Movimiento de tierras

Secciones
1
2
3
4
5
6
7
8
9
10
11
12

Corte
m2
2.207
60.089
76.424
80.403
90.112
88.532
89.756
90.354
93.788
101.309
111.227
133.718

Relleno
m2
189.572
156.072
145.076
126.013
102.671
76.096
49.997
22.455
10.729
0.000
0.000
0.000
Total

Ancho Efec.
m
10
10
10
10
10
10
10
10
10
10
10
10

Corte
m3
22.07
600.89
764.24
804.03
901.12
885.32
897.56
903.54
937.88
1013.09
1112.27
1337.18
10179.19

Relleno
m3
1895.72
1560.72
1450.76
1260.13
1026.71
760.96
499.97
224.55
107.29
0
0
0
8786.81

HOJA DE METRADOS DEL ESTADIO SAN ILDEFONSO


CODIGO
1.00.00
1.01.00
1.02.00
1.03.00
1.04.00

2.00.00
2.01.00
2.02.00
2.03.00
2.04.00
2.05.00
3.00.00
3.01.00
3.02.00
3.03.00

NOMBRE DE PARTIDA
TRABAJOS PRELIMINARES
ALMACEN DE OBRA
LIMPIEZA DEL TERRENO MANUAL
CARTEL DE IDENTIFICACIN DE LA OBRA DE 1.20X2.40M
MOVILIZACION Y DESMOVILIZACION DE EQUIPO A OBRA
TRACTOR ORUGA
CARGADOR FRONTAL
VOLQUETE DE 15 M3
CAMPO DEPORTIVO
TRAZO Y REPLANTEO
MOVIMIENTO MASIVO DE TIERRA C/MAQUINARIA
RELLENO CON MATERIAL PROPIO C/MAQUINARIA
ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO
NIVELACION Y COMPACTADO MANUAL
MURO DE MAMPOSTERIA DE PIEDRA
EXCAVACION MANUAL
EXTRACCION Y TRASLADO DE ROCAS Y PIEDRAS
MANPOSTERIA DE PIEDRA PARA MURO
MURO ( 01 )
ZAPATA
PANTALLA
RECTANGULAR
TRIANGULAR
MURO ( 02 )
ZAPATA
PANTALLA
RECTANGULAR
TRIANGULAR

4.00.00 CERCO PERIMETRICO


4.01.00 EXCAVACION MANUAL PARA CIMIENTO
4.02.00 CONCRETO CICLOPEO fc=14MPa+70%PM
CIMIENTO CORRIDO
SOBRECIMIENTO
4.03.00 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO
4.04.00 TUBERIA =3" PARA CERCO, L=3.00M.
4.05.00 MALLA METALICA
4.06.00 ALAMBRE DE PUA
4.07.00 PORTON PRINCIPAL METALICO TIPO I : 2.94 X 2.00 M.
5.00.00
5.01.00
5.02.00
5.03.00

SARDINEL
EXCAVACION MANUAL PARA CIMIENTO
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO
CONCRETO CICLOPEO fc=14MPa+70%PM

6.00.00 CIMIENTO DE ARCOS


6.01.00 EXCAVACION MANUAL PARA CIMIENTO
6.02.00 CONCRETO fc=14MPa + 30 % DE PIEDRA GRANDE
7.00.00 EQUIPAMENTO DE CAMPO DEPORTIVO
7.01.00 ARCOS
7.02.00 MALLAS

UND
M2
M2
UND
UND

5
67.30

METRADO
LARGO
ALTO

FACT.

6
127.30

SUB
TOTAL
30.00
8567.29

TOTAL
30.00
8567.29
1.00
1.00

1.00

M2
M3
M3
M3
M2

1.00
1.00
1.00
1.00
1.00

67.30

127.30

8567.29
10179.19
8786.81
1392.38
8567.29

8567.29
10179.19
8786.81
1392.38
8567.29

67.30

127.30

M3
M3
M3

1.00
1.00

2.00

102.98

0.40

82.38
297.03

82.38
297.03
297.03

M3

1.00

2.00

72.98

0.40

58.38

M3
M3

1.00
1.00

0.30
0.85

72.98
72.98

4.00
4.00

87.58
124.07

M3

1.00

1.00

30.00

0.20

6.00

M3
M3

1.00
1.00

0.20
0.30

30.00
30.00

2.00
2.00

12.00
9.00

M3

1.00

0.20

255.28

0.50

12.76

M3

0.20
0.15

P2
UND
M2
ML
UND

1.00
1.00
2.00
124.00
122.00
3.00
1.00

255.28
358.26
358.26

0.50
0.20
0.20

12.76
5.37
71.65
124.00
717.36
1074.78
1.00

71.65
124.00
717.36
1074.78
1.00

M3
P2
M3

1.00
2.00
1.00

0.15

M3
M3

8.00
8.00

UND
M2

2.00
26.18

ML

9.00.00
9.01.00
9.02.00
9.03.00
9.04.00
9.05.00

M3
ML
M3
M3
M3

10.00.00 FLETE TERRESTRE


10.01.00 FLETE TERRESTRE

1
1.00
1.00

ANCHO

1.00

8.00.00 PINTADO
8.01.00 TRAZO
SISTEMA DE DRENAJE
EXCAVACION MANUAL PARA CIMIENTO
TUBERIA PVC SAP = 4"
HORMIGON SELECCIONADO = 3/4"
RELLENO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE C/CARRETILLA

N de
Veces

GLB

1.20

2.94

2.00
358.26

12.76
18.14

0.15

338.48
338.48
338.48

0.30
0.20
0.50

7.62
67.70
12.69

7.62
67.70
12.69

0.40
0.40

0.40
0.40

0.60
0.60

0.77
0.77

0.77
0.77

2.00
26.18

746.08

1.00
1.00
1.00
1.00
1.00

0.30
0.30
0.30

269.40
269.40
269.40
269.40

1.00
0.50
0.40
1.20

80.82
269.40
40.41
32.33
58.19

80.82
269.40
40.41
32.33
58.19

1.00

DISEO DE MURO DE MAMPOSTERIA DE PIEDRA


1.- DATOS

st =
Hp =
gs =
ga =
gc =
f'c =

0.18 MPa
3000 mm.
1.85E-05 N/mm

=
hs =
f=

35
0
0.55

1.00E-05 N/mm

BL =

200

2.60E-05 N/mm
14 MPa

e base =
u=

150
0.55

0.4994042

2.- PREDIMENSIONAMIENTO
Ka = 1-sen
0.271
1+sen
De tablas: B/(H+hs) =

Ka*gs =

5.01E-06

==>

B=
hz =

0.50

1497
300

1500

A.- MURO VACIO


3.- CALCULO DE PRESIONES
Pa = Ka * gt * H =
Ea = Pa * H/2 =

1.65E-02 MPa
27 N/mm

3300

4.- PRESION HORIZONTAL


Verificando la estabilidad del muro por 1 m. de ancho
EMP. ACT.

Ea
SFH =

FUERZA(N)

27298
2.73E+04

BRAZO(mm)

Ea
1100

Mto (N-mm)

1100
30027256
SMO = 3.00E+07

5.- PRESION VERTICAL


FUERZA(N)

1.2.3.4.5.SFV =

1.17E+04
3.12E+04
2.34E+04
1.67E+04
1.39E+04
9.68E+04

400
BRAZO(mm)

750
450
850
1050
1375
SMR =

Mto (N-mm)

8.78.E+06
1.40.E+07
1.99.E+07
1.75.E+07
1.91.E+07
7.93E+07

250
SMR =
SMO

ii) Por Deslizamiento


f * SFV =
F.S.D. =
SFH
iii) Presin del suelo
SMR-SMO =
P PR =
SFV
e=

B/2 - PPR =

2.64

> 2

OK!

1.95

> 1.5

OK!

1000

509
241

iv) Reaccin neta del suelo


SFV 6*SFV * e =
qn=
*
*

<

B/6 = 250

0.1269
0.0022

3000

6.- VERIFICAR
i) Por Volteo
F.S.V. =

OK!

< st

OK!

300
250