The Department of Engineering Services of the Ministry of Works and Human Settlement is
pleased to publish the "Bhutan Schedule of Rates (BSR) - 2011" for Building and Road Works.
This is the revised edition of the BSR 2009. Until February 2011, the erstwhile Standards and
Quality Control Authority (SQCA) under MoWHS was responsible for publishing the BSR. With
the re-naming of SQCA as Bhutan Standards Bureau (BSB) and the subsequent revision of its
mandate, the publication of the BSR and its related works fell outside its new mandate. Thus
from February 2011, this task was then handed over to the Department of Engineering Services.
The last Bhutan Schedule of Rates was revised and published in 2009, and since then the price
of materials and labour in the market have seen substantial fluctuations/changes
over the
period.
Until 2009, the publication of BSR was once every two years, but hereafter, we shall try to
publish it on an annual basis by publishing it at the beginning of every calendar year. We will
continue to improve and refine the BSRin the future so that it benefits all the users and meets
the objective of preparing realistic cost estimates of the work.
As there are many different brands of construction material in the market with wide ranges in
their price even among the BSB approved brands, it is thus not possible to prepare accurate
cost estimates. The BSR is to be used only as a guide and to prepare detail cost estimate of
project, individuals will have to collect market prices of the materials and make their own
estimates using the approved labour and material coefficients.
Sample cost indices table are given at the back of the BSR to arrive at the actual cost of a
particular project at a location other than the base towns.
I hope this Bhutan Schedule of Rates 2011 will prove useful to all the users within Bhutan.

Dr. Sonam Tenzin


Secretary
Ministry of Works and Human Settlement
Thimphu.

Secretary
Ministry of Works & Human Settlement
THIMPHU : BHUTAN

Date:

OlS ( I z..l7P

((
Department of Engineering Services, MoWHS.

Disclaimer
TheBSR(bothCivilandElectrical)2011ispreparedandpublishedprimarilyasatool
to assist in the estimation of project costs. Due to difficulty in obtaining
comprehensiveandaccurateratesfrombasetowns,andtheassociatedcomplexityin
their analysis, the BSR reflects only suggestive averages and not accurate current
marketrates.Materialandlabourratesalsofluctuatefrequently,andbythetimeof
thepublicationofthisbook,manyrateswouldhavealreadychanged.Henceusersare
advised to refrain from using the BSR for the purposes of filling tenders, evaluating
tenders,awardingworksand/ormakingcontractualpayments.Thepublisherisinno
way accountable or answerable for any issues/disputes arising as a result of
individuals or agencies using the rates in the BSR 2011 as a basis for filling their
tenders,evaluatingtenders,awardingworksand/ormakingcontractualpayments.

AllrightsreservedwithDES,MoWHS.Reproductionforsaleofthispublication,inpart(s)or
whole,inanyformorbyanymeans,byanyagencyorindividual,isapunishableoffenceandis
strictlyprohibited.

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Preface
1. BhutanScheduleofRates2011istherevisededitionofBhutanScheduleofRates2009.

2. Theratesshownforallthebuiltupitemsareforupto10Kmradiusandisinclusiveof:

5%onlabourcostforhandtoolsandequipments

5%onmaterialsforwastagesandmiscellaneousmaterials

5%onmachineryforwastagesandoverheads

1%forwatercharges

10%foroverheadcharges

3. The built up item rates are based on "Labour and Material Coefficients 2011" with the applicable
percentagesgivenabove.

4. Thescheduleisdesignedprimarilyasatoolforestimationofconstructionprojectsonlyandnotfor
paymenttocontractors(unlessstatedsointhetenderdocument)orfillinguptenders.

5. ThisSchedulewillbereadalongwiththe"SpecificationsforBuildingandRoadworks2009"and
the"LabourandMaterialsCoefficients2011"

6. Fewnewitemshavebeenincorporated.

7. Generally,thebasicratesofmaterials,incorporatedinthisSchedulepertaintoaverageratesofthe
mostavailablebrands

8. HirechargesforplantsandmachineryarebasedonthebuiltupratesprovidedbytheConstruction
DevelopmentCorporationLimited,Thimphu.

9. Calculation of cost indices has been detailed and few samples are provided on calculation of cost
indices.

10. Listofapprovedbrands,asapplicableatthetimeofpublicationofBSR2011,isprovided.However,
pleasenotethatthislistisreviewedfromtimetotime.Thelatestlistisavailableonwww.bsb.gov.bt

BhutanScheduleofRates2011
11. Material Rates used in BSR2011 are collected during the period JuneSeptember 2011. Users are
suggestedtoupdateratesaccordinglywiththeprevailingmarketrates.

12. BSRcontainsonlythecommonlyuseditems,thenewitemsmaybeworkoutandanalyzedbythe
engineersasmayberelevant.

Bhutan Schedule of Rates - 2011

Contents

CONTENTS
Section 1 BASIC RATES

Description

Page

Preface

Labour

Bitumen Products, Chemicals and Blasting Materials

Quarry and Forest Products

Bricks

Cement and Concrete Materials

Steel and Other Metals

Roofing Materials

Carpentry and Joinery Materials

Doors, Windows and Hardware

10

Tiles and Glass Materials

13

Plastering Materials

14

Paint and Wall Paper Materials

14

Drainage Materials

15

Plumbing ( Pipe Work)

16

Plumbing ( Sanitary Installations, Fittings and Accessories)

23

Machinery and Plant Hire Charges

27

Section 2 MECHANICAL TRANSPORTATION RATES

Description

Page

Hill Roads

Plain Roads

Bhutan Schedule of Rates - 2011

Contents

Section 3 BUILT UP RATES

Sl. No Description

Page

01

Dismantling and Demolition

02

Clearing and Grubbing

03

Earthwork

04

Drainage

05

Mortars

10

06

Concrete Works

11

07

Damp Proofing

13

08

Reinforced Concrete

14

09

Brick Work

18

10

Stone/Mud

21

11

Wood Work

24

12

Steel

33

13

Flooring

35

14

Tiling Wall and Floor

39

15

Roofing

40

16

Plumbing Indoor Work

44

17

Plumbing Outdoor Work

49

18

Plastering

57

19

Painting and Wall Paper

59

20

Additions, Alterations and Repairs

61

21

Road Works

62

4. COST INDICES
5. APPROVED MATERIAL BRANDS

Bhutan Schedule of Rates 2011

SECTION 1
Basic Rates of Materials and Labour
Hire Charges of Plants and Equipments

BhutanScheduleofRates2011

Code

Description

Page 1

Category

Units

PL

GP

SJ

LB
LB
LB
LB
LB
LB

day
day
day
day
day
day

240.00
220.00
195.00
180.00
165.00
165.00

240.00
220.00
195.00
180.00
165.00
165.00

240.00
220.00
195.00
180.00
165.00
165.00

LB
LB
LB
LB
LB
LB
LB

year
year
year
year
day
year
year

360.00
660.00
400.00
180.00
10.00
50.00
450.00

360.00
660.00
400.00
180.00
10.00
50.00
450.00

360.00
660.00
400.00
180.00
10.00
50.00
450.00

LB
LB
LB
LB
LB
LB

day
day
day
day
day
day

259.60
259.60
259.60
259.60
259.60
259.60

259.60
259.60
259.60
259.60
259.60
259.60

259.60
259.60
259.60
259.60
259.60
259.60

LB
LB
LB
LB
LB
LB
LB
LB
LB
LB

day
day
day
day
day
day
day
day
day
day

238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32

238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32

238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32

LB
LB
LB
LB
LB
LB
LB
LB
LB
LB
LB
LB

day
day
day
day
day
day
day
day
day
day
day
day

211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61

211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61

211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61

Chapter 1: BASIC RATES - LABOUR

BhutaneseNationalLabour

LB0001
LB0002
LB0003
LB0004
LB0005
LB0006

Category1
Category2
Category3
Category4
Category5(Male)
Category5(Female)

StatutoryOnCostAllowances

LB0010
LB0011
LB0012
LB0013
LB0014
LB0015
LB0016

WorkersCompensationpremium
Temporarysiteaccommodation
Transportationto&fromsite
Dependencyallowance
Leadinghandallowance
Recruitmentagencyfee
Incentivepayment

BuiltupTradeRates
Category 1
LB0020
LB0021
LB0022
LB0023
LB0024
LB0025

Auto-Mechanic Gd.1
Carpenter Gd.1
General Mechanic Gd.1
Lharib
Lineman Gd.1
Plant Operator Gd.1

Category 2
LB0030
LB0031
LB0032
LB0033
LB0034
LB0035
LB0036
LB0037
LB0038
LB0039

Auto-Electrician Gd.1
Auto-Mechanic Gd.2
Blacksmith (metal-worker)
Carpenter Gd.2
General Mechanic Gd.2
Lineman Gd.2
Mason Gd.1
Plant Operator Gd.2
Plumber Gd.1
Work Supervisor (Lajab)

Category 3
LB0045
LB0046
LB0047
LB0048
LB0049
LB0050
LB0051
LB0052
LB0053
LB0054
LB0055
LB0056

Auto-Electrician Gd.2
Auto-Mechanic Gd.3
Blaster
Carpenter Gd.3
General Mechanic Gd.3
Lineman Gd.3
Mason Gd.2
Painter Gd.1
Plant Operator Gd.3
Plumber Gd.2
Sawyer Gd.1
Wireman Gd.1

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

Page 2

Category

Units

PL

GP

SJ

LB
LB
LB
LB
LB

day
day
day
day
day

195.60
195.60
195.60
195.60
195.60

195.60
195.60
195.60
195.60
195.60

195.60
195.60
195.60
195.60
195.60

LB
LB

day
day

178.76
178.76

178.76
178.76

178.76
178.76

LB

day

178.76

178.76

178.76

Category 4
LB0065
LB0066
LB0067
LB0068
LB0069

Cleaner
Machine Operator
Painter Gd.2
Sawyer Gd.2
Wireman Gd.2

Category 5
LB0075
LB0076

Labourer (Male)
Labourer (Female)

Labour ( Market Rate)


LB0077

Labour

Note: The above rates are calculated to comply with the Ministry of Labour and Human Resourses Wage Regulations, revised from
15th July 2011

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

Units

PL

GP

SJ

tonne
tonne

45174.00
38777.11

45174.00
38777.11

45174.00
38777.11

sq.m
sq.m

200.00
100.00

200.00
100.00

200.00
100.00

kg
litre

39.78
50.00

39.78
50.00

39.78
50.00

sq.m

550.00

550.00

550.00

kg
each
each
each
kg
each
each

73.42
69.00
5.92
4755.00
337.00
3364.00
2307.00

73.42
69.00
5.92
4755.00
337.00
3364.00
2307.00

73.42
69.00
5.92
4755.00
337.00
3364.00
2307.00

litre

265.00

285.00

280.00

litre
litre
litre

12.13
35.86
56.46

12.09
35.75
56.21

12.23
35.98
56.45

cu.m
truck
cu.m
cu.m
bundle
each
each
each
Sq.m

981.25
50.00
77.00
212.014
60.50
11.00
0.11
6.00
0.07
29.70

379.00
50.00
77.00
290.00
60.50
11.00
0.11
6.00
0.07
29.70

706.25
50.00
77.00
330.48
60.50
11.00
0.11
6.00
0.07
29.70

cu.m

172.50

290.00

320.00

BASICRATESBITUMENPRODUCTS,CHEMICALS&BLASTINGMATERIALS

Bitumenmaterials

MT0001 Bitumen80\100
MT0002 BitumenEmulsion

BitumenfeltType3
MT0005 Grade1
MT0006 Grade2

SealingCompounds

MT0010
MT0011

HotsealingcompoundGradeA
BitumenSolutionprimer

Jointfiller

MT0015

Premouldedbitumenimpregnatedfibreboard,12mmthick(IS:1838orequivalent)

Blastingmaterials

MT0020
MT0021
MT0022
MT0023
MT0024
MT0025
MT0026

Superdyne/Gelatine
FuseCoil
Detonator
Drillrod8'0"
SilentBlaster
Drillrod5'0"
Drillrod3'0"

Chemicals

MT0030

AldrinEmulsifiableConcentrate30%(forantitermitetreatment)

Fuels

MT0035
MT0036
MT0037

Kerosene
Diesel
Petrol

BASICRATESQUARRY&FORESTPRODUCTS

MT0040
MT0041
MT0042
MT0043
MT0044
MT0045
MT0046
MT0047
MT0048
MT0049

Firewood(stackedvolume)
Royaltyforearth,mud,boulder,sand&gravel
Muddry
Sand
Hay/husk
Straw,girth<100mm
Cuttings
Seedlings
GrassSlips
Turf

kg

Stone

MT0060

Boulder

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

Units

PL

GP

SJ

cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m

812.72
812.72
812.72
812.72
812.72
848.05
848.05
848.05

893.99
893.99
893.99
893.99
893.99
932.86
932.86
932.86

987.84
987.84
987.84
987.84
987.84
1069.14
1069.14
1069.14

cu.m
cu.m

363.00
467.50

390.50
489.50

407.00
481.25

tonne
tonne

3750.00
4000.00

3500.00
3950.00

3700.00
4100.00

sq.m
sq.m
sq.m
sq.m

674.70
674.80
647.80
782.23

670.00
670.00
670.00
670.00

655.00
655.00
655.00
655.00

sq.m
sq.m
sq.m
sq.m

522.72
653.40
588.00
660.00

522.72
653.40
588.00
660.00

522.72
653.40
588.00
660.00

sq.m
sq.m

650.00
1405.00

650.00
1405.00

650.00
1405.00

kg
kg

15.00
20.00

17.00
20.50

15.00
22.00

each

55.00

55.00

55.00

CrushedRock
MT0064 100mm
MT0065 75mm
MT0066 63mm
MT0067 50mm
MT0068 40mm
MT0069 25mm
MT0070 20mm
MT0071 12.56mm

Gravel\Shingles(Riverstone)
MT0080 40mmto20mm
MT0081 20mmto10mm

MarbleItems

MarbleChips6mm
MT0085 BlackorWhite
MT0086 Coloured

MarbleSlab20mm
MT0090 Black
MT0091 White
MT0092 BlackandWhite
MT0093 Coloured

MarbleSlab40mm
MT0100 Black
MT0101 White
MT0102 BlackandWhite
MT0103 Coloured

KotaStoneSlab
MT0110 20mm
MT0111 40mm

Lime

MT0120
MT0121

Slakedlime
Unslakedlime

Others
MT0122

SealedBag

BASICRATESBRICK

Brickmaterials

MT0125
MT0126
MT0127

Bricks2ndclass
Brickaggregate
Gradedbrickaggregate

MT0128 Interlockingcementearthblock(300mmX150mmX100mm)
MT0129 Interlockingcementearthblock(250mmX125mmX100mm)
BASICRATESCEMENT&CONCRETEMTERIALS
Cement

MT0145
MT0146

Cement(OPC/PSC)
WhiteCement

1000#
cu.m
cu.m
1000#
1000#

6900.00
1015.44
1192.00

7400.00
847.00
1078.00

7000.00
797.50
870.00

25060.00
16550.00

29430.00
19590.00

29430.00
19590.00

tonne
tonne

5050.00
25000.00

6126.30
26000.00

6376.25
26333.33

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

Units

PL

GP

SJ

kg
kg
kg

95.00
43.00
30.00

90.00
40.00
25.00

95.00
40.00
25.00

sq.m
sq.m
sq.m

30.00
37.50
45.00

27.50
37.50
45.00

30.00
40.00
47.50

m
m

350.00
80.00

350.00
75.00

340.00
75.00

kg
kg
kg
kg

350.00
350.00
350.00
350.00

350.00
350.00
350.00
350.00

350.00
350.00
350.00
350.00

m
m

87.50
65.00

89.50
70.00

90.00
67.90

kg
kg
kg
kg
kg

48.00
55.00
48.00
58.00
58.00

57.50
57.50
57.50
57.50
57.50

56.33
60.67
57.67
60.00
63.33

kg
kg
kg
kg

68.00
68.00
68.00
68.00

70.00
70.00
70.00
70.00

75.00
75.00
70.00
70.00

kg

51.50

58.00

58.00

m
m

250.00
160.00

240.00
170.50

260.00
172.00

kg

44.50

55.00

55.00

sq.m
sq.m

180.00
220.00

169.49
214.00

190.00
225.00

Additives&Admixtures

MT0150
MT0151
MT0152

RedOxidePigment\otherpigments
Waterproofingcompound
FloorHardener(metallic)

UnderlayforSlabs

PlasticSheet
MT0155 50micrometre
MT0156 100micrometre
MT0157 200micrometre

BASICRATESSTEEL&OTHERMETALMATERIALS

AluminiumMaterials

MT0160 AluminiumFlutedStrips3.15mmthick150mmwide
MT0161 AluminiumStrip40x1.6mm

AnodisedAluminiumSectionfordoors,windows
MT0165 Sliding,openableandpivotedwindows
MT0166 Slidingandopenabledoors
MT0167 Partitionsframing
MT0168 Falseceilingframing

AluminiumStripEdging
MT0175 57mmx12mmx1.6mm
MT0176 38mmx12mmx1.6mm

SteelMaterials

Rolledsections(250MPa)
MT0180 Angles
MT0181 Channels
MT0182 Flats
MT0183 Joists
MT0184 Plates

Sheet(250MPa)
MT0190 1mm
MT0191 2mm
MT0192 2.8mm
MT0193 3.5mm
MildsteelStrips
MT0194 1830mmX230mmX3mm

WeldedTube(250MPa)
MT0200 50mmdia
MT0201 40mmdia

ReinforcingBars&Mesh
MT0208 ThermoMechanicallyTreated(TMT)bars(yieldstrength500MPa)

WeldedMesh
MT0215 75mmx25mm
MT0216 ExpandedMetal(19mmx3mmx16gauge)

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

Units

PL

GP

SJ

kg
kg

62.50
80.00

62.50
85.00

70.00
85.00

10.28

11.67

12.50

sq.m
sq.m
sq.m
sq.m

190.00
145.00
138.00
110.00

210.00
190.00
160.00
130.00

228.00
196.00
165.00
140.00

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

190.00
140.00
170.00
120.00
240.00
170.00

225.00
160.00
246.00
230.00
315.00
315.00

226.04
236.81
236.81
236.81
312.16
312.16

tonne

78000.00

72500.00

68666.67

Fasteners
MT0220 M.S.Rivets
MT0221 M.S.Bolts&Nuts,Screwsetc

FencingWireProducts

MT0225 BarbedWire

G.Idoubleknottedmesh
MT0230 100x100x8gauge
MT0231 100x100x12gauge
MT0232 150x150x8gauge
MT0233 150x150x12gauge

G.Ichainlinkmesh
MT0240 100x100x8gauge
MT0241 100x100x12gauge
MT0242 75x75x8gauge
MT0243 75x75x12gauge
MT0244 50x50x8gauge
MT0245 50x50x12gauge

GalvanisedIron
MT0250

PlainG.ISheet,24gauge(0.63mm)

PunchedTypeConcertinaWire
MT0255

PunchedTypeConcertinaWire

484.00

484.00

484.00

Wires
MT0256

GIwires(assorteddiameters)

kg

70.00

85.00

80.00

tonne

72000.00

72000.00

72000.00

sq.m

1100.00

1100.00

1100.00

each

24.20

24.20

24.20

each
each
each

12.10
14.30
14.85

12.10
14.30
14.85

12.10
14.30
14.85

each
each
each

15.40
15.95
16.50

15.40
15.95
16.50

15.40
15.95
16.50

BASICRATESROOFINGMATERIALS

GalvanisedIron

CorrugatedG.ISheets
MT0275 24G(0.63mm)

Fibreglass

MT0280 Reinforcedpolyestertransparentsheets1.2mm,corrugated

RoofingSlate
MT0285 600mmx300mm

ConcreteRoofingTiles

PlainPantile/RomanII500mmx250mmconcretetiles
MT0290 6mm
MT0291 8mm
MT0292 10mm

ColouredPantile/RomanII500mmx250mmconcretetiles
MT0295 6mm
MT0296 8mm
MT0297 10mm

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

Units

PL

GP

SJ

each
each

28.60
31.90

28.60
31.90

28.60
31.90

each
each

29.70
47.30

29.70
47.30

29.70
47.30

each
each

30.80
49.50

30.80
49.50

30.80
49.50

pair

16.50

16.50

16.50

sq.m
m

299.20
220.00

299.20
220.00

299.20
220.00

m
m
m

25.30
36.30
41.80

25.30
36.30
41.80

25.30
36.30
41.80

cu.m
cu.m

9748.50
9786.66

8490.89
8792.66

8266.15
8567.92

sq.m
sq.m
sq.m
sq.m

107.21
260.00
196.11
349.96

102.28
280.00
160.66
468.73

99.00
247.50
155.00
257.00

sq.m
sq.m
sq.m

167.86
184.80
211.75

167.86
184.80
211.75

167.86
184.80
211.75

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

280.94
298.49
339.35
370.70
452.10
561.00
595.10
764.50

280.94
298.49
339.35
370.70
452.10
561.00
595.10
764.50

280.94
298.49
339.35
370.70
452.10
561.00
595.10
764.50

SuperRoman600mmx330mmx10mmconcretetiles
MT0300 Plain
MT0301 Coloured

Semisheet600mmx600mmx8mmconcretetiles
MT0305 Plain
MT0306 Coloured

Hip/Ridge,600mm
MT0310 Plain
MT0311 Coloured

Shingleproofing
MT0315 1500mm(approx.)

RedMudPlasticSheet

MT0320
MT0321

Redmudplasticcorrugatedsheet,1.5mm
Redmudplasticplainsheet,1.3mm

BASICRATESCARPENTRY&JOINERYMATERIALS

Timber

MT0325
MT0326
MT0327

Ballies75to125mmdia
Ballies250to300mmdia
Ballies125to250mmdia

Roughsawntimber(urbanrate)
MT0330 Class'B',(MixedConifer)
MT0331 Class'A',(Bluepine,Champ)

Plywood

MT0340 4mm,commercialply
MT0341 4mm,teakply
MT0342 6mm,commercialply
MT0343 12mm,commercialply

GypsumWallboard
MT0345 10mm
MT0346 12mm
MT0347 15mm

Bisonpanel,Prelaminated(bothsides)
MT0350 6mm
MT0351 8mm
MT0352 10mm
MT0353 12mm
MT0354 16mm
MT0355 20mm
MT0356 25mm
MT0357 30mm

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

10

Units

PL

GP

SJ

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

256.67
300.00
333.67
463.67
606.67
838.00

280.00
340.00
375.00
440.00
597.00
888.00

290.00
345.00
370.00
480.00
600.00
910.00

sq.m
sq.m
sq.m
sq.m

447.00
460.00
549.00
710.00

390.00
476.00
550.00
820.00

398.00
460.00
520.00
720.00

sq.m

650.00

657.00

660.00

m
m
sq.m
each

13.12
16.08
68.75
250.00

14.22
16.40
62.50
240.00

12.02
15.31
70.00
250.00

sq.m
sq.m

501.60
550.00

501.60
550.00

501.60
550.00

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

533.50
454.30
408.10
440.00
408.10
470.80

533.50
454.30
408.10
440.00
408.10
470.80

533.50
454.30
408.10
440.00
408.10
470.80

sq.m

150.00

180.00

190.00

sq.m
sq.m
sq.m
sq.m

845.00
1020.00
1150.00
1350.00

929.50
1122.00
1265.00
1485.00

954.85
1152.60
1299.50
1525.50

sq.m
sq.m
sq.m
sq.m

1350.00
1550.00
1850.00
2100.00

1485.00
1705.00
2035.00
2310.00

1525.50
1751.50
2090.50
2373.00

PlainParticleBoard
MT0365 6mm
MT0366 10mm
MT0367 12mm
MT0368 18mm
MT0369 25mm
MT0370 35mm

PrelaminatedParticleBoard(oneside)
MT0375 8mm
MT0376 10mm
MT0377 12mm
MT0378 18mm

Skylightpanel

MT0385

Translucentdiffuserpanel,forskylightsetc

CaneProducts

Bamboo
MT0390 25mmdia
MT0391 75mmdia
MT0392 Mat
MT0393 canebasket

Prefab.Pannelling

Flooring
MT0395 25mm,Mixedconifer
MT0396 38mm,Bluepine

Wallpanelling
MT0400 19mm,bluepine
MT0401 15mm,bluepine
MT0402 12mm,bluepine
MT0403 19mm,mixedconifer
MT0404 12mm,mixedconifer
MT0405 12mm,Champwood

WireGauze

MT0410

Galv.mildsteelwiregauze,85G(0.85mmaveragewidthofaperture),0.56mm
dia.

BASICRATESDOORS,WINDOWS&HARDWARE

Prefab.TimberDoors&Boards

FlushDoor,blockboardcore,commercialplyveneer,U\Fbonded
MT0415 25mm
MT0416 30mm
MT0417 35mm
MT0418 40mm

FlushDoor,blockboardcore,teakplyveneer,U\Fbonded
MT0425 25mm
MT0426 30mm
MT0427 35mm
MT0428 40mm

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

11

Units

PL

GP

SJ

sq.m
sq.m
sq.m
sq.m

980.00
1150.00
1350.00
1550.00

1078.00
1265.00
1485.00
1705.00

1107.40
1299.50
1525.50
1751.50

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

1336.50
1353.00
1364.00
979.00
991.10
1062.60
960.30
970.20
976.80

1336.50
1353.00
1364.00
979.00
991.10
1062.60
960.30
970.20
976.80

1336.50
1353.00
1364.00
979.00
991.10
1062.60
960.30
970.20
976.80

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

1382.70
1387.10
1389.30
1026.30
1028.50
1032.90
988.90
993.30
998.80

1382.70
1387.10
1389.30
1026.30
1028.50
1032.90
988.90
993.30
998.80

1382.70
1387.10
1389.30
1026.30
1028.50
1032.90
988.90
993.30
998.80

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

1397.55
1427.80
1431.10
1040.88
1043.08
1049.40
1001.28
1007.88
1016.68

1397.55
1427.80
1431.10
1040.88
1043.08
1049.40
1001.28
1007.88
1016.68

1397.55
1427.80
1431.10
1040.88
1043.08
1049.40
1001.28
1007.88
1016.68

sq.m
sq.m
sq.m

526.90
535.70
540.10

526.90
535.70
540.10

526.90
535.70
540.10

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
m

1039.50
330.00
572.00
572.00
715.00
972.40
396.00

1039.50
330.00
572.00
572.00
715.00
972.40
396.00

1039.50
330.00
572.00
572.00
715.00
972.40
396.00

FlushDoor,blockboardcore,plyveneer,chemicallytreated
MT0435 25mm
MT0436 30mm
MT0437 35mm
MT0438 40mm

PanelledDoor,withsinglelockrail
MT0445 30mm,12mmveneeredparticleboardpanel
MT0446 35mm,12mmveneeredparticleboardpanel
MT0447 40mm,12mmveneeredparticleboardpanel
MT0448 30mm,12mmplywoodpanel
MT0449 35mm,12mmplywoodpanel
MT0450 40mm,12mmplywoodpanel
MT0451 30mm,9mmplywoodpanel
MT0452 35mm,9mmplywoodpanel
MT0453 40mm,9mmplywoodpanel

PanelledDoor,withsinglelockrail&stile
MT0465 30mm,12mmveneeredparticleboardpanel
MT0466 35mm,12mmveneeredparticleboardpanel
MT0467 40mm,12mmveneeredparticleboardpanel
MT0468 30mm,12mmplywoodpanel
MT0469 35mm,12mmplywoodpanel
MT0470 40mm,12mmplywoodpanel
MT0471 30mm,9mmplywoodpanel
MT0472 35mm,9mmplywoodpanel
MT0473 40mm,9mmplywoodpanel

PanelledDoor,withdoublelockrail&stile
MT0485 30mm,12mmveneeredparticleboardpanel
MT0486 35mm,12mmveneeredparticleboardpanel
MT0487 40mm,12mmveneeredparticleboardpanel
MT0488 30mm,12mmplywoodpanel
MT0489 35mm,12mmplywoodpanel
MT0490 40mm,12mmplywoodpanel
MT0491 30mm,9mmplywoodpanel
MT0492 35mm,9mmplywoodpanel
MT0493 40mm,9mmplywoodpanel

Prefab.fullyglazedwindowshutters,incl.75mmrailwithpreservative&oneprimercoat,excluding
glass
MT0505
MT0506
MT0507

30mm
35mm
40mm

SteelDoorsandWindows

MT0510
MT0511
MT0512
MT0513
MT0514
MT0515
MT0516

Steeldoorwithnecessaryhinges,lugs,glazingclips
Steelwindows(fixed)withlugsandglazingclips
Steelwindows(sidehung)withhinges,lugsandglazingclips
Steelventilators(tophung)withhinges,lugsandglazingclips.
Steelventilators(centrehung)withpivots,lugsandglazingclips
Rollingshutterswithallaccessories,excludingtopcover
TopcoverforRollingshutter

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

12

Units

PL

GP

SJ

each
each
each

50.00
40.00
26.67

50.00
40.00
35.00

45.00
30.00
20.00

each
each
each
each

26.50
20.00
16.00
14.00

30.00
25.00
19.00
15.00

29.50
24.00
19.00
14.00

each
each
each
each

45.00
35.00
20.00
16.00

60.00
40.00
20.00
15.00

75.00
40.00
26.00
15.33

sq.m

345.00

355.00

360.00

each
each
each

150.00
120.00
105.00

140.00
125.00
110.00

135.00
120.00
107.50

each
each
each

45.00
35.00
22.50

65.00
35.00
27.50

55.00
35.00
25.00

each
each
each

70.00
52.50
35.00

80.00
65.00
50.00

70.00
46.50
30.00

each
each
each
each

53.75
46.25
41.25
35.00

65.00
55.00
45.00
40.00

90.00
75.00
60.00
40.00

each
each

37.00
31.25

48.00
38.00

50.00
40.00

each
each
each

500.00
478.33
435.00

480.00
390.00
370.00

597.50
487.50
432.50

each
each
each

155.00
107.00
76.00

140.00
112.50
82.50

145.00
120.00
75.00

Aluminium

AnodisedAluminiumFittings:ButtHinges
MT0530 100mm
MT0531 75mm
MT0532 50mm

AnodisedAluminiumFittings:Handles
MT0540 150mm
MT0541 125mm
MT0542 100mm
MT0543 75mm

AnodisedAluminiumFittings:HooksandEyes
MT0550 300mm
MT0551 200mm
MT0552 150mm
MT0553 100mm

AnodisedAluminiumFittings:KickingPlate
MT0560 4mmthick

AnodisedAluminiumFittings:SlidingDoorBolts
MT0565 300mm
MT0566 250mm
MT0567 200mm

AnodisedAluminiumFittings:TowerBolts(BarrelType)
MT0570 200mm
MT0571 150mm
MT0572 100mm

Brass

Brightfinishedbrass:ButtHinges
MT0575 100mm
MT0576 75mm
MT0577 50mm

Brightfinishedbrass:Handles
MT0580 150mm
MT0581 125mm
MT0582 100mm
MT0583 75mm

Brightfinishedbrass:HooksandEyes
MT0590 150mm
MT0591 100mm

Brightfinishedbrass:SlidingDoorBolts
MT0595 300mm
MT0596 250mm
MT0597 200mm

Brightfinishedbrass:TowerBolts(BarrelType)
MT0600 250mm
MT0601 150mm
MT0602 100mm

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

13

Units

PL

GP

SJ

each
each
each
each

95.00
650.00
550.00
770.00

85.00
850.00
650.00
890.00

100.00
730.00
700.00
940.00

each
each
each

24.67
18.50
11.17

25.50
20.50
14.25

33.33
25.00
15.67

each
each
each
each

32.00
25.50
20.25
16.00

30.00
25.00
19.00
15.00

37.50
27.50
22.50
17.50

each
each
each
each

48.00
32.00
17.00
14.00

60.00
37.50
21.50
16.00

50.00
31.67
21.67
16.67

each
each
each

83.33
75.00
63.33

86.67
83.33
75.00

97.50
82.50
67.50

each
each
each

40.00
28.33
20.00

47.50
36.67
28.33

62.50
37.50
22.50

each

51.67

47.25

50.00

sq.m
sq.m
sq.m

414.00
398.12
580.50

385.00
405.00
589.10

376.60
410.00
597.70

sq.m
sq.m

398.12
645.60

370.00
568.00

360.00
550.00

DoorClosers/Stoppers
MT0605 Brightfinishedbrass:DoorStopper
MT0606 Brightfinishedbrass:MortiseLatch100mm
MT0607 brass,hinged,springloadedtype
MT0608 brass,overhead,hydraulictype

MildSteel

MildSteel:ButtHinges
MT0615 100mm
MT0616 75mm
MT0617 50mm

MildSteel:Handles
MT0620 150mm
MT0621 125mm
MT0622 100mm
MT0623 75mm

MildSteel:HooksandEyes
MT0630 300mm
MT0631 200mm
MT0632 150mm
MT0633 100mm

MildSteel:SlidingDoorBolts
MT0640 300mm
MT0641 250mm
MT0642 200mm

MildSteel:TowerBolts(BarrelType)
MT0645 250mm
MT0646 150mm
MT0647 100mm

MSDoorStopper

MT0650

MildSteel:DoorStopper

BASICRATESTILES&GLASSMATERIALS

Glass

PlainGlass
MT0655 3mmthick
MT0656 4mmthick
MT0657 5.5mmthick

FrostedGlass
MT0660 3mmthick
MT0661 5.5mmthick

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

14

Units

PL

GP

SJ

each
each
each
each
each
each
each
sq.m

20.58
1.70
2.20
31.35
26.75
23.00
21.00
335.00

23.00
1.70
2.20
35.00
26.00
23.00
21.00
345.00

17.50
1.70
2.20
32.00
26.00
24.00
21.00
350.00

kg

15.00

20.00

20.00

kg
kg
kg

58.50
55.00
42.00

60.00
54.00
47.50

62.33
65.60
54.00

kg
kg
sq.m
sq.m
kg
kg

46.00
78.33
25.00
25.00
270.00
760.00

51.00
80.00
32.00
40.00
285.00
800.00

55.00
85.00
25.00
35.00
265.00
810.00

litre
litre
litre
litre
litre

141.00
130.00
121.00
132.46
116.55

140.00
128.33
122.00
128.90
128.00

145.00
130.00
118.75
130.00
127.50

litre
litre
litre
litre
litre
litre
litre

181.80
110.25
152.75
195.75
214.13
310.00
165.00

186.25
117.50
150.33
160.00
230.00
320.00
176.00

178.00
166.67
185.00
193.33
212.50
320.00
185.00

litre
litre
litre

326.00
205.00
250.00

308.00
206.33
255.00

293.00
237.50
260.00

litre
litre

130.00
90.00

120.00
85.00

140.00
87.50

Tiles

Glazedtiles
MT0665 white,150x150mm
MT0666 extra,forregularcolours
MT0667 extra,forspecialcolours
MT0668 White,300x300mm
MT0669 White,200x200mm
MT0670 White,200x100mm
MT0671 White,100x100mm
MT0672 Linoleumsheet,2mm

BASICRATESPLASTERINGMATERIALS

MT0685

PlasterofParis

BASICRATESPAINT&WALLPAPERMATERIALS

Distemper&DistemperPrimers

MT0690
MT0691
MT0692

DryDistemper
Acrylicwashabledistemper
WaterproofingCementpaint

BhutanesePaintingMaterials

MT0695
MT0696
MT0697
MT0698
MT0699
MT0700

MudPaintforBhutanesetraditionalpainting
Animalglue
ClothforBhutanesepainting
PaperforBhutanesepainting
Colourpowder(excludinggoldpowder)
Goldpowder

Primers

MT0710
MT0711
MT0712
MT0713
MT0714

Cementprimer
Syntheticredleadprimer
Redoxideprimer,formetals
Whiteprimer,forwood
Pinkprimer,forwood

Finishingcoat

MT0720
MT0721
MT0722
MT0723
MT0724
MT0725
MT0726

Aluminiumpaint
RedCorrugalpaint
Syntheticenamelpaint
Highglosssyntheticenamel
Acrylicemulsion
Vinylplasticemulsionpaint(forcementplaster)
Black\Whitebitumenenamel

StainsVarnishPolish

MT0730
MT0731
MT0732

WoodStain(variouscolours)
Clearsyntheticvarnish
FrenchPolish

WoodPreservative

MT0735
MT0736

WoodpreservativeBrown
CrudeCoalTar

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

15

Units

PL

GP

SJ

kg

45.00

46.25

45.00

sq.m
sq.m

295.00
403.00

298.00
410.00

302.00
417.00

each

495.00

437.50

450.00

each

1866.67

1900.00

1872.50

each

6950.00

7010.00

7100.00

each

650.00

680.00

662.50

m
each
each
each
each
each
each

1050.00
270.00
250.00
360.00
550.00
430.00
138.00

1150.00
287.00
255.00
320.00
548.00
450.00
145.00

1050.00
270.00
250.00
300.00
600.00
500.00
150.00

m
m
m
m
m
m
m
m
m
m

337.26
367.13
458.43
573.32
861.08
1220.78
1760.33
2223.65
4778.95
6827.15

337.26
367.13
458.43
573.32
861.08
1220.78
1760.33
2223.65
4778.95
6827.15

337.26
367.13
458.43
573.32
861.08
1220.78
1760.33
2223.65
4778.95
6827.15

each
each
each
each
each
each
each
each
each
each

54.01
58.69
73.35
112.22
168.54
238.94
344.54
389.40
545.60
720.72

54.55
59.27
74.08
113.34
170.23
241.33
347.99
389.40
545.60
720.72

54.82
59.57
74.45
113.91
171.07
242.53
349.71
389.40
545.60
720.72

Accessories

MT0740

Putty

WallPaper

Wallpaper:
MT0745 Standard
MT0746 HighQuality

BASICRATESDRAINAGEMATERIALS

C.I.ManholeCovers

MT0750
MT0751
MT0752
MT0753

WatertightC.I.ManholeCoverwithframe,300x300mminsidesizeWt.ofcovernotlessthan
4.53kgwt.offramenotlessthan2.72kg
C.I.manholecoverwithframe(lightduty)internaldimension455x610mmTotalweightofCover
andframenotlessthan38kg.(Cover23kg.andframe15kg.)
C.I.manholecoverandframe(mediumduty)500mminternaldia.Totalweightofcoverand
framenotlessthan116kg.(cover58kg.andframe58kg)
C.I.manholecover400mmdia.inside,mosquitoproofwithlockingarrangement(Wtofcovernot
lessthan7kg).

RainwaterPipes&Fittings

CastIron
MT0760 Pipe,100mmdia.
MT0761 Bend100mm
MT0762 Head100mm
MT0763 Offset100mm,75mmprojection
MT0764 Offset100mm,150mmprojection
MT0765 Shoe,100mm
MT0766 Grating

R.CNonPressurepipe

NP2class
MT0768 100mmdia
MT0769 150mmdia
MT0770 225mmdia
MT0771 300mmdia
MT0772 450mmdia
MT0773 600mmdia
MT0774 750mmdia
MT0775 900mmdia
MT0776 1050mmdia
MT0777 1200mmdia

NP2ClassCollar
MT0783
MT0784
MT0785
MT0786
MT0787
MT0788
MT0789
MT0790
MT0791
MT0792

100mmdia
150mmdia
225mmdia
300mmdia
450mmdia
600mmdia
750mmdia
900mmdia
1050mmdia
1200mmdia

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

16

Units

PL

GP

SJ

Stonewarepipes60cmlong
MT0795 100mmdia
MT0796 150mmdia
MT0797 200mmdia
MT0778 230mmdia
MT0779 250mmdia
MT0780 300mmdia
MT0781 350mmdia
MT0782 400mmdia
MT0793 500mmdia
MT0794 600mmdia

each
each
each
each
each
each
each
each
each
each

121.00
269.50
473.00
578.60
649.00
803.00
962.50
1127.50
1479.50
1776.50

122.21
272.20
477.73
584.39
655.49
811.03
972.13
1138.78
1494.30
1794.27

122.82
273.54
480.10
587.28
658.74
815.05
976.94
1144.41
1501.69
1803.15

S\WtrapPType
MT0800 100x100mm
MT0801 150x100mm
MT0802 180x150mm

each
each
each

99.00
112.20
143.00

99.99
113.32
144.43

100.49
113.88
145.15

m
m
m
m
m
m
m
m
m
m

85.18
104.17
150.91
204.12
246.91
315.86
406.74
524.17
737.50
1144.58

106.50
155.00
196.51
266.13
313.39
393.89
502.03
643.79
857.93
1500.75

110.31
133.81
191.50
261.42
296.88
393.04
501.75
644.75
925.29
1611.92

m
m
m
m
m
m
m
m
m
m
m
m

17.85
26.95
44.25
68.20
105.30
168.00
235.97
340.00
505.10
822.00
1069.13
2103.50

20.62
29.82
56.13
110.10
141.65
178.00
265.00
385.00
585.00
910.00
1250.00
2387.67

20.95
31.25
44.89
74.01
122.68
194.07
284.43
388.27
595.80
942.40
1240.08
2460.27

m
m
m
m
m
m
m
m
m
m

29.97
46.45
71.75
112.75
157.55
227.37
336.37
542.00
708.60
1395.93

41.00
66.00
88.50
128.50
168.50
233.50
338.50
648.50
827.00
1525.00

39.00
51.79
78.27
139.34
196.89
286.07
369.97
612.17
796.20
1576.47

StonewarePipeSpecials

BASICRATESPLUMBING(PIPEWORK)

WaterSupplyPipes

G.Ipipe
MT0805 15mm
MT0806 20mm
MT0807 25mm
MT0808 32mm
MT0809 40mm
MT0810 50mm
MT0811 65mm
MT0812 80mm
MT0813 100mm
MT0814 150mm

H.D.P.Epressureclass10kg/sq.cm
MT0817 20mm
MT0818 25mm
MT0819 32mm
MT0820 40mm
MT0821 50mm
MT0822 63mm
MT0823 75mm
MT0824 90mm
MT0825 110mm
MT0826 140mm
MT0827 160mm
MT0828 225mm

H.D.P.EPipesofpressureclass6kg/sq.cm
MT0830 32mm
MT0831 40mm
MT0832 50mm
MT0833 63mm
MT0834 75mm
MT0835 90mm
MT0836 110mm
MT0837 140mm
MT0838 160mm
MT0839 225mm

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

17

Units

H.D.P.EPipesofpressureclass4kg/sq.cm
MT0841 40mm
MT0842 50mm
MT0843 63mm
MT0844 75mm
MT0845 90mm
MT0846 110mm
MT0847 140mm
MT0848 160mm
MT0849 225mm

H.D.P.EPipesofpressureclass2.5kg/sq.cm
MT0852 110mm
MT0853 140mm
MT0854 160mm
MT0855 225mm
DuctileIronPipesClassK9
MT0856 80mm
MT0857 100mm
MT0858 150mm
MT0859 200mm
MT0860 250mm
MT0861 300mm
MT0862 350mm
MT0863 400mm
MT0864 450mm
MT0865 500mm
MT0866 600mm

PL

GP

SJ

m
m
m
m
m
m
m
m
m

44.00
50.00
77.55
112.00
161.56
234.55
317.43
545.00
983.63

48.40
62.50
86.50
133.50
183.50
259.50
400.00
559.00
1117.00

49.28
54.43
82.21
122.87
175.06
253.63
414.40
555.40
1119.73

m
m
m
m

157.00
251.23
324.13
638.37

195.00
345.00
415.00
815.00

198.00
314.40
410.40
847.20

m
m
m
m
m
m
m
m
m
m
m

853.20
987.29
1455.17
1980.54
2648.04
3366.98
4170.77
5000.97
5906.52
6901.83
9835.20

853.20
987.29
1455.17
1980.54
2648.04
3366.98
4170.77
5000.97
5906.52
6901.83
9835.20

853.20
987.29
1455.17
1980.54
2648.04
3366.98
4170.77
5000.97
5906.52
6901.83
9835.20

m
m
m
m
m
m
m
m
m
m

854.28
1278.20
1666.31
2195.87
2799.77
3457.26
4140.42
4859.07
5712.48
8338.80

854.28
1278.195
1666.31
2195.865
2799.765
3457.26
4140.42
4859.07
5712.48
8338.8

854.28
1278.20
1666.31
2195.87
2799.77
3457.26
4140.42
4859.07
5712.48
8338.80

m
m
m
m
m
m
m
m
m
m

1720.00
2480.00
3490.00
4590.00
5690.00
7050.00
8450.00
11400.00
13400.00
17450.00

1720.00
2480.00
3490.00
4590.00
5690.00
7050.00
8450.00
11400.00
13400.00
17450.00

1720.00
2480.00
3490.00
4590.00
5690.00
7050.00
8450.00
11400.00
13400.00
17450.00

DuctileIronPipesClassK7
MT0871
MT0872
MT0873
MT0874
MT0875
MT0876
MT0877
MT0878
MT0879
MT0880

100mm
150mm
200mm
250mm
300mm
350mm
400mm
450mm
500mm
600mm

DuctileIronPipesK9DoubleFlanged
MT0882 100mm
MT0883 150mm
MT0884 200mm
MT0885 250mm
MT0886 300mm
MT0887 350mm
MT0888 400mm
MT0889 450mm
MT0890 500mm
MT0891 600mm

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

18

Units

PL

GP

SJ

each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each

38.45
52.13
83.63
189.00
117.00
330.00
450.00
1500.00
25.50
72.00
97.50
292.50
390.00
200.00
205.00
205.00
590.00
97.00
125.00
243.00
280.00
480.00

45.00
65.00
95.00
155.00
270.00
385.00
630.00
1970.00
85.00
285.00
315.00
325.00
380.00
220.00
225.50
225.50
649.00
106.70
137.50
267.30
308.00
528.00

30.68
42.63
66.18
132.55
245.80
346.40
602.75
2354.70
48.95
102.73
190.63
267.30
485.25
230.00
235.75
235.75
678.50
111.55
143.75
279.45
322.00
552.00

each
each

156.00
212.25

140.00
215.00

150.00
230.00

each

175.00

170.67

175.00

each
each
each

280.00
293.50
401.00

267.00
280.00
370.00

270.00
295.00
395.00

each
each
each
each
each

780.30
1049.50
1514.70
1930.00
2575.00

780.00
1080.00
1850.00
3250.00
3750.00

895.00
1268.33
1722.00
2790.00
3750.00

each
each
each

1435.00
2352.00
3570.00

1413.33
2500.00
3300.00

1490.00
2574.50
3345.00

each
each
each
each
each
each
each
each
each
each
each

50.40
58.86
89.28
142.74
185.94
264.60
295.20
412.20
442.80
484.20
831.60

50.40
58.86
89.28
142.74
185.94
264.60
295.20
412.20
442.80
484.20
831.60

50.40
58.86
89.28
142.74
185.94
264.60
295.20
412.20
442.80
484.20
831.60

PipeFittings

H.D.P.Eweldedtypefittings
MT0895 TEE,20mm
MT0896 TEE,25mm
MT0897 TEE,32mm
MT0898 TEE,50mm
MT0899 TEE,63mm
MT0900 TEE,90mm
MT0901 TEE,110mm
MT0902 TEE,160mm
MT0903 Elbow,32mm
MT0904 Elbow,50mm
MT0905 Elbow,63mm
MT0906 Elbow,90mm
MT0907 Elbow,110mm
MT0908 Reducer,90x50mm
MT0909 Reducer,90x63mm
MT0910 Reducer,110x63mm
MT0911 Reducer,160x90mm
MT0912 Blankend,50mm
MT0913 Blankend,63mm
MT0914 Blankend,90mm
MT0915 Blankend,110mm
MT0916 Blankend,160mm

M.I.FittingsUnion
MT0921 32mm
MT0922 40mm

BrassFittingsBibcock
MT0925 15mm

Stopcock
MT0930 15mmnombore
MT0931 20mmnombore
MT0932 25mmnombore

Wheelvalve
MT0940 32mmnombore
MT0941 40mmnombore
MT0942 50mmnombore
MT0943 65mmnombore
MT0944 80mmnombore

Nonreturnvalve
MT0951 50mmnombore
MT0952 65mmnombore
MT0953 80mmnombore
RubberGasketofS.B.RQuality
MT0960 80mm
MT0961 100mm
MT0962 150mm
MT0963 200mm
MT0964 250mm
MT0965 300mm
MT0966 350mm
MT0967 400mm
MT0968 450mm
MT0969 500mm
MT0970 600mm

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

19

Units

PL

GP

SJ

each
each
each
each

575.00
707.50
900.00
1462.50

450.00
910.00
1185.00
1690.00

450.00
722.50
1025.00
1575.00

each
each
each

150.00
172.00
295.00

170.00
180.00
285.00

167.50
190.00
297.50

each
each
each

205.40
201.00
255.00

210.00
280.00
305.00

207.50
296.00
315.00

each
each
each

109.00
151.00
216.00

150.00
190.00
305.00

160.00
190.00
325.00

each
each
each

124.00
255.00
320.00

120.00
253.00
380.00

150.00
230.00
300.00

each
each
each

210.00
315.00
430.00

205.00
290.00
380.00

200.00
275.00
450.00

each
each
each
each

170.00
216.00
295.00
315.00

176.50
212.00
305.00
390.00

190.00
225.00
325.00
425.00

each
each
each

290.00
363.00
544.00

205.00
245.00
490.00

220.00
260.00
555.00

each
each
each

251.00
321.50
422.00

225.00
270.00
390.00

220.00
260.00
462.50

each
each
each

210.00
275.00
320.00

219.00
285.00
326.00

220.00
292.00
330.00

each
each
each

225.50
345.00
367.00

230.50
345.00
376.00

240.00
360.00
382.50

WastewaterPipework

CastIronPipes,SingleSocketted,1.83mlong
MT0975 50mm
MT0976 75mm
MT0977 100mm
MT0978 150mm

Plainbend
MT0985 50mm
MT0986 75mm
MT0987 100mm

Doorbend
MT0990 50mm
MT0991 75mm
MT0992 100mm

Collar
MT1000 50mm
MT1001 75mm
MT1002 100mm

Heelrestbend
MT1010 50mm
MT1011 75mm
MT1012 100mm

Singleequaljunctionplain
MT1020 50mm
MT1021 75mm
MT1022 100mm

Singleequaljunction,door
MT1030 50mm
MT1031 75mm
MT1032 100mm
MT1033 150mm

Doubleequaljunction,plain
MT1040 50mm
MT1041 75mm
MT1042 100mm

Doubleequaljunction,door
MT1050 50mm
MT1051 75mm
MT1052 100mm

Singleunequaljunction,plain
MT1060 75x50mm
MT1061 100x50mm
MT1062 100x75mm

Singleunequaljunction,door
MT1070 75x50mm
MT1071 100x50mm
MT1072 100x75mm

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

20

Units

PL

GP

SJ

each
each

310.00
360.00

315.00
355.00

325.00
370.00

each
each

325.00
370.00

325.00
369.00

340.00
390.00

each
each
each

190.00
367.00
510.00

165.00
350.00
495.00

210.00
240.00
450.00

each
each
each

290.00
406.00
544.00

260.00
320.00
485.00

240.00
295.00
347.00

each
each

272.50
379.00

280.00
384.00

293.00
397.00

each
each

267.50
386.00

240.00
390.00

220.00
395.00

each
each

260.00
365.00

267.00
365.00

275.00
375.00

each
each

315.00
385.00

300.00
375.00

275.00
375.00

each
each
each
each

120.00
200.00
305.00
540.00

125.00
212.00
300.00
540.00

175.00
243.50
300.00
482.50

each
each
each

145.00
305.00
450.00

205.00
325.00
450.00

257.50
337.50
427.50

kg

91.00

98.00

105.00

each
each
each

211.50
290.00
385.60

205.50
308.00
392.80

203.00
284.00
400.00

each
each
each

322.33
438.40
580.87

318.00
532.00
597.00

350.00
420.00
450.00

Doubleunequaljunction,plain
MT1080 100x50
MT1081 100x75

Doubleunequaljunction,door
MT1085 100x50
MT1086 100x75

SingleequalYJunction
MT1090 50mm
MT1091 75mm
MT1092 100mm

DoubleequalYJunction
MT1100 50mm
MT1101 75mm
MT1102 100mm

Singleunequalinvertbranch
MT1110 75x50mm
MT1111 100x50mm

Offsets50mmdiaoffset
MT1115 with75mmprojection
MT1116 with150mmprojection

75mmdiaoffset
MT1120 with75mmprojection
MT1121 with150mmprojection

100mmdiaoffset
MT1125 with75mmprojection
MT1126 with150mmprojection

TerminalGuard
MT1130 50mm
MT1131 75mm
MT1132 100mm
MT1133 150mm

PtypeNahaniTrap
MT1140 100mminlet&50mmoutlet
MT1141 100mminlet&75mmoutlet
MT1142 C.I.Ptrap100mm

JointingMaterials

MT1145

Piglead

P.V.CPipes&fittings(SoilWasteandVent)

Pipes,SingleSocketed1.83mlong
MT1150 75mm
MT1151 90mm
MT1152 110mm

Pipes,SingleSocketed3.00mlong
MT1160 75mm
MT1161 90mm
MT1162 110mm

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

21

Units

PL

GP

SJ

each
each
each

236.33
353.60
443.53

240.00
373.00
455.00

230.00
353.60
420.00

each
each
each

163.90
226.60
302.20

180.00
295.00
359.00

170.00
290.00
340.00

each

172.80

180.00

190.25

each
each
each

87.00
95.00
112.00

118.00
117.50
150.00

90.85
115.60
137.70

each
each
each

54.65
64.60
76.96

63.50
76.50
86.00

52.90
71.35
81.33

each
each
each

70.00
97.00
112.00

85.00
110.00
130.00

95.00
125.00
145.00

each
each
each

95.00
112.00
148.00

105.00
135.00
160.00

112.00
143.00
140.00

each
each
each

165.00
247.00
338.00

175.00
254.00
330.00

214.07
295.83
352.00

each
each
each

108.00
125.00
159.00

110.00
135.00
160.00

114.00
138.50
170.00

each
each
each

89.00
119.20
155.00

103.00
150.00
165.00

72.00
125.00
132.00

each
each
each

96.53
130.40
173.40

115.00
140.00
180.00

91.00
132.00
164.00

each
each
each

151.33
211.20
276.87

132.00
206.00
235.00

150.00
215.00
299.00

Pipes,DoubledSocketed1.83mlong
MT1170 75mm
MT1171 90mm
MT1172 110mm

Pipes,DoubledSocketed1.20mlong
MT1180 75mm
MT1181 90mm
MT1182 110mm

PipeConnector
MT1190 110mm

Reducer
MT1195 90x75mm
MT1196 110x75mm
MT1197 110x90mm

Coupler
MT1205 75mm
MT1206 90mm
MT1207 110mm

Plainbend
MT1215 75mm
MT1216 90mm
MT1217 110mm

Doorbend
MT1225 75mm
MT1226 90mm
MT1227 110mm

LongArmBend
MT1235 75mm
MT1236 90mm
MT1237 110mm
PlainShoe
MT1239 75mm
MT1240 90mm
MT1241 110mm

SingleTee,Plain
MT1245 75mm
MT1246 90mm
MT1247 110mm

SingleTee,WithDoor
MT1255 75mm
MT1256 90mm
MT1257 110mm

DoubleTee,Plain
MT1265 75mm
MT1266 90mm
MT1267 110mm

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

22

Units

PL

GP

SJ

each
each
each

222.00
272.00
304.53

267.00
353.50
383.50

215.00
210.00
305.00

each
each
each

115.00
136.00
205.00

135.00
225.00
262.67

149.00
212.50
233.47

each
each
each

135.00
172.80
262.00

176.00
263.00
343.00

178.20
265.20
273.83

each
each
each

160.00
280.00
274.00

223.00
313.00
349.50

185.65
357.00
320.05

each
each
each

222.00
237.60
360.00

260.00
334.50
396.50

290.00
357.00
288.00

each
each
each

35.00
45.00
50.00

37.00
45.00
54.00

34.00
47.00
56.00

each
each

181.60
212.80

198.00
280.00

190.00
250.00

each
each

308.00
436.80

329.00
405.00

243.45
392.00

each
each

290.00
328.59

366.00
410.00

247.34
289.00

each
each
each

78.00
85.00
90.00

89.00
100.00
103.00

87.00
95.00
105.00

each

122.00

120.00

160.00

each
each

335.00
315.00

404.00
350.00

390.00
340.00

DoubleTee,WithDoor
MT1275 75mm
MT1276 90mm
MT1277 110mm

SingleY,Plain
MT1285 75mm
MT1286 90mm
MT1287 110mm

SingleY,WithDoor
MT1295 75mm
MT1296 90mm
MT1297 110mm

DoubleY,Plain
MT1305 75mm
MT1306 90mm
MT1307 110mm

DoubleY,WithDoor
MT1315 75mm
MT1316 90mm
MT1317 110mm
SealRing
MT1320 75mm
MT1321 90mm
MT1322 110mm

75mmdia.offset
MT1325 With75mmprojection
MT1326 With150mmprojection

90mmdia.offset
MT1330 With75mmprojection
MT1331 With150mmprojection

110mmdia.offset
MT1335 With75mmprojection
MT1336 With150mmprojection

TerminalGuard
MT1340 75mm
MT1341 90mm
MT1342 110mm

NahaniTrap
MT1345 100mminlet&75mmoutlet

PTrapwithoutairvent
MT1350 Big
MT1351 Small

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

23

Units

PL

GP

SJ

each
each

14125.00
11700.00

14600.00
13000.00

14500.00
12500.00

each
each

1522.50
792.67

1510.00
789.00

1505.00
750.00

each

730.00

850.00

780.00

each

1128.00

1105.00

1215.00

each

2730.00

3165.00

2950.00

each
each
each
each
each
each
each
each
each
each
each

750.00
990.00
1063.75
1500.00
1725.00
2270.00
1300.00
1600.00
3230.00
3500.00
640.00

883.33
1000.00
1360.00
2000.00
2180.00
2430.00
1320.00
1800.00
3050.00
3450.00
880.00

750.00
950.00
1320.00
1470.00
1670.00
2450.00
1250.00
1750.00
3350.00
3220.00
1180.00

each
each
each
each
each
each
pair

950.00
1535.00
570.00
1125.75
1748.67
459.75
122.50

1050.00
1887.50
522.50
1315.00
1780.00
515.00
110.00

1250.00
1950.00
400.00
1282.50
1650.00
395.00
95.00

each
each
each

1465.00
1701.50
1980.00

1265.00
1780.50
2010.00

1450.00
1890.00
1935.00

each
each

1368.00
1935.00

1275.00
2675.00

1690.00
2744.50

each

290.00

275.00

325.00

BASICRATESPLUMBING(SanitaryInstallation,Fittings&accessories)

Baths

MT1355
MT1356

Porcelainbathtub,whiteenamelled,1700x740x440mm
Fibreglassbathtub

Basins,Sinks

Flatbackwashbasin,whitevitreous
MT1360 630x450mm
MT1361 550x400mm

Anglebackwashbasin
MT1365 400mmx400mm,whitevitreouschina

Pedestalforwashbasin
MT1370 whitevitreouschina

SinksWhiteglazedvitreousChina
MT1375 600x450x250

StainlessSteelKitchenSinks
MT1380 singlebowl,450x400x150mm
MT1381 singlebowl,580x480x175mm
MT1382 singlebowl&drainboard,940x460x160mm
MT1383 singlebowl&drainboard,1080x520x175mm
MT1384 singlebowl&drainboard,1150x515x175mm
MT1385 singlebowl&doubledrainboard,1740x520x200mm
MT1386 doublebowl,940x460x160mm
MT1387 doublebowl,1150x520x150mm
MT1388 doublebowl&singledrainboard,1740x520x200mm
MT1389 doublebowl&doubledrainboard,1740x520x165mm
MT1390 singledrainboard,610x460mm

W.CPans

W.C.Pans
MT1400 VitreousChinaEuropeanwhite
MT1401 VitreousChinaEuropeancolour
MT1402 VitreousChinaIndiantype500mm,white
MT1403 VitreousChinaIndiantype580mmOrissa,white
MT1404 VitreousChinaIndiantype580mmOrissa,colour
MT1405 Plasticseat&lidforEuropeanpan
MT1406 VitreousChinaFootrests(250x130x30),forIndianpan

Cisterns

C.I.AutomaticflushingCisternwithfittings
MT1420 5litres
MT1421 10litres
MT1422 12.5litres

VitreousChinacisternlowlevel,incl.fittings&flushbend
MT1430 10litres,white
MT1431 10litres,colour

FloatValve

MT1440

15mmballvalvewithplasticfloat

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

24

Units

PL

GP

SJ

each

731.60

790.00

930.00

each
each
each
each

1010.00
1153.00
415.00
350.00

1015.00
1160.00
420.00
355.00

1018.00
1169.00
450.00
365.00

each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each

460.04
893.80
565.20
491.00
440.00
522.50
572.17
569.30
440.00
491.00
700.20
656.13
657.20
456.17
430.00
644.00
863.00

335.00
582.67
688.00
550.00
397.50
363.33
430.00
494.00
412.00
436.67
546.00
550.00
550.00
432.50
435.00
675.00
885.00

307.50
490.00
490.00
425.00
397.00
499.00
496.00
550.00
437.50
495.00
675.00
695.00
897.00
315.00
421.67
648.00
900.00

each
each
each
each
each
each
each

960.00
1010.00
790.00
550.00
655.00
475.00
300.00

630.00
709.00
860.00
500.00
722.50
350.00
350.00

660.00
750.00
900.00
450.00
695.00
480.00
390.00

each
each
each
each
each
each
each
each
each
each
each
each
each

1898.40
1599.00
1347.50
1240.80
2022.00
2611.00
2616.20
2150.00
1252.80
2580.00
3562.24
2099.25
2398.80

1800.00
1460.00
1350.00
1250.00
2130.00
2654.00
2625.00
1740.00
1025.00
2450.00
3500.00
2100.00
2240.00

1900.00
1470.00
1500.00
1300.00
1980.00
2700.00
2665.00
1900.00
1120.00
2490.00
3380.00
2180.00
2300.00

each

2623.00

2700.00

2780.00

each
each
each

138.75
1300.00
680.00

145.00
1260.00
650.00

150.00
1350.00
700.00

Urinals

MT1445 WhitevitreousChinaflatbacklippedfronttypeurinals,430x260x350mm

Flushfittings
MT1450 c.pflushvalve,32mm
MT1451 c.pflushvalve,32mm,concealed
MT1452 c.pflushbend,long
MT1453 c.pflushvalveelbow

C.pCocks&Spouts

MT1460 15mmpillarcock
MT1461 15mmpillarcock,swanneck,c.pknob
MT1462 15mmpillarcock,aerator,c.pknob
MT1463 20mmpillarcock(forbath)
MT1464 15mmbibcock,vert,c.pknob
MT1465 15mmbibcock,inclined,c.pknob
MT1466 15mmbibcock,longnose,c.pknob
MT1467 15mmbibcock,longbody,c.pknob
MT1468 15mmstopcock,c.pknob
MT1469 20mmstopcock,c.pknob
MT1470 15mmstopcock,concealed,c.pknob
MT1471 15mmstopcock,H\Dconcealed,c.pknob
MT1472 20mmstopcock,H\Dconcealed,c.pknob
MT1473 15mmanglestopcock,c.pknob
MT1474 Wallspout,std,15mm
MT1475 Wallspout,w\odiverter,usedwithsinglelevermixers
MT1476 Wallspout,withdiverter,usedwithsinglelevermixers

C.pBrassShowerfittingsfor15to20mminlet
MT1510 rose,100mmdia
MT1511 rose,150mmdia
MT1512 shower,withflextube
MT1513 shower,revolvingjoint
MT1514 shower,adjustablewithlockingkey
MT1515 showerarm,15mm
MT1516 showerarm,15mm,heavyduty

C.pMixers
MT1530 basin,singlehole,castedspout,15mm
MT1531 basin,closehole,15mm
MT1532 sink,withspoutJpipe,15mm
MT1533 sink,withcastedspoutswinging,15mm
MT1534 wall,nontelephonictype,15mm
MT1535 wall,telephonictypewithcrutchandtel.shower,15mm
MT1536 wall,telephonictypewithoutcrutchandtel.shower,15mm
MT1537 wall,telephonictypewithcrutchandwithouttel.shower,15mm
MT1538 wall,telephonictypewithC.Pbend&flanges,15mm
MT1539 Threeholemixerwithoutpopup,15mm
MT1540 Threeholemixerwithpopup,15mm
MT1541 basin,elbowaction,surgical,15mm
MT1542 basin,elbowaction,surgicalwithshower,15mm
MT1543
bath,withexposedadjustablelegswithtelephoneshowerarrangementwithcrutch,15mm
MT1544 wall,withtelephonicshowerarrangementwith115mmlongbendpipeforoverheadshower
connection,15mm
MT1545 shower,threeinone,withbendflexibletube,andshower&hook,15mm
MT1546 sink,withswivelspout,15mm

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

25

Units

PL

GP

SJ

each
each

540.00
72.00

467.00
93.00

450.00
80.00

pair

100.00

125.00

120.00

each
each

162.83
238.75

185.00
230.00

180.00
220.00

each

64.80

65.00

75.00

each
each

81.00
92.00

90.00
100.00

110.00
125.00

each
each
each
each

280.00
335.00
264.00
170.00

230.00
390.00
240.00
180.00

225.00
380.00
225.00
170.00

each
each
each
each

337.10
381.10
430.20
286.20

312.67
362.67
426.00
296.00

345.00
475.00
500.00
295.00

each
each

150.00
235.00

141.25
216.25

145.00
195.67

each
each

367.50
650.00

380.00
650.00

385.00
670.00

each
each
each
each

325.00
650.00
720.00
635.00

316.25
670.00
710.00
659.00

360.00
580.00
613.00
554.00

each
each
each
each
each
each
each

5390.00
5697.33
6307.50
7681.00
9511.25
14130.00
17235.00

6324.00
6253.00
7200.00
8500.00
11265.00
13780.00
18450.00

5375.00
5450.00
6950.00
7750.00
12550.00
13550.00
19800.00

Traps,c.p
MT1580 32mm
MT1581 forbath

BathroomAccessories

Brackets
MT1585 R.S.orC.I.Brackets

C.p.brasswaste
MT1590 32mm
MT1591 40mm

PVCwaste
MT1595 32mm

C.p.brasschainwithplug
MT1600 32mm
MT1601 40mm

SoapContainers
MT1605 c.pbrasswithbracket
MT1606 c.pLiquidSoapContainer
MT1607 Recessedceramic,200x100mm
MT1608 Recessedceramic,150x150mm

C.pTowelRails
MT1615 20mmx450mm
MT1616 20mmx600mm
MT1617 20mmx750mm
MT1618 C.pTowelRing

C.pCoatHooks
MT1625 single
MT1626 double

Glassself/Mirror

MT1630 GlassShelf
MT1631 Mirror(Bevellededge)600mmx450mm

Toiletpaperholders
MT1635 C.P.brass
MT1636 recessedceramic(white),200x100mm
MT1637 recessedceramic(coloured),200x100mm
MT1638 recessedceramic(rolltype),150x150mm

ElectricWaterHeater

ElectricWaterHeaters
MT1645 10litres,vertical
MT1646 15litres,vertical
MT1647 25litres,vertical
MT1648 35litres,vertical
MT1649 50litres,vertical
MT1650 75litres,vertical
MT1651 100litres,vertical

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

26

Units

PL

GP

SJ

each
each
each
each
each

1765.13
3358.33
5870.00
11720.00
18300.00

1653.75
3708.33
6400.00
12800.00
19250.00

1713.33
3187.50
6225.00
12625.00
17850.00

WaterStorageTanks

H.D.P.Ewaterstoragetank
MT1665 270litres
MT1666 500litres
MT1667 1000litres
MT1668 2000litres
MT1669 3000litres

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code

Description

27

Units

PL

GP

SJ

4624.00
4896.00
4736.00
4336.00
3912.00
10752.00
13888.00
14240.00
13232.00
12768.00
11696.00
6760.00
3920.00
3552.00
1056.00
20048.00
768.00
10256.00
15760.00
8856.00
14624.00
11488.00
7112.00
11520.00
14624.00
968.00
8560.00
7280.00
9264.00
9680.00
9576.00
10056.00
12240.00
12112.00
624.00
3680.00
2080.00
2904.00
3536.00
9680.00
9856.00
3120.00
8984.00
19176.00
2688.00
4752.00
4416.00
3264.00
4208.00
4384.00
3328.00
4416.00
4784.00
3360.00
20416.00
648.00
5344.00
3056.00
440.00

4624.00
4896.00
4736.00
4336.00
3912.00
10752.00
13888.00
14240.00
13232.00
12768.00
11696.00
6760.00
3920.00
3552.00
1056.00
20048.00
768.00
10256.00
15760.00
8856.00
14624.00
11488.00
7112.00
11520.00
14624.00
968.00
8560.00
7280.00
9264.00
9680.00
9576.00
10056.00
12240.00
12112.00
624.00
3680.00
2080.00
2904.00
3536.00
9680.00
9856.00
3120.00
8984.00
19176.00
2688.00
4752.00
4416.00
3264.00
4208.00
4384.00
3328.00
4416.00
4784.00
3360.00
20416.00
648.00
5344.00
3056.00
440.00

Chapter17B:MACHINERYANDPLANTHIRECHARGES

MachineryandPlantHireCharges(CDCLApril2009,July2011)

MP0100
MP0101
MP0102
MP0103
MP0104
MP0105
MP0106
MP0107
MP0108
MP0109
MP0110
MP0111
MP0112
MP0113
MP0114
MP0115
MP0116
MP0117
MP0118
MP0119
MP0120
MP0121
MP0122
MP0123
MP0124
MP0125
MP0126
MP0127
MP0128
MP0129
MP0130
MP0131
MP0132
MP0133
MP0134
MP0135
MP0136
MP0137
MP0138
MP0139
MP0140
MP0141
MP0142
MP0143
MP0144
MP0145
MP0146
MP0147
MP0148
MP0149
MP0150
MP0151
MP0152
MP0153
MP0154
MP0155
MP0156
MP0157
MP0158

AirCompressor(KG)
AirCompressor(P300)
AirCompressor(XAM140)
AirCompressor(VT/6)
AirCompressor(VT/250)
BullDozer(CATD4H)
BullDozer(CATD6D)
BullDozer(D7G)
BullDozer(TD12E)
BullDozer(CATD5MXL)
BullDozer(CATD4G)
AsphaltPave,Hanta
BitumenHeating/StorageTank12000litres
BitumenHeating/StorageTank4000litres
Compactor,PlateType
Crane(Kato,KR250)
Chipsspreader
MotorGrader(MG330)
SpotMixPlant,10/16TPH
SpotMixPlant,6/10TPH
Excavator(PC200)
Excavator(PC120)
Excavator(PC60)
ExcavatorCAT312B
ExcavatorCAT320
WaterPumpKUBOTA
BackhoeLoader(CASE580SuperM)
BackhoeLoader(CAT416)
PayLoader(IH510B)
PayLoader(IH515B)
PayLoader(CAT916)
PayLoader(CAT926E)
PayLoader(CAT930)
PayLoader(CAT928F)
RoadBroom(Mechanical),2595x1220x965
RoadRoller(10tonnes,BRITANIA)
RoadRoller(10tonnes,JAYPEE)
RoadRoller(8tonnes,JESSOP)
RoadRoller(8tonnes,SpeedCraft)
RoadRoller(PneumaticTyre)TS300
RoadRoller(SV91Sakai)
ConcretePump
Concrete/GroutPump,P88
CoreDrillMachine,TS190RS
ForkLiftToyota
Tanker(NISSAN)
Tanker(TATA)
CanterTipper,Mitsubishi
TataLB(1210SE)
TataLB(1612SE)
CanterTipper,LongBody,FE444E(Nissan)
Tripper(Hino),172KD
ISUZUTruck
TractorwithTrailor,Toyota
Trailor(HINO25MT)
RoadBrushHead,Sweetper
RockBreaker
Asphalt/BitumenheatingKettle,IndiaMake
JackHammer

DepartmentofEngineeringServices,MoWHS

day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day

4624.00
4896.00
4736.00
4336.00
3912.00
10752.00
13888.00
14240.00
13232.00
12768.00
11696.00
6760.00
3920.00
3552.00
1056.00
20048.00
768.00
10256.00
15760.00
8856.00
14624.00
11488.00
7112.00
11520.00
14624.00
968.00
8560.00
7280.00
9264.00
9680.00
9576.00
10056.00
12240.00
12112.00
624.00
3680.00
2080.00
2904.00
3536.00
9680.00
9856.00
3120.00
8984.00
19176.00
2688.00
4752.00
4416.00
3264.00
4208.00
4384.00
3328.00
4416.00
4784.00
3360.00
20416.00
648.00
5344.00
3056.00
440.00

BhutanScheduleofRates2011

Code

Description

MP0159
MP0160
MP0161
MP0162
MP0163
MP0164
MP0165
MP0166
MP0167
MP0168
MP0169
MP0170
MP0171
MP0172
MP0173
MP0174
MP0175
MP0200
MP0201
MP0202
MP0203
MP0204
MP0205
MP0206
MP0207
MP0208
MP0209
MP0210
MP0211
MP0212
MP0213
MP0214
MP0215
MP0216
MP0217
MP0218
MP0219
MP0220
MP0221
MP0222

Asphalt/BitumenheatingKettle,JapanMake
ExplosiveVan,FE1210
DaewooDumper/Tipper
Lubricating/ServiceVan,ISUZU
Lubricating/ServiceVan,TATA
MiniDumper,TATA
NissanDumper/TipperCKA12HHT(10MT)
NissanDumper/TipperCKA12HHT(8MT)
SideDumpTruck
TATATipper,1612SE
TATAMiniTruck,407
TrailerCPB12E16772,NISSAN10MT
TrailerShortBodyNISSAN20MT
TruckMountedConcreteMixer,1612SE
TruckwithCrane,HINO/ISUZU
Vibromax
WorkshopVan
Roller,CATCS551
WaterpumpAVIType
WelderElectricarc
PayLoader(CAT910)
Crusher(KurimotoFJ2010R)
ConcreteMixer(7/5Cft)
ConcreteVibrator(M/C5)
StoneCrusher(Sisco)
BullDozer(IHTD20E)
Hyd.Excavator(IH640)
MotorGrader(CAT130G)
Truck/Tipper(Tata,1210SK32)
Compressor(CPS300)
RoadBroom(TD96)
Asphalt/BitumenSprayer(Hino)
Drill(PinjorMachine)
AirCompressorCPS300
AirCompressorCPS325
AirCompressorP310
ExcavatorSK115
ExcavatorSK200
MotorGraderCASE845
MotorGraderCAT130G

28

Units

Note: Buit-up rates are inclusive of HSD, M.Oil, Operators/drivers, etc complete.

DepartmentofEngineeringServices,MoWHS

day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day

PL

GP

SJ

6504.00
4984.00
5408.00
4880.00
4592.00
1552.00
5144.00
4888.00
2520.00
4096.00
2800.00
8480.00
15080.00
7008.00
5952.00
864.00
4848.00
10024.00
1016.00
175.00
8424.00
6240.00
896.00
752.00
4704.00
17392.00
13256.00
10752.00
3984.00
4928.00
480.00
5232.00
1088.00
4928.00
5792.00
5120.00
11640.00
15104.00
12984.00
10752.00

6504.00
4984.00
5408.00
4880.00
4592.00
1552.00
5144.00
4888.00
2520.00
4096.00
2800.00
8480.00
15080.00
7008.00
5952.00
864.00
4848.00
10024.00
1016.00
175.00
8424.00
6240.00
896.00
752.00
4704.00
17392.00
13256.00
10752.00
3984.00
4928.00
480.00
5232.00
1088.00
4928.00
5792.00
5120.00
11640.00
15104.00
12984.00
10752.00

6504.00
4984.00
5408.00
4880.00
4592.00
1552.00
5144.00
4888.00
2520.00
4096.00
2800.00
8480.00
15080.00
7008.00
5952.00
864.00
4848.00
10024.00
1016.00
175.00
8424.00
6240.00
896.00
752.00
4704.00
17392.00
13256.00
10752.00
3984.00
4928.00
480.00
5232.00
1088.00
4928.00
5792.00
5120.00
11640.00
15104.00
12984.00
10752.00

Bhutan Schedule of Rates 2011

SECTION 2
Mechanical Transportation Costs

BHUTANSCHEDULEOFRATES2011

1
CARRIAGEOFMATERIALSMECHANICALTRANSPORTINCLUDINGLOADING,UNLOADINGANDSTACKING

1 HILLROADS
Rate
sl.no

Materials

quantity
payable

Unit

1km

2km

3km

4km

5km

beyond5
upto10
kmfor
everykm

beyond
10upto
20kmfor
everykm

beyond
20upto
50kmfor
everykm

10

1 Lime,moorum,buildingrubbish

cu.m

125.19

134.80

144.21

153.19

161.78

7.55

5.67

7.08

2 Dryearth

cu.m

4.8

156.48

168.50

180.26

191.49

202.22

9.44

7.08

8.85

3 ManureorSludge

cu.m

5.7

131.78

141.89

151.80

161.25

170.29

7.95

5.96

7.45

4 ExcavatedRock

cu.m

250.37

269.60

288.42

306.38

323.55

15.11

11.33

14.16

5 Sand,stoneaggregatesoflessthan40mmsize cu.m

150.22

161.76

173.05

183.83

194.13

9.06

6.80

8.50

6 Stoneaggregatesofmorethan40mmsize

cu.m

4.6

163.29

175.82

188.10

199.82

211.01

9.85

7.39

9.24

7 stoneboulders

cu.m

4.25

176.73

190.30

203.59

216.27

228.39

10.66

8.00

10.00

8 bricks

1000nos

2000

350.56

379.40

407.63

434.58

460.33

22.66

17.00

21.25

9 tiles

1000nos

3000

233.71

252.93

271.75

289.72

306.89

15.11

11.33

14.16

10 cement

tonne

87.64

94.85

101.91

108.64

115.08

5.67

4.25

5.31

11 GI,CIPipes

tonne

100.16

108.40

116.46

124.16

131.52

6.47

4.86

6.07

12 Concrete

tonne

100.16

108.40

116.46

124.16

131.52

6.47

4.86

6.07

13 steel

tonne

87.64

94.85

101.91

108.64

115.08

5.67

4.25

5.31

14 bitumen

tonne

4.5

155.80

168.62

181.17

193.14

204.59

10.07

7.55

9.44

15 timber

cu.m

7.5

100.15

107.84

115.37

122.55

129.42

6.04

4.53

5.67

BHUTANSCHEDULEOFRATES2011

2.PLAINROADS
Rate
sl.no

Materials

quantity
payable

Unit

1km

2km

3km

4km

beyond5
upto10
kmfor
everykm

5km

beyond
beyond
10upto
20kmfor
20kmfor
everykm
everykm

10

1 Lime,moorum,buildingrubbish

cu.m

123.06

131.23

139.08

146.63

153.91

6.54

5.12

3.82

2 Dryearth

cu.m

4.8

153.83

164.03

173.85

183.29

192.39

8.17

6.39

4.78

3 ManureorSludge

cu.m

5.7

129.54

138.13

146.40

154.35

162.01

6.88

5.38

4.02

4 ExcavatedRock

cu.m

246.12

262.45

278.16

293.27

307.82

13.07

10.23

7.64

5 Sand,stoneaggregatesoflessthan40mmsize cu.m

147.67

157.47

166.89

175.96

184.69

7.84

6.14

4.58

6 Stoneaggregatesofmorethan40mmsize

cu.m

4.6

160.52

171.17

181.41

191.26

200.75

8.52

6.67

4.98

7 stoneboulders

cu.m

4.25

173.73

185.26

196.35

207.01

217.28

9.23

7.22

5.39

8 bricks

1000nos

2000

344.19

368.68

392.24

414.90

436.73

19.61

15.35

11.46

9 tiles

1000nos

3000

229.46

245.79

261.49

276.60

291.15

13.07

10.23

7.64

10 cement

tonne

86.05

92.17

98.06

103.73

109.18

4.90

3.84

2.87

11 GI,CIPipes

tonne

98.34

105.34

112.07

118.54

124.78

5.60

4.38

3.27

12 Concrete

tonne

98.34

105.34

112.07

118.54

124.78

5.60

4.38

3.27

13 steel

tonne

86.05

92.17

98.06

103.73

109.18

4.90

3.84

2.87

14 bitumen

tonne

4.5

152.97

163.86

174.33

184.40

194.10

8.71

6.82

5.09

15 timber

cu.m

7.5

98.45

104.98

111.26

117.31

123.13

5.23

4.09

3.06

NOTE:Formanualtransportation,refertheLMC(CIVIL)2011andSBRW2009

Bhutan Schedule of Rates 2011

SECTION 3 - Built Up Rates

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Chapter1:DISMANTLING&DEMOLITIONWORK

Concrete

DD0001

Demolishingcementconcrete1:3:6&richer,includingdisposalof
materialswithin50mlead

cu.m

602.66

602.66

602.66

DD0002

Demolishingcementconcrete1:4:8&leaner,includingdisposalof
materialswithin50mlead

cu.m

373.27

373.27

373.27

DD0003

Demolishingreinforcedconcrete,includingstackingsteelbarsand
disposalofrubbishwithin50mlead

cu.m

878.55

878.55

878.55

cu.m

158.48

158.48

158.48

229.39
469.20

229.39
469.20

Limeconcrete
DD0004

Demolishinglimeconcreteanddisposalofrubbishwithin50mlead

StoneMasonry
Demolishingstonerubblemasonryincludingstackingusefulmaterials&disposalofrubbishwithin50mlead

DD0005
DD0006

Inlimemortar
Incementmortar

229.39
469.20

cu.m
cu.m

Dismantlingdressedashlarfacestoneworkincludingstackingusefulmaterials&disposalofrubbishwithin50mlead

DD0007
DD0008

Inlimemortar
Incementmortar

291.95
563.04

291.95
563.04

291.95
563.04

cu.m
cu.m

238.71
264.50

238.71
264.50

238.71
264.50

cu.m

851.86

851.86

851.86

cu.m

787.21

787.21

787.21

2.29

2.29

2.29

250.24

250.24

250.24

135.55
160.57
396.21

135.55
160.57
396.21

135.55
160.57
396.21

899.68
1027.78
1282.92

899.68
1027.78
1282.92

cu.m
cu.m

Removingmortarfromstones,cleaningstonesandconcretearticles,andarranginginstacks
DD0009
DD0010

Inlimemortar
Incementmortar

Brick&HollowBlockMasonry
DD0011
DD0012
DD0013
DD0014

Demolishinghollowblockmasonryincludingstackingusefulmaterials
&disposalofrubbishwithin50mlead
Demolishingreinforcedbrickwork,includingstackingsteelbarsand
disposalofrubbishwithin50mlead
Extraforscraping,cleaning,straighteningreinforcementfromR.C&
reinforcedbrickwork
Extraforcuttingreinforcementbarsinreinforcedcementconcreteand
reinforcedbrickwork(paymenttobemadethecrosssectionalareaof
RCCorRBwork)

kg
sq.m

Demolishingbrickworkincludingstackingusefulmaterials&disposalofrubbishwithin50mlead
DD0015
DD0016
DD0017

Inmudmortar
Inlimemortar
Incementmortar

cu.m
cu.m
cu.m

RemovingMortarfrombricksandcleaningbricksincludingstackingusefulmaterialswithin50mlead
DD0018
DD0019
DD0020

FromBWinmudmortar
FromBWinlimemortar
FromBWincementmortar

1000#
1000#
1000#

899.68
1027.78
1282.92

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

SteelWork
Dismantlingsteelworkinsinglesectionsincludingdismemberingandstackingwithin50mlead
DD0021

InRSjoists

kg

0.71

0.71

0.71

DD0022

Inchannels,angles,teesandflats

kg

0.63

0.63

0.63

DD0023

Dismantlingsteelworkinbuiltupsectionsinchannels,angles,teesand
flatsinallgussetplates,bolts,nuts,cuttingrivets,weldingetc.
includingdismemberingandstackingwithin50mlead

kg

1.46

1.46

1.46

DD0024

Dismantlingsteelworkinbuiltupsectionswithoutdismemberingand
stackingwithin50mlead

kg

1.25

1.25

1.25

cu.m

611.66

611.66

611.66

55.61

55.61

55.61

cu.m

121.64

121.64

121.64

cu.m

0.56

0.56

0.56

Woodwork

DD0025

Dismantlingwoodworkofsectionalarea40sq.cmandabovein
frames,trusses(<10mspan)includingstackingwithin50mlead

DD0026

Dismantlingwoodworkofsectionalarea<40sq.cminframes,trusses
includingstackingwithin50mlead
Extrafordismantlingtrusses,rafters,purlinsetc.ofeveryadditional
spanof1metreorpartthereofforspan>10m(sectionalarea>
40sq.cm)
Extrafordismantlingtrusses,rafters,purlinsetc.everyadditionalspan
of1metreorpartthereof>10m(sectionalarea<40sq.cm)

DD0027

DD0028

DD0029

Dismantlingdoors,windows,andclerestorywindows<3sq.m(steel,
wood)includingarchitrave,holdfasts,stackingwithin50mlead

each

95.15

95.15

95.15

DD0030

Dismantlingdoors,windowsandclerestorywindows>3sq.m
(steel\wood)includingarchitrave,holdfasts,andstackingwithin50m
lead
Takingoutdoors,windowsandclerestorywindowsshutters<3sq.m
(steel,wood)includingstackingwithin50mlead
Takingoutdoors,windowsandclerestorywindowshutters>3sq.m
(steelorwood)includingstackingwithin50mlead

each

129.87

129.87

129.87

each

36.28

36.28

36.28

each

86.99

86.99

86.99

sq.m

38.92

38.92

38.92

cu.m

260.67

260.67

260.67

DD0031
DD0032

Flooring

DD0040
DD0041

Dismantlingwoodenflooringincludingstackingusefulmaterials&
disposalofrubbishwithin50mlead
Dismantlingdrybrickpatchinginfloors,drainsetcincludingstacking
usefulmaterials&disposalofrubbishwithin50mlead

DD0042

Dismantlingstoneslabflooringlaidincementmortarincluding
stackingusefulmaterials&disposalofrubbishwithin50mlead

sq.m

53.09

53.09

53.09

DD0043

Dismantlingjackarchroofingandfloorsincludingstackinguseful
materials&disposalofrubbishwithin50mlead

sq.m

52.13

52.13

52.13

sq.m

43.44

43.44

43.44

sq.m

46.22

46.22

46.22

sq.m

19.12

19.12

19.12

Roofing

DD0045
DD0046

DismantlingG.Isheetsincludingridges,hips,valleys,gutters&stacking
materialswithin50mlead
Dismantlingtiledroofingwithbattenboardingetc.completeincluding
stackingusefulmaterials&disposalofrubbishwithin50mlead

Metalwork

DD0050

Dismantlingexpandedmetal,fabrics&battens,beadingincluding
stackingusefulwithin50mlead

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

kg

9.18

9.18

9.18

each

87.06

87.06

87.06

each

103.62

103.62

103.62

each

26.07

26.07

26.07

Fencing

DD0055
DD0056
DD0057
DD0058

Dismantlingbarbedwire,flexiblewireincludingmakingrolls&stacking
within50mlead
Dismantlingfenceposts,struts\T&Liron\pipes&earth
work\demolishingofconcreteandstackingwithin50mlead
Dismantlingfenceposts,strutsR.Cincludingearthwork\demolishing
concretefootings,stacking,50mlead
Cuttingballies\woodenpostsatgroundorprojectionaboveconcrete&
stackingwithin50mlead

Ceiling&Cladding

DD0065

DismantlingcementA.C,celotex,hardboardceiling,partition,including
stackingusefulmaterials&disposalrubbishwithin50m

sq.m

14.87

14.87

14.87

DD0066

Dismantlingofekrawallincementmortar1:6orricherincluding
stackingusefulmaterials&disposalofrubbishwithin50mlead

sq.m

26.34

26.34

26.34

DD0067

Dismantlingoldplasterorskirting,rakingoutjointsandcleaningthe
surfaceforplasterincludingdisposalofrubbishwithin50mlead

sq.m

10.43

10.43

10.43

Pipes

DemolishingofoldS.Wpipesincludingbreakingjoints,bedconcrete,stackingofusefulmaterials&disposalofrubbishwithin50m
lead
DD0075
DD0076
DD0077

100mmdia
150mmdia
200mmdia

m
m
m

22.31
24.61
26.28

22.31
24.61
26.28

22.31
24.61
26.28

DismantlingCIpipesincludingexcavationandrefillingtrenchesaftertakingoutthepipes,breakingleadcaulkedjoints,meltingof
leadandmakingintoblocks,stackingofpiesatsiteanddisposalofrubbishwithin50mlead
DD0078
DD0079
DD0080

Upto150mmdia
From150mmupto300mm
Above300mmdia

m
m
m

70.37
105.90
206.38

69.77
104.49
204.43

70.10
105.26
205.57

DismantlingofG.IorHDPEpipesofdiameter100mmto250mmincludingbreakingbedconcrete,clamps,etc.andstackingofuseful
materials&disposalofrubbishwithin50mlead
DD0085
DD0086

G.IPipes
H.D.P.EPipes

m
m

20.23
26.69

20.23
26.69

20.23
26.69

PrecastWalls
Dismantlingofprecastconcreteorstoneslabsinwalls,partitionwallsetc.includingstackingofusefulmaterials&disposalof
rubbishwithin50mlead
DD0090
DD0091

Upto40mmthickness
Above40mmthicknessandupto74mmthickness

sq.m
sq.m

60.31
88.76

60.31
88.76

60.31
88.76

DD0095

Dismantlingwaterboundmacadamroadincludingstackingofuseful
materials&disposalofrubbishwithin50mlead

sq.m

46.71

46.71

46.71

DD0096

Dismantlingbituminousroadincludingcutting,stackingofuseful
materials&disposalofrubbishwithin50mlead

sq.m

7.19

7.19

7.19

180.24

180.24

180.24

Roads

Cisterns
DD0100

Dismantlingofflushingcisternofanysizeincludingstackingofuseful
materials&disposalofrubbishwithin50mlead

no

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Chapter2:CLEARINGANDGRUBBING

ClearingGrass

CG0001

Clearinggrassincludingremovalofrubbishwithin50mofsite

sq.m

2.21

2.21

2.21

CG0002

Clearingjungleincludinguprootingofvegetation&treesofgirth<
300mm&disposalwithin50mofthesite

sq.m

6.99

6.99

6.99

FellingTrees(Manually)

Fellingtreesincludingcuttingoftrunksandbranches,removalofroots,stackingofserviceablematerialsanddisposalofrubbish
within50mlead
CG0010
CG0011
CG0012
CG0013

Girth300to600mm
Girth600to1200m
Girth1200to2400
Girth>2400mm

each
each
each
each

65.19
294.03
1368.49
2736.99

65.19
294.03
1368.49
2736.99

65.19
294.03
1368.49
2736.99

FellingTrees(Dozer)

Fellingoftreesincludingremovalofrootsanddisposalofrubbishusingbulldozer(excludingcuttingoftrunks,branches&stacking)

CG0020
CG0021
CG0022
CG0023

Girth300to600mm
Girth600to1200m
Girth1200to2400
Girth>2400m

Each
Each
Each
Each

73.04
275.21
550.42
999.39

73.04
275.21
550.42
999.39

73.04
275.21
550.42
999.39

cu.m

47.13

47.13

47.13

LandslideDebris

CG0030

Clearinggrassremovaloflandslidedebris&surfacematerialincluding
excavation&disposalwithin50mlead

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Chapter3:EARTHWORK

Excavation(Manually)

Surfacedressingofground,includingremovalofvegetationsandinequalities<150mmdeep,disposalofrubbishwithin50mlead
and1.5mlifts
EW0001
EW0002

OrdinarySoil
HardSoil

sq.m
sq.m

7.07
9.93

7.07
9.93

7.07
9.93

Ploughingtheexistinggroundtoadepth150mmto250mm,andwateringthesame
EW0010 OrdinarySoil
sq.m
2.61
2.61
2.61
EW0011 HardSoil
sq.m
6.26
6.26
6.26

Earthworkinsurfaceexcavation,depth<300mm,width>1.5m,area>10Sq.minplan,includingdisposalofexcavatedearthwithin
50mlead&1.5mliftanddisposedsoiltobeneatlydressed
EW0020 OrdinarySoil
sq.m
13.05
13.05
13.05
EW0021 HardSoil
sq.m
18.25
18.25
18.25

Earthworkinexcavationoverareas,depth>300mm,width>1.5m,area>10Sq.monplan,includingdisposalofexcavatedearth
within50mleadand1.5mlift&disposedsoiltobeneatlydressed
EW0030 OrdinarySoil
cu.m
89.69
EW0031 HardSoil
cu.m
116.01
EW0032 Ordinaryrockwithorwithoutblasting
cu.m
367.17
EW0033 Hardrockrequiringblasting
cu.m
510.29
EW0034 Hardrockrequiringchiselling(whereblastingisprohibited)
cu.m
758.16

Extraforeveryadditionalleadof25mbeyond50mupto250manddeposittoalevelupto1.5m
EW0035 AllKindsofSoil
cu.m
27.11

Extraforeveryadditionalleadof250mbeyond50mupto1000manddeposittoalevelupto1.5m
EW0040

AllKindsofSoil

89.69
116.01
367.17
510.29
758.16

89.69
116.01
367.17
510.29
758.16

27.11

27.11

cu.m

53.05

53.05

53.05

cu.m
cu.m

75.99
102.36

75.99
102.36

75.99
102.36

70.01
140.02

70.01
140.02

70.01
140.02

DozerExcavation

EarthworkinexcavationoverareasbyDozerincludinglevellinganddressing
EW0046
EW0047

AllkindsofSoil
Allkindsofrocks(blasted)

BlastingOperation

Blastingofrockscompleteexcludingthecostofcollectionandstackingofblastedrock
EW0055
EW0056

Ordinaryrock
Hardrock

cu.m
cu.m

SilentBlaster

Breakingofrocksusingnonexplosiveblaster(silentblaster)inoverareas,depth>300mm,width>1.5m,area>10sq.monplan
includingstackingofbouldersorusefulmaterialsanddisposalofrubbishetc.complete
EW0065
EW0066

Ordinaryrock
Hardrock

cu.m
cu.m

4404.60
4531.88

DepartmentofEngineeringServices,MoWHS

4404.60
4531.88

4404.60
4531.88

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Breakingofrocksusingnonexplosiveblaster(silentblaster)infoundationtrencheswidth<1.5m,area<10sq.monplanincluding
stackingofbouldersorusefulmaterialsanddisposalofrubbishetc.complete
EW0075
EW0076

Ordinaryrock
Hardrock

cu.m
cu.m

4442.97
4594.44

4442.97
4594.44

4442.97
4594.44

Excavation&Banking

Earthworkinroughexcavation&bankingofexcavatedearthinlayers<200mmindepthforroad,flood/guidebanks&
depressions,includingwatering,powerrolling,dressing,leadupto50m&1.5mlift
EW0085

AllKindsofSoil

cu.m

141.29

141.29

141.29

Bankingexcavatedearthforroad,floodbanks,guidebanks&depressions,inlayers<200mmdepth,includingwatering,rolling&
dressingupwithin50mlead&1.5mlift
EW0096
EW0097

AllKindsofSoil
Deductionfornotrollingwithpowerrollerinlayeredbankingworks

cu.m
cu.m

95.76
23.60

95.76
23.60

95.76
23.60

EW0098 Deductionfornotwateringinlayered,bankingworks
cu.m
4.44
4.44
4.44

Excavationinfoundationtrenchesordrainsnotexceeding1.5minwidthorarea10sq.monplan,includingdressing&ramming,
disposalofsurplussoilwithin50mlead&1.5mlift
EW0105 OrdinarySoil
EW0106 HardSoil
EW0107 Ordinaryrockwithorwithoutblasting
EW0108 Hardrockrequiringblasting
EW0109 Hardrockrequiringchiselling(whereblastingisprohibited)

Extraforeveryadditionalliftof1.5morpartthereof

cu.m
cu.m
cu.m
cu.m
cu.m

95.67
122.62
396.62
587.20
769.21

95.67
122.62
396.62
587.20
769.21

95.67
122.62
396.62
587.20
769.21

EW0115 Allkindsofsoils
EW0116 Allkindsofrocks

Extrafortrench,pitworkspercu.mpermdepth

cu.m
cu.m

10.43
18.56

10.43
18.56

10.43
18.56

EW0125
EW0126

cu.m
cu.m

36.38
30.65

36.38
30.65

36.38
30.65

Underwater
Infoulconditions

Excavation/RefillingforPipes/Cables

Handexcavationandrefillinginlayers<200mm,oftrenchesforpipes&sockets,cables,includingdressingofsides/rammingof
bottom,depthupto1.5m,disposalofsurplusmaterialwithinleadof50m:Allkindsofsoil
EW0135 Pipes,cablesetc.80mm<dia<300mm
m
133.91
133.91
133.91
EW0136 Pipes,cablesetc.dia.>300mm
m
209.02
209.02
209.02

Handexcavationandrefillinginlayers<200mm,oftrenchesforpipes&sockets,cables,includingdressingofsides/rammingof
bottom,depthupto1.5m,disposalofsurplusmaterialwithinleadof50m:Ordinaryrockwithorwithoutblasting
EW0155 Pipes,cablesetc.80mm<dia<300mm
m
545.11
545.11
545.11
EW0156 Pipes,cablesetc.dia.>300mm
m
627.24
627.24
627.24

Handexcavationandrefillinginlayers<200mm,oftrenchesforpipes&sockets,cables,includingdressingofsides/rammingof
bottom,depthupto1.5m,disposalofsurplusmaterialwithinleadof50m:Hardrockrequiringblasting
EW0165
EW0166

Pipes,cablesetc.80mm<dia<300mm
Pipes,cablesetc.dia.>300mm

m
m

DepartmentofEngineeringServices,MoWHS

768.09
883.88

768.09
883.88

768.09
883.88

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Handexcavationandrefillinginlayers<200mm,oftrenchesforpipes&sockets,cables,includingdressingofsides/rammingof
bottom,depthupto1.5m,disposalofsurplusmaterialwithinleadof50m:
Hardrockrequiringchiselling(whereblastingisprohibited)
EW0175 Pipes,cablesetc.80mm<dia<300mm
m
EW0176 Pipes,cablesetc.dia.>300mm
m

Extraforexcavatingtrenchesforpipes,cablesetc.,1.5<depth<3m

981.03
1128.97

981.03
1128.97

981.03
1128.97

EW0185
EW0186

277.51
1411.21

277.51
1411.21

277.51
1411.21

AllkindsofSoils
AllkindsofRocks

m
m

Fillingorbedding

EW0195

Fillingoftrenches,sidesoffoundationsetc.inlayers<200mmusing
selectedexcavatedearth,rammingetc.withinlead50m&lift1.5m

cu.m

61.62

61.62

61.62

EW0196

Providing&layingsandbedding,includingwatering,ramming,dressing

cu.m

307.55

398.52

445.75

EW0197

Providing&layingdryearthbedding,includingconsolidatingeach
depositedlayerbywatering,ramminganddressing

cu.m

153.01

153.01

153.01

96.89
99.29
103.49

94.61
97.01
101.21

EW0215 Depthnotexceeding1.5m
sq.m
305.44
267.74
EW0216 1.5m<depth<3m
sq.m
311.77
274.07
EW0217 3m<depth<4.5m
sq.m
318.09
280.38

Closetimberingincludinglagging&struttingofshafts,wells,cesspits,manholes(persq.mfaceareatimbered

261.00
267.33
273.64

EW0225
EW0226
EW0227

TimberingforTrenches&cuts

Opentimberingoverareasincludinglagging&struttingoftrenches,cuts(persq.mfaceareatimbered)
EW0205 Depthnotexceeding1.5m
sq.m
109.65
EW0206 1.5m<depth<3m
sq.m
112.05
EW0207 Depth>3m
sq.m
116.25

Closetimberingoverareasincludinglagging&struttingoftrenches,cuts(persq.mfaceareatimbered)

Depthnotexceeding1.5m
1.5m<Depth<3m
3m<Depth<4.5m

sq.m
sq.m
sq.m

277.38
285.65
294.50

244.52
252.79
261.63

238.64
246.91
255.76

cu.m

88.55

88.55

88.55

sq.m

100.73

104.23

103.35

DeWatering

EW0235

Pumpingoutwatercausedbysprings,river,seepage,brokenwater
mains,drains,andalike

AntiTermiteTreatment

EW0240

ProvidingandinjectingchemicalemulsionforPreconstructionanti
termitetreatmentusingaldrinemulsifiable0.5%concentration

ProvidingandinjectingchemicalemulsionforPostconstruction,usingaldrinemulsifiable0.5%concentration
EW0245
EW0246
EW0247
EW0248
EW0249

Alongoutsideoffoundation
Alongexternalwallsbelowconcrete\masonryapron
Underexistingfloorsincludingdrilling&plugging12mmholeswith
mortar1:2
Voidsinmasonryincludingdrillingholesat45degree&pluggingwith
cementmortar1:2)
Woodwork(usingchemicalinoilorkerosenebasedsolution)including
drilling&plugging6mmholes

m
m
sq.m

224.87
159.61
281.99

228.37
160.19
282.76

227.50
160.04
282.56

176.91

177.29

177.19

169.41

169.53

169.50

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Chapter4:DRAINAGE

PlinthProtection

Providingandlaying50mmthickPlinthProtectionandgroutedwithfinesandmixincludingwellrammed,finishingthetopsmooth

DR0001
DR0002
DR0003
DR0004

Withcementconcrete1:3:6,20mmaggregates,laidover75mmthick
layerofcompactedgravel(40mm)
Withcementconcrete1:3:6,20mmgravelorshingleslaidover75mm
thicklayerofcompactedgravel(40mm)
Withcementconcrete1:3:6,20mmaggregate,laidover75mmthick
layerofcompacteddrybrickaggregate(40mm)
Withcementconcrete1:3:6,20mmgravelorshingleslaidon75mm
thicklayerofcompacteddrybrickaggregate(40mm)

sq.m

255.07

278.62

292.14

sq.m

218.34

241.15

247.96

sq.m

315.20

322.02

330.00

sq.m

293.92

297.23

297.12

OpenSurfaceDrains

Constructingsecondclassbrickmasonryopensurfacedrainincementmortar1:4includingearthworkinexcavation100mmthick
concretebed1:5:10,40mmaggregateand25mmthickcementconcrete
1:2:4,12mmaggregateforfillinghaunchesincluding12mmcementplastering1:4withafloatingcoatofneatcementanddisposal
ofsurplusearthetc.complete
DR0010 100mmx200mmdepth
m
393.47
430.61
434.36
DR0011 150mmx200mmdepth
m
413.53
453.06
458.02
DR0012 250mmx300mmdepth
m
571.08
624.70
629.42
DR0013 300mmx450mmdepth
m
850.69
924.77
922.16

Extraforadditionaldepthofbrickmasonrydrain
DR0020 100mmwide........permetreadditionaldepth
m
1194.18
1292.45
1268.46
DR0021 150mmwide........permetreadditionaldepth
m
1199.10
1297.36
1273.37
DR0022 250mmwide........permetreadditionaldepth
m
1208.54
1306.80
1282.81

Constructingrandomrubblemasonryopensurfacedrainincementmortar1:6includingearthworkinexcavation,100mmthick
concretebase1:5:10,40mmaggregate25mmthickcementconcrete1:2:4,
12mmaggregateforfillinghaunches,including20mmcementplasterwithafloatingcoatofneatcement,disposalofsurplusearth

DR0030 100x200mmdepth
DR0031 150x200mmdepth
DR0032 250x300mmdepth
DR0033 300mmx450mmdepth

Extraforadditionaldepthofrandomrubblemasonrydrain

m
m
m
m

566.65
586.01
766.16
1331.67

637.09
658.73
862.90
1529.20

662.21
685.01
896.85
1590.23

DR0040
DR0041
DR0042

m
m
m

1502.24
1507.03
1516.59

1706.55
1711.33
1720.90

1763.05
1767.83
1777.40

100mmwide........permetreadditionaldepth
150mmwide........permetreadditionaldepth
250mmwide........permetreadditionaldepth

StonewarePipeDrains&Fittings
Providing,layingandjointingglazedStoneWarepipeswithstiffmixtureofcementmortar1:includingtestingofjointscomplete

DR0047
DR0048
DR0049

100mmdia.
150mmdia.
200mmdia.

m
m
m

318.75
657.17
1105.17

DepartmentofEngineeringServices,MoWHS

322.15
664.13
1116.86

323.66
667.33
1122.34

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Providing,layingandjointingglazedStoneWarepipeswithstiffmixtureofcementmortar1:1includingtestingofjointscomplete

DR0050 100mmdia.
m
325.27
330.06
331.90
DR0051 150mmdia.
m
666.99
676.04
679.73
DR0052 200mmdia.
m
1118.13
1132.59
1138.71
DR0053 230mmdia.
m
1358.32
1375.62
1383.02
DR0054 250mmdia.
m
1517.94
1537.29
1545.58
DR0055 300mmdia.
m
1868.38
1892.67
1903.00
DR0056 350mmdia.
m
2236.13
2266.58
2279.29
DR0057 400mmdia.
m
2612.05
2648.21
2663.21
DR0058 500mmdia.
m
3386.31
3431.09
3450.12
DR0059 600mmdia.
m
4044.10
4096.98
4119.62

Providingandlayingcementconcrete1:5:10,40mmaggregatesencasingStoneWarepipesincluding150mmconcretebed
DR0060 100mmdiaS.Wpipe
m
435.28
488.35
517.07
DR0061 150mmdiaS.Wpipe
m
466.35
523.21
553.99
DR0062 200mmdiaS.Wpipe
m
535.72
601.03
636.39

Providing&layingcementconcrete1:5:10,40mmaggregatesuptohaunchesofS.Wpipesincluding150mmconcretebed
DR0070
DR0071
DR0072

100mmdia.S\Wpipe
150mmdia.S\Wpipe
200mmdia.S\Wpipe

m
m
m

291.78
320.47
373.13

327.35
359.54
418.63

346.61
380.69
437.29

Providing&fixingsquaremouthS.WgullytrapAgradeincludingC.Igrating,C.I.coverwithframeof300x300mm,brickmasonry
chamber
DR0080
DR0081
DR0082

100x100mmPType
150x100mmPorSType
180x150mmPorSType

each
each
each

1585.99
1724.30
1811.11

1598.13
1902.97
1850.75

1595.36
1902.97
1883.54

R.CPipes&Fittings

Providing&layingNP2classR.Cpipes,includingcollars,jointingincementmortar1:2includingtestingofjointsetc.complete
DR0088
DR0089
DR0090
DR0091
DR0092
DR0093
DR0094
DR0095
DR0096
DR0097

100mmdia
150mmdia
225mmdia.
300mmdia.
450mmdia.
600mmdia.
750mmdia.
900mmdia.
1050mmdia.
1200mmdia.

m
m
m
m
m
m
m
m
m
m

477.06
525.31
663.69
802.31
1195.14
1672.17
2357.01
2979.90
5937.42
8518.31

483.27
532.94
665.36
804.35
1199.24
1677.70
2362.21
2986.78
5937.48
8519.13

484.80
534.80
665.89
805.01
1200.49
1679.39
2363.94
2988.55
5937.57
8519.35

Manholes

ConstructingBrickmasonrymanholeincementmortar1:5,R.C.Ctopslabwith1:2:420mmaggregates,foundationconcrete1:4:8
40mmaggregates,12mmplasterinCM1:3finishedwithfloatingcoatof
neatcementandmakingchannelsincementconcrete1:2:420mmaggregates,neatlyfinishedcomplete
DR0105
DR0106
DR0107

Insidedimension900x800mm&450mmdeepincludingC.I.cover&
frame(weight>38kg)
Insidedimension900x800mm&600mmdeepincludingC.I.cover&
frame(weight>38kg)
Insidedimension1200x900mm&900mmdeepincludingC.I.cover&
frameweight>116kg)

each

6618.13

7190.08

7267.73

each

7105.25

7729.23

7790.49

each

16854.03

17966.62

18176.05

m
m

4127.03
4933.67

4474.13
5348.92

4356.13
5208.97

Extraforadditionaldepthofmanholes
DR0115
DR0116

900x800mm
1200x900mm

DepartmentofEngineeringServices,MoWHS

10

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

cu.m
cu.m
cu.m
cu.m
cu.m
cu.m

6419.72
4475.49
3503.69
2737.85
2325.47
1972.01

7765.21
5415.70
4241.36
3312.30
2812.04
2383.24

8096.26
5658.83
4440.60
3473.63
2952.95
2506.66

cu.m
cu.m

6397.43
8102.98

6901.03
8258.59

6040.58
8165.77

cu.m

344.99

344.99

344.99

cu.m
cu.m
cu.m

20381.07
15336.26
9503.51

21265.42
16028.54
9962.48

21576.25
16277.38
10133.55

cu.m
cu.m

7142.90
4665.76

7841.49
5142.90

8318.36
5464.05

Chapter5:MORTARS

CementMortar

MR0001
MR0002
MR0003
MR0004
MR0005
MR0006

Cementmortar1:1(1cement:1sand)
Cementmortar1:2(1cement:2sand)
Cementmortar1:3(1cement:3sand)
Cementmortar1:4(1cement:4sand)
Cementmortar1:5(1cement:5sand)
Cementmortar1:6(1cement:6sand)

LimeMortar

MR0010
MR0011

Limemortar1:2(1limeputty:2BrickPowder)
LimeMortar1:1:1(1Limeputty:1BrickPowder:1Sand)

MudMortar

MR0015

Mudmortar

WhiteCementMortar
MR0020
MR0021
MR0022

WhiteCementmortar1:2(1whitecement:2sand)
WhiteCementmortar1:3(1whitecement:3sand)
WhiteCementmortar1:5(1whitecement:5sand)

CementLimeMortar
MR0025
MR0026

Cementlimemortar1:1:3(1cement:1limeputty:3sand)
Cementlimemortar1:1:6(1cement:1limeputty:6sand)

DepartmentofEngineeringServices,MoWHS

11

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Chapter6:CONCRETEWORK

PlainCementConcrete

ProvidingandlayinginpositionplaincementconcreteexcludingthecostofcenteringandshutteringAllworkuptoplinthlevel.

CW0001

1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)

cu.m

5122.21

6018.08

6360.28

CW0002

cu.m

3882.73

4516.09

4794.65

CW0003

1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)

cu.m

3465.98

4005.14

4270.46

CW0004

1:2:4(1cement:2sand:4gradedcrushedrock40mmnominalsize)

cu.m

3462.83

3996.88

4230.66

CW0005

1:3:6(1cement:3sand:6gradedcrushedrock20mmnominalsize)

cu.m

2949.57

3365.78

3606.89

CW0006

1:3:6(1cement:3sand:6gradedcrushedrock40mmnominalsize)

cu.m

2887.25

3297.23

3499.50

CW0007

1:3:6(1cement:3sand:6gradedgravel/shingles40mmnominalsize)

cu.m

2418.40

2767.02

2864.49

CW0008

1:4:8(1cement:4sand:8gradedcrushedstone40mmnominalsize)

cu.m

2545.48

2896.87

3089.13

CW0009

1:4:8(1cement:4sand:8gradedcrushedstone50mmnominalsize)

cu.m

2545.48

2896.87

3089.13

CW0010

1:4:8(1cement:4sand:8gradedgravel/shingles40mmnominalsize)

cu.m

2062.30

2350.37

2434.15

CW0011

1:5:10(1cement:5sand:10gradedcrushedstone40mmnominal
size)
1:5:10(1cement:5sand:10gradedcrushedstone50mmnominal
size)
1:5:10(1cement:5sand:10gradedgravel/shingles40mmnominal
size)

cu.m

2268.37

2564.41

2738.61

cu.m

2257.95

2553.98

2728.18

cu.m

1795.82

2031.39

2102.28

CW0012
CW0013

Providingandlayinginpositionplaincementconcreteinretainingwalls,returnwalls,walls(anythickness)includingattached
pilasters,columns,piers,abutments,pillars,posts,struts,buttresses,stringorlacing
courses,parapets,coping,bedblocks,anchorblocks,plainwindowsills,filletsetc.uptofloorfivelevel,excludingthecostof
centeringandshuttering
CW0020

1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)

cu.m

5372.29

6268.15

6610.35

CW0021

cu.m

4133.79

4767.26

5045.97

CW0022

1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)

cu.m

3716.05

4255.22

4520.54

CW0023

1:2:4(1cement:2sand:4gradedcrushedrock40mmnominalsize)

cu.m

3663.95

4197.91

4431.53

CW0024

1:3:6(1cement:3sand:6gradedcrushedrock20mmnominalsize)

cu.m

3151.69

3567.89

3809.00

CW0025

1:3:6(1cement:3sand:6gradedcrushedrock40mmnominalsize)

cu.m

3089.36

3499.34

3701.61

CW0026

1:3:6(1cement:3sand:6gradedgravel/shingles40mmnominalsize)

cu.m

2620.51

2969.14

3066.60

DepartmentofEngineeringServices,MoWHS

12

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

PrecastCementConcrete
Providingandfixinguptofloorfivelevelprecastcementconcretelacingcourses,copings,bedplates,anchorblocks,plainwindow
sills,shelves,louvers,steps,staircasesetc.includinghoistingandsettinginposition
withcementmortar1:3(1cement:3sand)costofrequiredformworkandfinishingsmoothwith6mmthickcementplasteron
exposedsurfacecomplete
CW0050

1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)

cu.m

3293.86

3910.07

4194.24

CW0051

1:3:6(1cement:3sand:6gradedcrushedrock20mmnominalsize)

cu.m

2759.42

3262.48

3527.07

CW0060

Providingandfixingatorneargroundlevelprecastcementconcrete
inkerbs,edgingsetc.asperapprovalpatternandsettinginposition
withcementmortar1:3(1cement:3sand)
costofrequiredformworkandfinishingsmoothwith6mmthick
cementplasteronexposedsurfacecomplete1:2:4(1cement:2sand
:4gradedcrushedrock20mmnominalsize)

cu.m

3200.56

3798.85

4080.20

Providingandfixinguptofloorfivelevelprecastcementconcretesolidblockincludinghoistingandsettinginpositionwithcement
mortar1:3(1cement:3sand)includingthecostofrequiredformworkandfinishing
smoothwith6mmthickcementplasteronexposedsurfacecomplete
CW0070

1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)

cu.m

3527.50

4199.56

4500.84

CW0071

1:3:6(1cement:3sand:6gradedcrushedrock20mmnominalsize)

cu.m

2970.79

3521.53

3798.97

Providingandfixinguptofloorfivelevelprecastcementconcretehollowblockincludinghoistingandsettinginpositionwithcemen
smoothwith6mmthickcementplasteronexposedsurfacecomplete
CW0080

1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)

cu.m

2044.71

2431.75

2608.15

CW0081

1:3:6(1cement:3sand:6gradedcrushedrock20mmnominalsize)

cu.m

1708.46

2021.89

2183.55

LimeConcrete
Providingandlayinglimeconcrete,with40%mortarcomprisingof1:1:1limemortar,infootingsandbasesforcolumnsexcluding
costofformwork
CW0090
CW0091

Withgradedstoneaggregateof40mm
withgradedbrickaggregateof40mm

cu.m
cu.m

4597.18
5013.08

4748.54
4950.32

4814.32
4685.10

Extra

Extraforlayingcementconcretework
CW0135
CW0136

CW0137
CW0140

Cementconcreteworkinsuperstructureabovefloorfivelevelfor
eachfourfloorsorpartthereof
Inorunderwater,mud,includingthecostofpumpingorbailingout
waterandremovingslushetc.complete....permetredepth(concrete
notleanerthan1:2:4)
Cementconcreteworkunderfoulconditions
Providingandmixingwaterproofingmaterialsinintheproportion12
kg/cu.morasprescribedbythemanufacturer

cu.m
cu.m

8%oftheratesworkedoutforrespective
items
483.70
511.32
517.74

cu.m

437.91

437.91

437.91

cu.m

309.67

288.67

288.67

DepartmentofEngineeringServices,MoWHS

13

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

DP0001 25mmthick
sq.m
114.81
DP0002 40mmthick
sq.m
167.96

Providingandlayingdampproofcoursewithcementconcrete1:2:4,20mmaggregate

128.11
189.24

134.51
199.48

DP0010

Chapter7:DAMPPROOFING

ConcreteCourse

Providingandlayingdampproofcoursewithcementconcrete1:2:4,12.5mmaggregate

50mmthick

sq.m

203.38

229.97

242.78

sq.m

122.61

122.60

122.62

BituminousCoatings

DP0015

Applyingacoatofhotbitumen(maxphalt)80\100orequivalentusing
1.7kgpersq.mincludingthesurfacecleaning

MoistureBarriers

Providingandlayingmoisturebarrierusingplasticsheetingunderlay
DP0020 50micrometre
DP0021 100micrometre
DP0022 200micrometre

ProvidingandlayingBitumenfeltType3inwallbasesetc.

sq.m
sq.m
sq.m

43.79
52.98
62.17

40.73
52.98
62.17

43.79
56.04
65.23

DP0030

sq.m

130.83

130.83

130.83

Grade2

DepartmentofEngineeringServices,MoWHS

14

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Chapter8:REINFORCEDCONCRETE

ConcretingItems

Providing&layinginpositionreinforcedcementconcreteexcludingthecostofcentering,shutteringandreinforcementallwork
uptoplinthlevel
RC0001

1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)

cu.m

5134.33

6030.20

6372.40

RC0002

1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)

cu.m

3894.85

4528.21

4806.77

cu.m

3478.10

4017.26

4282.58

RC0003

Providing&layinginpositionreinforcedcementconcreteworkinwalls(anythickness)includingattachedpilastersbuttresses,
piers,abutmentsetc.uptofloorfivelevelexcludingthecostofcentering,shutteringandreinforcement
RC0005

1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)

cu.m

5136.51

6032.37

6374.57

RC0006

1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)

cu.m

3897.02

4530.38

4808.94

cu.m

3459.42

3998.58

4263.90

RC0007

Providing&layinginpositionreinforcedcementconcreteworkinplinthandskirtingcourses,fillets,columns,pillars,postsand
strutsuptofloorfivelevelexcludingthecostofcentering,shutteringandreinforcement.
RC0009

1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)

cu.m

5182.38

6078.25

6420.45

RC0010

1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)

cu.m

3942.90

4576.26

4854.82

cu.m

3526.15

4065.31

4330.63

RC0011

Providing&layinginpositionreinforcedcementconcreteworkinsuspendedfloor,roofshavingslopeupto15o,landings,balconies,
shelvesandchajjasuptofloorfivelevelexcludingthecostofcentering,shutteringandreinforcement
RC0013

1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)

cu.m

5247.12

6142.98

6485.18

RC0014

1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)

cu.m

4007.63

4641.00

4919.55

cu.m

3590.88

4130.04

4395.37

RC0015

Providing&layinginpositionreinforcedcementconcreteworkinbeams,lintels,bands,plainwindowsills,staircases,spiral
staircasesuptofloorfivelevelexcludingthecostofcentering,shutteringandreinforcement
RC0017

1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)

cu.m

5173.42

6069.28

6411.48

RC0018

1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)

cu.m

3933.93

4567.30

4845.85

cu.m

3517.18

4056.34

4321.67

RC0019

Providing&layinginpositionreinforcedcementconcreteworkinkerbs,stepsandthelikeuptofloorfivelevelexcludingthecostof
centering,shutteringandreinforcement
RC0020

1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)

cu.m

5173.42

6069.28

6411.48

RC0021

1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)

cu.m

3933.93

4567.30

4845.85

cu.m

3517.18

4056.34

4321.67

RC0022

DepartmentofEngineeringServices,MoWHS

15

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Providing&layinginpositionreinforcedcementconcreteworkinarchesandarchribsuptofloorfivelevelexcludingthecostof
centering,shutteringandreinforcement
RC0023

1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)

cu.m

6038.26

6934.13

7276.32

RC0024

1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)

cu.m

4798.77

5432.14

5710.69

cu.m

4382.02

4921.19

5186.51

RC0025

Providing&layinginpositionreinforcedcementconcreteworkindomes,vaults,shellsfoldedplatesandroofshavingmorethan
15uptofloorfivelevelexcludingthecostofcentering,shutteringandreinforcement
RC0026

1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)

cu.m

6083.81

7000.56

7354.37

RC0027

1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)

cu.m

4788.57

5434.52

5718.41

cu.m

4364.62

4914.53

5185.15

RC0028

Providing&layinginpositionreinforcedcementconcreteworkinverticalandhorizontalfinsindividuallyorformingboxlouvers,
fasciasandeavesboardsuptofloorfivelevelexcludingthecostofcentering,shutteringandreinforcement
RC0029

1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)

cu.m

4309.88

4953.35

5244.69

TraditionalCornices

BhutantypeTraditionalCornicesinR.C.C1:1.5:3,20mmaggregateincludingcostofformworkincludingfinishingwith6mmthick
plasterontheexposedsurfacewithcementmortar1:3,excluding
reinforcement&decorativepaintingcostasperstandarddesign(Measurementtobetakenalongthecorniceandwalljunction)

RC0030
RC0031
RC0032

SingleStoriedbuilding,includingPhana
MultiStoriedbuilding..atfloor2levelincludingthecostoflhanglag
andatotherfloorswhereLhanglagisprovided
MultiStoriedbuilding..atallmiddlefloorlevels(excludingthecostof
phana)
Phana
LintelCornice(onlycorniceportionatexternalface)

m
m

1284.14
1295.55

1299.38
1310.83

1308.20
1319.58

1695.24

1734.86

1755.68

RC0033
m
735.05
738.88
740.83
RC0034
m
740.01
744.85
748.12

BhutantypeTraditionalCornicesinR.C.C1:2:4,20mmaggregateincludingcostofformworkincludingfinishingwith6mmthick
plasterontheexposedsurfacewithcementmortar1:3,excluding
reinforcement&decorativepaintingcostasperstandarddesign(Measurementtobetakenalongthecorniceandwalljunction)

RC0040
RC0041
RC0042
RC0043
RC0044

SingleStoriedbuilding,includingPhana
MultiStoriedbuilding..atfloor2levelandatotherfloorswhere
Lhanglagisprovidedincludingthecostoflhanglag
MultiStoriedbuilding..atallmiddlefloorlevels(excludingthecostof
phana)
Phana
Lintelcornice(onlycorniceportionatexternalface)

m
m

1268.32
1279.94

1280.05
1291.76

1288.27
1299.93

1798.21

1829.85

1849.30

m
m

732.11
733.70

735.29
737.14

737.12
740.18

DepartmentofEngineeringServices,MoWHS

16

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

22.66

26.12

26.92

ExtraforR.CWorks

RC0050

RC0051
RC0052
RC0053
RC0054

ApplyingcementslurryonR.C.Cslabsusing2.75kgpersq.mfor
receivingC.C.floorincludingroughening,cleaning&dampenthe
surface
ExtraforR.C.Cworkabovefloor5levelforeveryfourfloorsorpart
thereof,excludingcostofreinforcement
Extraforrenderingincementmortar1:2,thetopofsuspended
floors\landings\staircasetreadsandrisers
Renderingsmoothfinishingoftheexposedsurfacewith6mmthick
C.M1:3
Providingthroating,plasteringdripandmouldingtoR.C.Cchajjas

sq.m

cu.m

8%ofrespectiveitemrates

sq.m

33.08

35.90

36.63

sq.m

74.89

80.19

81.63

19.78

19.78

19.78

PrecastItems

Providing&fixing,below&includingfloor2level,PrecastR.C.Cjali1:2:4,12.5mmaggregate,reinforcedwithmildsteelwire1.6mm
dia.,includingroughening,cleaning,fixing,finishingincementmortar1:3
excludingplasteringofthejambs,sills,soffits
RC0060 50mmthick
sq.m
706.01
720.34
757.07
RC0061 40mmthick
sq.m
630.44
639.46
673.63
RC0062 25mmthick
sq.m
577.23
578.26
608.59

Providing&fixing,below&includingfloor2level,PrecastR.C.C1:2:4,20mmaggregateincludingfinishing,plasteringwith6mm
cementplaster1:3andformwork,butexcludingreinforcementcost
RC0070

Stringcourses,copings,bedplates,anchorblocks,plainwindowsills

cu.m

7695.64

8077.02

8314.26

RC0071
RC0072

Smalllintels&joists<1.5mclearspan,shelves
Joists,span>1.5m,shelves

cu.m
cu.m

7097.21
5585.02

7471.63
6184.86

7705.26
6463.09

61.20

74.06

74.06

SteelReinforcement

RC0083

Providing&fixingThermoMechanicallyTreatedreinforcementbar
(YieldStrength500MPa)forR.C.Cworkincludingcutting,bending,
bindingandplacinginpositioncomplete

kg

Formwork

Providing&fixingcenteringandshuttering(formwork),includingstrutting,proppingetc.andremovalofformwork
RC0090
RC0091
RC0092
RC0093
RC0094
RC0095
RC0096
RC0097
RC0098

Foundationandplinthetc.
Walls,pilasters,buttresses,stringcourseetc.
Lintels,beams,girders,bresummers,cantileversetc.
Columns,pillars,post,strutsetc.
Staircase(exceptspiralstaircase)excludinglanding
Suspendedfloor,roof,landing,shelvesandtheirsupports,balconies,
chajjas,etc.
Spiralstaircaseexcludinglanding
Arches,curvedsurfaces
Domes,vaults,shellroof

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

241.82
492.91
326.56
412.85
337.26
524.76

222.01
471.78
302.36
387.47
314.52
500.11

218.48
468.01
298.03
382.94
310.46
495.71

sq.m
sq.m
sq.m

414.74
1683.90
1887.85

392.49
1564.72
1676.24

388.52
1523.47
1618.48

DepartmentofEngineeringServices,MoWHS

17

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

61486.64
17697.13

59660.00
17285.30

60652.56
17589.52

ExpansionJoints

Providing&fillingorfixinginpositioninexpansionjoints
RC0105
RC0106

Blownbitumen
Bitumenmixfillerofproportion80kgofhotbitumen,1kgofcement
and0.25cumofsandforexpansionjoints
12mmbitumenimpregnatedfibreboard

cu.m
cu.m

RC0107
sq.m
883.57
883.57
883.57

Providingandfixingsheetcoveringoverexpansionjointswithironscrewsasperdesigntomatchthecolourshadeofthedistemper
orwalltreatment
RC0116

Aluminiumflutedstrip3.15x150mm

469.09

469.09

456.84

DesignMixConcrete
Providing&layinginpositionmachinebatched,machinemixedandmachinevibratedM20designmixcementconcretefor
reinforcedcementconcretestructuralelements,excludingthecostofcentering,
shutteringandreinforcement,Includingadmixturesinrecommendedproportions(asperIS9103)toaccelerate,retardsettingof
concrete,improveworkabilitywithoutimpairingstrengthanddurabilityasperthedirectionoftheengineer
Note:Mixdesignshouldbedonebyaqualifiedengineer
RC0130
RC0131
RC0132
RC0133

Allworkuptoplinthlevel
Allworkfromplinthleveltofloorfivelevel
Walls,Columns,Pillars,postsandstruts
Beams,Plinthbeams,girders,bresummers,cantilevers,suspended
floors,lintels,roofsandstaircasesincludingspiralstaircases,shelves
etc.

cu.m
cu.m
cu.m
cu.m

3596.60
3733.29
3785.42
3861.11

4145.66
4282.35
4334.48
4410.16

4415.83
4552.53
4604.66
4680.34

117.82
235.64

applicable
142.93
285.87

148.76
297.53

Addordeductforprovidingricherorleanermixesrespectivelyatallfloorsproviding
RC0135
RC0136
RC0137

ProvidingM25gradeRCCinsteadofM20gradeRCC
ProvidingM30gradeRCCinsteadofM20gradeRCC
ProvidingM35gradeRCCinsteadofM20gradeRCC

cu.m
cu.m
cu.m

DepartmentofEngineeringServices,MoWHS

18

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

cu.m
cu.m
cu.m
cu.m
cu.m

4661.23
4469.77
4366.68
4278.31
3819.22

5083.04
4850.78
4725.71
4618.51
4056.61

4942.94
4701.20
4571.03
4459.45
3866.70

Extraforbrickworkinsquareorrectangularpillars
Extraforbrickincircularpillars
Extraforbrickworkinsuperstructureaboveplinthlevel,uptofloor
twolevel
Extraforbrickworkinsuperstructureabovefloortwolevel...perfloor

cu.m
cu.m
cu.m

248.62
1699.35
138.09

248.62
1782.18
138.09

248.62
1715.92
138.09

cu.m

60.47

60.47

60.47

BW0014

Extraforprovidinghoopiron25x1.6mmorequivalentreinforcementin
masonryateverythirdcourse,embeddedincementmortar

sq.m

57.67

69.09

69.29

BW0015

Extraformixingwaterproofingcompoundincementmortar

cu.m

103.39

96.39

96.39

Chapter9:BRICKWORK

OneBrickMasonry(250mm)

Providing&layingSecondClassBrickworkinFoundation&Plinth
BW0001
BW0002
BW0003
BW0004
BW0005

Incementmortar1:3
Incementmortar1:4
Incementmortar1:5
Incementmortar1:6
Inmudmortar

Extras

BW0010
BW0011
BW0012
BW0013

HalfBrickMasonry(125mm)

Providing&layingSecondClassHalfbrickMasonry(125mm)insuperstructurebelowfloor2level
BW0020
BW0021

Incementmortar1:3
Incementmortar1:4

sq.m
sq.m

618.27
599.13

667.04
643.82

647.76
623.59

sq.m

7.09

7.09

7.09

sq.m
sq.m

13.10
340.56

12.40
371.99

12.40
361.13

sq.m

7.09

7.09

7.09

ExtrasforHalfBrick

BW0030
BW0031
BW0032
BW0033

Extraforhalfbrickmasonryinsuperstructureabovefloor2level...per
floor
Extraformixingwaterproofingcompoundincementmortar
75mmthickbrickmasonry(secondclassbricks)incementmortar1:3
inpartitionsetc.insuperstructurebelowfloor2level
Extrafor75mmbrickmasonryincementmortar1:3inpartitionsetc.in
superstructureabovefloor2level...Perfloor

TraditionalCornices

Providing&layingsecondclassbrickworkinBhutantypeTraditionalCornicesincementmortar1:3,including12mmplasterin
cementmortar1:5,butexcludingdecorativepainting.
(Measurementtobetakenalongthecorniceandwalljunction)
BW0040
BW0041

Flooronelevelincludinglhanglag
MiddleFloorlevelsexcludingphana

m
m

747.71
1174.93

767.60
1219.22

763.89
1208.17

sq.m
sq.m
sq.m
sq.m

59.58
65.15
88.72
117.32

61.79
67.37
90.93
120.72

62.39
67.96
91.53
121.64

Pointing

Pointingonbrickworkwithcementmortar1:3
BW0050
BW0051
BW0052
BW0053

Flushpointing
Ruledpointing
Cut,weatherstruckpointing
Raised&cutpointing

DepartmentofEngineeringServices,MoWHS

19

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

cu.m
cu.m
cu.m
cu.m
cu.m

7302.34
7127.14
7077.08
7026.69
6800.13

8550.80
8337.76
8277.54
8216.40
7931.84

8582.77
8360.59
8298.36
8234.73
7931.84

cu.m
cu.m

130.23
73.05

130.23
73.05

130.23
73.05

cu.m

31.53

31.53

31.53

InterlockingCementEarthBlock(300mmX150mmX100mm)

Providing&layingICEB(300mmX150mmX100mm)inFoundation&Plinth
BW0060
BW0061
BW0062
BW0063
BW0064

Incementmortar1:3
Incementmortar1:4
Incementmortar1:5
Incementmortar1:6
Inmudmortar

Extras

BW0070
BW0071
BW0072

ExtraforICEBworkinsquareorrectangularpillars
ExtraforICEBworkinsuperstructureaboveplinthlevel,uptofloor
twolevel
ExtraforICEBworkinsuperstructureabovefloortwolevel...perfloor

InterlockingCementEarthBlock(300mmX150mmX100mm)
Providing&layingICEB(300mmX150mmX100mm)insuperstructurebelowfloor2level
BW0080
BW0081

Incementmortar1:3
Incementmortar1:4

sq.m
sq.m

1078.94
1073.16

1256.00
1248.99

1257.94
1250.65

sq.m

7.41

7.41

7.41

Extras

BW0090

ExtraforICEBworkinsuperstructureabovefloor2level...perfloor

DepartmentofEngineeringServices,MoWHS

20

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

cu.m
cu.m
cu.m
cu.m
cu.m

6942.36
6864.84
6790.14
6785.07
6620.13

8154.40
8060.35
7969.73
7963.58
7754.95

8175.80
8077.91
7983.59
7977.20
7754.95

cu.m
cu.m

186.07
104.37

186.07
104.37

186.07
104.37

cu.m

45.04

45.04

45.04

InterlockingCementEarthBlock(250mmX125mmX100mm)

Providing&layingICEB(250mmX125mmX100mm)inFoundation&Plinth
BW0100
BW0101
BW0102
BW0103
BW0104

Incementmortar1:3
Incementmortar1:4
Incementmortar1:5
Incementmortar1:6
Inmudmortar

Extras

BW0110
BW0111
BW0112

ExtraforICEBworkinsquareorrectangularpillars
ExtraforICEBworkinsuperstructureaboveplinthlevel,uptofloor
twolevel
ExtraforICEBworkinsuperstructureabovefloortwolevel...perfloor

InterlockingCementEarthBlock(250mmX125mmX100mm)
Providing&layingICEB(250mmX125mmX100mm)insuperstructurebelowfloor2level
BW0120
BW0121

Incementmortar1:3
Incementmortar1:4

sq.m
sq.m

899.02
892.01

1049.54
1041.03

1051.90
1043.05

sq.m

8.98

8.98

8.98

Extras

BW0130

ExtraforICEBworkinsuperstructureabovefloor2level...perfloor

DepartmentofEngineeringServices,MoWHS

21

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

460.99

454.02

452.78

cu.m
cu.m
cu.m
cu.m

1922.35
1786.27
1669.62
1182.77

2248.99
2083.90
1942.40
1319.84

2337.22
2165.40
2018.12
1354.84

cu.m

183.78

183.78

183.78

cu.m

60.47

60.47

60.47

cu.m

267.19

267.19

267.19

cu.m

529.75

529.75

529.75

cu.m

98.37

91.72

91.72

Chapter10:STONE/MUD

RammedMudWork

SM0001

Constructingrammedmudwallsinsuperstructureincludingthecostof
formwork

cu.m

RandomRubbleMasonry

Providing&layingRandomRubbleMasonrywithhardstoneinfoundation&plinth
SM0005
SM0006
SM0007
SM0008

Incementmortar1:4
Incementmortar1:5
Incementmortar1:6
Hammerdressed,inmudmortar

Extras

SM0015
SM0016
SM0017
SM0018
SM0019

Extraforrandomrubblemasonrywithhardstoneinsuperstructure
aboveplinth,below&includingfloor2level
Extraforrandomrubblemasonrywithhardstoneinsuperstructure
abovefloor2level
Extraforrandomrubblemasonryworkwithhardstoneinsquareor
rectangularpillars
Extraforrandomrubblemasonryworkwithhardstoneincircular
pillars
Extraforrandomrubblemasonryworkwithhardstoneformixing
waterproofingmaterialsincementmortar

CoursedRubbleMasonry

Providing&layingCoursedRubbleMasonrywithhardstonehammerdressedinfoundation&plinth
SM0025
SM0026
SM0027
SM0028

Incementmortar1:3
Incementmortar1:4
Incementmortar1:5
Incementmortar1:6

cu.m
cu.m
cu.m
cu.m

2347.09
2117.33
1993.62
1887.58

2719.17
2440.45
2290.37
2161.73

2817.43
2527.34
2371.14
2237.25

ExtraforC.R.masonrywithhardstoneinsuperstructureaboveplinth,
below&includingfloor2level
ExtraforC.R.masonrywithhardstoneinsuperstructureabovefloor2
level
ExtraforC.Rmasonrywithhardstoneinsquareorrectangularpillars

cu.m

173.22

173.22

173.22

cu.m

60.47

60.47

60.47

cu.m

278.26

278.26

278.26

ExtraforC.Rmasonrywithhardstoneincircularpillars
ExtraforC.Rmasonrywithhardstonechiseldressedinfoundations
andplinth
ExtraforC.Rmasonrywithhardstonechiseldressedinsuperstructure
aboveplinth,below&includingfloor2level
ExtraforC.Rmasonrywithhardstoneformixingwaterproofing
materials

cu.m
cu.m

672.07
59.03

715.93
59.03

727.13
59.03

cu.m

191.43

191.43

191.43

cu.m

118.44

110.39

110.39

SM0050

Dryhandpackedrubblemasonrywithstoneboulders>0.01Cu.m cu.m

832.00

969.07

1004.06

SM0051

Dryhandpackedrubblemasonryhammerdressed(facing),withstone
boulder>0.01cu.m
Dryhandpackedrubblemasonrychiseldressed(facing)withstone
boulder>0.01cu.m

cu.m

923.71

1074.48

1112.98

cu.m

1033.59

1184.37

1222.86

Extras

SM0035
SM0036
SM0037
SM0038
SM0039
SM0040
SM0041

DryHandPackedRubbleMasonry

SM0052

DepartmentofEngineeringServices,MoWHS

22

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

StoneMasonryinConcreteMortar

SM0060

Providingandlayingwithhardstone(averagevolume0.008Cu.m)
handpackedstonemasonryincementconcretemortar1:2:4,20mm
aggregates
Providing&layingwithhardstone(averagevolume0.008Cu.m)hand
packedstonemasonryincementconcretemortar1:3:6,20mm
aggregates

cu.m

2020.05

2332.66

2452.20

cu.m

1822.71

2095.73

2208.53

SM0062

Providingandlayinghammerdressedstonemasonrywithhardstone
(averagevolume0.008Cu.m)incementconcretemortar1:2:420mm
aggregates

cu.m

2108.54

2434.86

2557.90

SM0063

Providingandlayinghammerdressedstonemasonrywithhardstone
(averagevolume0.008Cu.m)inconcretemortar1:3:620mm
aggregates

cu.m

1929.97

2216.70

2333.00

SM0064

Providingandlayingrubblemasonrychiseldressed(facing)withhard
stone(averagevolume0.008cu.m)inconcretemortar1:2:420mm
aggregates

cu.m

2548.34

2874.66

2997.70

SM0065

Providingandlayingrubblemasonrychiseldressed(facing)withhard
stone(averagevolume0.008cu.m)inconcretemortar1:3:620mm
aggregates

cu.m

2369.77

2656.49

2772.80

SM0070
SM0071
SM0072

ProvidingandlayingHammerdresseddrystonesoling
cu.m
ProvidingandlayingChiseldresseddrystonesoling
cu.m
ProvidingandlayingHandpackedstonefillingorsolingwithstones cu.m

599.32
656.25
442.58

750.10
807.02
579.65

788.60
845.52
614.65

SM0073

ProvidingandlayingHammerdressedstoneedging150x250mmwith
stonesincludingexcavation,refillinganddisposalofsurplusearth
within30mlead

43.27

49.58

51.19

SM0061

StoneSolingFilling&Edging

StonePavementHammerDressed

Providingandlayinghammerdressed150mmthickflatstonepavementwithhammerdressedstoneedging150mmwide&250mm
deeponbothsides,includinggroutingjoints
SM0080
SM0081
SM0082

Withcementconcretemortar1:3:6,12mmaggregate
Withcementmortar1:3
Withsandorearthetc.

sq.m
sq.m
sq.m

244.26
185.81
194.46

285.32
214.04
228.11

300.38
221.28
236.75

FlatStone(Dolep)Paving

Providing&layinghammerdressedflatstonepavingincementmortar1:6onpreparedbedding(excludingthecostofbedding)

SM0090
SM0091
SM0092

20mm
30mm
40mm

sq.m
sq.m
sq.m

298.52
384.23
469.95

302.08
389.37
476.67

303.01
390.71
478.40

Providingandlayinghammerdresseddrydoleppavingincludingpreparationofbed
SM0093 30mm
sq.m
382.26
386.99
388.20
SM0094 40mm
sq.m
467.98
474.29
475.90

Providing&layingallsideschiseldressedflatstonepavingincementmortar1:6onpreparedbedding(excludingthecostof
bedding)
SM0100
SM0101
SM0102

20mm
30mm
40mm

sq.m
sq.m
sq.m

DepartmentofEngineeringServices,MoWHS

381.92
467.64
581.16

385.48
472.78
587.87

386.41
474.11
589.61

23

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

465.67
579.19

470.40
585.49

471.60
587.10

60.30
64.27
118.94

62.00
65.96
121.75

62.45
66.42
122.51

Providingandlayingchiseldresseddrydoleppavingincludingpreparationofbed
SM0103
SM0104

30mm
40mm

sq.m
sq.m

Pointing

Providing&layingpointingonstoneworkwithcementmortar1:3
SM0110
SM0111
SM0112

Flushpointing
Ruledpointing
Raisedandcutpointing

sq.m
sq.m
sq.m

GabionWork

Providing&fillinghandpackedstoneinG.Imesh4mm(8swg)includingsupplyingandweavingofmeshcomplete
SM0120
SM0121
SM0122

Doubleknottedmesh....100mm
Doubleknottedmesh....150mm
Chainlinkmesh....100mm

cu.m
cu.m
cu.m

1550.21
1307.56
1550.21

1780.60
1547.29
1850.59

1899.59
1605.62
1890.44

SM0130 30cmsthick
sq.m
857.21
928.88
SM0131 20cmsthick
sq.m
576.61
624.97

Providing&layingPrecastStoneMasonryblocks(1:5:8)incementmortar1:6insuperstructureuptofloortwolevel

973.79
655.88

SM0140
SM0141
SM0142

PrecastStoneMasonry

Providing&layingPrecastStoneMasonryblocks(1:5:8)incementmortar1:6infoundationandplinth

20cmsthick
15cmsthick
10cmsthick

sq.m
sq.m
sq.m

579.21
434.91
294.32

627.57
471.26
318.53

658.48
494.49
334.06

sq.m

60.47

60.47

60.47

ExtraforPrecastStoneMasonryblocks
SM0150

ExtraforPrecastStoneMasonryblocksinsuperstructureabovefloor
twolevel...perfloor

DepartmentofEngineeringServices,MoWHS

24

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Chapter11:WOODWORK

DressedTimberFraming

Providing&fixinginpositiondressedwoodworkinframesofdoors,windows,clerestorywindowsandotherframes,wroughtand
framed
WW0001 Bluepine
cu.m
17213.95
15996.42
15721.14
WW0002 Champwood
cu.m
17213.95
15996.42
15721.14
WW0003 MixedConifer
cu.m
17167.21
15626.79
15351.51

Providing&fixingbluepinemouldedbeadingtodoor,windowframeswithironscrewsincludingplugs,primingcoatonunexposed
surfaces
WW0010 50x12mm
m
49.61
WW0011 50x20mm
m
54.87

Providing&fixingjoists,includinghoisting,applyingwoodpreservativeonunexposedsurfaces

48.92
53.69

48.74
53.39

WW0020 Bluepine
cu.m
15443.29
WW0021 MixedConifer
cu.m
15396.55

Providing&fixingEavesboard(225x25mm)withmouldingfittedandfixedwithnecessaryscrews

14223.31
13853.68

13952.93
13583.30

103.38

101.78

WW0030 MixedConifer

112.32

TraditionalCornices
Providing,making&fixingwoodworkdressedintraditionalcornicescompleteasperstandarddesigninMixedConifer,including
applyingwoodpreservativeonunexposedsurfaces,excludingdecorative
painting(Measurementtobetakenalongthecorniceandwalljunctionline)
WW0035 Atflooronelevelincludinglhanglag
m
1594.84
WW0036 Atallotherfloorlevels(excludingphana)
m
2223.82
WW0037 Forsinglestoriedstructureincludingphana
m
1970.79
WW0038 Phana
m
927.32
WW0039 Lintellevel
m
1393.63

Providing&fixingtraditionalwoodenTshegayforwindows\railingetc.asperstandarddesign

1493.63
2075.66
1823.31
876.03
1282.13

1480.63
2056.81
1805.35
871.94
1262.21

WW0045 Inmixedconifer
WW0046 Inbluepine

sq.m
sq.m

2112.82
2114.24

2065.87
2077.13

2057.48
2068.75

cu.m

15605.86

14065.44

13790.16

UndressedTimberFraming

WW0055 Providing&fixingMixedConifer(undressed)inwallframesetc.

Providing&fixingroofframing,intrusses,purlins,rafters,posts,postplatesincludinghoisting,etc.(excludingsteelitems)
WW0060 MixedConifer
cu.m
WW0061 BluePine
cu.m

Providing&fixinggussetsfortimbertrussesincludingwoodpreservative(coaltar)
WW0070 12mmphenolicplywood

18492.58
18539.32

16952.16
17321.79

16676.88
17046.52

352.37

308.94

302.02

sq.m

DepartmentofEngineeringServices,MoWHS

25

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

WallandceilingLinings

Providingandfixingtoframes(wallorceiling)Gypsumplasterboardincludingfinishingofjointssmoothcomplete(excludingcost
offrame)

WW0080 10mmthick
sq.m
330.72
330.72
330.72
WW0081 12mmthick
sq.m
351.47
351.47
351.47
WW0082 15mmthick
sq.m
384.48
384.48
384.48

Providing&fixingtoframes(wallorceiling)bluepineplainlining,tonguedandgrooved,includingnecessaryfixtures,woodenplugs
andprimingcoatonunexposedsurfaces(excludingcostofframes)

WW0090 12mmthick
WW0091 20mmthick

sq.m
sq.m

257.19
328.32

242.89
302.81

239.38
297.04

Providing&fixingtoframes(wallorceiling)PlainParticleBoardLiningwithnecessarynailsetc.complete(excludingcostofframes)

WW0100 6mm
sq.m
421.12
448.34
WW0101 10mm
sq.m
471.67
518.33
WW0102 12mm
sq.m
510.95
559.16
WW0103 18mm
sq.m
662.60
634.99

Providing&fixingPrelaminatedParticleBoardLiningwithnecessarynailsetc.complete(excludingcostofframe)

460.01
524.17
553.33
681.65

WW0110
WW0111
WW0112
WW0113

585.99
658.32
728.31
961.62

8mm
10mm
12mm
18mm

sq.m
sq.m
sq.m
sq.m

643.15
658.32
762.14
949.96

576.66
676.98
763.31
1078.28

BisonPanel

Providing&fixingbisonpanel(prelaminatedbothsidesforwall/ceiling)liningwithnecessarynails/screwsetc.complete,excluding
thecostofframe
WW0120 6mm
sq.m
449.44
449.44
WW0121 8mm
sq.m
469.90
469.90
WW0122 10mm
sq.m
517.57
517.57
WW0123 12mm
sq.m
514.83
514.83
WW0124 16mm
sq.m
649.10
649.10
WW0125 20mm
sq.m
776.14
776.14

Providing&fixingPlywoodliningwithnecessarynailsetc.includingbeadingcomplete(excludingcostofframe)

449.44
469.90
517.57
514.83
649.10
776.14

WW0130 4mm,commercial
sq.m
376.87
364.67
359.55
WW0131 4mm,teak
sq.m
564.02
582.36
541.45
WW0132 6mm,commercial
sq.m
485.77
436.18
428.15

Providing&fixingPrefabricatedwallpanellingprofileswithnecessarynailsetc.completebutexcludingthecostofframe)
WW0140 19mm,bluepine
sq.m
744.06
WW0141 19mm,mixedconifer
sq.m
634.99
WW0142 15mm,bluepine
sq.m
1231.26

Providing&fixingwoodenskirtinginmixedconiferwithnecessarynailsorscrewscomplete

744.06
634.99
1231.26

744.06
634.99
1231.26

WW0150 20mm
WW0151 25mm

1018.99
1071.48

1013.44
1064.55

sq.m
sq.m

1048.79
1109.07

DepartmentofEngineeringServices,MoWHS

26

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

sq.m

576.25

606.95

597.26

sq.m

557.81

584.58

573.98

sq.m

541.97

565.35

553.97

sq.m

326.86

331.83

314.92

sq.m

375.81

380.77

363.86

sq.m

93.03

85.38

94.56

BambooWalling

WW0160 Providing&fixing75mmthicksplitbamboowallincludinggrooving
frames,20mmplastercementmortar1:4bothsides(excludingcostof
frame)
WW0161 Providing&fixing75mmthicksplitbamboowallincludinggrooving
frames,20mmplastercementmortar1:5bothsides(excludingcostof
frame)
WW0162 Providing&fixing75mmthicksplitbamboowallincludinggrooving
frames,20mmplastercementmortar1:6bothsides(excludingcostof
frame)
WW0163 Providing&fixing75mmthicksplitbamboowallincludinggrooving
frames,20mmmudplasterbothsides(excludingcostofframe)
WW0164 Providing&fixing150mmthicksplitbamboowallincludinggrooving
frames,60mmmudplasterbothsides(excludingcostofframe)
WW0165 Providing&fixingsplitBamboomatting(excludingthecostofframing
andbeading)

Partitions

Providing&fixingPanelledorPanelled&Glazedpartition,singlecentralpanellingincludingframeetc.complete

WW0170
WW0171
WW0172
WW0173

100mmframing,38mmthickMixedConiferpanelling
75mmframing,38mmthickMixedConiferpanelling
100mmframing,38mmthickChamporBluePinepanelling
75mmframing,38mmthickChamporBluePinepanelling

sq.m
sq.m
sq.m
sq.m

1599.35
1501.55
1601.69
1503.63

1514.29
1425.27
1532.78
1441.65

1498.20
1410.75
1516.69
1427.13

Providing&fixingPanelledorPanelled&Glazed,Plywoodpanellingfrombothsidesincludingframe
WW0180 100mmframing,4mmCommercialPly
sq.m
869.86
825.92
811.16
WW0181 75mmframing,4mmCommercialPly
sq.m
780.96
745.80
732.61
WW0182 100mmframing,4mmTeakPly
sq.m
1261.99
1282.02
1192.27
WW0183 75mmframing,4mmTeakPly
sq.m
1167.50
1196.08
1107.91

Providing&fixingPanelledwithPrefabricatedprofilesfrombothsidesincludingtheframeandprimecoatonconcealedface
WW0190
WW0191
WW0192
WW0193
WW0194
WW0195

100mm,12mmbluepine
75mm,12mmbluepine
100mm,12mmmixedconifer
75mm,12mmmixedconifer
100mm,12mmchampwood
75mm,12mmchampwood

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

1551.98
1457.49
1551.98
1457.49
1698.26
1603.77

1520.68
1434.73
1520.68
1434.73
1666.96
1581.02

1514.34
1429.97
1514.34
1429.97
1660.63
1576.26

WW0200 Champwood
sq.m
1282.44
1239.04
WW0201 MixedConifer
sq.m
1088.74
1037.97

Providing&fixing35mmthickPanelledorglazeddoorsandwindowsShuttersetc.completeincludinghinges

1193.25
992.18

WW0210 Champwood
sq.m
1456.13
1413.18
WW0211 MixedConifer
sq.m
1265.70
1212.91

Providing&fixing38mmthickPanelledorglazeddoorsandwindowsShuttersetc.completeincludinghinges

1365.29
1165.02

WW0220 Champwood
WW0221 MixedConifer

1385.28
1184.31

Door&WindowShutters

Providing&fixing25mmthickPanelledorglazedShuttersforcupboardsetc.completeincludinghinges

sq.m
sq.m

1478.97
1288.45

DepartmentofEngineeringServices,MoWHS

1433.70
1232.72

27

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

WW0230 Champwood
sq.m
1515.19
1466.33
WW0231 MixedConifer
sq.m
1323.42
1263.15

Providing&fixing50mmthickPanelledorglazeddoorsandwindowsShuttersetc.completeincludinghinges

1417.10
1213.92

Providing&fixing44mmthickPanelledorglazeddoorsandwindowsShuttersetc.completeincludinghinges

WW0240 Champwood
sq.m
1571.13
1516.59
1466.07
WW0241 MixedConifer
sq.m
1405.53
1328.35
1289.50

Providing&fixingWiregauzeShutters25mmfordoors&windowsusinggalvanisedM.Swiregauze0.56mmdiawireincludingthe
costofhinges
WW0250 Champwood
sq.m
1056.13
1058.36
1043.84
WW0251 MixedConifer
sq.m
812.61
809.30
794.78

Providing&fixingWiregauzeShutters35mmfordoors&windowsusinggalvanisedM.Swiregauze0.56mmdiawireincludingthe
costofhinges
WW0260 Champwood
sq.m
1125.77
1120.93
1104.81
WW0261 MixedConifer
sq.m
881.98
869.72
853.60

Providing&fixingWiregauzeShutters38mmfordoors&windowsusinggalvanisedM.Swiregauze0.56mmdiawireincludingthe
costofhinges
WW0270 Champwood
sq.m
1147.46
1140.41
1123.80
WW0271 MixedConifer
sq.m
903.58
888.54
871.92

Providing&fixingBatteneddoor&windowshutters20mm,withledgesandbraces(25mm),includingthecostofhinges
WW0280 Champwood
sq.m
932.14
892.34
901.17
WW0281 Bluepine
sq.m
932.14
892.34
901.17
WW0282 MixedConifer
sq.m
930.54
879.67
888.50

Providing&fixingbattenedgaragedoorwithledgesandbraces(38mm)inMixedConifer,includingmountingsetc.complete
WW0290 22mm
sq.m
973.22

Providing&fixingbattenedandframeddoorshutters,MixedConiferexcludingthecostofhinges

924.55

912.59

WW0295 38mm

sq.m

844.38

805.03

815.48

sq.m

927.06

900.81

919.08

sq.m

333.24

325.76

324.42

sq.m

559.17

534.23

529.77

sq.m

999.79

963.76

988.32

VenetianWorks

WW0300 Providing&fixing38mmthicklouveredshuttersforwindows,doors
withfixed12mmvenetians,inMixedConiferexcludingthecostof
hinges
WW0301 Providing&fixingMixedConifervenetians50mmwide,10mmthickat
45mmapartinventilatorsabovedoors(excludingframe)

Trellis

WW0310 Providing&fixingplaintrellisof38x12mmlathswith38mmgap
(excludingframes)includingfixingbeading50x12mmwithMixed
Conifer
WW0311 Providing&fixingDoor&windowshuttersofplaintrellisof38x12mm
lathswith38mmgap(excludingframe)includingfixingbeading
50x12mmwithMixedconifer

DepartmentofEngineeringServices,MoWHS

28

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

1175.67

1208.19

1199.34

CompoundGates

WW0320 Providing&fixingCompoundGateincludinghingesupportscomplete
asper

sq.m

WindowAccessories

WW0325 Providing&fixingM.S.roundorsquarebarsinwindowframes

kg

72.95

86.42

86.42

WW0326 Providing&fixingM.S.roundorsquarebarswithM.S.flatsinwindow
frames
WW0327 Providing&fixingornamentalsteelgrillsinframeswithM.S.flats&
barsincludingroundheadedboltsandnutsetc.
WW0328 Providing&fixingexpandedmetal20x60mmstrands3.25x1.6mm
including60x20mmbeadingofMixedConifer

kg

67.54

80.91

80.95

kg

119.70

131.89

132.11

sq.m

450.25

435.95

448.88

WW0335 25mm
sq.m
705.82
WW0336 30mm
sq.m
903.44

Providing&fixingFlushDoorshutters(prefabricated),blockboardcorewithcommercialplyveneer

705.82
903.44

705.82
903.44

WW0345 25mm
sq.m
997.34
WW0346 30mm
sq.m
1201.49
WW0347 35mm
sq.m
1353.14
WW0348 40mm
sq.m
1586.45

Providing&fixingflushdoorshutters(prefabricated),blockboardcorewithteakplyveneer

1095.92
1320.48
1487.29
1743.93

1125.49
1356.17
1527.54
1791.18

WW0355 25mm
sq.m
1586.45
1743.93
WW0356 30mm
sq.m
1819.76
2054.82
WW0357 35mm
sq.m
2169.73
2385.54
WW0358 40mm
sq.m
2461.36
2706.34

Providing&fixingflushdoorshutters(prefabricated),blockboardcorewithplyveneer,chemicallytreated

1791.18
2054.82
2450.28
2779.83

WW0365 25mm
sq.m
1154.83
1269.15
WW0366 30mm
sq.m
1353.14
1487.29
WW0367 35mm
sq.m
1586.45
1743.93
WW0368 40mm
sq.m
1819.76
2000.58

Providing&fixingpanelleddoors,with12mmparticleboardpanelswithhorizontalmiddlerailincludingprimecoat

1303.45
1527.54
1791.18
2054.82

WW0375 30mm
sq.m
1570.70
1570.70
WW0376 35mm
sq.m
1589.95
1589.95
WW0377 40mm
sq.m
1602.78
1602.78

Providing&fixingpanelleddoors,with12mmplywoodpanelswithhorizontalmiddlerailincludingprimecoat

1570.70
1589.95
1602.78

WW0385 30mm
sq.m
1153.66
1153.66
WW0386 35mm
sq.m
1167.78
1167.78
WW0387 40mm
sq.m
1251.18
1251.18

Providing&fixingpanelleddoors,with9mmplywoodpanelswithhorizontalmiddlerailincludingprimecoat

1153.66
1167.78
1251.18

WW0395 30mm
WW0396 35mm
WW0397 40mm

1131.85
1143.39
1151.09

Prefabricatedshutters

Providing&fixingFlushDoorshutterswithprelaminatedbisonpanel

sq.m
sq.m
sq.m

1131.85
1143.39
1151.09

DepartmentofEngineeringServices,MoWHS

1131.85
1143.39
1151.09

29

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Providing&fixingpanelleddoors,with12mmparticleboardpanelswithhorizontalsinglelockrail&stileincludingprimecoat
WW0400 30mm
sq.m
1624.60
1624.60
WW0401 35mm
sq.m
1629.73
1629.73
WW0402 40mm
sq.m
1632.30
1632.30

Providing&fixingpanelleddoors,with12mmplywoodpanelswithhorizontalsinglelockrail&stileincludingprimecoat

1624.60
1629.73
1632.30

WW0410 30mm
sq.m
1208.84
1208.84
WW0411 35mm
sq.m
1211.40
1211.40
WW0412 40mm
sq.m
1216.54
1216.54

Providing&fixingpanelleddoors,with9mmplywoodpanelswithhorizontalsinglelockrail&stileincludingprimecoat

1208.84
1211.40
1216.54

WW0420 30mm
sq.m
1165.21
1165.21
1165.21
WW0421 35mm
sq.m
1170.34
1170.34
1170.34
WW0422 40mm
sq.m
1176.76
1176.76
1176.76

Providing&fixingpanelleddoors,with12mmparticleboardpanelswithhorizontaldoublelockrail&stileincludingprimecoat

WW0430 30mm
sq.m
1641.92
1641.92
1641.92
WW0431 35mm
sq.m
1677.21
1677.21
1677.21
WW0432 40mm
sq.m
1681.06
1681.06
1681.06

Providing&fixingpanelleddoors,with12mmplywoodpanelswithhorizontaldoublelockrail&stileincludingprimecoat
WW0440 30mm
sq.m
1225.84
1225.84
WW0441 35mm
sq.m
1228.41
1228.41
WW0442 40mm
sq.m
1235.79
1235.79

Providing&fixingpanelleddoors,with9mmplywoodpanelswithhorizontaldoublelockrail&stileincludingprimecoat

1225.84
1228.41
1235.79

WW0450 30mm
sq.m
1179.65
1179.65
WW0451 35mm
sq.m
1187.34
1187.34
WW0452 40mm
sq.m
1197.61
1197.61

Providing&fixingpanelleddoors,with9mmplywoodpanelswithhorizontaldoublelockrail&stileincludingprimecoat

1179.65
1187.34
1197.61

WW0460 30mm
WW0461 35mm
WW0462 40mm

sq.m
sq.m
sq.m

626.26
636.53
641.66

626.26
636.53
641.66

626.26
636.53
641.66

Shelving&Cupboards

Providing&fixing38mmthickwoodenshelvessupportedon40x40x6mm`T'or`L'ironbracketsfixedatsuitabledistancebutnot
exceeding75cmapartin7.5x7.5x15cmblocksofcementconcrete1:3:6,20mmaggregates
WW0470 MixedConifer
sq.m
764.83
706.61
696.97

Providing&fixing25mmthickCupboard(900x2000x450mm...LxHxD)withglazedorpanelledshutters,25mmthickpartitionsand
shelvessupportedon25x25mmwoodenrunners,50x20mmarchitravesand
25mmdiacurtainrodmountedonwoodenbrackets,includingwithAnodisedAluminiumHingesandframeinmixedconifer
WW0475 MixedConifer
WW0476 Champwood

each
each

4629.74
4939.65

DepartmentofEngineeringServices,MoWHS

4423.35
4745.06

4375.93
4697.65

30

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

50mm
100mm

229.62
427.14

219.88
420.23

221.03
423.17

100mm

425.68

418.77

421.71

100mm

329.49

321.47

323.27

100mm

328.60

320.58

322.38

ExtrasforCupboardsincludingframeofmixedconifer
WW0485 Foradditionaldepthof50mmorpartthereof
WW0486 Foradditionalwidthof100mmorpartthereofincludingshuttersof
Mixedconifer
WW0487 Foradditionalwidthof100mmorpartthereof,includingshuttersof
Champwood
WW0488 Foradditionalheightof100mmorpartthereof,includingshuttersof
Mixedconifer
WW0489 Foradditionalheightof100mmorpartthereof,includingshuttersof
Champwood

Railing

Providing&fixingrailingwith90x60mmtop&bottomrails,trellis60x45mmincluding2coatsofpaintetc.allcomplete
WW0495
WW0496
WW0497
WW0498
WW0499
WW0500

900mmhigh,Champwood
900mmhigh,MixedConifer
1000mmhigh,Champwood
1000mmhigh,MixedConifer
1200mmhigh,Champwood
1200mmhigh,MixedConifer

m
m
m
m
m
m

424.31
418.00
488.58
487.62
577.54
576.40

403.07
390.92
464.35
456.71
548.96
539.94

404.20
392.05
465.84
458.20
550.75
541.73

Pelmets

Providing&fixing100x12mm,with25mmdia.woodencurtainrodandbracketsincludingM.Sflats25x3x100mmandplugsetc.
complete
WW0505 Champwood
m
130.96
127.42
126.48
WW0506 MixedConifer
m
127.70
123.04
122.10

Providing&fixing150x12mm,with25mmdia.woodencurtainrodandbracketsincludingM.Sflats25x3x100mmandplugsetc.
complete
WW0515 Champwood
WW0516 MixedConifer

m
m

137.47
135.60

133.27
129.78

132.18
128.68

36.07
28.88
20.32

37.05
31.21
23.92

46.18
36.46
25.58

59.03
47.23
37.50

76.52
48.19
30.70

119.64
115.74
106.03

132.27
114.77
97.28

ShuttersFittings

Providing&fixingM.S.pressedbutthingeswithnecessaryscrewsetc.complete
WW0525 100mm
each
WW0526 75mm
each
WW0527 50mm
each

Providing&fixingM.Stowerbolt(barreltype)withnecessaryscrewsetc.complete

WW0535 250mm
each
50.28
WW0536 150mm
each
37.50
WW0537 100mm
each
27.78

Providing&fixingM.S.slidingdoorbolt,brightfinished,enamelledwithnecessaryscrewsetc.complete
WW0545 300mm
WW0546 250mm
WW0547 200mm

each
each
each

DepartmentofEngineeringServices,MoWHS

115.16
105.44
91.83

31

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

WW0555 150mm
each
WW0556 125mm
each
WW0557 100mm
each
WW0558 75mm
each

Providing&fixingM.S.hookandeyewithnecessaryscrewsetc.complete

39.55
31.97
25.85
20.89

37.22
31.39
24.39
19.72

45.97
34.30
28.47
22.64

WW0565
WW0566
WW0567
WW0568

58.22
39.55
22.06
18.56

72.22
45.97
27.30
20.89

60.55
39.17
27.50
21.67

WW0575 Providing&fixingM.S.doorstopperwithnutsandnecessaryscrews
each
81.47
complete

Providing&fixinganodisedaluminiumbutthingeswithnecessaryaluminiumscrewsetc.complete

76.32

79.53

WW0580 100mm
each
63.78
WW0581 75mm
each
52.11

Providing&fixinganodisedaluminiumtowerbolt(barreltype)withaluminiumscrewsetc.complete

63.78
52.11

57.95
40.45

WW0590 200mm
each
56.43
WW0591 150mm
each
43.86
WW0592 100mm
each
29.28

Providing&fixinganodisedaluminiumslidingdoorboltswithnutsandaluminiumscrewsetc.complete

79.76
43.86
35.11

68.10
43.86
32.19

WW0600 300mm
each
194.06
WW0601 250mm
each
159.06
WW0602 200mm
each
141.57

Providing&fixinganodisedaluminiumhandlewithnecessaryaluminiumscrewsetc.complete

182.40
164.90
147.40

176.56
159.06
144.48

WW0610 150mm
each
33.34
WW0611 125mm
each
25.75
WW0612 100mm
each
21.09
WW0613 75mm
each
18.75

Providing&fixinganodisedaluminiumhookandeyewithnecessaryscrewsetc.complete

37.42
31.59
24.59
19.92

36.84
30.42
24.59
18.75

WW0620
WW0621
WW0622
WW0623

54.92
43.25
25.75
21.09

72.42
49.08
25.75
19.92

89.91
49.08
32.75
20.31

481.83

493.49

499.32

89.40
68.99
48.57

101.07
83.57
66.07

89.40
61.99
42.74

Providing&fixingM.S.handlewithnecessaryscrewsetc.complete

300mm
200mm
150mm
100mm

each
each
each
each

M.Sdoorstopper

300mm
200mm
150mm
100mm

each
each
each
each

Kickingplate

WW0630 Providing&fixinganodisedaluminiumkickingplate,4mmthickwith
sq.m
necessaryaluminiumscrewsetc.complete

Providing&fixingbrasspressedbutthingeswithnecessaryscrewsetc.complete
WW0635 100mm
WW0636 75mm
WW0637 50mm

each
each
each

DepartmentofEngineeringServices,MoWHS

32

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

WW0645 250mm
each
WW0646 150mm
each
WW0647 100mm
each

Providing&fixingbrassslidingdoorboltwithnutsnecessaryscrewsetc.complete

184.75
127.85
91.69

167.25
134.27
99.27

173.09
143.01
90.52

WW0655 300mm
each
WW0656 250mm
each
WW0657 200mm
each

Providing&fixingbrasshandlewithnecessaryscrewsetc.complete

598.42
573.14
522.59

575.09
470.10
446.77

712.16
583.83
519.67

each
each
each
each

65.12
56.38
50.54
43.25

78.25
66.58
54.92
49.08

107.41
89.91
72.42
49.08

each

764.62

997.93

857.94

each

656.74

773.40

831.73

each

918.60

1058.58

1116.91

each
113.49
WW0678 Providing&fixingbrightfinishedbrassdoorstopperwithnutsand
necessaryscrewsetc.complete

Providing&fixingbrightfinishedbrasshookandeyewithnecessaryscrewsetc.complete

101.82

119.32

Providing&fixingbrasstowerbolt(barreltype)withnecessaryscrewsetc.complete

WW0665
WW0666
WW0667
WW0668

150mm
125mm
100mm
75mm

Otherfittings

WW0675 Providing&fixingbrightfinishbrass100mmmortiselatch&pairof
levers,handleswithnecessaryscrewsetc.complete
WW0676 Providing&fixingbrightfinishbrassspringloaded,hingeddoorcloser
withnecessaryscrewsetc.complete
WW0677 Providing&fixingbrightfinishbrasshydraulicdoorcloser

WW0685 150mm
WW0686 100mm

each
each

45.59
38.88

58.42
46.75

60.75
49.08

each

66.34

72.83

74.07

cu.m

517.98

488.81

517.98

sq.m

1041.73

1044.14

1046.71

sq.m

908.51

908.51

908.51

FixingAccessories

WW0695 P&f40x3mmM.S.holdfast400mmlong,fixingtoframewith10mm
bolts&nuts,plugs,concreteblocks300x100x150mmwith1:3:6,20mm
aggregate

CeilingInsulation

WW0700 Providing&layingdryearthinceilingsinproportion1:5(1straw:5dry
earth)includingplasticunderlay

Skylight

WW0705 Providing&fixingskylighttranslucentdiffuserpanelincluding50x12
beadingetc.complete

TimberCarving

WW0710 Providing&fixingDecorativeTraditionalTimberCarving

DepartmentofEngineeringServices,MoWHS

33

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

76.73
77.16
77.58

79.80
77.38
81.47

Chapter12:STEEL

SingleSections

Steelworkinsinglesectionincludingcutting,hoisting,fixingandapplyingprimingcoatofredleadpaint

SW0001 InR.S.joists
kg
77.35
SW0002 InFlats
kg
65.53
SW0003 InTees,anglesandchannels
kg
74.52

Fabricated&BuitupSections

Steelworkrivetedorbolted,inbuiltupsections,trusses,frameworks,includingcutting,hoisting,fixingandappl.primingcoatof
redleadpaint
SW0010 InR.S.joists
kg
77.09
76.49
81.46
SW0011 InTees,angles,flatsandchannels
kg
127.75
133.57
136.47

Steelworkwelded,inbuiltupsections,trusses,frameworksincludingcutting,hoisting,fixingandappl.primingcoatofredlead
paint
SW0020
SW0021
SW0022

InR.S.joists
InTees,angles,flatsandchannels
InTubularsections

kg
kg
kg

78.20
74.57
65.89

76.23
80.45
65.21

81.11
83.24
68.77

Doors/Windows&Accessories

Providing&fixinginpositionwithverticalchannels20x10x2mmandbracedwithflatiron,diagonals20x5mmwithtopandbottom
railsofTiron40x40x6mmwith38mmdiasteelpulleyscompletewith
bolts,nuts,lockingarrangement,stoppershandlesincludingapplyingaprimingcoatofredleadpaint
SW0030 Collapsiblesteelshutters
sq.m

Providing&fixinginpositionincludingapplyingaprimingcoatofredleadpaint

3723.22

3990.77

4044.11

SW0035

1343.64

1343.64

1343.64

Rollingshutters,includingallaccessoriescompletebutexcludingtop
cover
Topcoverforrollingshutters

sq.m

SW0036
m
580.12
580.12
580.12

Providing&fixinganodisedAluminiumsectionfordoors,windows,ventilators,partitionsframing,falseceilingframingofspecified
sectionsincludingallaccessoriessuchasUrubbergasketforfixing
glasspanes,weatherstripsorweatherseals,roller,springs,etccomplete(excludingthecostofglasspanesorboardsincaseof
partitions/doors/windowsandceilingboardsincaseofceiling)

SW0045 Sliding,openableandpivotedwindows
kg
434.91
434.91
434.91
SW0046 Slidingandopenabledoors
kg
436.30
436.30
436.30
SW0047 Partitionframing
kg
432.13
432.13
432.13
kg
431.02
431.02
431.02
SW0048 Falseceilingframing

Extraforprovidingandfixingplainglasspanesonaluminiumsectioncomplete(excludingthecostofaluminiumframe&
accessories)
SW0055 4mmthickplainglass
sq.m
542.22
550.25
556.08
SW0056 5.5mmthick,plainglass
sq.m
754.98
765.01
775.04
SW0057 5.5mmthickfrostedglass
sq.m
830.92
740.39
719.40

Providing&fixingsteelglazeddoors,windows,ventilatorsofstandardrolledsteelsectionsjointsmitredandweldedwith15x3mm
lugsembeddedasrequiredincludingp&fglasspanesandacoatofprimer

SW0065 Doors
sq.m
1824.49
1797.30
1789.59
SW0066 Windowsfixed
sq.m
991.82
964.97
957.36
SW0067 Windowssidehung
sq.m
1280.26
1252.98
1245.24
SW0068 Ventilatorstophung
sq.m
1274.13
1247.27
1239.66
SW0069 Ventilatorscentrehung
sq.m
1440.95
1414.09
1406.48

DepartmentofEngineeringServices,MoWHS

34

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

sq.m

243.35

247.65

258.49

kg

59.55

69.13

70.54

kg
kg

116.68
123.51

122.51
123.51

122.51
132.26

kg

67.94

72.58

76.46

each

112.58

133.40

133.40

ExtraforBhutantypeArchitraves

SW0075

ExtraforProviding&fixingBhutantypearchitraveswith24Gsteel
sheet....persq.m.ofwindowarea

SteelFasteners

SW0080
SW0081
SW0082

Providing&fixingM.S.roundholddownboltswithnutsandwasher
plates
Providing&fixingboltsofvarioussizesincludingnuts&washers
Providing&fixingM.S.rivetsofvarioussizes

Plates

SW0090

Providing,makingandfixingM.S.straps,flats,soleplatesetc.

FanClamps

SW0095

Providing&fixingM.S.fanclampsof16mmdia.inR.C.slabs,including
paintingwithredleadpaint

DepartmentofEngineeringServices,MoWHS

35

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

577.01
555.28
505.70

623.76
597.33
537.19

604.36
576.81
513.79

407.20
387.78
319.75

439.87
416.43
339.52

428.81
404.49
325.16

sq.m
FL0020
Flushpointing
FL0021
Ruledpointing
sq.m

Providing&layingpointingonbrickflooringwithcementmortar1:4

45.41
49.20

46.56
50.34

46.88
50.67

FL0030
Flushpointing
sq.m
FL0031
Ruledpointing
sq.m

Providing&layingPointingonbrickflooringwithcementmortar1:6

45.41
49.20

46.56
50.34

46.88
50.67

FL0040
FL0041

43.88
47.66

44.70
48.49

44.95
48.73

FL0050
12mmaggregates,25mmthick
sq.m
166.93
FL0051
20mmaggregates,40mmthick
sq.m
226.15
FL0052
20mmaggregates,50mmthick
sq.m
262.16
FL0053
20mmaggregates,75mmthick
sq.m
347.98
FL0054
20mmrivergravel,40mmthick
sq.m
424.35
FL0055
20mmrivergravel,50mmthick
sq.m
509.71

Providing&layingcementconcreteflooring1:3:6,finishedwithafloatingcoatofneatcement

182.91
250.20
291.55
390.02
468.51
564.18

189.90
261.09
305.01
409.74
477.86
575.69

FL0060
FL0061

260.53
235.34

273.44
240.05

Chapter13:FLOORING

BrickFlooring

Providing&laying2ndclassBrickonedgeflooring
FL0001
FL0002
FL0003

Incementmortar1:4
Incementmortar1:6
Indrybrick,includingfillingjointswithsandonbeddingof12.5mm
mudmortar

Providing&laying2ndclassFlatbrickflooring

sq.m
sq.m
sq.m

FL0010
FL0011
FL0012

sq.m
sq.m
sq.m

Incementmortar1:4
Incementmortar1:6
Indrybrick,fillingjointswithsand,onabaseof12.5mmmudmortar

Providing&layingpointingonbrickflooringwithcementmortar1:2

Flushpointing
Ruledpointing

sq.m
sq.m

ConcreteFlooring

Palcementconcreteflooring1:2:4,finishedwithfloatingcoatofneatcement

20mmaggregates,50mm
20mmrivergravel,50mm

sq.m
sq.m

236.18
214.56

RedOxideFlooring

Providing&laying40mmredoxideflooring,finishedwithafloatingcoatofneatcement(redoxidemixed)includingcementslurry
etc.complete
FL0070

Underlayerof30mmthickcementconcrete1:2:4,12.5mmaggregates
andtoplayerof10mmthickplasterofcementredoxidemixed

sq.m

DepartmentofEngineeringServices,MoWHS

528.28

552.42

566.52

36

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

SurfaceHardening

Providing&laying62mmthickflooringwithsublayercementconcrete1:2:420mmaggregates,toplayerwithmetalliccement
hardenerconsistingofmix1:2(1cementhardener:26mmstoneaggregate),
themetallichardeningcompoundismixedbyvolumeintheratio4partsofcement&1partofmetallichardeningcompound
includingcementslurry
FL0075

50mmthicksublayerand12mmtopping

sq.m

452.93

481.44

499.06

sq.m

20.04

20.04

20.04

ExtraforConcreteflooring

FL0080

Extraformakingchequersonconcretefloors,steps,landings,
pavementsetc.

TerrazzoMarbleChipFlooring

Providing&laying40mmthickmarblechipsflooringtoplayer6mmthickwithwhite,blackorblackandwhitemarblechipsof
nominalsize1.53mminproportion1:2(cement:chips),on34mmthickconcrete
baseincementconcrete1:2:4,12.5mmaggregate(cementandmarblepowdermixshallbeoftheratio3partofcementto1part
ofmarblepowder)
FL0085
FL0086

Ingreycement
Inwhitecement

sq.m
sq.m

592.96
698.08

613.63
719.06

625.56
731.62

sq.m

40.60

40.09

41.61

sq.m

65.33

64.51

66.96

Extraforcolouredchips

FL0095
FL0096

Extraforcolouredchipsinsteadofblack,whiteorblackandwhite
chipsintop6mmlayerofmarblechipsflooring
Extraforcolouredchipsinsteadofblack,whiteorblackandwhite
chipsintop10mmlayermarblechipsflooring

Providing&laying40mmthickmarblechipsflooringtoplayer10mmthickwithwhite,blackorblackandwhitemarblechipsofsize
6mminproportion1:2(cement:chips),on30mmcementconcrete1:2:4base,12.5mmaggregate
FL0105
FL0106

Ingreycement
Inwhitecement

sq.m
sq.m

619.40
759.13

639.46
778.65

652.50
792.28

ExtraforTerrazzoFlooring

FL0115

ExtraforProviding&fixingglassstripsinjointsofterrazzofloors

FL0116

Extraforterrazzoflooringlaidasfloorborders,margins,bands,75<
width>300mm
Extraforlayingterrazzoflooringonstaircasetreads,width<300mm
includingformingnosing
Extraforlayingterrazzoinnarrowbandswidth<75mm
Extraformakingmouldednosinginterrazzo,includingmoulded
returns,ends,angles
Providing&fixingaluminiumstrip40x1.6mminjointsofterrazzofloor

FL0117
FL0118
FL0119
FL0120

15.09

15.09

15.09

sq.m

16.60

16.60

16.60

sq.m

24.90

24.90

24.90

m
m

1.76
67.28

1.76
67.28

1.76
67.28

107.58

101.74

101.74

DepartmentofEngineeringServices,MoWHS

37

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Skirting

Providing&layingCementplasterskirting<300mmheightwithcementmortar1:3withafloatingcoatofneatcementincluding
roundingoffjunctionswithfloor
FL0130
20mm
sq.m
209.32
228.03
233.03
FL0131
22mm
sq.m
219.83
240.75
246.35

Providing&fixingTerrazzoorMarblechipsskirting<300mmheighttoplayer6mmthickwithwhiteorblack,blackandwhite
marblechipssize4mminproportion1:2,laidon12.5mmthickcementplaster1:3base
FL0140
FL0141

Ingreycement
Inwhitecement

sq.m
sq.m

580.38
680.45

596.07
695.76

602.82
702.93

MarbleStoneFlooring

Providing&layingmarblestoneflooringover20mmthickbaseofcementmortar1:4,jointedwithgreycementslurrymixedwith
pigmentwherenecessary,rubbing&polishingcomplete
FL0150
20mmthickblackmarble
sq.m
2074.89
2086.64
2071.41
FL0151
20mmthickwhitemarble
sq.m
2077.29
2090.00
2074.95
FL0152
20mmthickblackandwhitemarble
sq.m
2041.07
2090.00
2074.95
FL0153
20mmthickcolouredmarble
sq.m
2057.44
2076.58
2081.65
FL0154
40mmthickblackmarble
sq.m
1875.63
1895.28
1900.46
FL0155
40mmthickwhitemarble
sq.m
1798.20
1817.85
1823.03
FL0156
40mmthickblackandwhitemarble
sq.m
1963.21
1982.85
1988.04
FL0157
40mmthickcolouredmarble
sq.m
2221.41
2090.00
2074.95

Providing&layingKotastoneflooringover20mmthickbaseofcementmortar1:4,jointedwithgreycementslurrymixedwith
pigmentwherenecessary,rubbing&polishingcomplete
FL0160
FL0161

20mm
40mm

sq.m
sq.m

1797.58
2766.40

1816.72
2785.54

1821.79
2790.61

206.72

206.72

206.72

173.77

173.77

173.77

FL0180
25mm
sq.m
850.63
850.63
FL0181
30mm
sq.m
1058.12
1058.12

Providing&fixingPlainParticleBoardFlooringfixingwithnecessaryscrewsetc.complete,excludingcostofframe

850.63
1058.12

FL0190
25mm
sq.m
829.42
818.14
FL0191
35mm
sq.m
1099.27
1157.60

Providing&fixingMixedConiferFlooringincludingfixingwithironscrewsetc.complete,excludingthecostofframe

821.64
1183.27

ExtrasforMarblestoneflooring

FL0170
FL0171

Extraformarblestoneflooringforlayinginsteptreads,width<300
mm
Extraformarblestoneflooringfornosinginsteptreads

TimberFlooring

Providing&fixingbisonpanelflooringincludingnails/screwsetc.completeexcludingthecostofframe

FL0200
FL0201
FL0202
FL0203
FL0204
FL0205

25mmthick,T&G
25mmthick,halflapped
40mmthick,T&G
40mmthick,halflapped
45mmthick,T&G
45mmthick,halflapped

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

DepartmentofEngineeringServices,MoWHS

448.92
425.54
640.76
634.39
690.14
680.12

405.19
381.80
573.27
566.90
617.52
607.50

397.37
373.99
561.22
554.84
604.55
594.52

38

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Parquetflooring

Providing&fixingParquet(woodblock)flooringincludingblownbitumenunderlayandironscrewsetc.complete,excludingcostof
frame
FL0210
38mmthick,champwood
sq.m
2388.38
2339.91

Providing&fixingPreFabricatedFlooringProfilesinmixedconiferincludingnecessaryscrewsetc.complete
FL0215
FL0216

25mmthick
38mmthick

sq.m
sq.m

706.85
763.31

706.85
763.31

2328.96

706.85
763.31

Vinyl&LinoleumFlooring

Providing&fixing2mmthickVinylorLinoleumsheet1.3mmlaidwithspecialadhesive,including2coatofbitumenappliedover
subflooronpreparedsurface@1.5kg/sq.meachcoatincludingthecostofbaseconcrete
FL0225

Overbaseof25mmthickcementconcrete1:2:4,12.5mmaggregate

sq.m

805.46

833.10

845.96

sq.m

74.17

74.17

74.17

Mudflooring

FL0230

Providing&layingrammedmudflooringcomplete

DepartmentofEngineeringServices,MoWHS

39

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

1615.92

1757.43

1472.46

Chapter14:TILINGWALL&FLOOR

GL0001

Providing&fixingwhite/colouredGlazedtiles,150x150mmin
skirting,steprisers,dado,finishedwithflushpointinginwhitecement

sq.m

Providing&fixingwhite/colouredglazedtilesinflooring,treadsofstepsandlandingslaidonbedof12mmthickcementmortar1:3
finishedwithflushpointinginwhitecement:
GL0005 for150x150mm
GL0006 for100x100mm
GL0007 for200x100mm
GL0008 for200x200mm
GL0009 for300x300mm

Extraforlayingglazedtiles

sq.m
sq.m
sq.m
sq.m
sq.m

1432.49
2943.97
1820.11
1203.80
828.47

1574.00
2958.44
1834.58
1196.40
894.03

1289.03
2962.20
1896.66
1200.15
855.79

GL0015
GL0016

sq.m
sq.m

92.44
532.77

92.44
532.77

92.44
532.77

Intreadsofsteps,width<300mm
Inskirting,risersofsteps,dadowheretilesarerequiredtobecut(only
areaofportionofcuttilestobemeasured)

DepartmentofEngineeringServices,MoWHS

40

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Chapter15:ROOFING

C.G.ISheeting

Providing&fixingCorrugatedGalvanisedIron(CGI)sheeting,includingbolts,hooksandnuts8mmdia.withbitumenandG.Ilimpet
washersfilledwithwhiteleadforconnection,excludingthecostofpurlins,rafterandtrusses
RF0001 24g
sq.m
649.93
649.93
649.93

Providing&fixing600mmridgesorhipsinplainG.I.includingbolts,hooksandnuts8mmdiaG.Ilimpetandbitumenwashersfor
connection
RF0005 24g.
m
553.92
524.79

Providing&fixing450mmoverallsemicircularplainG.Igutter,includingbrackets,bolts,nuts,washers&rainwaterpipes
connections,excludingthecostofpipes

504.49

RF0010

24gsheet

417.39

408.43

395.94

7.05
7.09

7.05
7.09

7.05
7.09

133.22

133.22

133.22

each
each
each

20.61
50.60
75.90

20.61
50.60
75.90

20.61
50.60
75.90

122.21

144.37

144.77

sq.m

685.26

715.28

655.23

sq.m

351.67

375.58

327.75

1298.09

1330.43

1265.76

sq.m

702.69

702.69

702.69

ExtraforGalvanisedIron

RF0015
RF0016
RF0017

ExtraforProviding&fixingcurvedC.G.I.sheetinroofing
ExtraforProviding&fixingC.G.I.sheetsverticallyortoapitch>60
degrees
Extraformakingstraightcutopenings(in24g)forchimney,skylights

sq.m
sq.m

ExtraformakingopeningorrecessinCGIroofingofgirth<1metre
RF0025
RF0026
RF0027

Areaupto0.01sq.m
0.01<Area<0.04sq.m
Area>0.04sq.m

WindBracing

RF0060

Providing&fixingwindtieof40x6mmflats

ThatchedRoofing

RF0065
RF0066
RF0067

Providing&fixing150mmthatchedroofing,includingstraws/grass
bundles,halfsplitbamboofillet,tyingstringscomplete
Providing&fixing25mmdia.bamboosat225mmapartincluding
moonjban(rope)orstring
Providing&fixingthatchedcopingtoridgesandhips,girth<1metre
includingtyingandsplitbamboowindtiecomplete

SlateRoofing

RF0075

Providing&fixingsingleslateroofingincludingbitumenfeltwater
proofingetccomplete,excludingthecostofwoodenreapers,trusses

DepartmentofEngineeringServices,MoWHS

41

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

ConcreteTilesRoofing

Providing&fixingPLAINPantileorRomanIIconcretetiles500mmx250mmincludingtyingwiresbutexcludingthecostofframe
work
RF0080 6mm
sq.m
198.59
198.59
198.59
RF0081 8mm
sq.m
230.67
230.67
230.67
RF0082 10mm
sq.m
238.69
238.69
238.69

Providing&fixingCOLOUREDPantileorRomanconcretetiles500mmx250mmincludingtyingwiresbutexcludingthecostof
framework
RF0090 6mm
sq.m
246.71
246.71
246.71
RF0091 8mm
sq.m
254.73
254.73
254.73
RF0092 10mm
sq.m
262.75
262.75
262.75

Providing&fixingPLAINSuperRomanconcretetiles600mmx330mmincludingtyingwiresbutexcludingthecostofframework

RF0100 10mm
sq.m
283.14
283.14
283.14

Providing&fixingCOLOUREDSuperRomanconcretetiles600mmx330mmincludingtyingwiresbutexcludingthecostofframe
work
RF0105 10mm
sq.m
313.94
313.94
313.94

Providing&fixingPLAINSemiSheetconcretetiles600mmx600mmincludingtyingwiresbutexcludingthecostofframework
RF0110 8mm
sq.m
153.66
153.66
153.66

Providing&fixingCOLOUREDSemiSheetconcretetiles600mmx600mmincludingtyingwiresbutexcludingthecostofframework

RF0115 8mm
sq.m

Providingandfixingconcretetilesridgesorhipsincludingtyingwireetc.complete

235.78

235.78

235.78

RF0120
RF0121

78.23
121.86

78.23
121.86

78.23
121.86

281.26

289.48

291.58

Plain
Coloured

m
m

ShinglepRoofing

RF0130

Providing&fixingshingleproofingwithshinglepofsize
sq.m
1350x125x12mmin3layersincludingtying,upliftprotectioncomplete

RedMudPlasticSheeting

RF0135

Providing&fixingredmudcorrugatedplasticsheeting,1.5mmthick

sq.m

500.35

500.35

500.35

RF0136

Providing&fixingredmudplasticsheet600mmridging,1.3mmthick

444.99

444.99

444.99

sq.m

1444.81

1444.81

1444.81

CorrugatedFibreglassSheeting

RF0150

P&f1.2mmtransparentsheetincluding8mmG.IJorLhooks,bitumen
&G.Ilimpetwashersetccomplete,excludingcostofframe

DepartmentofEngineeringServices,MoWHS

42

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

ConcreteTerracingOnRoofs

Providing&layinglimeconcreteterracingonroofing,averagedepth100mm
RF0155

includingdrainagefall,ramming,roundingatparapets

sq.m

694.77

700.30

651.50

RF0156

includingdrainagefall,ramming,roundingatparapetsandundercoat
ofhotbitumen80/100

sq.m

796.52

802.05

753.27

Providing&layingcementconcreteterracingonroofwithcementconcrete1:3:6,20mmaggregatesoverabasecoatofbitumen
80\100mixedwithcoarsesand
RF0165
RF0166

115mmaveragethickness
Paintingroofwithbitumenincludingspreadingsand,cleaningslabetc.
complete

sq.m
sq.m

461.72
107.89

506.75
108.14

535.74
108.60

RainWaterPipe

Providing&fixingC.I.rainwaterpipes&fittingswithnecessaryscrewsonthewallfaceincludingfillingjointsetc.complete
RF0175 100mmdiaC.Ipipes
m
1323.38
RF0176 100mmdiaC.I.headforpipe
each
293.25
RF0177 100mmdiaC.I.bendforpipe
each
316.58
RF0178 100mmdiaC.I.shoesforpipe
each
503.23

Providing&fixing100mmdiaC.I.offsetforrainwaterpipeonwallfaceincludingfillingjoints
RF0185
RF0186

75mmprojection
150mmprojection

each
each

421.57
643.21

1445.87
299.08
336.41
526.56

1323.38
293.25
316.58
584.89

374.91
640.88

351.58
701.54

ProvidingandfixingonwallfacesinglesocketedrigidPVC(WorkingPressure4kgfpersq.cm)rainwaterpipesincludingjointing
withsealringleaving10mmgapforthermalexpansioncomplete
RF0190
RF0191
RF0192

75mmdia
90mmdia
110mmdia

m
m
m

319.66
368.69
426.03

318.76
405.08
433.86

330.03
362.31
377.47

ProvidingandfixingonwallfacePVCcouplerforrigidrainwaterpipesincludingjointingwithsealringleaving10mmgapfor
thermalexpansioncomplete
RF0195
RF0196
RF0197

75mm
90mm
110mm

each
each
each

169.74
204.68
230.76

184.73
218.56
250.64

165.36
217.22
249.86

ProvidingandfixingonwallfacePVCSingleteewithdoorforrigidrainwaterpipesincludingjointingwithsealringleaving10mm
gapforthermalexpansioncomplete
RF0200
RF0201
RF0202

75mm
90mm
110mm

each
each
each

218.60
281.43
343.26

244.81
292.63
360.29

209.81
287.97
346.30

ProvidingandfixingonwallfacePVCplainSingleteeforrigidrainwaterpipesincludingjointingwithsealringleaving10mmgap
forthermalexpansioncomplete
RF0205
RF0206
RF0207

75mm
90mm
110mm

each
each
each

DepartmentofEngineeringServices,MoWHS

209.81
268.37
321.80

230.81
304.30
342.80

187.64
279.80
308.97

43

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

ProvidingandfixingonwallfacePVCbendforrigidrainwaterpipesincludingjointingwithsealringleaving10mmgapforthermal
expansioncomplete
RF0210
RF0211
RF0212

75mm
90mm
110mm

each
each
each

187.64
242.47
271.64

209.81
257.64
301.97

214.47
279.80
324.13

ProvidingandfixingonwallfacePVCshoeforrigidrainwaterpipesincludingjointingwithsealringleaving10mmgapforthermal
expansioncomplete
RF0215
RF0216
RF0217

75mm
90mm
110mm

each
each
each

DepartmentofEngineeringServices,MoWHS

231.97
275.14
326.46

238.97
286.80
336.96

236.64
295.55
353.29

44

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

PI0001
15mm
m
PI0002
20mm
m
PI0003
25mm
m
PI0004
32mm
m
PI0005
40mm
m
PI0006
50mm
m

Providing&fixingH.D.P.Epipesincludingclamps&repairwallsetc.complete

149.30
176.02
235.60
305.81
374.39
473.50

174.17
235.31
288.79
378.14
451.94
564.52

178.61
210.59
282.95
372.64
432.68
563.53

PI0010
PI0011
PI0012
PI0013
PI0014

75.32
90.99
160.29
165.92
227.87

75.32
94.34
174.15
214.80
270.27

75.32
96.01
161.04
172.70
248.14

Chapter16:PLUMBINGINDOORWORK

WaterSupply

Providing&fixingG.I.pipesincludingG.I.fittings&clamps&repairwalls

20mm
25mm
32mm
40mm
50mm

m
m
m
m
m

StorageTanks

Providing&fixingstoragetankofM.S.sheetweldedallround,including40mmG.Iscourpipe,25mmG.Ioverflow,15mmballvalve
,padsforinletandoutletpipes,redleadprimer&twocoatsofbitumasticpaint

PI0020
270litrecapacityof2mmsteelsheet
each
PI0021
810litrecapacityof2.8mmsteelsheet
each
PI0022
1620litrecapacityof3.15mmsteelsheet
each

Providing&fixingplastictankincludingallaccessoriescomplete
PI0030
PI0031
PI0032
PI0033
PI0034

270litrecapacity
500litrecapacity
1000litrecapacity
2000litrecapacity
3000litrecapacity

each
each
each
each
each

6913.41
14739.70
22600.34

7144.50
15179.50
23241.47

7439.35
15209.42
23274.36

2508.07
4388.74
7351.93
14184.76
21902.36

2360.64
4779.54
7952.70
15427.13
22993.09

2488.47
4230.29
7806.88
15281.31
21418.24

Pans&Cisterns

Providing&fixingIndiantypevitreouschinaw.csquattingpan,including100mmH.C.IPorStrap,10litlowlevelvitreouschina
cistern&fittings,repairwalls
PI0040
500mm,white
each
3771.89
3637.15
3946.29
PI0041
580mm,whiteOrissamodel
each
4420.20
4561.64
4975.77
PI0042
580mm,colourOrissamodel
each
5146.86
5104.09
5404.48

Providing&fixingEuropeantypevitreouschinaw.cpedestalincludingseatandlidwithc.pbrasshinges,15litwhitevitreouschina
lowlevelcistern,fittings,brackets,repairwalls
PI0050
PI0051

white,withplasticseat&lid
coloured,withplasticseat&lid

each
each

4273.79
5617.65

4375.57
6985.72

4947.18
6993.89

pair

163.75

149.17

131.67

FootRests

PI0060

Providing&fixingwhitevitreouschinafootrests(250x130x30mm)for
IndianW.C

DepartmentofEngineeringServices,MoWHS

45

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Urinals

Providing&fixingwhitevitreouschinaflatback,lippedfronturinalbasin430x260x350mmincludingC.Icistern&fittings,brackets,
G.I.flushpipe&spreaders,brassunions,G.I.clamps,painting,repairwalls

PI0065
Onebowl5litres.C.I.cistern
each
3682.77
3546.75
3920.04
PI0066
Twobowls10litres.C.I.cistern
each
5375.09
5632.67
6081.21
PI0067
Threebowls10litres.C.I.cistern
each
6833.94
7159.64
7771.50

Baths

Providingandfixingbathtubswithfittingsandaccessoriescomplete
PI0075

PI0076
PI0077

Porcelain,whiteenamelled,withapairof20mmC.Ppillartap,40mm
C.Pbrasswaste,32mmC.Pbrassoverflow,rubberplug,40mmC.P
trapetc.
Fibreglasstub,white
PTrap,heavyduty,forbathtub

each

19995.65

20552.97

20564.63

each
each

17069.45
111.79

18589.17
136.29

18134.22
121.13

Basins&Sinks

Providing&fixingwhitevitreouschinawashbasin,includingC.Ibrackets,15mmC.P.brasspillartaps,c.p.chain&rubberplug,
32mmpvcwaste,32mmdia.trap&union,repairwalls
PI0085
PI0086
PI0087
PI0088

Flatbackwashbasin630x450mmwithapairof15mmc.p.brasspillar
taps
Flatbackwashbasin630x450mmwithsingle15mmc.p.brasspillar
taps
Flatbackwashbasin550x400mmwithapairof15mmc.p.brasspillar
taps
Flatbackwashbasin550x400mmwithsingle15mmc.p.brasspillartap

each

4465.54

4120.93

4054.44

each

3912.20

3713.46

3679.04

each

3614.16

3279.85

3173.69

each

3060.81

2872.37

2798.30

Providing&fixingwhitevitreouschinaanglebackwashbasin400x400mmincludingbrackets,15mmc.pbrasspillartaps,c.pbrass
chain&rubberplug,32mmc.pbrasswaste,32mmdiac.pbrasstrapandM.Iunionandrepairwalls
PI0095
PI0096

Withsingle15mmc.p.brasspillartap
Withpairof15mmc.p.brasspillartaps

each
each

2987.71
3541.05

2943.53
3351.01

2833.29
3208.69

FlushValve&Bend

PI0105
PI0106

Providing&fixingc.p.flushvalve,32mmwith40mmoutlet
Providing&fixingc.p.concealedflushvalve,32mmwith40mmoutlet

each
each

1206.02
1372.83

1211.85
1381.00

1215.35
1391.50

PI0107
PI0108

Providing&fixingc.p.flushbend,long
Providing&fixingc.p.flushvalveelbow

each
each

511.92
436.09

517.75
441.93

552.75
453.59

DepartmentofEngineeringServices,MoWHS

46

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

1329.77

1302.94

1431.26

3981.23
1048.90
1328.87

4531.55
1189.40
1340.54

4315.74
1048.90
1282.21

1501.90
2010.81

1847.49
2594.08

1800.83
1975.81

2273.28

2804.06

2209.12

2996.05
1777.50
2127.46

3182.70
1800.83
2360.77

3206.03
1719.17
2302.45

4115.94

3905.96

4255.92

4430.90

4372.58

4104.27

each

892.46

1172.43

1522.39

each

108.39

118.89

142.22

each
each
each

89.49
203.85
292.41

89.73
229.71
282.21

101.39
223.88
270.54

each
each
each
each
each
each
each

6355.08
6722.04
7436.25
9038.50
11186.22
16574.22
20200.21

7452.97
7380.37
8488.01
10004.52
13245.33
16179.20
21631.65

6348.16
6446.36
8199.24
9132.48
14747.93
15914.48
23210.30

PI0175
Showerwithrevolvingjoint,15mm,
PI0176
Adjustableshower,withlockingkey,15mm
PI0177
Showerarm,standard15mm
PI0178
Showerarm,heavyduty15mm
PI0179
Flexibleshowertube&shower

Providing&fixingc.p.brassstopcock

each
each
each
each
each

669.40
791.89
581.91
377.77
1043.21

611.08
870.63
436.09
436.09
1124.87

552.75
838.55
587.75
482.76
1171.53

PI0185
PI0186
PI0187
PI0188
PI0189

each
each
each
each
each

541.08
600.58
794.46
844.62
559.94

508.42
537.19
669.40
664.74
532.33

538.17
605.24
1074.20
815.22
395.26

Pedestals&KitchenSinks

PI0115
Providing&fixingpedestalsforbasins,whitevitreouschina,recessedba each

Providing&fixingKitchenSinksincludingallconnectionsandfittings
PI0120
PI0121
PI0122
PI0123

Whiteglazedvitreouschina600x450x250mmincludingaccessories
andrepairstowallsetc.
Stainlesssteel,450x400x150mm,singlebowl
Stainlesssteel,580x480x175mm,singlebowl
Stainlesssteel,940x460x160mm,singlebowl&drainboard

each
each
each
each

PI0124
PI0125

Stainlesssteel,1080x520x175mm,singlebowl&drainboard
Stainlesssteel,1150x515x175mm,singlebowl&drainboard

each
each

PI0126

Stainlesssteel,1740x520x200mm,singlebowl&doubledrainboard each

PI0127
PI0128
PI0129

Stainlesssteel,940x460x160mm,doublebowl
each
Stainlesssteel,1150x520x160mm,singlebowl
each
Stainlesssteel,1740x520x200mm,doublebowl&singledrainboard each

PI0130

Stainlesssteel,1740x520x200mm,doublebowl&doubledrain
board

each

DrainBoard,Rubberplug

PI0140
PI0141

Providing&fixingstainlesssteeldrainboard,610x460mmwithall
necessaryfittings
Providing&fixingc.p.brasschain&rubberplugforbasinandsink

Wastes

PI0150
PI0151
PI0152

Providing&fixing32mmdiapvc.waste
Providing&fixing32mmc.p.brasswaste
Providing&fixing40mmc.p.brasswaste

WaterHeaters

Providing&fixingElectricwaterheaterincludingnecessaryfittings
PI0160
PI0161
PI0162
PI0163
PI0164
PI0165
PI0166

10litres
15litres
25litres
35litres
50litres
70litres
100litres

WaterSupplyFittings

Providing&fixingC.P.Brassshowerfittings

15mm,standard,c.pknob
20mm,standard,c.pknob
20mm,heavyduty,c.pknob
15mm,concealed,c.pknob
15mm,angle,c.pknob

DepartmentofEngineeringServices,MoWHS

47

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Providing&fixingc.p.brasspillarcock
PI0195
15mm,standard,c.pknob
PI0196
15mm,swanneck,c.pknob

Providing&fixingc.p.brassbibcock

each
each

564.46
1070.46

418.60
707.51

386.52
599.41

PI0205
15mm,standardvertical,c.pknob
PI0206
15mm,inclined,c.p.knob
PI0207
15mm,longnose,c.p.knob
PI0208
15mm,longbody,c.p.knob

Providing&fixingc.p.brassmixers,15mm

each
each
each
each

541.08
637.32
695.26
691.92

491.50
451.65
529.42
604.08

490.92
609.91
606.41
669.40

PI0215
PI0216
PI0217
PI0218
PI0219
PI0220
PI0221
PI0222
PI0223
PI0224
PI0225
PI0226
PI0227

each
each
each
each
each
each
each
each
each
each
each
each
each

2242.38
1893.11
2476.68
2826.12
1599.73
1475.26
821.06
2386.57
3073.66
3079.73
2535.88
1489.26
189.66

2127.59
1730.96
2477.56
2640.87
1602.64
1485.99
786.06
2512.55
3123.82
3089.99
2057.60
1489.26
196.95

2244.25
1742.63
2570.88
2710.87
1777.63
1544.32
844.39
2337.57
3177.49
3136.66
2244.25
1334.34
202.78

each
each
each

3037.50
4183.33
3087.66

2885.85
4110.73
3177.49

2932.51
3970.74
3270.81

each

1544.32

1497.65

1602.64

each
each

515.52
1020.63

521.35
1046.30

505.80
1063.80

each

962.61

962.61

985.94

each

584.40

598.98

604.82

each

608.89

603.99

690.31

each

551.61

530.11

661.15

each

500.28

471.79

509.50

PI0255

Providing&fixingtoiletpaperholder

each

387.39

398.82

397.65

PI0260
PI0261
PI0262
PI0263

each
each
each
each

452.11
912.90
786.06
768.56

441.90
901.23
809.39
796.56

492.94
788.08
704.40
674.07

PI0228
PI0229
PI0230
PI0231

Forbasin,singlehole,castedspout
Forbasin,closehole
Forbasin,elbowaction,surgical
Forbasin,elbowaction,surgicalwithshower
Forsink,withspoutJpipe
Forsink,withcastedspoutswinging
Forsink,withswivelspout
Forwall,nontelephonictype
Forwall,telephonictypewithcrutchandtel.shower
Forwall,telephonictypewithoutcrutchandtel.shower
Forwall,telephonictypewithcrutchandwithouttel.shower
Forwall,telephonictypewithC.Pbend&flanges
Forwall,withtelephonicshowerarrangementwith115mmlongbend
pipeforoverheadshowerconnection
Threeholemixerwithoutpopup
Threeholemixerwithpopup
Forbath,withexposedadjustablelegswithtelephoneshower
arrangementwithcrutch
Forshower,threeinone,withbendflexibletube,andshower&hook

Providing&fixingWallSpouts
PI0240
PI0241

C.p.,standard,15mm
Withdiverter,forusewithsinglelevermixers

BathroomAccessories

PI0250
PI0251
PI0252
PI0253
PI0254

Providing&fixing600x450mmbevellededgemirror(superiorglass)
incl.4mmA.Csheetbasefixedtowoodencleats
Providing&fixing450x120mmglassshelf,includingc.pbrassbrackets
fixedtowoodencleats
Providing&fixingc.p.towelrail750x20mmwithc.pbrassbrackets
fixedtowoodencleats
Providing&fixingc.p.towelrail600x20mmwithc.pbrassbrackets
fixedtowoodencleats
Providing&fixingc.p.towelrail450x20mmwithc.pbrassbrackets
fixedtowoodencleats
Providing&fixingc.p.towelring

C.P.brass
Recessedceramic,200x100mm,coloured,
Recessedceramic,200x100mm,white
Recessedceramic,rolltype,150x150mm

DepartmentofEngineeringServices,MoWHS

48

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

each

463.78

527.94

516.27

PI0275
includingbrackets,woodencleats,c.p.brassscrews
PI0276
Recessed,ceramic,150x150mm
PI0277
Recessed,ceramic,200x100mm

Providing&fixingc.pcoathook

each
each
each

399.62
226.11
335.77

341.29
237.78
307.77

335.46
226.11
290.27

PI0285
PI0286

each
each

228.50
327.66

218.30
305.79

222.67
281.77

SoapContainer,CoatHooks

PI0270

Providing&fixingLiquidsoapcontainer,c.p,includingc.pbrasslid&
brackets,woodencleats,c.pbrassscrews

Providing&fixingsoapdish

Single
Double

DepartmentofEngineeringServices,MoWHS

49

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Chapter17:PLUMBINGOUTDOORWORK

ExternalWaterSupplyPipework

Providing&layingG.I.pipesincludingG.I.fittings(excludingtrenching,refilling&thrustblock)
PO0001 15mm
m
106.32
131.19
135.64
PO0002 20mm
m
128.47
187.77
163.05
PO0003 25mm
m
186.68
239.87
234.03
PO0004 32mm
m
249.79
322.13
316.63
PO0005 40mm
m
302.14
379.70
360.43
PO0006 50mm
m
382.58
473.60
472.61
PO0007 65mm
m
500.69
611.85
611.52
PO0008 80mm
m
637.68
777.22
778.34
PO0009 100mm
m
894.42
1034.91
1113.49
PO0010 150mm
m
1388.90
1804.39
1934.07

Providing&layingH.D.P.Epipes,pressureclass10kg/sq.m,includingH.D.P.Efittings(excludingtrenching,refilling&thrustblock)

PO0015 25mm
m
42.07
45.42
47.09
PO0016 32mm
m
63.30
77.15
64.04
PO0017 40mm
m
93.67
142.55
100.45
PO0018 50mm
m
136.95
179.35
157.22
PO0019 63mm
m
222.18
233.85
252.59
PO0020 75mm
m
301.47
335.34
358.01
PO0021 90mm
m
429.38
481.87
485.68
PO0022 110mm
m
625.03
718.24
730.84
PO0023 140mm
m
1012.59
1115.25
1153.04
PO0024 160mm
m
1300.89
1511.88
1500.31
PO0025 225mm
m
2507.53
2839.02
2923.71

Providing&layingH.D.P.EPipesincludingH.D.P.Efittingspressureclass6kg/sq.cm(excludingtrenching,refilling&thrustblock)

PO0030 32mm
m
46.63
59.51
57.17
PO0031 40mm
m
68.30
91.10
74.53
PO0032 50mm
m
97.81
117.35
105.41
PO0033 63mm
m
157.73
176.11
188.75
PO0034 75mm
m
209.99
222.77
255.88
PO0035 90mm
m
297.99
305.14
366.47
PO0036 110mm
m
428.20
430.69
467.40
PO0037 140mm
m
685.96
810.20
767.81
PO0038 160mm
m
880.31
1018.42
982.50
PO0039 225mm
m
1682.11
1832.68
1892.72

Providing&layingH.D.P.EPipesincludingH.D.P.Efittingspressureclass4kg/sq.cm(excludingtrenching,refilling&thrustblock)

PO0045
PO0046
PO0047
PO0048
PO0049
PO0050
PO0051
PO0052
PO0053

40mm
50mm
63mm
75mm
90mm
110mm
140mm
160mm
225mm

m
m
m
m
m
m
m
m
m

65.44
72.44
116.67
156.86
221.22
309.42
423.99
689.46
1201.15

DepartmentofEngineeringServices,MoWHS

70.57
87.02
127.11
181.94
246.81
338.53
520.31
705.79
1356.72

71.60
77.61
122.11
169.53
236.97
331.69
537.11
701.59
1359.91

50

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Providing&layingH.D.P.EPipesincludingH.D.P.Efittingspressureclass2.5kg/sq.cm(excludingtrenching,refilling&thrustblock)

PO0060
PO0061
PO0062
PO0063

110mm
140mm
160mm
225mm

m
m
m
m

218.96
346.76
431.81
798.37

263.29
456.15
537.81
1004.43

266.79
420.45
532.44
1041.99

m
m
m
m
m
m
m
m
m
m
m

1009.83
1166.25
1720.59
2338.99
3126.19
3975.14
4921.92
5908.11
6977.92
8153.65
11607.45

1009.83
1166.25
1720.59
2338.99
3126.19
3975.14
4921.92
5908.11
6977.92
8153.65
11607.45

1009.83
1166.25
1720.59
2338.99
3126.19
3975.14
4921.92
5908.11
6977.92
8153.65
11607.45

m
m
m
m
m
m
m
m
m
m

1011.09
1514.14
1972.42
2598.71
3313.46
4089.58
4904.23
5756.01
6766.21
9861.83

1011.09
1514.14
1972.42
2598.71
3313.46
4089.58
4904.23
5756.01
6766.21
9861.83

1011.09
1514.14
1972.42
2598.71
3313.46
4089.58
4904.23
5756.01
6766.21
9861.83

2031.14
2927.55
4116.37
5413.49
6714.27
8321.52
9976.36
13464.84
15856.19
20683.74

2031.14
2927.55
4116.37
5413.49
6714.27
8321.52
9976.36
13464.84
15856.19
20683.74

2031.14
2927.55
4116.37
5413.49
6714.27
8321.52
9976.36
13464.84
15856.19
20683.74

ProvidingandLayingDuctileIronK9pipes
PO0065
PO0066
PO0067
PO0068
PO0069
PO0070
PO0071
PO0072
PO0073
PO0074
PO0075

80mm
100mm
150mm
200mm
250mm
300mm
350mm
400mm
450mm
500mm
600mm

ProvidingandLayingDuctileIronK7pipes
PO0078
PO0079
PO0080
PO0081
PO0082
PO0083
PO0084
PO0085
PO0086
PO0087

100mm
150mm
200mm
250mm
300mm
350mm
400mm
450mm
500mm
600mm

ProvidingandLayingDoubleFlanged(ScrewedorWelded)CentrifugallySpunDuctileIronK9Pipes
PO0090
PO0091
PO0092
PO0093
PO0094
PO0095
PO0096
PO0097
PO0098
PO0099

100mm
150mm
200mm
250mm
300mm
350mm
400mm
450mm
500mm
600mm

m
m
m
m
m
m
m
m
m
m

BrassFittings

Providing&fixingbrassstopcock
PO0100 15mm
PO0101 20mm
PO0102 25mm

Providing&fixingbrassfullwayvalvewithwheel

each
each
each

332.19
347.94
473.35

317.03
332.19
437.18

320.53
349.69
466.35

PO0105
PO0106
PO0107
PO0108
PO0109

each
each
each
each
each

915.82
1229.85
1772.53
2257.00
3009.43

915.47
1265.43
2163.68
3796.85
4380.12

1049.62
1485.13
2014.36
3260.23
4380.12

32mm
40mm
50mm
65mm
80mm

DepartmentofEngineeringServices,MoWHS

51

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Providing&fixingnonreturnvalve
PO0110 50mm
PO0111 65mm
PO0112 80mm

Providing&fixingbrassbibcock

each
each
each

1679.56
2749.29
4170.14

1654.28
2921.94
3855.18

1743.72
3008.84
3907.67

PO0114

each

209.71

204.66

209.71

each
each
each
each
each
each
each
each

50.41
66.37
103.11
226.04
142.05
390.52
530.51
1755.39

58.05
81.39
116.38
186.38
320.53
454.68
740.49
2303.66

41.34
55.28
82.76
160.19
292.30
409.65
708.70
2752.44

PO0125 32mm
PO0126 50mm
PO0127 63mm
PO0128 90mm
PO0129 110mm

Providing&fixingH.D.P.EReducer

each
each
each
each
each

35.31
89.55
119.30
346.78
460.51

104.72
338.03
373.02
384.69
448.85

62.66
125.39
227.93
317.38
571.63

PO0130 90x50mm
PO0131 90x63mm
PO0132 110x63mm
PO0133 110x90mm

Providing&fixingH.D.P.EBlankEnd(Cap)

each
each
each
each

238.87
244.70
244.70
693.82

262.20
268.62
268.62
762.65

273.87
280.57
280.57
797.06

PO0140
PO0141
PO0142
PO0143
PO0144

each
each
each
each
each

118.72
151.38
289.03
332.19
565.50

130.03
165.96
317.38
364.86
621.50

135.69
173.25
331.55
381.19
649.50

69.50
83.12
132.79
205.85
266.95
365.94
402.75
564.96
610.38
664.93
1109.12

69.50
83.12
132.79
205.85
266.95
365.94
402.75
564.96
610.38
664.93
1109.12

15mm,brass

H.D.P.EFittings(ButtWeldedType)

Providing&fixingH.D.P.E,EqualTeebuttweldedtypefittings
PO0115
PO0116
PO0117
PO0118
PO0119
PO0120
PO0121
PO0122

20mm
25mm
32mm
50mm
63mm
90mm
110mm
160mm

Providing&fixingH.D.P.EElbow

50mm
63mm
90mm
110mm
160mm

ProvidingandfixingpushonjointstoCentrifugallySpunD.Ipipesincludingthecostofrubbergaskets
PO0150
PO0151
PO0152
PO0153
PO0154
PO0155
PO0156
PO0157
PO0158
PO0159
PO0160

80mm
100mm
150mm
200mm
250mm
300mm
350mm
400mm
450mm

500mm
600mm

each
each
each
each
each
each
each
each
each
each
each

69.50
83.12
132.79
205.85
266.95
365.94
402.75
564.96
610.38
664.93
1109.12

DepartmentofEngineeringServices,MoWHS

52

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

each
each
each
each

124.10
149.58
174.68
271.61

130.39
156.76
182.68
285.98

136.68
163.95
190.68
300.35

m
m
m
m

406.11
528.86
634.44
1023.45

321.53
665.87
827.27
1177.38

321.53
539.01
719.01
1099.57

PO0170 50mmdia
PO0171 75mmdia
PO0172 100mmdia

Providing&fixingC.Iplainbendincludingfittings

each
each
each

245.17
240.04
303.03

250.54
332.19
361.36

247.62
350.86
373.02

PO0180 50mmdia
PO0181 75mmdia
PO0182 100mmdia

Providing&fixingC.Iheelrestbend

each
each
each

180.54
206.21
349.69

203.87
215.54
338.03

200.96
227.20
352.61

PO0190 50mm
each
PO0191 75mm
each
PO0192 100mm
each

Providing&fixingC.Idoubleequaldoorjunctionincludingfittings

150.21
303.03
378.86

145.55
300.70
448.85

180.54
273.87
355.53

PO0200
PO0201
PO0202

each
each
each

497.84
380.61
298.36

460.51
320.53
268.03

545.09
308.86
262.20

PO0210 100mm
each
PO0211 75mm
each
PO0212 50mm
each

Providing&fixingC.Isingleequaldoorjunctionincludingfittings

640.16
429.02
343.86

577.17
291.36
244.70

653.00
308.86
262.20

PO0220 150mm
PO0221 100mm
PO0222 75mm
PO0223 50mm

Providing&fixingC.Isingleequalplainjunctionincludingfittings

each
each
each
each

373.02
349.69
257.54
203.87

460.51
361.36
252.87
211.46

501.34
384.69
268.03
227.20

PO0230 100mm
each
PO0231 75mm
each
PO0232 50mm
each

Providing&fixingC.Idoubleunequaldoorjunctionincludingfittings

507.18
373.02
250.54

448.85
343.86
244.70

530.51
326.36
238.87

PO0240
PO0241

437.18
384.69

436.02
384.69

460.51
402.19

SoilWastePipework

ProvidingleadcaulkedjointstoC.Ipipesandfittings
PO0162 50mmdiapipe
PO0163 75mmdiapipe
PO0164 100mmdiapipe
PO0165 150mmdiapipe

Providing&fixingC.ISoilWasteandVentpipes
PO0166
PO0167
PO0168
PO0169

50mmdia
75mmdia
100mmdia
150mmdia

WasteFittings&Accessories

Providing&fixingC.Idoorbendincludingfittings

100mm
75mm
50mm

Providing&fixingC.Idoubleequalplainjunctionincludingfittings

100x75mm
100x50mm

each
each

DepartmentofEngineeringServices,MoWHS

53

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Providing&fixingC.Idoubleunequalplainjunction
PO0250 100x75mm
PO0251 100x50mm

Providing&fixingC.Isingleunequaldoorjunction

each
each

425.52
367.19

419.69
373.02

437.18
384.69

PO0260 100x75mm
PO0261 100x50mm
PO0262 75x50mm

Providing&fixingC.Isingleunequalplainjunction

each
each
each

433.68
408.02
268.62

444.18
408.02
274.45

451.77
425.52
285.53

PO0270 100x75mm
PO0271 100x50mm
PO0272 75x50mm

Providing&fixingC.IdoubleequalYJunction

each
each
each

378.86
326.36
250.54

385.86
338.03
261.03

390.52
346.19
262.20

PO0280 100mm
PO0281 75mm
PO0282 50mm

Providing&fixingC.IsingleequalYJunction

each
each
each

640.16
479.18
343.86

571.34
378.86
308.86

410.35
349.69
285.53

PO0290 100mm
PO0291 75mm
PO0292 50mm

Providing&fixingsingleunequalplaininvertedbranch

each
each
each

600.50
433.68
227.20

583.00
413.85
198.04

530.51
285.53
250.54

PO0300 100x50mm
PO0301 75x50mm

Providing&fixingS.C.Ioffsets100mmOffsets

each
each

447.68
323.45

453.52
332.19

468.68
347.36

PO0310 75mmprojection
PO0311 150mmprojection

Providing&fixingS.C.Ioffsets75mmoffset

each
each

308.86
454.68

317.03
443.02

326.36
443.02

PO0320 75mmprojection
PO0321 150mmprojection

Providing&fixingS.C.Ioffsets50mmoffset

each
each

308.86
431.35

317.03
431.35

326.36
443.02

PO0330 75mmprojection
PO0331 150mmprojection

Providing&fixingC.Iterminalguard

each
each

317.61
455.85

285.53
460.51

262.20
466.35

PO0340 150mm
PO0341 100mm
PO0342 75mm
PO0343 50mm

Providing&fixingC.Icollar

each
each
each
each

635.50
361.36
238.87
145.55

635.50
355.53
252.87
151.38

568.42
355.53
289.62
209.71

PO0350
PO0351
PO0352

each
each
each

257.54
181.71
132.71

361.36
227.20
180.54

384.69
227.20
192.21

100mm
75mm
50mm

DepartmentofEngineeringServices,MoWHS

54

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Providing&fixingC.IPTypeNahanitrap
PO0360 100mminlet&75mmoutlet
each
439.20
545.94
560.52
PO0361 100mminlet&50mmoutlet
each
252.55
405.95
467.19

Providing&fixingP.V.Csoilwasteandventpipes,singleordoublesocketed,includingpipeclipcomplete(excludingthecostofPVC
fittings)
PO0370 75mmdia
PO0371 90mmdia
PO0372 110mmdia

Providing&fixingP.V.CPipeconnector

m
m
m

155.23
210.73
277.40

151.31
222.49
282.10

149.68
206.81
286.80

PO0380 110mmdia

Providing&fixingP.V.CCoupler

each

207.14

215.54

227.50

PO0385 75mmdia
PO0386 90mmdia
PO0387 110mmdia

Providing&fixingP.V.CReducer

each
each
each

69.31
80.92
95.34

79.64
94.80
105.88

67.27
88.79
100.44

PO0395 90x75mm
PO0396 110x75mm
PO0397 110x90mm

Providing&fixingP.V.Cplainbend

each
each
each

107.05
116.38
136.21

143.21
142.63
180.54

111.54
140.41
166.19

PO0405 75mmdia
PO0406 90mmdia
PO0407 110mmdia

Providing&fixingP.V.Cdoorbend

each
each
each

87.22
118.72
136.21

104.72
133.88
157.21

116.38
151.38
174.71

PO0415 75mmdia
PO0416 90mmdia
PO0417 110mmdia

Providing&fixingP.V.CLongarmbendwithdoor

each
each
each

116.38
136.21
178.21

128.05
163.04
192.21

136.21
172.38
168.88

PO0425 75mmdia
PO0426 90mmdia
PO0427 110mmdia

Providing&fixingP.V.CSingleTeeplain

each
each
each

198.04
293.70
399.85

209.71
301.86
390.52

255.28
350.66
416.19

PO0435 75mmdia
PO0436 90mmdia
PO0437 110mmdia

Providing&fixingP.V.CSingleTeewithdoor

each
each
each

109.38
144.61
186.38

125.71
180.54
198.04

89.55
151.38
159.54

PO0445 75mmdia
PO0446 90mmdia
PO0447 110mmdia

Providing&fixingP.V.CDoubleTeeplain

each
each
each

118.17
157.68
207.84

139.71
168.88
215.54

111.72
159.54
196.87

PO0455
PO0456
PO0457

each
each
each

182.10
251.94
328.54

159.54
245.87
279.70

180.54
256.37
354.36

75mmdia
90mmdia
110mmdia

DepartmentofEngineeringServices,MoWHS

55

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Providing&fixingP.V.CDoubleTeewithdoor
PO0465 75mmdia
PO0466 90mmdia
PO0467 110mmdia

Providing&fixingP.V.CSingleY,plain

each
each
each

264.53
322.86
360.81

317.03
417.94
452.93

256.37
250.54
361.36

PO0475 75mmdia
PO0476 90mmdia
PO0477 110mmdia

Providing&fixingP.V.CSingleY,withdoor

each
each
each

139.71
164.21
244.70

163.04
268.03
311.97

179.38
253.45
277.91

PO0485
PO0486
PO0487

each
each
each

320.53
207.14
311.20

421.75
312.36
405.69

426.88
314.93
325.00

PO0495 75mmdia
PO0496 90mmdia
PO0497 110mmdia

Providing&fixingP.V.CDoubleY,withdoor

each
each
each

192.21
332.19
325.19

265.70
370.69
413.27

222.13
422.02
378.91

PO0505 75mmdia
PO0506 90mmdia
PO0507 110mmdia

Providing&fixingP.V.COffset,75mmdia

each
each
each

264.53
282.73
425.52

308.86
395.77
468.10

343.86
422.02
341.53

PO0515 With75mmprojection
PO0516 With150mmprojection

Providing&fixingP.V.COffset,90mmdia

each
each

217.41
253.80

236.54
332.19

227.20
297.20

PO0525 With75mmprojection
PO0526 With150mmprojection

Providing&fixingP.V.COffset,110mmdia

each
each

364.86
515.11

389.36
478.01

289.56
462.85

PO0535 With75mmprojection
PO0536 With150mmprojection

Providing&fixingP.V.CTerminalguard

each
each

343.86
388.88

432.52
483.85

294.09
342.69

PO0545 75mmdia
PO0546 90mmdia
PO0547 110mmdia

Providing&fixingP.V.CPTrap,withoutairvent

each
each
each

96.55
104.72
110.55

109.38
122.22
125.71

107.05
116.38
128.05

PO0555 Big
PO0556 Small

Providing&fixingP.V.CNahaniTrap

each
each

396.35
373.02

476.85
413.85

460.51
402.19

PO0565

each

147.88

145.55

145.55

75mmdia
90mmdia
110mmdia

Providing&fixingP.V.CDoubleY,plain

110mminlet&75mmoutlet

DepartmentofEngineeringServices,MoWHS

56

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

PO0570 15mmdiapipe
m
3.67
PO0571 20mmdiapipe
m
4.92
PO0572 25mmdiapipe
m
6.10
PO0573 32mmdiapipe
m
7.82

PaintingC.Ispunsoilwasteventpipes&fittingsincludingprimer,topcoat(anycolour),fornewwork

3.44
4.61
5.71
7.32

3.65
4.89
6.06
7.77

PaintingG.IPipes&Fittings

PaintingG.Ipipesandfittingsincludingprimer&whitecoat,fornewwork

PO0580 50mm
m
PO0581 75mm
m
PO0582 100mm
m

RepaintingC.Ispunsoilwasteventpipes&fittingsincludingpaintsofanycolour

12.60
6.35
25.19

11.78
6.62
23.56

12.54
6.89
25.09

PO0590
PO0591
PO0592

6.07
9.10
12.13

5.53
8.30
11.07

6.03
9.05
12.06

50mm
75mm
100mm

m
m
m

Soakpits&SepticTanks

ConstructingSoakPit
PO0600
PO0601

Size1200x1200x1200mm,filledwithbrickbatsincluding100mmSW
drainpipeX1200mmlong
Size2500dia.x3000mmdepthincluding450x450mmdrybrick
honeycombshaftandSWdrainpipeX1800mmlong

each

3186.27

2884.15

2757.67

each

22479.11

19941.52

19042.54

15users
25users
50users
75users
100users

each
each
each
each
each

ConstructingSepticTanks,inR.RMasonryincementmortar1:6,includingfittings,C.Icoverwithframe,40mmthickconcrete
flooring(40mmaggregates)cementplasterconcretebaseinC.C1:4:8etc.completeasperstandarddesign
PO0610
PO0611
PO0612
PO0613
PO0614

22691.68
27386.71
38797.75
45063.71
54246.40

24464.72
29711.31
42355.87
49239.78
58997.71

25119.13
30584.83
43871.85
51059.63
61254.57

ConstructingSepticTanks,in2ndclassbrickmasonryincementmortar1:4,includingfittings,C.Icoverwithframe,40mmthick
concreteflooring(40mmaggregates)cementplasterconcretebaseinC.C1:4:8etc.completeasperstandarddesign
PO0620 15users
each
24894.50
26475.03
26609.57
PO0621 25users
each
31245.10
33902.40
33734.22
PO0622 50users
each
43800.36
47817.79
47684.45
PO0623 75users
each
52891.82
57898.58
57794.36
PO0624 100users
each
64086.27
69788.69
69686.02

ConstructingSepticTanks,inreinforcedconcrete1:2:4(20mmaggregates)includingfittings,C.Icoverwithframe,40mmthick
concreteflooring(40mmaggregates)cementplasterconcretebaseinC.C1:4:8etc.completeasperstandarddesign
PO0630
PO0631
PO0632
PO0633
PO0634

15users
25users
50users
75users
100users

each
each
each
each
each

28917.51
37145.46
53067.72
65547.82
80899.72

DepartmentofEngineeringServices,MoWHS

30434.35
39675.75
56872.09
70125.88
85868.83

30919.96
40027.37
57555.71
71032.39
86926.65

57

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

sq.m
sq.m

68.18
72.33

68.18
72.33

68.18
72.33

sq.m
sq.m
sq.m

76.00
70.53
1.67

81.30
74.67
1.67

82.74
75.83
1.67

PL0020 C.M1:3
sq.m
PL0021 C.M1:4
sq.m
PL0022 C.M1:5
sq.m
PL0023 C.M1:6
sq.m

Providing&laying15mmcementplasteronroughsideofsingleorhalfbrickwall

106.94
95.92
89.97
84.91

117.56
104.19
96.97
90.83

120.42
106.52
99.00
92.61

PL0030 C.M1:3
PL0031 C.M1:4
PL0032 C.M1:5
PL0033 C.M1:6

Providing&laying20mmcementplaster

sq.m
sq.m
sq.m
sq.m

125.93
112.80
105.67
99.60

138.62
122.68
114.04
106.67

142.05
125.46
116.46
108.80

PL0040 C.M1:3
sq.m
PL0041 C.M1:4
sq.m
PL0042 C.M1:5
sq.m
PL0043 C.M1:6
sq.m

Providing&laying12mmplaincementmortarbandinC.M1:4

155.82
138.68
129.43
121.53

172.34
151.54
140.32
130.75

176.80
155.16
143.48
133.51

PL0050 Flushband
sq.m
PL0051 Sunkband
sq.m
PL0052 Raisedband
sq.m

Providing&laying20mmplaincementmortarbandinC.M1:4

210.55
228.34
257.75

218.59
236.38
265.79

220.85
238.64
268.05

PL0060 Flushband
sq.m
PL0061 Sunkband
sq.m
PL0062 Raisedband
sq.m

Providing&layingcementplaster,finishedwithfloatingcoatofneatcement

261.40
282.33
317.92

272.89
293.82
329.41

276.12
297.05
332.63

PL0070
PL0071
PL0072
PL0073
PL0074
PL0075
PL0076

134.98
153.98
183.86
123.97
140.84
166.72
109.28

148.36
169.43
203.15
135.00
153.49
182.35
117.59

151.87
173.49
208.25
137.96
156.91
186.60
119.43

Chapter18:PLASTERING

MudPlaster

Providing&layingmudplasterincludingneatfinish
PL0001
PL0002

15mm
20mm

CementPlaster

Providing&laying6mmcementplaster(inceilings)
PL0010 C.M1:3
PL0011 C.M1:4
PL0012 Extraforplastertoceilingheight>5m......peradditionalmetre.ht

Providing&laying12mmcementplaster

12mmplasterinC.M1:3
15mmplasterinC.M1:3
20mmplasterinC.M1:3
12mmplasterinC.M1:4
15mmplasterinC.M1:4
20mmplasterinC.M1:4
6mmcementplasterinC.M1:3,includinglimewashontopofwall
whendryforbearingR.Cslabsandbeams

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

DepartmentofEngineeringServices,MoWHS

58

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Roughcastplasterwithamixtureofsandandgravelorcrushedstone212mmincludingplasterin2layers12mm1:4,&10mm1:3
hydratedlimecement
PL0080 Greycement
sq.m
247.73
268.01
272.15
PL0081 Whitecement
sq.m
396.47
422.69
428.81

Pebbledashplasterwithamixtureofwashedpebbleorcrushedstone6mmto12mmnominalsizedashedoverfreshplasterinthe
layers,underlayer12mmcementplaster1:4andtoplayer10mm
cementplastermixedwithfinallygroundhydratedlimebyvolumeofcement
PL0090

Greycement

sq.m

246.24

266.52

270.65

CementPlasterin2coats
PL0091

18mmcementplasterintwocoats;underlayer12mmC.P1:5(1
cement:5sand)andtoplayer6mmthickC.P1:4(1cement:6sand)
finishedevenandsmoothandcuringetc.complete

sq.m

82.32

82.46

82.49

Pl0092

18mmcementplasterintwocoats;underlayer12mmC.P1:5(1
cement:5sand)andtoplayer6mmthickC.P1:3(1cement:6sand)
finishedevenandsmoothandcuringetc.complete

sq.m

82.29

82.41

82.45

sq.m

144.79

151.66

156.29

sq.m

63.36

63.36

63.36

CementLimePlaster
PL0095

PL0096

12mmcementlimeplasterofmixonfairsideofbrickwork1:1:6(1
cement:1lime:6sand)finishedevenandsmoothandcuringetc.
complete
12mmcementlimeplasterofmixonroughsideofbrickwork1:1:6(
1cement:1lime:6sand)finishedevenandsmoothandcuringetc.
complete

Extraforprovidingandmixingwaterproofingmaterialsinproportionrecommendedbythemanufacturers
PL0100
PL0101
PL0102
PL0103
PL0104
PL0105

12mmplasterinC.M1:3
12mmplasterinC.M1:4
15mmplasterinC.M1:3
15mmplasterinC.M1:4
20mmplasterinC.M1:3
20mmplasterinC.M1:4

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

9.51
7.85
10.34
8.71
12.33
10.16

8.99
7.45
9.76
8.24
11.62
9.60

8.99
7.45
9.76
8.24
11.62
9.60

sq.m

28.04

30.81

31.45

601.92
31.96

601.92
31.96

Extraforcementplastering

PL0110

Neatcementpunning

PlasterofParis

Providing&fixing12mmPlasterofParis(gypsumanhydrous)tiles,renderedsmoothwithPlasterofParis
PL0120
PL0121

Heightabovefloor<5m
Extraforheightsabovefloor>5m.....permetreheight

sq.m
sq.m

DepartmentofEngineeringServices,MoWHS

508.02
31.96

59

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

sq.m
sq.m

4.44
5.48

4.44
5.48

4.44
5.48

PT0010 Cementprimer
PT0011 Metalworksyntheticredoxideprimer
PT0012 Woodworkpinkprimer
PT0013 Woodworkwhiteprimer
PT0014 Redleadprimer

Providing&applyingwhiteorcolourwashing

sq.m
sq.m
sq.m
sq.m
sq.m

27.00
21.28
24.31
22.01
21.85

26.92
21.35
25.32
21.78
21.75

27.32
21.14
25.27
21.85
21.85

PT0020
PT0021
PT0022
PT0023

sq.m
sq.m
sq.m
sq.m

17.04
10.34
5.83
17.04

17.22
10.46
5.89
17.22

17.74
10.81
6.06
17.74

PT0024
PT0025

FinishingwallwithWaterProofCementPaint

sq.m
sq.m

10.34
5.83

10.46
5.89

10.81
6.06

PT0030 Newwork,threecoats
PT0031 Oldwork,onecoats

Providingandapplyingfinishingcoats

sq.m
sq.m

49.57
23.53

53.08
24.94

57.23
26.61

PT0040

Drydistemper,twocoatsonnewwork,includingwhiteprimingcoat sq.m

42.63

42.95

43.53

PT0041
PT0042

sq.m
sq.m

19.58
59.39

19.75
59.13

20.02
61.57

PT0043
PT0044
PT0045
PT0046

Drydistemper,onecoatonoldwork
Acrylicwashabledistemper,twocoatsonnewwork,includingcement
primercoat
Acrylicwashabledistemper,onecoatonoldwork
Bituminasticenamel,forsteelwork,twocoatsonnewwork
Bituminasticenamel,forsteelwork,onecoatonoldwork
Syntheticenamel,forsteel&woodwork\onecoatonoldwork

sq.m
sq.m
sq.m
sq.m

19.17
49.25
31.46
33.86

19.05
50.47
32.20
33.65

20.40
51.47
32.79
36.68

PT0047

Syntheticenamel,forsteel&woodwork,twocoatsonnewwork

sq.m

53.47

53.12

58.17

PT0048

Highglosssyntheticenamel\forsteel&woodwork,twocoatsonnew
work
Highglosssyntheticenamel,forsteel&woodwork\onecoatonold
work
Redcorrugal,readymixed\onG.I.sheets,twocoatsonnewwork
Redcorrugal,readymixed,onG.I.sheets\onecoatonoldwork

sq.m

56.88

51.88

56.54

sq.m

37.92

34.58

37.69

sq.m
sq.m

41.26
26.41

41.93
26.80

46.52
29.44

sq.m

74.50

75.91

75.91

sq.m
sq.m
sq.m

35.72
30.00
47.93

37.22
30.25
48.35

35.56
29.80
47.58

Chapter19:PAINTING&WALLPAPER

SurfacePreparation

Surfacepreparationremovingbyscraping,sandpapering,includingscratchrepairs
PT0001
PT0002

Whitecolourwash
Dryoilbounddistemper

PaintingItems

Providing&applyingonecoatofprimers

PT0049
PT0050
PT0051
PT0052
PT0053
PT0054
PT0055

Whitewashingwithlimenewworkthreecoats
Whitewashingwithlime,oldwork,twocoats
Whitewashingwithlime,oldwork,onecoat
Colourwashing\newwork,twocoats,includingbasecoatofwhite
washwithlime
Colourwashingwithlime,oldwork,twocoats
Colourwashingwithlime,oldwork,onecoat

Vinylplasticemulsionpaint,forcement,masonry,plaster,twocoats
onnewwork
Acrylicemulsion,onecoat
Aluminiumpaint,onecoatonoldwork
Aluminiumpaint,twocoatsonnewwork

DepartmentofEngineeringServices,MoWHS

60

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

sq.m
sq.m
sq.m

57.59
66.62
119.56

56.12
66.78
119.82

54.89
70.41
125.74

sq.m
sq.m

71.87
128.12

72.46
129.07

73.04
130.02

sq.m
sq.m
sq.m
sq.m

23.82
18.66
41.37
21.98

22.65
17.71
39.73
21.28

24.98
19.60
40.55
21.63

sq.m
sq.m

380.99
513.28

384.67
521.85

389.56
530.43

PT0090 Rab
sq.m
PT0091 Ding
sq.m
PT0092 Thamar
sq.m

Providing,preparingandapplyingDangtshonpainting(Notwashable)

449.14
319.61
234.11

451.88
321.96
236.45

451.41
321.28
235.77

PT0100 Rab
sq.m
PT0101 Ding
sq.m
PT0102 Thamar
sq.m

Providing,preparingandapplyingSumdangwashablepainting

620.15
462.12
319.61

622.89
464.47
321.96

622.42
463.78
321.28

PT0110 Rab
sq.m
PT0111 Ding
sq.m
PT0112 Thamar
sq.m

Providing,preparingandapplyingDangtshonwashablepainting

496.13
375.15
281.10

497.45
376.08
282.02

500.01
378.42
284.37

PT0120 Rab
PT0121 Ding
PT0122 Thamar

Providing,preparingandapplyingYutshonpainting(plain)

630.09
480.61
349.50

631.41
481.54
350.43

633.97
483.88
352.77

Providingandapplyingwoodstains,varnishes&polishes
PT0060
PT0061
PT0062
PT0063
PT0064

Woodstain(variouscolours),onecoat
Syntheticvarnish(clear)onecoat,onoldwork
Syntheticvarnish(clear)twocoats,includingcoatofwoodfilleron
newwork
Frenchpolishonecoat,onoldwork
Frenchpolishtwocoats,onnewwork

WoodPreservatives

Providingandapplyingwoodpreservatives
PT0070
PT0071
PT0072
PT0073

Brown,twocoatsonnewwork
Brown,onecoatonoldwork
Coaltar,twocoatsonnewwork
Coaltar,onecoatonoldwork

WallPaper

Providing&fixingwallpaper
PT0080
PT0081

StandardQuality
HighQuality

TraditionalPainting

Providing,preparingandapplyingSumdangpainting(Notwashable)

sq.m
sq.m
sq.m

PT0130 Washable
sq.m
129.86
130.70
133.08
PT0131 NotWashable
sq.m
108.45
109.39
110.15

Providing,preparingandapplyingflowernaturalpaintingforwalldecorationdesignsuchasTashitageysymbols,TashiZeegay,Za
Tshering,etc.
PT0140
PT0141

DangtshonRab
SumdangRab

sq.m
sq.m

DepartmentofEngineeringServices,MoWHS

85.96
81.69

95.82
91.54

91.77
87.50

61

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Chapter20:ADDITIONS,ALTERATIONS&REPAIRS
RepairtoPlasters

Repairtoplasterincludingcuttingtoshape,surfacepreparation,provingandapplyingcementplastertothesurface,disposal
rubbishwithin50mlead
AA0001

Patcharea<2.5sq.m

sq.m

147.06

157.40

160.30

GlassPanes

Providing&fixingglasspaneswithputty,nailsincludingremaining.brokenglasspanes
AA0005
AA0006
AA0007
AA0008
AA0009

3mmthickplain
4mmthickplain
5.5mmthickplain
3mmthickfrosted
5.5mmthickfrosted

sq.m
sq.m
sq.m
sq.m
sq.m

699.01
678.63
912.66
678.63
996.20

662.78
688.45
924.69
643.54
897.61

651.01
693.87
934.73
629.71
873.52

AA0015
AA0016

Cuttingholes<300x300mminbrickwallsincludingrepairwall each
Cuttingholes<150x150mminR.Cfloorsorroofincludingmakingleak
each
proofingwithconcrete1:2:4,20mmaggregates
Makingchases<75x75mminwallsincludingrepairafterfixingG.Ipipe
m
etc.

179.05
109.22

187.24
110.40

184.90
110.96

54.83

56.40

57.30

CuttingWalls

AA0017

AluminiumStripEdging

Providing&fixingAluminiumstripedgingtostaircasesincludingrawlplugsandscrews,athinlayerofcementmortar1:3
AA0025
AA0026

57mmx12mmx3mm
38mmx12mmx3mm

m
m

DepartmentofEngineeringServices,MoWHS

489.73
140.64

489.73
146.77

477.48
144.20

62

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Chapter21:ROADWORKS

ContractorWork/Labourcamp
RW0001

RW0002

Installationoflabourcamps,includingwatersupply,pitlatrines,solid
wastedisposaletc.accordingtoEnvironmentCodeofPractice

item

Restorationoflabourcamps:Restorationofcampsitesincluding
disposalofwreckage,rubbish,restorationofsiteusingbioengineering,
enclosureoftemporaryaccessaccordingtoEnvironmentCodeof
Practice

item

Lumpsum

Lumpsum

Excavation
Earthworkinexcavationoverareas,exceeding300mmindepth,1.5minwidthaswellas10sq.monplanincludingdisposalof
excavatedearth(disposedearthtobelevelledandneatlydressed)
RW0006
RW0007
RW0008
RW0009
RW0010

OrdinarySoil
HardSoil
OrdinaryRockwithorwithoutblasting
Hardrockrequiringblasting
Hardrockrequiringchiselling(whereblastingisprohibited)

sq.m
sq.m
sq.m
sq.m
sq.m

SamerateasforitemsEW0030toEW0034

Excavationofroadformation/trace/boxcutting,withbulldozerincludingseparatedepositionofsoil,rocksandstoneswithin50m
forreuse
RW0011
RW0012

Alltypesofsoil
Alltypesofrock

cu.m
cu.m

SamerateasforitemsEW0046andEW0047

Excavationofroadformation/trace/boxcutting,withexcavatorincludingseparatedepositionofsoil,rocksandstoneswithin50m
forreuse
RW0013
RW0014

Alltypesofsoil

cu.m
cu.m

Alltypesofrock

59.71
203.21

59.71
203.21

59.71
203.21

EarthworkinExcavationinfoundationtrenchesordrainsincludingdressingofsidesandrammingofbottom,disposalofsurplus
excavatedsoilwithin50mlead
RW0015
RW0016
RW0017
RW0018

OrdinarySoil
HardSoil
OrdinaryRockwithorwithoutblasting
Hardrockrequiringblasting

cu.m
cu.m
cu.m
cu.m

SamerateasforitemsEW0105toEW0109

TransportationofLooseSoils
Transportofloosesoilmaterialsindesignatedlocationsincludingloading/unloading,dressingofdumpsitesandplantationof
vegetationaftercompletionofdumping
RW0019
RW0020
RW0021

Beyond50upto200m
Beyond200upto500m
Beyond500upto1000m

cu.m
cu.m
cu.m

AnalyseasperprocedureinLMC2011

cu.m

RatesameasEW0195

FillingofTrenches
RW0035

Fillingoftrenches,sidesoffoundations,walls,etcincludingfilter
material(600mmwide)with100to200mmstoneswherever
applicableincludingfillingwithselectedsuitableexcavated
materialinlayernotexceeding200mmindepth(compacted),
consolidatingeachlayerwithpowerrollerorportablecompactor,
wateringetc.within50mlead

DepartmentofEngineeringServices,MoWHS

63

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Quarries
RW0040

RW0041

Opening,runningandrestorationofquarriesaccordingto
environmentalcodeofpracticeandaspertechnicalspecifications

item

Opening,runningandrestorationofsandquarriesaccordingto
environmentalcodeofpracticeforHighwaysandRoads,andasperthe
technicalspecification

item

Lumpsum

Lumpsum

SupplyandStacking
Supplying/collectionandstackingofstoneaggregate
RW0044
RW0045
RW0046
RW0047
RW0048
RW0049
RW0050

100mm
75mm
50mm
6340mm
20mm
126mm
5020mm

cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m

1062.77
1021.06
1031.49
1031.49
1083.13
1093.56
1053.19

1157.58
1115.87
1126.30
1126.30
1182.06
1192.49
1149.65

1267.06
1225.35
1235.78
1235.78
1341.04
1351.47
1278.93

cu.m
cu.m
cu.m

229.47
501.33
271.70

229.47
501.33
271.70

229.47
501.33
271.70

Supplying/collectionandstackingatsite
RW0055
RW0056
RW0057

Blindingmaterials
Gravel/Coarsesand
Boulder

Walls
ConstructionofGabionwallasperdrawings,includingexcavationoffoundationsinalltypesofsoils,sidesandbackfilling,delivery
ofmaterialsetc.complete
RW0065
RW0066
RW0067
RW0068
RW0069
RW0070
RW0071
RW0072
RW0073

Heightupto1.0m
Heightupto2.0m
Heightupto3.0m
Heightupto4.0m
Heightupto5.0m
Heightupto6.0m
Heightupto7.0m
Heightupto8.0m
Heightupto9.0m

m
m
m
m
m
m
m
m
m

2131.71
4278.45
7601.99
7230.81
17237.26
23613.21
31140.39
39343.87
49039.44

2474.97
4971.96
8836.64
8169.28
20042.81
27459.03
36213.87
45755.38
57032.35

2449.30
4918.30
8735.73
8344.61
19817.66
27153.39
35809.66
45260.18
56409.42

ProvidingandConstructionLighttimbercribwalls
RW0075
RW0076

Withtimbersectionof100to150mmdiameterincludingexcavationin
alltypesofsoilandbackfilling
Withtimbersectionof250to300mmdiameterincludingexcavationin
alltypesofsoilandbackfilling

sq.m

913.23

930.87

930.87

sq.m

807.15

843.72

843.72

Providingandconstructingboulderbarrier,heightnotexceeding1.5
m,max.inclinationof20deg.totheroadalignmentandwidthnotless
than900mmwithin50mlead

90.36

90.36

90.36

Barriers
RW0081

DepartmentofEngineeringServices,MoWHS

64

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Drains
ConstructionofFrenchdrain,includingjungleclearance,earthworkinexcavation,levellingofexcavatedearthtothesides,filling
drainwith50100mmstones,completeasperdesign
RW0095
RW0096

DrainSize0.6mX1.0m
DrainSize1.0mX1.5m

m
m

1778.00
3982.01

1911.00
4295.52

2064.58
4657.55

RW0100

Constructionoffoundationdrainsofminimumsize200mmwide&250
mmdeepwithstonefillofaveragesize50100mmasperdrawingor
asdirectedbytheengineer
includingexcavationanddeliveryofmaterials

197.92

202.31

207.38

ConstructionofVshapedstonepitcheddrainincludingexcavation,levellinganddisposalofsurplusearthwithin50m
RW0105
RW0106

depth300mm,width600mm
depth300mmandwidth450mm

m
m

160.83
94.37

190.99
108.07

198.69
111.57

ConstructionofVshapedearthendrainincludingexcavation,levellinganddisposalofsurplusexcavatedearthwithin50m
RW0107

depth500mmandwidth600mm

21.46

21.46

21.46

RW0108

ConstructionofLinedVShapeddrain600X300with50mmthickPCC
1:2:4,150mmthickstonesoling,RRMinCM1:5onsides,finishedwith
20mmthick1:4cementplaster
includingexcavation,levellinganddisposalofsurplusearthwithin50m

436.50

508.14

532.19

RW0120

ProvidingandlayingHammerdressedstoneedging150x250mmwith
stonesincludingexcavation,refillinganddisposalofsurplusearth
within30mlead

43.27

49.58

51.19

Subgrade
Preparationofsubgradewithpropercamberbyexcavatingearthtodepthequaltopavementthickness,consolidationwithroller,
disposalofsurplusearthupto50m
RW0121
RW0122

Allkindsofsoil
BlastedRock

cu.m
cu.m

30.86
106.68

30.86
106.68

30.86
106.68

Consolidationofsubgradewithroller,andmakinggoodthe
undulationwithearthandrerollingthesubgrade
Extraforcompactionofearthinembankmentsundersuitablemoisture
conditionstogiveatleast95%oftheproctordensity

sq.m

6.43

6.43

6.43

cu.m

13.90

13.90

13.90

cu.m

1124.23

1179.69

1193.81

cu.m

1482.10

1553.49

1645.40

RW0123
RW0124

GranularSubbase
RW0130

ProvidingandlayingGranularsubbasecourse(GSB)torequired
degreeofcompactionwithproperformationofcrossfallusingmotor
graderforlayingandcompactedtorequired
densityaspermaterialgradationandaggregatequalityspecified

WetMixMacadam
RW0131

Providingandlayingwetmixmacadamgradedaggregatebasecourse
torequireddegreeofcompactionwithproperformationofcrossfall
byusingwellgradedcrushed
aggregatespremixedwithOMCusingsuitablemixer,motorgraderas
permaterialgradationandaaggregatesqualityspecified

DepartmentofEngineeringServices,MoWHS

65

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

DenseBituminousMacadam
ProvidingandLayingDenseBituminousMacadam(DBM)torequireddegreeofcompactionbasedonmixturedesign(jobmix
formula)approvedbythesupervisingengineerincludingpreparationof
surfacewithroadbroom,applicationofprimecoat@0.75kg/sq.mbymechanizedmethodusingasphaltplant,paver,steelroller,
tyrerolleretc.complete
RW0132
RW0133
RW0134
RW0135

50mm
60mm
70mm
80mm

sq.m
sq.m
sq.m
sq.m

507.47
590.86
673.53
756.49

512.59
596.99
680.68
764.67

518.69
604.31
689.23
774.43

Asphalt/BituminousConcrete
ProvidingandLayingAsphalt/BituminousConcretetorequireddegreeofcompactionbasedonthejobmixturedesignapprovedby
thesupervisingengineerusingasphaltplant,paver,steelroller,tyreroller
etc.aspermaterialgradationandaggregatequalityspecified
RW0136
RW0137
RW0138
RW0139

25mm
30mm
35mm
40mm

sq.m
sq.m
sq.m
sq.m

299.54
347.77
396.00
443.54

302.02
350.73
399.47
447.50

304.70
353.95
403.23
451.79

sq.m

28.12

28.12

28.12

158.52

160.89

163.62

Scarifying

RW0145

Scarifyingmetalled(waterbound)roadsurfacedisposalofrubbishup
to50mandconsolidationoftheaggregatereceivedfromscarifying

RepairofRoads
Cuttingandrepairingofroads,includingsupplyofrequiredquantitiesofaggregatescomplete
RW0146

Waterboundmacadamroad

sq.m

WearingCourse
Layingwearingcourseincludingscreening,sorting,spreadingtotemplateandconsolidation(measurementofwearingcoursetobe
takenequaltothequantityofaggregateused,excludingblindingmaterials)Withstoneaggregatesandblindingmaterials

RW0147

Withstoneaggregatesandblindingmaterials

cu.m

599.21

599.21

599.21

471.71

475.23

UsingBitumenEmulsion

Cutting&repairingbituminousroadincludingsupplyofrequiredquantityofaggregate&bitumenemulsion
RW0150

Manually

cu.m

468.41

CuttingbituminousroadalongwithW.B.Mlayer&solingandmakinggoodthesameincludingsupplyofextraquantitiesof
aggregate,grit&bitumenemulsionrequiredcomplete
RW0151 Manually
sq.m
858.70
870.55
884.24

Paintingtwocoatswithbitumenemulsion(coat112kgemulsionand0.1cu.m,12mmaggregatesper10sq.m,coat21.6kg
emulsion0.06cu.m,10mmaggregatesper10sq.m)complete
RW0152

Mechanized

sq.m

DepartmentofEngineeringServices,MoWHS

164.30

165.88

168.42

66

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Repaintingonecoatwithbitumenemulsion@2.3kgofemulsionand0.002cu.mof10mmnominalsizestonechipspersq.mof
surfaceareacomplete
RW0153 Mechanized
sq.m
122.99
123.19

Premixconsolidatedcarpetsurfacingincludingatackcoat@0.75kgbitumenemulsionpersq.mofroadsurface

123.51

RW0154

RW0155

RW0156

50mmthickwith6.0cu.mofaggregate10mmnominalsizeper100
sq.musing96kgofemulsionofapprovedqualitypercu.mofstone
aggregate(Mechanized)
25mmthickwith2.7cu.mofstoneaggregate,10mmnominalsizeper
100sq.musing149kgofbitumenemulsionpercu.mofstone
aggregate(Mechanized)
20mmthickwith2.10cu.mofstoneaggregate,10mmnominalsize
per100sq.musing147kgofbitumenemulsionpercu.mofstone
aggregate(Mechanized)

sq.m

344.64

349.76

355.68

sq.m

262.91

265.88

270.65

sq.m

214.45

216.83

220.64

82.10

83.37

41.83

42.04

Providingsealcoatwithbitumenemulsion
RW0157

Using1.3kgofemulsionand0.80cu.mstoneaggregateof10mmper
10sq.mofroadsurfacecomplete

sq.m

Providingsealcoatofpremixedsandwithbitumenemulsion
RW0158

Using5.3kgofemulsionand0.045cu.mcoarsesandper10sq.mof
roadsurfacecomplete
complete

81.31

sq.m

41.42

UsingBitumen80/100

Cuttingandrepairingofroads,includingsupplyofrequiredquantitiesofaggregate,gritandbitumen
RW0160 Bituminousroad
sq.m
540.97
540.39
550.18

Cuttingbituminousroadandmakinggoodthesameincludingsupplyofextraquantitiesofaggregate,grit&bitumenrequired
complete
RW0161

BituminousroadalongwithW.B.Mlayer&soling(mechanized) sq.m

891.14

897.51

914.17

Paintingtwocoatsofbitumen80\100(coat12kgofbitumen,0.015cu.m,12.5mmaggregatepersq.m;coat21kgofbitumen,
0.009cu.m,10mmaggregates,persq.mcomplete)
RW0165
RW0166

Mechanized
Manually

sq.m
sq.m

199.42
237.78

201.79
234.67

205.61
241.47

sq.m

288.49

294.43

303.97

sq.m

187.96

190.93

195.70

sq.m

145.73

148.00

150.63

Premixcarpetsurfacingincludingatackcoat@0.75kgbitumenpersq.mofroadsurface
RW0167

RW0168

RW0169

50mmthickwith6cu.mofaggregate10mmnominalsizeper100sq.m
using51.5kgofbitumen80/100gradepercu.mofstoneaggregate
(Mechanized)
25mmthickwith3cu.mofstoneaggregateper100sq.mand51.5kg
ofbitumen80/100gradepercu.mofstoneaggregate(Mechanised)
20mmthickwith2.40cu.mofstoneaggregate10mmnominalsizeper
100sq.mand51.5kgofbitumen80/100gradepercu.mofstone
aggregate(Mechanized)

DepartmentofEngineeringServices,MoWHS

67

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

PremixCarpetingwith64kgofbitumen80\100percu.mofaggregatesincludingatackcoatwithbitumenofsamequality@0.75kg
persq.mofroadsurface
RW0170

20mmthickwith2.4cu.m,10mmaggregateper100sq.m(Manually)

sq.m

188.89

187.05

193.15

RW0171

25mmthickwith3.0cu.m,10mmaggregateper100sq.m(Manually)

sq.m

219.41

217.46

224.90

Repainting,onecoatofbitumen80\100@1kgofbitumen;0.009cu.m,10mmaggregatepersq.mofroadsurface
RW0175
RW0176

Manually
Mechanised

sq.m
sq.m

82.60
67.60

81.67
68.49

84.09
69.92

Providingsealcoatwithbitumen80/100gradeofapprovedqualityusing1.12cu.mofstoneaggregate10mmsizeper100sq.mand
56kgofbitumen80/100gradepercu.mofstoneaggregatewithatackcoat
of0.75kgofbitumenpersq.mofroadsurfacecomplete
RW0177 Mechanized
sq.m
98.18
99.28
101.06

Providingsealcoatwithbitumen80\100using1.5kgofbitumenpersq.mwith1.05cu.m,10mmaggregateper100sq.mofroad
surface
RW0178 Manually
sq.m
111.67
109.97
113.13

Providingsealcoatofpremixedsandwithbitumen80\100using128kgofbitumenpercu.mofsandand0.75cu.mofcoarsesand
per100sq.mofroadsurface
RW0179

Manually

sq.m

71.64

70.56

71.87

each
each
each

1594.49
2317.48
2482.10

1707.31
2453.64
2632.98

1713.66
2477.55
2659.45

each

3.45

3.45

3.45

Providing&fixingRCnameboardincludingprimerandwhitezincpaint
RW0180
RW0181
RW0182

Rectangularwithpost
Flatwithoutpostforonedirectiononly
Flatwithoutpostfortwodirectionsonly

RoadSigns

RW0183

Engravinglettersonhardstone.......perletterpercentimetreheight

Providing&fixingprecastboundarystoneofRC1:2:4(20mmaggregate)includingfinishingwithmortar1:3(costofexcavation,
refillingetctobepaidseparately)
RW0185 150mmdiax900mmhigh
each
343.55
363.91
367.98

Providing&fixingprecastkilometrestoneofRC1:2:4(20mmaggregate)includingfinishingwithmortar1:3completeasper
standarddesign(costofexcavation,concreting,paintingetc.shallbepaidseparately)
RW0186
RW0187
RW0188

35cmx111cmx25cm
50cmx152.5cmx25cm
35cmx93.5cmx18cm

each
each
each

1086.43
1905.79
704.00

1187.75
2103.34
763.01

1211.63
2149.47
777.17

each

1.06

1.06

1.07

each

0.82

0.82

0.83

Letterings

RW0189
RW0190

Letteringwithpaintofapprovedbrandandmanufacture......perletter
percentimetreht
Reletteringwithpaintofapprovedbrandandmanufacture......per
letterpercentimetreht

DepartmentofEngineeringServices,MoWHS

68

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

Fencing

Supplyingposts&struts
RW0195
RW0196
RW0197
RW0198
RW0199
RW0200

Localballies,250mmmin.girth
Localballies250mmmingirth,1.8mlong
PrecastR.Cposts,1.8mlong
PrecastR.Cstruts2.0mlong
RCCposts&struts,1.8mlong
RCCposts&struts,2mlong

m
each
each
each
m
m

61.11
147.54
713.87
542.29
955.88
593.42

61.11
147.54
766.83
571.42
1036.06
626.43

61.11
147.54
773.68
575.13
1057.64
632.24

Providing&fixingG.IbarbedWireNettingincludingfixingofpostorstruts,G.Istaples,coaltarringincaseofballiescomplete
(posts/struts,earthwork,concretepaidseparately)
RW0202

2.5mm,(12SWG),4barbsformbytwistingtwopointwires,eachtwo
turns,pitchofbarbs75mm

14.07

15.69

16.66

Providing&fixingG.Idoubleknottedmeshincludingfixingofpostorstruts,G.Istaples,coaltarringincaseofballiescomplete
(excludingthecostofposts/struts,earthwork,concrete)
RW0205 4mm(8SWG)x100mm
sq.m
237.13
260.46
281.46
RW0206 2.5mm(12SWG)x100mm
sq.m
184.64
237.13
244.13
RW0207 4mm(8SWG)x150mm
sq.m
176.47
202.13
207.97
RW0208 2.5mm(12SWG)x150mm
sq.m
143.81
167.14
178.80

Providing&fixingG.Ichainlinkmeshincludingfixingofpostorstruts,G.Istaples(excludingthecostofposts/struts,earthwork,
concreteetc.)
RW0209
RW0210
RW0211
RW0212
RW0213
RW0214

4mm(8SWG)x50mm
2.5mm(12SWG)x50mm
4mm(8SWG)x75mm
2.5mm(12SWG)x75mm
4mm(8SWG)x100mm
2.5mm(12SWG)x100mm

sq.m
sq.m
sq.m
sq.m
sq.m
sq.m

DepartmentofEngineeringServices,MoWHS

295.46
213.80
213.80
155.47
237.13
184.64

382.95
382.95
302.46
283.79
277.96
237.13

379.64
379.64
291.74
291.74
279.17
244.13

69

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

ProvidingandFixingBarbedWire(Min.10kg/100m)fencing
RW0215

1.2mhighfencingwith1.8mR.C.Cpostsofstandarddesignplaced
every3mapart,embeddedincementconcreteblocks,every15th
post,lastbutoneendpostandcornerpostshallbestruttedonboth
sidesandendpostonesideonly,
providedwithninehorizontallinesandtwodiagonalsofbarbedwire
betweentwopostsfittedandfixedwithGIstaplesonwoodenplugsor
GIbindingwiretiedto6mmbars
nibsfixedwhilecastingthepost(costofRCCposts,struts,earthwork
andconcretetobepaidforseparately)

149.21

167.32

178.13

RW0216

1.2mhighfencingwith1.8mballiposts250mmgirth(min)placed
every2.5mapart,embeddedincementconcreteblocks,every15th
post,lastbutoneendpostandcornerpostshallbestruttedonboth
sidesandendpostonesideonly,
providedwithsixhorizontallinesandtwodiagonalsofbarbedwire
betweentwopostsfittedandfixedwithGI
staplesdrivenintothepostscomplete(costofRCCposts,struts,
earthworkandconcretetobepaidforseparately)

124.93

137.72

145.83

RW0217

2.4mhighfencingwith3.3mballiposts250mmgirth(min)placed
every2.5mapart,embeddedincementconcreteblocks,every15th
post,lastbutoneendpostandcornerpostshallbestruttedonboth
sidesandendpostonesideonly,

217.98

240.98

255.53

88.34

88.34

88.34

146.99

164.99

175.74

192.76

215.90

229.71

providedwithtwelvehorizontallinesandtwodiagonalsofbarbed
wirebetweentwopostfittedandfixedwithGIstaples
drivenintothepostscomplete(costofRCCposts,struts,earthwork
andconcretetobepaidforseparately)
RW0218

RW0219

RW0220

1.3mhighconcreterailandpalefencingwith1.8mR.C.Cposts2.2m
railsand1.25mpalesplacedevery2.5mapart,embeddedincement
concreteblocks
(450mmx450mmx700mm),ofmix1:5:10(1cement:5sand:10
gradedcrushedrock40mmnominalsize)(costofearthworkin
excavation,concretework,posts,railsandpalestobepaidfor
separately)
1.2mhighfencingwith1.2mangleposts(40mmx40mmx6mm)
placedevery3mapart,embeddedincementconcreteblocks,every
15thpost,lastbutoneendpostandcornerpostshallbestruttedon
bothsidesandendpostonesideonly,
providedwithninehorizontallinesandtwodiagonalsofbarbedwire
betweentwopostfittedandfixedwithGIstaples,turnbuckles
complete(costof,posts,struts,earthworkandconcretetobepaid
forseparately)
1.8mhighfencingwith1.8mangleposts(50mmx50mmx6mm)
placedevery3mapart,embeddedincementconcreteblocks,every
15thpost,lastbutoneendpostandcornerpostshallbestruttedon
bothsidesandendpostonesideonly,
providedwithninehorizontallinesandtwodiagonalsofbarbedwire
betweentwopostfittedandfixedwithGIstaples,turnbuckles
complete(costof,posts,struts,earthworkandconcretetobepaid
forseparately)

DepartmentofEngineeringServices,MoWHS

70

BhutanScheduleofRates2011

Code Description

Units

PL

GP

SJ

kg

320.66

320.66

320.66

sq.m

35.45

35.45

35.45

sq.m

35.45

35.45

35.45

43.12

43.12

43.12

51.01

51.01

51.01

no

138.81

138.81

138.81

Bioengineering
SeedsCollection,treatmentandstorage
RW0230

Grassandpioneerplantseedcollection,includingseparation,dryingin
thesun&storing

Broadcasting
RW0231

Broadcastingofgrass/pioneerplantsseedsonslopes;seedingrate25
gmperm2

DirectSeeding
RW0232

Directseedingofshrubsortreeseedsat30cmspacingincluding
diggingholesupto5cmdepthandcoveringwithsoil,withtwoseeds
perplantinghole

LiveStacking/Palisade
RW0233

Preparationofmaterials(woodycuttings24cmdiameterand50cm
length)andstakingthemofthecuttingsinthesoil

Brushlayer/HedgeBrushLayer
RW0234

Collectionandpreparationofmaterials(woodycuttings24cm
diameterand60cmlength)andstakingthemofthecuttingsinthe

Plantingofseedlings/wildings
RW0235

Plantingofseedlingsorwildlings(includingthecollectionofwildlings
fromthewild)andplantingtheminapitsize30cmx30cm

Sodding/Turfing
RW0236

Soddingofslopeswithsods,eglemongrass(30cmscentretocentre),
titepati(1metrecentretocentre)incontourlines.Thesodsshouldbe
placedevenclosertoeachotheriftheslopeisgreaterthan25degree

sq.m

41.40

40.82

41.40

RW0237

Turfingofembankmentwith30x30cmturfsandfixedtotheground
withwoodenpegs,ifslopeisgreaterthan25

sq.m

76.35

76.35

76.35

sq.m

18.59

18.59

18.59

GrassSlipsPlanting
RW0238

Grassslipsplantingonslopes(randomorinline)at10cmapartand5
cmdeep.

DepartmentofEngineeringServices,MoWHS

BhutanScheduleofRates2011

4.COSTINDICES

5.APPROVEDMATERIALBRANDS

BhutanScheduleofRates2011

COSTINDEXCALCULATION

Anyratescalculatedaddingcostindexshallnotbeusedformakingpaymenttocontractorsorparties
Paymenttocontractorsshallbestrictlyasperthecontractagreementonly
Thesixexamples,thatfollow,areforpurposeofguidanceandengineersareencouragedtocalculate
costindicesontheirown.
I

ProcedureforcalculationofcostIndex:

a)
b)
c)
d)
e)

Col.(4)=
Col.(5)=
Col.(6)=
Col.(7)=
Col.(8)=

II

Weightage

Basicratesatnearestbasetown
Ratesattheprojectlocation
[{col.5/col.4}1]x100
Weightageshallremainfixed
{Col.(6)xCol.(7)}/100

Weightageofaparticularmaterialisthepercentageofitscostfromthetotalcostoftheproject.
II

Thecostindexshallnotbeapplicablefor:

a)
b)

Allbasicrates
Anyworkswhereonlylabourisinvolvedsuchas:
Dismantlinganddemolition.
Earthwork
Installation,testing,commissioning
Forsuchworksactuallabourrequirementshallbeworkedoutandadditionalamountaddedforanyincreaseinlabourrates

II

Procedureforcalculationofratesattheprojectlocation

a)

Toderivetheapproximateitemrateatanylocation,theBSRitemratesofthenearestbasetownshallbeenhancedbythe
costindexcalculatedabove.

b)

Sameweightageshallbeapplicableforsimilarworksatanylocation

c)

Weightagediffersfordifferentkindsofprojectsandengineerscancalculateweightagesusingratesofitemsofthenearest
basetowns

Bhutan Schedule of Rates - 2011

SAMPLECALCULATIONSOFCOSTINDICES
1.BuildingWorkswithBrickInfillwallsandsteeltrusses

Sl.No. Description
(1)

(2)

Unit
(3)

CostatabaseTown
(4)

CostatProject
Location
(5)

%Increase

Weightage

CostIndex

(6)

(7)

(8)

Cement

MT

4770.00

5689.00

19.27

17.00

3.28

SteelReinforcement

MT

31500.00

33500.00

6.35

14.00

0.89

RolledSteel

MT

32300.00

34400.00

6.50

3.00

0.20

C.G.ISheet

MT

44000.00

50600.00

15.00

5.00

0.75

Brick/ICEB

Nos

4650.00

6830.00

46.88

9.50

4.45

StoneBoulders

cu.m

180.00

530.00

194.44

1.50

2.92

RoughSawnTimber

cu.m

7800.66

8122.45

4.13

17.00

0.70

StoneAggregates
(20mm)

cu.m

618.00

883.00

42.88

4.50

1.93

Sand

cu.m

180.00

534.00

196.67

2.00

3.93

10

Labour:Average
Cat.ItoIV

each

130.00

145.00

11.54

11.50

1.33

Cat.V

each

108.00

108.00

0.00

15.00

0.00

Remarks
(9)

100.00
CostIndex=

20.37 %

2.BuildingWorkswithBrickInfillwallsandtimbertrusses
Sl.No. Description
(1)
1

(2)
Cement

Unit
(3)
MT

CostatabaseTown
(4)
4770.00

CostatProject
Location
(5)
5689.00

%Increase

Weightage

CostIndex

(6)

(7)

(8)

19.27

17.00

3.28

SteelReinforcement

MT

31500.00

33500.00

6.35

14.00

0.89

C.G.ISheet

MT

46000.00

50600.00

10.00

5.00

0.50

Brick/ICEB

Nos

4630.00

6830.00

47.52

10.50

4.99

StoneBoulders

cu.m

180.00

530.00

194.44

1.50

2.92

RoughSawnTimber

cu.m

7800.66

8122.45

4.13

19.00

0.78

StoneAggregates
(20mm)

cu.m

618.00

883.00

42.88

4.50

1.93

Sand

cu.m

180.00

534.00

196.67

2.00

3.93

Remarks

Labour:Average
Cat.ItoIV

each

130.00

145.00

11.54

11.50

1.33

Cat.V

each

108.00

108.00

0.00

15.00

0.00

100.00
CostIndex=

20.54 %

(9)

BhutanScheduleofRates2011

3.BuildingWorkswithstonemasonryInfillwalls

Costatbasetown
Sl.No. Description
(1)

(2)

Unit
(3)

CostatProject
Location
%Increase

Weightage

CostIndex Remarks

(4)

(5)

(6)

(7)

(8)

(9)

Cement

MT

4770.00

5689.00

19.27

17.00

3.28

SteelReinforcement

MT

31500.00

33500.00

6.35

5.00

0.32

C.G.ISheet

MT

46000.00

50600.00

10.00

8.00

0.80

Stoneboulders

cu.m

180.00

534.00

196.67

6.00

11.80

Bricks/ICEB

1000#

4650.00

6830.00

46.88

1.00

0.47

RoughSawnTimber

cu.m

7800.66

8122.45

4.13

22.00

0.91

StoneAggregates
(20mm)

cu.m

618.00

883.00

42.88

3.00

1.29

Sand

cu.m

180.00

530.00

194.44

3.00

5.83

Labour:Average
Cat.ItoIV

each

130.00

145.00

11.54

20.00

2.31

Cat.V

each

108.00

108.00

0.00

15.00

0.00

100.00
CostIndex=

27.00 %

Weightage

CostIndex Remarks

4.BitumenSealingWorks
Sl.No. Description

Unit

Costatabase
town
(4)
32189.00
3928.00
535.00

(1)
1
2
3

(2)
Bitumen***
RoadRoller(810T)
Firewood**

(3)
MT
day
cu.m

StoneAggregates.
20mm

cu.m

618.00

each
each

Labour:Average
Cat.ItoIV
Cat.V

CostatProject
Location
(5)
34389.00
3928.00
650.00

%Increase
(6)
6.83
0.00
21.50

(7)
63.00
9.00
3.00

(8)
4.31
0.00
0.64

635.70

2.86

14.00

0.40

130.00

145.00

108.00

108.00

11.54
0.00

0.50
10.50

0.06
0.00

100.00
CostIndex=
***
**

Bitumen80/100orEmulsionasappropreate
Firewoodmeasuredinstackedvolume

5.41 %

(9)

BhutanScheduleofRates2011

5.RoadPermanentWorksRetainingWalls,Culvertandothersimilarworks

Sl.No. Description
(1)

(2)

Unit
(3)

Costatabasetown CostatProject
Location
(4)
(5)

%Increase

Weightage

CostIndex Remarks

(6)

(7)

(8)

Cement

MT

4770.00

5689.00

19.27

30.00

5.78

Stoneboulder

cu.m

180.00

205.00

13.89

20.00

2.78

StoneAggregates
(20mm)

cu.m

618.00

700.00

13.27

3.00

0.40

Sand

cu.m

180.00

534.00

196.67

5.00

9.83

Labour:Average
Cat.ItoIV

each

130.00

145.00

11.54

16.00

1.85

Cat.V

each

108.00

108.00

0.00

26.00

0.00

(9)

100.00
CostIndex=

20.64 %

6.RoadWorksBaseCourse
Sl.No. Description
(1)

(2)

Unit
(3)

Weightage

CostIndex Remarks

(4)

(5)

(6)

(7)

(8)

205.00

13.89

5.00

0.69

day

3440.00

3440.00

0.00

32.00

0.00

cu.m

70.00

70.00

0.00

3.75

0.00

cu.m

618.00

700.00

13.27

42.00

5.57

each
each

130.00

145.00

108.00

108.00

11.54
0.00

0.25
17.00

0.03
0.00

StoneBoulder

cu.m

RoadRoller(810T)

Blindingmaterials
StoneAggregates20
mm
Labour:Average
Cat.ItoIV
Cat.V

%Increase

180.00

Costatabasetown CostatProject
Location

100.00
CostIndex=

6.30 %

(9)

BhutanScheduleofRate2011

LATESTAPPROVEDCONSTRUCTIONMATERIALS(CIVIL)

I.PLUMBINGMATERIALS
Sl.No
1
a.
b.
c.
d.
e.
f.
g.
2
a.
b.
c.
d.
e.
f.
g.
3
a.

Materials
ApprovedBrands
Pipes

GI
BABA(2565mmonly)
HDPE
AJAPLAS,Supreme,Duraline
PVC

PPR
SFMC
CPVC

DI
Nirmaldhara,TataMetaliks,Lanco,Kejriwal,BalajiShakti,JindalSaw
CI
Kejriwal
PipeFittings(Union,Socket,Elbow,Tee,Plug,Bend,Tanknipple,Barrelnipple,Flanges)
GI
JSI
HDPE
AJAPLAS,Duraline,Supreme
PVC

PPR
SFMC
CPVC

DI
Electrosteel,Kejriwal
CI
Kejriwal
Valves&Cocks
Bibcocks,Stopcocks,
R,Zoloto(Ferrous&NonFerrous),Coats
Pushcocks,Liftcocks,Gate
valves,Floatvalves,Nonreturn
valves,etc.
DI&CIvalves
Kejriwal
SanitaryAppliances

Sinks,Washbasins,WCpans,
Simpolo,Commander
Cistern,Urinals,Bathtubs,
Bidets,etc.
WaterStorageTanks
WaterStorageTanks
PolyFoam,PolyExport,PolyP4

b.
4
a.

5
a.

BhutanScheduleofRate2011

II.OTHERMATERIALS
Sl.No
1
a.
b.
2
a.
b.

Materials
ApprovedBrands
ReinforcementSteel

Fe415
KarmaTMT,PCMLhakiTMT,PeldenThermex
Fe500
Willbenotifiedlater
RoofingSheet/Tiles/Tubularpipes(Thisisinadditiontothelocallyavailablematerials)
CGI
AartiSuraksha
ColourRoof
1.Everestmetalroofing(ER32251profileonly)
2.CRIL(i.Hispan,ii.Histern975,iii.SteelLock,iv.StileRainbow,
v.RiverClack,vi.Versatileprofilesonly)
Basemetal
Metashield(SeCladonly)
Roofingtiles
EverestHiTech
Tubularpipes(M.Spipes)
BABA
WhitePortlandCement

FlooringandWallTiles

Bitumen/Emulsion
CationicEmulsion
Bhubit
80/100

Bricks/HollowBlocks&Others
InterlockingCementEarth
DSE
Blocks
Boards
Cementfibreboards
Everest
Cements
Willbenotifiedlater
33Grade
Willbenotifiedlater
43Grade
Willbenotifiedlater
PSC

c.
d.
e.
3
a.
4.
a.
5
a.
b.
6
a.
7
a.
8
a.
b.
c.

Vous aimerez peut-être aussi