

72.11

258.51

30.80

90.36

451.78

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

61.35

193.04

63.60

317.99

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

37.08

160.37

49.36

246.81

107 d

GRANULAR BACK FILL

CM

22.14

83.07

329.22

108.61

543.04

107 e

COMMON BACK FILL

CM

16.48

37.31

4.13

14.48

72.40

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.56

106.71

4.13

28.85

144.25

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

13.28

302.97

48.81

91.27

456.33

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

9.96

268.11

1.96

70.01

350.04

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

8.85

238.60

61.86

309.31

CM

5.22

112.14

31.04

155.21

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 50 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (17) Gujranwala
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

4.08

46.31

4.13

13.63

68.15

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

9.52

73.87

2.45

21.46

107.30

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.91

16.84

1.18

4.73

23.66

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.65

10.31

0.63

2.90

14.49

110

IMPROVED SUB-GRADE

CM

6.51

75.50

52.80

33.70

168.51

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.55

9.38

0.64

2.64

13.21

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.83

9.92

0.74

2.87

14.36

201

GRANULAR SUB-BASE

CM

5.29

106.91

416.81

132.25

661.26

202

AGGREGATE BASE

CM

6.07

132.11

608.64

186.71

933.53

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

48.32

916.98

3,421.83

1,096.78

5,483.91

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

50.04

916.98

3,645.96

1,153.25

5,766.23

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

53.74

957.74

3,416.51

1,107.00

5,534.99

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

53.74

954.75

3,727.26

1,183.94

5,919.69

204 b

CEMENT STABILIZED BASE

CM

18.65

272.73

734.94

256.58

1,282.90

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

158.20

568.44

21,817.80

5,636.11

28,180.55

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

158.20

568.44

22,723.31

5,862.49

29,312.44

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

63.11

55.65

644.74

190.88

954.38

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

98.63

1,408.67

3,111.91

1,154.80

5,774.01

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

69.82

66.68

576.19

178.17

890.86

207 a

DEEP PATCHING (0-15 cm)

SM

1.13

30.14

1.02

8.07

40.36

207 b

DEEP PATCHING (16-30 cm)

SM

1.13

26.47

1.02

7.16

35.78

208

REINSTATEMENT OF ROAD SURFACE

SM

1.18

37.00

0.45

9.66

48.29

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.34

70.82

0.55

18.18

90.89

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.27

14.16

0.11

3.64

18.18

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.19

0.67

21.82

5.67

28.35

Page 51 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (17) Gujranwala
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.19

0.67

21.82

5.67

28.35

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.62

2.49

12.43

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.09

2.35

11.76

304 a

SINGLE SURFACE TREATMENT

SM

0.50

4.16

43.29

11.99

59.94

304 b

DOUBLE SURFACE TREATMENT

SM

0.73

8.06

82.98

22.94

114.71

304 c

TRIPLE SURFACE TREATMENT

SM

1.23

11.08

99.30

27.90

139.51

304 d

SEAL COAT

SM

0.46

2.33

24.49

6.82

34.10

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

45.44

906.07

3,985.93

1,234.36

6,171.80

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

45.44

876.73

4,294.89

1,304.27

6,521.33

307 a

DENSE GRADED HOT BIT-MAC

CM

110.24

171.48

3,276.79

889.63

4,448.14

307 b

OPEN GRADED HOT BIT-MAC

CM

110.24

171.48

3,191.69

868.35

4,341.76

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

18.76

456.95

931.06

351.69

1,758.46

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

140.29

465.97

23,893.50

6,124.94

30,624.70

309 a

COLD MILLING, 0 - 30 mm

SM

0.61

16.87

7.54

6.26

31.28

309 b

COLD MILLING, 0 - 50 mm

SM

1.02

28.11

12.57

10.43

52.13

309 c

COLD MILLING, 0 - 70 mm

SM

1.54

42.16

18.85

15.64

78.19

401 ai

CONCRETE CLASS "A3" (Underground)

CM

355.69

643.62

3,069.56

1,017.22

5,086.09

401 aii CONCRETE CLASS "A3" (On ground)

CM

355.69

643.62

3,278.46

1,069.44

5,347.21

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

355.69

643.62

3,696.26

1,173.89

5,869.46

401 b

CONCRETE CLASS "B"

CM

451.80

407.09

2,306.62

791.38

3,956.89

401 ci

CONCRETE CLASS "C" (Underground)

CM

349.63

258.76

2,754.14

840.63

4,203.16

401 cii CONCRETE CLASS "C" (On ground)

CM

349.63

258.76

2,843.23

862.91

4,314.53

401 ciii CONCRETE CLASS "C" (Elevated)

CM

349.63

258.76

3,021.43

907.46

4,537.28

401 d

CONCRETE CLASS "D1"

CM

557.86

810.64

3,929.63

1,324.53

6,622.66

401 e

CONCRETE CLASS "Y"

CM

783.77

258.76

3,359.00

1,100.38

5,501.91

401 f

LEAN CONCRETE

CM

293.16

252.12

1,854.29

599.89

2,999.46

Page 52 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (17) Gujranwala
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,185.81

468.57

3,862.75

1,379.28

6,896.41

401 gii PRECAST CONCRETE CLASS "B"

CM

1,185.81

468.57

3,475.29

1,282.42

6,412.09

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,077.00

42,564.93

10,910.48

54,552.41

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,077.00

44,664.93

11,435.48

57,177.41

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

879.26

2,335.68

37,031.47

10,061.60

50,308.01

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,963.83

6,882.66

80,751.44

22,399.48

111,997.41

405 b

LAUNCHING OF GIRDER

TON

46.52

403.69

112.55

562.76

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

78.30

184.82

65.78

328.90

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

78.30

193.53

67.96

339.79

406 c

STEEL EXPANSION JOINTS

KG

6.47

11.61

60.72

19.70

98.50

406 d

WATER STOPS 6" SIZE

64.47

309.34

93.45

467.26

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

28.48

1,411.19

359.92

1,799.59

406 g

STEEL OR METAL BEARING DEVICES

KG

13.63

30.66

81.08

31.34

156.71

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

249.55

847.08

553.83

412.62

2,063.08

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

374.32

1,270.62

830.75

618.92

3,094.61

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

374.32

1,270.62

635.39

570.08

2,850.41

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

623.87

2,117.70

783.98

881.39

4,406.94

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

534.74

1,815.17

730.91

770.21

3,851.03

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

935.80

3,176.55

1,021.28

1,283.41

6,417.04

407 h

PILE LOAD TEST UP TO 120 TON

EACH

14,181.84

19,990.40

69,433.80

25,901.51

129,507.55

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,537.92

19,990.40

138,867.60

46,848.98

234,244.90

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,528.24

19,990.40

208,301.40

67,705.01

338,525.05

407 k

CONFIRMATORY BORING (NX SIZE)

141.47

826.61

5.16

243.31

1,216.55

410

BRICK WORK

CM

228.58

142.50

2,046.30

604.35

3,021.73

411 a

STONE MASONRY RANDOM DRY

CM

239.18

56.01

447.19

185.60

927.98

Page 53 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (17) Gujranwala
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

284.37

84.89

1,147.43

379.17

1,895.86

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

329.75

56.01

497.50

220.82

1,104.08

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

375.12

84.89

1,208.58

417.15

2,085.74

411 g

ROLL POINTING

SM

49.08

5.78

45.31

25.04

125.21

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

495.69

134.30

1,137.20

441.80

2,208.99

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

152.58

230.36

364.89

186.96

934.79

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

149.04

297.19

469.93

229.04

1,145.20

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

145.30

514.83

579.70

309.96

1,549.79

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

152.54

639.81

869.60

415.49

2,077.44

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

175.95

704.13

1,174.64

513.68

2,568.40

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

218.35

868.93

1,770.71

714.50

3,572.49

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

282.57

961.94

2,216.07

865.15

4,325.73

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

332.27

1,168.07

3,093.91

1,148.56

5,742.81

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

394.68

1,362.74

4,691.20

1,612.16

8,060.78

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

152.58

263.77

385.49

200.46

1,002.30

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

149.04

297.19

502.73

237.24

1,186.20

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

141.92

514.83

605.94

315.67

1,578.36

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

152.54

639.81

929.55

430.48

2,152.38

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

175.95

704.13

1,640.60

630.17

3,150.85

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

218.35

868.93

2,233.19

830.12

4,150.59

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

282.57

961.94

2,845.83

1,022.59

5,112.93

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

332.27

1,168.07

3,719.87

1,305.05

6,525.26

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

394.68

1,362.74

5,123.28

1,720.18

8,600.88

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

58.96

68.08

237.18

91.06

455.28

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

511.94

309.47

2,358.84

795.06

3,975.31

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.63

75.81

19.86

99.30

Page 54 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (17) Gujranwala
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

64.23

420.00

121.06

605.29

508 a

BRICK PAVING (SINGLE COURSE)

SM

75.73

15.80

162.67

63.55

317.75

508 b

BRICK PAVING (DOUBLE COURSE)

SM

136.11

15.80

323.20

118.78

593.89

509 a

RIP RAP CLASS "A"

CM

328.60

375.81

176.10

880.51

509 b

RIP RAP CLASS "B"

CM

317.18

372.81

172.50

862.49

509 c

RIP RAP CLASS "C"

CM

319.70

375.81

173.88

869.39

509 d

GROUTED RIP RAP CLASS "A"

CM

382.73

35.09

1,362.44

445.07

2,225.33

509 e

GROUTED RIP RAP CLASS "B"

CM

369.64

28.07

1,257.31

413.76

2,068.78

509 f

GROUTED RIP RAP CLASS "C"

CM

365.42

23.39

1,278.91

416.93

2,084.65

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

536.72

181.56

2,719.76

859.51

4,297.55

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

32.48

115.89

328.98

119.34

596.69

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

74.18

194.57

67.19

335.94

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

102.67

35.01

61.07

49.69

248.44

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

131.42

44.81

78.17

63.60

318.00

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

167.72

91.01

230.06

122.20

610.99

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

209.65

113.77

287.58

152.75

763.75

603

BRICK EDGING

5.94

25.92

7.97

39.83

605 a

CONCRETE BEAM GUARDRAIL

50.73

14.67

419.73

121.28

606.41

605 c

CONCRETE POST FOR GUARDRAIL

62.29

13.10

415.57

122.74

613.70

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

160.96

128.42

4,674.99

1,241.09

6,205.46

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

47.54

192.63

6,834.48

1,768.66

8,843.31

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

160.96

272.87

8,442.48

2,219.08

11,095.39

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

526.82

304.65

15,517.01

4,087.12

20,435.60

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

105.36

60.93

6,999.66

1,791.49

8,957.44

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,027.18

317.76

1,588.78

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,540.77

446.15

2,230.76

Page 55 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (17) Gujranwala
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.78

2.85

15.38

5.00

25.01

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.59

1.27

30.30

8.04

40.20

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.78

2.85

20.53

6.29

31.45

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.59

1.27

40.41

10.57

52.84

EACH

52.03

148.63

50.17

250.83

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

52.03

381.78

108.45

542.26

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.22

3.56

21.40

6.80

33.98

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.22

4.75

51.71

14.67

73.35

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.22

3.56

28.52

8.58

42.88

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.22

4.75

68.95

18.98

94.90

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

52.03

206.59

64.66

323.28

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

52.03

652.07

176.03

880.13

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

42.92

99.09

35.50

177.51

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

42.92

254.90

74.46

372.28

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

42.92

137.73

45.16

225.81

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

42.92

435.37

119.57

597.86

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

6.33

46.68

167.52

55.13

275.66

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

6.33

46.68

202.52

63.88

319.41

610 b

RIGHT OF WAY MARKER

EACH

69.98

60.88

208.50

84.84

424.20

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

434.77

476.40

1,399.18

577.59

2,887.94

610 d

TEN KILOMETRE POST

EACH

839.16

952.79

3,051.12

1,210.77

6,053.84

Page 56 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (18) Gujrat
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.48

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.77

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

13.73

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.86

9.30

0.88

27.02

135.11

258.13

1.97

68.46

342.29

54.90

1,032.53

7.89

273.83

1,369.15

CM

1.64

59.42

15.27

76.33

COMPACTION OF NATURAL GROUND

SM

0.23

5.92

1.69

8.46

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.91

86.79

22.43

112.13

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

84.91

193.76

46.20

81.22

406.09

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

11.89

214.84

56.68

283.41

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.85

167.12

43.74

218.71

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.38

78.63

20.25

101.26

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

84.91

193.76

46.20

81.22

406.09

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

13.54

199.88

53.36

266.78

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

6.01

167.24

43.31

216.56

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.81

89.04

0.31

23.54

117.70

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

42.68

165.86

53.31

65.46

327.31

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

75.22

258.51

30.80

91.13

455.66

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

63.90

193.04

64.24

321.18

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

38.68

160.37

49.76

248.81

107 d

GRANULAR BACK FILL

CM

22.86

83.07

306.30

103.06

515.29

107 e

COMMON BACK FILL

CM

16.71

37.31

4.13

14.54

72.69

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.70

106.71

4.13

28.89

144.43

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

13.64

302.97

48.81

91.36

456.78

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

10.23

268.11

1.96

70.08

350.38

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

9.09

238.60

61.92

309.61

CM

5.37

112.14

31.08

155.40

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 57 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (18) Gujrat
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

4.19

46.31

4.13

13.66

68.29

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

9.72

73.87

2.45

21.51

107.55

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.94

16.84

1.18

4.74

23.70

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.67

10.31

0.63

2.90

14.51

110

IMPROVED SUB-GRADE

CM

6.70

75.50

47.26

32.37

161.83

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.56

9.38

0.64

2.65

13.23

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.84

9.92

0.74

2.88

14.38

201

GRANULAR SUB-BASE

CM

5.45

106.91

448.24

140.15

700.75

202

AGGREGATE BASE

CM

6.39

132.11

598.19

184.17

920.86

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

49.26

916.98

3,409.69

1,093.98

5,469.91

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

51.10

916.98

3,636.00

1,151.02

5,755.10

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

54.75

957.74

3,404.30

1,104.20

5,520.99

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

54.75

954.75

3,717.40

1,181.73

5,908.63

204 b

CEMENT STABILIZED BASE

CM

19.51

272.73

716.10

252.09

1,260.43

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

162.43

568.44

21,868.80

5,649.92

28,249.59

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

162.43

568.44

22,774.46

5,876.33

29,381.66

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

63.47

55.65

633.68

188.20

941.00

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

101.04

1,408.67

3,101.61

1,152.83

5,764.15

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

70.28

66.68

539.74

169.18

845.88

207 a

DEEP PATCHING (0-15 cm)

SM

1.15

30.14

1.02

8.08

40.39

207 b

DEEP PATCHING (16-30 cm)

SM

1.15

26.47

1.02

7.16

35.80

208

REINSTATEMENT OF ROAD SURFACE

SM

1.23

37.00

0.45

9.67

48.35

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.37

70.82

0.55

18.19

90.93

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.27

14.16

0.11

3.64

18.18

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.20

0.67

21.88

5.69

28.44

Page 58 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (18) Gujrat
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.19

0.67

21.88

5.69

28.43

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.64

2.49

12.45

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.11

2.36

11.79

304 a

SINGLE SURFACE TREATMENT

SM

0.52

4.16

43.31

12.00

59.99

304 b

DOUBLE SURFACE TREATMENT

SM

0.76

8.06

82.97

22.95

114.74

304 c

TRIPLE SURFACE TREATMENT

SM

1.28

11.08

99.23

27.90

139.49

304 d

SEAL COAT

SM

0.49

2.33

24.50

6.83

34.15

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

46.55

906.07

3,974.70

1,231.83

6,159.15

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

46.55

876.73

4,283.05

1,301.58

6,507.91

307 a

DENSE GRADED HOT BIT-MAC

CM

112.86

171.48

3,265.63

887.49

4,437.46

307 b

OPEN GRADED HOT BIT-MAC

CM

112.86

171.48

3,182.30

866.66

4,333.30

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

19.29

456.95

930.25

351.62

1,758.11

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

143.24

465.97

23,944.50

6,138.43

30,692.14

309 a

COLD MILLING, 0 - 30 mm

SM

0.64

16.87

7.54

6.26

31.31

309 b

COLD MILLING, 0 - 50 mm

SM

1.07

28.11

12.57

10.44

52.19

309 c

COLD MILLING, 0 - 70 mm

SM

1.61

42.16

18.85

15.66

78.28

401 ai

CONCRETE CLASS "A3" (Underground)

CM

349.99

643.62

3,098.93

1,023.14

5,115.68

401 aii CONCRETE CLASS "A3" (On ground)

CM

349.99

643.62

3,307.83

1,075.36

5,376.80

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

349.99

643.62

3,725.63

1,179.81

5,899.05

401 b

CONCRETE CLASS "B"

CM

452.93

407.09

2,339.44

799.87

3,999.33

401 ci

CONCRETE CLASS "C" (Underground)

CM

342.65

258.76

2,783.29

846.18

4,230.88

401 cii CONCRETE CLASS "C" (On ground)

CM

342.65

258.76

2,872.39

868.45

4,342.25

401 ciii CONCRETE CLASS "C" (Elevated)

CM

342.65

258.76

3,050.58

913.00

4,564.99

401 d

CONCRETE CLASS "D1"

CM

541.62

810.64

3,960.28

1,328.14

6,640.68

401 e

CONCRETE CLASS "Y"

CM

756.36

258.76

3,386.21

1,100.33

5,501.66

401 f

LEAN CONCRETE

CM

291.55

252.12

1,885.63

607.33

3,036.63

Page 59 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (18) Gujrat
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,160.97

468.57

3,893.82

1,380.84

6,904.20

401 gii PRECAST CONCRETE CLASS "B"

CM

1,160.97

468.57

3,507.45

1,284.25

6,421.24

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,050.76

42,568.47

10,904.81

54,524.04

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,050.76

44,668.47

11,429.81

57,149.04

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

861.14

2,335.68

37,396.01

10,148.21

50,741.04

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

2,031.81

6,882.66

84,745.53

23,415.00

117,075.00

405 b

LAUNCHING OF GIRDER

TON

47.94

403.69

112.91

564.54

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

76.97

185.36

65.58

327.91

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

76.97

194.08

67.76

338.81

406 c

STEEL EXPANSION JOINTS

KG

6.32

11.61

61.26

19.80

98.99

406 d

WATER STOPS 6" SIZE

62.95

309.51

93.12

465.58

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

27.88

1,411.38

359.82

1,799.08

406 g

STEEL OR METAL BEARING DEVICES

KG

13.80

30.66

81.56

31.51

157.53

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

255.70

847.08

548.23

412.75

2,063.76

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

383.56

1,270.62

822.35

619.13

3,095.66

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

383.56

1,270.62

626.99

570.29

2,851.46

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

639.26

2,117.70

769.98

881.74

4,408.68

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

547.94

1,815.17

718.91

770.51

3,852.53

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

958.89

3,176.55

1,000.28

1,283.93

6,419.65

407 h

PILE LOAD TEST UP TO 120 TON

EACH

14,326.74

19,990.40

72,541.08

26,714.56

133,572.78

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,583.46

19,990.40

145,082.16

48,414.01

242,070.03

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,673.14

19,990.40

217,623.24

70,071.70

350,358.48

407 k

CONFIRMATORY BORING (NX SIZE)

143.54

826.61

5.16

243.83

1,219.14

410

BRICK WORK

CM

221.09

142.50

2,121.13

621.18

3,105.90

411 a

STONE MASONRY RANDOM DRY

CM

232.10

56.01

422.34

177.61

888.06

Page 60 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (18) Gujrat
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

276.28

84.89

1,153.27

378.61

1,893.05

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

319.63

56.01

470.67

211.58

1,057.89

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

362.98

84.89

1,205.21

413.27

2,066.35

411 g

ROLL POINTING

SM

47.11

5.78

45.84

24.68

123.41

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

422.16

134.30

1,098.44

413.73

2,068.63

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

152.58

230.36

365.89

187.21

936.04

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

148.78

297.19

471.13

229.28

1,146.38

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

145.62

514.83

581.09

310.39

1,551.93

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

152.83

639.81

871.22

415.97

2,079.83

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

176.94

704.13

1,176.26

514.33

2,571.66

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

219.95

868.93

1,773.07

715.49

3,577.44

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

284.64

961.94

2,218.44

866.26

4,331.28

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

335.51

1,168.07

3,096.79

1,150.09

5,750.46

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

397.62

1,362.74

4,694.56

1,613.73

8,068.65

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

152.58

263.77

387.37

200.93

1,004.65

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

148.78

297.19

503.93

237.48

1,187.38

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

142.24

514.83

607.33

316.10

1,580.50

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

152.83

639.81

930.81

430.86

2,154.31

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

176.94

704.13

1,642.43

630.88

3,154.38

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

219.95

868.93

2,235.55

831.11

4,155.54

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

284.64

961.94

2,848.20

1,023.70

5,118.48

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

335.51

1,168.07

3,722.76

1,306.59

6,532.93

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

397.62

1,362.74

5,126.65

1,721.75

8,608.76

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

59.80

68.08

279.55

101.86

509.29

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

508.95

309.47

2,391.88

802.58

4,012.88

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.62

76.80

20.11

100.53

Page 61 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (18) Gujrat
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

64.74

408.33

118.27

591.34

508 a

BRICK PAVING (SINGLE COURSE)

SM

73.96

15.80

170.09

64.96

324.81

508 b

BRICK PAVING (DOUBLE COURSE)

SM

132.31

15.80

337.68

121.45

607.24

509 a

RIP RAP CLASS "A"

CM

319.63

350.96

167.65

838.24

509 b

RIP RAP CLASS "B"

CM

308.38

348.15

164.13

820.66

509 c

RIP RAP CLASS "C"

CM

310.34

350.96

165.33

826.63

509 d

GROUTED RIP RAP CLASS "A"

CM

342.94

28.07

1,193.49

391.13

1,955.63

509 e

GROUTED RIP RAP CLASS "B"

CM

342.94

28.07

1,193.49

391.13

1,955.63

509 f

GROUTED RIP RAP CLASS "C"

CM

338.44

23.39

1,212.95

393.70

1,968.48

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

527.49

181.56

2,753.22

865.57

4,327.84

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

32.71

115.89

306.47

113.77

568.84

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

75.19

194.57

67.44

337.20

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

100.46

35.01

57.03

48.13

240.63

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

128.59

44.81

73.00

61.60

308.00

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

163.27

91.01

232.98

121.82

609.08

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

204.08

113.77

291.23

152.27

761.35

603

BRICK EDGING

5.87

26.88

8.19

40.94

605 a

CONCRETE BEAM GUARDRAIL

50.00

14.67

420.77

121.36

606.80

605 c

CONCRETE POST FOR GUARDRAIL

61.39

13.10

416.85

122.84

614.18

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

160.13

128.42

4,675.58

1,241.03

6,205.16

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

46.02

192.63

6,841.34

1,770.00

8,849.99

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

160.13

272.87

8,454.83

2,221.96

11,109.79

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

523.55

304.65

15,536.23

4,091.11

20,455.54

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

104.71

60.93

7,004.35

1,792.50

8,962.49

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,027.43

317.82

1,589.09

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,541.15

446.25

2,231.24

Page 62 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (18) Gujrat
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.77

2.85

15.38

5.00

25.00

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.59

1.27

30.30

8.04

40.20

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.77

2.85

20.53

6.29

31.44

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.59

1.27

40.41

10.57

52.84

EACH

49.67

148.65

49.58

247.90

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

49.67

381.78

107.86

539.31

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.21

3.56

21.40

6.79

33.96

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.21

4.75

51.71

14.67

73.34

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.21

3.56

28.53

8.58

42.88

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.21

4.75

68.95

18.98

94.89

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

49.67

206.61

64.07

320.35

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

49.67

652.07

175.44

877.18

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

41.16

99.10

35.07

175.33

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

41.16

254.90

74.02

370.08

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

41.16

137.74

44.73

223.63

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

41.16

435.37

119.13

595.66

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

6.08

46.68

167.56

55.08

275.40

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

6.08

46.68

202.56

63.83

319.15

610 b

RIGHT OF WAY MARKER

EACH

69.61

60.88

209.63

85.03

425.15

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

425.15

476.40

1,408.28

577.46

2,887.29

610 d

TEN KILOMETRE POST

EACH

821.95

952.79

3,069.66

1,211.10

6,055.50

Page 63 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (200A) Hafizabad
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.48

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.77

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

13.73

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.86

9.30

0.88

27.02

135.11

258.13

1.97

68.46

342.29

54.90

1,032.53

7.89

273.83

1,369.15

CM

1.62

59.42

15.26

76.30

COMPACTION OF NATURAL GROUND

SM

0.23

5.92

1.69

8.46

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.91

86.79

22.43

112.13

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

85.01

193.76

46.20

81.24

406.21

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

11.85

214.84

56.67

283.36

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.79

167.12

43.73

218.64

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.38

78.63

20.25

101.26

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

85.01

193.76

46.20

81.24

406.21

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

13.57

199.88

53.36

266.81

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.98

167.24

43.31

216.53

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.75

89.04

0.31

23.53

117.63

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

41.33

165.86

53.31

65.13

325.63

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

75.38

258.51

30.80

91.17

455.86

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

64.05

193.04

64.27

321.36

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

38.77

160.37

49.79

248.93

107 d

GRANULAR BACK FILL

CM

22.91

83.07

300.49

101.62

508.09

107 e

COMMON BACK FILL

CM

16.71

37.31

4.13

14.54

72.69

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.66

106.71

4.13

28.88

144.38

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

13.57

302.97

48.81

91.34

456.69

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

10.18

268.11

1.96

70.06

350.31

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

9.05

238.60

61.91

309.56

CM

5.33

112.14

31.07

155.35

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 64 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (200A) Hafizabad
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

4.15

46.31

4.13

13.65

68.24

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

9.63

73.87

2.45

21.49

107.44

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.93

16.84

1.18

4.74

23.69

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.66

10.31

0.63

2.90

14.50

110

IMPROVED SUB-GRADE

CM

6.67

75.50

47.95

32.53

162.65

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.55

9.38

0.64

2.64

13.21

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.83

9.92

0.74

2.87

14.36

201

GRANULAR SUB-BASE

CM

5.42

106.91

429.67

135.50

677.50

202

AGGREGATE BASE

CM

6.42

132.11

556.42

173.74

868.69

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

49.14

916.98

3,380.59

1,086.68

5,433.39

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

50.98

916.98

3,601.88

1,142.46

5,712.30

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

54.49

957.74

3,375.19

1,096.86

5,484.28

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

54.49

954.75

3,683.35

1,173.15

5,865.74

204 b

CEMENT STABILIZED BASE

CM

19.58

272.73

693.83

246.54

1,232.68

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

160.18

568.44

21,817.80

5,636.61

28,183.03

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

160.18

568.44

22,721.62

5,862.56

29,312.80

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

63.32

55.65

589.42

177.10

885.49

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

100.50

1,408.67

3,054.93

1,141.03

5,705.13

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

70.23

66.68

477.14

153.51

767.56

207 a

DEEP PATCHING (0-15 cm)

SM

1.14

30.14

1.02

8.08

40.38

207 b

DEEP PATCHING (16-30 cm)

SM

1.14

26.47

1.02

7.16

35.79

208

REINSTATEMENT OF ROAD SURFACE

SM

1.24

37.00

0.45

9.67

48.36

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.33

70.82

0.55

18.18

90.88

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.27

14.16

0.11

3.64

18.18

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.20

0.67

21.82

5.67

28.36

Page 65 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (200A) Hafizabad
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.19

0.67

21.82

5.67

28.35

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.62

2.49

12.43

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.09

2.35

11.76

304 a

SINGLE SURFACE TREATMENT

SM

0.52

4.16

42.99

11.92

59.59

304 b

DOUBLE SURFACE TREATMENT

SM

0.76

8.06

82.03

22.71

113.56

304 c

TRIPLE SURFACE TREATMENT

SM

1.27

11.08

97.96

27.58

137.89

304 d

SEAL COAT

SM

0.49

2.33

24.45

6.82

34.09

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

46.40

906.07

3,943.80

1,224.07

6,120.34

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

46.40

876.73

4,252.46

1,293.90

6,469.49

307 a

DENSE GRADED HOT BIT-MAC

CM

112.86

171.48

3,243.92

882.07

4,410.33

307 b

OPEN GRADED HOT BIT-MAC

CM

112.86

171.48

3,149.83

858.54

4,292.71

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

19.29

456.95

921.03

349.32

1,746.59

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

140.98

465.97

23,893.50

6,125.11

30,625.56

309 a

COLD MILLING, 0 - 30 mm

SM

0.64

16.87

7.54

6.26

31.31

309 b

COLD MILLING, 0 - 50 mm

SM

1.07

28.11

12.57

10.44

52.19

309 c

COLD MILLING, 0 - 70 mm

SM

1.61

42.16

18.85

15.66

78.28

401 ai

CONCRETE CLASS "A3" (Underground)

CM

335.19

643.62

3,092.94

1,017.94

5,089.69

401 aii CONCRETE CLASS "A3" (On ground)

CM

335.19

643.62

3,301.84

1,070.16

5,350.81

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

335.19

643.62

3,719.64

1,174.61

5,873.06

401 b

CONCRETE CLASS "B"

CM

441.46

407.09

2,316.72

791.32

3,956.59

401 ci

CONCRETE CLASS "C" (Underground)

CM

328.65

258.76

2,761.42

837.21

4,186.04

401 cii CONCRETE CLASS "C" (On ground)

CM

328.65

258.76

2,850.52

859.48

4,297.41

401 ciii CONCRETE CLASS "C" (Elevated)

CM

328.65

258.76

3,028.71

904.03

4,520.15

401 d

CONCRETE CLASS "D1"

CM

513.30

810.64

3,948.42

1,318.09

6,590.45

401 e

CONCRETE CLASS "Y"

CM

714.57

258.76

3,384.89

1,089.56

5,447.78

401 f

LEAN CONCRETE

CM

285.81

252.12

1,864.37

600.58

3,002.88

Page 66 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (200A) Hafizabad
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,117.53

468.57

3,889.42

1,368.88

6,844.40

401 gii PRECAST CONCRETE CLASS "B"

CM

1,117.53

468.57

3,481.08

1,266.80

6,333.98

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

996.68

42,565.00

10,890.42

54,452.10

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

996.68

44,665.00

11,415.42

57,077.10

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

837.24

2,335.68

37,038.29

10,052.80

50,264.01

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

2,042.79

6,882.66

80,753.29

22,419.69

112,098.43

405 b

LAUNCHING OF GIRDER

TON

48.16

403.69

112.96

564.81

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

74.23

185.35

64.90

324.48

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

74.23

194.06

67.07

335.36

406 c

STEEL EXPANSION JOINTS

KG

6.20

11.61

60.71

19.63

98.15

406 d

WATER STOPS 6" SIZE

60.25

309.52

92.44

462.21

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

26.65

1,411.63

359.57

1,797.85

406 g

STEEL OR METAL BEARING DEVICES

KG

14.06

30.66

81.07

31.45

157.24

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

256.79

847.08

558.00

415.47

2,077.34

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

385.19

1,270.62

837.00

623.20

3,116.01

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

385.19

1,270.62

641.64

574.36

2,871.81

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

641.98

2,117.70

794.39

888.52

4,442.59

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

550.27

1,815.17

739.84

776.32

3,881.60

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

962.97

3,176.55

1,036.90

1,294.11

6,470.53

407 h

PILE LOAD TEST UP TO 120 TON

EACH

14,356.02

19,990.40

70,987.00

26,333.36

131,666.78

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,583.46

19,990.40

141,974.00

47,636.97

238,184.83

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,702.42

19,990.40

212,961.00

68,913.46

344,567.28

407 k

CONFIRMATORY BORING (NX SIZE)

144.15

826.61

5.16

243.98

1,219.90

410

BRICK WORK

CM

210.01

142.50

2,080.20

608.18

3,040.89

411 a

STONE MASONRY RANDOM DRY

CM

221.28

56.01

430.06

176.84

884.19

Page 67 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (200A) Hafizabad
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

264.11

84.89

1,172.68

380.42

1,902.10

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

304.76

56.01

479.01

209.95

1,049.73

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

345.40

84.89

1,221.86

413.04

2,065.19

411 g

ROLL POINTING

SM

44.41

5.78

46.02

24.05

120.26

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

458.88

134.30

1,150.49

435.92

2,179.59

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

150.89

230.36

366.22

186.87

934.34

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

147.09

297.19

471.52

228.95

1,144.75

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

143.83

514.83

581.55

310.05

1,550.26

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

151.21

639.81

871.76

415.70

2,078.48

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

175.32

704.13

1,176.80

514.06

2,570.31

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

217.83

868.93

1,773.84

715.15

3,575.75

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

281.89

961.94

2,219.18

865.75

4,328.76

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

333.14

1,168.07

3,097.69

1,149.73

5,748.63

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

393.72

1,362.74

4,695.61

1,613.02

8,065.09

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

150.89

263.77

388.13

200.70

1,003.49

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

147.09

297.19

504.32

237.15

1,185.75

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

140.46

514.83

607.79

315.77

1,578.85

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

151.21

639.81

931.23

430.56

2,152.81

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

175.32

704.13

1,643.00

630.61

3,153.06

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

217.83

868.93

2,236.32

830.77

4,153.85

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

281.89

961.94

2,848.94

1,023.19

5,115.96

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

333.14

1,168.07

3,723.66

1,306.22

6,531.09

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

393.72

1,362.74

5,127.70

1,721.04

8,605.20

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

59.58

68.08

258.36

96.51

482.53

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

492.97

309.47

2,368.95

792.85

3,964.24

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.50

75.81

19.83

99.14

Page 68 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (200A) Hafizabad
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

64.51

414.17

119.67

598.35

508 a

BRICK PAVING (SINGLE COURSE)

SM

71.12

15.80

163.56

62.62

313.10

508 b

BRICK PAVING (DOUBLE COURSE)

SM

126.77

15.80

324.79

116.84

584.20

509 a

RIP RAP CLASS "A"

CM

305.77

358.69

166.12

830.58

509 b

RIP RAP CLASS "B"

CM

295.13

355.82

162.74

813.69

509 c

RIP RAP CLASS "C"

CM

296.59

358.69

163.82

819.10

509 d

GROUTED RIP RAP CLASS "A"

CM

321.96

35.09

1,346.61

425.92

2,129.58

509 e

GROUTED RIP RAP CLASS "B"

CM

309.95

28.07

1,241.47

394.87

1,974.36

509 f

GROUTED RIP RAP CLASS "C"

CM

305.54

23.39

1,263.09

398.01

1,990.03

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

510.48

181.56

2,729.17

855.30

4,276.51

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

32.51

115.89

300.56

112.24

561.20

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

75.19

194.57

67.44

337.20

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

96.66

35.01

58.29

47.49

237.45

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

123.72

44.81

74.61

60.79

303.93

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

156.24

91.01

234.80

120.51

602.56

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

195.30

113.77

293.50

150.64

753.21

603

BRICK EDGING

5.70

25.92

7.91

39.53

605 a

CONCRETE BEAM GUARDRAIL

48.74

14.67

420.62

121.01

605.04

605 c

CONCRETE POST FOR GUARDRAIL

59.85

13.10

416.69

122.41

612.05

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

156.73

128.42

4,670.21

1,238.84

6,194.20

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

43.99

192.63

6,836.28

1,768.23

8,841.13

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

156.73

272.87

8,446.59

2,219.05

11,095.24

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

515.74

304.65

15,487.94

4,077.08

20,385.41

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

103.15

60.93

6,994.75

1,789.71

8,948.54

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,027.45

317.82

1,589.11

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,541.18

446.26

2,231.28

Page 69 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (200A) Hafizabad
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.63

2.85

15.38

4.97

24.83

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.54

1.27

30.31

8.03

40.15

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.63

2.85

20.53

6.25

31.26

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.54

1.27

40.43

10.56

52.80

EACH

45.14

148.65

48.45

242.24

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

45.14

381.97

106.78

533.89

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.04

3.56

21.40

6.75

33.75

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.04

4.75

51.71

14.63

73.13

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.04

3.56

28.53

8.53

42.66

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.04

4.75

68.95

18.94

94.68

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

45.14

206.61

62.94

314.69

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

45.14

652.07

174.30

871.51

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

37.44

99.10

34.14

170.68

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

37.44

255.03

73.12

365.59

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

37.44

137.74

43.80

218.98

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

37.44

435.37

118.20

591.01

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

5.74

46.68

167.57

55.00

274.99

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

5.74

46.68

202.57

63.75

318.74

610 b

RIGHT OF WAY MARKER

EACH

68.65

60.88

209.50

84.76

423.79

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

409.60

476.40

1,408.49

573.62

2,868.11

610 d

TEN KILOMETRE POST

EACH

793.56

952.79

3,067.60

1,203.49

6,017.44

Page 70 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (22) Jhang
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.46

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.51

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

13.15

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.86

9.28

0.88

26.96

134.79

258.13

1.97

68.31

341.56

52.59

1,032.53

7.89

273.25

1,366.26

CM

1.54

59.42

15.24

76.20

COMPACTION OF NATURAL GROUND

SM

0.22

5.92

1.69

8.45

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.54

86.79

22.33

111.66

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

76.94

193.76

46.20

79.23

396.13

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

10.93

214.84

56.44

282.21

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.20

167.12

43.58

217.90

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.07

78.63

20.18

100.88

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

76.94

193.76

46.20

79.23

396.13

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

12.25

199.88

53.03

265.16

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.51

167.24

43.19

215.94

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.29

89.04

0.31

23.41

117.05

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

39.89

165.86

53.31

64.77

323.83

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

68.04

258.51

30.80

89.34

446.69

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

57.95

193.04

62.75

313.74

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

34.99

160.37

48.84

244.20

107 d

GRANULAR BACK FILL

CM

21.41

83.07

289.48

98.49

492.45

107 e

COMMON BACK FILL

CM

16.26

37.31

4.13

14.43

72.13

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.26

106.71

4.13

28.78

143.88

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

12.58

302.97

48.81

91.09

455.45

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

9.44

268.11

1.96

69.88

349.39

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

8.39

238.60

61.75

308.74

CM

4.93

112.14

30.97

154.85

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 71 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (22) Jhang
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

3.82

46.31

4.13

13.57

67.83

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

9.04

73.87

2.45

21.34

106.70

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.86

16.84

1.18

4.72

23.60

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.61

10.31

0.63

2.89

14.44

110

IMPROVED SUB-GRADE

CM

6.16

75.50

52.06

33.43

167.15

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.52

9.38

0.64

2.64

13.18

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.78

9.92

0.74

2.86

14.30

201

GRANULAR SUB-BASE

CM

4.99

106.91

459.23

142.78

713.91

202

AGGREGATE BASE

CM

5.71

132.11

556.42

173.56

867.80

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

46.99

916.98

3,354.69

1,079.67

5,398.33

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

48.59

916.98

3,599.00

1,141.14

5,705.71

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

52.06

957.74

3,349.54

1,089.84

5,449.18

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

52.06

954.75

3,681.54

1,172.09

5,860.44

204 b

CEMENT STABILIZED BASE

CM

17.68

272.73

601.82

223.06

1,115.29

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

149.47

568.44

22,174.80

5,723.18

28,615.89

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

149.47

568.44

23,086.55

5,951.12

29,755.58

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

62.27

55.65

589.45

176.84

884.21

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

94.69

1,408.67

3,058.73

1,140.52

5,702.61

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

69.09

66.68

509.35

161.28

806.40

207 a

DEEP PATCHING (0-15 cm)

SM

1.06

30.14

1.02

8.06

40.28

207 b

DEEP PATCHING (16-30 cm)

SM

1.06

26.47

1.02

7.14

35.69

208

REINSTATEMENT OF ROAD SURFACE

SM

1.11

37.00

0.45

9.64

48.20

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.23

70.82

0.55

18.15

90.75

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.25

14.16

0.11

3.63

18.15

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.18

0.67

22.18

5.76

28.79

Page 72 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (22) Jhang
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.18

0.67

22.18

5.76

28.79

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.76

2.52

12.59

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.23

2.39

11.93

304 a

SINGLE SURFACE TREATMENT

SM

0.47

4.16

43.56

12.05

60.24

304 b

DOUBLE SURFACE TREATMENT

SM

0.69

8.06

83.26

23.00

115.01

304 c

TRIPLE SURFACE TREATMENT

SM

1.15

11.08

99.30

27.88

139.41

304 d

SEAL COAT

SM

0.44

2.33

24.49

6.82

34.08

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

43.89

906.07

3,940.29

1,222.56

6,112.81

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

43.89

876.73

4,246.95

1,291.89

6,459.46

307 a

DENSE GRADED HOT BIT-MAC

CM

106.87

171.48

3,229.13

876.87

4,384.35

307 b

OPEN GRADED HOT BIT-MAC

CM

106.87

171.48

3,157.98

859.08

4,295.41

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

17.98

456.95

929.43

351.09

1,755.45

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

132.83

465.97

24,250.50

6,212.33

31,061.63

309 a

COLD MILLING, 0 - 30 mm

SM

0.58

16.87

7.54

6.25

31.24

309 b

COLD MILLING, 0 - 50 mm

SM

0.97

28.11

12.57

10.41

52.06

309 c

COLD MILLING, 0 - 70 mm

SM

1.46

42.16

18.85

15.62

78.09

401 ai

CONCRETE CLASS "A3" (Underground)

CM

326.74

643.62

3,048.05

1,004.60

5,023.01

401 aii CONCRETE CLASS "A3" (On ground)

CM

326.74

643.62

3,256.95

1,056.83

5,284.14

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

326.74

643.62

3,674.75

1,161.28

5,806.39

401 b

CONCRETE CLASS "B"

CM

422.50

407.09

2,325.68

788.82

3,944.09

401 ci

CONCRETE CLASS "C" (Underground)

CM

323.94

258.76

2,741.94

831.16

4,155.80

401 cii CONCRETE CLASS "C" (On ground)

CM

323.94

258.76

2,831.04

853.44

4,267.18

401 ciii CONCRETE CLASS "C" (Elevated)

CM

323.94

258.76

3,009.23

897.98

4,489.91

401 d

CONCRETE CLASS "D1"

CM

509.33

810.64

3,914.16

1,308.53

6,542.66

401 e

CONCRETE CLASS "Y"

CM

718.83

258.76

3,325.92

1,075.88

5,379.39

401 f

LEAN CONCRETE

CM

280.58

252.12

1,873.20

601.48

3,007.38

Page 73 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (22) Jhang
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,110.64

468.57

3,835.58

1,353.70

6,768.49

401 gii PRECAST CONCRETE CLASS "B"

CM

1,110.64

468.57

3,490.20

1,267.35

6,336.76

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

980.21

42,564.98

10,886.30

54,431.49

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

980.21

44,664.98

11,411.30

57,056.49

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

813.97

2,335.68

37,036.41

10,046.52

50,232.58

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,895.98

6,882.66

80,746.45

22,381.27

111,906.36

405 b

LAUNCHING OF GIRDER

TON

45.10

403.69

112.20

560.99

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

72.79

187.63

65.11

325.53

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

72.79

196.34

67.28

336.41

406 c

STEEL EXPANSION JOINTS

KG

6.10

11.61

60.61

19.58

97.90

406 d

WATER STOPS 6" SIZE

59.09

308.57

91.92

459.58

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

26.38

1,412.25

359.66

1,798.29

406 g

STEEL OR METAL BEARING DEVICES

KG

13.30

30.66

80.95

31.23

156.14

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

242.87

847.08

555.96

411.48

2,057.39

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

364.31

1,270.62

833.95

617.22

3,086.10

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

364.31

1,270.62

638.59

568.38

2,841.90

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

607.18

2,117.70

789.31

878.55

4,392.74

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

520.44

1,815.17

735.48

767.77

3,838.86

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

910.77

3,176.55

1,029.28

1,279.15

6,395.75

407 h

PILE LOAD TEST UP TO 120 TON

EACH

13,360.38

19,990.40

67,879.72

25,307.63

126,538.13

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,492.38

19,990.40

135,759.44

46,060.56

230,302.78

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,383.58

19,990.40

203,639.16

66,503.29

332,516.43

407 k

CONFIRMATORY BORING (NX SIZE)

139.40

826.61

5.16

242.79

1,213.96

410

BRICK WORK

CM

213.78

142.50

2,085.84

610.53

3,052.65

411 a

STONE MASONRY RANDOM DRY

CM

223.92

56.01

417.09

174.26

871.28

Page 74 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (22) Jhang
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

267.42

84.89

1,166.76

379.77

1,898.84

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

309.42

56.01

465.00

207.61

1,038.04

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

351.42

84.89

1,213.15

412.37

2,061.83

411 g

ROLL POINTING

SM

45.66

5.78

46.14

24.40

121.98

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

466.92

134.30

1,141.77

435.75

2,178.74

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

149.02

230.36

366.44

186.46

932.28

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

145.73

297.19

471.79

228.68

1,143.39

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

140.55

514.83

581.86

309.31

1,546.55

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

148.23

639.81

872.12

415.04

2,075.20

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

170.94

704.13

1,177.16

513.06

2,565.29

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

211.49

868.93

1,774.36

713.70

3,568.48

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

273.70

961.94

2,219.70

863.84

4,319.18

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

322.71

1,168.07

3,098.32

1,147.28

5,736.38

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

382.43

1,362.74

4,696.35

1,610.38

8,051.90

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

149.02

263.77

388.57

200.34

1,001.70

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

145.73

297.19

504.59

236.88

1,184.39

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

137.36

514.83

608.10

315.07

1,575.36

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

148.23

639.81

931.51

429.89

2,149.44

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

170.94

704.13

1,643.40

629.62

3,148.09

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

211.49

868.93

2,236.84

829.32

4,146.58

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

273.70

961.94

2,849.46

1,021.28

5,106.38

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

322.71

1,168.07

3,724.29

1,303.77

6,518.84

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

382.43

1,362.74

5,128.43

1,718.40

8,592.00

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

57.54

68.08

215.99

85.40

427.01

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

475.26

309.47

2,377.90

790.66

3,953.29

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.41

75.81

19.81

99.03

Page 75 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (22) Jhang
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

63.15

379.17

110.58

552.90

508 a

BRICK PAVING (SINGLE COURSE)

SM

71.75

15.80

161.79

62.34

311.68

508 b

BRICK PAVING (DOUBLE COURSE)

SM

128.75

15.80

321.61

116.54

582.70

509 a

RIP RAP CLASS "A"

CM

309.72

345.71

163.86

819.29

509 b

RIP RAP CLASS "B"

CM

299.37

342.95

160.58

802.90

509 c

RIP RAP CLASS "C"

CM

301.48

345.71

161.80

808.99

509 d

GROUTED RIP RAP CLASS "A"

CM

326.38

35.09

1,337.23

424.68

2,123.38

509 e

GROUTED RIP RAP CLASS "B"

CM

315.10

28.07

1,231.83

393.75

1,968.75

509 f

GROUTED RIP RAP CLASS "C"

CM

311.18

23.39

1,253.58

397.04

1,985.19

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

506.86

181.56

2,737.62

856.51

4,282.55

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

31.72

115.89

289.33

109.24

546.18

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

73.16

194.57

66.93

334.66

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

97.06

35.01

56.18

47.06

235.31

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

124.23

44.81

71.91

60.24

301.19

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

157.83

91.01

233.13

120.49

602.46

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

197.29

113.77

291.42

150.62

753.10

603

BRICK EDGING

5.66

25.92

7.90

39.48

605 a

CONCRETE BEAM GUARDRAIL

48.80

14.67

418.41

120.47

602.35

605 c

CONCRETE POST FOR GUARDRAIL

59.92

13.10

413.97

121.75

608.74

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

153.44

128.42

4,672.52

1,238.60

6,192.98

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

44.25

192.63

6,841.06

1,769.49

8,847.43

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

153.44

272.87

8,454.46

2,220.19

11,100.96

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

512.17

304.65

15,538.34

4,088.79

20,443.95

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

102.43

60.93

7,007.96

1,792.83

8,964.15

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,028.39

318.06

1,590.29

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,542.59

446.61

2,233.04

Page 76 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (22) Jhang
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.56

2.85

15.39

4.95

24.75

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.52

1.27

30.37

8.04

40.20

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.56

2.85

20.54

6.24

31.19

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.52

1.27

40.51

10.58

52.88

EACH

42.16

148.72

47.72

238.60

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

46.16

382.77

107.23

536.16

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

1.95

3.56

21.41

6.73

33.65

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

1.95

4.75

51.71

14.60

73.01

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

1.95

3.56

28.54

8.51

42.56

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

1.95

4.75

68.95

18.91

94.56

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

46.16

206.68

63.21

316.05

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

46.16

652.07

174.56

872.79

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

38.06

99.15

34.30

171.51

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

38.06

255.56

73.41

367.03

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

38.06

137.79

43.96

219.81

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

38.06

435.37

118.36

591.79

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

5.77

46.68

167.58

55.01

275.04

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

5.77

46.68

202.58

63.76

318.79

610 b

RIGHT OF WAY MARKER

EACH

68.20

60.88

207.15

84.06

420.29

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

412.95

476.40

1,389.70

569.76

2,848.81

610 d

TEN KILOMETRE POST

EACH

798.91

952.79

3,029.27

1,195.24

5,976.21

Page 77 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (23) Jhelum
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.48

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.77

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

13.73

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.86

9.30

0.88

27.02

135.11

258.13

1.97

68.46

342.29

54.90

1,032.53

7.89

273.83

1,369.15

CM

1.64

59.42

15.27

76.33

COMPACTION OF NATURAL GROUND

SM

0.23

5.92

1.69

8.46

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.91

86.79

22.43

112.13

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

85.33

193.76

46.20

81.32

406.61

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

11.93

214.84

56.69

283.46

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.87

167.12

43.75

218.74

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.38

78.63

20.25

101.26

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

85.33

193.76

46.20

81.32

406.61

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

13.61

199.88

53.37

266.86

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

6.03

167.24

43.32

216.59

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.79

89.04

0.31

23.54

117.68

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

42.18

165.86

53.31

65.34

326.69

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

75.62

258.51

30.80

91.23

456.16

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

64.26

193.04

64.33

321.63

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

38.89

160.37

49.82

249.08

107 d

GRANULAR BACK FILL

CM

22.91

83.07

297.15

100.78

503.91

107 e

COMMON BACK FILL

CM

16.71

37.31

4.13

14.54

72.69

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.70

106.71

4.13

28.89

144.43

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

13.65

302.97

48.81

91.36

456.79

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

10.24

268.11

1.96

70.08

350.39

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

9.10

238.60

61.93

309.63

CM

5.36

112.14

31.08

155.39

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 78 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (23) Jhelum
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

4.19

46.31

4.13

13.66

68.29

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

9.70

73.87

2.45

21.51

107.53

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.94

16.84

1.18

4.74

23.70

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.67

10.31

0.63

2.90

14.51

110

IMPROVED SUB-GRADE

CM

6.70

75.50

54.33

34.13

170.66

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.56

9.38

0.64

2.65

13.23

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.84

9.92

0.74

2.88

14.38

201

GRANULAR SUB-BASE

CM

5.45

106.91

391.76

126.03

630.15

202

AGGREGATE BASE

CM

6.42

132.11

556.42

173.74

868.69

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

49.22

916.98

3,360.78

1,081.75

5,408.73

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

51.05

916.98

3,588.53

1,139.14

5,695.70

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

54.65

957.74

3,355.43

1,091.96

5,459.78

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

54.65

954.75

3,670.10

1,169.88

5,849.38

204 b

CEMENT STABILIZED BASE

CM

19.58

272.73

663.22

238.88

1,194.41

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

161.59

568.44

21,817.80

5,636.96

28,184.79

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

161.59

568.44

22,717.33

5,861.84

29,309.20

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

63.43

55.65

589.45

177.13

885.66

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

100.84

1,408.67

3,048.24

1,139.44

5,697.19

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

70.29

66.68

478.56

153.88

769.41

207 a

DEEP PATCHING (0-15 cm)

SM

1.15

30.14

1.02

8.08

40.39

207 b

DEEP PATCHING (16-30 cm)

SM

1.15

26.47

1.02

7.16

35.80

208

REINSTATEMENT OF ROAD SURFACE

SM

1.24

37.00

0.45

9.67

48.36

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.35

70.82

0.55

18.18

90.90

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.27

14.16

0.11

3.64

18.18

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.20

0.67

21.82

5.67

28.36

Page 79 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (23) Jhelum
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.19

0.67

21.82

5.67

28.35

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.62

2.49

12.43

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.09

2.35

11.76

304 a

SINGLE SURFACE TREATMENT

SM

0.52

4.16

42.93

11.90

59.51

304 b

DOUBLE SURFACE TREATMENT

SM

0.76

8.06

81.98

22.70

113.50

304 c

TRIPLE SURFACE TREATMENT

SM

1.28

11.08

97.87

27.56

137.79

304 d

SEAL COAT

SM

0.49

2.33

24.35

6.79

33.96

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

46.49

906.07

3,927.35

1,219.98

6,099.89

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

46.49

876.73

4,233.62

1,289.21

6,446.05

307 a

DENSE GRADED HOT BIT-MAC

CM

112.86

171.48

3,223.85

877.05

4,385.24

307 b

OPEN GRADED HOT BIT-MAC

CM

112.86

171.48

3,138.68

855.76

4,278.78

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

19.29

456.95

921.03

349.32

1,746.59

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

142.39

465.97

23,893.50

6,125.47

30,627.33

309 a

COLD MILLING, 0 - 30 mm

SM

0.64

16.87

7.54

6.26

31.31

309 b

COLD MILLING, 0 - 50 mm

SM

1.07

28.11

12.57

10.44

52.19

309 c

COLD MILLING, 0 - 70 mm

SM

1.61

42.16

18.85

15.66

78.28

401 ai

CONCRETE CLASS "A3" (Underground)

CM

344.68

643.62

2,994.29

995.65

4,978.24

401 aii CONCRETE CLASS "A3" (On ground)

CM

344.68

643.62

3,203.19

1,047.87

5,239.36

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

344.68

643.62

3,621.00

1,152.33

5,761.63

401 b

CM

448.96

407.09

2,228.55

771.15

3,855.75

401 c1 CONCRETE CLASS "C" (Underground)

CM

337.56

258.76

2,668.88

816.30

4,081.50

401 c2 CONCRETE CLASS "C" (On ground)

CM

337.56

258.76

2,757.97

838.57

4,192.86

401 c3 CONCRETE CLASS "C" (Elevated)

CM

337.56

258.76

2,936.17

883.12

4,415.61

401 d

CONCRETE CLASS "D1"

CM

531.23

810.64

3,861.18

1,300.76

6,503.81

401 e

CONCRETE CLASS "Y"

CM

740.82

258.76

3,289.32

1,072.23

5,361.13

401 f

LEAN CONCRETE

CM

289.56

252.12

1,776.10

579.45

2,897.23

CONCRETE CLASS "B"

Page 80 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (23) Jhelum
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,145.67

468.57

3,780.44

1,348.67

6,743.35

401 gii PRECAST CONCRETE CLASS "B"

CM

1,145.67

468.57

3,393.05

1,251.82

6,259.11

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,030.44

42,565.13

10,898.89

54,494.46

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,030.44

44,665.13

11,423.89

57,119.46

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

857.50

2,335.68

37,052.17

10,061.34

50,306.69

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

2,042.79

6,882.66

80,755.13

22,420.15

112,100.73

405 b

LAUNCHING OF GIRDER

TON

48.16

403.69

112.96

564.81

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

76.11

186.70

65.70

328.51

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

76.11

195.42

67.88

339.41

406 c

STEEL EXPANSION JOINTS

KG

6.33

11.61

60.64

19.65

98.23

406 d

WATER STOPS 6" SIZE

61.94

309.78

92.93

464.65

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

27.50

1,411.74

359.81

1,799.05

406 g

STEEL OR METAL BEARING DEVICES

KG

14.06

30.66

81.03

31.44

157.19

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

256.79

847.08

554.23

414.53

2,072.63

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

385.19

1,270.62

831.35

621.79

3,108.95

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

385.19

1,270.62

635.99

572.95

2,864.75

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

641.98

2,117.70

784.98

886.17

4,430.83

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

550.27

1,815.17

731.76

774.30

3,871.50

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

962.97

3,176.55

1,022.78

1,290.58

6,452.88

407 h

PILE LOAD TEST UP TO 120 TON

EACH

14,356.02

19,990.40

72,541.08

26,721.88

133,609.38

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,583.46

19,990.40

145,082.16

48,414.01

242,070.03

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,702.42

19,990.40

217,623.24

70,079.02

350,395.08

407 k

CONFIRMATORY BORING (NX SIZE)

144.15

826.61

5.16

243.98

1,219.90

410

BRICK WORK

CM

216.93

142.50

2,023.70

595.78

2,978.91

411 a

STONE MASONRY RANDOM DRY

CM

228.04

56.01

378.61

165.67

828.33

Page 81 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (23) Jhelum
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

271.70

84.89

1,050.61

351.80

1,759.00

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

314.04

56.01

500.45

217.63

1,088.13

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

356.38

84.89

1,190.34

407.90

2,039.51

411 g

ROLL POINTING

SM

46.10

5.78

44.84

24.18

120.90

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

472.38

134.30

1,118.96

431.41

2,157.05

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

151.95

230.36

364.01

186.58

932.90

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

148.15

297.19

468.87

228.55

1,142.76

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

145.10

514.83

578.47

309.60

1,548.00

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

152.36

639.81

868.15

415.08

2,075.40

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

176.47

704.13

1,173.19

513.45

2,567.24

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

219.36

868.93

1,768.62

714.23

3,571.14

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

283.88

961.94

2,213.99

864.95

4,324.76

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

334.95

1,168.07

3,091.39

1,148.60

5,743.01

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

396.54

1,362.74

4,688.25

1,611.88

8,059.41

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

151.95

263.77

383.72

199.86

999.30

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

148.15

297.19

501.67

236.75

1,183.76

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

141.72

514.83

604.71

315.32

1,576.58

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

152.36

639.81

928.42

430.15

2,150.74

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

176.47

704.13

1,638.99

629.90

3,149.49

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

219.36

868.93

2,231.10

829.85

4,149.24

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

283.88

961.94

2,843.75

1,022.39

5,111.96

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

334.95

1,168.07

3,717.35

1,305.09

6,525.46

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

396.54

1,362.74

5,120.34

1,719.91

8,599.53

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

59.72

68.08

279.55

101.84

509.19

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

503.28

309.47

2,280.78

773.38

3,866.91

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.58

75.81

19.85

99.24

Page 82 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (23) Jhelum
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

64.65

350.00

103.66

518.31

508 a

BRICK PAVING (SINGLE COURSE)

SM

72.89

15.80

164.44

63.28

316.41

508 b

BRICK PAVING (DOUBLE COURSE)

SM

130.23

15.80

326.38

118.10

590.51

509 a

RIP RAP CLASS "A"

CM

314.42

307.24

155.42

777.08

509 b

RIP RAP CLASS "B"

CM

303.40

304.78

152.05

760.23

509 c

RIP RAP CLASS "C"

CM

305.17

307.24

153.10

765.51

509 d

GROUTED RIP RAP CLASS "A"

CM

349.20

35.09

1,236.55

405.21

2,026.05

509 e

GROUTED RIP RAP CLASS "B"

CM

336.47

28.07

1,137.94

375.62

1,878.10

509 f

GROUTED RIP RAP CLASS "C"

CM

332.03

23.39

1,156.52

377.99

1,889.93

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

521.27

181.56

2,645.90

837.18

4,185.91

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

32.64

115.89

297.37

111.48

557.38

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

75.19

194.57

67.44

337.20

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

99.03

35.01

49.93

45.99

229.96

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

126.76

44.81

63.91

58.87

294.35

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

160.63

91.01

217.64

117.32

586.60

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

200.78

113.77

272.06

146.65

733.26

603

BRICK EDGING

5.81

25.92

7.93

39.66

605 a

CONCRETE BEAM GUARDRAIL

49.53

14.67

416.81

120.25

601.26

605 c

CONCRETE POST FOR GUARDRAIL

60.81

13.10

412.00

121.48

607.39

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

159.26

128.42

4,671.85

1,239.88

6,199.41

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

45.26

192.63

6,823.60

1,765.37

8,826.86

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

159.26

272.87

8,423.82

2,213.99

11,069.94

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

521.23

304.65

15,491.62

4,079.38

20,396.88

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

104.25

60.93

6,997.71

1,790.72

8,953.61

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,028.12

317.99

1,589.95

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,542.18

446.51

2,232.53

Page 83 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (23) Jhelum
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.72

2.85

15.39

4.99

24.95

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.57

1.27

30.35

8.05

40.24

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.72

2.85

20.53

6.28

31.38

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.57

1.27

40.48

10.58

52.90

EACH

47.92

148.70

49.16

245.78

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

47.92

382.50

107.61

538.03

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.15

3.56

21.40

6.78

33.89

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.15

4.75

51.71

14.65

73.26

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.15

3.56

28.54

8.56

42.81

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.15

4.75

68.95

18.96

94.81

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

47.92

206.66

63.65

318.23

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

47.92

652.07

175.00

874.99

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

39.71

99.13

34.71

173.55

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

39.71

255.39

73.78

368.88

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

39.71

137.77

44.37

221.85

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

39.71

435.37

118.77

593.85

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

5.95

46.68

167.48

55.03

275.14

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

5.95

46.68

202.48

63.78

318.89

610 b

RIGHT OF WAY MARKER

EACH

69.25

60.88

205.38

83.88

419.39

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

419.31

476.40

1,373.07

567.20

2,835.98

610 d

TEN KILOMETRE POST

EACH

811.28

952.79

3,000.21

1,191.07

5,955.35

Page 84 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (28) Kasur
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.46

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.53

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

13.19

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.86

9.28

0.88

26.96

134.81

258.13

1.97

68.32

341.61

52.74

1,032.53

7.89

273.29

1,366.45

CM

1.55

59.42

15.24

76.21

COMPACTION OF NATURAL GROUND

SM

0.22

5.92

1.69

8.45

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.54

86.79

22.33

111.66

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

77.22

193.76

46.20

79.30

396.48

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

11.00

214.84

56.46

282.30

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.24

167.12

43.59

217.95

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.08

78.63

20.18

100.89

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

77.22

193.76

46.20

79.30

396.48

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

12.29

199.88

53.04

265.21

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.55

167.24

43.20

215.99

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.32

89.04

0.31

23.42

117.09

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

40.14

165.86

53.31

64.83

324.14

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

68.25

258.51

30.80

89.39

446.95

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

58.14

193.04

62.80

313.98

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

35.10

160.37

48.87

244.34

107 d

GRANULAR BACK FILL

CM

21.41

83.07

341.93

111.60

558.01

107 e

COMMON BACK FILL

CM

16.26

37.31

4.13

14.43

72.13

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.30

106.71

4.13

28.79

143.93

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

12.66

302.97

48.81

91.11

455.55

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

9.49

268.11

1.96

69.89

349.45

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

8.44

238.60

61.76

308.80

CM

4.96

112.14

30.98

154.89

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 85 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (28) Kasur
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

3.85

46.31

4.13

13.57

67.86

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

9.10

73.87

2.45

21.36

106.78

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.86

16.84

1.18

4.72

23.60

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.61

10.31

0.63

2.89

14.44

110

IMPROVED SUB-GRADE

CM

6.21

75.50

54.33

34.01

170.05

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.52

9.38

0.64

2.64

13.18

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.78

9.92

0.74

2.86

14.30

201

GRANULAR SUB-BASE

CM

5.02

106.91

458.85

142.70

713.48

202

AGGREGATE BASE

CM

5.75

132.11

639.97

194.46

972.29

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

47.13

916.98

3,463.35

1,106.87

5,534.33

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

48.73

916.98

3,695.92

1,165.41

5,827.04

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

52.21

957.74

3,457.88

1,116.96

5,584.79

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

52.21

954.75

3,777.62

1,196.15

5,980.73

204 b

CEMENT STABILIZED BASE

CM

17.80

272.73

744.69

258.81

1,294.03

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

149.47

568.44

22,174.80

5,723.18

28,615.89

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

149.47

568.44

23,095.91

5,953.46

29,767.28

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

62.37

55.65

677.92

198.99

994.93

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

95.14

1,408.67

3,166.76

1,167.64

5,838.21

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

69.15

66.68

571.68

176.88

884.39

207 a

DEEP PATCHING (0-15 cm)

SM

1.07

30.14

1.02

8.06

40.29

207 b

DEEP PATCHING (16-30 cm)

SM

1.07

26.47

1.02

7.14

35.70

208

REINSTATEMENT OF ROAD SURFACE

SM

1.12

37.00

0.45

9.64

48.21

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.24

70.82

0.55

18.15

90.76

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.25

14.16

0.11

3.63

18.15

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.18

0.67

22.18

5.76

28.79

Page 86 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (28) Kasur
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.18

0.67

22.18

5.76

28.79

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.76

2.52

12.59

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.24

2.39

11.94

304 a

SINGLE SURFACE TREATMENT

SM

0.47

4.16

44.18

12.20

61.01

304 b

DOUBLE SURFACE TREATMENT

SM

0.69

8.06

84.93

23.42

117.10

304 c

TRIPLE SURFACE TREATMENT

SM

1.16

11.08

101.69

28.48

142.41

304 d

SEAL COAT

SM

0.44

2.33

24.81

6.90

34.48

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

44.05

906.07

4,034.68

1,246.20

6,231.00

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

44.05

876.73

4,346.04

1,316.71

6,583.53

307 a

DENSE GRADED HOT BIT-MAC

CM

107.62

171.48

3,315.97

898.77

4,493.84

307 b

OPEN GRADED HOT BIT-MAC

CM

107.62

171.48

3,240.81

879.98

4,399.89

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

18.24

456.95

945.48

355.17

1,775.84

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

132.83

465.97

24,250.50

6,212.33

31,061.63

309 a

COLD MILLING, 0 - 30 mm

SM

0.59

16.87

7.54

6.25

31.25

309 b

COLD MILLING, 0 - 50 mm

SM

0.98

28.11

12.57

10.42

52.08

309 c

COLD MILLING, 0 - 70 mm

SM

1.47

42.16

18.85

15.62

78.10

401 ai

CONCRETE CLASS "A3" (Underground)

CM

331.44

643.62

3,197.37

1,043.11

5,215.54

401 aii CONCRETE CLASS "A3" (On ground)

CM

331.44

643.62

3,406.27

1,095.33

5,476.66

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

331.44

643.62

3,824.07

1,199.78

5,998.91

401 b

CONCRETE CLASS "B"

CM

426.68

407.09

2,453.43

821.80

4,109.00

401 ci

CONCRETE CLASS "C" (Underground)

CM

328.12

258.76

2,896.94

870.96

4,354.78

401 cii CONCRETE CLASS "C" (On ground)

CM

328.12

258.76

2,986.03

893.23

4,466.14

401 ciii CONCRETE CLASS "C" (Elevated)

CM

328.12

258.76

3,164.22

937.78

4,688.88

401 d

CONCRETE CLASS "D1"

CM

517.17

810.64

4,062.95

1,347.69

6,738.45

401 e

CONCRETE CLASS "Y"

CM

727.18

258.76

3,476.19

1,115.53

5,577.66

401 f

LEAN CONCRETE

CM

282.77

252.12

1,995.35

632.56

3,162.80

Page 87 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (28) Kasur
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,120.67

468.57

3,998.08

1,396.83

6,984.15

401 gii PRECAST CONCRETE CLASS "B"

CM

1,120.67

468.57

3,625.35

1,303.65

6,518.24

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

995.25

42,670.66

10,916.48

54,582.39

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

995.25

44,770.66

11,441.48

57,207.39

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

814.00

2,335.68

37,106.25

10,063.98

50,319.91

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,895.98

6,882.66

80,763.03

22,385.42

111,927.09

405 b

LAUNCHING OF GIRDER

TON

45.10

403.69

112.20

560.99

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

73.63

184.86

64.62

323.11

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

73.63

193.57

66.80

334.00

406 c

STEEL EXPANSION JOINTS

KG

6.04

11.61

60.84

19.62

98.11

406 d

WATER STOPS 6" SIZE

60.59

309.30

92.47

462.36

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

26.38

1,411.44

359.46

1,797.28

406 g

STEEL OR METAL BEARING DEVICES

KG

13.00

30.66

81.19

31.21

156.06

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

242.62

847.08

490.06

394.94

1,974.70

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

363.93

1,270.62

735.10

592.41

2,962.06

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

363.93

1,270.62

574.11

552.17

2,760.83

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

606.56

2,117.70

727.68

862.99

4,314.93

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

519.91

1,815.17

672.84

751.98

3,759.90

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

909.84

3,176.55

962.62

1,262.25

6,311.26

407 h

PILE LOAD TEST UP TO 120 TON

EACH

14,037.18

19,990.40

72,541.06

26,642.16

133,210.80

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,492.38

19,990.40

145,082.12

48,391.23

241,956.13

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,383.58

19,990.40

217,623.18

69,999.29

349,996.45

407 k

CONFIRMATORY BORING (NX SIZE)

139.40

826.61

5.16

242.79

1,213.96

410

BRICK WORK

CM

213.93

142.50

2,167.24

630.92

3,154.59

411 a

STONE MASONRY RANDOM DRY

CM

224.67

56.01

503.60

196.07

980.35

Page 88 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (28) Kasur
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

268.17

84.89

1,291.12

411.05

2,055.23

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

310.17

56.01

558.43

231.15

1,155.76

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

352.17

84.89

1,336.77

443.46

2,217.29

411 g

ROLL POINTING

SM

45.66

5.78

46.85

24.57

122.86

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

467.67

134.30

1,265.39

466.84

2,334.20

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

149.21

230.36

367.78

186.84

934.19

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

145.92

297.19

473.40

229.13

1,145.64

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

140.93

514.83

583.70

309.87

1,549.33

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

148.57

639.81

874.29

415.67

2,078.34

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

171.28

704.13

1,179.33

513.69

2,568.43

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

211.84

868.93

1,777.54

714.58

3,572.89

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

274.14

961.94

2,222.96

864.76

4,323.80

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

323.24

1,168.07

3,102.27

1,148.40

5,741.98

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

382.74

1,362.74

4,700.96

1,611.61

8,058.05

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

149.21

263.77

390.80

200.95

1,004.73

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

145.92

297.19

506.20

237.33

1,186.64

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

137.55

514.83

609.94

315.58

1,577.90

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

148.57

639.81

933.18

430.39

2,151.95

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

171.28

704.13

1,645.92

630.33

3,151.66

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

211.84

868.93

2,240.02

830.20

4,150.99

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

274.14

961.94

2,852.72

1,022.20

5,111.00

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

323.24

1,168.07

3,728.24

1,304.89

6,524.44

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

382.74

1,362.74

5,133.04

1,719.63

8,598.15

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

57.66

68.08

279.55

101.32

506.61

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

481.94

309.47

2,506.54

824.49

4,122.44

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.41

77.80

20.30

101.51

Page 89 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (28) Kasur
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

63.28

431.67

123.74

618.69

508 a

BRICK PAVING (SINGLE COURSE)

SM

71.83

15.80

170.09

64.43

322.15

508 b

BRICK PAVING (DOUBLE COURSE)

SM

128.83

15.80

337.68

120.58

602.89

509 a

RIP RAP CLASS "A"

CM

309.91

432.23

185.54

927.68

509 b

RIP RAP CLASS "B"

CM

299.52

428.77

182.07

910.36

509 c

RIP RAP CLASS "C"

CM

301.60

432.23

183.46

917.29

509 d

GROUTED RIP RAP CLASS "A"

CM

343.21

35.09

1,438.44

454.19

2,270.93

509 e

GROUTED RIP RAP CLASS "B"

CM

331.27

28.07

1,330.80

422.54

2,112.68

509 f

GROUTED RIP RAP CLASS "C"

CM

327.36

23.39

1,354.25

426.25

2,131.25

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

511.45

181.56

2,868.48

890.37

4,451.86

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

31.84

115.89

341.91

122.41

612.05

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

73.16

194.57

66.93

334.66

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

97.29

35.01

70.24

50.64

253.18

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

124.53

44.81

89.90

64.81

324.05

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

158.13

91.01

254.13

125.82

629.09

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

197.67

113.77

317.67

157.28

786.39

603

BRICK EDGING

5.68

26.88

8.14

40.70

605 a

CONCRETE BEAM GUARDRAIL

48.95

14.67

424.88

122.13

610.63

605 c

CONCRETE POST FOR GUARDRAIL

60.11

13.10

421.82

123.76

618.79

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

153.69

128.42

4,682.11

1,241.06

6,205.28

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

45.00

192.63

6,861.63

1,774.82

8,874.08

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

153.69

272.87

8,490.65

2,229.30

11,146.51

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

512.54

304.65

15,588.81

4,101.50

20,507.50

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

102.51

60.93

7,013.47

1,794.23

8,971.14

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,027.02

317.72

1,588.58

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,540.53

446.09

2,230.46

Page 90 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (28) Kasur
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.62

2.85

15.38

4.96

24.81

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.54

1.27

30.29

8.03

40.13

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.62

2.85

20.52

6.25

31.24

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.54

1.27

40.39

10.55

52.75

EACH

46.62

148.62

48.81

244.05

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

46.62

381.64

107.07

535.33

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.02

3.56

21.40

6.75

33.73

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.02

4.75

51.71

14.62

73.10

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.02

3.56

28.53

8.53

42.64

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.02

4.75

68.95

18.93

94.65

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

46.62

206.58

63.30

316.50

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

46.62

652.07

174.67

873.36

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

38.52

99.08

34.40

172.00

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

38.52

254.81

73.33

366.66

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

38.52

137.72

44.06

220.30

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

38.52

435.37

118.47

592.36

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

5.91

46.68

167.65

55.06

275.30

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

5.91

46.68

202.65

63.81

319.05

610 b

RIGHT OF WAY MARKER

EACH

68.45

60.88

213.63

85.74

428.70

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

413.33

476.40

1,439.92

582.41

2,912.06

610 d

TEN KILOMETRE POST

EACH

799.66

952.79

3,135.85

1,222.08

6,110.38

Page 91 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (30) Khanewal
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.55

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

5.30

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

15.51

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.88

9.39

0.88

27.16

135.78

258.13

1.97

68.90

344.51

62.05

1,032.53

7.89

275.62

1,378.09

CM

1.81

59.42

15.31

76.54

COMPACTION OF NATURAL GROUND

SM

0.25

5.92

1.70

8.49

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.80

86.79

22.40

111.99

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

87.34

193.76

46.20

81.83

409.13

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

12.73

214.84

56.89

284.46

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

8.31

167.12

43.86

219.29

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.29

78.63

20.23

101.15

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

87.34

193.76

46.20

81.83

409.13

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

13.85

199.88

53.43

267.16

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

6.43

167.24

43.42

217.09

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.92

89.04

0.31

23.57

117.84

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

46.25

165.86

53.31

66.36

331.78

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

76.92

258.51

30.80

91.56

457.79

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

65.68

193.04

64.68

323.40

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

39.56

160.37

49.98

249.91

107 d

GRANULAR BACK FILL

CM

24.47

83.07

293.22

100.19

500.95

107 e

COMMON BACK FILL

CM

19.07

37.31

4.13

15.13

75.64

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.94

106.71

4.13

28.95

144.73

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

14.63

302.97

48.81

91.60

458.01

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

10.97

268.11

1.96

70.26

351.30

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

9.75

238.60

62.09

310.44

CM

5.74

112.14

31.17

155.86

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 92 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (30) Khanewal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

4.46

46.31

4.13

13.73

68.63

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

10.61

73.87

2.45

21.73

108.66

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.99

16.84

1.18

4.75

23.76

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.71

10.31

0.63

2.91

14.56

110

IMPROVED SUB-GRADE

CM

7.28

75.50

49.40

33.05

165.23

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.61

9.38

0.64

2.66

13.29

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.92

9.92

0.74

2.90

14.48

201

GRANULAR SUB-BASE

CM

5.77

106.91

477.57

147.56

737.81

202

AGGREGATE BASE

CM

6.59

132.11

629.52

192.06

960.28

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

55.24

916.98

3,500.43

1,118.16

5,590.81

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

56.95

916.98

3,726.28

1,175.05

5,875.26

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

60.91

957.74

3,495.02

1,128.42

5,642.09

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

60.91

954.75

3,808.39

1,206.01

6,030.06

204 b

CEMENT STABILIZED BASE

CM

20.50

272.73

773.78

266.75

1,333.76

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

167.04

568.44

22,378.80

5,778.57

28,892.85

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

167.04

568.44

23,295.73

6,007.80

30,039.01

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

74.01

55.65

665.20

198.72

993.58

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

110.88

1,408.67

3,177.28

1,174.21

5,871.04

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

81.92

66.68

572.84

180.36

901.80

207 a

DEEP PATCHING (0-15 cm)

SM

1.24

30.14

1.02

8.10

40.50

207 b

DEEP PATCHING (16-30 cm)

SM

1.24

26.47

1.02

7.18

35.91

208

REINSTATEMENT OF ROAD SURFACE

SM

1.30

37.00

0.45

9.69

48.44

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.41

70.82

0.55

18.20

90.98

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.28

14.16

0.11

3.64

18.19

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.21

0.67

22.39

5.82

29.09

Page 93 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (30) Khanewal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.20

0.67

22.39

5.82

29.08

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.84

2.54

12.70

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.32

2.41

12.05

304 a

SINGLE SURFACE TREATMENT

SM

0.53

4.16

44.60

12.32

61.61

304 b

DOUBLE SURFACE TREATMENT

SM

0.78

8.06

85.60

23.61

118.05

304 c

TRIPLE SURFACE TREATMENT

SM

1.30

11.08

102.48

28.72

143.58

304 d

SEAL COAT

SM

0.48

2.33

25.13

6.99

34.93

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

51.35

906.07

4,075.83

1,258.31

6,291.56

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

51.35

876.73

4,393.20

1,330.32

6,651.60

307 a

DENSE GRADED HOT BIT-MAC

CM

128.09

171.48

3,363.68

915.81

4,579.06

307 b

OPEN GRADED HOT BIT-MAC

CM

128.09

171.48

3,272.60

893.04

4,465.21

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

22.26

456.95

948.27

356.87

1,784.35

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

149.13

465.97

24,454.50

6,267.40

31,337.00

309 a

COLD MILLING, 0 - 30 mm

SM

0.67

16.87

7.54

6.27

31.35

309 b

COLD MILLING, 0 - 50 mm

SM

1.12

28.11

12.57

10.45

52.25

309 c

COLD MILLING, 0 - 70 mm

SM

1.69

42.16

18.85

15.68

78.38

401 ai

CONCRETE CLASS "A3" (Underground)

CM

392.63

643.62

3,214.56

1,062.70

5,313.51

401 aii CONCRETE CLASS "A3" (On ground)

CM

392.63

643.62

3,423.46

1,114.93

5,574.64

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

392.63

643.62

3,841.26

1,219.38

6,096.89

401 b

CONCRETE CLASS "B"

CM

501.04

407.09

2,445.02

838.29

4,191.44

401 ci

CONCRETE CLASS "C" (Underground)

CM

390.72

258.76

2,899.75

887.31

4,436.54

401 cii CONCRETE CLASS "C" (On ground)

CM

390.72

258.76

2,988.85

909.58

4,547.91

401 ciii CONCRETE CLASS "C" (Elevated)

CM

390.72

258.76

3,167.04

954.13

4,770.65

401 d

CONCRETE CLASS "D1"

CM

615.44

810.64

4,075.38

1,375.37

6,876.83

401 e

CONCRETE CLASS "Y"

CM

856.70

258.76

3,499.77

1,153.81

5,769.04

401 f

LEAN CONCRETE

CM

337.24

252.12

1,986.65

644.00

3,220.01

Page 94 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (30) Khanewal
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,323.95

468.57

4,018.93

1,452.86

7,264.31

401 gii PRECAST CONCRETE CLASS "B"

CM

1,323.95

468.57

3,616.43

1,352.24

6,761.19

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,180.20

42,565.60

10,936.45

54,682.25

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,180.20

44,665.60

11,461.45

57,307.25

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

965.98

2,335.68

37,099.90

10,100.39

50,501.95

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,963.83

6,882.66

80,754.35

22,400.21

112,001.05

405 b

LAUNCHING OF GIRDER

TON

46.52

403.69

112.55

562.76

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

87.26

189.38

69.16

345.80

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

87.26

198.09

71.34

356.69

406 c

STEEL EXPANSION JOINTS

KG

7.09

11.61

60.62

19.83

99.15

406 d

WATER STOPS 6" SIZE

75.83

308.23

96.02

480.08

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

29.42

1,412.90

360.58

1,802.90

406 g

STEEL OR METAL BEARING DEVICES

KG

14.80

30.66

81.02

31.62

158.10

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

251.61

847.08

558.00

414.17

2,070.86

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

377.42

1,270.62

837.00

621.26

3,106.30

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

377.42

1,270.62

641.64

572.42

2,862.10

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

629.03

2,117.70

794.39

885.28

4,426.40

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

539.17

1,815.17

739.84

773.55

3,867.73

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

943.55

3,176.55

1,036.90

1,289.25

6,446.25

407 h

PILE LOAD TEST UP TO 120 TON

EACH

19,761.84

19,990.40

67,884.12

26,909.09

134,545.45

407 i

PILE LOAD TEST UP TO 240 TON

EACH

33,779.52

19,990.40

135,768.24

47,384.54

236,922.70

407 j

PILE LOAD TEST UP TO 360 TON

EACH

50,390.64

19,990.40

203,652.36

68,508.35

342,541.75

407 k

CONFIRMATORY BORING (NX SIZE)

152.39

826.61

5.16

246.04

1,230.20

410

BRICK WORK

CM

243.03

142.50

2,067.29

613.21

3,066.03

411 a

STONE MASONRY RANDOM DRY

CM

258.70

56.01

478.66

198.34

991.71

Page 95 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (30) Khanewal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

309.19

84.89

1,266.25

415.08

2,075.41

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

356.44

56.01

531.50

235.99

1,179.94

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

403.68

84.89

1,309.88

449.61

2,248.06

411 g

ROLL POINTING

SM

51.54

5.78

46.85

26.04

130.21

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

537.25

134.30

1,238.50

477.51

2,387.56

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

175.32

230.36

367.78

193.37

966.83

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

171.78

297.19

473.40

235.59

1,177.96

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

165.09

514.83

583.70

315.91

1,579.53

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

174.51

639.81

874.30

422.16

2,110.78

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

200.56

704.13

1,179.34

521.01

2,605.04

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

246.69

868.93

1,777.54

723.29

3,616.45

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

319.25

961.94

2,222.96

876.04

4,380.19

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

377.18

1,168.07

3,102.28

1,161.88

5,809.41

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

444.06

1,362.74

4,700.96

1,626.94

8,134.70

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

175.32

263.77

390.80

207.47

1,037.36

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

171.78

297.19

506.20

243.79

1,218.96

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

160.16

514.83

609.94

321.23

1,606.16

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

174.51

639.81

933.18

436.88

2,184.38

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

200.56

704.13

1,645.92

637.65

3,188.26

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

246.69

868.93

2,240.02

838.91

4,194.55

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

319.25

961.94

2,852.72

1,033.48

5,167.39

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

377.18

1,168.07

3,728.24

1,318.37

6,591.86

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

444.06

1,362.74

5,133.05

1,734.96

8,674.81

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

67.67

68.08

216.05

87.95

439.75

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

575.26

309.47

2,498.13

845.72

4,228.58

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.83

75.81

19.91

99.55

Page 96 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (30) Khanewal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

74.89

408.33

120.81

604.03

508 a

BRICK PAVING (SINGLE COURSE)

SM

82.54

15.80

156.14

63.62

318.10

508 b

BRICK PAVING (DOUBLE COURSE)

SM

147.70

15.80

310.31

118.45

592.26

509 a

RIP RAP CLASS "A"

CM

353.94

407.29

190.31

951.54

509 b

RIP RAP CLASS "B"

CM

342.45

404.03

186.62

933.10

509 c

RIP RAP CLASS "C"

CM

344.56

407.29

187.96

939.81

509 d

GROUTED RIP RAP CLASS "A"

CM

434.15

35.09

1,399.23

467.12

2,335.59

509 e

GROUTED RIP RAP CLASS "B"

CM

418.35

28.07

1,293.25

434.92

2,174.59

509 f

GROUTED RIP RAP CLASS "C"

CM

418.35

28.07

1,293.25

434.92

2,174.59

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

608.41

181.56

2,860.17

912.54

4,562.68

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

37.75

115.89

293.05

111.67

558.36

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

80.00

194.57

68.64

343.21

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

112.25

35.01

66.18

53.36

266.80

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

143.68

44.81

84.72

68.30

341.51

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

181.47

91.01

248.49

130.24

651.21

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

226.84

113.77

310.61

162.81

814.03

603

BRICK EDGING

6.62

24.96

7.90

39.48

605 a

CONCRETE BEAM GUARDRAIL

57.53

14.67

425.26

124.37

621.83

605 c

CONCRETE POST FOR GUARDRAIL

70.63

13.10

422.35

126.52

632.60

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

177.00

128.42

4,686.14

1,247.89

6,239.45

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

55.14

192.63

6,867.37

1,778.79

8,893.93

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

177.00

272.87

8,499.60

2,237.37

11,186.84

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

599.34

304.65

15,608.14

4,128.03

20,640.16

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

119.87

60.93

7,024.44

1,801.31

9,006.55

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,029.15

318.25

1,591.24

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,543.72

446.89

2,234.45

Page 97 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (30) Khanewal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

2.25

2.85

15.33

5.11

25.54

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.75

1.27

30.41

8.11

40.54

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

2.25

2.85

20.46

6.39

31.95

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.75

1.27

40.56

10.65

53.23

EACH

55.33

148.14

50.87

254.34

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

55.33

383.23

109.64

548.20

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.82

3.56

21.41

6.95

34.74

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.82

4.75

51.71

14.82

74.10

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.82

3.56

28.55

8.73

43.66

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.82

4.75

68.95

19.13

95.65

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

55.33

206.73

65.52

327.58

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

55.33

652.07

176.85

884.25

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

46.60

98.76

36.34

181.70

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

46.60

255.87

75.62

378.09

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

46.60

137.82

46.11

230.53

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

46.60

435.37

120.49

602.46

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

7.36

46.68

167.65

55.42

277.11

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

7.36

46.68

202.65

64.17

320.86

610 b

RIGHT OF WAY MARKER

EACH

81.39

60.88

214.43

89.18

445.88

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

475.57

476.40

1,445.78

599.44

2,997.19

610 d

TEN KILOMETRE POST

EACH

921.80

952.79

3,147.97

1,255.64

6,278.20

Page 98 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (32) Khushab
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.40

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

3.93

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

11.37

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.84

9.20

0.88

26.81

134.06

258.13

1.97

67.87

339.34

45.47

1,032.53

7.89

271.47

1,357.36

CM

1.36

59.42

15.20

75.98

COMPACTION OF NATURAL GROUND

SM

0.19

5.92

1.68

8.41

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.34

86.79

22.28

111.41

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

69.80

193.76

46.20

77.44

387.20

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

9.88

214.84

56.18

280.90

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

6.53

167.12

43.41

217.06

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

1.91

78.63

20.14

100.68

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

69.80

193.76

46.20

77.44

387.20

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

11.11

199.88

52.75

263.74

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

4.99

167.24

43.06

215.29

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

3.94

89.04

0.31

23.32

116.61

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

37.55

165.86

53.31

64.18

320.90

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

61.75

258.51

30.80

87.77

438.83

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

52.53

193.04

61.39

306.96

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

31.76

160.37

48.03

240.16

107 d

GRANULAR BACK FILL

CM

18.81

83.07

309.33

102.80

514.01

107 e

COMMON BACK FILL

CM

13.90

37.31

4.13

13.84

69.18

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

3.88

106.71

4.13

28.68

143.40

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

11.29

302.97

48.81

90.77

453.84

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

8.47

268.11

1.96

69.64

348.18

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

7.53

238.60

61.53

307.66

CM

4.44

112.14

30.85

154.24

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 99 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (32) Khushab
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

3.47

46.31

4.13

13.48

67.39

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

8.06

73.87

2.45

21.10

105.48

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.77

16.84

1.18

4.70

23.49

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.55

10.31

0.63

2.87

14.36

110

IMPROVED SUB-GRADE

CM

5.53

75.50

54.33

33.84

169.20

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.46

9.38

0.64

2.62

13.10

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.70

9.92

0.74

2.84

14.20

201

GRANULAR SUB-BASE

CM

4.50

106.91

361.33

118.19

590.93

202

AGGREGATE BASE

CM

5.20

132.11

545.98

170.82

854.11

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

40.82

916.98

3,358.91

1,079.18

5,395.89

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

42.29

916.98

3,581.69

1,135.24

5,676.20

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

45.38

957.74

3,353.77

1,089.22

5,446.11

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

45.38

954.75

3,663.31

1,165.86

5,829.30

204 b

CEMENT STABILIZED BASE

CM

15.93

272.73

669.62

239.57

1,197.85

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

133.88

568.44

21,715.80

5,604.53

28,022.65

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

133.88

568.44

22,610.28

5,828.15

29,140.75

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

53.12

55.65

576.94

171.43

857.14

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

83.42

1,408.67

3,033.26

1,131.34

5,656.69

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

58.80

66.68

495.77

155.31

776.56

207 a

DEEP PATCHING (0-15 cm)

SM

0.96

30.14

1.02

8.03

40.15

207 b

DEEP PATCHING (16-30 cm)

SM

0.96

26.47

1.02

7.11

35.56

208

REINSTATEMENT OF ROAD SURFACE

SM

1.01

37.00

0.45

9.62

48.08

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.13

70.82

0.55

18.13

90.63

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.23

14.16

0.11

3.63

18.13

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.16

0.67

21.72

5.64

28.19

Page 100 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (32) Khushab
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.16

0.67

21.72

5.64

28.19

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.58

2.47

12.36

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.04

2.34

11.69

304 a

SINGLE SURFACE TREATMENT

SM

0.42

4.16

42.69

11.82

59.09

304 b

DOUBLE SURFACE TREATMENT

SM

0.62

8.06

81.41

22.52

112.61

304 c

TRIPLE SURFACE TREATMENT

SM

1.04

11.08

97.18

27.33

136.63

304 d

SEAL COAT

SM

0.39

2.33

24.29

6.75

33.76

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

38.43

906.07

3,926.19

1,217.67

6,088.36

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

38.43

876.73

4,233.42

1,287.15

6,435.73

307 a

DENSE GRADED HOT BIT-MAC

CM

93.23

171.48

3,228.07

873.20

4,365.98

307 b

OPEN GRADED HOT BIT-MAC

CM

93.23

171.48

3,134.31

849.76

4,248.78

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

15.89

456.95

916.62

347.37

1,736.83

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

118.53

465.97

23,791.50

6,094.00

30,470.00

309 a

COLD MILLING, 0 - 30 mm

SM

0.52

16.87

7.54

6.23

31.16

309 b

COLD MILLING, 0 - 50 mm

SM

0.87

28.11

12.57

10.39

51.94

309 c

COLD MILLING, 0 - 70 mm

SM

1.31

42.16

18.85

15.58

77.90

401 ai

CONCRETE CLASS "A3" (Underground)

CM

323.96

643.62

3,021.89

997.37

4,986.84

401 aii CONCRETE CLASS "A3" (On ground)

CM

323.96

643.62

3,230.79

1,049.59

5,247.96

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

323.96

643.62

3,648.59

1,154.04

5,770.21

401 b

CONCRETE CLASS "B"

CM

399.54

407.09

2,246.30

763.23

3,816.16

401 ci

CONCRETE CLASS "C" (Underground)

CM

317.08

258.76

2,689.44

816.32

4,081.60

401 cii CONCRETE CLASS "C" (On ground)

CM

317.08

258.76

2,778.53

838.59

4,192.96

401 ciii CONCRETE CLASS "C" (Elevated)

CM

317.08

258.76

2,956.72

883.14

4,415.70

401 d

CONCRETE CLASS "D1"

CM

516.11

810.64

3,884.51

1,302.82

6,514.08

401 e

CONCRETE CLASS "Y"

CM

726.54

258.76

3,318.24

1,075.89

5,379.43

401 f

LEAN CONCRETE

CM

255.74

252.12

1,793.83

575.42

2,877.11

Page 101 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (32) Khushab
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,074.27

468.57

3,811.53

1,338.59

6,692.96

401 gii PRECAST CONCRETE CLASS "B"

CM

1,074.27

468.57

3,409.90

1,238.19

6,190.93

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

883.89

42,565.18

10,862.27

54,311.34

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

883.89

44,665.18

11,387.27

56,936.34

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

747.87

2,335.68

37,056.57

10,035.03

50,175.15

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,836.73

6,882.66

80,750.39

22,367.45

111,837.23

405 b

LAUNCHING OF GIRDER

TON

43.86

403.69

111.89

559.44

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

71.19

186.87

64.52

322.58

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

71.19

195.58

66.69

333.46

406 c

STEEL EXPANSION JOINTS

KG

5.56

11.61

60.64

19.45

97.26

406 d

WATER STOPS 6" SIZE

58.76

309.26

92.01

460.03

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

26.36

1,411.73

359.52

1,797.61

406 g

STEEL OR METAL BEARING DEVICES

KG

12.09

30.66

81.03

30.95

154.73

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

236.62

847.08

624.25

426.99

2,134.94

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

354.92

1,270.62

936.37

640.48

3,202.39

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

354.92

1,270.62

706.64

583.05

2,915.23

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

591.54

2,117.70

856.89

891.53

4,457.66

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

507.03

1,815.17

803.23

781.36

3,906.79

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

887.31

3,176.55

1,104.87

1,292.18

6,460.91

407 h

PILE LOAD TEST UP TO 120 TON

EACH

11,971.56

19,990.40

69,433.80

25,348.94

126,744.70

407 i

PILE LOAD TEST UP TO 240 TON

EACH

24,126.84

19,990.40

138,867.60

45,746.21

228,731.05

407 j

PILE LOAD TEST UP TO 360 TON

EACH

35,781.96

19,990.40

208,301.40

66,018.44

330,092.20

407 k

CONFIRMATORY BORING (NX SIZE)

128.82

826.61

5.16

240.15

1,200.74

410

BRICK WORK

CM

210.09

142.50

1,990.65

585.81

2,929.05

411 a

STONE MASONRY RANDOM DRY

CM

216.60

56.01

394.94

166.89

834.44

Page 102 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (32) Khushab
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

256.80

84.89

1,088.12

357.45

1,787.26

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

299.40

56.01

441.07

199.12

995.60

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

342.00

84.89

1,146.85

393.44

1,967.18

411 g

ROLL POINTING

SM

45.73

5.78

45.19

24.18

120.88

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

450.00

134.30

1,075.48

414.95

2,074.73

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

130.65

230.36

364.67

181.42

907.10

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

127.61

297.19

469.67

223.62

1,118.09

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

124.80

514.83

579.39

304.76

1,523.78

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

130.64

639.81

869.23

409.92

2,049.60

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

150.47

704.13

1,174.27

507.22

2,536.09

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

187.45

868.93

1,770.19

706.64

3,533.21

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

242.58

961.94

2,215.55

855.02

4,275.09

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

283.84

1,168.07

3,093.28

1,136.30

5,681.49

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

338.93

1,362.74

4,690.46

1,598.03

7,990.16

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

130.65

263.77

385.04

194.87

974.33

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

127.61

297.19

502.47

231.82

1,159.09

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

121.96

514.83

605.63

310.61

1,553.03

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

130.64

639.81

929.27

424.93

2,124.65

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

150.47

704.13

1,640.19

623.70

3,118.49

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

187.45

868.93

2,232.67

822.26

4,111.31

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

242.58

961.94

2,845.31

1,012.46

5,062.29

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

283.84

1,168.07

3,719.24

1,292.79

6,463.94

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

338.93

1,362.74

5,122.55

1,706.06

8,530.28

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

49.73

68.08

237.18

88.75

443.74

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

457.35

309.47

2,298.52

766.34

3,831.68

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.02

75.81

19.71

98.54

Page 103 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (32) Khushab
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

54.08

379.17

108.31

541.56

508 a

BRICK PAVING (SINGLE COURSE)

SM

68.16

15.80

157.02

60.25

301.23

508 b

BRICK PAVING (DOUBLE COURSE)

SM

123.36

15.80

311.90

112.77

563.83

509 a

RIP RAP CLASS "A"

CM

298.72

323.56

155.57

777.85

509 b

RIP RAP CLASS "B"

CM

288.18

320.97

152.29

761.44

509 c

RIP RAP CLASS "C"

CM

291.15

323.56

153.68

768.39

509 d

GROUTED RIP RAP CLASS "A"

CM

307.76

35.09

1,285.65

407.13

2,035.63

509 e

GROUTED RIP RAP CLASS "B"

CM

296.97

28.07

1,183.55

377.15

1,885.74

509 f

GROUTED RIP RAP CLASS "C"

CM

293.38

23.39

1,202.22

379.75

1,898.74

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

479.21

181.56

2,662.34

830.78

4,153.89

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

27.34

115.89

309.21

113.11

565.55

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

67.35

194.57

65.48

327.40

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

91.92

35.01

52.58

44.88

224.39

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

117.66

44.81

67.30

57.44

287.21

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

151.74

91.01

221.24

116.00

579.99

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

189.67

113.77

276.55

145.00

724.99

603

BRICK EDGING

5.22

24.96

7.55

37.73

605 a

CONCRETE BEAM GUARDRAIL

44.45

14.67

417.91

119.26

596.29

605 c

CONCRETE POST FOR GUARDRAIL

54.58

13.10

413.36

120.26

601.30

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

142.15

128.42

6,660.05

1,732.66

8,663.28

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

42.04

192.63

7,331.61

1,891.57

9,457.85

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

142.15

272.87

8,766.65

2,295.42

11,477.09

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

457.43

304.65

16,006.25

4,192.08

20,960.41

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

91.49

60.93

7,101.11

1,813.38

9,066.91

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,028.26

318.03

1,590.13

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,542.39

446.56

2,232.79

Page 104 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (32) Khushab
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.46

2.85

15.39

4.93

24.63

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.49

1.27

30.36

8.03

40.15

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.46

2.85

20.54

6.21

31.06

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.49

1.27

40.49

10.56

52.81

EACH

41.99

148.71

47.68

238.38

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

41.99

382.57

106.14

530.70

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

1.83

3.56

21.40

6.70

33.49

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

1.83

4.75

51.71

14.57

72.86

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

1.83

3.56

28.54

8.48

42.41

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

1.83

4.75

68.95

18.88

94.41

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

41.99

206.67

62.17

310.83

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

41.99

652.07

173.52

867.58

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

34.70

99.14

33.46

167.30

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

34.70

255.43

72.53

362.66

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

34.70

137.78

43.12

215.60

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

34.70

435.37

117.52

587.59

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

5.56

46.68

167.51

54.94

274.69

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

5.56

46.68

202.51

63.69

318.44

610 b

RIGHT OF WAY MARKER

EACH

60.35

60.88

206.58

81.95

409.76

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

390.23

476.40

1,383.35

562.50

2,812.48

610 d

TEN KILOMETRE POST

EACH

750.45

952.79

3,019.79

1,180.76

5,903.79

Page 105 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (37) Lahore
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.55

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

5.38

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

15.59

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.88

9.39

0.88

27.18

135.88

258.13

1.97

68.92

344.61

62.38

1,032.53

7.89

275.70

1,378.50

CM

1.83

59.42

15.31

76.56

COMPACTION OF NATURAL GROUND

SM

0.26

5.92

1.70

8.50

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

3.12

86.79

22.48

112.39

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

92.94

193.76

46.20

83.23

416.13

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

13.11

214.84

56.99

284.94

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

8.63

167.12

43.94

219.69

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.55

78.63

20.30

101.48

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

92.94

193.76

46.20

83.23

416.13

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

14.81

199.88

53.67

268.36

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

6.62

167.24

43.47

217.33

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

5.20

89.04

0.31

23.64

118.19

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

47.03

165.86

53.31

66.55

332.75

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

82.26

258.51

30.80

92.89

464.46

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

69.98

193.04

65.76

328.78

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

42.30

160.37

50.67

253.34

107 d

GRANULAR BACK FILL

CM

25.57

83.07

337.20

111.46

557.30

107 e

COMMON BACK FILL

CM

19.14

37.31

4.13

15.15

75.73

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

5.14

106.71

4.13

29.00

144.98

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

15.08

302.97

48.81

91.72

458.58

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

11.31

268.11

1.96

70.35

351.73

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

10.05

238.60

62.16

310.81

CM

5.92

112.14

31.22

156.09

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 106 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (37) Lahore
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

4.59

46.31

4.13

13.76

68.79

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

10.80

73.87

2.45

21.78

108.90

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

1.03

16.84

1.18

4.76

23.81

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.73

10.31

0.63

2.92

14.59

110

IMPROVED SUB-GRADE

CM

7.42

75.50

50.67

33.40

166.99

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.62

9.38

0.64

2.66

13.30

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.93

9.92

0.74

2.90

14.49

201

GRANULAR SUB-BASE

CM

6.00

106.91

467.28

145.05

725.24

202

AGGREGATE BASE

CM

6.98

132.11

629.52

192.15

960.76

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

55.76

916.98

3,470.89

1,110.91

5,554.54

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

57.72

916.98

3,691.19

1,166.47

5,832.36

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

61.76

957.74

3,465.56

1,121.27

5,606.33

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

61.76

954.75

3,772.62

1,197.28

5,986.41

204 b

CEMENT STABILIZED BASE

CM

21.47

272.73

780.58

268.70

1,343.48

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

178.31

568.44

21,970.80

5,679.39

28,396.94

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

178.31

568.44

22,887.39

5,908.54

29,542.68

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

73.03

55.65

665.21

198.47

992.36

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

113.05

1,408.67

3,151.41

1,168.28

5,841.41

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

80.99

66.68

599.83

186.88

934.38

207 a

DEEP PATCHING (0-15 cm)

SM

1.27

30.14

1.02

8.11

40.54

207 b

DEEP PATCHING (16-30 cm)

SM

1.27

26.47

1.02

7.19

35.95

208

REINSTATEMENT OF ROAD SURFACE

SM

1.35

37.00

0.45

9.70

48.50

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.48

70.82

0.55

18.21

91.06

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.30

14.16

0.11

3.64

18.21

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.22

0.67

21.98

5.72

28.59

Page 107 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (37) Lahore
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.21

0.67

21.98

5.72

28.58

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.09

0.24

9.68

2.50

12.51

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.09

0.24

9.15

2.37

11.85

304 a

SINGLE SURFACE TREATMENT

SM

0.57

4.16

43.78

12.13

60.64

304 b

DOUBLE SURFACE TREATMENT

SM

0.83

8.06

84.02

23.23

116.14

304 c

TRIPLE SURFACE TREATMENT

SM

1.40

11.08

100.63

28.28

141.39

304 d

SEAL COAT

SM

0.53

2.33

24.76

6.91

34.53

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

52.30

906.07

4,036.03

1,248.60

6,243.00

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

52.30

876.73

4,349.12

1,319.54

6,597.69

307 a

DENSE GRADED HOT BIT-MAC

CM

127.64

171.48

3,326.30

906.36

4,531.78

307 b

OPEN GRADED HOT BIT-MAC

CM

127.64

171.48

3,235.11

883.56

4,417.79

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

21.70

456.95

938.68

354.33

1,771.66

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

157.83

465.97

24,046.50

6,167.58

30,837.88

309 a

COLD MILLING, 0 - 30 mm

SM

0.71

16.87

7.54

6.28

31.40

309 b

COLD MILLING, 0 - 50 mm

SM

1.18

28.11

12.57

10.47

52.33

309 c

COLD MILLING, 0 - 70 mm

SM

1.77

42.16

18.85

15.70

78.48

401 ai

CONCRETE CLASS "A3" (Underground)

CM

384.45

643.62

3,161.14

1,047.30

5,236.51

401 aii CONCRETE CLASS "A3" (On ground)

CM

384.45

643.62

3,370.04

1,099.53

5,497.64

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

384.45

643.62

3,787.84

1,203.98

6,019.89

401 b

CONCRETE CLASS "B"

CM

500.98

407.09

2,394.16

825.56

4,127.79

401 ci

CONCRETE CLASS "C" (Underground)

CM

379.76

258.76

2,846.33

871.21

4,356.06

401 cii CONCRETE CLASS "C" (On ground)

CM

379.76

258.76

2,935.43

893.49

4,467.44

401 ciii CONCRETE CLASS "C" (Elevated)

CM

379.76

258.76

3,113.62

938.04

4,690.18

401 d

CONCRETE CLASS "D1"

CM

595.07

810.64

4,011.32

1,354.26

6,771.29

401 e

CONCRETE CLASS "Y"

CM

833.94

258.76

3,446.11

1,134.70

5,673.51

401 f

LEAN CONCRETE

CM

329.55

252.12

1,941.94

630.90

3,154.51

Page 108 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (37) Lahore
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,295.35

468.57

3,963.52

1,431.86

7,159.30

401 gii PRECAST CONCRETE CLASS "B"

CM

1,295.35

468.57

3,564.37

1,332.07

6,660.36

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,150.12

42,364.33

10,878.61

54,393.06

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,150.12

44,464.33

11,403.61

57,018.06

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

941.99

2,335.68

37,999.44

10,319.28

51,596.39

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

2,015.46

6,882.66

80,753.57

22,412.92

112,064.61

405 b

LAUNCHING OF GIRDER

TON

47.14

403.69

112.71

563.54

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

85.37

183.38

67.19

335.94

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

85.37

192.09

69.37

346.83

406 c

STEEL EXPANSION JOINTS

KG

6.97

11.61

62.29

20.22

101.09

406 d

WATER STOPS 6" SIZE

69.95

309.12

94.77

473.84

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

30.55

1,410.87

360.36

1,801.78

406 g

STEEL OR METAL BEARING DEVICES

KG

15.33

30.66

82.45

32.11

160.55

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

250.73

847.08

492.03

397.46

1,987.30

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

376.10

1,270.62

738.05

596.19

2,980.96

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

376.10

1,270.62

577.06

555.95

2,779.73

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

626.83

2,117.70

732.60

869.28

4,346.41

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

537.28

1,815.17

677.05

757.38

3,786.88

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

940.24

3,176.55

970.00

1,271.70

6,358.49

407 h

PILE LOAD TEST UP TO 120 TON

EACH

16,480.20

19,990.40

75,648.36

28,029.74

140,148.70

407 i

PILE LOAD TEST UP TO 240 TON

EACH

33,018.12

19,990.40

151,296.72

51,076.31

255,381.55

407 j

PILE LOAD TEST UP TO 360 TON

EACH

49,513.80

19,990.40

226,945.08

74,112.32

370,561.60

407 k

CONFIRMATORY BORING (NX SIZE)

150.22

826.61

5.16

245.50

1,227.49

410

BRICK WORK

CM

245.53

142.50

2,241.54

657.39

3,286.96

411 a

STONE MASONRY RANDOM DRY

CM

258.32

56.01

448.61

190.74

953.68

Page 109 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (37) Lahore
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

308.47

84.89

1,205.41

399.69

1,998.46

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

356.32

56.01

499.04

227.84

1,139.21

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

404.18

84.89

1,252.53

435.40

2,177.00

411 g

ROLL POINTING

SM

52.16

5.78

46.26

26.05

130.25

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

537.14

134.30

1,181.15

463.15

2,315.74

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

174.27

230.36

366.66

192.82

964.11

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

170.22

297.19

472.05

234.87

1,174.33

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

164.97

514.83

582.18

315.50

1,577.48

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

173.81

639.81

872.49

421.53

2,107.64

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

200.87

704.13

1,177.53

520.63

2,603.16

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

248.79

868.93

1,774.88

723.15

3,615.75

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

321.97

961.94

2,220.22

876.03

4,380.16

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

380.11

1,168.07

3,098.96

1,161.79

5,808.93

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

449.57

1,362.74

4,697.09

1,627.35

8,136.75

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

174.27

263.77

389.02

206.77

1,033.83

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

170.22

297.19

504.85

243.07

1,215.33

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

161.04

514.83

608.42

321.07

1,605.36

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

173.81

639.81

931.80

436.36

2,181.78

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

200.87

704.13

1,643.81

637.20

3,186.01

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

248.79

868.93

2,237.36

838.77

4,193.85

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

321.97

961.94

2,849.98

1,033.47

5,167.36

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

380.11

1,168.07

3,724.92

1,318.28

6,591.38

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

449.57

1,362.74

5,129.17

1,735.37

8,676.85

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

67.97

68.08

321.92

114.49

572.46

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

562.93

309.47

2,446.38

829.70

4,148.48

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.99

76.80

20.20

100.99

Page 110 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (37) Lahore
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

74.22

431.67

126.47

632.36

508 a

BRICK PAVING (SINGLE COURSE)

SM

82.87

15.80

183.15

70.46

352.28

508 b

BRICK PAVING (DOUBLE COURSE)

SM

148.20

15.80

363.45

131.86

659.31

509 a

RIP RAP CLASS "A"

CM

356.75

377.24

183.50

917.49

509 b

RIP RAP CLASS "B"

CM

344.66

374.22

179.72

898.60

509 c

RIP RAP CLASS "C"

CM

346.73

377.24

180.99

904.96

509 d

GROUTED RIP RAP CLASS "A"

CM

420.41

35.09

1,370.29

456.45

2,282.24

509 e

GROUTED RIP RAP CLASS "B"

CM

405.18

28.07

1,264.46

424.43

2,122.14

509 f

GROUTED RIP RAP CLASS "C"

CM

400.43

23.39

1,286.64

427.62

2,138.08

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

592.20

181.56

2,802.16

893.98

4,469.90

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

37.35

115.89

337.48

122.68

613.40

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

78.66

194.57

68.31

341.54

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

112.38

35.01

61.30

52.17

260.86

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

143.85

44.81

78.47

66.78

333.91

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

182.14

91.01

242.50

128.91

644.56

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

227.67

113.77

303.12

161.14

805.70

603

BRICK EDGING

6.60

28.80

8.85

44.25

605 a

CONCRETE BEAM GUARDRAIL

56.72

14.67

422.31

123.43

617.13

605 c

CONCRETE POST FOR GUARDRAIL

69.64

13.10

418.85

125.40

626.99

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

179.34

128.42

4,675.13

1,245.72

6,228.61

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

51.63

192.63

6,846.84

1,772.78

8,863.88

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

179.34

272.87

8,464.33

2,229.14

11,145.68

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

596.55

304.65

15,547.58

4,112.20

20,560.98

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

119.31

60.93

7,003.13

1,795.84

8,979.21

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,026.39

317.56

1,587.79

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,539.58

445.86

2,229.28

Page 111 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (37) Lahore
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

2.01

2.85

15.38

5.06

25.30

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.67

1.27

30.25

8.05

40.24

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

2.01

2.85

20.52

6.35

31.73

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.67

1.27

40.34

10.57

52.85

EACH

54.02

148.57

50.65

253.24

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

54.02

381.18

108.80

544.00

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.52

3.56

21.39

6.87

34.34

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.52

4.75

51.71

14.75

73.73

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.52

3.56

28.52

8.65

43.25

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.52

4.75

68.95

19.06

95.28

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

54.02

206.53

65.14

325.69

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

54.02

652.07

176.52

882.61

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

44.91

99.05

35.99

179.95

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

44.91

254.50

74.85

374.26

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

44.91

137.69

45.65

228.25

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

44.91

435.37

120.07

600.35

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

6.75

46.68

167.59

55.26

276.28

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

6.75

46.68

202.59

64.01

320.03

610 b

RIGHT OF WAY MARKER

EACH

79.67

60.88

212.06

88.15

440.76

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

477.13

476.40

1,428.77

595.58

2,977.88

610 d

TEN KILOMETRE POST

EACH

923.88

952.79

3,107.56

1,246.06

6,230.29

Page 112 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (40) Leiah
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.45

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.41

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

12.92

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.85

9.26

5.13

28.00

139.98

258.13

11.55

70.65

353.25

51.66

1,032.53

46.20

282.60

1,412.99

CM

1.50

59.42

15.23

76.15

COMPACTION OF NATURAL GROUND

SM

0.21

5.92

1.69

8.44

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.36

86.79

22.29

111.44

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

73.74

193.76

68.85

344.24

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

10.60

214.84

56.36

281.80

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

6.95

167.12

43.52

217.59

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

1.93

78.63

20.14

100.70

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

73.74

193.76

68.85

344.24

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

11.72

199.88

52.90

264.50

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.34

167.24

43.15

215.73

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.06

89.04

0.31

23.35

116.76

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

39.18

165.86

53.31

64.59

322.94

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

65.10

258.51

5.26

82.22

411.09

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

55.56

193.04

62.15

310.75

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

33.48

160.37

48.46

242.31

107 d

GRANULAR BACK FILL

CM

20.73

83.07

335.01

109.70

548.51

107 e

COMMON BACK FILL

CM

16.03

37.31

4.13

14.37

71.84

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.10

106.71

4.13

28.74

143.68

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

12.18

302.97

10.50

81.41

407.06

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

9.14

268.11

1.96

69.80

349.01

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

8.12

238.60

61.68

308.40

CM

4.76

112.14

30.93

154.64

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 113 / 244

OH-PROFIT

0.62
7.89

7.89

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (40) Leiah
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

3.69

46.31

4.13

13.53

67.66

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

8.78

73.87

2.45

21.28

106.38

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.82

16.84

1.18

4.71

23.55

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.59

10.31

0.63

2.88

14.41

110

IMPROVED SUB-GRADE

CM

5.97

75.50

54.33

33.95

169.75

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.50

9.38

0.64

2.63

13.15

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.75

9.92

0.74

2.85

14.26

201

GRANULAR SUB-BASE

CM

4.80

106.91

461.59

143.33

716.63

202

AGGREGATE BASE

CM

5.46

132.11

619.08

189.16

945.81

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

46.04

916.98

3,476.77

1,109.95

5,549.74

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

47.51

916.98

3,698.19

1,165.67

5,828.35

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

50.87

957.74

3,471.47

1,120.02

5,600.10

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

50.87

954.75

3,779.97

1,196.40

5,981.99

204 b

CEMENT STABILIZED BASE

CM

17.01

272.73

771.75

265.37

1,326.86

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

142.42

568.44

22,123.80

5,708.67

28,543.33

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

142.42

568.44

23,025.76

5,934.16

29,670.78

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

61.80

55.65

654.19

192.91

964.55

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

92.05

1,408.67

3,150.15

1,162.72

5,813.59

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

68.60

66.68

518.47

163.44

817.19

207 a

DEEP PATCHING (0-15 cm)

SM

1.02

30.14

1.02

8.05

40.23

207 b

DEEP PATCHING (16-30 cm)

SM

1.02

26.47

1.02

7.13

35.64

208

REINSTATEMENT OF ROAD SURFACE

SM

1.07

37.00

0.45

9.63

48.15

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.17

70.82

0.55

18.14

90.68

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.23

14.16

0.11

3.63

18.13

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.17

0.67

22.13

5.74

28.71

Page 114 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (40) Leiah
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.17

0.67

22.13

5.74

28.71

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.74

2.51

12.56

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.21

2.38

11.90

304 a

SINGLE SURFACE TREATMENT

SM

0.45

4.16

44.03

12.16

60.80

304 b

DOUBLE SURFACE TREATMENT

SM

0.65

8.06

84.42

23.28

116.41

304 c

TRIPLE SURFACE TREATMENT

SM

1.09

11.08

101.06

28.31

141.54

304 d

SEAL COAT

SM

0.41

2.33

24.90

6.91

34.55

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

42.76

906.07

4,047.18

1,249.00

6,245.01

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

42.76

876.73

4,362.43

1,320.48

6,602.40

307 a

DENSE GRADED HOT BIT-MAC

CM

104.99

171.48

3,339.08

903.89

4,519.44

307 b

OPEN GRADED HOT BIT-MAC

CM

104.99

171.48

3,244.56

880.26

4,401.29

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

17.72

456.95

940.27

353.74

1,768.68

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

127.07

465.97

24,199.50

6,198.14

30,990.68

309 a

COLD MILLING, 0 - 30 mm

SM

0.56

16.87

7.54

6.24

31.21

309 b

COLD MILLING, 0 - 50 mm

SM

0.93

28.11

12.57

10.40

52.01

309 c

COLD MILLING, 0 - 70 mm

SM

1.39

42.16

18.85

15.60

78.00

401 ai

CONCRETE CLASS "A3" (Underground)

CM

328.35

643.62

3,140.13

1,028.03

5,140.13

401 aii CONCRETE CLASS "A3" (On ground)

CM

328.35

643.62

3,349.03

1,080.25

5,401.25

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

328.35

643.62

3,766.84

1,184.70

5,923.51

401 b

CONCRETE CLASS "B"

CM

418.56

407.09

2,354.21

794.97

3,974.83

401 ci

CONCRETE CLASS "C" (Underground)

CM

327.26

258.76

2,817.29

850.83

4,254.14

401 cii CONCRETE CLASS "C" (On ground)

CM

327.26

258.76

2,906.39

873.10

4,365.51

401 ciii CONCRETE CLASS "C" (Elevated)

CM

327.26

258.76

3,084.58

917.65

4,588.25

401 d

CONCRETE CLASS "D1"

CM

517.50

810.64

4,010.83

1,334.74

6,673.71

401 e

CONCRETE CLASS "Y"

CM

731.57

258.76

3,436.09

1,106.61

5,533.03

401 f

LEAN CONCRETE

CM

280.89

252.12

1,894.29

606.83

3,034.13

Page 115 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (40) Leiah
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,123.07

468.57

3,937.98

1,382.41

6,912.03

401 gii PRECAST CONCRETE CLASS "B"

CM

1,123.07

468.57

3,525.07

1,279.18

6,395.89

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,041.01

42,671.76

10,928.19

54,640.96

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,041.01

44,771.76

11,453.19

57,265.96

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

850.78

2,335.68

37,219.37

10,101.46

50,507.29

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,755.73

6,882.66

80,760.03

22,349.61

111,748.03

405 b

LAUNCHING OF GIRDER

TON

41.72

403.69

111.35

556.76

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

73.59

190.71

66.08

330.38

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

73.59

199.43

68.26

341.28

406 c

STEEL EXPANSION JOINTS

KG

6.34

11.61

60.73

19.67

98.35

406 d

WATER STOPS 6" SIZE

60.68

308.26

92.24

461.18

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

26.36

1,413.12

359.87

1,799.35

406 g

STEEL OR METAL BEARING DEVICES

KG

13.05

30.66

81.12

31.21

156.04

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

225.34

847.08

660.51

433.23

2,166.16

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

338.00

1,270.62

990.76

649.85

3,249.23

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

338.00

1,270.62

833.71

610.58

3,052.91

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

563.34

2,117.70

1,114.52

948.89

4,744.45

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

482.86

1,815.17

1,014.23

828.07

4,140.33

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

845.01

3,176.55

1,517.09

1,384.66

6,923.31

407 h

PILE LOAD TEST UP TO 120 TON

EACH

13,915.56

19,990.40

74,094.28

27,000.06

135,000.30

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,374.84

19,990.40

148,188.56

49,138.45

245,692.25

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,261.96

19,990.40

222,282.84

71,133.80

355,669.00

407 k

CONFIRMATORY BORING (NX SIZE)

133.32

826.61

5.16

241.27

1,206.36

410

BRICK WORK

CM

215.39

142.50

2,012.95

592.71

2,963.55

411 a

STONE MASONRY RANDOM DRY

CM

225.08

56.01

518.54

199.91

999.54

Page 116 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (40) Leiah
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

268.88

84.89

1,237.84

397.90

1,989.51

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

311.48

56.01

574.52

235.50

1,177.51

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

354.08

84.89

1,302.14

435.28

2,176.39

411 g

ROLL POINTING

SM

46.21

5.78

45.73

24.43

122.15

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

470.48

134.30

1,230.77

458.89

2,294.44

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

148.07

230.36

365.69

186.03

930.15

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

145.03

297.19

470.89

228.28

1,141.39

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

139.24

514.83

580.76

308.71

1,543.54

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

147.04

639.81

870.87

414.43

2,072.15

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

169.05

704.13

1,175.91

512.27

2,561.36

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

208.76

868.93

1,772.59

712.57

3,562.85

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

270.16

961.94

2,218.06

862.54

4,312.70

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

318.19

1,168.07

3,096.33

1,145.65

5,728.24

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

377.10

1,362.74

4,694.02

1,608.47

8,042.33

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

148.07

263.77

386.50

199.59

997.93

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

145.03

297.19

503.69

236.48

1,182.39

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

135.87

514.83

607.00

314.43

1,572.13

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

147.04

639.81

930.51

429.34

2,146.70

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

169.05

704.13

1,642.13

628.83

3,144.14

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

208.76

868.93

2,235.07

828.19

4,140.95

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

270.16

961.94

2,847.82

1,019.98

5,099.90

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

318.19

1,168.07

3,722.29

1,302.14

6,510.69

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

377.10

1,362.74

5,126.10

1,716.49

8,582.43

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

56.54

68.08

300.73

106.34

531.69

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

475.58

309.47

2,407.54

798.15

3,990.74

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.46

75.81

19.82

99.09

Page 117 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (40) Leiah
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

62.49

379.17

110.42

552.08

508 a

BRICK PAVING (SINGLE COURSE)

SM

72.01

15.80

159.67

61.87

309.35

508 b

BRICK PAVING (DOUBLE COURSE)

SM

129.61

15.80

316.66

115.52

577.59

509 a

RIP RAP CLASS "A"

CM

311.34

447.16

189.63

948.13

509 b

RIP RAP CLASS "B"

CM

301.15

443.59

186.19

930.93

509 c

RIP RAP CLASS "C"

CM

303.56

447.16

187.68

938.40

509 d

GROUTED RIP RAP CLASS "A"

CM

316.38

35.09

1,417.66

442.28

2,211.41

509 e

GROUTED RIP RAP CLASS "B"

CM

305.48

28.07

1,313.60

411.79

2,058.94

509 f

GROUTED RIP RAP CLASS "C"

CM

301.82

23.39

1,335.98

415.30

2,076.49

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

511.26

181.56

2,776.89

867.43

4,337.14

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

31.35

115.89

335.17

120.60

603.01

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

69.75

194.57

66.08

330.40

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

97.20

35.01

72.66

51.22

256.09

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

124.41

44.81

93.01

65.56

327.79

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

158.49

91.01

246.86

124.09

620.45

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

198.12

113.77

308.57

155.12

775.58

603

BRICK EDGING

5.65

24.96

7.65

38.26

605 a

CONCRETE BEAM GUARDRAIL

49.15

14.67

423.06

121.72

608.60

605 c

CONCRETE POST FOR GUARDRAIL

60.34

13.10

419.59

123.26

616.29

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

152.58

128.42

4,688.08

1,242.27

6,211.35

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

44.97

192.63

6,855.13

1,773.18

8,865.91

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

152.58

272.87

8,477.92

2,225.84

11,129.21

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

511.47

304.65

15,577.85

4,098.49

20,492.46

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

102.29

60.93

7,021.06

1,796.07

8,980.35

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,029.95

318.45

1,592.24

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,544.93

447.19

2,235.96

Page 118 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (40) Leiah
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.52

2.85

15.40

4.94

24.71

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.51

1.27

30.46

8.06

40.30

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.52

2.85

20.55

6.23

31.15

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.51

1.27

40.62

10.60

53.00

EACH

44.24

148.82

48.27

241.33

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

44.24

383.83

107.02

535.09

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

1.90

3.56

21.42

6.72

33.60

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

1.90

4.75

51.71

14.59

72.95

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

1.90

3.56

28.54

8.50

42.50

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

1.90

4.75

68.95

18.90

94.50

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

44.24

206.78

62.76

313.78

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

44.24

652.07

174.08

870.39

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

36.54

99.22

33.94

169.70

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

36.54

256.27

73.20

366.01

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

36.54

137.86

43.60

218.00

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

36.54

435.37

117.98

589.89

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

5.86

46.68

167.58

55.03

275.15

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

5.86

46.68

202.58

63.78

318.90

610 b

RIGHT OF WAY MARKER

EACH

68.69

60.88

211.64

85.30

426.51

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

422.67

476.40

1,420.68

579.94

2,899.69

610 d

TEN KILOMETRE POST

EACH

815.34

952.79

3,103.20

1,217.83

6,089.16

Page 119 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (41 A) Lodheran
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.52

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

5.08

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

14.78

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.87

9.35

0.88

27.10

135.50

258.13

1.97

68.72

343.60

59.14

1,032.53

7.89

274.89

1,374.45

CM

1.72

59.42

15.29

76.43

COMPACTION OF NATURAL GROUND

SM

0.24

5.92

1.70

8.48

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.78

86.79

22.39

111.96

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

84.76

193.76

46.20

81.18

405.90

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

12.19

214.84

56.76

283.79

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.94

167.12

43.77

218.83

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.28

78.63

20.23

101.14

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

84.76

193.76

46.20

81.18

405.90

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

13.46

199.88

53.34

266.68

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

6.15

167.24

43.35

216.74

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.76

89.04

0.31

23.53

117.64

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

43.15

165.86

53.31

65.58

327.90

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

74.80

258.51

30.80

91.03

455.14

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

63.78

193.04

64.21

321.03

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

38.47

160.37

49.71

248.55

107 d

GRANULAR BACK FILL

CM

23.58

83.07

307.17

103.46

517.28

107 e

COMMON BACK FILL

CM

18.08

37.31

4.13

14.88

74.40

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.75

106.71

4.13

28.90

144.49

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

14.01

302.97

48.81

91.45

457.24

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

10.51

268.11

1.96

70.15

350.73

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

9.34

238.60

61.99

309.93

CM

5.50

112.14

31.11

155.56

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 120 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (41 A) Lodheran
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

4.27

46.31

4.13

13.68

68.39

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

10.11

73.87

2.45

21.61

108.04

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.95

16.84

1.18

4.74

23.71

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.68

10.31

0.63

2.91

14.53

110

IMPROVED SUB-GRADE

CM

6.99

75.50

52.37

33.72

168.58

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.58

9.38

0.64

2.65

13.25

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.87

9.16

0.74

2.69

13.46

201

GRANULAR SUB-BASE

CM

5.55

106.91

476.30

147.19

735.95

202

AGGREGATE BASE

CM

6.46

132.11

639.97

194.64

973.18

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

52.61

916.98

3,505.00

1,118.65

5,593.24

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

54.33

916.98

3,725.61

1,174.23

5,871.15

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

57.98

957.74

3,499.70

1,128.86

5,644.28

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

57.98

954.75

3,807.38

1,205.03

6,025.14

204 b

CEMENT STABILIZED BASE

CM

19.97

272.73

799.74

273.11

1,365.55

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

160.09

568.44

22,276.80

5,751.33

28,756.66

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

160.09

568.44

22,331.42

5,764.99

28,824.94

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

69.71

55.65

676.24

200.40

1,002.00

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

106.03

1,408.67

3,178.89

1,173.40

5,866.99

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

77.22

66.68

585.45

182.34

911.69

207 a

DEEP PATCHING (0-15 cm)

SM

1.19

30.14

1.02

8.09

40.44

207 b

DEEP PATCHING (16-30 cm)

SM

1.19

26.47

1.02

7.17

35.85

208

REINSTATEMENT OF ROAD SURFACE

SM

1.27

37.00

0.45

9.68

48.40

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.34

70.82

0.55

18.18

90.89

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.27

14.16

0.11

3.64

18.18

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.20

0.67

22.28

5.79

28.94

Page 121 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (41 A) Lodheran
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.19

0.67

22.28

5.79

28.93

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.91

2.56

12.79

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

8.93

2.31

11.56

304 a

SINGLE SURFACE TREATMENT

SM

0.52

4.16

43.22

11.98

59.88

304 b

DOUBLE SURFACE TREATMENT

SM

0.76

8.06

82.15

22.74

113.71

304 c

TRIPLE SURFACE TREATMENT

SM

1.27

11.08

98.34

27.67

138.36

304 d

SEAL COAT

SM

0.48

2.33

25.76

7.14

35.71

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

49.11

906.07

4,075.68

1,257.72

6,288.58

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

49.11

876.73

4,392.53

1,329.59

6,647.96

307 a

DENSE GRADED HOT BIT-MAC

CM

122.42

171.48

3,372.56

916.62

4,583.08

307 b

OPEN GRADED HOT BIT-MAC

CM

122.42

171.48

3,278.04

892.99

4,464.93

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

21.33

456.95

922.49

350.19

1,750.96

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

142.17

465.97

24,250.50

6,214.66

31,073.30

309 a

COLD MILLING, 0 - 30 mm

SM

0.66

16.87

7.54

6.27

31.34

309 b

COLD MILLING, 0 - 50 mm

SM

1.10

28.11

12.57

10.45

52.23

309 c

COLD MILLING, 0 - 70 mm

SM

1.64

42.16

18.85

15.66

78.31

401 ai

CONCRETE CLASS "A3" (Underground)

CM

361.52

643.62

3,230.16

1,058.83

5,294.13

401 aii CONCRETE CLASS "A3" (On ground)

CM

361.52

643.62

3,439.06

1,111.05

5,555.25

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

361.52

643.62

3,856.86

1,215.50

6,077.50

401 b

CONCRETE CLASS "B"

CM

469.51

407.09

2,450.86

831.87

4,159.33

401 ci

CONCRETE CLASS "C" (Underground)

CM

358.72

258.76

2,912.99

882.62

4,413.09

401 cii CONCRETE CLASS "C" (On ground)

CM

358.72

258.76

3,002.08

904.89

4,524.45

401 ciii CONCRETE CLASS "C" (Elevated)

CM

358.72

258.76

3,180.27

949.44

4,747.19

401 d

CONCRETE CLASS "D1"

CM

559.75

810.64

4,092.61

1,365.75

6,828.75

401 e

CONCRETE CLASS "Y"

CM

774.77

258.76

3,517.99

1,137.88

5,689.40

401 f

LEAN CONCRETE

CM

314.20

252.12

1,990.89

639.30

3,196.51

Page 122 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (41 A) Lodheran
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,214.89

468.57

4,035.98

1,429.86

7,149.30

401 gii PRECAST CONCRETE CLASS "B"

CM

1,214.89

468.57

3,623.52

1,326.75

6,633.73

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,077.80

42,672.44

10,937.56

54,687.80

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,077.80

44,772.44

11,462.56

57,312.80

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

881.40

2,335.68

37,289.50

10,126.65

50,633.23

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,963.83

6,882.66

80,755.54

22,400.51

112,002.54

405 b

LAUNCHING OF GIRDER

TON

46.52

403.69

112.55

562.76

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

80.34

191.59

67.98

339.91

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

80.34

190.52

67.72

338.58

406 c

STEEL EXPANSION JOINTS

KG

6.44

11.61

60.80

19.71

98.56

406 d

WATER STOPS 6" SIZE

69.49

307.78

94.32

471.59

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

26.91

1,413.49

360.10

1,800.50

406 g

STEEL OR METAL BEARING DEVICES

KG

13.90

30.66

81.19

31.44

157.19

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

250.44

847.08

558.00

413.88

2,069.40

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

375.67

1,270.62

837.00

620.82

3,104.11

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

375.67

1,270.62

641.64

571.98

2,859.91

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

626.11

2,117.70

794.39

884.55

4,422.75

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

536.67

1,815.17

739.84

772.92

3,864.60

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

939.17

3,176.55

1,036.90

1,288.16

6,440.78

407 h

PILE LOAD TEST UP TO 120 TON

EACH

18,660.24

19,990.40

69,433.80

27,021.11

135,105.55

407 i

PILE LOAD TEST UP TO 240 TON

EACH

31,777.92

19,990.40

138,867.60

47,658.98

238,294.90

407 j

PILE LOAD TEST UP TO 360 TON

EACH

47,388.24

19,990.40

208,301.40

68,920.01

344,600.05

407 k

CONFIRMATORY BORING (NX SIZE)

148.22

826.61

5.16

245.00

1,224.99

410

BRICK WORK

CM

220.14

142.50

2,063.79

606.61

3,033.04

411 a

STONE MASONRY RANDOM DRY

CM

235.22

56.01

601.09

223.08

1,115.40

Page 123 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (41 A) Lodheran
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

281.54

84.89

1,383.95

437.60

2,187.98

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

323.78

56.01

664.92

261.18

1,305.89

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

366.02

84.89

1,440.21

472.78

2,363.90

411 g

ROLL POINTING

SM

46.31

5.78

46.79

24.72

123.60

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

488.18

134.30

1,368.83

497.83

2,489.14

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

164.24

230.36

367.67

190.57

952.84

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

160.70

297.19

473.27

232.79

1,163.95

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

154.88

514.83

583.54

313.31

1,566.56

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

163.71

639.81

874.12

419.41

2,097.05

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

188.76

704.13

1,179.16

518.01

2,590.06

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

232.48

868.93

1,777.29

719.68

3,598.38

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

300.86

961.94

2,222.73

871.38

4,356.91

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

356.25

1,168.07

3,102.00

1,156.58

5,782.90

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

418.52

1,362.74

4,700.64

1,620.48

8,102.38

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

164.24

263.77

390.47

204.62

1,023.10

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

160.70

297.19

506.07

240.99

1,204.95

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

150.26

514.83

609.78

318.72

1,593.59

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

163.71

639.81

933.04

434.14

2,170.70

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

188.76

704.13

1,645.74

634.66

3,173.29

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

232.48

868.93

2,239.77

835.30

4,176.48

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

300.86

961.94

2,852.49

1,028.82

5,144.11

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

356.25

1,168.07

3,727.97

1,313.07

6,565.36

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

418.52

1,362.74

5,132.72

1,728.50

8,642.48

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

64.18

68.08

237.18

92.36

461.80

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

535.01

309.47

2,504.19

837.17

4,185.84

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.57

75.81

19.85

99.23

Page 124 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (41 A) Lodheran
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

70.65

443.33

128.50

642.48

508 a

BRICK PAVING (SINGLE COURSE)

SM

75.55

15.80

157.02

62.09

310.46

508 b

BRICK PAVING (DOUBLE COURSE)

SM

134.59

15.80

311.90

115.57

577.86

509 a

RIP RAP CLASS "A"

CM

322.55

529.71

213.07

1,065.33

509 b

RIP RAP CLASS "B"

CM

311.99

525.47

209.37

1,046.83

509 c

RIP RAP CLASS "C"

CM

313.43

529.71

210.79

1,053.93

509 d

GROUTED RIP RAP CLASS "A"

CM

392.17

35.09

1,513.85

485.28

2,426.39

509 e

GROUTED RIP RAP CLASS "B"

CM

377.24

28.07

1,407.71

453.26

2,266.28

509 f

GROUTED RIP RAP CLASS "C"

CM

372.78

23.39

1,431.50

456.92

2,284.59

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

560.59

181.56

2,868.19

902.59

4,512.93

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

35.59

115.89

307.06

114.64

573.18

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

77.78

194.57

68.09

340.44

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

102.91

35.01

86.08

56.00

280.00

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

131.72

44.81

110.18

71.68

358.39

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

165.52

91.01

263.56

130.02

650.11

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

206.90

113.77

329.45

162.53

812.65

603

BRICK EDGING

6.12

24.96

7.77

38.85

605 a

CONCRETE BEAM GUARDRAIL

53.17

14.67

426.42

123.57

617.83

605 c

CONCRETE POST FOR GUARDRAIL

65.29

13.10

423.72

125.53

627.64

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

164.82

128.42

4,691.11

1,246.09

6,230.44

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

50.16

192.63

6,873.12

1,778.98

8,894.89

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

164.82

272.87

8,508.98

2,236.67

11,183.34

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

558.26

304.65

15,625.41

4,122.08

20,610.40

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

111.65

60.93

7,031.73

1,801.08

9,005.39

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,030.30

318.54

1,592.68

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,545.45

447.32

2,236.61

Page 125 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (41 A) Lodheran
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

2.10

2.85

15.40

5.09

25.44

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.70

1.27

30.48

8.11

40.56

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

2.10

2.85

20.56

6.38

31.89

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.70

1.27

40.65

10.66

53.28

EACH

49.52

148.85

49.59

247.96

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

49.52

384.09

108.40

542.01

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.62

3.56

21.42

6.90

34.50

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.62

4.75

51.71

14.77

73.85

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.62

3.56

28.56

8.69

43.43

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.62

4.75

68.95

19.08

95.40

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

49.52

206.81

64.08

320.41

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

49.52

652.07

175.40

876.99

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

41.89

99.23

35.28

176.40

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

41.89

256.45

74.59

372.93

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

41.89

137.87

44.94

224.70

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

41.89

435.37

119.32

596.58

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

6.65

46.68

167.66

55.25

276.24

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

6.65

46.68

202.66

64.00

319.99

610 b

RIGHT OF WAY MARKER

EACH

75.90

60.88

215.27

88.01

440.06

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

435.87

476.40

1,451.89

591.04

2,955.20

610 d

TEN KILOMETRE POST

EACH

846.30

952.79

3,162.56

1,240.41

6,202.06

Page 126 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (47 A) Mandi baha-udin
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.49

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.89

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

14.00

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.86

9.31

0.88

27.05

135.26

258.13

1.97

68.53

342.63

55.98

1,032.53

7.89

274.10

1,370.50

CM

1.68

59.42

15.28

76.38

COMPACTION OF NATURAL GROUND

SM

0.24

5.92

1.70

8.48

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

3.10

86.79

22.47

112.36

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

88.37

193.76

46.20

82.08

410.41

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

12.22

214.84

56.77

283.83

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

8.07

167.12

43.80

218.99

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.53

78.63

20.29

101.45

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

88.37

193.76

46.20

82.08

410.41

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

14.11

199.88

53.50

267.49

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

6.18

167.24

43.36

216.78

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

5.01

89.04

0.31

23.59

117.95

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

43.94

165.86

53.31

65.78

328.89

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

78.42

258.51

30.80

91.93

459.66

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

66.52

193.04

64.89

324.45

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

40.33

160.37

50.18

250.88

107 d

GRANULAR BACK FILL

CM

23.59

83.07

282.24

97.23

486.13

107 e

COMMON BACK FILL

CM

16.93

37.31

4.13

14.59

72.96

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.86

106.71

4.13

28.93

144.63

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

14.03

302.97

48.81

91.45

457.26

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

10.52

268.11

1.96

70.15

350.74

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

9.35

238.60

61.99

309.94

CM

5.52

112.14

31.12

155.59

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 127 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (47 A) Mandi baha-udin
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

4.31

46.31

4.13

13.69

68.44

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

9.94

73.87

2.45

21.57

107.83

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.97

16.84

1.18

4.75

23.74

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.69

10.31

0.63

2.91

14.54

110

IMPROVED SUB-GRADE

CM

6.91

75.50

54.33

34.19

170.93

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.57

9.38

0.64

2.65

13.24

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.86

9.92

0.74

2.88

14.40

201

GRANULAR SUB-BASE

CM

5.63

106.91

441.75

138.57

692.86

202

AGGREGATE BASE

CM

6.71

132.11

587.75

181.64

908.21

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

50.24

916.98

3,394.93

1,090.54

5,452.69

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

52.20

916.98

3,616.90

1,146.52

5,732.60

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

55.83

957.74

3,389.56

1,100.78

5,503.91

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

55.83

954.75

3,698.05

1,177.16

5,885.79

204 b

CEMENT STABILIZED BASE

CM

20.36

272.73

717.03

252.53

1,262.65

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

167.23

568.44

21,715.80

5,612.87

28,064.34

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

167.23

568.44

22,611.89

5,836.89

29,184.45

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

63.88

55.65

621.06

185.15

925.74

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

103.59

1,408.67

3,082.01

1,148.57

5,742.84

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

70.76

66.68

533.23

167.67

838.34

207 a

DEEP PATCHING (0-15 cm)

SM

1.18

30.14

1.02

8.09

40.43

207 b

DEEP PATCHING (16-30 cm)

SM

1.18

26.47

1.02

7.17

35.84

208

REINSTATEMENT OF ROAD SURFACE

SM

1.29

37.00

0.45

9.69

48.43

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.40

70.82

0.55

18.19

90.96

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.28

14.16

0.11

3.64

18.19

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.21

0.67

21.72

5.65

28.25

Page 128 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (47 A) Mandi baha-udin
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.20

0.67

21.72

5.65

28.24

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.58

2.48

12.38

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.04

2.34

11.70

304 a

SINGLE SURFACE TREATMENT

SM

0.55

4.16

42.96

11.92

59.59

304 b

DOUBLE SURFACE TREATMENT

SM

0.80

8.06

82.20

22.77

113.83

304 c

TRIPLE SURFACE TREATMENT

SM

1.34

11.08

98.30

27.68

138.40

304 d

SEAL COAT

SM

0.51

2.33

24.37

6.80

34.01

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

47.69

906.07

3,954.92

1,227.17

6,135.85

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

47.69

876.73

4,261.92

1,296.59

6,482.93

307 a

DENSE GRADED HOT BIT-MAC

CM

115.49

171.48

3,249.50

884.12

4,420.59

307 b

OPEN GRADED HOT BIT-MAC

CM

115.49

171.48

3,162.28

862.31

4,311.56

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

19.81

456.95

924.65

350.35

1,751.76

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

146.75

465.97

23,791.50

6,101.06

30,505.28

309 a

COLD MILLING, 0 - 30 mm

SM

0.67

16.87

7.54

6.27

31.35

309 b

COLD MILLING, 0 - 50 mm

SM

1.12

28.11

12.57

10.45

52.25

309 c

COLD MILLING, 0 - 70 mm

SM

1.68

42.16

18.85

15.67

78.36

401 ai

CONCRETE CLASS "A3" (Underground)

CM

363.90

643.62

3,090.65

1,024.54

5,122.71

401 aii CONCRETE CLASS "A3" (On ground)

CM

363.90

643.62

3,299.55

1,076.77

5,383.84

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

363.90

643.62

3,717.35

1,181.22

5,906.09

401 b

CONCRETE CLASS "B"

CM

468.71

407.09

2,313.39

797.30

3,986.49

401 ci

CONCRETE CLASS "C" (Underground)

CM

354.21

258.76

2,766.33

844.83

4,224.13

401 cii CONCRETE CLASS "C" (On ground)

CM

354.21

258.76

2,855.43

867.10

4,335.50

401 ciii CONCRETE CLASS "C" (Elevated)

CM

354.21

258.76

3,033.62

911.65

4,558.24

401 d

CONCRETE CLASS "D1"

CM

563.34

810.64

3,962.73

1,334.18

6,670.89

401 e

CONCRETE CLASS "Y"

CM

784.40

258.76

3,386.78

1,107.49

5,537.43

401 f

LEAN CONCRETE

CM

297.26

252.12

1,855.18

601.14

3,005.70

Page 129 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (47 A) Mandi baha-udin
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,197.32

468.57

3,883.96

1,387.46

6,937.31

401 gii PRECAST CONCRETE CLASS "B"

CM

1,197.32

468.57

3,481.10

1,286.75

6,433.74

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,097.96

42,670.98

10,942.24

54,711.18

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,097.96

44,770.98

11,467.24

57,336.18

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

900.26

2,335.68

37,138.92

10,093.72

50,468.58

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

2,099.70

6,882.66

80,759.34

22,435.43

112,177.13

405 b

LAUNCHING OF GIRDER

TON

49.36

403.69

113.26

566.31

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

79.72

186.38

66.53

332.63

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

79.72

195.09

68.70

343.51

406 c

STEEL EXPANSION JOINTS

KG

6.57

11.61

60.79

19.74

98.71

406 d

WATER STOPS 6" SIZE

65.11

309.75

93.72

468.58

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

29.12

1,411.57

360.17

1,800.86

406 g

STEEL OR METAL BEARING DEVICES

KG

14.30

30.66

81.15

31.53

157.64

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

262.40

847.08

559.81

417.32

2,086.61

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

393.61

1,270.62

839.72

625.99

3,129.94

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

393.61

1,270.62

644.36

577.15

2,885.74

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

656.01

2,117.70

798.93

893.16

4,465.80

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

562.30

1,815.17

743.73

780.30

3,901.50

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

984.02

3,176.55

1,043.71

1,301.07

6,505.35

407 h

PILE LOAD TEST UP TO 120 TON

EACH

14,471.40

19,990.40

69,433.80

25,973.90

129,869.50

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,629.00

19,990.40

138,867.60

46,871.75

234,358.75

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,817.80

19,990.40

208,301.40

67,777.40

338,887.00

407 k

CONFIRMATORY BORING (NX SIZE)

145.60

826.61

5.16

244.34

1,221.71

410

BRICK WORK

CM

228.36

142.50

2,055.10

606.49

3,032.45

411 a

STONE MASONRY RANDOM DRY

CM

238.20

56.01

560.00

213.55

1,067.76

Page 130 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (47 A) Mandi baha-udin
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

283.20

84.89

1,269.84

409.48

2,047.41

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

328.20

56.01

619.34

250.89

1,254.44

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

373.20

84.89

1,339.42

449.38

2,246.89

411 g

ROLL POINTING

SM

48.81

5.78

45.55

25.04

125.18

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

493.20

134.30

1,268.04

473.89

2,369.43

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

154.50

230.36

365.35

187.55

937.76

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

150.45

297.19

470.48

229.53

1,147.65

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

147.94

514.83

580.30

310.77

1,553.84

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

154.95

639.81

870.32

416.27

2,081.35

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

179.75

704.13

1,175.36

514.81

2,574.05

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

224.21

868.93

1,771.80

716.24

3,581.18

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

290.16

961.94

2,217.24

867.34

4,336.68

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

341.62

1,168.07

3,095.34

1,151.26

5,756.29

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

405.43

1,362.74

4,692.86

1,615.26

8,076.29

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

154.50

263.77

385.95

201.06

1,005.28

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

150.45

297.19

503.28

237.73

1,188.65

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

144.57

514.83

606.54

316.49

1,582.43

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

154.95

639.81

930.09

431.21

2,156.06

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

179.75

704.13

1,641.50

631.35

3,156.73

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

224.21

868.93

2,234.28

831.86

4,159.28

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

290.16

961.94

2,847.00

1,024.78

5,123.88

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

341.62

1,168.07

3,721.30

1,307.75

6,538.74

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

405.43

1,362.74

5,124.95

1,723.28

8,616.40

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

60.70

68.08

237.18

91.49

457.45

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

526.72

309.47

2,366.50

800.67

4,003.36

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.77

75.81

19.90

99.48

Page 131 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (47 A) Mandi baha-udin
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

65.30

420.00

121.33

606.63

508 a

BRICK PAVING (SINGLE COURSE)

SM

75.90

15.80

162.67

63.59

317.96

508 b

BRICK PAVING (DOUBLE COURSE)

SM

135.90

15.80

323.20

118.73

593.63

509 a

RIP RAP CLASS "A"

CM

329.09

488.63

204.43

1,022.15

509 b

RIP RAP CLASS "B"

CM

317.27

484.72

200.50

1,002.49

509 c

RIP RAP CLASS "C"

CM

319.40

488.63

202.01

1,010.04

509 d

GROUTED RIP RAP CLASS "A"

CM

315.34

35.09

1,464.01

453.61

2,268.05

509 e

GROUTED RIP RAP CLASS "B"

CM

303.56

28.07

1,359.17

422.70

2,113.50

509 f

GROUTED RIP RAP CLASS "C"

CM

298.87

23.39

1,380.65

425.73

2,128.64

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

540.88

181.56

2,735.78

864.56

4,322.78

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

33.00

115.89

282.27

107.79

538.95

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

76.20

194.57

67.69

338.46

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

102.94

35.01

79.40

54.34

271.69

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

131.76

44.81

101.63

69.55

347.75

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

167.76

91.01

247.83

126.65

633.25

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

209.70

113.77

309.78

158.31

791.56

603

BRICK EDGING

5.99

25.92

7.98

39.89

605 a

CONCRETE BEAM GUARDRAIL

50.97

14.67

421.06

121.68

608.38

605 c

CONCRETE POST FOR GUARDRAIL

62.58

13.10

417.15

123.21

616.04

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

164.31

128.42

4,679.02

1,242.94

6,214.69

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

46.50

192.63

6,840.37

1,769.88

8,849.38

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

164.31

272.87

8,453.54

2,222.68

11,113.40

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

531.46

304.65

15,535.90

4,093.00

20,465.01

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

106.29

60.93

7,006.21

1,793.36

8,966.79

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,028.01

317.96

1,589.81

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,542.02

446.47

2,232.33

Page 132 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (47 A) Mandi baha-udin
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.63

2.85

15.39

4.97

24.84

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.54

1.27

30.34

8.04

40.19

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.63

2.85

20.53

6.25

31.26

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.54

1.27

40.47

10.57

52.85

EACH

46.85

148.66

48.88

244.39

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

46.85

382.37

107.31

536.53

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.04

3.56

21.40

6.75

33.75

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.04

4.75

51.71

14.63

73.13

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.04

3.56

28.53

8.53

42.66

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.04

4.75

68.95

18.94

94.68

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

46.85

206.62

63.37

316.84

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

46.85

652.07

174.73

873.65

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

38.75

99.11

34.47

172.33

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

38.75

255.30

73.51

367.56

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

38.75

137.75

44.13

220.63

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

38.75

435.37

118.53

592.65

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

6.09

46.68

167.56

55.08

275.41

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

6.09

46.68

202.56

63.83

319.16

610 b

RIGHT OF WAY MARKER

EACH

70.46

60.88

209.52

85.22

426.08

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

435.90

476.40

1,404.29

579.15

2,895.74

610 d

TEN KILOMETRE POST

EACH

841.80

952.79

3,068.61

1,215.80

6,079.00

Page 133 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (45) Mianwali
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.47

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.67

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

13.52

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.86

9.29

0.88

27.00

134.99

258.13

1.97

68.41

342.03

54.06

1,032.53

7.89

273.62

1,368.10

CM

1.61

59.42

15.26

76.29

COMPACTION OF NATURAL GROUND

SM

0.23

5.92

1.69

8.46

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.78

86.79

22.39

111.96

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

79.76

193.76

46.20

79.93

399.65

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

11.01

214.84

56.46

282.31

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.25

167.12

43.59

217.96

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.27

78.63

20.23

101.13

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

79.76

193.76

46.20

79.93

399.65

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

12.70

199.88

53.15

265.73

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.55

167.24

43.20

215.99

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.56

89.04

0.31

23.48

117.39

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

40.86

165.86

53.31

65.01

325.04

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

70.55

258.51

30.80

89.97

449.83

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

59.74

193.04

63.20

315.98

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

36.28

160.37

49.16

245.81

107 d

GRANULAR BACK FILL

CM

22.19

83.07

270.72

94.00

469.98

107 e

COMMON BACK FILL

CM

16.67

37.31

4.13

14.53

72.64

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.36

106.71

4.13

28.80

144.00

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

12.88

302.97

48.81

91.17

455.83

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

9.66

268.11

1.96

69.93

349.66

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

8.59

238.60

61.80

308.99

CM

5.03

112.14

31.00

154.98

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 134 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (45) Mianwali
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

3.92

46.31

4.13

13.59

67.95

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

9.26

73.87

2.45

21.40

106.98

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.88

16.84

1.18

4.73

23.63

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.64

10.31

0.63

2.90

14.48

110

IMPROVED SUB-GRADE

CM

6.31

75.50

54.47

34.07

170.35

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.54

9.38

0.64

2.64

13.20

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.80

9.92

0.74

2.87

14.33

201

GRANULAR SUB-BASE

CM

5.08

106.91

468.52

145.13

725.64

202

AGGREGATE BASE

CM

5.84

132.11

608.64

186.65

933.24

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

47.24

916.98

3,432.24

1,099.12

5,495.58

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

48.83

916.98

3,652.55

1,154.59

5,772.95

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

52.31

957.74

3,426.87

1,109.23

5,546.15

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

52.31

954.75

3,733.78

1,185.21

5,926.05

204 b

CEMENT STABILIZED BASE

CM

18.03

272.73

751.49

260.56

1,302.81

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

155.59

568.44

21,817.80

5,635.46

28,177.29

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

155.59

568.44

22,711.54

5,858.89

29,294.46

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

62.81

55.65

643.16

190.41

952.03

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

95.42

1,408.67

3,115.61

1,154.93

5,774.63

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

69.43

66.68

480.71

154.21

771.03

207 a

DEEP PATCHING (0-15 cm)

SM

1.09

30.14

1.02

8.06

40.31

207 b

DEEP PATCHING (16-30 cm)

SM

1.09

26.47

1.02

7.15

35.73

208

REINSTATEMENT OF ROAD SURFACE

SM

1.15

37.00

0.45

9.65

48.25

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.33

70.82

0.55

18.18

90.88

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.27

14.16

0.11

3.64

18.18

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.19

0.67

21.82

5.67

28.35

Page 135 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (45) Mianwali
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.18

0.67

21.82

5.67

28.34

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.62

2.49

12.43

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.08

2.35

11.75

304 a

SINGLE SURFACE TREATMENT

SM

0.49

4.16

43.32

11.99

59.96

304 b

DOUBLE SURFACE TREATMENT

SM

0.71

8.06

83.01

22.95

114.73

304 c

TRIPLE SURFACE TREATMENT

SM

1.19

11.08

99.36

27.91

139.54

304 d

SEAL COAT

SM

0.45

2.33

24.55

6.83

34.16

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

44.13

906.07

3,993.62

1,235.96

6,179.78

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

44.13

876.73

4,303.50

1,306.09

6,530.45

307 a

DENSE GRADED HOT BIT-MAC

CM

106.87

171.48

3,286.38

891.18

4,455.91

307 b

OPEN GRADED HOT BIT-MAC

CM

106.87

171.48

3,196.69

868.76

4,343.80

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

18.06

456.95

931.06

351.52

1,757.59

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

138.95

465.97

23,893.50

6,124.61

30,623.03

309 a

COLD MILLING, 0 - 30 mm

SM

0.60

16.87

7.54

6.25

31.26

309 b

COLD MILLING, 0 - 50 mm

SM

1.00

28.11

12.57

10.42

52.10

309 c

COLD MILLING, 0 - 70 mm

SM

1.50

42.16

18.85

15.63

78.14

401 ai

CONCRETE CLASS "A3" (Underground)

CM

331.79

643.62

3,095.47

1,017.72

5,088.60

401 aii CONCRETE CLASS "A3" (On ground)

CM

331.79

643.62

3,304.37

1,069.95

5,349.73

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

331.79

643.62

3,722.18

1,174.40

5,871.99

401 b

CONCRETE CLASS "B"

CM

431.42

407.09

2,313.06

787.89

3,939.46

401 ci

CONCRETE CLASS "C" (Underground)

CM

329.21

258.76

2,772.46

840.11

4,200.54

401 cii CONCRETE CLASS "C" (On ground)

CM

329.21

258.76

2,861.55

862.38

4,311.90

401 ciii CONCRETE CLASS "C" (Elevated)

CM

329.21

258.76

3,039.75

906.93

4,534.65

401 d

CONCRETE CLASS "D1"

CM

517.38

810.64

3,966.91

1,323.73

6,618.66

401 e

CONCRETE CLASS "Y"

CM

730.10

258.76

3,392.55

1,095.35

5,476.76

401 f

LEAN CONCRETE

CM

285.55

252.12

1,854.68

598.09

2,990.44

Page 136 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (45) Mianwali
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,128.16

468.57

3,889.59

1,371.58

6,857.90

401 gii PRECAST CONCRETE CLASS "B"

CM

1,128.16

468.57

3,482.75

1,269.87

6,349.35

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,054.90

42,576.74

10,907.91

54,539.55

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,054.90

44,676.74

11,432.91

57,164.55

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

851.65

2,335.68

38,248.00

10,358.83

51,794.16

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,804.18

6,882.66

80,755.91

22,360.69

111,803.44

405 b

LAUNCHING OF GIRDER

TON

42.62

403.69

111.58

557.89

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

73.69

188.84

65.63

328.16

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

73.69

197.57

67.82

339.08

406 c

STEEL EXPANSION JOINTS

KG

6.34

11.61

62.39

20.09

100.43

406 d

WATER STOPS 6" SIZE

60.60

308.84

92.36

461.80

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

26.79

1,412.36

359.79

1,798.94

406 g

STEEL OR METAL BEARING DEVICES

KG

13.39

30.66

82.84

31.72

158.61

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

231.63

847.08

632.06

427.69

2,138.46

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

347.45

1,270.62

948.10

641.54

3,207.71

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

347.45

1,270.62

718.36

584.11

2,920.54

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

579.08

2,117.70

876.43

893.30

4,466.51

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

496.35

1,815.17

819.98

782.88

3,914.38

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

868.62

3,176.55

1,134.18

1,294.84

6,474.19

407 h

PILE LOAD TEST UP TO 120 TON

EACH

13,468.20

19,990.40

64,772.44

24,557.76

122,788.80

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,485.00

19,990.40

129,544.88

44,505.07

222,525.35

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,491.40

19,990.40

194,317.32

64,199.78

320,998.90

407 k

CONFIRMATORY BORING (NX SIZE)

134.30

826.61

5.16

241.52

1,207.59

410

BRICK WORK

CM

217.65

142.50

2,043.80

600.99

3,004.94

411 a

STONE MASONRY RANDOM DRY

CM

227.85

56.01

321.38

151.31

756.55

Page 137 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (45) Mianwali
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

271.65

84.89

1,017.10

343.41

1,717.05

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

314.25

56.01

361.63

182.97

914.86

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

356.85

84.89

1,071.11

378.21

1,891.06

411 g

ROLL POINTING

SM

46.35

5.78

45.31

24.36

121.80

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

473.25

134.30

999.73

401.82

2,009.10

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

151.61

230.36

364.91

186.72

933.60

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

147.86

297.19

469.95

228.75

1,143.75

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

142.90

514.83

579.68

309.35

1,546.76

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

150.36

639.81

869.60

414.94

2,074.71

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

173.07

704.13

1,174.64

512.96

2,564.80

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

213.86

868.93

1,770.76

713.39

3,566.94

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

276.76

961.94

2,216.20

863.73

4,318.63

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

326.21

1,168.07

3,094.08

1,147.09

5,735.45

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

386.76

1,362.74

4,691.39

1,610.22

8,051.11

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

151.61

263.77

385.06

200.11

1,000.55

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

147.86

297.19

502.75

236.95

1,184.75

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

139.71

514.83

605.92

315.12

1,575.58

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

150.36

639.81

929.53

429.93

2,149.63

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

173.07

704.13

1,640.70

629.48

3,147.38

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

213.86

868.93

2,233.24

829.01

4,145.04

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

276.76

961.94

2,845.96

1,021.17

5,105.83

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

326.21

1,168.07

3,720.04

1,303.58

6,517.90

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

386.76

1,362.74

5,123.48

1,718.25

8,591.23

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

59.38

68.08

173.61

75.27

376.34

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

485.18

309.47

2,366.18

790.21

3,951.04

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.62

75.81

19.86

99.29

Page 138 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (45) Mianwali
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

64.38

379.17

110.89

554.44

508 a

BRICK PAVING (SINGLE COURSE)

SM

72.72

15.80

160.02

62.14

310.68

508 b

BRICK PAVING (DOUBLE COURSE)

SM

130.32

15.80

318.43

116.14

580.69

509 a

RIP RAP CLASS "A"

CM

314.55

250.00

141.14

705.69

509 b

RIP RAP CLASS "B"

CM

303.72

248.00

137.93

689.65

509 c

RIP RAP CLASS "C"

CM

305.70

250.00

138.93

694.63

509 d

GROUTED RIP RAP CLASS "A"

CM

343.34

35.09

1,220.55

399.75

1,998.73

509 e

GROUTED RIP RAP CLASS "B"

CM

331.38

28.07

1,118.15

369.40

1,847.00

509 f

GROUTED RIP RAP CLASS "C"

CM

327.45

23.39

1,136.76

371.90

1,859.50

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

512.80

181.56

2,735.51

857.47

4,287.34

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

32.00

115.89

270.39

104.57

522.85

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

72.00

194.57

66.64

333.21

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

98.95

35.01

40.63

43.65

218.24

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

126.66

44.81

52.00

55.87

279.34

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

160.74

91.01

209.04

115.20

575.99

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

200.93

113.77

261.30

144.00

720.00

603

BRICK EDGING

5.79

25.92

7.93

39.64

605 a

CONCRETE BEAM GUARDRAIL

49.58

14.67

420.86

121.28

606.39

605 c

CONCRETE POST FOR GUARDRAIL

60.87

13.10

416.95

122.73

613.65

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

154.80

128.42

4,684.06

1,241.82

6,209.10

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

44.55

192.63

6,844.73

1,770.48

8,852.39

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

154.80

272.87

8,460.05

2,221.93

11,109.65

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

514.81

304.65

15,548.92

4,092.10

20,460.48

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

102.96

60.93

7,012.71

1,794.15

8,970.75

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,029.18

318.26

1,591.28

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,543.77

446.90

2,234.51

Page 139 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (45) Mianwali
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.63

2.85

15.40

4.97

24.85

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.54

1.27

30.41

8.06

40.28

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.63

2.85

20.54

6.26

31.28

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.54

1.27

40.56

10.59

52.96

EACH

46.77

148.77

48.89

244.43

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

46.77

383.23

107.50

537.50

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.04

3.56

21.41

6.75

33.76

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.04

4.75

51.71

14.63

73.13

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.04

3.56

28.55

8.54

42.69

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.04

4.75

68.95

18.94

94.68

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

46.77

206.73

63.38

316.88

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

46.77

652.07

174.71

873.55

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

38.67

99.18

34.46

172.31

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

38.67

255.87

73.64

368.18

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

38.67

137.82

44.12

220.61

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

38.67

435.37

118.51

592.55

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

5.80

46.68

167.54

55.01

275.03

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

5.80

46.68

202.54

63.76

318.78

610 b

RIGHT OF WAY MARKER

EACH

69.41

60.88

209.67

84.99

424.95

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

428.33

476.40

1,404.60

577.33

2,886.66

610 d

TEN KILOMETRE POST

EACH

826.65

952.79

3,070.16

1,212.40

6,062.00

Page 140 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (46) Multan
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.40

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.05

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

11.52

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.84

9.20

0.88

26.84

134.21

258.13

1.97

67.91

339.53

46.08

1,032.53

7.89

271.63

1,358.13

CM

1.44

59.42

15.22

76.08

COMPACTION OF NATURAL GROUND

SM

0.21

5.92

1.69

8.44

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.70

86.79

22.37

111.86

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

76.56

193.76

46.20

79.13

395.65

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

10.64

214.84

56.37

281.85

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.11

167.12

43.56

217.79

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.21

78.63

20.21

101.05

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

76.56

193.76

46.20

79.13

395.65

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

12.21

199.88

53.02

265.11

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.41

167.24

43.16

215.81

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.47

89.04

0.31

23.46

117.28

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

39.21

165.86

53.31

64.60

322.98

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

67.84

258.51

30.80

89.29

446.44

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

57.51

193.04

62.64

313.19

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

34.89

160.37

48.82

244.08

107 d

GRANULAR BACK FILL

CM

19.74

83.07

314.43

104.31

521.55

107 e

COMMON BACK FILL

CM

13.82

37.31

4.13

13.82

69.08

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.27

106.71

4.13

28.78

143.89

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

12.15

302.97

48.81

90.98

454.91

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

9.11

268.11

1.96

69.80

348.98

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

8.10

238.60

61.68

308.38

CM

4.81

112.14

30.94

154.70

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 141 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (46) Multan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

3.80

46.31

4.13

13.56

67.80

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

8.60

73.87

2.45

21.23

106.15

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.84

16.84

1.18

4.72

23.58

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.61

10.31

0.63

2.89

14.44

110

IMPROVED SUB-GRADE

CM

5.95

75.50

48.96

32.60

163.01

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.50

9.38

0.64

2.63

13.15

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.76

9.92

0.74

2.86

14.28

201

GRANULAR SUB-BASE

CM

4.90

106.91

436.15

136.99

684.95

202

AGGREGATE BASE

CM

5.75

132.11

566.87

176.18

880.91

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

41.78

916.98

3,412.81

1,092.89

5,464.46

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

43.49

916.98

3,636.01

1,149.12

5,745.60

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

46.84

957.74

3,407.35

1,102.98

5,514.91

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

46.84

954.75

3,717.84

1,179.86

5,899.29

204 b

CEMENT STABILIZED BASE

CM

17.31

272.73

706.44

249.12

1,245.60

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

147.12

568.44

22,072.80

5,697.09

28,485.45

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

147.12

568.44

22,974.53

5,922.52

29,612.61

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

52.23

55.65

599.01

176.72

883.61

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

87.75

1,408.67

3,084.46

1,145.22

5,726.10

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

57.55

66.68

517.51

160.44

802.18

207 a

DEEP PATCHING (0-15 cm)

SM

1.04

30.14

1.02

8.05

40.25

207 b

DEEP PATCHING (16-30 cm)

SM

1.04

26.47

1.02

7.13

35.66

208

REINSTATEMENT OF ROAD SURFACE

SM

1.10

37.00

0.45

9.64

48.19

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.29

70.82

0.55

18.17

90.83

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.26

14.16

0.11

3.63

18.16

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.18

0.67

22.08

5.73

28.66

Page 142 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (46) Multan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.18

0.67

22.08

5.73

28.66

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.72

2.51

12.54

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.19

2.38

11.88

304 a

SINGLE SURFACE TREATMENT

SM

0.47

4.16

43.58

12.05

60.26

304 b

DOUBLE SURFACE TREATMENT

SM

0.69

8.06

83.23

23.00

114.98

304 c

TRIPLE SURFACE TREATMENT

SM

1.16

11.08

99.41

27.91

139.56

304 d

SEAL COAT

SM

0.44

2.33

24.72

6.87

34.36

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

40.01

906.07

3,981.03

1,231.78

6,158.89

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

40.01

876.73

4,292.80

1,302.39

6,511.93

307 a

DENSE GRADED HOT BIT-MAC

CM

95.54

171.48

3,278.80

886.46

4,432.28

307 b

OPEN GRADED HOT BIT-MAC

CM

95.54

171.48

3,184.17

862.80

4,313.99

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

16.47

456.95

929.03

350.61

1,753.06

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

129.21

465.97

24,148.50

6,185.92

30,929.60

309 a

COLD MILLING, 0 - 30 mm

SM

0.57

16.87

7.54

6.25

31.23

309 b

COLD MILLING, 0 - 50 mm

SM

0.95

28.11

12.57

10.41

52.04

309 c

COLD MILLING, 0 - 70 mm

SM

1.43

42.16

18.85

15.61

78.05

401 ai

CONCRETE CLASS "A3" (Underground)

CM

327.33

643.62

3,125.09

1,024.01

5,120.05

401 aii CONCRETE CLASS "A3" (On ground)

CM

327.33

643.62

3,333.99

1,076.24

5,381.18

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

327.33

643.62

3,751.79

1,180.69

5,903.43

401 b

CONCRETE CLASS "B"

CM

411.02

407.09

2,340.66

789.69

3,948.46

401 ci

CONCRETE CLASS "C" (Underground)

CM

315.27

258.76

2,793.03

841.77

4,208.83

401 cii CONCRETE CLASS "C" (On ground)

CM

315.27

258.76

2,882.13

864.04

4,320.20

401 ciii CONCRETE CLASS "C" (Elevated)

CM

315.27

258.76

3,060.32

908.59

4,542.94

401 d

CONCRETE CLASS "D1"

CM

511.76

810.64

3,992.69

1,328.77

6,643.86

401 e

CONCRETE CLASS "Y"

CM

712.73

258.76

3,420.74

1,098.06

5,490.29

401 f

LEAN CONCRETE

CM

253.23

252.12

1,882.23

596.90

2,984.48

Page 143 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (46) Multan
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,053.16

468.57

3,922.13

1,360.97

6,804.83

401 gii PRECAST CONCRETE CLASS "B"

CM

1,053.16

468.57

3,506.91

1,257.16

6,285.80

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

997.00

42,565.72

10,890.68

54,453.40

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

997.00

44,665.72

11,415.68

57,078.40

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

816.76

2,335.68

37,112.48

10,066.23

50,331.15

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,711.38

6,882.66

80,755.70

22,337.44

111,687.18

405 b

LAUNCHING OF GIRDER

TON

39.87

403.69

110.89

554.45

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

70.52

189.92

65.11

325.55

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

70.52

198.63

67.29

336.44

406 c

STEEL EXPANSION JOINTS

KG

5.91

11.61

60.60

19.53

97.65

406 d

WATER STOPS 6" SIZE

57.77

308.03

91.45

457.25

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

26.33

1,412.87

359.80

1,799.00

406 g

STEEL OR METAL BEARING DEVICES

KG

12.34

30.66

81.01

31.00

155.01

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

211.09

847.08

552.95

402.78

2,013.90

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

316.64

1,270.62

829.42

604.17

3,020.85

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

316.64

1,270.62

634.06

555.33

2,776.65

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

527.73

2,117.70

781.77

856.80

4,284.00

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

452.34

1,815.17

729.01

749.13

3,745.65

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

791.59

3,176.55

1,017.96

1,246.53

6,232.63

407 h

PILE LOAD TEST UP TO 120 TON

EACH

11,748.24

19,990.40

72,583.32

26,080.49

130,402.45

407 i

PILE LOAD TEST UP TO 240 TON

EACH

22,913.52

19,990.40

145,166.64

47,017.64

235,088.20

407 j

PILE LOAD TEST UP TO 360 TON

EACH

34,428.24

19,990.40

217,749.96

68,042.15

340,210.75

407 k

CONFIRMATORY BORING (NX SIZE)

116.19

826.61

5.16

236.99

1,184.95

410

BRICK WORK

CM

204.73

142.50

2,033.38

595.15

2,975.76

411 a

STONE MASONRY RANDOM DRY

CM

213.30

56.01

485.30

188.65

943.26

Page 144 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (46) Multan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

251.84

84.89

1,230.50

391.81

1,959.04

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

292.92

56.01

538.67

221.90

1,109.50

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

334.00

84.89

1,285.26

426.04

2,130.19

411 g

ROLL POINTING

SM

44.19

5.78

46.14

24.03

120.14

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

437.62

134.30

1,213.88

446.45

2,232.25

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

128.60

230.36

366.46

181.36

906.78

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

125.05

297.19

471.81

223.51

1,117.56

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

124.97

514.83

581.85

305.41

1,527.06

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

129.97

639.81

872.13

410.48

2,052.39

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

150.66

704.13

1,177.17

507.99

2,539.95

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

188.67

868.93

1,774.41

708.00

3,540.01

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

244.16

961.94

2,219.84

856.49

4,282.43

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

286.09

1,168.07

3,098.50

1,138.17

5,690.83

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

341.39

1,362.74

4,696.55

1,600.17

8,000.85

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

128.60

263.77

388.15

195.13

975.65

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

125.05

297.19

504.61

231.71

1,158.56

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

122.27

514.83

608.09

311.30

1,556.49

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

129.97

639.81

931.50

425.32

2,126.60

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

150.66

704.13

1,643.51

624.58

3,122.88

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

188.67

868.93

2,236.89

823.62

4,118.11

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

244.16

961.94

2,849.60

1,013.93

5,069.63

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

286.09

1,168.07

3,724.46

1,294.66

6,473.28

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

341.39

1,362.74

5,128.63

1,708.19

8,540.95

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

50.40

68.08

280.13

99.65

498.26

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

464.98

309.47

2,393.77

792.06

3,960.28

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.32

77.80

20.28

101.40

Page 145 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (46) Multan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

53.67

437.50

122.79

613.96

508 a

BRICK PAVING (SINGLE COURSE)

SM

66.60

15.80

158.81

60.30

301.51

508 b

BRICK PAVING (DOUBLE COURSE)

SM

119.68

15.80

315.12

112.65

563.25

509 a

RIP RAP CLASS "A"

CM

291.29

413.93

176.31

881.53

509 b

RIP RAP CLASS "B"

CM

280.29

410.61

172.73

863.63

509 c

RIP RAP CLASS "C"

CM

282.66

413.93

174.15

870.74

509 d

GROUTED RIP RAP CLASS "A"

CM

445.85

35.09

1,385.25

466.55

2,332.74

509 e

GROUTED RIP RAP CLASS "B"

CM

429.48

28.07

1,281.38

434.73

2,173.66

509 f

GROUTED RIP RAP CLASS "C"

CM

424.88

23.39

1,303.36

437.91

2,189.54

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

470.25

181.56

2,761.49

853.33

4,266.63

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

27.43

115.89

314.56

114.47

572.35

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

60.70

194.57

63.82

319.09

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

90.63

35.01

67.26

48.23

241.13

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

116.00

44.81

86.10

61.73

308.64

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

148.87

91.01

244.93

121.20

606.01

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

186.09

113.77

306.16

151.51

757.53

603

BRICK EDGING

5.20

24.96

7.54

37.70

605 a

CONCRETE BEAM GUARDRAIL

43.38

14.67

421.90

119.99

599.94

605 c

CONCRETE POST FOR GUARDRAIL

53.27

13.10

418.25

121.16

605.78

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

142.12

128.42

4,680.70

1,237.81

6,189.05

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

41.61

192.63

6,850.13

1,771.09

8,855.46

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

142.12

272.87

8,470.22

2,221.30

11,106.51

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

446.25

304.65

15,565.28

4,079.05

20,395.23

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

89.25

60.93

7,017.32

1,791.88

8,959.38

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,029.58

318.36

1,591.78

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,544.37

447.05

2,235.26

Page 146 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (46) Multan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

2.33

2.85

15.39

5.14

25.71

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.78

1.27

30.44

8.12

40.61

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

2.33

2.85

20.55

6.43

32.16

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.78

1.27

40.60

10.66

53.31

EACH

56.03

148.80

51.21

256.04

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

56.03

383.56

109.90

549.49

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.91

3.56

21.41

6.97

34.85

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.91

4.75

51.71

14.84

74.21

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.91

3.56

28.55

8.76

43.78

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.91

4.75

68.95

19.15

95.76

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

56.03

206.76

65.70

328.49

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

56.03

652.07

177.03

885.13

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

47.31

99.20

36.63

183.14

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

47.31

256.09

75.85

379.25

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

47.31

137.84

46.29

231.44

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

47.31

435.37

120.67

603.35

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

5.66

46.68

167.60

54.99

274.93

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

5.66

46.68

202.60

63.74

318.68

610 b

RIGHT OF WAY MARKER

EACH

58.62

60.88

210.84

82.59

412.93

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

380.96

476.40

1,415.43

568.20

2,840.99

610 d

TEN KILOMETRE POST

EACH

732.84

952.79

3,089.29

1,193.73

5,968.65

Page 147 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (47) Muzaffargarh
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.52

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

5.04

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

14.84

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.87

9.35

0.88

27.09

135.45

258.13

1.97

68.74

343.68

59.35

1,032.53

7.89

274.94

1,374.71

CM

1.71

59.42

15.28

76.41

COMPACTION OF NATURAL GROUND

SM

0.24

5.92

1.70

8.48

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.61

86.79

22.35

111.75

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

82.47

193.76

46.20

80.61

403.04

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

11.96

214.84

56.70

283.50

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.84

167.12

43.74

218.70

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.13

78.63

20.19

100.95

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

82.47

193.76

46.20

80.61

403.04

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

13.09

199.88

53.24

266.21

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

6.02

167.24

43.32

216.58

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.56

89.04

0.31

23.48

117.39

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

43.35

165.86

53.31

65.63

328.15

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

72.73

258.51

30.80

90.51

452.55

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

62.11

193.04

63.79

318.94

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

37.40

160.37

49.44

247.21

107 d

GRANULAR BACK FILL

CM

23.54

83.07

307.26

103.47

517.34

107 e

COMMON BACK FILL

CM

18.51

37.31

4.13

14.99

74.94

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.61

106.71

4.13

28.86

144.31

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

13.78

302.97

48.81

91.39

456.95

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

10.34

268.11

1.96

70.10

350.51

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

9.19

238.60

61.95

309.74

CM

5.39

112.14

31.09

155.43

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 148 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (47) Muzaffargarh
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

4.16

46.31

4.13

13.65

68.25

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

10.00

73.87

2.45

21.58

107.90

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.93

16.84

1.18

4.74

23.69

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.66

10.31

0.63

2.90

14.50

110

IMPROVED SUB-GRADE

CM

6.76

75.50

53.08

33.84

169.18

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.57

9.38

0.64

2.65

13.24

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.86

9.92

0.74

2.88

14.40

201

GRANULAR SUB-BASE

CM

5.42

106.91

435.25

136.90

684.48

202

AGGREGATE BASE

CM

6.09

132.11

556.42

173.66

868.28

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

52.85

916.98

3,424.96

1,098.70

5,493.49

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

54.46

916.98

3,648.72

1,155.04

5,775.20

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

58.35

957.74

3,419.73

1,108.96

5,544.78

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

58.35

954.75

3,731.11

1,186.05

5,930.26

204 b

CEMENT STABILIZED BASE

CM

19.08

272.73

700.18

248.00

1,239.99

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

161.47

568.44

22,225.80

5,738.93

28,694.64

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

161.47

568.44

23,132.82

5,965.68

29,828.41

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

71.61

55.65

587.97

178.81

894.04

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

105.09

1,408.67

3,083.75

1,149.38

5,746.89

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

79.48

66.68

478.88

156.26

781.30

207 a

DEEP PATCHING (0-15 cm)

SM

1.16

30.14

1.02

8.08

40.40

207 b

DEEP PATCHING (16-30 cm)

SM

1.16

26.47

1.02

7.16

35.81

208

REINSTATEMENT OF ROAD SURFACE

SM

1.19

37.00

0.45

9.66

48.30

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.32

70.82

0.55

18.17

90.86

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.26

14.16

0.11

3.63

18.16

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.20

0.67

22.23

5.78

28.88

Page 149 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (47) Muzaffargarh
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.19

0.67

22.23

5.77

28.86

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.78

2.53

12.63

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.25

2.39

11.96

304 a

SINGLE SURFACE TREATMENT

SM

0.50

4.16

43.83

12.12

60.61

304 b

DOUBLE SURFACE TREATMENT

SM

0.73

8.06

83.64

23.11

115.54

304 c

TRIPLE SURFACE TREATMENT

SM

1.23

11.08

99.85

28.04

140.20

304 d

SEAL COAT

SM

0.46

2.33

24.87

6.92

34.58

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

48.88

906.07

4,002.76

1,239.43

6,197.14

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

48.88

876.73

4,318.03

1,310.91

6,554.55

307 a

DENSE GRADED HOT BIT-MAC

CM

120.29

171.48

3,303.64

898.85

4,494.26

307 b

OPEN GRADED HOT BIT-MAC

CM

120.29

171.48

3,202.34

873.53

4,367.64

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

20.24

456.95

930.63

351.96

1,759.78

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

144.58

465.97

24,301.50

6,228.01

31,140.06

309 a

COLD MILLING, 0 - 30 mm

SM

0.63

16.87

7.54

6.26

31.30

309 b

COLD MILLING, 0 - 50 mm

SM

1.05

28.11

12.57

10.43

52.16

309 c

COLD MILLING, 0 - 70 mm

SM

1.57

42.16

18.85

15.65

78.23

401 ai

CONCRETE CLASS "A3" (Underground)

CM

352.38

643.62

3,137.44

1,033.36

5,166.80

401 aii CONCRETE CLASS "A3" (On ground)

CM

352.38

643.62

3,346.34

1,085.59

5,427.93

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

352.38

643.62

3,764.14

1,190.04

5,950.18

401 b

CONCRETE CLASS "B"

CM

460.64

407.09

2,349.72

804.36

4,021.81

401 ci

CONCRETE CLASS "C" (Underground)

CM

354.12

258.76

2,801.75

853.66

4,268.29

401 cii CONCRETE CLASS "C" (On ground)

CM

354.12

258.76

2,890.85

875.93

4,379.66

401 ciii CONCRETE CLASS "C" (Elevated)

CM

354.12

258.76

3,069.04

920.48

4,602.40

401 d

CONCRETE CLASS "D1"

CM

549.00

810.64

4,003.28

1,340.73

6,703.65

401 e

CONCRETE CLASS "Y"

CM

776.76

258.76

3,433.21

1,117.18

5,585.91

401 f

LEAN CONCRETE

CM

315.47

252.12

1,891.25

614.71

3,073.55

Page 150 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (47) Muzaffargarh
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,219.79

468.57

3,935.90

1,406.07

7,030.33

401 gii PRECAST CONCRETE CLASS "B"

CM

1,219.79

468.57

3,515.17

1,300.88

6,504.41

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,049.43

42,566.02

10,903.86

54,519.31

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,049.43

44,666.02

11,428.86

57,144.31

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

868.28

2,335.68

37,143.46

10,086.86

50,434.28

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,909.48

6,882.66

80,754.63

22,386.69

111,933.46

405 b

LAUNCHING OF GIRDER

TON

45.39

403.69

112.27

561.35

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

79.42

190.67

67.52

337.61

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

79.42

199.39

69.70

348.51

406 c

STEEL EXPANSION JOINTS

KG

6.55

11.61

60.61

19.69

98.46

406 d

WATER STOPS 6" SIZE

65.49

307.88

93.34

466.71

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

27.87

1,413.17

360.26

1,801.30

406 g

STEEL OR METAL BEARING DEVICES

KG

14.36

30.66

81.02

31.51

157.55

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

245.14

847.08

578.96

417.80

2,088.98

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

367.71

1,270.62

868.45

626.70

3,133.48

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

367.71

1,270.62

673.09

577.86

2,889.28

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

612.86

2,117.70

846.81

894.34

4,471.71

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

525.30

1,815.17

784.76

781.31

3,906.54

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

919.28

3,176.55

1,115.53

1,302.84

6,514.20

407 h

PILE LOAD TEST UP TO 120 TON

EACH

16,074.66

19,990.40

72,541.08

27,151.54

135,757.68

407 i

PILE LOAD TEST UP TO 240 TON

EACH

32,965.38

19,990.40

145,082.16

49,509.49

247,547.43

407 j

PILE LOAD TEST UP TO 360 TON

EACH

49,108.26

19,990.40

217,623.24

71,680.48

358,402.38

407 k

CONFIRMATORY BORING (NX SIZE)

149.11

826.61

5.16

245.22

1,226.10

410

BRICK WORK

CM

231.07

142.50

2,044.64

604.55

3,022.76

411 a

STONE MASONRY RANDOM DRY

CM

205.11

42.98

459.71

176.95

884.75

Page 151 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (47) Muzaffargarh
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

241.72

63.18

1,124.18

357.27

1,786.35

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

280.53

42.98

511.55

208.77

1,043.83

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

319.34

63.18

1,184.31

391.71

1,958.54

411 g

ROLL POINTING

SM

48.98

5.78

46.38

25.29

126.43

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

511.36

134.30

1,203.81

462.37

2,311.84

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

169.17

230.36

366.90

191.61

958.04

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

165.83

297.19

472.34

233.84

1,169.20

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

158.22

514.83

582.46

313.88

1,569.39

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

167.67

639.81

872.85

420.08

2,100.41

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

192.78

704.13

1,177.89

518.70

2,593.50

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

237.01

868.93

1,775.45

720.35

3,601.74

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

306.72

961.94

2,220.88

872.39

4,361.93

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

362.68

1,168.07

3,099.75

1,157.63

5,788.13

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

427.96

1,362.74

4,698.01

1,622.18

8,110.89

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

169.17

263.77

389.03

205.49

1,027.46

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

165.83

297.19

505.14

242.04

1,210.20

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

154.29

514.83

608.70

319.46

1,597.28

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

167.67

639.81

932.06

434.89

2,174.43

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

192.78

704.13

1,644.31

635.31

3,176.53

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

237.01

868.93

2,237.93

835.97

4,179.84

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

306.72

961.94

2,850.64

1,029.83

5,149.13

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

362.68

1,168.07

3,725.72

1,314.12

6,570.59

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

427.96

1,362.74

5,130.10

1,730.20

8,651.00

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

65.11

68.08

279.55

103.19

515.93

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

519.62

309.47

2,402.83

807.98

4,039.90

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.65

75.81

19.87

99.33

Page 152 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (47) Muzaffargarh
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

72.30

420.00

123.08

615.38

508 a

BRICK PAVING (SINGLE COURSE)

SM

78.81

15.80

158.79

63.35

316.75

508 b

BRICK PAVING (DOUBLE COURSE)

SM

141.11

15.80

315.08

118.00

589.99

509 a

RIP RAP CLASS "A"

CM

276.64

394.83

167.87

839.34

509 b

RIP RAP CLASS "B"

CM

266.13

391.67

164.45

822.25

509 c

RIP RAP CLASS "C"

CM

268.23

394.83

165.77

828.83

509 d

GROUTED RIP RAP CLASS "A"

CM

337.72

35.09

1,365.31

434.53

2,172.65

509 e

GROUTED RIP RAP CLASS "B"

CM

325.93

28.07

1,261.70

403.93

2,019.63

509 f

GROUTED RIP RAP CLASS "C"

CM

321.89

23.39

1,283.10

407.10

2,035.48

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

563.18

181.56

2,770.02

878.69

4,393.45

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

36.24

115.89

307.43

114.89

574.45

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

78.32

194.57

68.22

341.11

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

86.88

26.87

64.16

44.48

222.39

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

111.21

34.39

82.12

56.93

284.65

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

142.26

66.70

231.72

110.17

550.85

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

177.82

83.38

289.66

137.72

688.58

603

BRICK EDGING

6.30

24.96

7.82

39.08

605 a

CONCRETE BEAM GUARDRAIL

54.72

14.67

422.37

122.94

614.70

605 c

CONCRETE POST FOR GUARDRAIL

67.19

13.10

418.83

124.78

623.90

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

169.06

128.42

4,680.32

1,244.45

6,222.25

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

50.03

192.63

6,852.53

1,773.80

8,868.99

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

169.06

272.87

8,474.49

2,229.11

11,145.53

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

578.09

304.65

15,572.50

4,113.81

20,569.05

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

115.62

60.93

7,019.74

1,799.07

8,995.36

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,029.88

318.43

1,592.15

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,544.82

447.17

2,235.83

Page 153 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (47) Muzaffargarh
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.66

2.85

15.40

4.98

24.89

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.55

1.27

30.45

8.07

40.34

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.66

2.85

20.55

6.27

31.33

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.55

1.27

40.62

10.61

53.05

EACH

47.21

148.82

49.01

245.04

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

47.21

383.76

107.74

538.71

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.07

3.56

21.42

6.76

33.81

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.07

4.75

51.71

14.63

73.16

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.07

3.56

28.56

8.55

42.74

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.07

4.75

68.95

18.94

94.71

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

47.21

206.78

63.50

317.49

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

47.21

652.07

174.82

874.10

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

39.01

99.21

34.56

172.78

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

39.01

256.23

73.81

369.05

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

39.01

137.85

44.22

221.08

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

39.01

435.37

118.60

592.98

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

6.54

46.68

167.62

55.21

276.05

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

6.54

46.68

202.62

63.96

319.80

610 b

RIGHT OF WAY MARKER

EACH

77.71

60.88

211.36

87.49

437.44

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

454.66

476.40

1,420.01

587.77

2,938.84

610 d

TEN KILOMETRE POST

EACH

881.99

952.79

3,097.78

1,233.14

6,165.70

Page 154 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (49 A) Narowal
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.47

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.65

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

13.45

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.86

9.29

0.88

26.99

134.96

258.13

1.97

68.39

341.94

53.81

1,032.53

7.89

273.56

1,367.79

CM

1.58

59.42

15.25

76.25

COMPACTION OF NATURAL GROUND

SM

0.22

5.92

1.69

8.45

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.63

86.79

22.36

111.78

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

78.54

193.76

46.20

79.63

398.13

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

11.24

214.84

56.52

282.60

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.43

167.12

43.64

218.19

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.15

78.63

20.20

100.98

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

78.54

193.76

46.20

79.63

398.13

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

12.48

199.88

53.09

265.45

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.68

167.24

43.23

216.15

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.45

89.04

0.31

23.45

117.25

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

40.95

165.86

53.31

65.03

325.15

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

69.35

258.51

30.80

89.67

448.33

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

59.07

193.04

63.03

315.14

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

35.67

160.37

49.01

245.05

107 d

GRANULAR BACK FILL

CM

21.56

83.07

331.09

108.93

544.65

107 e

COMMON BACK FILL

CM

16.30

37.31

4.13

14.44

72.18

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.40

106.71

4.13

28.81

144.05

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

12.90

302.97

48.81

91.17

455.85

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

9.68

268.11

1.96

69.94

349.69

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

8.60

238.60

61.80

309.00

CM

5.07

112.14

31.01

155.03

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 155 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (49 A) Narowal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

3.95

46.31

4.13

13.60

67.99

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

9.28

73.87

2.45

21.40

107.00

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.88

16.84

1.18

4.73

23.63

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.63

10.31

0.63

2.89

14.46

110

IMPROVED SUB-GRADE

CM

6.43

75.50

54.33

34.07

170.33

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.53

9.38

0.64

2.64

13.19

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.81

9.92

0.74

2.87

14.34

201

GRANULAR SUB-BASE

CM

5.21

106.91

549.03

165.29

826.44

202

AGGREGATE BASE

CM

6.06

132.11

671.29

202.37

1,011.83

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

47.88

916.98

3,514.68

1,119.89

5,599.43

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

49.50

916.98

3,729.06

1,173.89

5,869.43

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

53.16

957.74

3,509.53

1,130.11

5,650.54

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

53.16

954.75

3,810.13

1,204.51

6,022.55

204 b

CEMENT STABILIZED BASE

CM

18.63

272.73

844.90

284.07

1,420.33

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

153.21

568.44

21,817.80

5,634.86

28,174.31

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

153.21

568.44

22,722.60

5,861.06

29,305.31

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

62.68

55.65

709.35

206.92

1,034.60

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

97.17

1,408.67

3,193.61

1,174.86

5,874.31

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

69.55

66.68

670.40

201.66

1,008.29

207 a

DEEP PATCHING (0-15 cm)

SM

1.09

30.14

1.02

8.06

40.31

207 b

DEEP PATCHING (16-30 cm)

SM

1.09

26.47

1.02

7.15

35.73

208

REINSTATEMENT OF ROAD SURFACE

SM

1.19

37.00

0.45

9.66

48.30

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.29

70.82

0.55

18.17

90.83

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.26

14.16

0.11

3.63

18.16

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.19

0.67

21.82

5.67

28.35

Page 156 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (49 A) Narowal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.18

0.67

21.82

5.67

28.34

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.62

2.48

12.41

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.09

2.35

11.75

304 a

SINGLE SURFACE TREATMENT

SM

0.48

4.16

43.76

12.10

60.50

304 b

DOUBLE SURFACE TREATMENT

SM

0.70

8.06

84.24

23.25

116.25

304 c

TRIPLE SURFACE TREATMENT

SM

1.18

11.08

101.10

28.34

141.70

304 d

SEAL COAT

SM

0.44

2.33

24.74

6.88

34.39

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

44.91

906.07

4,076.65

1,256.91

6,284.54

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

44.91

876.73

4,391.41

1,328.26

6,641.31

307 a

DENSE GRADED HOT BIT-MAC

CM

109.21

171.48

3,364.65

911.34

4,556.68

307 b

OPEN GRADED HOT BIT-MAC

CM

109.21

171.48

3,270.40

887.77

4,438.86

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

18.35

456.95

943.10

354.60

1,773.00

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

136.31

465.97

23,893.50

6,123.95

30,619.73

309 a

COLD MILLING, 0 - 30 mm

SM

0.61

16.87

7.54

6.26

31.28

309 b

COLD MILLING, 0 - 50 mm

SM

1.02

28.11

12.57

10.43

52.13

309 c

COLD MILLING, 0 - 70 mm

SM

1.53

42.16

18.85

15.64

78.18

401 ai

CONCRETE CLASS "A3" (Underground)

CM

337.95

643.62

3,345.21

1,081.70

5,408.48

401 aii CONCRETE CLASS "A3" (On ground)

CM

337.95

643.62

3,554.11

1,133.92

5,669.60

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

337.95

643.62

3,971.91

1,238.37

6,191.85

401 b

CONCRETE CLASS "B"

CM

436.44

407.09

2,567.61

852.79

4,263.93

401 ci

CONCRETE CLASS "C" (Underground)

CM

332.57

258.76

3,034.37

906.43

4,532.13

401 cii CONCRETE CLASS "C" (On ground)

CM

332.57

258.76

3,123.47

928.70

4,643.50

401 ciii CONCRETE CLASS "C" (Elevated)

CM

332.57

258.76

3,301.66

973.25

4,866.24

401 d

CONCRETE CLASS "D1"

CM

525.27

810.64

4,204.21

1,385.03

6,925.15

401 e

CONCRETE CLASS "Y"

CM

737.11

258.76

3,627.60

1,155.87

5,779.34

401 f

LEAN CONCRETE

CM

284.85

252.12

2,105.16

660.53

3,302.66

Page 157 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (49 A) Narowal
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,128.03

468.57

4,160.61

1,439.30

7,196.51

401 gii PRECAST CONCRETE CLASS "B"

CM

1,128.03

468.57

3,742.65

1,334.81

6,674.06

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,004.79

42,670.65

10,918.86

54,594.30

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,004.79

44,770.65

11,443.86

57,219.30

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

832.57

2,335.68

37,105.70

10,068.49

50,342.44

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,909.48

6,882.66

80,769.74

22,390.47

111,952.35

405 b

LAUNCHING OF GIRDER

TON

45.39

403.69

112.27

561.35

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

74.18

184.89

64.77

323.84

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

74.18

193.60

66.95

334.73

406 c

STEEL EXPANSION JOINTS

KG

6.19

11.61

60.84

19.66

98.30

406 d

WATER STOPS 6" SIZE

61.03

309.39

92.61

463.03

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

26.63

1,411.21

359.46

1,797.30

406 g

STEEL OR METAL BEARING DEVICES

KG

13.37

30.66

81.19

31.31

156.53

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

245.82

847.08

548.65

410.39

2,051.94

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

368.73

1,270.62

822.97

615.58

3,077.90

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

368.73

1,270.62

627.61

566.74

2,833.70

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

614.55

2,117.70

771.02

875.82

4,379.09

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

526.76

1,815.17

719.80

765.43

3,827.16

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

921.83

3,176.55

1,001.84

1,275.06

6,375.28

407 h

PILE LOAD TEST UP TO 120 TON

EACH

14,065.86

19,990.40

70,987.00

26,260.82

131,304.08

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,501.38

19,990.40

141,974.00

47,616.45

238,082.23

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,412.26

19,990.40

212,961.00

68,840.92

344,204.58

407 k

CONFIRMATORY BORING (NX SIZE)

139.81

826.61

5.16

242.90

1,214.48

410

BRICK WORK

CM

215.74

142.50

2,169.04

631.82

3,159.10

411 a

STONE MASONRY RANDOM DRY

CM

227.58

56.01

665.13

237.18

1,185.90

Page 158 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (49 A) Narowal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

271.25

84.89

1,516.35

468.12

2,340.61

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

313.58

56.01

732.88

275.62

1,378.09

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

355.92

84.89

1,560.34

500.29

2,501.44

411 g

ROLL POINTING

SM

46.00

5.78

47.98

24.94

124.70

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

471.92

134.30

1,488.96

523.80

2,618.98

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

150.01

230.36

413.12

198.37

991.86

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

146.67

297.19

492.94

234.20

1,171.00

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

142.23

514.83

617.67

318.68

1,593.41

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

149.75

639.81

1,431.03

555.15

2,775.74

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

172.60

704.13

1,890.18

691.73

3,458.64

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

213.45

868.93

2,671.45

938.46

4,692.29

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

276.23

961.94

2,936.43

1,043.65

5,218.25

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

325.65

1,168.07

3,426.43

1,230.04

6,150.19

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

385.69

1,362.74

4,818.15

1,641.65

8,208.23

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

150.01

263.77

394.68

202.12

1,010.58

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

146.67

297.19

508.73

238.15

1,190.74

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

138.85

514.83

612.86

316.64

1,583.18

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

149.75

639.81

935.84

431.35

2,156.75

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

172.60

704.13

1,649.81

631.64

3,158.18

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

213.45

868.93

2,245.01

831.85

4,159.24

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

276.23

961.94

2,857.75

1,023.98

5,119.90

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

325.65

1,168.07

3,734.35

1,307.02

6,535.09

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

385.69

1,362.74

5,140.18

1,722.15

8,610.76

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

58.12

68.08

258.36

96.14

480.70

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

489.75

309.47

2,621.39

855.15

4,275.76

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.44

75.81

19.81

99.06

Page 159 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (49 A) Narowal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

63.67

431.67

123.84

619.18

508 a

BRICK PAVING (SINGLE COURSE)

SM

72.39

15.80

163.56

62.94

314.69

508 b

BRICK PAVING (DOUBLE COURSE)

SM

129.73

15.80

324.79

117.58

587.90

509 a

RIP RAP CLASS "A"

CM

312.25

593.75

226.50

1,132.50

509 b

RIP RAP CLASS "B"

CM

301.67

589.00

222.67

1,113.34

509 c

RIP RAP CLASS "C"

CM

303.72

593.75

224.37

1,121.84

509 d

GROUTED RIP RAP CLASS "A"

CM

365.83

35.09

1,651.18

513.03

2,565.13

509 e

GROUTED RIP RAP CLASS "B"

CM

353.42

28.07

1,536.92

479.60

2,398.01

509 f

GROUTED RIP RAP CLASS "C"

CM

349.20

23.39

1,563.44

484.01

2,420.04

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

516.28

181.56

2,983.54

920.35

4,601.73

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

32.15

115.89

330.99

119.76

598.79

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

73.36

194.57

66.98

334.91

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

98.32

35.01

96.48

57.45

287.26

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

125.84

44.81

123.50

73.54

367.69

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

159.71

91.01

285.50

134.06

670.28

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

199.64

113.77

356.87

167.57

837.85

603

BRICK EDGING

5.75

25.92

7.92

39.59

605 a

CONCRETE BEAM GUARDRAIL

49.15

14.67

430.81

123.66

618.29

605 c

CONCRETE POST FOR GUARDRAIL

60.35

13.10

429.09

125.64

628.18

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

155.09

128.42

4,688.96

1,243.12

6,215.59

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

45.94

192.63

6,883.94

1,780.63

8,903.14

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

155.09

272.87

8,529.67

2,239.41

11,197.04

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

514.97

304.65

15,647.89

4,116.88

20,584.39

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

102.99

60.93

7,025.97

1,797.47

8,987.36

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,027.22

317.77

1,588.83

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,540.83

446.17

2,230.84

Page 160 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (49 A) Narowal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.71

2.85

15.38

4.99

24.93

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.57

1.27

30.30

8.04

40.18

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.71

2.85

20.53

6.27

31.36

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.57

1.27

40.41

10.56

52.81

EACH

51.49

148.64

50.03

250.16

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

51.49

381.84

108.33

541.66

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.13

3.56

21.40

6.77

33.86

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.13

4.75

51.71

14.65

73.24

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.13

3.56

28.53

8.56

42.78

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.13

4.75

68.95

18.96

94.79

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

51.49

206.60

64.52

322.61

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

51.49

652.07

175.89

879.45

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

42.38

99.09

35.37

176.84

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

42.38

254.95

74.33

371.66

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

42.38

137.73

45.03

225.14

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

42.38

435.37

119.44

597.19

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

6.12

46.68

167.76

55.14

275.70

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

6.12

46.68

202.76

63.89

319.45

610 b

RIGHT OF WAY MARKER

EACH

68.69

60.88

219.98

87.39

436.94

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

416.35

476.40

1,490.17

595.73

2,978.65

610 d

TEN KILOMETRE POST

EACH

805.36

952.79

3,239.39

1,249.39

6,246.93

Page 161 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (50) Okara
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.45

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.41

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

12.92

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.85

9.26

0.88

26.93

134.66

258.13

1.97

68.26

341.28

51.66

1,032.53

7.89

273.02

1,365.10

CM

1.51

59.42

15.23

76.16

COMPACTION OF NATURAL GROUND

SM

0.21

5.92

1.69

8.44

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.36

86.79

22.29

111.44

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

73.50

193.76

46.20

78.37

391.83

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

10.59

214.84

56.36

281.79

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

6.97

167.12

43.52

217.61

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

1.93

78.63

20.14

100.70

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

73.50

193.76

46.20

78.37

391.83

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

11.67

199.88

52.89

264.44

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.34

167.24

43.15

215.73

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.09

89.04

0.31

23.36

116.80

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

39.21

165.86

53.31

64.60

322.98

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

64.86

258.51

30.80

88.54

442.71

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

55.33

193.04

62.09

310.46

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

33.35

160.37

48.43

242.15

107 d

GRANULAR BACK FILL

CM

20.69

83.07

313.74

104.38

521.88

107 e

COMMON BACK FILL

CM

16.03

37.31

4.13

14.37

71.84

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.11

106.71

4.13

28.74

143.69

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

12.20

302.97

48.81

91.00

454.98

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

9.15

268.11

1.96

69.81

349.03

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

8.13

238.60

61.68

308.41

CM

4.78

112.14

30.93

154.66

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 162 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (50) Okara
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

3.70

46.31

4.13

13.54

67.68

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

8.82

73.87

2.45

21.29

106.43

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.82

16.84

1.18

4.71

23.55

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.59

10.31

0.63

2.88

14.41

110

IMPROVED SUB-GRADE

CM

5.98

75.50

54.33

33.95

169.76

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.51

9.38

0.64

2.63

13.16

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.76

9.92

0.74

2.86

14.28

201

GRANULAR SUB-BASE

CM

4.81

106.91

484.41

149.03

745.16

202

AGGREGATE BASE

CM

5.44

132.11

598.19

183.94

919.68

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

46.10

916.98

3,386.55

1,087.41

5,437.04

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

47.57

916.98

3,630.63

1,148.80

5,743.98

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

51.00

957.74

3,381.09

1,097.46

5,487.29

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

51.00

954.75

3,712.65

1,179.60

5,898.00

204 b

CEMENT STABILIZED BASE

CM

16.95

272.73

645.05

233.68

1,168.41

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

143.55

568.44

22,174.80

5,721.70

28,608.49

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

143.55

568.44

23,092.99

5,951.25

29,756.23

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

61.87

55.65

632.11

187.41

937.04

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

92.32

1,408.67

3,106.64

1,151.91

5,759.54

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

68.61

66.68

523.32

164.65

823.26

207 a

DEEP PATCHING (0-15 cm)

SM

1.03

30.14

1.02

8.05

40.24

207 b

DEEP PATCHING (16-30 cm)

SM

1.03

26.47

1.02

7.13

35.65

208

REINSTATEMENT OF ROAD SURFACE

SM

1.06

37.00

0.45

9.63

48.14

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.19

70.82

0.55

18.14

90.70

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.24

14.16

0.11

3.63

18.14

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.17

0.67

22.18

5.76

28.78

Page 163 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (50) Okara
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.17

0.67

22.18

5.76

28.78

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.76

2.52

12.59

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.24

2.39

11.94

304 a

SINGLE SURFACE TREATMENT

SM

0.45

4.16

43.82

12.11

60.54

304 b

DOUBLE SURFACE TREATMENT

SM

0.65

8.06

84.05

23.19

115.95

304 c

TRIPLE SURFACE TREATMENT

SM

1.10

11.08

100.41

28.15

140.74

304 d

SEAL COAT

SM

0.41

2.33

24.56

6.83

34.13

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

42.83

906.07

3,963.30

1,228.05

6,140.25

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

42.83

876.73

4,268.77

1,297.08

6,485.41

307 a

DENSE GRADED HOT BIT-MAC

CM

104.99

171.48

3,243.99

880.12

4,400.58

307 b

OPEN GRADED HOT BIT-MAC

CM

104.99

171.48

3,181.47

864.49

4,322.43

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

17.72

456.95

937.45

353.03

1,765.15

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

128.19

465.97

24,250.50

6,211.17

31,055.83

309 a

COLD MILLING, 0 - 30 mm

SM

0.56

16.87

7.54

6.24

31.21

309 b

COLD MILLING, 0 - 50 mm

SM

0.93

28.11

12.57

10.40

52.01

309 c

COLD MILLING, 0 - 70 mm

SM

1.39

42.16

18.85

15.60

78.00

401 ai

CONCRETE CLASS "A3" (Underground)

CM

325.33

643.62

3,187.04

1,039.00

5,194.99

401 aii CONCRETE CLASS "A3" (On ground)

CM

325.33

643.62

3,395.94

1,091.22

5,456.11

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

325.33

643.62

3,813.75

1,195.68

5,978.38

401 b

CONCRETE CLASS "B"

CM

416.55

407.09

2,471.97

823.90

4,119.51

401 ci

CONCRETE CLASS "C" (Underground)

CM

324.41

258.76

2,892.14

868.83

4,344.14

401 cii CONCRETE CLASS "C" (On ground)

CM

324.41

258.76

2,981.24

891.10

4,455.51

401 ciii CONCRETE CLASS "C" (Elevated)

CM

324.41

258.76

3,159.43

935.65

4,678.25

401 d

CONCRETE CLASS "D1"

CM

511.48

810.64

4,056.10

1,344.56

6,722.78

401 e

CONCRETE CLASS "Y"

CM

723.10

258.76

3,457.49

1,109.84

5,549.19

401 f

LEAN CONCRETE

CM

279.88

252.12

2,013.82

636.46

3,182.28

Page 164 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (50) Okara
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,111.76

468.57

3,984.27

1,391.15

6,955.75

401 gii PRECAST CONCRETE CLASS "B"

CM

1,111.76

468.57

3,640.45

1,305.20

6,525.98

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

981.01

42,565.11

10,886.53

54,432.65

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

981.01

44,665.11

11,411.53

57,057.65

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

801.22

2,335.68

37,050.00

10,046.73

50,233.63

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,827.91

6,882.66

80,757.24

22,366.95

111,834.76

405 b

LAUNCHING OF GIRDER

TON

43.68

403.69

111.84

559.21

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

72.70

185.96

64.67

323.33

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

72.70

194.67

66.84

334.21

406 c

STEEL EXPANSION JOINTS

KG

5.98

11.61

60.71

19.58

97.88

406 d

WATER STOPS 6" SIZE

60.08

308.68

92.19

460.95

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

25.97

1,411.77

359.44

1,797.18

406 g

STEEL OR METAL BEARING DEVICES

KG

12.67

30.66

81.07

31.10

155.50

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

236.18

847.08

561.46

411.18

2,055.90

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

354.27

1,270.62

842.20

616.77

3,083.86

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

354.27

1,270.62

646.84

567.93

2,839.66

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

590.46

2,117.70

803.06

877.81

4,389.03

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

506.11

1,815.17

747.26

767.14

3,835.68

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

885.69

3,176.55

1,049.90

1,278.04

6,390.18

407 h

PILE LOAD TEST UP TO 120 TON

EACH

13,892.04

19,990.40

69,433.80

25,829.06

129,145.30

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,446.84

19,990.40

138,867.60

46,826.21

234,131.05

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,238.44

19,990.40

208,301.40

67,632.56

338,162.80

407 k

CONFIRMATORY BORING (NX SIZE)

137.33

826.61

5.16

242.28

1,211.38

410

BRICK WORK

CM

213.12

142.50

2,101.14

614.19

3,070.95

411 a

STONE MASONRY RANDOM DRY

CM

223.66

56.01

563.58

210.81

1,054.06

Page 165 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (50) Okara
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

267.16

84.89

1,393.47

436.38

2,181.90

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

309.16

56.01

623.20

247.09

1,235.46

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

351.16

84.89

1,433.32

467.34

2,336.71

411 g

ROLL POINTING

SM

45.61

5.78

47.56

24.74

123.69

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

466.66

134.30

1,361.94

490.73

2,453.63

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

147.94

230.36

369.10

186.85

934.25

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

144.90

297.19

474.99

229.27

1,146.35

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

139.08

514.83

585.55

309.87

1,549.33

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

146.89

639.81

876.46

415.79

2,078.95

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

168.91

704.13

1,181.50

513.64

2,568.18

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

208.39

868.93

1,780.67

714.50

3,572.49

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

269.68

961.94

2,226.07

864.42

4,322.11

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

317.82

1,168.07

3,106.06

1,147.99

5,739.94

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

376.42

1,362.74

4,705.37

1,611.13

8,055.66

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

147.94

263.77

393.45

201.29

1,006.45

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

144.90

297.19

507.79

237.47

1,187.35

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

135.71

514.83

611.79

315.58

1,577.91

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

146.89

639.81

934.87

430.39

2,151.96

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

168.91

704.13

1,648.33

630.34

3,151.71

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

208.39

868.93

2,243.15

830.12

4,150.59

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

269.68

961.94

2,855.83

1,021.86

5,109.31

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

317.82

1,168.07

3,732.02

1,304.48

6,522.39

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

376.42

1,362.74

5,137.45

1,719.15

8,595.76

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

56.65

68.08

237.18

90.48

452.39

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

472.56

309.47

2,525.08

826.78

4,133.89

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.33

77.80

20.28

101.41

Page 166 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (50) Okara
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

62.60

431.67

123.57

617.84

508 a

BRICK PAVING (SINGLE COURSE)

SM

71.47

15.80

157.02

61.07

305.36

508 b

BRICK PAVING (DOUBLE COURSE)

SM

128.47

15.80

311.90

114.04

570.21

509 a

RIP RAP CLASS "A"

CM

308.51

492.20

200.18

1,000.89

509 b

RIP RAP CLASS "B"

CM

298.41

488.26

196.67

983.34

509 c

RIP RAP CLASS "C"

CM

300.67

492.20

198.22

991.09

509 d

GROUTED RIP RAP CLASS "A"

CM

341.89

35.09

1,536.04

478.26

2,391.28

509 e

GROUTED RIP RAP CLASS "B"

CM

330.21

28.07

1,423.95

445.56

2,227.79

509 f

GROUTED RIP RAP CLASS "C"

CM

326.48

23.39

1,450.85

450.18

2,250.90

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

507.75

181.56

2,885.58

893.72

4,468.61

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

31.45

115.89

313.60

115.24

576.18

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

72.15

194.57

66.68

333.40

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

96.66

35.01

79.98

52.91

264.56

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

123.72

44.81

102.38

67.73

338.64

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

157.32

91.01

267.43

128.94

644.70

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

196.65

113.77

334.29

161.18

805.89

603

BRICK EDGING

5.63

24.96

7.65

38.24

605 a

CONCRETE BEAM GUARDRAIL

48.74

14.67

423.64

121.76

608.81

605 c

CONCRETE POST FOR GUARDRAIL

59.85

13.10

420.38

123.33

616.66

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

151.48

128.42

4,679.01

1,239.73

6,198.64

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

45.00

192.63

6,865.96

1,775.90

8,879.49

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

151.48

272.87

8,498.72

2,230.77

11,153.84

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

509.22

304.65

15,602.43

4,104.08

20,520.38

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

101.84

60.93

7,018.02

1,795.20

8,975.99

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,027.56

317.85

1,589.25

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,541.35

446.30

2,231.49

Page 167 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (50) Okara
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.63

2.85

15.38

4.97

24.83

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.54

1.27

30.32

8.03

40.16

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.63

2.85

20.53

6.25

31.26

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.54

1.27

40.44

10.56

52.81

EACH

46.96

148.65

48.90

244.51

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

46.96

382.04

107.25

536.25

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.04

3.56

21.40

6.75

33.75

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.04

4.75

51.71

14.63

73.13

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.04

3.56

28.53

8.53

42.66

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.04

4.75

68.95

18.94

94.68

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

46.96

206.61

63.39

316.96

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

46.96

652.07

174.76

873.79

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

38.86

99.10

34.49

172.45

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

38.86

255.08

73.49

367.43

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

38.86

137.74

44.15

220.75

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

38.86

435.37

118.56

592.79

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

5.91

46.68

167.71

55.08

275.38

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

5.91

46.68

202.71

63.83

319.13

610 b

RIGHT OF WAY MARKER

EACH

68.11

60.88

212.75

85.44

427.18

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

411.31

476.40

1,433.54

580.31

2,901.56

610 d

TEN KILOMETRE POST

EACH

795.61

952.79

3,120.63

1,217.26

6,086.29

Page 168 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (53 A) Pakpattan
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.45

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.41

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

12.92

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.85

9.26

0.88

26.93

134.66

258.13

1.97

68.26

341.28

51.66

1,032.53

7.89

273.02

1,365.10

CM

1.50

59.42

15.23

76.15

COMPACTION OF NATURAL GROUND

SM

0.21

5.92

1.69

8.44

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.36

86.79

22.29

111.44

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

73.25

193.76

46.20

78.30

391.51

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

10.53

214.84

56.34

281.71

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

6.91

167.12

43.51

217.54

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

1.93

78.63

20.14

100.70

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

73.25

193.76

46.20

78.30

391.51

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

11.64

199.88

52.88

264.40

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.30

167.24

43.14

215.68

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.06

89.04

0.31

23.35

116.76

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

39.98

165.86

53.31

64.79

323.94

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

64.67

258.51

30.80

88.50

442.48

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

55.16

193.04

62.05

310.25

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

33.26

160.37

48.41

242.04

107 d

GRANULAR BACK FILL

CM

20.69

83.07

327.34

107.78

538.88

107 e

COMMON BACK FILL

CM

16.03

37.31

4.13

14.37

71.84

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.08

106.71

4.13

28.73

143.65

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

12.13

302.97

48.81

90.98

454.89

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

9.10

268.11

1.96

69.79

348.96

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

8.09

238.60

61.67

308.36

CM

4.75

112.14

30.93

154.63

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 169 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (53 A) Pakpattan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

3.67

46.31

4.13

13.53

67.64

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

8.76

73.87

2.45

21.27

106.35

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.82

16.84

1.18

4.71

23.55

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.58

10.31

0.63

2.88

14.40

110

IMPROVED SUB-GRADE

CM

5.95

75.50

56.45

34.48

172.38

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.50

9.38

0.64

2.63

13.15

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.75

9.92

0.74

2.85

14.26

201

GRANULAR SUB-BASE

CM

4.79

106.91

529.03

160.18

800.91

202

AGGREGATE BASE

CM

5.44

132.11

639.97

194.38

971.90

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

46.04

916.98

3,452.05

1,103.77

5,518.84

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

47.51

916.98

3,698.18

1,165.67

5,828.34

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

50.87

957.74

3,446.97

1,113.90

5,569.48

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

50.87

954.75

3,780.75

1,196.59

5,982.96

204 b

CEMENT STABILIZED BASE

CM

16.95

272.73

688.59

244.57

1,222.84

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

142.42

568.44

22,378.80

5,772.42

28,862.08

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

142.42

568.44

23,299.10

6,002.49

30,012.45

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

61.77

55.65

676.24

198.42

992.08

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

92.05

1,408.67

3,168.23

1,167.24

5,836.19

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

68.56

66.68

585.74

180.25

901.23

207 a

DEEP PATCHING (0-15 cm)

SM

1.02

30.14

1.02

8.05

40.23

207 b

DEEP PATCHING (16-30 cm)

SM

1.02

26.47

1.02

7.13

35.64

208

REINSTATEMENT OF ROAD SURFACE

SM

1.06

37.00

0.45

9.63

48.14

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.17

70.82

0.55

18.14

90.68

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.23

14.16

0.11

3.63

18.13

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.17

0.67

22.39

5.81

29.04

Page 170 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (53 A) Pakpattan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.17

0.67

22.39

5.81

29.04

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.84

2.54

12.69

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.32

2.41

12.04

304 a

SINGLE SURFACE TREATMENT

SM

0.45

4.16

44.50

12.28

61.39

304 b

DOUBLE SURFACE TREATMENT

SM

0.65

8.06

85.63

23.59

117.93

304 c

TRIPLE SURFACE TREATMENT

SM

1.09

11.08

102.44

28.65

143.26

304 d

SEAL COAT

SM

0.41

2.33

24.82

6.89

34.45

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

42.76

906.07

4,041.70

1,247.63

6,238.16

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

42.76

876.73

4,352.79

1,318.07

6,590.35

307 a

DENSE GRADED HOT BIT-MAC

CM

104.99

171.48

3,317.65

898.53

4,492.65

307 b

OPEN GRADED HOT BIT-MAC

CM

104.99

171.48

3,253.41

882.47

4,412.35

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

17.72

456.95

950.28

356.24

1,781.19

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

127.07

465.97

24,454.50

6,261.89

31,309.43

309 a

COLD MILLING, 0 - 30 mm

SM

0.56

16.87

7.54

6.24

31.21

309 b

COLD MILLING, 0 - 50 mm

SM

0.93

28.11

12.57

10.40

52.01

309 c

COLD MILLING, 0 - 70 mm

SM

1.39

42.16

18.85

15.60

78.00

401 ai

CONCRETE CLASS "A3" (Underground)

CM

340.69

643.62

3,213.83

1,049.54

5,247.68

401 aii CONCRETE CLASS "A3" (On ground)

CM

340.69

643.62

3,422.73

1,101.76

5,508.80

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

340.69

643.62

3,840.53

1,206.21

6,031.05

401 b

CONCRETE CLASS "B"

CM

427.46

407.09

2,506.38

835.23

4,176.16

401 ci

CONCRETE CLASS "C" (Underground)

CM

339.04

258.76

2,929.71

881.88

4,409.39

401 cii CONCRETE CLASS "C" (On ground)

CM

339.04

258.76

3,018.80

904.15

4,520.75

401 ciii CONCRETE CLASS "C" (Elevated)

CM

339.04

258.76

3,197.00

948.70

4,743.50

401 d

CONCRETE CLASS "D1"

CM

541.84

810.64

4,081.62

1,358.53

6,792.63

401 e

CONCRETE CLASS "Y"

CM

767.35

258.76

3,479.91

1,126.51

5,632.53

401 f

LEAN CONCRETE

CM

285.34

252.12

2,048.12

646.40

3,231.98

Page 171 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (53 A) Pakpattan
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,161.76

468.57

4,012.91

1,410.81

7,054.05

401 gii PRECAST CONCRETE CLASS "B"

CM

1,161.76

468.57

3,678.51

1,327.21

6,636.05

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,041.01

42,564.98

10,901.50

54,507.49

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,041.01

44,664.98

11,426.50

57,132.49

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

849.22

2,335.68

37,035.85

10,055.19

50,275.94

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,827.91

6,882.66

80,757.24

22,366.95

111,834.76

405 b

LAUNCHING OF GIRDER

TON

43.68

403.69

111.84

559.21

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

76.04

187.80

65.96

329.80

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

76.04

196.52

68.14

340.70

406 c

STEEL EXPANSION JOINTS

KG

6.32

11.61

60.60

19.63

98.16

406 d

WATER STOPS 6" SIZE

63.08

308.87

92.99

464.94

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

27.47

1,412.44

359.98

1,799.89

406 g

STEEL OR METAL BEARING DEVICES

KG

12.97

30.66

80.99

31.16

155.78

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

236.68

847.08

571.33

413.77

2,068.86

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

355.02

1,270.62

857.00

620.66

3,103.30

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

355.02

1,270.62

661.64

571.82

2,859.10

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

591.71

2,117.70

827.73

884.29

4,421.43

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

507.18

1,815.17

768.41

772.69

3,863.45

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

887.56

3,176.55

1,086.90

1,287.75

6,438.76

407 h

PILE LOAD TEST UP TO 120 TON

EACH

13,892.04

19,990.40

69,433.80

25,829.06

129,145.30

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,446.84

19,990.40

138,867.60

46,826.21

234,131.05

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,238.44

19,990.40

208,301.40

67,632.56

338,162.80

407 k

CONFIRMATORY BORING (NX SIZE)

137.33

826.61

5.16

242.28

1,211.38

410

BRICK WORK

CM

224.99

142.50

2,151.14

629.66

3,148.29

411 a

STONE MASONRY RANDOM DRY

CM

233.48

56.01

697.50

246.75

1,233.74

Page 172 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (53 A) Pakpattan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

278.48

84.89

1,527.40

472.69

2,363.46

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

323.48

56.01

767.84

286.83

1,434.16

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

368.48

84.89

1,577.96

507.83

2,539.16

411 g

ROLL POINTING

SM

48.61

5.78

47.56

25.49

127.44

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

488.48

134.30

1,506.58

532.34

2,661.70

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

149.27

230.36

369.10

187.18

935.91

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

146.23

297.19

474.99

229.60

1,148.01

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

140.25

514.83

585.55

310.16

1,550.79

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

147.95

639.81

876.46

416.06

2,080.28

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

169.96

704.13

1,181.50

513.90

2,569.49

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

210.13

868.93

1,780.67

714.93

3,574.66

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

271.93

961.94

2,226.07

864.99

4,324.93

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

319.48

1,168.07

3,106.06

1,148.40

5,742.01

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

379.61

1,362.74

4,705.37

1,611.93

8,059.65

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

149.27

263.77

393.45

201.62

1,008.11

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

146.23

297.19

507.79

237.80

1,189.01

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

136.87

514.83

611.79

315.87

1,579.36

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

147.95

639.81

934.87

430.66

2,153.29

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

169.96

704.13

1,648.33

630.61

3,153.03

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

210.13

868.93

2,243.15

830.55

4,152.76

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

271.93

961.94

2,855.83

1,022.43

5,112.13

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

319.48

1,168.07

3,732.02

1,304.89

6,524.46

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

379.61

1,362.74

5,137.45

1,719.95

8,599.75

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

56.54

68.08

237.18

90.45

452.25

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

488.48

309.47

2,559.49

839.36

4,196.80

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.46

75.81

19.82

99.09

Page 173 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (53 A) Pakpattan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

62.49

443.33

126.46

632.28

508 a

BRICK PAVING (SINGLE COURSE)

SM

74.41

15.80

162.67

63.22

316.10

508 b

BRICK PAVING (DOUBLE COURSE)

SM

134.41

15.80

323.20

118.35

591.76

509 a

RIP RAP CLASS "A"

CM

323.34

626.13

237.37

1,186.84

509 b

RIP RAP CLASS "B"

CM

312.67

621.12

233.45

1,167.24

509 c

RIP RAP CLASS "C"

CM

315.56

626.13

235.42

1,177.11

509 d

GROUTED RIP RAP CLASS "A"

CM

316.06

35.09

1,669.01

505.04

2,525.20

509 e

GROUTED RIP RAP CLASS "B"

CM

305.22

28.07

1,555.94

472.31

2,361.54

509 f

GROUTED RIP RAP CLASS "C"

CM

301.60

23.39

1,583.80

477.20

2,385.99

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

525.71

181.56

2,918.15

906.36

4,531.78

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

31.35

115.89

327.12

118.59

592.95

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

72.15

194.57

66.68

333.40

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

100.20

35.01

101.75

59.24

296.20

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

128.25

44.81

130.23

75.82

379.11

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

164.25

91.01

287.19

135.61

678.06

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

205.32

113.77

358.99

169.52

847.60

603

BRICK EDGING

5.77

25.92

7.92

39.61

605 a

CONCRETE BEAM GUARDRAIL

50.14

14.67

424.66

122.37

611.84

605 c

CONCRETE POST FOR GUARDRAIL

61.56

13.10

421.61

124.07

620.34

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

155.26

128.42

4,685.31

1,242.25

6,211.24

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

46.17

192.63

6,875.26

1,778.52

8,892.58

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

155.26

272.87

8,513.80

2,235.48

11,177.41

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

517.88

304.65

15,627.28

4,112.45

20,562.26

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

103.58

60.93

7,025.67

1,797.55

8,987.73

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,028.37

318.05

1,590.26

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,542.55

446.60

2,232.99

Page 174 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (53 A) Pakpattan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.48

2.85

15.39

4.93

24.65

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.49

1.27

30.37

8.03

40.16

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.48

2.85

20.54

6.22

31.09

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.49

1.27

40.51

10.57

52.84

EACH

43.85

148.72

48.14

240.71

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

43.85

382.77

106.66

533.28

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

1.86

3.56

21.41

6.71

33.54

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

1.86

4.75

51.71

14.58

72.90

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

1.86

3.56

28.54

8.49

42.45

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

1.86

4.75

68.95

18.89

94.45

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

43.85

206.68

62.63

313.16

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

43.85

652.07

173.98

869.90

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

36.15

99.15

33.83

169.13

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

36.15

255.56

72.93

364.64

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

36.15

137.79

43.49

217.43

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

36.15

435.37

117.88

589.40

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

6.01

46.68

167.71

55.10

275.50

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

6.01

46.68

202.71

63.85

319.25

610 b

RIGHT OF WAY MARKER

EACH

69.09

60.88

213.82

85.95

429.74

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

427.47

476.40

1,442.20

586.52

2,932.59

610 d

TEN KILOMETRE POST

EACH

824.94

952.79

3,138.14

1,228.97

6,144.84

Page 175 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (55) Rahim Yar Khan
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.53

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

5.17

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

15.14

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.87

9.36

0.88

27.12

135.61

258.13

1.97

68.81

344.05

60.54

1,032.53

7.89

275.24

1,376.20

CM

1.73

59.42

15.29

76.44

COMPACTION OF NATURAL GROUND

SM

0.24

5.92

1.70

8.48

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.81

86.79

22.40

112.00

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

85.85

193.76

46.20

81.45

407.26

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

12.21

214.84

56.76

283.81

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.98

167.12

43.78

218.88

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.30

78.63

20.23

101.16

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

85.85

193.76

46.20

81.45

407.26

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

13.67

199.88

53.39

266.94

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

6.14

167.24

43.35

216.73

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.71

89.04

0.31

23.52

117.58

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

42.96

165.86

53.31

65.53

327.66

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

75.93

258.51

30.80

91.31

456.55

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

64.71

193.04

64.44

322.19

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

39.05

160.37

49.86

249.28

107 d

GRANULAR BACK FILL

CM

24.34

83.07

340.40

111.95

559.76

107 e

COMMON BACK FILL

CM

18.76

37.31

4.13

15.05

75.25

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.73

106.71

4.13

28.89

144.46

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

14.10

302.97

48.81

91.47

457.35

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

10.57

268.11

1.96

70.16

350.80

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

9.40

238.60

62.00

310.00

CM

5.51

112.14

31.12

155.58

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 176 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (55) Rahim Yar Khan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

4.24

46.31

4.13

13.67

68.35

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

10.15

73.87

2.45

21.62

108.09

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.95

16.84

1.18

4.74

23.71

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.68

10.31

0.63

2.91

14.53

110

IMPROVED SUB-GRADE

CM

6.94

75.50

50.65

33.27

166.36

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.58

9.38

0.64

2.65

13.25

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.86

9.92

0.74

2.88

14.40

201

GRANULAR SUB-BASE

CM

5.57

106.91

574.86

171.84

859.18

202

AGGREGATE BASE

CM

6.44

132.11

702.62

210.29

1,051.46

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

53.81

916.98

3,571.16

1,135.49

5,677.44

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

55.56

916.98

3,790.05

1,190.65

5,953.24

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

59.30

957.74

3,565.96

1,145.75

5,728.75

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

59.30

954.75

3,871.58

1,221.41

6,107.04

204 b

CEMENT STABILIZED BASE

CM

20.02

272.73

873.18

291.48

1,457.41

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

164.83

568.44

22,174.80

5,727.02

28,635.09

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

164.83

568.44

22,961.46

5,923.68

29,618.41

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

71.89

55.65

742.47

217.50

1,087.51

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

107.43

1,408.67

3,252.54

1,192.16

5,960.80

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

79.92

66.68

642.18

197.20

985.98

207 a

DEEP PATCHING (0-15 cm)

SM

1.17

30.14

1.02

8.08

40.41

207 b

DEEP PATCHING (16-30 cm)

SM

1.17

26.47

1.02

7.17

35.83

208

REINSTATEMENT OF ROAD SURFACE

SM

1.26

37.00

0.45

9.68

48.39

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.33

70.82

0.55

18.18

90.88

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.27

14.16

0.11

3.64

18.18

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.20

0.67

22.18

5.76

28.81

Page 177 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (55) Rahim Yar Khan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.20

0.67

22.18

5.76

28.81

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.91

2.56

12.79

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.18

2.38

11.88

304 a

SINGLE SURFACE TREATMENT

SM

0.53

4.16

43.54

12.06

60.29

304 b

DOUBLE SURFACE TREATMENT

SM

0.77

8.06

83.25

23.02

115.10

304 c

TRIPLE SURFACE TREATMENT

SM

1.29

11.08

99.93

28.08

140.38

304 d

SEAL COAT

SM

0.49

2.33

25.89

7.18

35.89

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

50.02

906.07

4,141.24

1,274.33

6,371.66

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

50.02

876.73

4,460.59

1,346.84

6,734.18

307 a

DENSE GRADED HOT BIT-MAC

CM

123.18

171.48

3,430.15

931.20

4,656.01

307 b

OPEN GRADED HOT BIT-MAC

CM

123.18

171.48

3,338.79

908.36

4,541.81

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

20.82

456.95

934.53

353.08

1,765.38

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

146.53

465.97

24,250.50

6,215.75

31,078.75

309 a

COLD MILLING, 0 - 30 mm

SM

0.66

16.87

7.54

6.27

31.34

309 b

COLD MILLING, 0 - 50 mm

SM

1.10

28.11

12.57

10.45

52.23

309 c

COLD MILLING, 0 - 70 mm

SM

1.65

42.16

18.85

15.67

78.33

401 ai

CONCRETE CLASS "A3" (Underground)

CM

345.43

643.62

3,315.44

1,076.12

5,380.61

401 aii CONCRETE CLASS "A3" (On ground)

CM

345.43

643.62

3,524.34

1,128.35

5,641.74

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

345.43

643.62

3,942.14

1,232.80

6,163.99

401 b

CONCRETE CLASS "B"

CM

460.56

407.09

2,549.32

854.24

4,271.21

401 ci

CONCRETE CLASS "C" (Underground)

CM

345.43

258.76

3,014.19

904.60

4,522.98

401 cii CONCRETE CLASS "C" (On ground)

CM

345.43

258.76

3,103.29

926.87

4,634.35

401 ciii CONCRETE CLASS "C" (Elevated)

CM

345.43

258.76

3,281.48

971.42

4,857.09

401 d

CONCRETE CLASS "D1"

CM

529.88

810.64

4,167.39

1,376.98

6,884.89

401 e

CONCRETE CLASS "Y"

CM

744.05

258.76

3,592.49

1,148.83

5,744.13

401 f

LEAN CONCRETE

CM

313.04

252.12

2,090.74

663.98

3,319.88

Page 178 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (55) Rahim Yar Khan
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,190.58

468.57

4,129.04

1,447.05

7,235.24

401 gii PRECAST CONCRETE CLASS "B"

CM

1,190.58

468.57

3,727.12

1,346.57

6,732.84

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,018.32

42,671.26

10,922.40

54,611.98

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,018.32

44,771.26

11,447.40

57,236.98

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

854.22

2,335.68

37,167.69

10,089.40

50,446.99

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,984.20

6,882.66

80,748.52

22,403.85

112,019.23

405 b

LAUNCHING OF GIRDER

TON

46.95

403.69

112.66

563.30

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

77.83

192.28

67.53

337.64

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

77.83

200.99

69.71

348.53

406 c

STEEL EXPANSION JOINTS

KG

6.44

11.61

60.56

19.65

98.26

406 d

WATER STOPS 6" SIZE

63.70

307.05

92.69

463.44

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

27.16

1,413.63

360.20

1,800.99

406 g

STEEL OR METAL BEARING DEVICES

KG

14.73

30.66

80.98

31.59

157.96

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

252.22

847.08

559.91

414.80

2,074.01

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

378.33

1,270.62

839.86

622.20

3,111.01

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

378.33

1,270.62

644.50

573.36

2,866.81

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

630.54

2,117.70

799.16

886.85

4,434.25

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

540.46

1,815.17

743.93

774.89

3,874.45

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

945.81

3,176.55

1,044.06

1,291.61

6,458.03

407 h

PILE LOAD TEST UP TO 120 TON

EACH

16,230.41

19,990.40

68,811.91

26,258.18

131,290.90

407 i

PILE LOAD TEST UP TO 240 TON

EACH

33,015.60

19,990.40

137,623.82

47,657.46

238,287.28

407 j

PILE LOAD TEST UP TO 360 TON

EACH

49,267.61

19,990.40

206,435.73

68,923.44

344,617.18

407 k

CONFIRMATORY BORING (NX SIZE)

151.38

826.61

5.16

245.79

1,228.94

410

BRICK WORK

CM

222.24

142.50

2,095.49

615.06

3,075.29

411 a

STONE MASONRY RANDOM DRY

CM

235.73

56.01

573.55

216.32

1,081.61

Page 179 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (55) Rahim Yar Khan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

283.19

84.89

1,396.38

441.12

2,205.58

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

325.67

56.01

633.98

253.92

1,269.58

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

368.15

84.89

1,438.79

472.96

2,364.79

411 g

ROLL POINTING

SM

46.70

5.78

47.44

24.98

124.90

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

493.05

134.30

1,367.42

498.69

2,493.46

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

168.92

230.36

368.88

192.04

960.20

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

165.30

297.19

474.72

234.30

1,171.51

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

158.13

514.83

585.24

314.55

1,572.75

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

167.59

639.81

876.10

420.88

2,104.38

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

193.46

704.13

1,181.14

519.68

2,598.41

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

238.34

868.93

1,780.14

721.85

3,609.26

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

308.44

961.94

2,225.55

873.98

4,369.91

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

365.61

1,168.07

3,105.42

1,159.78

5,798.88

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

430.40

1,362.74

4,704.63

1,624.44

8,122.21

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

168.92

263.77

393.01

206.43

1,032.13

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

165.30

297.19

507.52

242.50

1,212.51

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

154.19

514.83

611.48

320.13

1,600.63

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

167.59

639.81

934.58

435.50

2,177.48

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

193.46

704.13

1,647.92

636.38

3,181.89

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

238.34

868.93

2,242.62

837.47

4,187.36

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

308.44

961.94

2,855.31

1,031.42

5,157.11

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

365.61

1,168.07

3,731.39

1,316.27

6,581.34

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

430.40

1,362.74

5,136.71

1,732.46

8,662.31

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

65.90

68.08

228.70

90.67

453.35

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

514.81

309.47

2,602.43

856.68

4,283.39

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.63

75.81

19.86

99.30

Page 180 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (55) Rahim Yar Khan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

72.73

457.05

132.45

662.23

508 a

BRICK PAVING (SINGLE COURSE)

SM

76.68

15.80

156.67

62.29

311.44

508 b

BRICK PAVING (DOUBLE COURSE)

SM

136.64

15.80

311.26

115.93

579.63

509 a

RIP RAP CLASS "A"

CM

326.99

502.18

207.29

1,036.46

509 b

RIP RAP CLASS "B"

CM

316.55

498.16

203.68

1,018.39

509 c

RIP RAP CLASS "C"

CM

317.92

502.18

205.03

1,025.13

509 d

GROUTED RIP RAP CLASS "A"

CM

378.33

35.09

1,520.97

483.60

2,417.99

509 e

GROUTED RIP RAP CLASS "B"

CM

363.52

28.07

1,411.43

450.76

2,253.78

509 f

GROUTED RIP RAP CLASS "C"

CM

359.02

23.39

1,436.61

454.76

2,273.78

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

551.89

181.56

2,958.80

923.06

4,615.31

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

36.38

115.89

340.06

123.08

615.41

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

79.44

194.57

68.50

342.51

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

103.95

35.01

81.60

55.14

275.70

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

133.05

44.81

104.45

70.58

352.89

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

167.04

91.01

265.17

130.81

654.03

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

208.79

113.77

331.46

163.51

817.53

603

BRICK EDGING

6.19

24.96

7.79

38.94

605 a

CONCRETE BEAM GUARDRAIL

53.87

14.67

429.64

124.55

622.73

605 c

CONCRETE POST FOR GUARDRAIL

66.14

13.10

427.64

126.72

633.60

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

167.74

128.42

4,697.52

1,248.42

6,242.10

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

47.91

192.63

6,891.67

1,783.05

8,915.26

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

167.74

272.87

8,540.14

2,245.19

11,225.94

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

573.77

304.65

15,673.32

4,137.94

20,689.68

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

114.75

60.93

7,042.73

1,804.60

9,023.01

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,030.72

318.64

1,593.20

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,546.08

447.48

2,237.40

Page 181 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (55) Rahim Yar Khan
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

2.07

2.85

15.41

5.08

25.41

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.69

1.27

30.52

8.12

40.60

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

2.07

2.85

20.56

6.37

31.85

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.69

1.27

40.71

10.67

53.34

EACH

47.12

148.90

49.01

245.03

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

47.12

384.62

107.94

539.68

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.59

3.56

21.42

6.89

34.46

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.59

4.75

51.71

14.76

73.81

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.59

3.56

28.57

8.68

43.40

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.59

4.75

68.95

19.07

95.36

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

47.12

206.86

63.50

317.48

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

47.12

652.07

174.80

873.99

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

39.95

99.27

34.81

174.03

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

39.95

256.80

74.19

370.94

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

39.95

137.91

44.47

222.33

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

39.95

435.37

118.83

594.15

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

6.15

46.68

167.70

55.13

275.66

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

6.15

46.68

202.70

63.88

319.41

610 b

RIGHT OF WAY MARKER

EACH

77.22

60.88

218.71

89.20

446.01

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

443.09

476.40

1,481.91

600.35

3,001.75

610 d

TEN KILOMETRE POST

EACH

861.19

952.79

3,218.93

1,258.23

6,291.14

Page 182 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (56) Rajan Pur
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.40

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

3.94

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

11.39

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.84

9.20

0.88

26.82

134.08

258.13

1.97

67.87

339.36

45.58

1,032.53

7.89

271.50

1,357.50

CM

1.36

59.42

15.20

75.98

COMPACTION OF NATURAL GROUND

SM

0.19

5.92

1.68

8.41

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.35

86.79

22.29

111.43

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

69.45

193.76

46.20

77.35

386.76

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

9.78

214.84

56.16

280.78

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

6.46

167.12

43.40

216.98

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

1.93

78.63

20.14

100.70

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

69.45

193.76

46.20

77.35

386.76

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

11.07

199.88

52.74

263.69

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

4.94

167.24

43.05

215.23

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

3.93

89.04

0.31

23.32

116.60

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

35.77

165.86

53.31

63.74

318.68

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

61.48

258.51

30.80

87.70

438.49

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

52.27

193.04

61.33

306.64

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

31.62

160.37

48.00

239.99

107 d

GRANULAR BACK FILL

CM

18.84

83.07

228.96

82.72

413.59

107 e

COMMON BACK FILL

CM

13.92

37.31

4.13

13.84

69.20

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

3.85

106.71

4.13

28.67

143.36

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

11.23

302.97

48.81

90.75

453.76

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

8.42

268.11

1.96

69.62

348.11

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

7.48

238.60

61.52

307.60

CM

4.41

112.14

30.84

154.20

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 183 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (56) Rajan Pur
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

3.44

46.31

4.13

13.47

67.35

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

8.02

73.87

2.45

21.09

105.43

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.77

16.84

1.18

4.70

23.49

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.55

10.31

0.63

2.87

14.36

110

IMPROVED SUB-GRADE

CM

5.51

75.50

54.33

33.84

169.18

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.46

9.38

0.64

2.62

13.10

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.69

9.92

0.74

2.84

14.19

201

GRANULAR SUB-BASE

CM

4.48

106.91

388.36

124.94

624.69

202

AGGREGATE BASE

CM

5.21

132.11

566.87

176.05

880.24

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

41.13

916.98

3,428.97

1,096.77

5,483.85

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

42.62

916.98

3,654.63

1,153.56

5,767.79

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

45.67

957.74

3,423.49

1,106.73

5,533.63

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

45.67

954.75

3,736.82

1,184.31

5,921.55

204 b

CEMENT STABILIZED BASE

CM

15.96

272.73

704.53

248.31

1,241.53

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

135.14

568.44

22,378.80

5,770.60

28,852.98

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

135.14

568.44

22,433.14

5,784.18

28,920.90

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

53.06

55.65

599.03

176.94

884.68

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

84.28

1,408.67

3,097.72

1,147.67

5,738.34

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

58.76

66.68

517.08

160.63

803.15

207 a

DEEP PATCHING (0-15 cm)

SM

0.95

30.14

1.02

8.03

40.14

207 b

DEEP PATCHING (16-30 cm)

SM

0.95

26.47

1.02

7.11

35.55

208

REINSTATEMENT OF ROAD SURFACE

SM

1.01

37.00

0.45

9.62

48.08

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.12

70.82

0.55

18.12

90.61

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.22

14.16

0.11

3.62

18.11

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.17

0.67

22.39

5.81

29.04

Page 184 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (56) Rajan Pur
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.16

0.67

22.39

5.81

29.03

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.95

2.57

12.83

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

8.97

2.32

11.60

304 a

SINGLE SURFACE TREATMENT

SM

0.44

4.16

42.94

11.89

59.43

304 b

DOUBLE SURFACE TREATMENT

SM

0.64

8.06

81.15

22.46

112.31

304 c

TRIPLE SURFACE TREATMENT

SM

1.08

11.08

96.82

27.25

136.23

304 d

SEAL COAT

SM

0.41

2.33

25.67

7.10

35.51

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

38.76

906.07

4,002.59

1,236.86

6,184.28

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

38.76

876.73

4,316.73

1,308.06

6,540.28

307 a

DENSE GRADED HOT BIT-MAC

CM

95.54

171.48

3,306.96

893.50

4,467.48

307 b

OPEN GRADED HOT BIT-MAC

CM

95.54

171.48

3,211.71

869.68

4,348.41

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

16.12

456.95

910.84

345.98

1,729.89

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

119.66

465.97

24,352.50

6,234.53

31,172.66

309 a

COLD MILLING, 0 - 30 mm

SM

0.53

16.87

7.54

6.24

31.18

309 b

COLD MILLING, 0 - 50 mm

SM

0.88

28.11

12.57

10.39

51.95

309 c

COLD MILLING, 0 - 70 mm

SM

1.33

42.16

18.85

15.59

77.93

401 ai

CONCRETE CLASS "A3" (Underground)

CM

297.38

643.62

3,116.38

1,014.35

5,071.73

401 aii CONCRETE CLASS "A3" (On ground)

CM

297.38

643.62

3,325.28

1,066.57

5,332.85

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

297.38

643.62

3,743.08

1,171.02

5,855.10

401 b

CONCRETE CLASS "B"

CM

379.98

407.09

2,331.99

779.77

3,898.83

401 ci

CONCRETE CLASS "C" (Underground)

CM

291.89

258.76

2,784.33

833.75

4,168.73

401 cii CONCRETE CLASS "C" (On ground)

CM

291.89

258.76

2,873.42

856.02

4,280.09

401 ciii CONCRETE CLASS "C" (Elevated)

CM

291.89

258.76

3,051.61

900.57

4,502.83

401 d

CONCRETE CLASS "D1"

CM

464.49

810.64

3,985.03

1,315.04

6,575.20

401 e

CONCRETE CLASS "Y"

CM

651.05

258.76

3,412.17

1,080.50

5,402.48

401 f

LEAN CONCRETE

CM

245.75

252.12

1,873.35

592.81

2,964.03

Page 185 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (56) Rajan Pur
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

990.52

468.57

3,912.45

1,342.89

6,714.43

401 gii PRECAST CONCRETE CLASS "B"

CM

990.52

468.57

3,498.54

1,239.41

6,197.04

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

899.22

42,672.73

10,892.99

54,464.94

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

899.22

44,772.73

11,417.99

57,089.94

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

735.94

2,335.68

37,319.37

10,097.75

50,488.74

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,834.77

6,882.66

80,895.05

22,403.12

112,015.60

405 b

LAUNCHING OF GIRDER

TON

43.83

403.69

111.88

559.40

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

65.51

193.33

64.71

323.55

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

65.51

202.04

66.89

334.44

406 c

STEEL EXPANSION JOINTS

KG

5.41

11.61

60.78

19.45

97.25

406 d

WATER STOPS 6" SIZE

53.81

307.47

90.32

451.60

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

23.81

1,414.07

359.47

1,797.35

406 g

STEEL OR METAL BEARING DEVICES

KG

11.55

30.66

81.19

30.85

154.25

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

235.78

847.08

699.06

445.48

2,227.40

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

353.66

1,270.62

1,048.60

668.22

3,341.10

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

353.66

1,270.62

784.49

602.19

3,010.96

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

589.44

2,117.70

940.81

911.99

4,559.94

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

505.23

1,815.17

884.98

801.35

4,006.73

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

884.16

3,176.55

1,204.96

1,316.42

6,582.09

407 h

PILE LOAD TEST UP TO 120 TON

EACH

11,962.62

19,990.40

67,879.72

24,958.19

124,790.93

407 i

PILE LOAD TEST UP TO 240 TON

EACH

24,131.34

19,990.40

135,759.44

44,970.30

224,851.48

407 j

PILE LOAD TEST UP TO 360 TON

EACH

35,773.02

19,990.40

203,639.16

64,850.65

324,253.23

407 k

CONFIRMATORY BORING (NX SIZE)

128.54

826.61

5.16

240.08

1,200.39

410

BRICK WORK

CM

190.05

142.50

2,077.70

602.56

3,012.81

411 a

STONE MASONRY RANDOM DRY

CM

198.58

56.01

510.40

191.25

956.24

Page 186 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (56) Rajan Pur
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

236.28

84.89

1,248.49

392.42

1,962.08

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

273.88

56.01

565.77

223.92

1,119.58

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

311.48

84.89

1,307.04

425.85

2,129.26

411 g

ROLL POINTING

SM

40.73

5.78

46.02

23.13

115.66

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

411.98

134.30

1,235.66

445.49

2,227.43

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

128.12

230.36

366.23

181.18

905.89

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

125.06

297.19

471.54

223.45

1,117.24

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

121.98

514.83

581.54

304.59

1,522.94

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

128.07

639.81

871.77

409.91

2,049.56

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

147.97

704.13

1,176.81

507.23

2,536.14

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

183.83

868.93

1,773.89

706.66

3,533.31

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

237.90

961.94

2,219.32

854.79

4,273.95

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

279.95

1,168.07

3,097.86

1,136.47

5,682.35

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

332.30

1,362.74

4,695.81

1,597.71

7,988.56

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

128.12

263.77

387.71

194.90

974.50

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

125.06

297.19

504.34

231.65

1,158.24

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

119.14

514.83

607.78

310.44

1,552.19

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

128.07

639.81

931.22

424.78

2,123.88

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

147.97

704.13

1,643.11

623.80

3,119.01

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

183.83

868.93

2,236.37

822.28

4,111.41

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

237.90

961.94

2,849.08

1,012.23

5,061.15

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

279.95

1,168.07

3,723.83

1,292.96

6,464.81

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

332.30

1,362.74

5,127.89

1,705.73

8,528.66

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

49.72

68.08

215.99

83.45

417.24

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

429.39

309.47

2,385.10

780.99

3,904.95

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.05

75.81

19.72

98.58

Page 187 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (56) Rajan Pur
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

54.04

408.33

115.59

577.96

508 a

BRICK PAVING (SINGLE COURSE)

SM

63.13

15.80

161.79

60.18

300.90

508 b

BRICK PAVING (DOUBLE COURSE)

SM

113.33

15.80

321.61

112.69

563.43

509 a

RIP RAP CLASS "A"

CM

273.70

439.03

178.18

890.91

509 b

RIP RAP CLASS "B"

CM

264.16

435.51

174.92

874.59

509 c

RIP RAP CLASS "C"

CM

266.14

439.03

176.29

881.46

509 d

GROUTED RIP RAP CLASS "A"

CM

291.71

35.09

1,432.09

439.72

2,198.61

509 e

GROUTED RIP RAP CLASS "B"

CM

280.89

28.07

1,325.76

408.68

2,043.40

509 f

GROUTED RIP RAP CLASS "C"

CM

277.27

23.39

1,348.75

412.35

2,061.76

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

448.47

181.56

2,753.28

845.83

4,229.14

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

27.28

115.89

229.14

93.08

465.39

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

67.45

194.57

65.51

327.53

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

85.54

35.01

71.34

47.97

239.86

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

109.49

44.81

91.32

61.41

307.03

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

139.57

91.01

243.09

118.42

592.09

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

174.46

113.77

303.87

148.03

740.13

603

BRICK EDGING

4.96

25.92

7.72

38.60

605 a

CONCRETE BEAM GUARDRAIL

42.44

14.67

422.04

119.79

598.94

605 c

CONCRETE POST FOR GUARDRAIL

52.11

13.10

418.36

120.89

604.46

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

134.98

128.42

4,684.41

1,236.95

6,184.76

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

39.23

192.63

6,853.92

1,771.45

8,857.23

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

134.98

272.87

8,476.01

2,220.97

11,104.83

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

441.67

304.65

15,578.19

4,081.13

20,405.64

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

88.33

60.93

7,024.97

1,793.56

8,967.79

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,031.10

318.74

1,593.68

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,546.65

447.62

2,238.11

Page 188 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (56) Rajan Pur
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.46

2.85

15.41

4.93

24.65

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.49

1.27

30.53

8.07

40.36

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.46

2.85

20.56

6.22

31.09

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.49

1.27

40.72

10.62

53.10

EACH

38.56

148.91

46.87

234.34

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

38.56

384.69

105.81

529.06

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

1.83

3.56

21.43

6.71

33.53

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

1.83

4.75

51.71

14.57

72.86

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

1.83

3.56

28.57

8.49

42.45

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

1.83

4.75

68.95

18.88

94.41

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

38.56

206.87

61.36

306.79

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

38.56

652.07

172.66

863.29

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

32.08

99.27

32.84

164.19

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

32.08

256.85

72.23

361.16

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

32.08

137.91

42.50

212.49

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

32.08

435.37

116.86

584.31

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

5.17

46.68

167.59

54.86

274.30

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

5.17

46.68

202.59

63.61

318.05

610 b

RIGHT OF WAY MARKER

EACH

58.69

60.88

210.59

82.54

412.70

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

362.62

476.40

1,413.62

563.16

2,815.80

610 d

TEN KILOMETRE POST

EACH

700.23

952.79

3,086.16

1,184.80

5,923.98

Page 189 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (57) Rawalpindi
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.48

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.77

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

13.73

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.86

9.30

0.88

27.02

135.11

258.13

1.97

68.46

342.29

54.90

1,032.53

7.89

273.83

1,369.15

CM

1.64

59.42

15.27

76.33

COMPACTION OF NATURAL GROUND

SM

0.23

5.92

1.69

8.46

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.91

86.79

22.43

112.13

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

84.72

193.76

46.20

81.17

405.85

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

11.83

214.84

56.67

283.34

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.81

167.12

43.73

218.66

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.38

78.63

20.25

101.26

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

84.72

193.76

46.20

81.17

405.85

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

13.51

199.88

53.35

266.74

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.98

167.24

43.31

216.53

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.79

89.04

0.31

23.54

117.68

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

42.18

165.86

53.31

65.34

326.69

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

75.08

258.51

30.80

91.10

455.49

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

63.77

193.04

64.20

321.01

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

38.61

160.37

49.75

248.73

107 d

GRANULAR BACK FILL

CM

22.86

83.07

273.87

94.95

474.75

107 e

COMMON BACK FILL

CM

16.71

37.31

4.13

14.54

72.69

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.68

106.71

4.13

28.88

144.40

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

13.59

302.97

48.81

91.34

456.71

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

10.19

268.11

1.96

70.07

350.33

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

9.06

238.60

61.92

309.58

CM

5.34

112.14

31.07

155.36

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 190 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (57) Rawalpindi
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

4.16

46.31

4.13

13.65

68.25

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

9.68

73.87

2.45

21.50

107.50

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.93

16.84

1.18

4.74

23.69

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.67

10.31

0.63

2.90

14.51

110

IMPROVED SUB-GRADE

CM

6.68

75.50

54.33

34.13

170.64

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.56

9.38

0.64

2.65

13.23

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.83

9.92

0.74

2.87

14.36

201

GRANULAR SUB-BASE

CM

5.43

106.91

397.51

127.46

637.31

202

AGGREGATE BASE

CM

6.39

132.11

525.11

165.90

829.51

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

49.22

916.98

3,318.64

1,071.21

5,356.05

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

51.05

916.98

3,544.20

1,128.06

5,640.29

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

54.65

957.74

3,313.25

1,081.41

5,407.05

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

54.65

954.75

3,625.61

1,158.75

5,793.76

204 b

CEMENT STABILIZED BASE

CM

19.51

272.73

632.26

231.13

1,155.63

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

161.59

568.44

21,664.80

5,598.71

27,993.54

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

161.59

568.44

22,552.65

5,820.67

29,103.35

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

63.40

55.65

554.86

168.48

842.39

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

100.84

1,408.67

3,002.47

1,128.00

5,639.98

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

70.24

66.68

401.73

134.66

673.31

207 a

DEEP PATCHING (0-15 cm)

SM

1.15

30.14

1.02

8.08

40.39

207 b

DEEP PATCHING (16-30 cm)

SM

1.15

26.47

1.02

7.16

35.80

208

REINSTATEMENT OF ROAD SURFACE

SM

1.23

37.00

0.45

9.67

48.35

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.35

70.82

0.55

18.18

90.90

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.27

14.16

0.11

3.64

18.18

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.20

0.67

21.67

5.64

28.18

Page 191 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (57) Rawalpindi
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.19

0.67

21.67

5.63

28.16

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.56

2.47

12.35

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.02

2.34

11.68

304 a

SINGLE SURFACE TREATMENT

SM

0.52

4.16

42.43

11.78

58.89

304 b

DOUBLE SURFACE TREATMENT

SM

0.76

8.06

80.80

22.41

112.03

304 c

TRIPLE SURFACE TREATMENT

SM

1.28

11.08

96.34

27.18

135.88

304 d

SEAL COAT

SM

0.49

2.33

24.15

6.74

33.71

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

46.49

906.07

3,880.69

1,208.31

6,041.56

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

46.49

876.73

4,184.08

1,276.83

6,384.13

307 a

DENSE GRADED HOT BIT-MAC

CM

112.86

171.48

3,182.48

866.71

4,333.53

307 b

OPEN GRADED HOT BIT-MAC

CM

112.86

171.48

3,094.82

844.79

4,223.95

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

19.29

456.95

911.40

346.91

1,734.55

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

142.39

465.97

23,740.50

6,087.22

30,436.08

309 a

COLD MILLING, 0 - 30 mm

SM

0.64

16.87

7.54

6.26

31.31

309 b

COLD MILLING, 0 - 50 mm

SM

1.07

28.11

12.57

10.44

52.19

309 c

COLD MILLING, 0 - 70 mm

SM

1.61

42.16

18.85

15.66

78.28

401 ai

CONCRETE CLASS "A3" (Underground)

CM

344.28

643.62

2,959.29

986.80

4,933.99

401 aii CONCRETE CLASS "A3" (On ground)

CM

344.28

643.62

3,168.20

1,039.03

5,195.13

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

344.28

643.62

3,586.00

1,143.48

5,717.38

401 b

CONCRETE CLASS "B"

CM

448.42

407.09

2,185.12

760.16

3,800.79

401 ci

CONCRETE CLASS "C" (Underground)

CM

337.29

258.76

2,624.42

805.12

4,025.59

401 cii CONCRETE CLASS "C" (On ground)

CM

337.29

258.76

2,713.51

827.39

4,136.95

401 ciii CONCRETE CLASS "C" (Elevated)

CM

337.29

258.76

2,891.71

871.94

4,359.70

401 d

CONCRETE CLASS "D1"

CM

530.83

810.64

3,828.31

1,292.45

6,462.23

401 e

CONCRETE CLASS "Y"

CM

740.55

258.76

3,259.15

1,064.62

5,323.08

401 f

LEAN CONCRETE

CM

289.29

252.12

1,732.55

568.49

2,842.45

Page 192 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (57) Rawalpindi
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,144.04

468.57

3,742.77

1,338.85

6,694.23

401 gii PRECAST CONCRETE CLASS "B"

CM

1,144.04

468.57

3,347.11

1,239.93

6,199.65

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,030.44

42,571.63

10,900.52

54,502.59

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,030.44

44,671.63

11,425.52

57,127.59

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

844.89

2,335.68

37,721.62

10,225.55

51,127.74

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

2,031.81

6,882.66

80,755.64

22,417.53

112,087.64

405 b

LAUNCHING OF GIRDER

TON

47.94

403.69

112.91

564.54

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

75.84

188.29

66.03

330.16

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

75.84

197.02

68.22

341.08

406 c

STEEL EXPANSION JOINTS

KG

6.21

11.61

61.61

19.86

99.29

406 d

WATER STOPS 6" SIZE

61.94

310.07

93.00

465.01

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

27.38

1,412.11

359.87

1,799.36

406 g

STEEL OR METAL BEARING DEVICES

KG

13.70

30.66

81.88

31.56

157.80

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

255.54

847.08

558.00

415.16

2,075.78

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

383.30

1,270.62

837.00

622.73

3,113.65

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

383.30

1,270.62

641.64

573.89

2,869.45

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

638.84

2,117.70

794.39

887.73

4,438.66

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

547.58

1,815.17

739.84

775.65

3,878.24

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

958.26

3,176.55

1,036.90

1,292.93

6,464.64

407 h

PILE LOAD TEST UP TO 120 TON

EACH

14,326.74

19,990.40

69,433.80

25,937.74

129,688.68

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,583.46

19,990.40

138,867.60

46,860.37

234,301.83

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,673.14

19,990.40

208,301.40

67,741.24

338,706.18

407 k

CONFIRMATORY BORING (NX SIZE)

143.54

826.61

5.16

243.83

1,219.14

410

BRICK WORK

CM

216.93

142.50

2,112.40

617.96

3,089.79

411 a

STONE MASONRY RANDOM DRY

CM

228.04

56.01

446.38

182.61

913.04

Page 193 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (57) Rawalpindi
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

271.70

84.89

1,104.25

365.21

1,826.05

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

314.04

56.01

502.08

218.03

1,090.16

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

356.38

84.89

1,181.38

405.66

2,028.31

411 g

ROLL POINTING

SM

46.10

5.78

44.60

24.12

120.60

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

472.38

134.30

1,110.00

429.17

2,145.85

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

151.95

230.36

363.57

186.47

932.35

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

148.15

297.19

468.34

228.42

1,142.10

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

144.86

514.83

577.85

309.39

1,546.93

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

152.14

639.81

867.43

414.85

2,074.23

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

176.25

704.13

1,172.47

513.21

2,566.06

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

219.03

868.93

1,767.58

713.89

3,569.43

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

283.45

961.94

2,212.95

864.59

4,322.93

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

334.42

1,168.07

3,090.13

1,148.16

5,740.78

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

395.93

1,362.74

4,686.78

1,611.36

8,056.81

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

151.95

263.77

382.84

199.64

998.20

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

148.15

297.19

501.14

236.62

1,183.10

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

141.48

514.83

604.09

315.10

1,575.50

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

152.14

639.81

927.86

429.95

2,149.76

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

176.25

704.13

1,638.19

629.64

3,148.21

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

219.03

868.93

2,230.06

829.51

4,147.53

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

283.45

961.94

2,842.71

1,022.03

5,110.13

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

334.42

1,168.07

3,716.09

1,304.65

6,523.23

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

395.93

1,362.74

5,118.87

1,719.39

8,596.93

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

59.72

68.08

237.18

91.25

456.23

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

502.74

309.47

2,237.34

762.39

3,811.94

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.58

75.81

19.85

99.24

Page 194 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (57) Rawalpindi
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

64.65

353.49

104.54

522.68

508 a

BRICK PAVING (SINGLE COURSE)

SM

72.89

15.80

173.97

65.67

328.33

508 b

BRICK PAVING (DOUBLE COURSE)

SM

130.23

15.80

345.80

122.96

614.79

509 a

RIP RAP CLASS "A"

CM

314.42

375.00

172.36

861.78

509 b

RIP RAP CLASS "B"

CM

303.40

372.00

168.85

844.25

509 c

RIP RAP CLASS "C"

CM

305.17

375.00

170.04

850.21

509 d

GROUTED RIP RAP CLASS "A"

CM

357.68

35.09

1,206.65

399.86

1,999.28

509 e

GROUTED RIP RAP CLASS "B"

CM

344.60

28.07

1,108.63

370.33

1,851.63

509 f

GROUTED RIP RAP CLASS "C"

CM

340.15

23.39

1,126.76

372.58

1,862.88

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

520.99

181.56

2,604.51

826.77

4,133.83

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

32.64

115.89

273.94

105.62

528.09

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

75.19

194.57

67.44

337.20

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

99.03

35.01

60.94

48.75

243.73

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

126.76

44.81

78.00

62.39

311.96

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

160.63

91.01

223.23

118.72

593.59

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

200.78

113.77

279.04

148.40

741.99

603

BRICK EDGING

5.81

27.84

8.41

42.06

605 a

CONCRETE BEAM GUARDRAIL

49.53

14.67

415.49

119.92

599.61

605 c

CONCRETE POST FOR GUARDRAIL

60.81

13.10

410.40

121.08

605.39

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

158.61

128.42

4,670.66

1,239.42

6,197.11

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

45.26

192.63

6,818.67

1,764.14

8,820.70

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

158.61

272.87

8,415.21

2,211.67

11,058.36

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

520.25

304.65

15,481.15

4,076.51

20,382.56

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

104.05

60.93

6,998.54

1,790.88

8,954.40

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,029.00

318.21

1,591.05

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,543.50

446.84

2,234.18

Page 195 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (57) Rawalpindi
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.76

2.85

15.40

5.00

25.01

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.59

1.27

30.41

8.07

40.34

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.76

2.85

20.54

6.29

31.44

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.59

1.27

40.55

10.60

53.01

EACH

48.28

148.76

49.26

246.30

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

48.28

383.17

107.86

539.31

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.20

3.56

21.41

6.79

33.96

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.20

4.75

51.71

14.67

73.33

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.20

3.56

28.55

8.58

42.89

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.20

4.75

68.95

18.98

94.88

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

48.28

206.72

63.75

318.75

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

48.28

652.07

175.09

875.44

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

40.08

99.17

34.81

174.06

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

40.08

255.83

73.98

369.89

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

40.08

137.81

44.47

222.36

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

40.08

435.37

118.86

594.31

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

5.95

46.68

167.46

55.02

275.11

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

5.95

46.68

202.46

63.77

318.86

610 b

RIGHT OF WAY MARKER

EACH

69.25

60.88

203.98

83.53

417.64

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

419.31

476.40

1,361.28

564.25

2,821.24

610 d

TEN KILOMETRE POST

EACH

811.28

952.79

2,977.37

1,185.36

5,926.80

Page 196 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (58) Sahiwal
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.45

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.41

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

12.92

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.85

9.26

0.88

26.93

134.66

258.13

1.97

68.26

341.28

51.66

1,032.53

7.89

273.02

1,365.10

CM

1.51

59.42

15.23

76.16

COMPACTION OF NATURAL GROUND

SM

0.21

5.92

1.69

8.44

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.36

86.79

22.29

111.44

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

73.50

193.76

46.20

78.37

391.83

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

10.59

214.84

56.36

281.79

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

6.97

167.12

43.52

217.61

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

1.93

78.63

20.14

100.70

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

73.50

193.76

46.20

78.37

391.83

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

11.67

199.88

52.89

264.44

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.34

167.24

43.15

215.73

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.09

89.04

0.31

23.36

116.80

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

40.21

165.86

53.31

64.85

324.23

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

64.86

258.51

30.80

88.54

442.71

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

55.33

193.04

62.09

310.46

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

33.35

160.37

48.43

242.15

107 d

GRANULAR BACK FILL

CM

20.69

83.07

342.32

111.52

557.60

107 e

COMMON BACK FILL

CM

16.03

37.31

4.13

14.37

71.84

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.11

106.71

4.13

28.74

143.69

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

12.20

302.97

48.81

91.00

454.98

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

9.15

268.11

1.96

69.81

349.03

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

8.13

238.60

61.68

308.41

CM

4.78

112.14

30.93

154.66

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 197 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (58) Sahiwal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

3.70

46.31

4.13

13.54

67.68

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

8.82

73.87

2.45

21.29

106.43

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.82

16.84

1.18

4.71

23.55

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.59

10.31

0.63

2.88

14.41

110

IMPROVED SUB-GRADE

CM

5.98

75.50

54.33

33.95

169.76

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.51

9.38

0.64

2.63

13.16

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.76

9.92

0.74

2.86

14.28

201

GRANULAR SUB-BASE

CM

4.81

106.91

509.69

155.35

776.76

202

AGGREGATE BASE

CM

5.44

132.11

619.08

189.16

945.79

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

46.10

916.98

3,445.14

1,102.06

5,510.28

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

47.57

916.98

3,685.01

1,162.39

5,811.95

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

51.00

957.74

3,439.71

1,112.11

5,560.56

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

51.00

954.75

3,766.63

1,193.10

5,965.48

204 b

CEMENT STABILIZED BASE

CM

16.95

272.73

740.83

257.63

1,288.14

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

143.55

568.44

22,123.80

5,708.95

28,544.74

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

143.55

568.44

23,037.27

5,937.32

29,686.58

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

61.87

55.65

712.85

207.59

1,037.96

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

92.32

1,408.67

3,140.86

1,160.46

5,802.31

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

68.61

66.68

561.95

174.31

871.55

207 a

DEEP PATCHING (0-15 cm)

SM

1.03

30.14

1.02

8.05

40.24

207 b

DEEP PATCHING (16-30 cm)

SM

1.03

26.47

1.02

7.13

35.65

208

REINSTATEMENT OF ROAD SURFACE

SM

1.06

37.00

0.45

9.63

48.14

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.19

70.82

0.55

18.14

90.70

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.24

14.16

0.11

3.63

18.14

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.17

0.67

22.13

5.74

28.71

Page 198 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (58) Sahiwal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.17

0.67

22.13

5.74

28.71

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.74

2.51

12.56

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.21

2.38

11.90

304 a

SINGLE SURFACE TREATMENT

SM

0.45

4.16

43.95

12.14

60.70

304 b

DOUBLE SURFACE TREATMENT

SM

0.65

8.06

84.35

23.27

116.33

304 c

TRIPLE SURFACE TREATMENT

SM

1.10

11.08

100.93

28.28

141.39

304 d

SEAL COAT

SM

0.41

2.33

24.77

6.88

34.39

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

42.83

906.07

4,029.21

1,244.53

6,222.64

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

42.83

876.73

4,350.01

1,317.39

6,586.96

307 a

DENSE GRADED HOT BIT-MAC

CM

104.99

171.48

3,313.74

897.55

4,487.76

307 b

OPEN GRADED HOT BIT-MAC

CM

104.99

171.48

3,232.74

877.30

4,386.51

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

17.72

456.95

940.27

353.74

1,768.68

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

128.19

465.97

24,199.50

6,198.42

30,992.08

309 a

COLD MILLING, 0 - 30 mm

SM

0.56

16.87

7.54

6.24

31.21

309 b

COLD MILLING, 0 - 50 mm

SM

0.93

28.11

12.57

10.40

52.01

309 c

COLD MILLING, 0 - 70 mm

SM

1.39

42.16

18.85

15.60

78.00

401 ai

CONCRETE CLASS "A3" (Underground)

CM

341.16

643.62

3,242.37

1,056.79

5,283.94

401 aii CONCRETE CLASS "A3" (On ground)

CM

341.16

643.62

3,451.27

1,109.01

5,545.06

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

341.16

643.62

3,869.08

1,213.47

6,067.33

401 b

CONCRETE CLASS "B"

CM

428.21

407.09

2,486.97

830.57

4,152.84

401 ci

CONCRETE CLASS "C" (Underground)

CM

339.41

258.76

2,939.55

884.43

4,422.15

401 cii CONCRETE CLASS "C" (On ground)

CM

339.41

258.76

3,028.65

906.71

4,533.53

401 ciii CONCRETE CLASS "C" (Elevated)

CM

339.41

258.76

3,206.84

951.25

4,756.26

401 d

CONCRETE CLASS "D1"

CM

542.31

810.64

4,109.36

1,365.58

6,827.89

401 e

CONCRETE CLASS "Y"

CM

768.10

258.76

3,517.56

1,136.11

5,680.53

401 f

LEAN CONCRETE

CM

285.72

252.12

2,028.77

641.65

3,208.26

Page 199 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (58) Sahiwal
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,161.76

468.57

4,046.64

1,419.24

7,096.21

401 gii PRECAST CONCRETE CLASS "B"

CM

1,161.76

468.57

3,658.93

1,322.32

6,611.58

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,041.01

42,565.00

10,901.50

54,507.51

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,041.01

44,665.00

11,426.50

57,132.51

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

849.22

2,335.68

37,038.01

10,055.73

50,278.64

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,827.91

6,882.66

80,758.83

22,367.35

111,836.75

405 b

LAUNCHING OF GIRDER

TON

43.68

403.69

111.84

559.21

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

76.04

186.51

65.64

328.19

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

76.04

195.24

67.82

339.10

406 c

STEEL EXPANSION JOINTS

KG

6.32

11.61

60.90

19.71

98.54

406 d

WATER STOPS 6" SIZE

63.08

308.63

92.93

464.64

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

27.47

1,411.89

359.84

1,799.20

406 g

STEEL OR METAL BEARING DEVICES

KG

12.97

30.66

81.26

31.22

156.11

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

236.68

847.08

555.33

409.77

2,048.86

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

355.02

1,270.62

833.00

614.66

3,073.30

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

355.02

1,270.62

637.64

565.82

2,829.10

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

591.71

2,117.70

787.73

874.29

4,371.43

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

507.18

1,815.17

734.12

764.12

3,820.59

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

887.56

3,176.55

1,026.90

1,272.75

6,363.76

407 h

PILE LOAD TEST UP TO 120 TON

EACH

13,892.04

19,990.40

72,541.08

26,605.88

133,029.40

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,446.84

19,990.40

145,082.16

48,379.85

241,899.25

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,238.44

19,990.40

217,623.24

69,963.02

349,815.10

407 k

CONFIRMATORY BORING (NX SIZE)

137.33

826.61

5.16

242.28

1,211.38

410

BRICK WORK

CM

225.12

142.50

2,095.49

615.78

3,078.89

411 a

STONE MASONRY RANDOM DRY

CM

234.16

56.01

537.14

206.83

1,034.14

Page 200 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (58) Sahiwal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

279.16

84.89

1,359.97

431.01

2,155.03

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

324.16

56.01

594.65

243.71

1,218.53

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

369.16

84.89

1,399.47

463.38

2,316.90

411 g

ROLL POINTING

SM

48.61

5.78

47.44

25.46

127.29

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

489.16

134.30

1,328.09

487.89

2,439.44

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

149.44

230.36

368.88

187.17

935.85

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

146.40

297.19

474.72

229.58

1,147.89

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

140.58

514.83

585.24

310.16

1,550.81

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

148.26

639.81

876.10

416.04

2,080.21

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

170.27

704.13

1,181.14

513.89

2,569.43

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

210.43

868.93

1,780.14

714.88

3,574.38

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

272.33

961.94

2,225.55

864.96

4,324.78

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

319.97

1,168.07

3,105.43

1,148.37

5,741.84

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

380.17

1,362.74

4,704.63

1,611.89

8,059.43

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

149.44

263.77

393.01

201.56

1,007.78

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

146.40

297.19

507.52

237.78

1,188.89

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

137.21

514.83

611.48

315.88

1,579.40

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

148.26

639.81

934.59

430.67

2,153.33

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

170.27

704.13

1,647.92

630.58

3,152.90

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

210.43

868.93

2,242.62

830.50

4,152.48

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

272.33

961.94

2,855.31

1,022.40

5,111.98

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

319.97

1,168.07

3,731.39

1,304.86

6,524.29

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

380.17

1,362.74

5,136.72

1,719.91

8,599.54

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

56.65

68.08

279.55

101.07

505.35

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

489.23

309.47

2,540.08

834.70

4,173.48

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.46

75.81

19.82

99.09

Page 201 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (58) Sahiwal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

62.60

437.50

125.03

625.13

508 a

BRICK PAVING (SINGLE COURSE)

SM

74.47

15.80

158.79

62.27

311.33

508 b

BRICK PAVING (DOUBLE COURSE)

SM

134.47

15.80

315.08

116.34

581.69

509 a

RIP RAP CLASS "A"

CM

323.51

465.76

197.32

986.59

509 b

RIP RAP CLASS "B"

CM

312.81

462.04

193.71

968.56

509 c

RIP RAP CLASS "C"

CM

315.67

465.76

195.36

976.79

509 d

GROUTED RIP RAP CLASS "A"

CM

341.56

35.09

1,542.63

479.82

2,399.10

509 e

GROUTED RIP RAP CLASS "B"

CM

329.95

28.07

1,427.31

446.33

2,231.66

509 f

GROUTED RIP RAP CLASS "C"

CM

326.26

23.39

1,455.04

451.17

2,255.86

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

526.08

181.56

2,911.47

904.78

4,523.89

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

31.45

115.89

342.29

122.41

612.04

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

72.15

194.57

66.68

333.40

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

100.41

35.01

75.69

52.78

263.89

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

128.52

44.81

96.88

67.55

337.76

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

164.52

91.01

264.14

129.92

649.59

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

205.65

113.77

330.17

162.40

811.99

603

BRICK EDGING

5.78

24.96

7.69

38.43

605 a

CONCRETE BEAM GUARDRAIL

50.14

14.67

426.40

122.80

614.01

605 c

CONCRETE POST FOR GUARDRAIL

61.56

13.10

423.74

124.60

623.00

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

155.48

128.42

4,685.22

1,242.28

6,211.40

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

46.50

192.63

6,873.74

1,778.22

8,891.09

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

155.48

272.87

8,511.99

2,235.09

11,175.43

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

518.22

304.65

15,623.17

4,111.51

20,557.55

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

103.64

60.93

7,023.17

1,796.94

8,984.68

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,027.86

317.93

1,589.63

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,541.80

446.41

2,232.05

Page 202 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (58) Sahiwal
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.60

2.85

15.39

4.96

24.80

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.53

1.27

30.34

8.04

40.18

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.60

2.85

20.53

6.25

31.23

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.53

1.27

40.46

10.57

52.83

EACH

46.57

148.68

48.81

244.06

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

46.57

382.31

107.22

536.10

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.00

3.56

21.40

6.74

33.70

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.00

4.75

51.71

14.62

73.08

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.00

3.56

28.54

8.53

42.63

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.00

4.75

68.95

18.93

94.63

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

46.57

206.64

63.30

316.51

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

46.57

652.07

174.66

873.30

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

38.47

99.12

34.40

171.99

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

38.47

255.26

73.43

367.16

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

38.47

137.76

44.06

220.29

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

38.47

435.37

118.46

592.30

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

6.09

46.68

167.70

55.12

275.59

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

6.09

46.68

202.70

63.87

319.34

610 b

RIGHT OF WAY MARKER

EACH

69.11

60.88

215.66

86.41

432.06

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

427.81

476.40

1,456.88

590.27

2,951.36

610 d

TEN KILOMETRE POST

EACH

825.61

952.79

3,168.08

1,236.62

6,183.10

Page 203 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (60) Sargodha
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.47

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.65

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

13.46

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.86

9.29

0.88

26.99

134.96

258.13

1.97

68.39

341.95

53.82

1,032.53

7.89

273.56

1,367.80

CM

1.59

59.42

15.25

76.26

COMPACTION OF NATURAL GROUND

SM

0.23

5.92

1.69

8.46

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.73

86.79

22.38

111.90

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

80.94

193.76

46.20

80.23

401.13

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

11.41

214.84

56.56

282.81

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.52

167.12

43.66

218.30

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.23

78.63

20.22

101.08

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

80.94

193.76

46.20

80.23

401.13

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

12.89

199.88

53.19

265.96

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.76

167.24

43.25

216.25

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.55

89.04

0.31

23.48

117.38

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

42.07

165.86

53.31

65.31

326.55

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

71.64

258.51

30.80

90.24

451.19

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

60.93

193.04

63.49

317.46

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

36.84

160.37

49.30

246.51

107 d

GRANULAR BACK FILL

CM

22.14

83.07

270.57

93.95

469.73

107 e

COMMON BACK FILL

CM

16.48

37.31

4.13

14.48

72.40

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.48

106.71

4.13

28.83

144.15

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

13.11

302.97

48.81

91.22

456.11

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

9.84

268.11

1.96

69.98

349.89

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

8.74

238.60

61.84

309.18

CM

5.15

112.14

31.03

155.13

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 204 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (60) Sargodha
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

4.00

46.31

4.13

13.61

68.05

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

9.38

73.87

2.45

21.43

107.13

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.90

16.84

1.18

4.73

23.65

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.64

10.31

0.63

2.90

14.48

110

IMPROVED SUB-GRADE

CM

6.44

75.50

54.33

34.07

170.34

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.54

9.38

0.64

2.64

13.20

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.81

9.92

0.74

2.87

14.34

201

GRANULAR SUB-BASE

CM

5.22

106.91

380.61

123.19

615.93

202

AGGREGATE BASE

CM

6.07

132.11

504.21

160.60

802.99

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

48.17

916.98

3,317.28

1,070.61

5,353.04

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

49.88

916.98

3,544.42

1,127.82

5,639.10

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

53.41

957.74

3,312.10

1,080.81

5,404.06

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

53.41

954.75

3,626.43

1,158.65

5,793.24

204 b

CEMENT STABILIZED BASE

CM

18.65

272.73

610.31

225.42

1,127.11

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

155.39

568.44

21,817.80

5,635.41

28,177.04

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

155.39

568.44

22,718.32

5,860.54

29,302.69

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

62.87

55.65

532.80

162.83

814.15

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

97.96

1,408.67

2,988.73

1,123.84

5,619.20

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

69.68

66.68

475.90

153.07

765.33

207 a

DEEP PATCHING (0-15 cm)

SM

1.11

30.14

1.02

8.07

40.34

207 b

DEEP PATCHING (16-30 cm)

SM

1.11

26.47

1.02

7.15

35.75

208

REINSTATEMENT OF ROAD SURFACE

SM

1.18

37.00

0.45

9.66

48.29

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.30

70.82

0.55

18.17

90.84

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.26

14.16

0.11

3.63

18.16

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.19

0.67

21.82

5.67

28.35

Page 205 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (60) Sargodha
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.19

0.67

21.82

5.67

28.35

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.62

2.49

12.43

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.09

2.35

11.76

304 a

SINGLE SURFACE TREATMENT

SM

0.50

4.16

42.61

11.82

59.09

304 b

DOUBLE SURFACE TREATMENT

SM

0.72

8.06

81.00

22.45

112.23

304 c

TRIPLE SURFACE TREATMENT

SM

1.22

11.08

96.49

27.20

135.99

304 d

SEAL COAT

SM

0.46

2.33

24.27

6.77

33.83

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

45.26

906.07

3,889.15

1,210.12

6,050.60

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

45.26

876.73

4,195.29

1,279.32

6,396.60

307 a

DENSE GRADED HOT BIT-MAC

CM

110.24

171.48

3,194.91

869.16

4,345.79

307 b

OPEN GRADED HOT BIT-MAC

CM

110.24

171.48

3,101.19

845.73

4,228.64

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

18.76

456.95

910.99

346.68

1,733.38

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

137.47

465.97

23,893.50

6,124.24

30,621.18

309 a

COLD MILLING, 0 - 30 mm

SM

0.61

16.87

7.54

6.26

31.28

309 b

COLD MILLING, 0 - 50 mm

SM

1.02

28.11

12.57

10.43

52.13

309 c

COLD MILLING, 0 - 70 mm

SM

1.54

42.16

18.85

15.64

78.19

401 ai

CONCRETE CLASS "A3" (Underground)

CM

352.53

643.62

3,026.26

1,005.60

5,028.01

401 aii CONCRETE CLASS "A3" (On ground)

CM

352.53

643.62

3,235.16

1,057.83

5,289.14

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

352.53

643.62

3,652.96

1,162.28

5,811.39

401 b

CONCRETE CLASS "B"

CM

448.46

407.09

2,244.79

775.09

3,875.43

401 ci

CONCRETE CLASS "C" (Underground)

CM

346.81

258.76

2,685.49

822.77

4,113.83

401 cii CONCRETE CLASS "C" (On ground)

CM

346.81

258.76

2,774.59

845.04

4,225.20

401 ciii CONCRETE CLASS "C" (Elevated)

CM

346.81

258.76

2,952.78

889.59

4,447.94

401 d

CONCRETE CLASS "D1"

CM

552.83

810.64

3,903.35

1,316.71

6,583.53

401 e

CONCRETE CLASS "Y"

CM

776.25

258.76

3,327.97

1,090.75

5,453.73

401 f

LEAN CONCRETE

CM

291.49

252.12

1,786.59

582.55

2,912.75

Page 206 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (60) Sargodha
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,179.55

468.57

3,813.74

1,365.47

6,827.33

401 gii PRECAST CONCRETE CLASS "B"

CM

1,179.55

468.57

3,405.50

1,263.41

6,317.03

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,069.48

42,565.01

10,908.62

54,543.11

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,069.48

44,665.01

11,433.62

57,168.11

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

874.74

2,335.68

37,039.51

10,062.48

50,312.41

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,963.83

6,882.66

80,760.39

22,401.72

112,008.60

405 b

LAUNCHING OF GIRDER

TON

46.52

403.69

112.55

562.76

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

77.88

186.29

66.04

330.21

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

77.88

195.01

68.22

341.11

406 c

STEEL EXPANSION JOINTS

KG

6.45

11.61

60.65

19.68

98.39

406 d

WATER STOPS 6" SIZE

64.10

309.15

93.31

466.56

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

28.29

1,411.63

359.98

1,799.90

406 g

STEEL OR METAL BEARING DEVICES

KG

13.63

30.66

81.03

31.33

156.65

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

249.55

847.08

553.60

412.56

2,062.79

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

374.32

1,270.62

830.40

618.84

3,094.18

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

374.32

1,270.62

635.04

570.00

2,849.98

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

623.87

2,117.70

783.39

881.24

4,406.20

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

534.74

1,815.17

730.41

770.08

3,850.40

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

935.80

3,176.55

1,020.40

1,283.19

6,415.94

407 h

PILE LOAD TEST UP TO 120 TON

EACH

14,181.84

19,990.40

69,433.80

25,901.51

129,507.55

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,537.92

19,990.40

138,867.60

46,848.98

234,244.90

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,528.24

19,990.40

208,301.40

67,705.01

338,525.05

407 k

CONFIRMATORY BORING (NX SIZE)

141.47

826.61

5.16

243.31

1,216.55

410

BRICK WORK

CM

226.74

142.50

2,055.10

606.09

3,030.43

411 a

STONE MASONRY RANDOM DRY

CM

236.18

56.01

327.05

154.81

774.05

Page 207 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (60) Sargodha
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

281.18

84.89

1,036.89

350.74

1,753.70

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

326.18

56.01

367.76

187.49

937.44

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

371.18

84.89

1,087.83

385.98

1,929.88

411 g

ROLL POINTING

SM

48.71

5.78

45.55

25.01

125.05

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

491.18

134.30

1,016.46

410.49

2,052.43

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

151.97

230.36

365.35

186.92

934.60

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

148.43

297.19

470.48

229.03

1,145.13

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

144.26

514.83

580.30

309.85

1,549.24

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

151.60

639.81

870.32

415.43

2,077.16

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

175.01

704.13

1,175.36

513.63

2,568.13

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

217.32

868.93

1,771.80

714.51

3,572.56

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

281.24

961.94

2,217.24

865.11

4,325.53

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

330.79

1,168.07

3,095.34

1,148.55

5,742.75

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

392.80

1,362.74

4,692.86

1,612.10

8,060.50

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

151.97

263.77

385.95

200.42

1,002.11

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

148.43

297.19

503.28

237.23

1,186.13

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

140.89

514.83

606.54

315.57

1,577.83

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

151.60

639.81

930.09

430.38

2,151.88

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

175.01

704.13

1,641.50

630.16

3,150.80

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

217.32

868.93

2,234.28

830.13

4,150.66

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

281.24

961.94

2,847.00

1,022.55

5,112.73

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

330.79

1,168.07

3,721.30

1,305.04

6,525.20

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

392.80

1,362.74

5,124.95

1,720.12

8,600.61

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

58.68

68.08

237.18

90.99

454.93

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

507.98

309.47

2,297.90

778.84

3,894.19

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.61

75.81

19.86

99.28

Page 208 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (60) Sargodha
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

63.95

379.17

110.78

553.90

508 a

BRICK PAVING (SINGLE COURSE)

SM

75.19

15.80

162.67

63.42

317.08

508 b

BRICK PAVING (DOUBLE COURSE)

SM

135.19

15.80

323.20

118.55

592.74

509 a

RIP RAP CLASS "A"

CM

326.30

255.68

145.50

727.48

509 b

RIP RAP CLASS "B"

CM

315.04

253.63

142.17

710.84

509 c

RIP RAP CLASS "C"

CM

317.53

255.68

143.30

716.51

509 d

GROUTED RIP RAP CLASS "A"

CM

362.05

35.09

1,255.74

413.22

2,066.10

509 e

GROUTED RIP RAP CLASS "B"

CM

349.05

28.07

1,150.21

381.83

1,909.16

509 f

GROUTED RIP RAP CLASS "C"

CM

344.88

23.39

1,170.35

384.66

1,923.28

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

533.48

181.56

2,670.84

846.47

4,232.35

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

32.22

115.89

270.66

104.69

523.46

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

74.18

194.57

67.19

335.94

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

101.67

35.01

41.55

44.56

222.79

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

130.14

44.81

53.18

57.03

285.16

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

166.14

91.01

214.52

117.92

589.59

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

207.68

113.77

268.15

147.40

737.00

603

BRICK EDGING

5.88

25.92

7.95

39.75

605 a

CONCRETE BEAM GUARDRAIL

50.55

14.67

418.02

120.81

604.05

605 c

CONCRETE POST FOR GUARDRAIL

62.07

13.10

413.52

122.17

610.86

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

159.90

128.42

4,670.12

1,239.61

6,198.05

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

46.50

192.63

6,827.05

1,766.55

8,832.73

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

159.90

272.87

8,431.81

2,216.15

11,080.73

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

524.85

304.65

15,503.05

4,083.14

20,415.69

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

104.97

60.93

6,999.33

1,791.31

8,956.54

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,027.92

317.94

1,589.70

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,541.88

446.43

2,232.15

Page 209 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (60) Sargodha
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.73

2.85

15.39

4.99

24.96

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.58

1.27

30.34

8.05

40.24

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.73

2.85

20.53

6.28

31.39

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.58

1.27

40.47

10.58

52.90

EACH

47.56

148.69

49.06

245.31

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

47.56

382.37

107.48

537.41

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.17

3.56

21.40

6.78

33.91

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.17

4.75

51.71

14.66

73.29

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.17

3.56

28.54

8.57

42.84

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.17

4.75

68.95

18.97

94.84

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

47.56

206.65

63.55

317.76

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

47.56

652.07

174.91

874.54

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

39.46

99.12

34.65

173.23

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

39.46

255.30

73.69

368.45

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

39.46

137.76

44.31

221.53

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

39.46

435.37

118.71

593.54

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

6.09

46.68

167.56

55.08

275.41

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

6.09

46.68

202.56

63.83

319.16

610 b

RIGHT OF WAY MARKER

EACH

69.79

60.88

206.71

84.35

421.73

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

431.85

476.40

1,381.03

572.32

2,861.60

610 d

TEN KILOMETRE POST

EACH

833.71

952.79

3,021.79

1,202.07

6,010.36

Page 210 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (61) Sheikhupura
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

MATERIAL

SM

0.46

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.53

102.44

0.88

26.96

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

13.19

258.13

1.97

68.32

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

52.74

1,032.53

7.89

273.29

103

STRIPPING

CM

1.53

59.42

104

COMPACTION OF NATURAL GROUND

SM

0.22

5.92

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.54

86.79

22.33

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

76.72

193.76

46.20

79.17

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

10.87

214.84

56.43

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.13

167.12

43.56

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.08

78.63

20.18

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

76.72

193.76

46.20

79.17

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

12.22

199.88

53.03

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.47

167.24

43.18

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.26

89.04

0.31

23.40

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

38.79

165.86

53.31

64.49

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

67.88

258.51

30.80

89.30

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

57.80

193.04

62.71

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

34.91

160.37

48.82

107 d

GRANULAR BACK FILL

CM

21.41

83.07

288.79

98.32

107 e

COMMON BACK FILL

CM

16.26

37.31

4.13

14.43

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.24

106.71

4.13

28.77

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

12.52

302.97

48.81

91.08

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

9.39

268.11

1.96

69.87

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

8.35

238.60

CM

4.90

112.14

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 211 / 244

OH-PROFIT

0.62

6.81

1.86

15.24
1.69

61.74
30.96

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (61) Sheikhupura
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

3.79

46.31

4.13

13.56

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

8.99

73.87

2.45

21.33

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.85

16.84

1.18

4.72

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.61

10.31

0.63

2.89

110

IMPROVED SUB-GRADE

CM

6.16

75.50

51.54

33.30

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.52

9.38

0.64

2.64

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.77

9.92

0.74

2.86

201

GRANULAR SUB-BASE

CM

4.96

106.91

433.69

136.39

202

AGGREGATE BASE

CM

5.75

132.11

566.87

176.18

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

47.01

916.98

3,399.87

1,090.97

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

48.60

916.98

3,629.36

1,148.74

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

51.94

957.74

3,394.47

1,101.04

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

51.94

954.75

3,711.38

1,179.52

204 b

CEMENT STABILIZED BASE

CM

17.80

272.73

679.09

242.41

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

147.22

568.44

22,123.80

5,709.87

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

147.22

568.44

23,043.87

5,939.88

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

62.18

55.65

599.00

179.21

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

94.60

1,408.67

3,081.88

1,146.29

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

69.04

66.68

488.34

156.02

207 a

DEEP PATCHING (0-15 cm)

SM

1.05

30.14

1.02

8.05

207 b

DEEP PATCHING (16-30 cm)

SM

1.05

26.47

1.02

7.14

208

REINSTATEMENT OF ROAD SURFACE

SM

1.12

37.00

0.45

9.64

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.21

70.82

0.55

18.15

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.24

14.16

0.11

3.63

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.18

0.67

22.13

5.75

Page 212 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (61) Sheikhupura
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.18

0.67

22.13

5.75

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.74

2.51

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.22

2.38

304 a

SINGLE SURFACE TREATMENT

SM

0.47

4.16

43.63

12.07

304 b

DOUBLE SURFACE TREATMENT

SM

0.69

8.06

83.38

23.03

304 c

TRIPLE SURFACE TREATMENT

SM

1.15

11.08

99.56

27.95

304 d

SEAL COAT

SM

0.44

2.33

24.68

6.86

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

43.90

906.07

3,972.81

1,230.70

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

43.90

876.73

4,283.17

1,300.95

307 a

DENSE GRADED HOT BIT-MAC

CM

107.62

171.48

3,267.28

886.60

307 b

OPEN GRADED HOT BIT-MAC

CM

107.62

171.48

3,180.08

864.80

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

18.24

456.95

930.23

351.36

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

130.59

465.97

24,199.50

6,199.02

309 a

COLD MILLING, 0 - 30 mm

SM

0.59

16.87

7.54

6.25

309 b

COLD MILLING, 0 - 50 mm

SM

0.98

28.11

12.57

10.42

309 c

COLD MILLING, 0 - 70 mm

SM

1.47

42.16

18.85

15.62

401 ai

CONCRETE CLASS "A3" (Underground)

CM

316.28

643.62

3,091.94

1,012.96

401 aii CONCRETE CLASS "A3" (On ground)

CM

316.28

643.62

3,300.84

1,065.19

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

316.28

643.62

3,718.64

1,169.64

401 b

CONCRETE CLASS "B"

CM

414.70

407.09

2,322.56

786.09

401 ci

CONCRETE CLASS "C" (Underground)

CM

313.89

258.76

2,767.50

835.04

401 cii CONCRETE CLASS "C" (On ground)

CM

313.89

258.76

2,856.60

857.31

401 ciii CONCRETE CLASS "C" (Elevated)

CM

313.89

258.76

3,034.79

901.86

401 d

CONCRETE CLASS "D1"

CM

488.52

810.64

3,964.35

1,315.88

401 e

CONCRETE CLASS "Y"

CM

685.24

258.76

3,385.84

1,082.46

401 f

LEAN CONCRETE

CM

276.78

252.12

1,864.92

598.46

Page 213 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (61) Sheikhupura
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

PRECAST CONCRETE CLASS "A"

CM

1,075.73

468.57

3,884.79

1,357.27

401 gii PRECAST CONCRETE CLASS "B"

CM

1,075.73

468.57

3,488.29

1,258.15

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

941.33

42,670.56

10,902.97

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

941.33

44,770.56

11,427.97

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

793.65

2,335.68

37,096.05

10,056.35

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,895.98

6,882.66

80,761.19

22,384.96

405 b

LAUNCHING OF GIRDER

TON

45.10

403.69

112.20

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

70.63

184.41

63.76

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

70.63

193.12

65.94

406 c

STEEL EXPANSION JOINTS

KG

5.95

11.61

60.85

19.60

406 d

WATER STOPS 6" SIZE

57.89

309.17

91.77

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

406 f

ASPHALT FELT (3 PLY)

SM

25.03

1,411.27

359.08

406 g

STEEL OR METAL BEARING DEVICES

KG

13.30

30.66

81.20

31.29

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

243.12

847.08

566.15

414.09

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

364.68

1,270.62

849.22

621.13

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

364.68

1,270.62

653.86

572.29

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

607.81

2,117.70

814.77

885.07

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

520.98

1,815.17

757.30

773.36

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

911.71

3,176.55

1,067.46

1,288.93

407 h

PILE LOAD TEST UP TO 120 TON

EACH

14,037.18

19,990.40

70,987.00

26,253.65

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,492.38

19,990.40

141,974.00

47,614.20

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,383.58

19,990.40

212,961.00

68,833.75

407 k

CONFIRMATORY BORING (NX SIZE)

139.40

826.61

5.16

242.79

410

BRICK WORK

CM

202.88

142.50

2,072.05

604.36

411 a

STONE MASONRY RANDOM DRY

CM

213.88

56.01

502.71

193.15

Page 214 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (61) Sheikhupura
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

256.04

84.89

1,233.74

393.67

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

295.34

56.01

557.47

227.21

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

334.64

84.89

1,293.44

428.24

411 g

ROLL POINTING

SM

42.96

5.78

45.91

23.66

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

446.10

134.30

1,222.06

450.62

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

147.52

230.36

366.01

185.97

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

144.23

297.19

471.28

228.18

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

138.90

514.83

581.23

308.74

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

146.73

639.81

871.41

414.49

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

169.44

704.13

1,176.45

512.51

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

209.39

868.93

1,773.36

712.92

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

270.97

961.94

2,218.80

862.93

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

320.35

1,168.07

3,097.23

1,146.41

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

378.25

1,362.74

4,695.07

1,609.02

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

147.52

263.77

387.27

199.64

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

144.23

297.19

504.08

236.38

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

135.53

514.83

607.47

314.46

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

146.73

639.81

930.93

429.37

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

169.44

704.13

1,642.71

629.07

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

209.39

868.93

2,235.84

828.54

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

270.97

961.94

2,848.56

1,020.37

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

320.35

1,168.07

3,723.19

1,302.90

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

378.25

1,362.74

5,127.16

1,717.04

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

57.44

68.08

258.36

95.97

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

465.47

309.47

2,375.67

787.65

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.30

75.81

19.78

Page 215 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (61) Sheikhupura
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

507 b

ROCK FILL IN GABIONS

CM

63.05

408.33

117.85

508 a

BRICK PAVING (SINGLE COURSE)

SM

69.00

15.80

163.56

62.09

508 b

BRICK PAVING (DOUBLE COURSE)

SM

123.30

15.80

324.79

115.97

509 a

RIP RAP CLASS "A"

CM

296.09

431.34

181.86

509 b

RIP RAP CLASS "B"

CM

286.31

427.89

178.55

509 c

RIP RAP CLASS "C"

CM

287.90

431.34

179.81

509 d

GROUTED RIP RAP CLASS "A"

CM

318.20

35.09

1,434.96

447.06

509 e

GROUTED RIP RAP CLASS "B"

CM

306.67

28.07

1,327.61

415.59

509 f

GROUTED RIP RAP CLASS "C"

CM

302.80

23.39

1,350.53

419.18

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

494.23

181.56

2,744.42

855.05

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

31.63

115.89

288.92

109.11

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

73.16

194.57

66.93

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

93.50

35.01

70.09

49.65

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

119.68

44.81

89.72

63.55

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

151.12

91.01

244.56

121.67

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

188.90

113.77

305.70

152.09

603

BRICK EDGING

5.51

25.92

7.86

605 a

CONCRETE BEAM GUARDRAIL

47.70

14.67

420.99

120.84

605 c

CONCRETE POST FOR GUARDRAIL

58.57

13.10

417.07

122.19

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

149.65

128.42

4,673.93

1,238.00

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

42.98

192.63

6,837.46

1,768.27

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

149.65

272.87

8,449.55

2,218.02

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

503.78

304.65

15,526.60

4,083.76

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

100.76

60.93

7,000.37

1,790.52

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,026.82

317.67

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,540.23

446.02

Page 216 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (61) Sheikhupura
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.55

2.85

15.38

4.95

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.52

1.27

30.27

8.02

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.55

2.85

20.52

6.23

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.52

1.27

40.38

10.54

EACH

42.77

148.60

47.84

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

42.77

381.51

106.07

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

1.94

3.56

21.39

6.72

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

1.94

4.75

51.71

14.60

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

1.94

3.56

28.53

8.51

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

1.94

4.75

68.95

18.91

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

42.77

206.56

62.33

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

42.77

652.07

173.71

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

35.48

99.07

33.64

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

35.48

254.72

72.55

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

35.48

137.71

43.30

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

35.48

435.37

117.71

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

5.57

46.68

167.58

54.96

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

5.57

46.68

202.58

63.71

610 b

RIGHT OF WAY MARKER

EACH

67.50

60.88

209.48

84.47

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

397.83

476.40

1,404.59

569.71

610 d

TEN KILOMETRE POST

EACH

771.35

952.79

3,067.89

1,198.01

Page 217 / 244

General Revision- IV
CSR - 2005
Quantity Surveying &
Estimation Specialist, NHA
District (61) Sheikhupura
RATE

9.28
134.81
341.61
1,366.45
76.19
8.45
111.66
395.85
282.14
217.81
100.89
395.85
265.13
215.89
117.01
322.45
446.49
313.55
244.10
491.59
72.13
143.85
455.38
349.33
308.69
154.81

Page 218 / 244

General Revision- IV
CSR - 2005
Quantity Surveying &
Estimation Specialist, NHA
District (61) Sheikhupura
RATE

67.79
106.64
23.59
14.44
166.50
13.18
14.29
681.95
880.91
5,454.83
5,743.68
5,505.19
5,897.59
1,212.03
28,549.33
29,699.41
896.04
5,731.44
780.08
40.26
35.68
48.21
90.73
18.14
28.73

Page 219 / 244

General Revision- IV
CSR - 2005
Quantity Surveying &
Estimation Specialist, NHA
District (61) Sheikhupura
RATE

28.73
12.56
11.91
60.33
115.16
139.74
34.31
6,153.48
6,504.75
4,432.98
4,323.98
1,756.78
30,995.08
31.25
52.08
78.10
5,064.80
5,325.93
5,848.18
3,930.44
4,175.19
4,286.56
4,509.30
6,579.39
5,412.30
2,992.28

Page 220 / 244

General Revision- IV
CSR - 2005
Quantity Surveying &
Estimation Specialist, NHA
District (61) Sheikhupura
RATE

6,786.36
6,290.74
54,514.86
57,139.86
50,281.73
111,924.79
560.99
318.80
329.69
98.01
458.83
1.54
1,795.38
156.45
2,070.44
3,105.65
2,861.45
4,425.35
3,866.81
6,444.65
131,268.23
238,070.98
344,168.73
1,213.96
3,021.79
965.75

Page 221 / 244

General Revision- IV
CSR - 2005
Quantity Surveying &
Estimation Specialist, NHA
District (61) Sheikhupura
RATE

1,968.34
1,136.03
2,141.21
118.31
2,253.08
929.86
1,140.88
1,543.70
2,072.44
2,562.53
3,564.60
4,314.64
5,732.06
8,045.08
998.20
1,181.88
1,572.29
2,146.84
3,145.35
4,142.70
5,101.84
6,514.51
8,585.19
479.85
3,938.26
98.89

Page 222 / 244

General Revision- IV
CSR - 2005
Quantity Surveying &
Estimation Specialist, NHA
District (61) Sheikhupura
RATE

589.23
310.45
579.86
909.29
892.75
899.05
2,235.31
2,077.94
2,095.90
4,275.26
545.55
334.66
248.25
317.76
608.36
760.46
39.29
604.20
610.93
6,190.00
8,841.34
11,090.09
20,418.79
8,952.58
1,588.33
2,230.09

Page 223 / 244

General Revision- IV
CSR - 2005
Quantity Surveying &
Estimation Specialist, NHA
District (61) Sheikhupura
RATE

24.73
40.08
31.15
52.71
239.21
530.35
33.61
73.00
42.54
94.55
311.66
868.55
168.19
362.75
216.49
588.56
274.79
318.54
422.33
2,848.53
5,990.04

Page 224 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (63) Sialkot
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.47

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.65

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

13.46

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.86

9.29

0.88

26.99

134.96

258.13

1.97

68.39

341.95

53.82

1,032.53

7.89

273.56

1,367.80

CM

1.61

59.42

15.26

76.29

COMPACTION OF NATURAL GROUND

SM

0.23

5.92

1.69

8.46

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.73

86.79

22.38

111.90

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

81.57

193.76

46.20

80.38

401.91

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

11.58

214.84

56.61

283.03

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.66

167.12

43.70

218.48

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.23

78.63

20.22

101.08

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

81.57

193.76

46.20

80.38

401.91

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

12.98

199.88

53.22

266.08

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.86

167.24

43.28

216.38

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.64

89.04

0.31

23.50

117.49

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

42.76

165.86

53.31

65.48

327.41

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

72.11

258.51

30.80

90.36

451.78

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

61.35

193.04

63.60

317.99

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

37.08

160.37

49.36

246.81

107 d

GRANULAR BACK FILL

CM

22.14

83.07

297.84

100.76

503.81

107 e

COMMON BACK FILL

CM

16.48

37.31

4.13

14.48

72.40

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.56

106.71

4.13

28.85

144.25

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

13.28

302.97

48.81

91.27

456.33

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

9.96

268.11

1.96

70.01

350.04

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

8.85

238.60

61.86

309.31

CM

5.22

112.14

31.04

155.21

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 225 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (63) Sialkot
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

4.08

46.31

4.13

13.63

68.15

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

9.52

73.87

2.45

21.46

107.30

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.91

16.84

1.18

4.73

23.66

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.65

10.31

0.63

2.90

14.49

110

IMPROVED SUB-GRADE

CM

6.51

75.50

54.33

34.09

170.43

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.55

9.38

0.64

2.64

13.21

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.83

9.92

0.74

2.87

14.36

201

GRANULAR SUB-BASE

CM

5.29

106.91

500.39

153.15

765.74

202

AGGREGATE BASE

CM

6.07

132.11

650.41

197.15

985.74

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

48.32

916.98

3,470.33

1,108.91

5,544.54

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

50.04

916.98

3,699.62

1,166.66

5,833.30

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

53.74

957.74

3,464.85

1,119.08

5,595.41

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

53.74

954.75

3,781.05

1,197.39

5,986.93

204 b

CEMENT STABILIZED BASE

CM

18.65

272.73

764.65

264.01

1,320.04

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

158.20

568.44

22,072.80

5,699.86

28,499.30

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

158.20

568.44

22,986.80

5,928.36

29,641.80

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

63.11

55.65

687.31

201.52

1,007.59

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

98.63

1,408.67

3,173.96

1,170.32

5,851.58

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

69.82

66.68

584.02

180.13

900.65

207 a

DEEP PATCHING (0-15 cm)

SM

1.13

30.14

1.02

8.07

40.36

207 b

DEEP PATCHING (16-30 cm)

SM

1.13

26.47

1.02

7.16

35.78

208

REINSTATEMENT OF ROAD SURFACE

SM

1.18

37.00

0.45

9.66

48.29

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.34

70.82

0.55

18.18

90.89

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.27

14.16

0.11

3.64

18.18

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.19

0.67

22.08

5.74

28.68

Page 226 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (63) Sialkot
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.19

0.67

22.08

5.74

28.68

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.72

2.51

12.55

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.08

0.24

9.19

2.38

11.89

304 a

SINGLE SURFACE TREATMENT

SM

0.50

4.16

44.05

12.18

60.89

304 b

DOUBLE SURFACE TREATMENT

SM

0.73

8.06

84.74

23.38

116.91

304 c

TRIPLE SURFACE TREATMENT

SM

1.23

11.08

101.53

28.46

142.30

304 d

SEAL COAT

SM

0.46

2.33

24.76

6.89

34.44

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

45.44

906.07

4,037.15

1,247.17

6,235.83

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

45.44

876.73

4,347.89

1,317.52

6,587.58

307 a

DENSE GRADED HOT BIT-MAC

CM

110.24

171.48

3,318.32

900.01

4,500.05

307 b

OPEN GRADED HOT BIT-MAC

CM

110.24

171.48

3,242.27

881.00

4,404.99

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

18.76

456.95

945.09

355.20

1,776.00

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

140.29

465.97

24,148.50

6,188.69

30,943.45

309 a

COLD MILLING, 0 - 30 mm

SM

0.61

16.87

7.54

6.26

31.28

309 b

COLD MILLING, 0 - 50 mm

SM

1.02

28.11

12.57

10.43

52.13

309 c

COLD MILLING, 0 - 70 mm

SM

1.54

42.16

18.85

15.64

78.19

401 ai

CONCRETE CLASS "A3" (Underground)

CM

355.69

643.62

3,266.03

1,066.34

5,331.68

401 aii CONCRETE CLASS "A3" (On ground)

CM

355.69

643.62

3,474.93

1,118.56

5,592.80

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

355.69

643.62

3,892.73

1,223.01

6,115.05

401 b

CONCRETE CLASS "B"

CM

451.80

407.09

2,523.67

845.64

4,228.20

401 ci

CONCRETE CLASS "C" (Underground)

CM

349.63

258.76

2,967.08

893.87

4,469.34

401 cii CONCRETE CLASS "C" (On ground)

CM

349.63

258.76

3,056.18

916.14

4,580.71

401 ciii CONCRETE CLASS "C" (Elevated)

CM

349.63

258.76

3,234.37

960.69

4,803.45

401 d

CONCRETE CLASS "D1"

CM

557.86

810.64

4,124.66

1,373.29

6,866.45

401 e

CONCRETE CLASS "Y"

CM

783.77

258.76

3,539.80

1,145.58

5,727.91

401 f

LEAN CONCRETE

CM

293.16

252.12

2,065.93

652.80

3,264.01

Page 227 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (63) Sialkot
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,185.81

468.57

4,073.14

1,431.88

7,159.40

401 gii PRECAST CONCRETE CLASS "B"

CM

1,185.81

468.57

3,696.50

1,337.72

6,688.60

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,077.00

42,567.98

10,911.25

54,556.23

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,077.00

44,667.98

11,436.25

57,181.23

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

880.76

2,335.68

37,345.45

10,140.47

50,702.36

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,963.83

6,882.66

80,762.49

22,402.25

112,011.23

405 b

LAUNCHING OF GIRDER

TON

46.52

403.69

112.55

562.76

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

78.30

185.62

65.98

329.90

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

78.30

194.33

68.16

340.79

406 c

STEEL EXPANSION JOINTS

KG

6.49

11.61

61.01

19.78

98.89

406 d

WATER STOPS 6" SIZE

64.47

309.53

93.50

467.50

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

28.48

1,411.59

360.02

1,800.09

406 g

STEEL OR METAL BEARING DEVICES

KG

13.67

30.66

81.36

31.42

157.11

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

249.61

847.08

555.25

412.99

2,064.93

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

374.41

1,270.62

832.87

619.48

3,097.38

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

374.41

1,270.62

637.51

570.64

2,853.18

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

624.02

2,117.70

787.52

882.31

4,411.55

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

534.88

1,815.17

733.94

771.00

3,854.99

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

936.03

3,176.55

1,026.59

1,284.79

6,423.96

407 h

PILE LOAD TEST UP TO 120 TON

EACH

14,181.84

19,990.40

69,433.80

25,901.51

129,507.55

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,537.92

19,990.40

138,867.60

46,848.98

234,244.90

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,528.24

19,990.40

208,301.40

67,705.01

338,525.05

407 k

CONFIRMATORY BORING (NX SIZE)

141.47

826.61

5.16

243.31

1,216.55

410

BRICK WORK

CM

228.58

142.50

2,206.79

644.47

3,222.34

411 a

STONE MASONRY RANDOM DRY

CM

239.18

56.01

536.00

207.80

1,038.99

Page 228 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (63) Sialkot
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

284.37

84.89

1,372.96

435.56

2,177.78

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

329.75

56.01

593.42

244.80

1,223.98

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

375.12

84.89

1,408.84

467.21

2,336.06

411 g

ROLL POINTING

SM

49.08

5.78

47.68

25.64

128.18

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

495.69

134.30

1,337.46

491.86

2,459.31

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

152.58

230.36

369.32

188.07

940.33

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

149.04

297.19

475.25

230.37

1,151.85

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

145.30

514.83

585.86

311.50

1,557.49

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

152.54

639.81

876.82

417.29

2,086.46

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

175.95

704.13

1,181.86

515.49

2,577.43

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

218.35

868.93

1,781.19

717.12

3,585.59

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

282.57

961.94

2,226.59

867.78

4,338.88

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

332.27

1,168.07

3,106.69

1,151.76

5,758.79

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

394.68

1,362.74

4,706.10

1,615.88

8,079.40

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

152.58

263.77

393.89

202.56

1,012.80

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

149.04

297.19

508.05

238.57

1,192.85

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

141.92

514.83

612.10

317.21

1,586.06

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

152.54

639.81

935.15

431.88

2,159.38

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

175.95

704.13

1,648.73

632.20

3,161.01

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

218.35

868.93

2,243.67

832.74

4,163.69

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

282.57

961.94

2,856.35

1,025.22

5,126.08

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

332.27

1,168.07

3,732.65

1,308.25

6,541.24

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

394.68

1,362.74

5,138.19

1,723.90

8,619.51

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

58.96

68.08

237.18

91.06

455.28

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

511.94

309.47

2,576.78

849.55

4,247.74

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.63

77.80

20.36

101.79

Page 229 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (63) Sialkot
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

64.23

436.72

125.24

626.19

508 a

BRICK PAVING (SINGLE COURSE)

SM

75.73

15.80

168.32

64.96

324.81

508 b

BRICK PAVING (DOUBLE COURSE)

SM

136.11

15.80

334.50

121.60

608.01

509 a

RIP RAP CLASS "A"

CM

328.60

464.63

198.31

991.54

509 b

RIP RAP CLASS "B"

CM

317.18

460.91

194.52

972.61

509 c

RIP RAP CLASS "C"

CM

319.70

464.63

196.08

980.41

509 d

GROUTED RIP RAP CLASS "A"

CM

366.12

35.09

1,565.32

491.63

2,458.16

509 e

GROUTED RIP RAP CLASS "B"

CM

353.65

28.07

1,447.62

457.34

2,286.68

509 f

GROUTED RIP RAP CLASS "C"

CM

349.39

23.39

1,474.19

461.74

2,308.71

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

536.72

181.56

2,934.51

913.20

4,565.99

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

32.48

115.89

297.79

111.54

557.70

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

74.18

194.57

67.19

335.94

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

102.67

35.01

75.50

53.30

266.48

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

131.42

44.81

96.64

68.22

341.09

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

167.72

91.01

264.28

130.75

653.76

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

209.65

113.77

330.35

163.44

817.21

603

BRICK EDGING

5.94

26.88

8.21

41.03

605 a

CONCRETE BEAM GUARDRAIL

50.73

14.67

426.99

123.10

615.49

605 c

CONCRETE POST FOR GUARDRAIL

62.29

13.10

424.46

124.96

624.81

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

160.96

128.42

4,684.15

1,243.38

6,216.91

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

47.54

192.63

6,875.20

1,778.84

8,894.21

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

160.96

272.87

8,513.99

2,236.96

11,184.78

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

526.82

304.65

15,625.02

4,114.12

20,570.61

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

105.36

60.93

7,022.15

1,797.11

8,985.55

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,027.45

317.82

1,589.11

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,541.17

446.25

2,231.26

Page 230 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (63) Sialkot
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.74

2.85

15.38

4.99

24.96

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.58

1.27

30.32

8.04

40.21

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.74

2.85

20.53

6.28

31.40

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.58

1.27

40.44

10.57

52.86

EACH

51.84

148.65

50.12

250.61

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

51.84

382.04

108.47

542.35

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

2.17

3.56

21.40

6.78

33.91

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

2.17

4.75

51.71

14.66

73.29

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

2.17

3.56

28.53

8.57

42.83

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

2.17

4.75

68.95

18.97

94.84

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

51.84

206.61

64.61

323.06

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

51.84

652.07

175.98

879.89

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

42.73

99.10

35.46

177.29

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

42.73

255.08

74.45

372.26

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

42.73

137.74

45.12

225.59

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

42.73

435.37

119.53

597.63

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

6.33

46.68

167.72

55.18

275.91

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

6.33

46.68

202.72

63.93

319.66

610 b

RIGHT OF WAY MARKER

EACH

69.98

60.88

216.30

86.79

433.95

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

434.77

476.40

1,462.48

593.41

2,967.06

610 d

TEN KILOMETRE POST

EACH

839.16

952.79

3,178.62

1,242.64

6,213.21

Page 231 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (69) Toba Tek Singh
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.46

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.53

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

13.19

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.86

9.28

0.88

26.96

134.81

258.13

1.97

68.32

341.61

52.74

1,032.53

7.89

273.29

1,366.45

CM

1.53

59.42

15.24

76.19

COMPACTION OF NATURAL GROUND

SM

0.22

5.92

1.69

8.45

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.54

86.79

22.33

111.66

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

76.72

193.76

46.20

79.17

395.85

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

10.87

214.84

56.43

282.14

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

7.13

167.12

43.56

217.81

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

2.08

78.63

20.18

100.89

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

76.72

193.76

46.20

79.17

395.85

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

12.22

199.88

53.03

265.13

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.47

167.24

43.18

215.89

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.26

89.04

0.31

23.40

117.01

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

38.79

165.86

53.31

64.49

322.45

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

67.88

258.51

30.80

89.30

446.49

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

57.80

193.04

62.71

313.55

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

34.91

160.37

48.82

244.10

107 d

GRANULAR BACK FILL

CM

21.41

83.07

320.73

106.30

531.51

107 e

COMMON BACK FILL

CM

16.26

37.31

4.13

14.43

72.13

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.24

106.71

4.13

28.77

143.85

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

12.52

302.97

48.81

91.08

455.38

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

9.39

268.11

1.96

69.87

349.33

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

8.35

238.60

61.74

308.69

CM

4.90

112.14

30.96

154.81

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 232 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (69) Toba Tek Singh
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

3.79

46.31

4.13

13.56

67.79

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

8.99

73.87

2.45

21.33

106.64

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.85

16.84

1.18

4.72

23.59

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.61

10.31

0.63

2.89

14.44

110

IMPROVED SUB-GRADE

CM

6.16

75.50

50.73

33.10

165.49

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.52

9.38

0.64

2.64

13.18

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.77

9.92

0.74

2.86

14.29

201

GRANULAR SUB-BASE

CM

4.96

106.91

443.36

138.81

694.04

202

AGGREGATE BASE

CM

5.75

132.11

568.47

176.58

882.91

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

47.01

916.98

3,434.72

1,099.68

5,498.39

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

48.60

916.98

3,661.83

1,156.85

5,784.26

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

51.94

957.74

3,429.39

1,109.77

5,548.84

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

51.94

954.75

3,743.88

1,187.64

5,938.21

204 b

CEMENT STABILIZED BASE

CM

17.80

272.73

714.57

251.28

1,256.38

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

147.22

568.44

22,174.80

5,722.62

28,613.08

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

147.22

568.44

23,087.09

5,950.69

29,753.44

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

62.18

55.65

621.07

184.73

923.63

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

94.60

1,408.67

3,112.26

1,153.88

5,769.41

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

69.04

66.68

532.66

167.10

835.48

207 a

DEEP PATCHING (0-15 cm)

SM

1.05

30.14

1.02

8.05

40.26

207 b

DEEP PATCHING (16-30 cm)

SM

1.05

26.47

1.02

7.14

35.68

208

REINSTATEMENT OF ROAD SURFACE

SM

1.12

37.00

0.45

9.64

48.21

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.21

70.82

0.55

18.15

90.73

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.24

14.16

0.11

3.63

18.14

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.18

0.67

22.18

5.76

28.79

Page 233 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (69) Toba Tek Singh
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.18

0.67

22.18

5.76

28.79

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.76

2.52

12.59

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.23

2.39

11.93

304 a

SINGLE SURFACE TREATMENT

SM

0.47

4.16

43.89

12.13

60.65

304 b

DOUBLE SURFACE TREATMENT

SM

0.69

8.06

83.99

23.19

115.93

304 c

TRIPLE SURFACE TREATMENT

SM

1.15

11.08

100.39

28.16

140.78

304 d

SEAL COAT

SM

0.44

2.33

24.81

6.90

34.48

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

43.90

906.07

4,008.88

1,239.71

6,198.56

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

43.90

876.73

4,321.89

1,310.63

6,553.15

307 a

DENSE GRADED HOT BIT-MAC

CM

107.62

171.48

3,302.16

895.32

4,476.58

307 b

OPEN GRADED HOT BIT-MAC

CM

107.62

171.48

3,211.77

872.72

4,363.59

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

18.24

456.95

935.45

352.66

1,763.30

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

130.59

465.97

24,250.50

6,211.77

31,058.83

309 a

COLD MILLING, 0 - 30 mm

SM

0.59

16.87

7.54

6.25

31.25

309 b

COLD MILLING, 0 - 50 mm

SM

0.98

28.11

12.57

10.42

52.08

309 c

COLD MILLING, 0 - 70 mm

SM

1.47

42.16

18.85

15.62

78.10

401 ai

CONCRETE CLASS "A3" (Underground)

CM

316.28

643.62

3,251.09

1,052.75

5,263.74

401 aii CONCRETE CLASS "A3" (On ground)

CM

316.28

643.62

3,459.99

1,104.97

5,524.86

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

316.28

643.62

3,877.79

1,209.42

6,047.11

401 b

CONCRETE CLASS "B"

CM

414.70

407.09

2,470.28

823.02

4,115.09

401 ci

CONCRETE CLASS "C" (Underground)

CM

313.89

258.76

2,926.64

874.82

4,374.11

401 cii CONCRETE CLASS "C" (On ground)

CM

313.89

258.76

3,015.73

897.10

4,485.48

401 ciii CONCRETE CLASS "C" (Elevated)

CM

313.89

258.76

3,193.93

941.65

4,708.23

401 d

CONCRETE CLASS "D1"

CM

488.52

810.64

4,134.63

1,358.45

6,792.24

401 e

CONCRETE CLASS "Y"

CM

685.24

258.76

3,543.96

1,121.99

5,609.95

401 f

LEAN CONCRETE

CM

276.78

252.12

2,002.23

632.78

3,163.91

Page 234 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (69) Toba Tek Singh
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,075.73

468.57

4,054.52

1,399.71

6,998.53

401 gii PRECAST CONCRETE CLASS "B"

CM

1,075.73

468.57

3,639.34

1,295.91

6,479.55

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

941.33

42,566.31

10,876.91

54,384.55

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

941.33

44,666.31

11,401.91

57,009.55

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

781.65

2,335.68

37,173.38

10,072.68

50,363.39

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,727.23

6,882.66

80,776.33

22,346.56

111,732.78

405 b

LAUNCHING OF GIRDER

TON

40.66

403.69

111.09

555.44

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

70.63

188.94

64.89

324.46

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

70.63

197.66

67.07

335.36

406 c

STEEL EXPANSION JOINTS

KG

5.84

11.61

60.75

19.55

97.75

406 d

WATER STOPS 6" SIZE

57.89

308.65

91.64

458.18

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

25.03

1,412.64

359.42

1,797.09

406 g

STEEL OR METAL BEARING DEVICES

KG

13.00

30.66

81.13

31.20

155.99

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

217.62

847.08

559.70

406.10

2,030.50

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

326.43

1,270.62

839.55

609.15

3,045.75

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

326.43

1,270.62

644.19

560.31

2,801.55

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

544.06

2,117.70

798.64

865.10

4,325.50

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

466.33

1,815.17

743.48

756.25

3,781.23

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

816.09

3,176.55

1,043.28

1,258.98

6,294.90

407 h

PILE LOAD TEST UP TO 120 TON

EACH

14,037.18

19,990.40

72,541.08

26,642.17

133,210.83

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,342.38

19,990.40

145,082.16

48,353.74

241,768.68

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,383.58

19,990.40

217,623.24

69,999.31

349,996.53

407 k

CONFIRMATORY BORING (NX SIZE)

130.03

826.61

5.16

240.45

1,202.25

410

BRICK WORK

CM

202.88

142.50

2,093.94

609.83

3,049.15

411 a

STONE MASONRY RANDOM DRY

CM

213.88

56.01

434.38

176.07

880.34

Page 235 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (69) Toba Tek Singh
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

256.04

84.89

1,252.82

398.44

1,992.19

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

295.34

56.01

483.67

208.76

1,043.78

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

334.64

84.89

1,288.35

426.97

2,134.85

411 g

ROLL POINTING

SM

42.96

5.78

47.51

24.06

120.31

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

446.10

134.30

1,216.97

449.34

2,246.71

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

147.52

230.36

369.03

186.73

933.64

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

144.23

297.19

474.89

229.08

1,145.39

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

138.90

514.83

585.37

309.78

1,548.88

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

146.73

639.81

876.29

415.71

2,078.54

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

169.44

704.13

1,181.33

513.73

2,568.63

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

209.39

868.93

1,780.49

714.70

3,573.51

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

270.97

961.94

2,226.05

864.74

4,323.70

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

320.35

1,168.07

3,106.04

1,148.62

5,743.08

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

378.25

1,362.74

4,705.34

1,611.58

8,057.91

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

147.52

263.77

392.49

200.95

1,004.73

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

144.23

297.19

507.69

237.28

1,186.39

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

135.53

514.83

611.61

315.49

1,577.46

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

146.73

639.81

934.70

430.31

2,151.55

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

169.44

704.13

1,648.31

630.47

3,152.35

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

209.39

868.93

2,242.97

830.32

4,151.61

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

270.97

961.94

2,855.81

1,022.18

5,110.90

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

320.35

1,168.07

3,732.00

1,305.11

6,525.53

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

378.25

1,362.74

5,137.43

1,719.61

8,598.03

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

57.44

68.08

279.55

101.27

506.34

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

465.47

309.47

2,524.95

824.97

4,124.86

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.30

75.81

19.78

98.89

Page 236 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (69) Toba Tek Singh
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

63.05

452.28

128.83

644.16

508 a

BRICK PAVING (SINGLE COURSE)

SM

69.00

15.80

158.79

60.90

304.49

508 b

BRICK PAVING (DOUBLE COURSE)

SM

123.30

15.80

315.08

113.55

567.73

509 a

RIP RAP CLASS "A"

CM

296.09

363.00

164.77

823.86

509 b

RIP RAP CLASS "B"

CM

286.31

360.10

161.60

808.01

509 c

RIP RAP CLASS "C"

CM

287.90

363.00

162.73

813.63

509 d

GROUTED RIP RAP CLASS "A"

CM

309.75

35.09

1,440.09

446.23

2,231.16

509 e

GROUTED RIP RAP CLASS "B"

CM

298.56

28.07

1,325.56

413.05

2,065.24

509 f

GROUTED RIP RAP CLASS "C"

CM

294.71

23.39

1,352.86

417.74

2,088.70

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

494.23

181.56

2,901.46

894.31

4,471.56

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

31.63

115.89

320.82

117.09

585.43

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

68.16

194.57

65.68

328.41

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

93.50

35.01

58.99

46.88

234.38

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

119.68

44.81

75.50

60.00

299.99

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

151.12

91.01

249.36

122.87

614.36

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

188.90

113.77

311.70

153.59

767.96

603

BRICK EDGING

5.51

24.96

7.62

38.09

605 a

CONCRETE BEAM GUARDRAIL

47.70

14.67

426.62

122.25

611.24

605 c

CONCRETE POST FOR GUARDRAIL

58.57

13.10

424.04

123.93

619.64

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

149.65

128.42

4,689.00

1,241.77

6,208.84

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

42.98

192.63

6,874.68

1,777.57

8,887.86

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

149.65

272.87

8,514.67

2,234.30

11,171.49

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

503.78

304.65

15,630.44

4,109.72

20,548.59

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

100.76

60.93

7,028.54

1,797.56

8,987.79

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,029.04

318.22

1,591.10

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,543.56

446.85

2,234.25

Page 237 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (69) Toba Tek Singh
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

608 b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 15 cm WIDTH

1.51

2.85

15.40

4.94

24.70

608 b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 15 cm WIDTH

0.50

1.27

30.41

8.05

40.23

608 c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


LINES OF 20 cm WIDTH

1.51

2.85

20.54

6.23

31.13

608 c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


LINES OF 20 cm WIDTH

0.50

1.27

40.55

10.58

52.90

EACH

42.45

148.76

47.80

239.01

608 d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M


ARROWS
EACH

42.45

383.17

106.41

532.03

608 d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0


M ARROWS

608 h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


15 cm WIDTH

1.89

3.56

21.41

6.72

33.58

608 h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


15 cm WIDTH

1.89

4.75

51.71

14.59

72.94

608 i1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF


20 cm WIDTH

1.89

3.56

28.55

8.50

42.50

608 i2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF


20 cm WIDTH

1.89

4.75

68.95

18.90

94.49

608 j1

PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M


ARROWS

EACH

42.45

206.72

62.29

311.46

608 j2

PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M


ARROWS

EACH

42.45

652.07

173.63

868.15

PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR


608 n1 STOP

EACH

35.15

99.17

33.58

167.90

PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR


608 n2 STOP

EACH

35.15

255.83

72.75

363.73

608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP

EACH

35.15

137.81

43.24

216.20

608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP

EACH

35.15

435.37

117.63

588.15

609 c

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE SINGLE)

EACH

5.57

46.68

188.79

60.26

301.30

609 d

REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE DOUBLE)

EACH

5.57

46.68

224.79

69.26

346.30

610 b

RIGHT OF WAY MARKER

EACH

67.50

60.88

215.88

86.07

430.33

610 c

KILOMETRE POST (0.610 X 0.114 X 1.5 M)

EACH

397.83

476.40

1,451.69

581.48

2,907.40

610 d

TEN KILOMETRE POST

EACH

771.35

952.79

3,171.50

1,223.91

6,119.55

Page 238 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (71) Vehari
CODE

DESCRIPTION

101

CLEARING AND GRUBBING

102 a

UNIT MANPOWER EQUIPMENT

SM

0.45

6.96

REMOVAL OF TREES 150 - 300 mm GIRTH

EACH

4.41

102.44

102 b

REMOVAL OF TREES 301 - 600 mm GIRTH

EACH

12.92

102 c

REMOVAL OF TREES 601 mm OR OVER GIRTH

EACH

103

STRIPPING

104

MATERIAL

RATE

1.85

9.26

0.88

26.93

134.66

258.13

1.97

68.26

341.28

51.66

1,032.53

7.89

273.02

1,365.10

CM

1.51

59.42

15.23

76.16

COMPACTION OF NATURAL GROUND

SM

0.21

5.92

1.69

8.44

106 a

EXCAVATE UNSUITABLE COMMON MATERIAL

CM

2.36

86.79

22.29

111.44

106 bi

EXCAVATE UNSUITABLE HARD ROCK MATERIAL

CM

73.50

193.76

46.20

78.37

391.83

106 bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL

CM

10.59

214.84

56.36

281.79

106 biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL

CM

6.97

167.12

43.52

217.61

106 c

EXCAVATE SURPLUS COMMON MATERIAL

CM

1.93

78.63

20.14

100.70

106 di

EXCAVATE SURPLUS HARD ROCK MATERIAL

CM

73.50

193.76

46.20

78.37

391.83

106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL

CM

11.67

199.88

52.89

264.44

106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL

CM

5.34

167.24

43.15

215.73

107 a

STRUCTURAL EXCAVATION IN COMMON MATERIAL

CM

4.09

89.04

0.31

23.36

116.80

107 b

STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW


WATER LEVEL

CM

40.21

165.86

53.31

64.85

324.23

107 ci

STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL

CM

64.86

258.51

30.80

88.54

442.71

107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL

CM

55.33

193.04

62.09

310.46

107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL

CM

33.35

160.37

48.43

242.15

107 d

GRANULAR BACK FILL

CM

20.69

83.07

318.22

105.50

527.48

107 e

COMMON BACK FILL

CM

16.03

37.31

4.13

14.37

71.84

108 a

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN COMMON MATERIAL

CM

4.11

106.71

4.13

28.74

143.69

108 bi

FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN HARD ROCK MATERIAL

CM

12.20

302.97

48.81

91.00

454.98

108 bii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN MEDIUM ROCK MATERIAL

CM

9.15

268.11

1.96

69.81

349.03

108 biii FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION


IN SOFT ROCK MATERIAL

CM

8.13

238.60

61.68

308.41

CM

4.78

112.14

30.93

154.66

108 c

FORMATION OF EMBANKMENT FROM BORROW EXCAVATION


IN COMMON MATERIAL

Page 239 / 244

OH-PROFIT

0.62

6.81

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (71) Vehari
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

108 d

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN COMMON MATERIAL

CM

3.70

46.31

4.13

13.54

67.68

108 e

FORMATION OF EMBANKMENT FROM STRUCTURAL


EXCAVATION IN ANY TYPE OF ROCK MATERIAL

CM

8.82

73.87

2.45

21.29

106.43

109 a

SUB GRADE PREPARATION IN EARTH CUT

SM

0.82

16.84

1.18

4.71

23.55

109 bi

SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT ANY


FILL

SM

0.59

10.31

0.63

2.88

14.41

110

IMPROVED SUB-GRADE

CM

5.98

75.50

51.11

33.15

165.74

114 a

DRESSING OF BERM WITHOUT EXTRA MATERIAL

SM

0.51

9.38

0.64

2.63

13.16

114 b

DRESSING OF BERM WITH EXTRA BORROW MATERIAL

SM

0.76

9.92

0.74

2.86

14.28

201

GRANULAR SUB-BASE

CM

4.81

106.91

534.38

161.53

807.63

202

AGGREGATE BASE

CM

5.44

132.11

650.41

196.99

984.95

203 a

ASPHALTIC BASE COURSE PLANT MIX (CLASS "A")

CM

46.10

916.98

3,532.31

1,123.85

5,619.24

203 b

ASPHALTIC BASE COURSE PLANT MIX (CLASS "B")

CM

47.57

916.98

3,755.33

1,179.97

5,899.85

203 c

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A")

CM

51.00

957.74

3,527.04

1,133.95

5,669.73

203 d

ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B")

CM

51.00

954.75

3,837.45

1,210.80

6,054.00

204 b

CEMENT STABILIZED BASE

CM

16.95

272.73

808.96

274.66

1,373.30

204 d

LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250

TON

143.55

568.44

22,378.80

5,772.70

28,863.49

204 e

EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1

TON

143.55

568.44

23,294.10

6,001.52

30,007.61

205 a

GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER

CM

61.87

55.65

687.30

201.21

1,006.03

205 b

ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER

CM

92.32

1,408.67

3,204.18

1,176.29

5,881.46

206 b

WATER BOUND MACADAM BASE WITH COARSE AGGREGATE


CLASS B

CM

68.61

66.68

620.49

188.95

944.73

207 a

DEEP PATCHING (0-15 cm)

SM

1.03

30.14

1.02

8.05

40.24

207 b

DEEP PATCHING (16-30 cm)

SM

1.03

26.47

1.02

7.13

35.65

208

REINSTATEMENT OF ROAD SURFACE

SM

1.06

37.00

0.45

9.63

48.14

209 a

BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE

CM

1.19

70.82

0.55

18.14

90.70

209 b

SCARIFICATION OF EXISTING ROAD PAVEMENT

SM

0.24

14.16

0.11

3.63

18.14

302 a

CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.17

0.67

22.39

5.81

29.04

Page 240 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (71) Vehari
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

302 b

EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT

SM

0.17

0.67

22.39

5.81

29.04

303 a

CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.84

2.54

12.69

303 b

EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT

SM

0.07

0.24

9.32

2.41

12.04

304 a

SINGLE SURFACE TREATMENT

SM

0.45

4.16

44.75

12.34

61.70

304 b

DOUBLE SURFACE TREATMENT

SM

0.65

8.06

86.01

23.68

118.40

304 c

TRIPLE SURFACE TREATMENT

SM

1.10

11.08

103.07

28.81

144.06

304 d

SEAL COAT

SM

0.41

2.33

25.21

6.99

34.94

305 a

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A")

CM

42.83

906.07

4,109.24

1,264.54

6,322.68

305 b

ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B")

CM

42.83

876.73

4,429.00

1,337.14

6,685.70

307 a

DENSE GRADED HOT BIT-MAC

CM

104.99

171.48

3,396.43

918.23

4,591.13

307 b

OPEN GRADED HOT BIT-MAC

CM

104.99

171.48

3,301.67

894.54

4,472.68

308 a

RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK)

CM

17.72

456.95

952.29

356.74

1,783.70

308 b

BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100)

TON

128.19

465.97

24,454.50

6,262.17

31,310.83

309 a

COLD MILLING, 0 - 30 mm

SM

0.56

16.87

7.54

6.24

31.21

309 b

COLD MILLING, 0 - 50 mm

SM

0.93

28.11

12.57

10.40

52.01

309 c

COLD MILLING, 0 - 70 mm

SM

1.39

42.16

18.85

15.60

78.00

401 ai

CONCRETE CLASS "A3" (Underground)

CM

341.16

643.62

3,235.26

1,055.01

5,275.05

401 aii CONCRETE CLASS "A3" (On ground)

CM

341.16

643.62

3,444.16

1,107.24

5,536.18

401 aiii CONCRETE CLASS "A3" (Elevated)

CM

341.16

643.62

3,861.96

1,211.69

6,058.43

401 b

CONCRETE CLASS "B"

CM

428.21

407.09

2,453.66

822.24

4,111.20

401 ci

CONCRETE CLASS "C" (Underground)

CM

339.41

258.76

2,920.02

879.55

4,397.74

401 cii CONCRETE CLASS "C" (On ground)

CM

339.41

258.76

3,009.11

901.82

4,509.10

401 ciii CONCRETE CLASS "C" (Elevated)

CM

339.41

258.76

3,187.31

946.37

4,731.85

401 d

CONCRETE CLASS "D1"

CM

542.31

810.64

4,105.08

1,364.51

6,822.54

401 e

CONCRETE CLASS "Y"

CM

768.10

258.76

3,525.59

1,138.11

5,690.56

401 f

LEAN CONCRETE

CM

285.72

252.12

1,991.32

632.29

3,161.45

Page 241 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (71) Vehari
CODE

401 gi

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

PRECAST CONCRETE CLASS "A"

CM

1,161.76

468.57

4,040.32

1,417.66

7,088.31

401 gii PRECAST CONCRETE CLASS "B"

CM

1,161.76

468.57

3,627.36

1,314.42

6,572.11

404 a

REINFORCEMENT AS PER AASHTO M. 31 GRADE 40

TON

1,041.01

42,565.73

10,901.69

54,508.43

404 b

REINFORCEMENT AS PER AASHTO M. 31 GRADE 60

TON

1,041.01

44,665.73

11,426.69

57,133.43

404 h

REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36

TON

849.22

2,335.68

37,113.46

10,074.59

50,372.95

405 a

PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN


ALL RESPECT

TON

1,659.16

6,882.66

80,762.90

22,326.18

111,630.90

405 b

LAUNCHING OF GIRDER

TON

39.24

403.69

110.73

553.66

406 a

PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC


JOINT SEAL

SM

76.04

189.97

66.50

332.51

406 b

NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH


BITUMASTIC JOINT SEAL

SM

76.04

198.69

68.68

343.41

406 c

STEEL EXPANSION JOINTS

KG

6.32

11.61

60.61

19.64

98.18

406 d

WATER STOPS 6" SIZE

63.08

308.57

92.91

464.56

406 e

ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND


THICKNESS)

ccm

0.01

1.22

0.31

1.54

406 f

ASPHALT FELT (3 PLY)

SM

27.47

1,413.07

360.14

1,800.68

406 g

STEEL OR METAL BEARING DEVICES

KG

12.97

30.66

81.01

31.16

155.80

407 d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN NORMAL SOIL

211.68

847.08

552.71

402.87

2,014.34

407 d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA (BORING


ONLY) IN GRAVEL STRATA

317.52

1,270.62

829.07

604.30

3,021.51

407 d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN NORMAL SOIL

317.52

1,270.62

633.71

555.46

2,777.31

407 d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING


ONLY) IN GRAVEL STRATA

529.21

2,117.70

781.18

857.02

4,285.11

407 d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN NORMAL SOIL

453.61

1,815.17

728.51

749.32

3,746.61

407 d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING


ONLY) IN GRAVEL SOIL

793.81

3,176.55

1,017.09

1,246.86

6,234.31

407 h

PILE LOAD TEST UP TO 120 TON

EACH

13,892.04

19,990.40

67,879.72

25,440.54

127,202.70

407 i

PILE LOAD TEST UP TO 240 TON

EACH

28,296.84

19,990.40

135,759.44

46,011.67

230,058.35

407 j

PILE LOAD TEST UP TO 360 TON

EACH

42,238.44

19,990.40

203,639.16

66,467.00

332,335.00

407 k

CONFIRMATORY BORING (NX SIZE)

127.95

826.61

5.16

239.93

1,199.65

410

BRICK WORK

CM

225.12

142.50

1,856.90

556.13

2,780.65

411 a

STONE MASONRY RANDOM DRY

CM

234.16

56.01

634.45

231.16

1,155.78

Page 242 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (71) Vehari
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

411 b

STONE MASONRY RANDOM WITH MORTAR

CM

279.16

84.89

1,407.99

443.01

2,215.05

411 c

STONE MASONRY DRESSED UNCOURSED DRY

CM

324.16

56.01

699.75

269.98

1,349.90

411 d

STONE MASONRY DRESSED UNCOURSED WITH MORTAR

CM

369.16

84.89

1,468.95

480.75

2,403.75

411 g

ROLL POINTING

SM

48.61

5.78

46.68

25.27

126.34

412 a

STONE MASONRY DRESSED COURSED WITH MORTAR

CM

489.16

134.30

1,397.57

505.26

2,526.29

501 a

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm

149.44

230.36

367.46

186.82

934.08

501 b

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm

146.40

297.19

473.01

229.15

1,145.75

501 c

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm

140.58

514.83

583.22

309.66

1,548.29

501 d

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm

148.26

639.81

873.76

415.46

2,077.29

501 e

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm

170.27

704.13

1,178.80

513.30

2,566.50

501 f

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm

210.43

868.93

1,776.79

714.04

3,570.19

501 g

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm

272.33

961.94

2,222.28

864.14

4,320.69

501 h

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm

319.97

1,168.07

3,101.45

1,147.37

5,736.86

501 i

R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm

380.17

1,362.74

4,700.00

1,610.73

8,053.64

501 j

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm

149.44

263.77

389.82

200.76

1,003.79

501 k

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm

146.40

297.19

505.81

237.35

1,186.75

501 l

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm

137.21

514.83

609.46

315.38

1,576.88

501 m

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm

148.26

639.81

932.75

430.21

2,151.03

501 n

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm

170.27

704.13

1,645.40

629.95

3,149.75

501 o

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm

210.43

868.93

2,239.27

829.66

4,148.29

501 p

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm

272.33

961.94

2,852.04

1,021.58

5,107.89

501 q

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm

319.97

1,168.07

3,727.42

1,303.87

6,519.33

501 r

R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm

380.17

1,362.74

5,132.08

1,718.75

8,593.74

502 a

GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT

CM

56.65

68.08

215.99

85.18

425.90

502 b

CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF


CONCRETE PIPE CULVERT

CM

489.23

309.47

2,507.44

826.54

4,132.68

507 a

STEEL WIRE MESH FOR GABIONS

KG

3.46

77.80

20.32

101.58

Page 243 / 244

General Revision- IV
CSR - 2005
National Highway Authority
Islamabad

Quantity Surveying &


Estimation Specialist, NHA

Rate Analysis Summary ( Construction)


District (71) Vehari
CODE

DESCRIPTION

UNIT MANPOWER EQUIPMENT

MATERIAL

OH-PROFIT

RATE

507 b

ROCK FILL IN GABIONS

CM

62.60

445.94

127.14

635.68

508 a

BRICK PAVING (SINGLE COURSE)

SM

74.47

15.80

133.54

55.95

279.76

508 b

BRICK PAVING (DOUBLE COURSE)

SM

134.47

15.80

265.11

103.85

519.23

509 a

RIP RAP CLASS "A"

CM

323.51

563.08

221.65

1,108.24

509 b

RIP RAP CLASS "B"

CM

312.81

558.57

217.85

1,089.23

509 c

RIP RAP CLASS "C"

CM

315.67

563.08

219.69

1,098.44

509 d

GROUTED RIP RAP CLASS "A"

CM

341.50

35.09

1,569.52

486.53

2,432.64

509 e

GROUTED RIP RAP CLASS "B"

CM

329.90

28.07

1,460.77

454.69

2,273.43

509 f

GROUTED RIP RAP CLASS "C"

CM

326.22

23.39

1,485.98

458.90

2,294.49

509 g

REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT


REINFORCEMENT)

CM

526.08

181.56

2,875.87

895.88

4,479.39

509 h

FILTER LAYER OF GRANULAR MATERIAL

CM

31.45

115.89

317.92

116.32

581.58

510

DISMANTLING OF STRUCTURE AND OBSTRUCTIONS

CM

67.15

194.57

65.43

327.15

511 a1 DRY STONE PITCHING (15-20 cm Thick)

SM

100.41

35.01

91.50

56.73

283.65

511 a2 DRY STONE PITCHING (21-25 cm Thick)

SM

128.52

44.81

117.12

72.61

363.06

511 b1 GROUTED STONE PITCHING (15-20 cm Thick)

SM

164.52

91.01

269.05

131.15

655.73

511 b2 GROUTED STONE PITCHING (21-25 cm Thick)

SM

205.65

113.77

336.32

163.94

819.68

603

BRICK EDGING

5.78

21.12

6.73

33.63

605 a

CONCRETE BEAM GUARDRAIL

50.14

14.67

426.18

122.75

613.74

605 c

CONCRETE POST FOR GUARDRAIL

61.56

13.10

423.48

124.54

622.68

607 a

TRAFFIC ROAD SIGN CATEGORY 1

EACH

155.48

128.42

4,692.23

1,244.03

6,220.16

607 b

TRAFFIC ROAD SIGN CATEGORY 2

EACH

46.50

192.63

6,871.94

1,777.77

8,888.84

607 c

TRAFFIC ROAD SIGN CATEGORY 3 (a)

EACH

155.48

272.87

8,507.58

2,233.98

11,169.91

607 d

TRAFFIC ROAD SIGN CATEGORY 3 (b)

EACH

518.22

304.65

15,620.93

4,110.95

20,554.75

607 e

TRAFFIC ROAD SIGN CATEGORY 3 (c)

SM

103.64

60.93

7,027.98

1,798.14

8,990.69

607 f

ADDITIONAL PANEL SIZE 60 X 30 cms

EACH

243.84

1,029.44

318.32

1,591.60

607 g

ADDITIONAL PANEL SIZE 90 X 30 cms

EACH

243.84

1,544.16

447.00

2,235.00