Vous êtes sur la page 1sur 2

COLLEGE OF ENGINEERING & TECH. BABHULGAON,AKOLA.

Date:-
LIST OF EQUIPMENT

NAME OF DEPARTMENT :- PRODUCTION ENGG.

NAME OF LABORATORY:- THEORY OF M/C / MACHINE DESIGN

S. NAME OF EQUIPMENT QTY. DATE OF COST PRESENT PAGE REMARK


NO. PURCHASE COST NO
1 WANKEL ENGINE (Model) 1 09/01/1985 1625.00 01
2 COTTER JOINT 1 21/02/1989 120.00 02
3 SLEEVE COTTER JOINT 1 21/02/1989 120.00 03
4 GIB & COTTER JOINT 1 21/02/1989 120.00 04
5 KNUKLE JOINT 1 21/02/1989 120.00 05
6 FLANGE COUPLING 1 21/02/1989 180.00 06
7 MUFF COUPLING 1 21/02/1989 140.00 07
8 OLD HAMS COUPLING 1 21/02/1989 600.00 08
9 SOCKUT & SPIGOT JOINT 1 21/02/1989 180.00 09
10 UNIVERSAL COUPLING 1 21/02/1989 155.00 10
11 FLEXIBLE COUPLING 1 21/02/1989 200.00 11
12 BELT PULLEY PLATE 1 21/02/1989 100.00 12
13 ROPE PULLEY 1 21/02/1989 100.00 13
14 VEE BELT PULLEY 1 21/02/1989 100.00 14
15 CONE OR STEP PULLEY 1 21/02/1989 110.00 15
16 LOOSE & FAST PULLEY 1 21/02/1989 500.00 16
17 CHAIN DRIVE 1 21/02/1989 440.00 17
18 PAWL & RATCHIT MOTION 1 21/02/1989 240.00 18
19 BEARING’S BALL ROLLER 1 21/02/1989 360.00 19
TAPER THRUST
20 SWIVEL BEARING 1 21/02/1989 300.00 20
21 ALL TYPES OF KEYS 1 21/02/1989 380.00 21
(for mc drawing)
22 SINGLE STAGE SPIRAL 1 21/02/1989 240.00 22
GEAR
23 SINGLE STAGE HELICAL 1 21/02/1989 240.00 23
GEAR
24 SINGLE STAGE BEVEL 1 21/02/1989 240.00 24
GEAR
25 TIEROD JOINT 1 30/03/1989 80.00 25
26 SELLER COUPLING 1 30/03/1989 300.00 26
27 BELT DRIVE TWO STEGE 1 30/03/1989 400.00 27
28 BELT DRIVE SINGLE STEGE 1 30/03/1989 300.00 28
SPEED
29 GEAR BOX SECTIONED 1 30/03/1989 1100.00 29
30 FRICTION WHEEL DRIVE 1 01/04/1989 440.00 30
31 GENEVA DRIVE 1 01/04/1989 360.00 31
32 RACK & QUADRANT GEAR 1 01/04/1989 200.00 32
(Full)
33 HOOK JOINT 1 01/04/1989 300.00 33
(Hook coupling single)
34 BESSEMER CONVERTOR 1 01/04/1989 1100.00 34
35 SUPPORTING HIGHT BLOCK 1 09/06/1989 110.00 35
CHART
1 PRD-8 BUSHES & LOCATORS 1 23/02/1989 175.00 90
2 ED-19 TYPES OF GEARS 7 1 23/02/1989 125.00 91
TOOTH PROFILE
3 PRD-14 TYPES OF DIE SETS 1 23/02/1989 175.00 92
contd.
4 PRD- 6 ELEMENTS OF 1 23/02/1989 175.00 93
FIXTURES
5 PRD- 5 ELEMENTS OF JIGS 1 23/02/1989 175.00 94
6 PRD- 7 CLAMPING & INDEX 1 23/02/1989 175.00 95
7 IC -11 TYPES OF FUEL 1 23/02/1989 125.00 96
INJECTOR
8 SE-4 COMMPOUND STEAM 1 23/02/1989 125.00 97
ENGINES
9 IC -10 OPERATIONS 1 23/02/1989 125.00 98
OF FUEL PUMP
10 ST-2 VELOCITY 1 23/02/1989 125.00 99
COMPOUNDED
11 IC-2 FOUR STROKE CYCLE 1 23/02/1989 125.00 100
12 REF-8 AIR REFRIGERATION 1 23/02/1989 125.00 101
CYCLE
13 SBA-4 TUBULAR AIR 1 23/02/1989 125.00 102
PREHEATER
14 IC-3 TWO STROKE CYCLE 1 23/02/1989 125.00 103
ENGINE
15 SBA-3 SUPER HEATER 1 23/02/1989 125.00 104
16 ST-6 STEAM CONDENSERS 1 23/02/1989 125.00 105
17 IC-7 COIL SYSTEM OF 1 23/02/1989 125.00 106
IGNITION
18 ST-4 VELOCITY & PRESSURE 1 23/02/1989 125.00 107
COMPOUNDED
19 IC-6 MAGNETO IGNITION 1 23/02/1989 125.00 108
SYSTEM
20 IC-12 GAS PRODUCER 1 23/02/1989 125.00 109
PLANT
21 SE-3 COMBINED
SEPARATING & THROTLING 1 23/02/1989 125.00 110
CALORIMETER
22 SBA-2 GREENS 1 23/02/1989 125.00 111
ECONOMISER
23 IC-8 FUEL PUMPS 1 23/02/1989 125.00 112
24 IC-14 TRIPLE VENTURI 1 23/02/1989 125.00 113
CARBURATOR
25 SB-5 NUCLEAR POWER 1 23/02/1989 175.00 114
PLANT
26 FM-11 HYDRAULIC RAM 1 23/02/1989 125.00 115
27 FM-1 HYDROELECTRIC 1 23/02/1989 125.00 116
POWER PLANT
Total cost-> 15275.00 29939/- 21385/-

PROF. A.W.MAHORE H.O.D.

LAB. I/C PROD.ENGG.)

Vous aimerez peut-être aussi