Vous êtes sur la page 1sur 1

CLEANING / CHANGING ROOM OPERATION

DATE-
S.NO CHECK POINTS 06-07 07-08 08-09 09-10 10-11 11-12 12-01 01-02 02-03 03-04 04-05 05-06 06-07 07-08 08-09 09-10 10-11 11-12 12-01 01-02 02-03 03-04 04-05 05-06
AM AM AM AM AM AM PM PM PM PM PM PM PM PM PM PM PM PM AM AM AM AM AM AM
1 WATER TANK FOR TOILET WATER

2 WORKERS DRESS

3 PROPER SHOES KEEPING & THEIR


SEQUATION.
4 TOILET SOAP AND PAPER POSITION

5 DRINKING WATER POSITION

6 DOOR CLEANING

7 DRINKING GLASS CLEANINGNESS

8 INSECTIKILLER LIGHT CLEANINGNESS

9 TOILET CLEANINGNESS

10 HANDWASH CLEANINGNESS

11 WALL CLEANINGNESS

12 FLOOR CLEANINGNESS

13 VISITORS MEDICAL FITNESS REPORTING


FILE
14 DOOR CLOSER FOR PROPER WORKING

15 AIR CURTAIN WORKING

16 DRIYER WORKING

17 WASTE WATER CONTAINNER CLEANING

18 ALL FOOT MATS CLEANINGNESS AND


KEEPING
19 WATER PURIFIER FUNCTION

20 LOCKER CLOSENESS AND POSITION

DONE BY

CHECKED BY

PERFORMANCE INCHARGE SIGN.

Vous aimerez peut-être aussi