Site Selection Site Characterization Vendor Selection & Bidding Licensing Submittal for Construction/Operation Program & Construction Management
3
Local Governments and Owners tend to disbelieve the results of PSHAs for NPPs
NPPs - designed for 10,000 yr to 25,000 yr return periods Non-NPPs designed for 1000 yr to 2500 yr return periods NPP Core Damage Analysis based on >1,000,000 yr event
Paul C. Rizzo Associates, Inc. Proprietary and Confidential Work Product
Scholarly Works in various languages Primarily historical - not recorded events Supplement with International Seismological Center Database
DETERMINISTIC OR PROBABILISTIC ?
DETERMINISTIC ANALYSIS
Advantages
Adequate for What if Scenarios Adequate where one feature controls the hazard Useful to understand seismic attenuation
Disadvantages
Poor management of uncertainty Can not assess various what if scenarios Difficult to compute reliable spectral ordinates
10
PROBABILISTIC ANALYSIS
Advantages
Manage Uncertainty Treats Multiple sources concurrently More mathematical rigor Can incorporate input from many experts
Paul C. Rizzo Associates, Inc. Proprietary and Confidential Work Product
Disadvantages
Complex computation Requires detailed investigation to define input to analysis (A MUST!)
11
SEISMICITY ANALYSIS
ENGINEERING ANALYSIS
RECURRENCE
CONTROLLING EVENTS
EARTHQUAKE CATALOG
FIELD INVESTIGATION
SEISMIC SOURCES
LOGIC TREES
SITE AMPLIFICATION
GMRS
12
B B
MODEL BASE
13
SEISMIC SOURCES
Criteria for Definition
Tectonic processes and historical seismicity Geology Uniform Hazard
Area Sources
Areas associated with observed seismicity; a tectonic process is not well identified Characterized by Gutenberg Richter relationship
14
15
16
EARTHQUAKE CATALOG
List of earthquakes
Time of occurrence Magnitude Location
17
SITE
18
SEISMICITY ANALYSIS
ENGINEERING ANALYSIS
RECURRENCE
CONTROLLING EVENTS
EARTHQUAKE CATALOG
FIELD INVESTIGATION
SEISMIC SOURCES
LOGIC TREES
SITE AMPLIFICATION
GMRS
19
20
21
22
SEISMICITY ANALYSIS
ENGINEERING ANALYSIS
RECURRENCE
CONTROLLING EVENTS
EARTHQUAKE CATALOG
FIELD INVESTIGATION
SEISMIC SOURCES
LOGIC TREES
SITE AMPLIFICATION
GMRS
23
B B
MODEL BASE
24
25
26
27
STABILITY ANALYSIS
Bearing Capacity, Settlement, Liquefaction
28
SALUTATIONS
The RIZZO People thank you for your time and consideration!