Foreword
The Department of Engineering Services of the Ministry of Works and Human Settlement is
pleased to publish the "Bhutan Schedule of Rates (BSR) - 2011" for Building and Road Works.
This is the revised edition of the BSR 2009. Until February 2011, the erstwhile Standards and
Quality Control Authority (SQCA) under MoWHS was responsible for publishing the BSR. With
the re-naming of SQCA as Bhutan Standards Bureau (BSB) and the subsequent revision of its
mandate, the publication of the BSR and its related works fell outside its new mandate. Thus
from February 2011, this task was then handed over to the Department of Engineering Services.
The last Bhutan Schedule of Rates was revised and published in 2009, and since then the price
of materials and labour in the market have seen substantial fluctuations/changes
over the
period.
Until 2009, the publication of BSR was once every two years, but hereafter, we shall try to
publish it on an annual basis by publishing it at the beginning of every calendar year. We will
continue to improve and refine the BSRin the future so that it benefits all the users and meets
the objective of preparing realistic cost estimates of the work.
As there are many different brands of construction material in the market with wide ranges in
their price even among the BSB approved brands, it is thus not possible to prepare accurate
cost estimates. The BSR is to be used only as a guide and to prepare detail cost estimate of
project, individuals will have to collect market prices of the materials and make their own
estimates using the approved labour and material coefficients.
Sample cost indices table are given at the back of the BSR to arrive at the actual cost of a
particular project at a location other than the base towns.
I hope this Bhutan Schedule of Rates 2011 will prove useful to all the users within Bhutan.
Secretary
Ministry of Works & Human Settlement
THIMPHU : BHUTAN
Date:
OlS ( I z..l7P
((
Department of Engineering Services, MoWHS.
Disclaimer
TheBSR(bothCivilandElectrical)2011ispreparedandpublishedprimarilyasatool
to assist in the estimation of project costs. Due to difficulty in obtaining
comprehensiveandaccurateratesfrombasetowns,andtheassociatedcomplexityin
their analysis, the BSR reflects only suggestive averages and not accurate current
marketrates.Materialandlabourratesalsofluctuatefrequently,andbythetimeof
thepublicationofthisbook,manyrateswouldhavealreadychanged.Henceusersare
advised to refrain from using the BSR for the purposes of filling tenders, evaluating
tenders,awardingworksand/ormakingcontractualpayments.Thepublisherisinno
way accountable or answerable for any issues/disputes arising as a result of
individuals or agencies using the rates in the BSR 2011 as a basis for filling their
tenders,evaluatingtenders,awardingworksand/ormakingcontractualpayments.
AllrightsreservedwithDES,MoWHS.Reproductionforsaleofthispublication,inpart(s)or
whole,inanyformorbyanymeans,byanyagencyorindividual,isapunishableoffenceandis
strictlyprohibited.
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Preface
1. BhutanScheduleofRates2011istherevisededitionofBhutanScheduleofRates2009.
2. Theratesshownforallthebuiltupitemsareforupto10Kmradiusandisinclusiveof:
5%onlabourcostforhandtoolsandequipments
5%onmaterialsforwastagesandmiscellaneousmaterials
5%onmachineryforwastagesandoverheads
1%forwatercharges
10%foroverheadcharges
3. The built up item rates are based on "Labour and Material Coefficients 2011" with the applicable
percentagesgivenabove.
4. Thescheduleisdesignedprimarilyasatoolforestimationofconstructionprojectsonlyandnotfor
paymenttocontractors(unlessstatedsointhetenderdocument)orfillinguptenders.
5. ThisSchedulewillbereadalongwiththe"SpecificationsforBuildingandRoadworks2009"and
the"LabourandMaterialsCoefficients2011"
6. Fewnewitemshavebeenincorporated.
7. Generally,thebasicratesofmaterials,incorporatedinthisSchedulepertaintoaverageratesofthe
mostavailablebrands
8. HirechargesforplantsandmachineryarebasedonthebuiltupratesprovidedbytheConstruction
DevelopmentCorporationLimited,Thimphu.
9. Calculation of cost indices has been detailed and few samples are provided on calculation of cost
indices.
10. Listofapprovedbrands,asapplicableatthetimeofpublicationofBSR2011,isprovided.However,
pleasenotethatthislistisreviewedfromtimetotime.Thelatestlistisavailableonwww.bsb.gov.bt
BhutanScheduleofRates2011
11. Material Rates used in BSR2011 are collected during the period JuneSeptember 2011. Users are
suggestedtoupdateratesaccordinglywiththeprevailingmarketrates.
12. BSRcontainsonlythecommonlyuseditems,thenewitemsmaybeworkoutandanalyzedbythe
engineersasmayberelevant.
Contents
CONTENTS
Section 1 BASIC RATES
Description
Page
Preface
Labour
Bricks
Roofing Materials
10
13
Plastering Materials
14
14
Drainage Materials
15
16
23
27
Description
Page
Hill Roads
Plain Roads
Contents
Sl. No Description
Page
01
02
03
Earthwork
04
Drainage
05
Mortars
10
06
Concrete Works
11
07
Damp Proofing
13
08
Reinforced Concrete
14
09
Brick Work
18
10
Stone/Mud
21
11
Wood Work
24
12
Steel
33
13
Flooring
35
14
39
15
Roofing
40
16
44
17
49
18
Plastering
57
19
59
20
61
21
Road Works
62
4. COST INDICES
5. APPROVED MATERIAL BRANDS
SECTION 1
Basic Rates of Materials and Labour
Hire Charges of Plants and Equipments
BhutanScheduleofRates2011
Code
Description
Page 1
Category
Units
PL
GP
SJ
LB
LB
LB
LB
LB
LB
day
day
day
day
day
day
240.00
220.00
195.00
180.00
165.00
165.00
240.00
220.00
195.00
180.00
165.00
165.00
240.00
220.00
195.00
180.00
165.00
165.00
LB
LB
LB
LB
LB
LB
LB
year
year
year
year
day
year
year
360.00
660.00
400.00
180.00
10.00
50.00
450.00
360.00
660.00
400.00
180.00
10.00
50.00
450.00
360.00
660.00
400.00
180.00
10.00
50.00
450.00
LB
LB
LB
LB
LB
LB
day
day
day
day
day
day
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
259.60
LB
LB
LB
LB
LB
LB
LB
LB
LB
LB
day
day
day
day
day
day
day
day
day
day
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
238.32
LB
LB
LB
LB
LB
LB
LB
LB
LB
LB
LB
LB
day
day
day
day
day
day
day
day
day
day
day
day
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
211.61
BhutaneseNationalLabour
LB0001
LB0002
LB0003
LB0004
LB0005
LB0006
Category1
Category2
Category3
Category4
Category5(Male)
Category5(Female)
StatutoryOnCostAllowances
LB0010
LB0011
LB0012
LB0013
LB0014
LB0015
LB0016
WorkersCompensationpremium
Temporarysiteaccommodation
Transportationto&fromsite
Dependencyallowance
Leadinghandallowance
Recruitmentagencyfee
Incentivepayment
BuiltupTradeRates
Category 1
LB0020
LB0021
LB0022
LB0023
LB0024
LB0025
Auto-Mechanic Gd.1
Carpenter Gd.1
General Mechanic Gd.1
Lharib
Lineman Gd.1
Plant Operator Gd.1
Category 2
LB0030
LB0031
LB0032
LB0033
LB0034
LB0035
LB0036
LB0037
LB0038
LB0039
Auto-Electrician Gd.1
Auto-Mechanic Gd.2
Blacksmith (metal-worker)
Carpenter Gd.2
General Mechanic Gd.2
Lineman Gd.2
Mason Gd.1
Plant Operator Gd.2
Plumber Gd.1
Work Supervisor (Lajab)
Category 3
LB0045
LB0046
LB0047
LB0048
LB0049
LB0050
LB0051
LB0052
LB0053
LB0054
LB0055
LB0056
Auto-Electrician Gd.2
Auto-Mechanic Gd.3
Blaster
Carpenter Gd.3
General Mechanic Gd.3
Lineman Gd.3
Mason Gd.2
Painter Gd.1
Plant Operator Gd.3
Plumber Gd.2
Sawyer Gd.1
Wireman Gd.1
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
Page 2
Category
Units
PL
GP
SJ
LB
LB
LB
LB
LB
day
day
day
day
day
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
195.60
LB
LB
day
day
178.76
178.76
178.76
178.76
178.76
178.76
LB
day
178.76
178.76
178.76
Category 4
LB0065
LB0066
LB0067
LB0068
LB0069
Cleaner
Machine Operator
Painter Gd.2
Sawyer Gd.2
Wireman Gd.2
Category 5
LB0075
LB0076
Labourer (Male)
Labourer (Female)
Labour
Note: The above rates are calculated to comply with the Ministry of Labour and Human Resourses Wage Regulations, revised from
15th July 2011
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
Units
PL
GP
SJ
tonne
tonne
45174.00
38777.11
45174.00
38777.11
45174.00
38777.11
sq.m
sq.m
200.00
100.00
200.00
100.00
200.00
100.00
kg
litre
39.78
50.00
39.78
50.00
39.78
50.00
sq.m
550.00
550.00
550.00
kg
each
each
each
kg
each
each
73.42
69.00
5.92
4755.00
337.00
3364.00
2307.00
73.42
69.00
5.92
4755.00
337.00
3364.00
2307.00
73.42
69.00
5.92
4755.00
337.00
3364.00
2307.00
litre
265.00
285.00
280.00
litre
litre
litre
12.13
35.86
56.46
12.09
35.75
56.21
12.23
35.98
56.45
cu.m
truck
cu.m
cu.m
bundle
each
each
each
Sq.m
981.25
50.00
77.00
212.014
60.50
11.00
0.11
6.00
0.07
29.70
379.00
50.00
77.00
290.00
60.50
11.00
0.11
6.00
0.07
29.70
706.25
50.00
77.00
330.48
60.50
11.00
0.11
6.00
0.07
29.70
cu.m
172.50
290.00
320.00
BASICRATESBITUMENPRODUCTS,CHEMICALS&BLASTINGMATERIALS
Bitumenmaterials
MT0001 Bitumen80\100
MT0002 BitumenEmulsion
BitumenfeltType3
MT0005 Grade1
MT0006 Grade2
SealingCompounds
MT0010
MT0011
HotsealingcompoundGradeA
BitumenSolutionprimer
Jointfiller
MT0015
Premouldedbitumenimpregnatedfibreboard,12mmthick(IS:1838orequivalent)
Blastingmaterials
MT0020
MT0021
MT0022
MT0023
MT0024
MT0025
MT0026
Superdyne/Gelatine
FuseCoil
Detonator
Drillrod8'0"
SilentBlaster
Drillrod5'0"
Drillrod3'0"
Chemicals
MT0030
AldrinEmulsifiableConcentrate30%(forantitermitetreatment)
Fuels
MT0035
MT0036
MT0037
Kerosene
Diesel
Petrol
BASICRATESQUARRY&FORESTPRODUCTS
MT0040
MT0041
MT0042
MT0043
MT0044
MT0045
MT0046
MT0047
MT0048
MT0049
Firewood(stackedvolume)
Royaltyforearth,mud,boulder,sand&gravel
Muddry
Sand
Hay/husk
Straw,girth<100mm
Cuttings
Seedlings
GrassSlips
Turf
kg
Stone
MT0060
Boulder
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
Units
PL
GP
SJ
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
812.72
812.72
812.72
812.72
812.72
848.05
848.05
848.05
893.99
893.99
893.99
893.99
893.99
932.86
932.86
932.86
987.84
987.84
987.84
987.84
987.84
1069.14
1069.14
1069.14
cu.m
cu.m
363.00
467.50
390.50
489.50
407.00
481.25
tonne
tonne
3750.00
4000.00
3500.00
3950.00
3700.00
4100.00
sq.m
sq.m
sq.m
sq.m
674.70
674.80
647.80
782.23
670.00
670.00
670.00
670.00
655.00
655.00
655.00
655.00
sq.m
sq.m
sq.m
sq.m
522.72
653.40
588.00
660.00
522.72
653.40
588.00
660.00
522.72
653.40
588.00
660.00
sq.m
sq.m
650.00
1405.00
650.00
1405.00
650.00
1405.00
kg
kg
15.00
20.00
17.00
20.50
15.00
22.00
each
55.00
55.00
55.00
CrushedRock
MT0064 100mm
MT0065 75mm
MT0066 63mm
MT0067 50mm
MT0068 40mm
MT0069 25mm
MT0070 20mm
MT0071 12.56mm
Gravel\Shingles(Riverstone)
MT0080 40mmto20mm
MT0081 20mmto10mm
MarbleItems
MarbleChips6mm
MT0085 BlackorWhite
MT0086 Coloured
MarbleSlab20mm
MT0090 Black
MT0091 White
MT0092 BlackandWhite
MT0093 Coloured
MarbleSlab40mm
MT0100 Black
MT0101 White
MT0102 BlackandWhite
MT0103 Coloured
KotaStoneSlab
MT0110 20mm
MT0111 40mm
Lime
MT0120
MT0121
Slakedlime
Unslakedlime
Others
MT0122
SealedBag
BASICRATESBRICK
Brickmaterials
MT0125
MT0126
MT0127
Bricks2ndclass
Brickaggregate
Gradedbrickaggregate
MT0128 Interlockingcementearthblock(300mmX150mmX100mm)
MT0129 Interlockingcementearthblock(250mmX125mmX100mm)
BASICRATESCEMENT&CONCRETEMTERIALS
Cement
MT0145
MT0146
Cement(OPC/PSC)
WhiteCement
1000#
cu.m
cu.m
1000#
1000#
6900.00
1015.44
1192.00
7400.00
847.00
1078.00
7000.00
797.50
870.00
25060.00
16550.00
29430.00
19590.00
29430.00
19590.00
tonne
tonne
5050.00
25000.00
6126.30
26000.00
6376.25
26333.33
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
Units
PL
GP
SJ
kg
kg
kg
95.00
43.00
30.00
90.00
40.00
25.00
95.00
40.00
25.00
sq.m
sq.m
sq.m
30.00
37.50
45.00
27.50
37.50
45.00
30.00
40.00
47.50
m
m
350.00
80.00
350.00
75.00
340.00
75.00
kg
kg
kg
kg
350.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
m
m
87.50
65.00
89.50
70.00
90.00
67.90
kg
kg
kg
kg
kg
48.00
55.00
48.00
58.00
58.00
57.50
57.50
57.50
57.50
57.50
56.33
60.67
57.67
60.00
63.33
kg
kg
kg
kg
68.00
68.00
68.00
68.00
70.00
70.00
70.00
70.00
75.00
75.00
70.00
70.00
kg
51.50
58.00
58.00
m
m
250.00
160.00
240.00
170.50
260.00
172.00
kg
44.50
55.00
55.00
sq.m
sq.m
180.00
220.00
169.49
214.00
190.00
225.00
Additives&Admixtures
MT0150
MT0151
MT0152
RedOxidePigment\otherpigments
Waterproofingcompound
FloorHardener(metallic)
UnderlayforSlabs
PlasticSheet
MT0155 50micrometre
MT0156 100micrometre
MT0157 200micrometre
BASICRATESSTEEL&OTHERMETALMATERIALS
AluminiumMaterials
MT0160 AluminiumFlutedStrips3.15mmthick150mmwide
MT0161 AluminiumStrip40x1.6mm
AnodisedAluminiumSectionfordoors,windows
MT0165 Sliding,openableandpivotedwindows
MT0166 Slidingandopenabledoors
MT0167 Partitionsframing
MT0168 Falseceilingframing
AluminiumStripEdging
MT0175 57mmx12mmx1.6mm
MT0176 38mmx12mmx1.6mm
SteelMaterials
Rolledsections(250MPa)
MT0180 Angles
MT0181 Channels
MT0182 Flats
MT0183 Joists
MT0184 Plates
Sheet(250MPa)
MT0190 1mm
MT0191 2mm
MT0192 2.8mm
MT0193 3.5mm
MildsteelStrips
MT0194 1830mmX230mmX3mm
WeldedTube(250MPa)
MT0200 50mmdia
MT0201 40mmdia
ReinforcingBars&Mesh
MT0208 ThermoMechanicallyTreated(TMT)bars(yieldstrength500MPa)
WeldedMesh
MT0215 75mmx25mm
MT0216 ExpandedMetal(19mmx3mmx16gauge)
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
Units
PL
GP
SJ
kg
kg
62.50
80.00
62.50
85.00
70.00
85.00
10.28
11.67
12.50
sq.m
sq.m
sq.m
sq.m
190.00
145.00
138.00
110.00
210.00
190.00
160.00
130.00
228.00
196.00
165.00
140.00
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
190.00
140.00
170.00
120.00
240.00
170.00
225.00
160.00
246.00
230.00
315.00
315.00
226.04
236.81
236.81
236.81
312.16
312.16
tonne
78000.00
72500.00
68666.67
Fasteners
MT0220 M.S.Rivets
MT0221 M.S.Bolts&Nuts,Screwsetc
FencingWireProducts
MT0225 BarbedWire
G.Idoubleknottedmesh
MT0230 100x100x8gauge
MT0231 100x100x12gauge
MT0232 150x150x8gauge
MT0233 150x150x12gauge
G.Ichainlinkmesh
MT0240 100x100x8gauge
MT0241 100x100x12gauge
MT0242 75x75x8gauge
MT0243 75x75x12gauge
MT0244 50x50x8gauge
MT0245 50x50x12gauge
GalvanisedIron
MT0250
PlainG.ISheet,24gauge(0.63mm)
PunchedTypeConcertinaWire
MT0255
PunchedTypeConcertinaWire
484.00
484.00
484.00
Wires
MT0256
GIwires(assorteddiameters)
kg
70.00
85.00
80.00
tonne
72000.00
72000.00
72000.00
sq.m
1100.00
1100.00
1100.00
each
24.20
24.20
24.20
each
each
each
12.10
14.30
14.85
12.10
14.30
14.85
12.10
14.30
14.85
each
each
each
15.40
15.95
16.50
15.40
15.95
16.50
15.40
15.95
16.50
BASICRATESROOFINGMATERIALS
GalvanisedIron
CorrugatedG.ISheets
MT0275 24G(0.63mm)
Fibreglass
MT0280 Reinforcedpolyestertransparentsheets1.2mm,corrugated
RoofingSlate
MT0285 600mmx300mm
ConcreteRoofingTiles
PlainPantile/RomanII500mmx250mmconcretetiles
MT0290 6mm
MT0291 8mm
MT0292 10mm
ColouredPantile/RomanII500mmx250mmconcretetiles
MT0295 6mm
MT0296 8mm
MT0297 10mm
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
Units
PL
GP
SJ
each
each
28.60
31.90
28.60
31.90
28.60
31.90
each
each
29.70
47.30
29.70
47.30
29.70
47.30
each
each
30.80
49.50
30.80
49.50
30.80
49.50
pair
16.50
16.50
16.50
sq.m
m
299.20
220.00
299.20
220.00
299.20
220.00
m
m
m
25.30
36.30
41.80
25.30
36.30
41.80
25.30
36.30
41.80
cu.m
cu.m
9748.50
9786.66
8490.89
8792.66
8266.15
8567.92
sq.m
sq.m
sq.m
sq.m
107.21
260.00
196.11
349.96
102.28
280.00
160.66
468.73
99.00
247.50
155.00
257.00
sq.m
sq.m
sq.m
167.86
184.80
211.75
167.86
184.80
211.75
167.86
184.80
211.75
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
280.94
298.49
339.35
370.70
452.10
561.00
595.10
764.50
280.94
298.49
339.35
370.70
452.10
561.00
595.10
764.50
280.94
298.49
339.35
370.70
452.10
561.00
595.10
764.50
SuperRoman600mmx330mmx10mmconcretetiles
MT0300 Plain
MT0301 Coloured
Semisheet600mmx600mmx8mmconcretetiles
MT0305 Plain
MT0306 Coloured
Hip/Ridge,600mm
MT0310 Plain
MT0311 Coloured
Shingleproofing
MT0315 1500mm(approx.)
RedMudPlasticSheet
MT0320
MT0321
Redmudplasticcorrugatedsheet,1.5mm
Redmudplasticplainsheet,1.3mm
BASICRATESCARPENTRY&JOINERYMATERIALS
Timber
MT0325
MT0326
MT0327
Ballies75to125mmdia
Ballies250to300mmdia
Ballies125to250mmdia
Roughsawntimber(urbanrate)
MT0330 Class'B',(MixedConifer)
MT0331 Class'A',(Bluepine,Champ)
Plywood
MT0340 4mm,commercialply
MT0341 4mm,teakply
MT0342 6mm,commercialply
MT0343 12mm,commercialply
GypsumWallboard
MT0345 10mm
MT0346 12mm
MT0347 15mm
Bisonpanel,Prelaminated(bothsides)
MT0350 6mm
MT0351 8mm
MT0352 10mm
MT0353 12mm
MT0354 16mm
MT0355 20mm
MT0356 25mm
MT0357 30mm
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
10
Units
PL
GP
SJ
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
256.67
300.00
333.67
463.67
606.67
838.00
280.00
340.00
375.00
440.00
597.00
888.00
290.00
345.00
370.00
480.00
600.00
910.00
sq.m
sq.m
sq.m
sq.m
447.00
460.00
549.00
710.00
390.00
476.00
550.00
820.00
398.00
460.00
520.00
720.00
sq.m
650.00
657.00
660.00
m
m
sq.m
each
13.12
16.08
68.75
250.00
14.22
16.40
62.50
240.00
12.02
15.31
70.00
250.00
sq.m
sq.m
501.60
550.00
501.60
550.00
501.60
550.00
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
533.50
454.30
408.10
440.00
408.10
470.80
533.50
454.30
408.10
440.00
408.10
470.80
533.50
454.30
408.10
440.00
408.10
470.80
sq.m
150.00
180.00
190.00
sq.m
sq.m
sq.m
sq.m
845.00
1020.00
1150.00
1350.00
929.50
1122.00
1265.00
1485.00
954.85
1152.60
1299.50
1525.50
sq.m
sq.m
sq.m
sq.m
1350.00
1550.00
1850.00
2100.00
1485.00
1705.00
2035.00
2310.00
1525.50
1751.50
2090.50
2373.00
PlainParticleBoard
MT0365 6mm
MT0366 10mm
MT0367 12mm
MT0368 18mm
MT0369 25mm
MT0370 35mm
PrelaminatedParticleBoard(oneside)
MT0375 8mm
MT0376 10mm
MT0377 12mm
MT0378 18mm
Skylightpanel
MT0385
Translucentdiffuserpanel,forskylightsetc
CaneProducts
Bamboo
MT0390 25mmdia
MT0391 75mmdia
MT0392 Mat
MT0393 canebasket
Prefab.Pannelling
Flooring
MT0395 25mm,Mixedconifer
MT0396 38mm,Bluepine
Wallpanelling
MT0400 19mm,bluepine
MT0401 15mm,bluepine
MT0402 12mm,bluepine
MT0403 19mm,mixedconifer
MT0404 12mm,mixedconifer
MT0405 12mm,Champwood
WireGauze
MT0410
Galv.mildsteelwiregauze,85G(0.85mmaveragewidthofaperture),0.56mm
dia.
BASICRATESDOORS,WINDOWS&HARDWARE
Prefab.TimberDoors&Boards
FlushDoor,blockboardcore,commercialplyveneer,U\Fbonded
MT0415 25mm
MT0416 30mm
MT0417 35mm
MT0418 40mm
FlushDoor,blockboardcore,teakplyveneer,U\Fbonded
MT0425 25mm
MT0426 30mm
MT0427 35mm
MT0428 40mm
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
11
Units
PL
GP
SJ
sq.m
sq.m
sq.m
sq.m
980.00
1150.00
1350.00
1550.00
1078.00
1265.00
1485.00
1705.00
1107.40
1299.50
1525.50
1751.50
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
1336.50
1353.00
1364.00
979.00
991.10
1062.60
960.30
970.20
976.80
1336.50
1353.00
1364.00
979.00
991.10
1062.60
960.30
970.20
976.80
1336.50
1353.00
1364.00
979.00
991.10
1062.60
960.30
970.20
976.80
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
1382.70
1387.10
1389.30
1026.30
1028.50
1032.90
988.90
993.30
998.80
1382.70
1387.10
1389.30
1026.30
1028.50
1032.90
988.90
993.30
998.80
1382.70
1387.10
1389.30
1026.30
1028.50
1032.90
988.90
993.30
998.80
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
1397.55
1427.80
1431.10
1040.88
1043.08
1049.40
1001.28
1007.88
1016.68
1397.55
1427.80
1431.10
1040.88
1043.08
1049.40
1001.28
1007.88
1016.68
1397.55
1427.80
1431.10
1040.88
1043.08
1049.40
1001.28
1007.88
1016.68
sq.m
sq.m
sq.m
526.90
535.70
540.10
526.90
535.70
540.10
526.90
535.70
540.10
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
m
1039.50
330.00
572.00
572.00
715.00
972.40
396.00
1039.50
330.00
572.00
572.00
715.00
972.40
396.00
1039.50
330.00
572.00
572.00
715.00
972.40
396.00
FlushDoor,blockboardcore,plyveneer,chemicallytreated
MT0435 25mm
MT0436 30mm
MT0437 35mm
MT0438 40mm
PanelledDoor,withsinglelockrail
MT0445 30mm,12mmveneeredparticleboardpanel
MT0446 35mm,12mmveneeredparticleboardpanel
MT0447 40mm,12mmveneeredparticleboardpanel
MT0448 30mm,12mmplywoodpanel
MT0449 35mm,12mmplywoodpanel
MT0450 40mm,12mmplywoodpanel
MT0451 30mm,9mmplywoodpanel
MT0452 35mm,9mmplywoodpanel
MT0453 40mm,9mmplywoodpanel
PanelledDoor,withsinglelockrail&stile
MT0465 30mm,12mmveneeredparticleboardpanel
MT0466 35mm,12mmveneeredparticleboardpanel
MT0467 40mm,12mmveneeredparticleboardpanel
MT0468 30mm,12mmplywoodpanel
MT0469 35mm,12mmplywoodpanel
MT0470 40mm,12mmplywoodpanel
MT0471 30mm,9mmplywoodpanel
MT0472 35mm,9mmplywoodpanel
MT0473 40mm,9mmplywoodpanel
PanelledDoor,withdoublelockrail&stile
MT0485 30mm,12mmveneeredparticleboardpanel
MT0486 35mm,12mmveneeredparticleboardpanel
MT0487 40mm,12mmveneeredparticleboardpanel
MT0488 30mm,12mmplywoodpanel
MT0489 35mm,12mmplywoodpanel
MT0490 40mm,12mmplywoodpanel
MT0491 30mm,9mmplywoodpanel
MT0492 35mm,9mmplywoodpanel
MT0493 40mm,9mmplywoodpanel
Prefab.fullyglazedwindowshutters,incl.75mmrailwithpreservative&oneprimercoat,excluding
glass
MT0505
MT0506
MT0507
30mm
35mm
40mm
SteelDoorsandWindows
MT0510
MT0511
MT0512
MT0513
MT0514
MT0515
MT0516
Steeldoorwithnecessaryhinges,lugs,glazingclips
Steelwindows(fixed)withlugsandglazingclips
Steelwindows(sidehung)withhinges,lugsandglazingclips
Steelventilators(tophung)withhinges,lugsandglazingclips.
Steelventilators(centrehung)withpivots,lugsandglazingclips
Rollingshutterswithallaccessories,excludingtopcover
TopcoverforRollingshutter
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
12
Units
PL
GP
SJ
each
each
each
50.00
40.00
26.67
50.00
40.00
35.00
45.00
30.00
20.00
each
each
each
each
26.50
20.00
16.00
14.00
30.00
25.00
19.00
15.00
29.50
24.00
19.00
14.00
each
each
each
each
45.00
35.00
20.00
16.00
60.00
40.00
20.00
15.00
75.00
40.00
26.00
15.33
sq.m
345.00
355.00
360.00
each
each
each
150.00
120.00
105.00
140.00
125.00
110.00
135.00
120.00
107.50
each
each
each
45.00
35.00
22.50
65.00
35.00
27.50
55.00
35.00
25.00
each
each
each
70.00
52.50
35.00
80.00
65.00
50.00
70.00
46.50
30.00
each
each
each
each
53.75
46.25
41.25
35.00
65.00
55.00
45.00
40.00
90.00
75.00
60.00
40.00
each
each
37.00
31.25
48.00
38.00
50.00
40.00
each
each
each
500.00
478.33
435.00
480.00
390.00
370.00
597.50
487.50
432.50
each
each
each
155.00
107.00
76.00
140.00
112.50
82.50
145.00
120.00
75.00
Aluminium
AnodisedAluminiumFittings:ButtHinges
MT0530 100mm
MT0531 75mm
MT0532 50mm
AnodisedAluminiumFittings:Handles
MT0540 150mm
MT0541 125mm
MT0542 100mm
MT0543 75mm
AnodisedAluminiumFittings:HooksandEyes
MT0550 300mm
MT0551 200mm
MT0552 150mm
MT0553 100mm
AnodisedAluminiumFittings:KickingPlate
MT0560 4mmthick
AnodisedAluminiumFittings:SlidingDoorBolts
MT0565 300mm
MT0566 250mm
MT0567 200mm
AnodisedAluminiumFittings:TowerBolts(BarrelType)
MT0570 200mm
MT0571 150mm
MT0572 100mm
Brass
Brightfinishedbrass:ButtHinges
MT0575 100mm
MT0576 75mm
MT0577 50mm
Brightfinishedbrass:Handles
MT0580 150mm
MT0581 125mm
MT0582 100mm
MT0583 75mm
Brightfinishedbrass:HooksandEyes
MT0590 150mm
MT0591 100mm
Brightfinishedbrass:SlidingDoorBolts
MT0595 300mm
MT0596 250mm
MT0597 200mm
Brightfinishedbrass:TowerBolts(BarrelType)
MT0600 250mm
MT0601 150mm
MT0602 100mm
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
13
Units
PL
GP
SJ
each
each
each
each
95.00
650.00
550.00
770.00
85.00
850.00
650.00
890.00
100.00
730.00
700.00
940.00
each
each
each
24.67
18.50
11.17
25.50
20.50
14.25
33.33
25.00
15.67
each
each
each
each
32.00
25.50
20.25
16.00
30.00
25.00
19.00
15.00
37.50
27.50
22.50
17.50
each
each
each
each
48.00
32.00
17.00
14.00
60.00
37.50
21.50
16.00
50.00
31.67
21.67
16.67
each
each
each
83.33
75.00
63.33
86.67
83.33
75.00
97.50
82.50
67.50
each
each
each
40.00
28.33
20.00
47.50
36.67
28.33
62.50
37.50
22.50
each
51.67
47.25
50.00
sq.m
sq.m
sq.m
414.00
398.12
580.50
385.00
405.00
589.10
376.60
410.00
597.70
sq.m
sq.m
398.12
645.60
370.00
568.00
360.00
550.00
DoorClosers/Stoppers
MT0605 Brightfinishedbrass:DoorStopper
MT0606 Brightfinishedbrass:MortiseLatch100mm
MT0607 brass,hinged,springloadedtype
MT0608 brass,overhead,hydraulictype
MildSteel
MildSteel:ButtHinges
MT0615 100mm
MT0616 75mm
MT0617 50mm
MildSteel:Handles
MT0620 150mm
MT0621 125mm
MT0622 100mm
MT0623 75mm
MildSteel:HooksandEyes
MT0630 300mm
MT0631 200mm
MT0632 150mm
MT0633 100mm
MildSteel:SlidingDoorBolts
MT0640 300mm
MT0641 250mm
MT0642 200mm
MildSteel:TowerBolts(BarrelType)
MT0645 250mm
MT0646 150mm
MT0647 100mm
MSDoorStopper
MT0650
MildSteel:DoorStopper
BASICRATESTILES&GLASSMATERIALS
Glass
PlainGlass
MT0655 3mmthick
MT0656 4mmthick
MT0657 5.5mmthick
FrostedGlass
MT0660 3mmthick
MT0661 5.5mmthick
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
14
Units
PL
GP
SJ
each
each
each
each
each
each
each
sq.m
20.58
1.70
2.20
31.35
26.75
23.00
21.00
335.00
23.00
1.70
2.20
35.00
26.00
23.00
21.00
345.00
17.50
1.70
2.20
32.00
26.00
24.00
21.00
350.00
kg
15.00
20.00
20.00
kg
kg
kg
58.50
55.00
42.00
60.00
54.00
47.50
62.33
65.60
54.00
kg
kg
sq.m
sq.m
kg
kg
46.00
78.33
25.00
25.00
270.00
760.00
51.00
80.00
32.00
40.00
285.00
800.00
55.00
85.00
25.00
35.00
265.00
810.00
litre
litre
litre
litre
litre
141.00
130.00
121.00
132.46
116.55
140.00
128.33
122.00
128.90
128.00
145.00
130.00
118.75
130.00
127.50
litre
litre
litre
litre
litre
litre
litre
181.80
110.25
152.75
195.75
214.13
310.00
165.00
186.25
117.50
150.33
160.00
230.00
320.00
176.00
178.00
166.67
185.00
193.33
212.50
320.00
185.00
litre
litre
litre
326.00
205.00
250.00
308.00
206.33
255.00
293.00
237.50
260.00
litre
litre
130.00
90.00
120.00
85.00
140.00
87.50
Tiles
Glazedtiles
MT0665 white,150x150mm
MT0666 extra,forregularcolours
MT0667 extra,forspecialcolours
MT0668 White,300x300mm
MT0669 White,200x200mm
MT0670 White,200x100mm
MT0671 White,100x100mm
MT0672 Linoleumsheet,2mm
BASICRATESPLASTERINGMATERIALS
MT0685
PlasterofParis
BASICRATESPAINT&WALLPAPERMATERIALS
Distemper&DistemperPrimers
MT0690
MT0691
MT0692
DryDistemper
Acrylicwashabledistemper
WaterproofingCementpaint
BhutanesePaintingMaterials
MT0695
MT0696
MT0697
MT0698
MT0699
MT0700
MudPaintforBhutanesetraditionalpainting
Animalglue
ClothforBhutanesepainting
PaperforBhutanesepainting
Colourpowder(excludinggoldpowder)
Goldpowder
Primers
MT0710
MT0711
MT0712
MT0713
MT0714
Cementprimer
Syntheticredleadprimer
Redoxideprimer,formetals
Whiteprimer,forwood
Pinkprimer,forwood
Finishingcoat
MT0720
MT0721
MT0722
MT0723
MT0724
MT0725
MT0726
Aluminiumpaint
RedCorrugalpaint
Syntheticenamelpaint
Highglosssyntheticenamel
Acrylicemulsion
Vinylplasticemulsionpaint(forcementplaster)
Black\Whitebitumenenamel
StainsVarnishPolish
MT0730
MT0731
MT0732
WoodStain(variouscolours)
Clearsyntheticvarnish
FrenchPolish
WoodPreservative
MT0735
MT0736
WoodpreservativeBrown
CrudeCoalTar
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
15
Units
PL
GP
SJ
kg
45.00
46.25
45.00
sq.m
sq.m
295.00
403.00
298.00
410.00
302.00
417.00
each
495.00
437.50
450.00
each
1866.67
1900.00
1872.50
each
6950.00
7010.00
7100.00
each
650.00
680.00
662.50
m
each
each
each
each
each
each
1050.00
270.00
250.00
360.00
550.00
430.00
138.00
1150.00
287.00
255.00
320.00
548.00
450.00
145.00
1050.00
270.00
250.00
300.00
600.00
500.00
150.00
m
m
m
m
m
m
m
m
m
m
337.26
367.13
458.43
573.32
861.08
1220.78
1760.33
2223.65
4778.95
6827.15
337.26
367.13
458.43
573.32
861.08
1220.78
1760.33
2223.65
4778.95
6827.15
337.26
367.13
458.43
573.32
861.08
1220.78
1760.33
2223.65
4778.95
6827.15
each
each
each
each
each
each
each
each
each
each
54.01
58.69
73.35
112.22
168.54
238.94
344.54
389.40
545.60
720.72
54.55
59.27
74.08
113.34
170.23
241.33
347.99
389.40
545.60
720.72
54.82
59.57
74.45
113.91
171.07
242.53
349.71
389.40
545.60
720.72
Accessories
MT0740
Putty
WallPaper
Wallpaper:
MT0745 Standard
MT0746 HighQuality
BASICRATESDRAINAGEMATERIALS
C.I.ManholeCovers
MT0750
MT0751
MT0752
MT0753
WatertightC.I.ManholeCoverwithframe,300x300mminsidesizeWt.ofcovernotlessthan
4.53kgwt.offramenotlessthan2.72kg
C.I.manholecoverwithframe(lightduty)internaldimension455x610mmTotalweightofCover
andframenotlessthan38kg.(Cover23kg.andframe15kg.)
C.I.manholecoverandframe(mediumduty)500mminternaldia.Totalweightofcoverand
framenotlessthan116kg.(cover58kg.andframe58kg)
C.I.manholecover400mmdia.inside,mosquitoproofwithlockingarrangement(Wtofcovernot
lessthan7kg).
RainwaterPipes&Fittings
CastIron
MT0760 Pipe,100mmdia.
MT0761 Bend100mm
MT0762 Head100mm
MT0763 Offset100mm,75mmprojection
MT0764 Offset100mm,150mmprojection
MT0765 Shoe,100mm
MT0766 Grating
R.CNonPressurepipe
NP2class
MT0768 100mmdia
MT0769 150mmdia
MT0770 225mmdia
MT0771 300mmdia
MT0772 450mmdia
MT0773 600mmdia
MT0774 750mmdia
MT0775 900mmdia
MT0776 1050mmdia
MT0777 1200mmdia
NP2ClassCollar
MT0783
MT0784
MT0785
MT0786
MT0787
MT0788
MT0789
MT0790
MT0791
MT0792
100mmdia
150mmdia
225mmdia
300mmdia
450mmdia
600mmdia
750mmdia
900mmdia
1050mmdia
1200mmdia
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
16
Units
PL
GP
SJ
Stonewarepipes60cmlong
MT0795 100mmdia
MT0796 150mmdia
MT0797 200mmdia
MT0778 230mmdia
MT0779 250mmdia
MT0780 300mmdia
MT0781 350mmdia
MT0782 400mmdia
MT0793 500mmdia
MT0794 600mmdia
each
each
each
each
each
each
each
each
each
each
121.00
269.50
473.00
578.60
649.00
803.00
962.50
1127.50
1479.50
1776.50
122.21
272.20
477.73
584.39
655.49
811.03
972.13
1138.78
1494.30
1794.27
122.82
273.54
480.10
587.28
658.74
815.05
976.94
1144.41
1501.69
1803.15
S\WtrapPType
MT0800 100x100mm
MT0801 150x100mm
MT0802 180x150mm
each
each
each
99.00
112.20
143.00
99.99
113.32
144.43
100.49
113.88
145.15
m
m
m
m
m
m
m
m
m
m
85.18
104.17
150.91
204.12
246.91
315.86
406.74
524.17
737.50
1144.58
106.50
155.00
196.51
266.13
313.39
393.89
502.03
643.79
857.93
1500.75
110.31
133.81
191.50
261.42
296.88
393.04
501.75
644.75
925.29
1611.92
m
m
m
m
m
m
m
m
m
m
m
m
17.85
26.95
44.25
68.20
105.30
168.00
235.97
340.00
505.10
822.00
1069.13
2103.50
20.62
29.82
56.13
110.10
141.65
178.00
265.00
385.00
585.00
910.00
1250.00
2387.67
20.95
31.25
44.89
74.01
122.68
194.07
284.43
388.27
595.80
942.40
1240.08
2460.27
m
m
m
m
m
m
m
m
m
m
29.97
46.45
71.75
112.75
157.55
227.37
336.37
542.00
708.60
1395.93
41.00
66.00
88.50
128.50
168.50
233.50
338.50
648.50
827.00
1525.00
39.00
51.79
78.27
139.34
196.89
286.07
369.97
612.17
796.20
1576.47
StonewarePipeSpecials
BASICRATESPLUMBING(PIPEWORK)
WaterSupplyPipes
G.Ipipe
MT0805 15mm
MT0806 20mm
MT0807 25mm
MT0808 32mm
MT0809 40mm
MT0810 50mm
MT0811 65mm
MT0812 80mm
MT0813 100mm
MT0814 150mm
H.D.P.Epressureclass10kg/sq.cm
MT0817 20mm
MT0818 25mm
MT0819 32mm
MT0820 40mm
MT0821 50mm
MT0822 63mm
MT0823 75mm
MT0824 90mm
MT0825 110mm
MT0826 140mm
MT0827 160mm
MT0828 225mm
H.D.P.EPipesofpressureclass6kg/sq.cm
MT0830 32mm
MT0831 40mm
MT0832 50mm
MT0833 63mm
MT0834 75mm
MT0835 90mm
MT0836 110mm
MT0837 140mm
MT0838 160mm
MT0839 225mm
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
17
Units
H.D.P.EPipesofpressureclass4kg/sq.cm
MT0841 40mm
MT0842 50mm
MT0843 63mm
MT0844 75mm
MT0845 90mm
MT0846 110mm
MT0847 140mm
MT0848 160mm
MT0849 225mm
H.D.P.EPipesofpressureclass2.5kg/sq.cm
MT0852 110mm
MT0853 140mm
MT0854 160mm
MT0855 225mm
DuctileIronPipesClassK9
MT0856 80mm
MT0857 100mm
MT0858 150mm
MT0859 200mm
MT0860 250mm
MT0861 300mm
MT0862 350mm
MT0863 400mm
MT0864 450mm
MT0865 500mm
MT0866 600mm
PL
GP
SJ
m
m
m
m
m
m
m
m
m
44.00
50.00
77.55
112.00
161.56
234.55
317.43
545.00
983.63
48.40
62.50
86.50
133.50
183.50
259.50
400.00
559.00
1117.00
49.28
54.43
82.21
122.87
175.06
253.63
414.40
555.40
1119.73
m
m
m
m
157.00
251.23
324.13
638.37
195.00
345.00
415.00
815.00
198.00
314.40
410.40
847.20
m
m
m
m
m
m
m
m
m
m
m
853.20
987.29
1455.17
1980.54
2648.04
3366.98
4170.77
5000.97
5906.52
6901.83
9835.20
853.20
987.29
1455.17
1980.54
2648.04
3366.98
4170.77
5000.97
5906.52
6901.83
9835.20
853.20
987.29
1455.17
1980.54
2648.04
3366.98
4170.77
5000.97
5906.52
6901.83
9835.20
m
m
m
m
m
m
m
m
m
m
854.28
1278.20
1666.31
2195.87
2799.77
3457.26
4140.42
4859.07
5712.48
8338.80
854.28
1278.195
1666.31
2195.865
2799.765
3457.26
4140.42
4859.07
5712.48
8338.8
854.28
1278.20
1666.31
2195.87
2799.77
3457.26
4140.42
4859.07
5712.48
8338.80
m
m
m
m
m
m
m
m
m
m
1720.00
2480.00
3490.00
4590.00
5690.00
7050.00
8450.00
11400.00
13400.00
17450.00
1720.00
2480.00
3490.00
4590.00
5690.00
7050.00
8450.00
11400.00
13400.00
17450.00
1720.00
2480.00
3490.00
4590.00
5690.00
7050.00
8450.00
11400.00
13400.00
17450.00
DuctileIronPipesClassK7
MT0871
MT0872
MT0873
MT0874
MT0875
MT0876
MT0877
MT0878
MT0879
MT0880
100mm
150mm
200mm
250mm
300mm
350mm
400mm
450mm
500mm
600mm
DuctileIronPipesK9DoubleFlanged
MT0882 100mm
MT0883 150mm
MT0884 200mm
MT0885 250mm
MT0886 300mm
MT0887 350mm
MT0888 400mm
MT0889 450mm
MT0890 500mm
MT0891 600mm
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
18
Units
PL
GP
SJ
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
38.45
52.13
83.63
189.00
117.00
330.00
450.00
1500.00
25.50
72.00
97.50
292.50
390.00
200.00
205.00
205.00
590.00
97.00
125.00
243.00
280.00
480.00
45.00
65.00
95.00
155.00
270.00
385.00
630.00
1970.00
85.00
285.00
315.00
325.00
380.00
220.00
225.50
225.50
649.00
106.70
137.50
267.30
308.00
528.00
30.68
42.63
66.18
132.55
245.80
346.40
602.75
2354.70
48.95
102.73
190.63
267.30
485.25
230.00
235.75
235.75
678.50
111.55
143.75
279.45
322.00
552.00
each
each
156.00
212.25
140.00
215.00
150.00
230.00
each
175.00
170.67
175.00
each
each
each
280.00
293.50
401.00
267.00
280.00
370.00
270.00
295.00
395.00
each
each
each
each
each
780.30
1049.50
1514.70
1930.00
2575.00
780.00
1080.00
1850.00
3250.00
3750.00
895.00
1268.33
1722.00
2790.00
3750.00
each
each
each
1435.00
2352.00
3570.00
1413.33
2500.00
3300.00
1490.00
2574.50
3345.00
each
each
each
each
each
each
each
each
each
each
each
50.40
58.86
89.28
142.74
185.94
264.60
295.20
412.20
442.80
484.20
831.60
50.40
58.86
89.28
142.74
185.94
264.60
295.20
412.20
442.80
484.20
831.60
50.40
58.86
89.28
142.74
185.94
264.60
295.20
412.20
442.80
484.20
831.60
PipeFittings
H.D.P.Eweldedtypefittings
MT0895 TEE,20mm
MT0896 TEE,25mm
MT0897 TEE,32mm
MT0898 TEE,50mm
MT0899 TEE,63mm
MT0900 TEE,90mm
MT0901 TEE,110mm
MT0902 TEE,160mm
MT0903 Elbow,32mm
MT0904 Elbow,50mm
MT0905 Elbow,63mm
MT0906 Elbow,90mm
MT0907 Elbow,110mm
MT0908 Reducer,90x50mm
MT0909 Reducer,90x63mm
MT0910 Reducer,110x63mm
MT0911 Reducer,160x90mm
MT0912 Blankend,50mm
MT0913 Blankend,63mm
MT0914 Blankend,90mm
MT0915 Blankend,110mm
MT0916 Blankend,160mm
M.I.FittingsUnion
MT0921 32mm
MT0922 40mm
BrassFittingsBibcock
MT0925 15mm
Stopcock
MT0930 15mmnombore
MT0931 20mmnombore
MT0932 25mmnombore
Wheelvalve
MT0940 32mmnombore
MT0941 40mmnombore
MT0942 50mmnombore
MT0943 65mmnombore
MT0944 80mmnombore
Nonreturnvalve
MT0951 50mmnombore
MT0952 65mmnombore
MT0953 80mmnombore
RubberGasketofS.B.RQuality
MT0960 80mm
MT0961 100mm
MT0962 150mm
MT0963 200mm
MT0964 250mm
MT0965 300mm
MT0966 350mm
MT0967 400mm
MT0968 450mm
MT0969 500mm
MT0970 600mm
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
19
Units
PL
GP
SJ
each
each
each
each
575.00
707.50
900.00
1462.50
450.00
910.00
1185.00
1690.00
450.00
722.50
1025.00
1575.00
each
each
each
150.00
172.00
295.00
170.00
180.00
285.00
167.50
190.00
297.50
each
each
each
205.40
201.00
255.00
210.00
280.00
305.00
207.50
296.00
315.00
each
each
each
109.00
151.00
216.00
150.00
190.00
305.00
160.00
190.00
325.00
each
each
each
124.00
255.00
320.00
120.00
253.00
380.00
150.00
230.00
300.00
each
each
each
210.00
315.00
430.00
205.00
290.00
380.00
200.00
275.00
450.00
each
each
each
each
170.00
216.00
295.00
315.00
176.50
212.00
305.00
390.00
190.00
225.00
325.00
425.00
each
each
each
290.00
363.00
544.00
205.00
245.00
490.00
220.00
260.00
555.00
each
each
each
251.00
321.50
422.00
225.00
270.00
390.00
220.00
260.00
462.50
each
each
each
210.00
275.00
320.00
219.00
285.00
326.00
220.00
292.00
330.00
each
each
each
225.50
345.00
367.00
230.50
345.00
376.00
240.00
360.00
382.50
WastewaterPipework
CastIronPipes,SingleSocketted,1.83mlong
MT0975 50mm
MT0976 75mm
MT0977 100mm
MT0978 150mm
Plainbend
MT0985 50mm
MT0986 75mm
MT0987 100mm
Doorbend
MT0990 50mm
MT0991 75mm
MT0992 100mm
Collar
MT1000 50mm
MT1001 75mm
MT1002 100mm
Heelrestbend
MT1010 50mm
MT1011 75mm
MT1012 100mm
Singleequaljunctionplain
MT1020 50mm
MT1021 75mm
MT1022 100mm
Singleequaljunction,door
MT1030 50mm
MT1031 75mm
MT1032 100mm
MT1033 150mm
Doubleequaljunction,plain
MT1040 50mm
MT1041 75mm
MT1042 100mm
Doubleequaljunction,door
MT1050 50mm
MT1051 75mm
MT1052 100mm
Singleunequaljunction,plain
MT1060 75x50mm
MT1061 100x50mm
MT1062 100x75mm
Singleunequaljunction,door
MT1070 75x50mm
MT1071 100x50mm
MT1072 100x75mm
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
20
Units
PL
GP
SJ
each
each
310.00
360.00
315.00
355.00
325.00
370.00
each
each
325.00
370.00
325.00
369.00
340.00
390.00
each
each
each
190.00
367.00
510.00
165.00
350.00
495.00
210.00
240.00
450.00
each
each
each
290.00
406.00
544.00
260.00
320.00
485.00
240.00
295.00
347.00
each
each
272.50
379.00
280.00
384.00
293.00
397.00
each
each
267.50
386.00
240.00
390.00
220.00
395.00
each
each
260.00
365.00
267.00
365.00
275.00
375.00
each
each
315.00
385.00
300.00
375.00
275.00
375.00
each
each
each
each
120.00
200.00
305.00
540.00
125.00
212.00
300.00
540.00
175.00
243.50
300.00
482.50
each
each
each
145.00
305.00
450.00
205.00
325.00
450.00
257.50
337.50
427.50
kg
91.00
98.00
105.00
each
each
each
211.50
290.00
385.60
205.50
308.00
392.80
203.00
284.00
400.00
each
each
each
322.33
438.40
580.87
318.00
532.00
597.00
350.00
420.00
450.00
Doubleunequaljunction,plain
MT1080 100x50
MT1081 100x75
Doubleunequaljunction,door
MT1085 100x50
MT1086 100x75
SingleequalYJunction
MT1090 50mm
MT1091 75mm
MT1092 100mm
DoubleequalYJunction
MT1100 50mm
MT1101 75mm
MT1102 100mm
Singleunequalinvertbranch
MT1110 75x50mm
MT1111 100x50mm
Offsets50mmdiaoffset
MT1115 with75mmprojection
MT1116 with150mmprojection
75mmdiaoffset
MT1120 with75mmprojection
MT1121 with150mmprojection
100mmdiaoffset
MT1125 with75mmprojection
MT1126 with150mmprojection
TerminalGuard
MT1130 50mm
MT1131 75mm
MT1132 100mm
MT1133 150mm
PtypeNahaniTrap
MT1140 100mminlet&50mmoutlet
MT1141 100mminlet&75mmoutlet
MT1142 C.I.Ptrap100mm
JointingMaterials
MT1145
Piglead
P.V.CPipes&fittings(SoilWasteandVent)
Pipes,SingleSocketed1.83mlong
MT1150 75mm
MT1151 90mm
MT1152 110mm
Pipes,SingleSocketed3.00mlong
MT1160 75mm
MT1161 90mm
MT1162 110mm
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
21
Units
PL
GP
SJ
each
each
each
236.33
353.60
443.53
240.00
373.00
455.00
230.00
353.60
420.00
each
each
each
163.90
226.60
302.20
180.00
295.00
359.00
170.00
290.00
340.00
each
172.80
180.00
190.25
each
each
each
87.00
95.00
112.00
118.00
117.50
150.00
90.85
115.60
137.70
each
each
each
54.65
64.60
76.96
63.50
76.50
86.00
52.90
71.35
81.33
each
each
each
70.00
97.00
112.00
85.00
110.00
130.00
95.00
125.00
145.00
each
each
each
95.00
112.00
148.00
105.00
135.00
160.00
112.00
143.00
140.00
each
each
each
165.00
247.00
338.00
175.00
254.00
330.00
214.07
295.83
352.00
each
each
each
108.00
125.00
159.00
110.00
135.00
160.00
114.00
138.50
170.00
each
each
each
89.00
119.20
155.00
103.00
150.00
165.00
72.00
125.00
132.00
each
each
each
96.53
130.40
173.40
115.00
140.00
180.00
91.00
132.00
164.00
each
each
each
151.33
211.20
276.87
132.00
206.00
235.00
150.00
215.00
299.00
Pipes,DoubledSocketed1.83mlong
MT1170 75mm
MT1171 90mm
MT1172 110mm
Pipes,DoubledSocketed1.20mlong
MT1180 75mm
MT1181 90mm
MT1182 110mm
PipeConnector
MT1190 110mm
Reducer
MT1195 90x75mm
MT1196 110x75mm
MT1197 110x90mm
Coupler
MT1205 75mm
MT1206 90mm
MT1207 110mm
Plainbend
MT1215 75mm
MT1216 90mm
MT1217 110mm
Doorbend
MT1225 75mm
MT1226 90mm
MT1227 110mm
LongArmBend
MT1235 75mm
MT1236 90mm
MT1237 110mm
PlainShoe
MT1239 75mm
MT1240 90mm
MT1241 110mm
SingleTee,Plain
MT1245 75mm
MT1246 90mm
MT1247 110mm
SingleTee,WithDoor
MT1255 75mm
MT1256 90mm
MT1257 110mm
DoubleTee,Plain
MT1265 75mm
MT1266 90mm
MT1267 110mm
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
22
Units
PL
GP
SJ
each
each
each
222.00
272.00
304.53
267.00
353.50
383.50
215.00
210.00
305.00
each
each
each
115.00
136.00
205.00
135.00
225.00
262.67
149.00
212.50
233.47
each
each
each
135.00
172.80
262.00
176.00
263.00
343.00
178.20
265.20
273.83
each
each
each
160.00
280.00
274.00
223.00
313.00
349.50
185.65
357.00
320.05
each
each
each
222.00
237.60
360.00
260.00
334.50
396.50
290.00
357.00
288.00
each
each
each
35.00
45.00
50.00
37.00
45.00
54.00
34.00
47.00
56.00
each
each
181.60
212.80
198.00
280.00
190.00
250.00
each
each
308.00
436.80
329.00
405.00
243.45
392.00
each
each
290.00
328.59
366.00
410.00
247.34
289.00
each
each
each
78.00
85.00
90.00
89.00
100.00
103.00
87.00
95.00
105.00
each
122.00
120.00
160.00
each
each
335.00
315.00
404.00
350.00
390.00
340.00
DoubleTee,WithDoor
MT1275 75mm
MT1276 90mm
MT1277 110mm
SingleY,Plain
MT1285 75mm
MT1286 90mm
MT1287 110mm
SingleY,WithDoor
MT1295 75mm
MT1296 90mm
MT1297 110mm
DoubleY,Plain
MT1305 75mm
MT1306 90mm
MT1307 110mm
DoubleY,WithDoor
MT1315 75mm
MT1316 90mm
MT1317 110mm
SealRing
MT1320 75mm
MT1321 90mm
MT1322 110mm
75mmdia.offset
MT1325 With75mmprojection
MT1326 With150mmprojection
90mmdia.offset
MT1330 With75mmprojection
MT1331 With150mmprojection
110mmdia.offset
MT1335 With75mmprojection
MT1336 With150mmprojection
TerminalGuard
MT1340 75mm
MT1341 90mm
MT1342 110mm
NahaniTrap
MT1345 100mminlet&75mmoutlet
PTrapwithoutairvent
MT1350 Big
MT1351 Small
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
23
Units
PL
GP
SJ
each
each
14125.00
11700.00
14600.00
13000.00
14500.00
12500.00
each
each
1522.50
792.67
1510.00
789.00
1505.00
750.00
each
730.00
850.00
780.00
each
1128.00
1105.00
1215.00
each
2730.00
3165.00
2950.00
each
each
each
each
each
each
each
each
each
each
each
750.00
990.00
1063.75
1500.00
1725.00
2270.00
1300.00
1600.00
3230.00
3500.00
640.00
883.33
1000.00
1360.00
2000.00
2180.00
2430.00
1320.00
1800.00
3050.00
3450.00
880.00
750.00
950.00
1320.00
1470.00
1670.00
2450.00
1250.00
1750.00
3350.00
3220.00
1180.00
each
each
each
each
each
each
pair
950.00
1535.00
570.00
1125.75
1748.67
459.75
122.50
1050.00
1887.50
522.50
1315.00
1780.00
515.00
110.00
1250.00
1950.00
400.00
1282.50
1650.00
395.00
95.00
each
each
each
1465.00
1701.50
1980.00
1265.00
1780.50
2010.00
1450.00
1890.00
1935.00
each
each
1368.00
1935.00
1275.00
2675.00
1690.00
2744.50
each
290.00
275.00
325.00
BASICRATESPLUMBING(SanitaryInstallation,Fittings&accessories)
Baths
MT1355
MT1356
Porcelainbathtub,whiteenamelled,1700x740x440mm
Fibreglassbathtub
Basins,Sinks
Flatbackwashbasin,whitevitreous
MT1360 630x450mm
MT1361 550x400mm
Anglebackwashbasin
MT1365 400mmx400mm,whitevitreouschina
Pedestalforwashbasin
MT1370 whitevitreouschina
SinksWhiteglazedvitreousChina
MT1375 600x450x250
StainlessSteelKitchenSinks
MT1380 singlebowl,450x400x150mm
MT1381 singlebowl,580x480x175mm
MT1382 singlebowl&drainboard,940x460x160mm
MT1383 singlebowl&drainboard,1080x520x175mm
MT1384 singlebowl&drainboard,1150x515x175mm
MT1385 singlebowl&doubledrainboard,1740x520x200mm
MT1386 doublebowl,940x460x160mm
MT1387 doublebowl,1150x520x150mm
MT1388 doublebowl&singledrainboard,1740x520x200mm
MT1389 doublebowl&doubledrainboard,1740x520x165mm
MT1390 singledrainboard,610x460mm
W.CPans
W.C.Pans
MT1400 VitreousChinaEuropeanwhite
MT1401 VitreousChinaEuropeancolour
MT1402 VitreousChinaIndiantype500mm,white
MT1403 VitreousChinaIndiantype580mmOrissa,white
MT1404 VitreousChinaIndiantype580mmOrissa,colour
MT1405 Plasticseat&lidforEuropeanpan
MT1406 VitreousChinaFootrests(250x130x30),forIndianpan
Cisterns
C.I.AutomaticflushingCisternwithfittings
MT1420 5litres
MT1421 10litres
MT1422 12.5litres
VitreousChinacisternlowlevel,incl.fittings&flushbend
MT1430 10litres,white
MT1431 10litres,colour
FloatValve
MT1440
15mmballvalvewithplasticfloat
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
24
Units
PL
GP
SJ
each
731.60
790.00
930.00
each
each
each
each
1010.00
1153.00
415.00
350.00
1015.00
1160.00
420.00
355.00
1018.00
1169.00
450.00
365.00
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
460.04
893.80
565.20
491.00
440.00
522.50
572.17
569.30
440.00
491.00
700.20
656.13
657.20
456.17
430.00
644.00
863.00
335.00
582.67
688.00
550.00
397.50
363.33
430.00
494.00
412.00
436.67
546.00
550.00
550.00
432.50
435.00
675.00
885.00
307.50
490.00
490.00
425.00
397.00
499.00
496.00
550.00
437.50
495.00
675.00
695.00
897.00
315.00
421.67
648.00
900.00
each
each
each
each
each
each
each
960.00
1010.00
790.00
550.00
655.00
475.00
300.00
630.00
709.00
860.00
500.00
722.50
350.00
350.00
660.00
750.00
900.00
450.00
695.00
480.00
390.00
each
each
each
each
each
each
each
each
each
each
each
each
each
1898.40
1599.00
1347.50
1240.80
2022.00
2611.00
2616.20
2150.00
1252.80
2580.00
3562.24
2099.25
2398.80
1800.00
1460.00
1350.00
1250.00
2130.00
2654.00
2625.00
1740.00
1025.00
2450.00
3500.00
2100.00
2240.00
1900.00
1470.00
1500.00
1300.00
1980.00
2700.00
2665.00
1900.00
1120.00
2490.00
3380.00
2180.00
2300.00
each
2623.00
2700.00
2780.00
each
each
each
138.75
1300.00
680.00
145.00
1260.00
650.00
150.00
1350.00
700.00
Urinals
MT1445 WhitevitreousChinaflatbacklippedfronttypeurinals,430x260x350mm
Flushfittings
MT1450 c.pflushvalve,32mm
MT1451 c.pflushvalve,32mm,concealed
MT1452 c.pflushbend,long
MT1453 c.pflushvalveelbow
C.pCocks&Spouts
MT1460 15mmpillarcock
MT1461 15mmpillarcock,swanneck,c.pknob
MT1462 15mmpillarcock,aerator,c.pknob
MT1463 20mmpillarcock(forbath)
MT1464 15mmbibcock,vert,c.pknob
MT1465 15mmbibcock,inclined,c.pknob
MT1466 15mmbibcock,longnose,c.pknob
MT1467 15mmbibcock,longbody,c.pknob
MT1468 15mmstopcock,c.pknob
MT1469 20mmstopcock,c.pknob
MT1470 15mmstopcock,concealed,c.pknob
MT1471 15mmstopcock,H\Dconcealed,c.pknob
MT1472 20mmstopcock,H\Dconcealed,c.pknob
MT1473 15mmanglestopcock,c.pknob
MT1474 Wallspout,std,15mm
MT1475 Wallspout,w\odiverter,usedwithsinglelevermixers
MT1476 Wallspout,withdiverter,usedwithsinglelevermixers
C.pBrassShowerfittingsfor15to20mminlet
MT1510 rose,100mmdia
MT1511 rose,150mmdia
MT1512 shower,withflextube
MT1513 shower,revolvingjoint
MT1514 shower,adjustablewithlockingkey
MT1515 showerarm,15mm
MT1516 showerarm,15mm,heavyduty
C.pMixers
MT1530 basin,singlehole,castedspout,15mm
MT1531 basin,closehole,15mm
MT1532 sink,withspoutJpipe,15mm
MT1533 sink,withcastedspoutswinging,15mm
MT1534 wall,nontelephonictype,15mm
MT1535 wall,telephonictypewithcrutchandtel.shower,15mm
MT1536 wall,telephonictypewithoutcrutchandtel.shower,15mm
MT1537 wall,telephonictypewithcrutchandwithouttel.shower,15mm
MT1538 wall,telephonictypewithC.Pbend&flanges,15mm
MT1539 Threeholemixerwithoutpopup,15mm
MT1540 Threeholemixerwithpopup,15mm
MT1541 basin,elbowaction,surgical,15mm
MT1542 basin,elbowaction,surgicalwithshower,15mm
MT1543
bath,withexposedadjustablelegswithtelephoneshowerarrangementwithcrutch,15mm
MT1544 wall,withtelephonicshowerarrangementwith115mmlongbendpipeforoverheadshower
connection,15mm
MT1545 shower,threeinone,withbendflexibletube,andshower&hook,15mm
MT1546 sink,withswivelspout,15mm
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
25
Units
PL
GP
SJ
each
each
540.00
72.00
467.00
93.00
450.00
80.00
pair
100.00
125.00
120.00
each
each
162.83
238.75
185.00
230.00
180.00
220.00
each
64.80
65.00
75.00
each
each
81.00
92.00
90.00
100.00
110.00
125.00
each
each
each
each
280.00
335.00
264.00
170.00
230.00
390.00
240.00
180.00
225.00
380.00
225.00
170.00
each
each
each
each
337.10
381.10
430.20
286.20
312.67
362.67
426.00
296.00
345.00
475.00
500.00
295.00
each
each
150.00
235.00
141.25
216.25
145.00
195.67
each
each
367.50
650.00
380.00
650.00
385.00
670.00
each
each
each
each
325.00
650.00
720.00
635.00
316.25
670.00
710.00
659.00
360.00
580.00
613.00
554.00
each
each
each
each
each
each
each
5390.00
5697.33
6307.50
7681.00
9511.25
14130.00
17235.00
6324.00
6253.00
7200.00
8500.00
11265.00
13780.00
18450.00
5375.00
5450.00
6950.00
7750.00
12550.00
13550.00
19800.00
Traps,c.p
MT1580 32mm
MT1581 forbath
BathroomAccessories
Brackets
MT1585 R.S.orC.I.Brackets
C.p.brasswaste
MT1590 32mm
MT1591 40mm
PVCwaste
MT1595 32mm
C.p.brasschainwithplug
MT1600 32mm
MT1601 40mm
SoapContainers
MT1605 c.pbrasswithbracket
MT1606 c.pLiquidSoapContainer
MT1607 Recessedceramic,200x100mm
MT1608 Recessedceramic,150x150mm
C.pTowelRails
MT1615 20mmx450mm
MT1616 20mmx600mm
MT1617 20mmx750mm
MT1618 C.pTowelRing
C.pCoatHooks
MT1625 single
MT1626 double
Glassself/Mirror
MT1630 GlassShelf
MT1631 Mirror(Bevellededge)600mmx450mm
Toiletpaperholders
MT1635 C.P.brass
MT1636 recessedceramic(white),200x100mm
MT1637 recessedceramic(coloured),200x100mm
MT1638 recessedceramic(rolltype),150x150mm
ElectricWaterHeater
ElectricWaterHeaters
MT1645 10litres,vertical
MT1646 15litres,vertical
MT1647 25litres,vertical
MT1648 35litres,vertical
MT1649 50litres,vertical
MT1650 75litres,vertical
MT1651 100litres,vertical
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
26
Units
PL
GP
SJ
each
each
each
each
each
1765.13
3358.33
5870.00
11720.00
18300.00
1653.75
3708.33
6400.00
12800.00
19250.00
1713.33
3187.50
6225.00
12625.00
17850.00
WaterStorageTanks
H.D.P.Ewaterstoragetank
MT1665 270litres
MT1666 500litres
MT1667 1000litres
MT1668 2000litres
MT1669 3000litres
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code
Description
27
Units
PL
GP
SJ
4624.00
4896.00
4736.00
4336.00
3912.00
10752.00
13888.00
14240.00
13232.00
12768.00
11696.00
6760.00
3920.00
3552.00
1056.00
20048.00
768.00
10256.00
15760.00
8856.00
14624.00
11488.00
7112.00
11520.00
14624.00
968.00
8560.00
7280.00
9264.00
9680.00
9576.00
10056.00
12240.00
12112.00
624.00
3680.00
2080.00
2904.00
3536.00
9680.00
9856.00
3120.00
8984.00
19176.00
2688.00
4752.00
4416.00
3264.00
4208.00
4384.00
3328.00
4416.00
4784.00
3360.00
20416.00
648.00
5344.00
3056.00
440.00
4624.00
4896.00
4736.00
4336.00
3912.00
10752.00
13888.00
14240.00
13232.00
12768.00
11696.00
6760.00
3920.00
3552.00
1056.00
20048.00
768.00
10256.00
15760.00
8856.00
14624.00
11488.00
7112.00
11520.00
14624.00
968.00
8560.00
7280.00
9264.00
9680.00
9576.00
10056.00
12240.00
12112.00
624.00
3680.00
2080.00
2904.00
3536.00
9680.00
9856.00
3120.00
8984.00
19176.00
2688.00
4752.00
4416.00
3264.00
4208.00
4384.00
3328.00
4416.00
4784.00
3360.00
20416.00
648.00
5344.00
3056.00
440.00
Chapter17B:MACHINERYANDPLANTHIRECHARGES
MachineryandPlantHireCharges(CDCLApril2009,July2011)
MP0100
MP0101
MP0102
MP0103
MP0104
MP0105
MP0106
MP0107
MP0108
MP0109
MP0110
MP0111
MP0112
MP0113
MP0114
MP0115
MP0116
MP0117
MP0118
MP0119
MP0120
MP0121
MP0122
MP0123
MP0124
MP0125
MP0126
MP0127
MP0128
MP0129
MP0130
MP0131
MP0132
MP0133
MP0134
MP0135
MP0136
MP0137
MP0138
MP0139
MP0140
MP0141
MP0142
MP0143
MP0144
MP0145
MP0146
MP0147
MP0148
MP0149
MP0150
MP0151
MP0152
MP0153
MP0154
MP0155
MP0156
MP0157
MP0158
AirCompressor(KG)
AirCompressor(P300)
AirCompressor(XAM140)
AirCompressor(VT/6)
AirCompressor(VT/250)
BullDozer(CATD4H)
BullDozer(CATD6D)
BullDozer(D7G)
BullDozer(TD12E)
BullDozer(CATD5MXL)
BullDozer(CATD4G)
AsphaltPave,Hanta
BitumenHeating/StorageTank12000litres
BitumenHeating/StorageTank4000litres
Compactor,PlateType
Crane(Kato,KR250)
Chipsspreader
MotorGrader(MG330)
SpotMixPlant,10/16TPH
SpotMixPlant,6/10TPH
Excavator(PC200)
Excavator(PC120)
Excavator(PC60)
ExcavatorCAT312B
ExcavatorCAT320
WaterPumpKUBOTA
BackhoeLoader(CASE580SuperM)
BackhoeLoader(CAT416)
PayLoader(IH510B)
PayLoader(IH515B)
PayLoader(CAT916)
PayLoader(CAT926E)
PayLoader(CAT930)
PayLoader(CAT928F)
RoadBroom(Mechanical),2595x1220x965
RoadRoller(10tonnes,BRITANIA)
RoadRoller(10tonnes,JAYPEE)
RoadRoller(8tonnes,JESSOP)
RoadRoller(8tonnes,SpeedCraft)
RoadRoller(PneumaticTyre)TS300
RoadRoller(SV91Sakai)
ConcretePump
Concrete/GroutPump,P88
CoreDrillMachine,TS190RS
ForkLiftToyota
Tanker(NISSAN)
Tanker(TATA)
CanterTipper,Mitsubishi
TataLB(1210SE)
TataLB(1612SE)
CanterTipper,LongBody,FE444E(Nissan)
Tripper(Hino),172KD
ISUZUTruck
TractorwithTrailor,Toyota
Trailor(HINO25MT)
RoadBrushHead,Sweetper
RockBreaker
Asphalt/BitumenheatingKettle,IndiaMake
JackHammer
DepartmentofEngineeringServices,MoWHS
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
4624.00
4896.00
4736.00
4336.00
3912.00
10752.00
13888.00
14240.00
13232.00
12768.00
11696.00
6760.00
3920.00
3552.00
1056.00
20048.00
768.00
10256.00
15760.00
8856.00
14624.00
11488.00
7112.00
11520.00
14624.00
968.00
8560.00
7280.00
9264.00
9680.00
9576.00
10056.00
12240.00
12112.00
624.00
3680.00
2080.00
2904.00
3536.00
9680.00
9856.00
3120.00
8984.00
19176.00
2688.00
4752.00
4416.00
3264.00
4208.00
4384.00
3328.00
4416.00
4784.00
3360.00
20416.00
648.00
5344.00
3056.00
440.00
BhutanScheduleofRates2011
Code
Description
MP0159
MP0160
MP0161
MP0162
MP0163
MP0164
MP0165
MP0166
MP0167
MP0168
MP0169
MP0170
MP0171
MP0172
MP0173
MP0174
MP0175
MP0200
MP0201
MP0202
MP0203
MP0204
MP0205
MP0206
MP0207
MP0208
MP0209
MP0210
MP0211
MP0212
MP0213
MP0214
MP0215
MP0216
MP0217
MP0218
MP0219
MP0220
MP0221
MP0222
Asphalt/BitumenheatingKettle,JapanMake
ExplosiveVan,FE1210
DaewooDumper/Tipper
Lubricating/ServiceVan,ISUZU
Lubricating/ServiceVan,TATA
MiniDumper,TATA
NissanDumper/TipperCKA12HHT(10MT)
NissanDumper/TipperCKA12HHT(8MT)
SideDumpTruck
TATATipper,1612SE
TATAMiniTruck,407
TrailerCPB12E16772,NISSAN10MT
TrailerShortBodyNISSAN20MT
TruckMountedConcreteMixer,1612SE
TruckwithCrane,HINO/ISUZU
Vibromax
WorkshopVan
Roller,CATCS551
WaterpumpAVIType
WelderElectricarc
PayLoader(CAT910)
Crusher(KurimotoFJ2010R)
ConcreteMixer(7/5Cft)
ConcreteVibrator(M/C5)
StoneCrusher(Sisco)
BullDozer(IHTD20E)
Hyd.Excavator(IH640)
MotorGrader(CAT130G)
Truck/Tipper(Tata,1210SK32)
Compressor(CPS300)
RoadBroom(TD96)
Asphalt/BitumenSprayer(Hino)
Drill(PinjorMachine)
AirCompressorCPS300
AirCompressorCPS325
AirCompressorP310
ExcavatorSK115
ExcavatorSK200
MotorGraderCASE845
MotorGraderCAT130G
28
Units
Note: Buit-up rates are inclusive of HSD, M.Oil, Operators/drivers, etc complete.
DepartmentofEngineeringServices,MoWHS
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
day
PL
GP
SJ
6504.00
4984.00
5408.00
4880.00
4592.00
1552.00
5144.00
4888.00
2520.00
4096.00
2800.00
8480.00
15080.00
7008.00
5952.00
864.00
4848.00
10024.00
1016.00
175.00
8424.00
6240.00
896.00
752.00
4704.00
17392.00
13256.00
10752.00
3984.00
4928.00
480.00
5232.00
1088.00
4928.00
5792.00
5120.00
11640.00
15104.00
12984.00
10752.00
6504.00
4984.00
5408.00
4880.00
4592.00
1552.00
5144.00
4888.00
2520.00
4096.00
2800.00
8480.00
15080.00
7008.00
5952.00
864.00
4848.00
10024.00
1016.00
175.00
8424.00
6240.00
896.00
752.00
4704.00
17392.00
13256.00
10752.00
3984.00
4928.00
480.00
5232.00
1088.00
4928.00
5792.00
5120.00
11640.00
15104.00
12984.00
10752.00
6504.00
4984.00
5408.00
4880.00
4592.00
1552.00
5144.00
4888.00
2520.00
4096.00
2800.00
8480.00
15080.00
7008.00
5952.00
864.00
4848.00
10024.00
1016.00
175.00
8424.00
6240.00
896.00
752.00
4704.00
17392.00
13256.00
10752.00
3984.00
4928.00
480.00
5232.00
1088.00
4928.00
5792.00
5120.00
11640.00
15104.00
12984.00
10752.00
SECTION 2
Mechanical Transportation Costs
BHUTANSCHEDULEOFRATES2011
1
CARRIAGEOFMATERIALSMECHANICALTRANSPORTINCLUDINGLOADING,UNLOADINGANDSTACKING
1 HILLROADS
Rate
sl.no
Materials
quantity
payable
Unit
1km
2km
3km
4km
5km
beyond5
upto10
kmfor
everykm
beyond
10upto
20kmfor
everykm
beyond
20upto
50kmfor
everykm
10
1 Lime,moorum,buildingrubbish
cu.m
125.19
134.80
144.21
153.19
161.78
7.55
5.67
7.08
2 Dryearth
cu.m
4.8
156.48
168.50
180.26
191.49
202.22
9.44
7.08
8.85
3 ManureorSludge
cu.m
5.7
131.78
141.89
151.80
161.25
170.29
7.95
5.96
7.45
4 ExcavatedRock
cu.m
250.37
269.60
288.42
306.38
323.55
15.11
11.33
14.16
5 Sand,stoneaggregatesoflessthan40mmsize cu.m
150.22
161.76
173.05
183.83
194.13
9.06
6.80
8.50
6 Stoneaggregatesofmorethan40mmsize
cu.m
4.6
163.29
175.82
188.10
199.82
211.01
9.85
7.39
9.24
7 stoneboulders
cu.m
4.25
176.73
190.30
203.59
216.27
228.39
10.66
8.00
10.00
8 bricks
1000nos
2000
350.56
379.40
407.63
434.58
460.33
22.66
17.00
21.25
9 tiles
1000nos
3000
233.71
252.93
271.75
289.72
306.89
15.11
11.33
14.16
10 cement
tonne
87.64
94.85
101.91
108.64
115.08
5.67
4.25
5.31
11 GI,CIPipes
tonne
100.16
108.40
116.46
124.16
131.52
6.47
4.86
6.07
12 Concrete
tonne
100.16
108.40
116.46
124.16
131.52
6.47
4.86
6.07
13 steel
tonne
87.64
94.85
101.91
108.64
115.08
5.67
4.25
5.31
14 bitumen
tonne
4.5
155.80
168.62
181.17
193.14
204.59
10.07
7.55
9.44
15 timber
cu.m
7.5
100.15
107.84
115.37
122.55
129.42
6.04
4.53
5.67
BHUTANSCHEDULEOFRATES2011
2.PLAINROADS
Rate
sl.no
Materials
quantity
payable
Unit
1km
2km
3km
4km
beyond5
upto10
kmfor
everykm
5km
beyond
beyond
10upto
20kmfor
20kmfor
everykm
everykm
10
1 Lime,moorum,buildingrubbish
cu.m
123.06
131.23
139.08
146.63
153.91
6.54
5.12
3.82
2 Dryearth
cu.m
4.8
153.83
164.03
173.85
183.29
192.39
8.17
6.39
4.78
3 ManureorSludge
cu.m
5.7
129.54
138.13
146.40
154.35
162.01
6.88
5.38
4.02
4 ExcavatedRock
cu.m
246.12
262.45
278.16
293.27
307.82
13.07
10.23
7.64
5 Sand,stoneaggregatesoflessthan40mmsize cu.m
147.67
157.47
166.89
175.96
184.69
7.84
6.14
4.58
6 Stoneaggregatesofmorethan40mmsize
cu.m
4.6
160.52
171.17
181.41
191.26
200.75
8.52
6.67
4.98
7 stoneboulders
cu.m
4.25
173.73
185.26
196.35
207.01
217.28
9.23
7.22
5.39
8 bricks
1000nos
2000
344.19
368.68
392.24
414.90
436.73
19.61
15.35
11.46
9 tiles
1000nos
3000
229.46
245.79
261.49
276.60
291.15
13.07
10.23
7.64
10 cement
tonne
86.05
92.17
98.06
103.73
109.18
4.90
3.84
2.87
11 GI,CIPipes
tonne
98.34
105.34
112.07
118.54
124.78
5.60
4.38
3.27
12 Concrete
tonne
98.34
105.34
112.07
118.54
124.78
5.60
4.38
3.27
13 steel
tonne
86.05
92.17
98.06
103.73
109.18
4.90
3.84
2.87
14 bitumen
tonne
4.5
152.97
163.86
174.33
184.40
194.10
8.71
6.82
5.09
15 timber
cu.m
7.5
98.45
104.98
111.26
117.31
123.13
5.23
4.09
3.06
NOTE:Formanualtransportation,refertheLMC(CIVIL)2011andSBRW2009
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Chapter1:DISMANTLING&DEMOLITIONWORK
Concrete
DD0001
Demolishingcementconcrete1:3:6&richer,includingdisposalof
materialswithin50mlead
cu.m
602.66
602.66
602.66
DD0002
Demolishingcementconcrete1:4:8&leaner,includingdisposalof
materialswithin50mlead
cu.m
373.27
373.27
373.27
DD0003
Demolishingreinforcedconcrete,includingstackingsteelbarsand
disposalofrubbishwithin50mlead
cu.m
878.55
878.55
878.55
cu.m
158.48
158.48
158.48
229.39
469.20
229.39
469.20
Limeconcrete
DD0004
Demolishinglimeconcreteanddisposalofrubbishwithin50mlead
StoneMasonry
Demolishingstonerubblemasonryincludingstackingusefulmaterials&disposalofrubbishwithin50mlead
DD0005
DD0006
Inlimemortar
Incementmortar
229.39
469.20
cu.m
cu.m
Dismantlingdressedashlarfacestoneworkincludingstackingusefulmaterials&disposalofrubbishwithin50mlead
DD0007
DD0008
Inlimemortar
Incementmortar
291.95
563.04
291.95
563.04
291.95
563.04
cu.m
cu.m
238.71
264.50
238.71
264.50
238.71
264.50
cu.m
851.86
851.86
851.86
cu.m
787.21
787.21
787.21
2.29
2.29
2.29
250.24
250.24
250.24
135.55
160.57
396.21
135.55
160.57
396.21
135.55
160.57
396.21
899.68
1027.78
1282.92
899.68
1027.78
1282.92
cu.m
cu.m
Removingmortarfromstones,cleaningstonesandconcretearticles,andarranginginstacks
DD0009
DD0010
Inlimemortar
Incementmortar
Brick&HollowBlockMasonry
DD0011
DD0012
DD0013
DD0014
Demolishinghollowblockmasonryincludingstackingusefulmaterials
&disposalofrubbishwithin50mlead
Demolishingreinforcedbrickwork,includingstackingsteelbarsand
disposalofrubbishwithin50mlead
Extraforscraping,cleaning,straighteningreinforcementfromR.C&
reinforcedbrickwork
Extraforcuttingreinforcementbarsinreinforcedcementconcreteand
reinforcedbrickwork(paymenttobemadethecrosssectionalareaof
RCCorRBwork)
kg
sq.m
Demolishingbrickworkincludingstackingusefulmaterials&disposalofrubbishwithin50mlead
DD0015
DD0016
DD0017
Inmudmortar
Inlimemortar
Incementmortar
cu.m
cu.m
cu.m
RemovingMortarfrombricksandcleaningbricksincludingstackingusefulmaterialswithin50mlead
DD0018
DD0019
DD0020
FromBWinmudmortar
FromBWinlimemortar
FromBWincementmortar
1000#
1000#
1000#
899.68
1027.78
1282.92
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
SteelWork
Dismantlingsteelworkinsinglesectionsincludingdismemberingandstackingwithin50mlead
DD0021
InRSjoists
kg
0.71
0.71
0.71
DD0022
Inchannels,angles,teesandflats
kg
0.63
0.63
0.63
DD0023
Dismantlingsteelworkinbuiltupsectionsinchannels,angles,teesand
flatsinallgussetplates,bolts,nuts,cuttingrivets,weldingetc.
includingdismemberingandstackingwithin50mlead
kg
1.46
1.46
1.46
DD0024
Dismantlingsteelworkinbuiltupsectionswithoutdismemberingand
stackingwithin50mlead
kg
1.25
1.25
1.25
cu.m
611.66
611.66
611.66
55.61
55.61
55.61
cu.m
121.64
121.64
121.64
cu.m
0.56
0.56
0.56
Woodwork
DD0025
Dismantlingwoodworkofsectionalarea40sq.cmandabovein
frames,trusses(<10mspan)includingstackingwithin50mlead
DD0026
Dismantlingwoodworkofsectionalarea<40sq.cminframes,trusses
includingstackingwithin50mlead
Extrafordismantlingtrusses,rafters,purlinsetc.ofeveryadditional
spanof1metreorpartthereofforspan>10m(sectionalarea>
40sq.cm)
Extrafordismantlingtrusses,rafters,purlinsetc.everyadditionalspan
of1metreorpartthereof>10m(sectionalarea<40sq.cm)
DD0027
DD0028
DD0029
Dismantlingdoors,windows,andclerestorywindows<3sq.m(steel,
wood)includingarchitrave,holdfasts,stackingwithin50mlead
each
95.15
95.15
95.15
DD0030
Dismantlingdoors,windowsandclerestorywindows>3sq.m
(steel\wood)includingarchitrave,holdfasts,andstackingwithin50m
lead
Takingoutdoors,windowsandclerestorywindowsshutters<3sq.m
(steel,wood)includingstackingwithin50mlead
Takingoutdoors,windowsandclerestorywindowshutters>3sq.m
(steelorwood)includingstackingwithin50mlead
each
129.87
129.87
129.87
each
36.28
36.28
36.28
each
86.99
86.99
86.99
sq.m
38.92
38.92
38.92
cu.m
260.67
260.67
260.67
DD0031
DD0032
Flooring
DD0040
DD0041
Dismantlingwoodenflooringincludingstackingusefulmaterials&
disposalofrubbishwithin50mlead
Dismantlingdrybrickpatchinginfloors,drainsetcincludingstacking
usefulmaterials&disposalofrubbishwithin50mlead
DD0042
Dismantlingstoneslabflooringlaidincementmortarincluding
stackingusefulmaterials&disposalofrubbishwithin50mlead
sq.m
53.09
53.09
53.09
DD0043
Dismantlingjackarchroofingandfloorsincludingstackinguseful
materials&disposalofrubbishwithin50mlead
sq.m
52.13
52.13
52.13
sq.m
43.44
43.44
43.44
sq.m
46.22
46.22
46.22
sq.m
19.12
19.12
19.12
Roofing
DD0045
DD0046
DismantlingG.Isheetsincludingridges,hips,valleys,gutters&stacking
materialswithin50mlead
Dismantlingtiledroofingwithbattenboardingetc.completeincluding
stackingusefulmaterials&disposalofrubbishwithin50mlead
Metalwork
DD0050
Dismantlingexpandedmetal,fabrics&battens,beadingincluding
stackingusefulwithin50mlead
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
kg
9.18
9.18
9.18
each
87.06
87.06
87.06
each
103.62
103.62
103.62
each
26.07
26.07
26.07
Fencing
DD0055
DD0056
DD0057
DD0058
Dismantlingbarbedwire,flexiblewireincludingmakingrolls&stacking
within50mlead
Dismantlingfenceposts,struts\T&Liron\pipes&earth
work\demolishingofconcreteandstackingwithin50mlead
Dismantlingfenceposts,strutsR.Cincludingearthwork\demolishing
concretefootings,stacking,50mlead
Cuttingballies\woodenpostsatgroundorprojectionaboveconcrete&
stackingwithin50mlead
Ceiling&Cladding
DD0065
DismantlingcementA.C,celotex,hardboardceiling,partition,including
stackingusefulmaterials&disposalrubbishwithin50m
sq.m
14.87
14.87
14.87
DD0066
Dismantlingofekrawallincementmortar1:6orricherincluding
stackingusefulmaterials&disposalofrubbishwithin50mlead
sq.m
26.34
26.34
26.34
DD0067
Dismantlingoldplasterorskirting,rakingoutjointsandcleaningthe
surfaceforplasterincludingdisposalofrubbishwithin50mlead
sq.m
10.43
10.43
10.43
Pipes
DemolishingofoldS.Wpipesincludingbreakingjoints,bedconcrete,stackingofusefulmaterials&disposalofrubbishwithin50m
lead
DD0075
DD0076
DD0077
100mmdia
150mmdia
200mmdia
m
m
m
22.31
24.61
26.28
22.31
24.61
26.28
22.31
24.61
26.28
DismantlingCIpipesincludingexcavationandrefillingtrenchesaftertakingoutthepipes,breakingleadcaulkedjoints,meltingof
leadandmakingintoblocks,stackingofpiesatsiteanddisposalofrubbishwithin50mlead
DD0078
DD0079
DD0080
Upto150mmdia
From150mmupto300mm
Above300mmdia
m
m
m
70.37
105.90
206.38
69.77
104.49
204.43
70.10
105.26
205.57
DismantlingofG.IorHDPEpipesofdiameter100mmto250mmincludingbreakingbedconcrete,clamps,etc.andstackingofuseful
materials&disposalofrubbishwithin50mlead
DD0085
DD0086
G.IPipes
H.D.P.EPipes
m
m
20.23
26.69
20.23
26.69
20.23
26.69
PrecastWalls
Dismantlingofprecastconcreteorstoneslabsinwalls,partitionwallsetc.includingstackingofusefulmaterials&disposalof
rubbishwithin50mlead
DD0090
DD0091
Upto40mmthickness
Above40mmthicknessandupto74mmthickness
sq.m
sq.m
60.31
88.76
60.31
88.76
60.31
88.76
DD0095
Dismantlingwaterboundmacadamroadincludingstackingofuseful
materials&disposalofrubbishwithin50mlead
sq.m
46.71
46.71
46.71
DD0096
Dismantlingbituminousroadincludingcutting,stackingofuseful
materials&disposalofrubbishwithin50mlead
sq.m
7.19
7.19
7.19
180.24
180.24
180.24
Roads
Cisterns
DD0100
Dismantlingofflushingcisternofanysizeincludingstackingofuseful
materials&disposalofrubbishwithin50mlead
no
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Chapter2:CLEARINGANDGRUBBING
ClearingGrass
CG0001
Clearinggrassincludingremovalofrubbishwithin50mofsite
sq.m
2.21
2.21
2.21
CG0002
Clearingjungleincludinguprootingofvegetation&treesofgirth<
300mm&disposalwithin50mofthesite
sq.m
6.99
6.99
6.99
FellingTrees(Manually)
Fellingtreesincludingcuttingoftrunksandbranches,removalofroots,stackingofserviceablematerialsanddisposalofrubbish
within50mlead
CG0010
CG0011
CG0012
CG0013
Girth300to600mm
Girth600to1200m
Girth1200to2400
Girth>2400mm
each
each
each
each
65.19
294.03
1368.49
2736.99
65.19
294.03
1368.49
2736.99
65.19
294.03
1368.49
2736.99
FellingTrees(Dozer)
Fellingoftreesincludingremovalofrootsanddisposalofrubbishusingbulldozer(excludingcuttingoftrunks,branches&stacking)
CG0020
CG0021
CG0022
CG0023
Girth300to600mm
Girth600to1200m
Girth1200to2400
Girth>2400m
Each
Each
Each
Each
73.04
275.21
550.42
999.39
73.04
275.21
550.42
999.39
73.04
275.21
550.42
999.39
cu.m
47.13
47.13
47.13
LandslideDebris
CG0030
Clearinggrassremovaloflandslidedebris&surfacematerialincluding
excavation&disposalwithin50mlead
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Chapter3:EARTHWORK
Excavation(Manually)
Surfacedressingofground,includingremovalofvegetationsandinequalities<150mmdeep,disposalofrubbishwithin50mlead
and1.5mlifts
EW0001
EW0002
OrdinarySoil
HardSoil
sq.m
sq.m
7.07
9.93
7.07
9.93
7.07
9.93
Ploughingtheexistinggroundtoadepth150mmto250mm,andwateringthesame
EW0010 OrdinarySoil
sq.m
2.61
2.61
2.61
EW0011 HardSoil
sq.m
6.26
6.26
6.26
Earthworkinsurfaceexcavation,depth<300mm,width>1.5m,area>10Sq.minplan,includingdisposalofexcavatedearthwithin
50mlead&1.5mliftanddisposedsoiltobeneatlydressed
EW0020 OrdinarySoil
sq.m
13.05
13.05
13.05
EW0021 HardSoil
sq.m
18.25
18.25
18.25
Earthworkinexcavationoverareas,depth>300mm,width>1.5m,area>10Sq.monplan,includingdisposalofexcavatedearth
within50mleadand1.5mlift&disposedsoiltobeneatlydressed
EW0030 OrdinarySoil
cu.m
89.69
EW0031 HardSoil
cu.m
116.01
EW0032 Ordinaryrockwithorwithoutblasting
cu.m
367.17
EW0033 Hardrockrequiringblasting
cu.m
510.29
EW0034 Hardrockrequiringchiselling(whereblastingisprohibited)
cu.m
758.16
Extraforeveryadditionalleadof25mbeyond50mupto250manddeposittoalevelupto1.5m
EW0035 AllKindsofSoil
cu.m
27.11
Extraforeveryadditionalleadof250mbeyond50mupto1000manddeposittoalevelupto1.5m
EW0040
AllKindsofSoil
89.69
116.01
367.17
510.29
758.16
89.69
116.01
367.17
510.29
758.16
27.11
27.11
cu.m
53.05
53.05
53.05
cu.m
cu.m
75.99
102.36
75.99
102.36
75.99
102.36
70.01
140.02
70.01
140.02
70.01
140.02
DozerExcavation
EarthworkinexcavationoverareasbyDozerincludinglevellinganddressing
EW0046
EW0047
AllkindsofSoil
Allkindsofrocks(blasted)
BlastingOperation
Blastingofrockscompleteexcludingthecostofcollectionandstackingofblastedrock
EW0055
EW0056
Ordinaryrock
Hardrock
cu.m
cu.m
SilentBlaster
Breakingofrocksusingnonexplosiveblaster(silentblaster)inoverareas,depth>300mm,width>1.5m,area>10sq.monplan
includingstackingofbouldersorusefulmaterialsanddisposalofrubbishetc.complete
EW0065
EW0066
Ordinaryrock
Hardrock
cu.m
cu.m
4404.60
4531.88
DepartmentofEngineeringServices,MoWHS
4404.60
4531.88
4404.60
4531.88
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Breakingofrocksusingnonexplosiveblaster(silentblaster)infoundationtrencheswidth<1.5m,area<10sq.monplanincluding
stackingofbouldersorusefulmaterialsanddisposalofrubbishetc.complete
EW0075
EW0076
Ordinaryrock
Hardrock
cu.m
cu.m
4442.97
4594.44
4442.97
4594.44
4442.97
4594.44
Excavation&Banking
Earthworkinroughexcavation&bankingofexcavatedearthinlayers<200mmindepthforroad,flood/guidebanks&
depressions,includingwatering,powerrolling,dressing,leadupto50m&1.5mlift
EW0085
AllKindsofSoil
cu.m
141.29
141.29
141.29
Bankingexcavatedearthforroad,floodbanks,guidebanks&depressions,inlayers<200mmdepth,includingwatering,rolling&
dressingupwithin50mlead&1.5mlift
EW0096
EW0097
AllKindsofSoil
Deductionfornotrollingwithpowerrollerinlayeredbankingworks
cu.m
cu.m
95.76
23.60
95.76
23.60
95.76
23.60
EW0098 Deductionfornotwateringinlayered,bankingworks
cu.m
4.44
4.44
4.44
Excavationinfoundationtrenchesordrainsnotexceeding1.5minwidthorarea10sq.monplan,includingdressing&ramming,
disposalofsurplussoilwithin50mlead&1.5mlift
EW0105 OrdinarySoil
EW0106 HardSoil
EW0107 Ordinaryrockwithorwithoutblasting
EW0108 Hardrockrequiringblasting
EW0109 Hardrockrequiringchiselling(whereblastingisprohibited)
Extraforeveryadditionalliftof1.5morpartthereof
cu.m
cu.m
cu.m
cu.m
cu.m
95.67
122.62
396.62
587.20
769.21
95.67
122.62
396.62
587.20
769.21
95.67
122.62
396.62
587.20
769.21
EW0115 Allkindsofsoils
EW0116 Allkindsofrocks
Extrafortrench,pitworkspercu.mpermdepth
cu.m
cu.m
10.43
18.56
10.43
18.56
10.43
18.56
EW0125
EW0126
cu.m
cu.m
36.38
30.65
36.38
30.65
36.38
30.65
Underwater
Infoulconditions
Excavation/RefillingforPipes/Cables
Handexcavationandrefillinginlayers<200mm,oftrenchesforpipes&sockets,cables,includingdressingofsides/rammingof
bottom,depthupto1.5m,disposalofsurplusmaterialwithinleadof50m:Allkindsofsoil
EW0135 Pipes,cablesetc.80mm<dia<300mm
m
133.91
133.91
133.91
EW0136 Pipes,cablesetc.dia.>300mm
m
209.02
209.02
209.02
Handexcavationandrefillinginlayers<200mm,oftrenchesforpipes&sockets,cables,includingdressingofsides/rammingof
bottom,depthupto1.5m,disposalofsurplusmaterialwithinleadof50m:Ordinaryrockwithorwithoutblasting
EW0155 Pipes,cablesetc.80mm<dia<300mm
m
545.11
545.11
545.11
EW0156 Pipes,cablesetc.dia.>300mm
m
627.24
627.24
627.24
Handexcavationandrefillinginlayers<200mm,oftrenchesforpipes&sockets,cables,includingdressingofsides/rammingof
bottom,depthupto1.5m,disposalofsurplusmaterialwithinleadof50m:Hardrockrequiringblasting
EW0165
EW0166
Pipes,cablesetc.80mm<dia<300mm
Pipes,cablesetc.dia.>300mm
m
m
DepartmentofEngineeringServices,MoWHS
768.09
883.88
768.09
883.88
768.09
883.88
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Handexcavationandrefillinginlayers<200mm,oftrenchesforpipes&sockets,cables,includingdressingofsides/rammingof
bottom,depthupto1.5m,disposalofsurplusmaterialwithinleadof50m:
Hardrockrequiringchiselling(whereblastingisprohibited)
EW0175 Pipes,cablesetc.80mm<dia<300mm
m
EW0176 Pipes,cablesetc.dia.>300mm
m
Extraforexcavatingtrenchesforpipes,cablesetc.,1.5<depth<3m
981.03
1128.97
981.03
1128.97
981.03
1128.97
EW0185
EW0186
277.51
1411.21
277.51
1411.21
277.51
1411.21
AllkindsofSoils
AllkindsofRocks
m
m
Fillingorbedding
EW0195
Fillingoftrenches,sidesoffoundationsetc.inlayers<200mmusing
selectedexcavatedearth,rammingetc.withinlead50m&lift1.5m
cu.m
61.62
61.62
61.62
EW0196
Providing&layingsandbedding,includingwatering,ramming,dressing
cu.m
307.55
398.52
445.75
EW0197
Providing&layingdryearthbedding,includingconsolidatingeach
depositedlayerbywatering,ramminganddressing
cu.m
153.01
153.01
153.01
96.89
99.29
103.49
94.61
97.01
101.21
EW0215 Depthnotexceeding1.5m
sq.m
305.44
267.74
EW0216 1.5m<depth<3m
sq.m
311.77
274.07
EW0217 3m<depth<4.5m
sq.m
318.09
280.38
Closetimberingincludinglagging&struttingofshafts,wells,cesspits,manholes(persq.mfaceareatimbered
261.00
267.33
273.64
EW0225
EW0226
EW0227
TimberingforTrenches&cuts
Opentimberingoverareasincludinglagging&struttingoftrenches,cuts(persq.mfaceareatimbered)
EW0205 Depthnotexceeding1.5m
sq.m
109.65
EW0206 1.5m<depth<3m
sq.m
112.05
EW0207 Depth>3m
sq.m
116.25
Closetimberingoverareasincludinglagging&struttingoftrenches,cuts(persq.mfaceareatimbered)
Depthnotexceeding1.5m
1.5m<Depth<3m
3m<Depth<4.5m
sq.m
sq.m
sq.m
277.38
285.65
294.50
244.52
252.79
261.63
238.64
246.91
255.76
cu.m
88.55
88.55
88.55
sq.m
100.73
104.23
103.35
DeWatering
EW0235
Pumpingoutwatercausedbysprings,river,seepage,brokenwater
mains,drains,andalike
AntiTermiteTreatment
EW0240
ProvidingandinjectingchemicalemulsionforPreconstructionanti
termitetreatmentusingaldrinemulsifiable0.5%concentration
ProvidingandinjectingchemicalemulsionforPostconstruction,usingaldrinemulsifiable0.5%concentration
EW0245
EW0246
EW0247
EW0248
EW0249
Alongoutsideoffoundation
Alongexternalwallsbelowconcrete\masonryapron
Underexistingfloorsincludingdrilling&plugging12mmholeswith
mortar1:2
Voidsinmasonryincludingdrillingholesat45degree&pluggingwith
cementmortar1:2)
Woodwork(usingchemicalinoilorkerosenebasedsolution)including
drilling&plugging6mmholes
m
m
sq.m
224.87
159.61
281.99
228.37
160.19
282.76
227.50
160.04
282.56
176.91
177.29
177.19
169.41
169.53
169.50
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Chapter4:DRAINAGE
PlinthProtection
Providingandlaying50mmthickPlinthProtectionandgroutedwithfinesandmixincludingwellrammed,finishingthetopsmooth
DR0001
DR0002
DR0003
DR0004
Withcementconcrete1:3:6,20mmaggregates,laidover75mmthick
layerofcompactedgravel(40mm)
Withcementconcrete1:3:6,20mmgravelorshingleslaidover75mm
thicklayerofcompactedgravel(40mm)
Withcementconcrete1:3:6,20mmaggregate,laidover75mmthick
layerofcompacteddrybrickaggregate(40mm)
Withcementconcrete1:3:6,20mmgravelorshingleslaidon75mm
thicklayerofcompacteddrybrickaggregate(40mm)
sq.m
255.07
278.62
292.14
sq.m
218.34
241.15
247.96
sq.m
315.20
322.02
330.00
sq.m
293.92
297.23
297.12
OpenSurfaceDrains
Constructingsecondclassbrickmasonryopensurfacedrainincementmortar1:4includingearthworkinexcavation100mmthick
concretebed1:5:10,40mmaggregateand25mmthickcementconcrete
1:2:4,12mmaggregateforfillinghaunchesincluding12mmcementplastering1:4withafloatingcoatofneatcementanddisposal
ofsurplusearthetc.complete
DR0010 100mmx200mmdepth
m
393.47
430.61
434.36
DR0011 150mmx200mmdepth
m
413.53
453.06
458.02
DR0012 250mmx300mmdepth
m
571.08
624.70
629.42
DR0013 300mmx450mmdepth
m
850.69
924.77
922.16
Extraforadditionaldepthofbrickmasonrydrain
DR0020 100mmwide........permetreadditionaldepth
m
1194.18
1292.45
1268.46
DR0021 150mmwide........permetreadditionaldepth
m
1199.10
1297.36
1273.37
DR0022 250mmwide........permetreadditionaldepth
m
1208.54
1306.80
1282.81
Constructingrandomrubblemasonryopensurfacedrainincementmortar1:6includingearthworkinexcavation,100mmthick
concretebase1:5:10,40mmaggregate25mmthickcementconcrete1:2:4,
12mmaggregateforfillinghaunches,including20mmcementplasterwithafloatingcoatofneatcement,disposalofsurplusearth
DR0030 100x200mmdepth
DR0031 150x200mmdepth
DR0032 250x300mmdepth
DR0033 300mmx450mmdepth
Extraforadditionaldepthofrandomrubblemasonrydrain
m
m
m
m
566.65
586.01
766.16
1331.67
637.09
658.73
862.90
1529.20
662.21
685.01
896.85
1590.23
DR0040
DR0041
DR0042
m
m
m
1502.24
1507.03
1516.59
1706.55
1711.33
1720.90
1763.05
1767.83
1777.40
100mmwide........permetreadditionaldepth
150mmwide........permetreadditionaldepth
250mmwide........permetreadditionaldepth
StonewarePipeDrains&Fittings
Providing,layingandjointingglazedStoneWarepipeswithstiffmixtureofcementmortar1:includingtestingofjointscomplete
DR0047
DR0048
DR0049
100mmdia.
150mmdia.
200mmdia.
m
m
m
318.75
657.17
1105.17
DepartmentofEngineeringServices,MoWHS
322.15
664.13
1116.86
323.66
667.33
1122.34
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Providing,layingandjointingglazedStoneWarepipeswithstiffmixtureofcementmortar1:1includingtestingofjointscomplete
DR0050 100mmdia.
m
325.27
330.06
331.90
DR0051 150mmdia.
m
666.99
676.04
679.73
DR0052 200mmdia.
m
1118.13
1132.59
1138.71
DR0053 230mmdia.
m
1358.32
1375.62
1383.02
DR0054 250mmdia.
m
1517.94
1537.29
1545.58
DR0055 300mmdia.
m
1868.38
1892.67
1903.00
DR0056 350mmdia.
m
2236.13
2266.58
2279.29
DR0057 400mmdia.
m
2612.05
2648.21
2663.21
DR0058 500mmdia.
m
3386.31
3431.09
3450.12
DR0059 600mmdia.
m
4044.10
4096.98
4119.62
Providingandlayingcementconcrete1:5:10,40mmaggregatesencasingStoneWarepipesincluding150mmconcretebed
DR0060 100mmdiaS.Wpipe
m
435.28
488.35
517.07
DR0061 150mmdiaS.Wpipe
m
466.35
523.21
553.99
DR0062 200mmdiaS.Wpipe
m
535.72
601.03
636.39
Providing&layingcementconcrete1:5:10,40mmaggregatesuptohaunchesofS.Wpipesincluding150mmconcretebed
DR0070
DR0071
DR0072
100mmdia.S\Wpipe
150mmdia.S\Wpipe
200mmdia.S\Wpipe
m
m
m
291.78
320.47
373.13
327.35
359.54
418.63
346.61
380.69
437.29
Providing&fixingsquaremouthS.WgullytrapAgradeincludingC.Igrating,C.I.coverwithframeof300x300mm,brickmasonry
chamber
DR0080
DR0081
DR0082
100x100mmPType
150x100mmPorSType
180x150mmPorSType
each
each
each
1585.99
1724.30
1811.11
1598.13
1902.97
1850.75
1595.36
1902.97
1883.54
R.CPipes&Fittings
Providing&layingNP2classR.Cpipes,includingcollars,jointingincementmortar1:2includingtestingofjointsetc.complete
DR0088
DR0089
DR0090
DR0091
DR0092
DR0093
DR0094
DR0095
DR0096
DR0097
100mmdia
150mmdia
225mmdia.
300mmdia.
450mmdia.
600mmdia.
750mmdia.
900mmdia.
1050mmdia.
1200mmdia.
m
m
m
m
m
m
m
m
m
m
477.06
525.31
663.69
802.31
1195.14
1672.17
2357.01
2979.90
5937.42
8518.31
483.27
532.94
665.36
804.35
1199.24
1677.70
2362.21
2986.78
5937.48
8519.13
484.80
534.80
665.89
805.01
1200.49
1679.39
2363.94
2988.55
5937.57
8519.35
Manholes
ConstructingBrickmasonrymanholeincementmortar1:5,R.C.Ctopslabwith1:2:420mmaggregates,foundationconcrete1:4:8
40mmaggregates,12mmplasterinCM1:3finishedwithfloatingcoatof
neatcementandmakingchannelsincementconcrete1:2:420mmaggregates,neatlyfinishedcomplete
DR0105
DR0106
DR0107
Insidedimension900x800mm&450mmdeepincludingC.I.cover&
frame(weight>38kg)
Insidedimension900x800mm&600mmdeepincludingC.I.cover&
frame(weight>38kg)
Insidedimension1200x900mm&900mmdeepincludingC.I.cover&
frameweight>116kg)
each
6618.13
7190.08
7267.73
each
7105.25
7729.23
7790.49
each
16854.03
17966.62
18176.05
m
m
4127.03
4933.67
4474.13
5348.92
4356.13
5208.97
Extraforadditionaldepthofmanholes
DR0115
DR0116
900x800mm
1200x900mm
DepartmentofEngineeringServices,MoWHS
10
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
6419.72
4475.49
3503.69
2737.85
2325.47
1972.01
7765.21
5415.70
4241.36
3312.30
2812.04
2383.24
8096.26
5658.83
4440.60
3473.63
2952.95
2506.66
cu.m
cu.m
6397.43
8102.98
6901.03
8258.59
6040.58
8165.77
cu.m
344.99
344.99
344.99
cu.m
cu.m
cu.m
20381.07
15336.26
9503.51
21265.42
16028.54
9962.48
21576.25
16277.38
10133.55
cu.m
cu.m
7142.90
4665.76
7841.49
5142.90
8318.36
5464.05
Chapter5:MORTARS
CementMortar
MR0001
MR0002
MR0003
MR0004
MR0005
MR0006
Cementmortar1:1(1cement:1sand)
Cementmortar1:2(1cement:2sand)
Cementmortar1:3(1cement:3sand)
Cementmortar1:4(1cement:4sand)
Cementmortar1:5(1cement:5sand)
Cementmortar1:6(1cement:6sand)
LimeMortar
MR0010
MR0011
Limemortar1:2(1limeputty:2BrickPowder)
LimeMortar1:1:1(1Limeputty:1BrickPowder:1Sand)
MudMortar
MR0015
Mudmortar
WhiteCementMortar
MR0020
MR0021
MR0022
WhiteCementmortar1:2(1whitecement:2sand)
WhiteCementmortar1:3(1whitecement:3sand)
WhiteCementmortar1:5(1whitecement:5sand)
CementLimeMortar
MR0025
MR0026
Cementlimemortar1:1:3(1cement:1limeputty:3sand)
Cementlimemortar1:1:6(1cement:1limeputty:6sand)
DepartmentofEngineeringServices,MoWHS
11
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Chapter6:CONCRETEWORK
PlainCementConcrete
ProvidingandlayinginpositionplaincementconcreteexcludingthecostofcenteringandshutteringAllworkuptoplinthlevel.
CW0001
1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)
cu.m
5122.21
6018.08
6360.28
CW0002
cu.m
3882.73
4516.09
4794.65
CW0003
1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)
cu.m
3465.98
4005.14
4270.46
CW0004
1:2:4(1cement:2sand:4gradedcrushedrock40mmnominalsize)
cu.m
3462.83
3996.88
4230.66
CW0005
1:3:6(1cement:3sand:6gradedcrushedrock20mmnominalsize)
cu.m
2949.57
3365.78
3606.89
CW0006
1:3:6(1cement:3sand:6gradedcrushedrock40mmnominalsize)
cu.m
2887.25
3297.23
3499.50
CW0007
1:3:6(1cement:3sand:6gradedgravel/shingles40mmnominalsize)
cu.m
2418.40
2767.02
2864.49
CW0008
1:4:8(1cement:4sand:8gradedcrushedstone40mmnominalsize)
cu.m
2545.48
2896.87
3089.13
CW0009
1:4:8(1cement:4sand:8gradedcrushedstone50mmnominalsize)
cu.m
2545.48
2896.87
3089.13
CW0010
1:4:8(1cement:4sand:8gradedgravel/shingles40mmnominalsize)
cu.m
2062.30
2350.37
2434.15
CW0011
1:5:10(1cement:5sand:10gradedcrushedstone40mmnominal
size)
1:5:10(1cement:5sand:10gradedcrushedstone50mmnominal
size)
1:5:10(1cement:5sand:10gradedgravel/shingles40mmnominal
size)
cu.m
2268.37
2564.41
2738.61
cu.m
2257.95
2553.98
2728.18
cu.m
1795.82
2031.39
2102.28
CW0012
CW0013
Providingandlayinginpositionplaincementconcreteinretainingwalls,returnwalls,walls(anythickness)includingattached
pilasters,columns,piers,abutments,pillars,posts,struts,buttresses,stringorlacing
courses,parapets,coping,bedblocks,anchorblocks,plainwindowsills,filletsetc.uptofloorfivelevel,excludingthecostof
centeringandshuttering
CW0020
1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)
cu.m
5372.29
6268.15
6610.35
CW0021
cu.m
4133.79
4767.26
5045.97
CW0022
1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)
cu.m
3716.05
4255.22
4520.54
CW0023
1:2:4(1cement:2sand:4gradedcrushedrock40mmnominalsize)
cu.m
3663.95
4197.91
4431.53
CW0024
1:3:6(1cement:3sand:6gradedcrushedrock20mmnominalsize)
cu.m
3151.69
3567.89
3809.00
CW0025
1:3:6(1cement:3sand:6gradedcrushedrock40mmnominalsize)
cu.m
3089.36
3499.34
3701.61
CW0026
1:3:6(1cement:3sand:6gradedgravel/shingles40mmnominalsize)
cu.m
2620.51
2969.14
3066.60
DepartmentofEngineeringServices,MoWHS
12
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
PrecastCementConcrete
Providingandfixinguptofloorfivelevelprecastcementconcretelacingcourses,copings,bedplates,anchorblocks,plainwindow
sills,shelves,louvers,steps,staircasesetc.includinghoistingandsettinginposition
withcementmortar1:3(1cement:3sand)costofrequiredformworkandfinishingsmoothwith6mmthickcementplasteron
exposedsurfacecomplete
CW0050
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)
cu.m
3293.86
3910.07
4194.24
CW0051
1:3:6(1cement:3sand:6gradedcrushedrock20mmnominalsize)
cu.m
2759.42
3262.48
3527.07
CW0060
Providingandfixingatorneargroundlevelprecastcementconcrete
inkerbs,edgingsetc.asperapprovalpatternandsettinginposition
withcementmortar1:3(1cement:3sand)
costofrequiredformworkandfinishingsmoothwith6mmthick
cementplasteronexposedsurfacecomplete1:2:4(1cement:2sand
:4gradedcrushedrock20mmnominalsize)
cu.m
3200.56
3798.85
4080.20
Providingandfixinguptofloorfivelevelprecastcementconcretesolidblockincludinghoistingandsettinginpositionwithcement
mortar1:3(1cement:3sand)includingthecostofrequiredformworkandfinishing
smoothwith6mmthickcementplasteronexposedsurfacecomplete
CW0070
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)
cu.m
3527.50
4199.56
4500.84
CW0071
1:3:6(1cement:3sand:6gradedcrushedrock20mmnominalsize)
cu.m
2970.79
3521.53
3798.97
Providingandfixinguptofloorfivelevelprecastcementconcretehollowblockincludinghoistingandsettinginpositionwithcemen
smoothwith6mmthickcementplasteronexposedsurfacecomplete
CW0080
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)
cu.m
2044.71
2431.75
2608.15
CW0081
1:3:6(1cement:3sand:6gradedcrushedrock20mmnominalsize)
cu.m
1708.46
2021.89
2183.55
LimeConcrete
Providingandlayinglimeconcrete,with40%mortarcomprisingof1:1:1limemortar,infootingsandbasesforcolumnsexcluding
costofformwork
CW0090
CW0091
Withgradedstoneaggregateof40mm
withgradedbrickaggregateof40mm
cu.m
cu.m
4597.18
5013.08
4748.54
4950.32
4814.32
4685.10
Extra
Extraforlayingcementconcretework
CW0135
CW0136
CW0137
CW0140
Cementconcreteworkinsuperstructureabovefloorfivelevelfor
eachfourfloorsorpartthereof
Inorunderwater,mud,includingthecostofpumpingorbailingout
waterandremovingslushetc.complete....permetredepth(concrete
notleanerthan1:2:4)
Cementconcreteworkunderfoulconditions
Providingandmixingwaterproofingmaterialsinintheproportion12
kg/cu.morasprescribedbythemanufacturer
cu.m
cu.m
8%oftheratesworkedoutforrespective
items
483.70
511.32
517.74
cu.m
437.91
437.91
437.91
cu.m
309.67
288.67
288.67
DepartmentofEngineeringServices,MoWHS
13
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
DP0001 25mmthick
sq.m
114.81
DP0002 40mmthick
sq.m
167.96
Providingandlayingdampproofcoursewithcementconcrete1:2:4,20mmaggregate
128.11
189.24
134.51
199.48
DP0010
Chapter7:DAMPPROOFING
ConcreteCourse
Providingandlayingdampproofcoursewithcementconcrete1:2:4,12.5mmaggregate
50mmthick
sq.m
203.38
229.97
242.78
sq.m
122.61
122.60
122.62
BituminousCoatings
DP0015
Applyingacoatofhotbitumen(maxphalt)80\100orequivalentusing
1.7kgpersq.mincludingthesurfacecleaning
MoistureBarriers
Providingandlayingmoisturebarrierusingplasticsheetingunderlay
DP0020 50micrometre
DP0021 100micrometre
DP0022 200micrometre
ProvidingandlayingBitumenfeltType3inwallbasesetc.
sq.m
sq.m
sq.m
43.79
52.98
62.17
40.73
52.98
62.17
43.79
56.04
65.23
DP0030
sq.m
130.83
130.83
130.83
Grade2
DepartmentofEngineeringServices,MoWHS
14
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Chapter8:REINFORCEDCONCRETE
ConcretingItems
Providing&layinginpositionreinforcedcementconcreteexcludingthecostofcentering,shutteringandreinforcementallwork
uptoplinthlevel
RC0001
1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)
cu.m
5134.33
6030.20
6372.40
RC0002
1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)
cu.m
3894.85
4528.21
4806.77
cu.m
3478.10
4017.26
4282.58
RC0003
Providing&layinginpositionreinforcedcementconcreteworkinwalls(anythickness)includingattachedpilastersbuttresses,
piers,abutmentsetc.uptofloorfivelevelexcludingthecostofcentering,shutteringandreinforcement
RC0005
1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)
cu.m
5136.51
6032.37
6374.57
RC0006
1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)
cu.m
3897.02
4530.38
4808.94
cu.m
3459.42
3998.58
4263.90
RC0007
Providing&layinginpositionreinforcedcementconcreteworkinplinthandskirtingcourses,fillets,columns,pillars,postsand
strutsuptofloorfivelevelexcludingthecostofcentering,shutteringandreinforcement.
RC0009
1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)
cu.m
5182.38
6078.25
6420.45
RC0010
1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)
cu.m
3942.90
4576.26
4854.82
cu.m
3526.15
4065.31
4330.63
RC0011
Providing&layinginpositionreinforcedcementconcreteworkinsuspendedfloor,roofshavingslopeupto15o,landings,balconies,
shelvesandchajjasuptofloorfivelevelexcludingthecostofcentering,shutteringandreinforcement
RC0013
1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)
cu.m
5247.12
6142.98
6485.18
RC0014
1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)
cu.m
4007.63
4641.00
4919.55
cu.m
3590.88
4130.04
4395.37
RC0015
Providing&layinginpositionreinforcedcementconcreteworkinbeams,lintels,bands,plainwindowsills,staircases,spiral
staircasesuptofloorfivelevelexcludingthecostofcentering,shutteringandreinforcement
RC0017
1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)
cu.m
5173.42
6069.28
6411.48
RC0018
1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)
cu.m
3933.93
4567.30
4845.85
cu.m
3517.18
4056.34
4321.67
RC0019
Providing&layinginpositionreinforcedcementconcreteworkinkerbs,stepsandthelikeuptofloorfivelevelexcludingthecostof
centering,shutteringandreinforcement
RC0020
1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)
cu.m
5173.42
6069.28
6411.48
RC0021
1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)
cu.m
3933.93
4567.30
4845.85
cu.m
3517.18
4056.34
4321.67
RC0022
DepartmentofEngineeringServices,MoWHS
15
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Providing&layinginpositionreinforcedcementconcreteworkinarchesandarchribsuptofloorfivelevelexcludingthecostof
centering,shutteringandreinforcement
RC0023
1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)
cu.m
6038.26
6934.13
7276.32
RC0024
1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)
cu.m
4798.77
5432.14
5710.69
cu.m
4382.02
4921.19
5186.51
RC0025
Providing&layinginpositionreinforcedcementconcreteworkindomes,vaults,shellsfoldedplatesandroofshavingmorethan
15uptofloorfivelevelexcludingthecostofcentering,shutteringandreinforcement
RC0026
1:1:2(1cement:1sand:2gradedcrushedrock20mmnominalsize)
cu.m
6083.81
7000.56
7354.37
RC0027
1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
1:2:4(1cement:2sand:4gradedcrushedrock20mmnominalsize)
cu.m
4788.57
5434.52
5718.41
cu.m
4364.62
4914.53
5185.15
RC0028
Providing&layinginpositionreinforcedcementconcreteworkinverticalandhorizontalfinsindividuallyorformingboxlouvers,
fasciasandeavesboardsuptofloorfivelevelexcludingthecostofcentering,shutteringandreinforcement
RC0029
1:1.5:3(1cement:1.5sand:3gradedcrushedrock20mmnominal
size)
cu.m
4309.88
4953.35
5244.69
TraditionalCornices
BhutantypeTraditionalCornicesinR.C.C1:1.5:3,20mmaggregateincludingcostofformworkincludingfinishingwith6mmthick
plasterontheexposedsurfacewithcementmortar1:3,excluding
reinforcement&decorativepaintingcostasperstandarddesign(Measurementtobetakenalongthecorniceandwalljunction)
RC0030
RC0031
RC0032
SingleStoriedbuilding,includingPhana
MultiStoriedbuilding..atfloor2levelincludingthecostoflhanglag
andatotherfloorswhereLhanglagisprovided
MultiStoriedbuilding..atallmiddlefloorlevels(excludingthecostof
phana)
Phana
LintelCornice(onlycorniceportionatexternalface)
m
m
1284.14
1295.55
1299.38
1310.83
1308.20
1319.58
1695.24
1734.86
1755.68
RC0033
m
735.05
738.88
740.83
RC0034
m
740.01
744.85
748.12
BhutantypeTraditionalCornicesinR.C.C1:2:4,20mmaggregateincludingcostofformworkincludingfinishingwith6mmthick
plasterontheexposedsurfacewithcementmortar1:3,excluding
reinforcement&decorativepaintingcostasperstandarddesign(Measurementtobetakenalongthecorniceandwalljunction)
RC0040
RC0041
RC0042
RC0043
RC0044
SingleStoriedbuilding,includingPhana
MultiStoriedbuilding..atfloor2levelandatotherfloorswhere
Lhanglagisprovidedincludingthecostoflhanglag
MultiStoriedbuilding..atallmiddlefloorlevels(excludingthecostof
phana)
Phana
Lintelcornice(onlycorniceportionatexternalface)
m
m
1268.32
1279.94
1280.05
1291.76
1288.27
1299.93
1798.21
1829.85
1849.30
m
m
732.11
733.70
735.29
737.14
737.12
740.18
DepartmentofEngineeringServices,MoWHS
16
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
22.66
26.12
26.92
ExtraforR.CWorks
RC0050
RC0051
RC0052
RC0053
RC0054
ApplyingcementslurryonR.C.Cslabsusing2.75kgpersq.mfor
receivingC.C.floorincludingroughening,cleaning&dampenthe
surface
ExtraforR.C.Cworkabovefloor5levelforeveryfourfloorsorpart
thereof,excludingcostofreinforcement
Extraforrenderingincementmortar1:2,thetopofsuspended
floors\landings\staircasetreadsandrisers
Renderingsmoothfinishingoftheexposedsurfacewith6mmthick
C.M1:3
Providingthroating,plasteringdripandmouldingtoR.C.Cchajjas
sq.m
cu.m
8%ofrespectiveitemrates
sq.m
33.08
35.90
36.63
sq.m
74.89
80.19
81.63
19.78
19.78
19.78
PrecastItems
Providing&fixing,below&includingfloor2level,PrecastR.C.Cjali1:2:4,12.5mmaggregate,reinforcedwithmildsteelwire1.6mm
dia.,includingroughening,cleaning,fixing,finishingincementmortar1:3
excludingplasteringofthejambs,sills,soffits
RC0060 50mmthick
sq.m
706.01
720.34
757.07
RC0061 40mmthick
sq.m
630.44
639.46
673.63
RC0062 25mmthick
sq.m
577.23
578.26
608.59
Providing&fixing,below&includingfloor2level,PrecastR.C.C1:2:4,20mmaggregateincludingfinishing,plasteringwith6mm
cementplaster1:3andformwork,butexcludingreinforcementcost
RC0070
Stringcourses,copings,bedplates,anchorblocks,plainwindowsills
cu.m
7695.64
8077.02
8314.26
RC0071
RC0072
Smalllintels&joists<1.5mclearspan,shelves
Joists,span>1.5m,shelves
cu.m
cu.m
7097.21
5585.02
7471.63
6184.86
7705.26
6463.09
61.20
74.06
74.06
SteelReinforcement
RC0083
Providing&fixingThermoMechanicallyTreatedreinforcementbar
(YieldStrength500MPa)forR.C.Cworkincludingcutting,bending,
bindingandplacinginpositioncomplete
kg
Formwork
Providing&fixingcenteringandshuttering(formwork),includingstrutting,proppingetc.andremovalofformwork
RC0090
RC0091
RC0092
RC0093
RC0094
RC0095
RC0096
RC0097
RC0098
Foundationandplinthetc.
Walls,pilasters,buttresses,stringcourseetc.
Lintels,beams,girders,bresummers,cantileversetc.
Columns,pillars,post,strutsetc.
Staircase(exceptspiralstaircase)excludinglanding
Suspendedfloor,roof,landing,shelvesandtheirsupports,balconies,
chajjas,etc.
Spiralstaircaseexcludinglanding
Arches,curvedsurfaces
Domes,vaults,shellroof
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
241.82
492.91
326.56
412.85
337.26
524.76
222.01
471.78
302.36
387.47
314.52
500.11
218.48
468.01
298.03
382.94
310.46
495.71
sq.m
sq.m
sq.m
414.74
1683.90
1887.85
392.49
1564.72
1676.24
388.52
1523.47
1618.48
DepartmentofEngineeringServices,MoWHS
17
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
61486.64
17697.13
59660.00
17285.30
60652.56
17589.52
ExpansionJoints
Providing&fillingorfixinginpositioninexpansionjoints
RC0105
RC0106
Blownbitumen
Bitumenmixfillerofproportion80kgofhotbitumen,1kgofcement
and0.25cumofsandforexpansionjoints
12mmbitumenimpregnatedfibreboard
cu.m
cu.m
RC0107
sq.m
883.57
883.57
883.57
Providingandfixingsheetcoveringoverexpansionjointswithironscrewsasperdesigntomatchthecolourshadeofthedistemper
orwalltreatment
RC0116
Aluminiumflutedstrip3.15x150mm
469.09
469.09
456.84
DesignMixConcrete
Providing&layinginpositionmachinebatched,machinemixedandmachinevibratedM20designmixcementconcretefor
reinforcedcementconcretestructuralelements,excludingthecostofcentering,
shutteringandreinforcement,Includingadmixturesinrecommendedproportions(asperIS9103)toaccelerate,retardsettingof
concrete,improveworkabilitywithoutimpairingstrengthanddurabilityasperthedirectionoftheengineer
Note:Mixdesignshouldbedonebyaqualifiedengineer
RC0130
RC0131
RC0132
RC0133
Allworkuptoplinthlevel
Allworkfromplinthleveltofloorfivelevel
Walls,Columns,Pillars,postsandstruts
Beams,Plinthbeams,girders,bresummers,cantilevers,suspended
floors,lintels,roofsandstaircasesincludingspiralstaircases,shelves
etc.
cu.m
cu.m
cu.m
cu.m
3596.60
3733.29
3785.42
3861.11
4145.66
4282.35
4334.48
4410.16
4415.83
4552.53
4604.66
4680.34
117.82
235.64
applicable
142.93
285.87
148.76
297.53
Addordeductforprovidingricherorleanermixesrespectivelyatallfloorsproviding
RC0135
RC0136
RC0137
ProvidingM25gradeRCCinsteadofM20gradeRCC
ProvidingM30gradeRCCinsteadofM20gradeRCC
ProvidingM35gradeRCCinsteadofM20gradeRCC
cu.m
cu.m
cu.m
DepartmentofEngineeringServices,MoWHS
18
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
cu.m
cu.m
cu.m
cu.m
cu.m
4661.23
4469.77
4366.68
4278.31
3819.22
5083.04
4850.78
4725.71
4618.51
4056.61
4942.94
4701.20
4571.03
4459.45
3866.70
Extraforbrickworkinsquareorrectangularpillars
Extraforbrickincircularpillars
Extraforbrickworkinsuperstructureaboveplinthlevel,uptofloor
twolevel
Extraforbrickworkinsuperstructureabovefloortwolevel...perfloor
cu.m
cu.m
cu.m
248.62
1699.35
138.09
248.62
1782.18
138.09
248.62
1715.92
138.09
cu.m
60.47
60.47
60.47
BW0014
Extraforprovidinghoopiron25x1.6mmorequivalentreinforcementin
masonryateverythirdcourse,embeddedincementmortar
sq.m
57.67
69.09
69.29
BW0015
Extraformixingwaterproofingcompoundincementmortar
cu.m
103.39
96.39
96.39
Chapter9:BRICKWORK
OneBrickMasonry(250mm)
Providing&layingSecondClassBrickworkinFoundation&Plinth
BW0001
BW0002
BW0003
BW0004
BW0005
Incementmortar1:3
Incementmortar1:4
Incementmortar1:5
Incementmortar1:6
Inmudmortar
Extras
BW0010
BW0011
BW0012
BW0013
HalfBrickMasonry(125mm)
Providing&layingSecondClassHalfbrickMasonry(125mm)insuperstructurebelowfloor2level
BW0020
BW0021
Incementmortar1:3
Incementmortar1:4
sq.m
sq.m
618.27
599.13
667.04
643.82
647.76
623.59
sq.m
7.09
7.09
7.09
sq.m
sq.m
13.10
340.56
12.40
371.99
12.40
361.13
sq.m
7.09
7.09
7.09
ExtrasforHalfBrick
BW0030
BW0031
BW0032
BW0033
Extraforhalfbrickmasonryinsuperstructureabovefloor2level...per
floor
Extraformixingwaterproofingcompoundincementmortar
75mmthickbrickmasonry(secondclassbricks)incementmortar1:3
inpartitionsetc.insuperstructurebelowfloor2level
Extrafor75mmbrickmasonryincementmortar1:3inpartitionsetc.in
superstructureabovefloor2level...Perfloor
TraditionalCornices
Providing&layingsecondclassbrickworkinBhutantypeTraditionalCornicesincementmortar1:3,including12mmplasterin
cementmortar1:5,butexcludingdecorativepainting.
(Measurementtobetakenalongthecorniceandwalljunction)
BW0040
BW0041
Flooronelevelincludinglhanglag
MiddleFloorlevelsexcludingphana
m
m
747.71
1174.93
767.60
1219.22
763.89
1208.17
sq.m
sq.m
sq.m
sq.m
59.58
65.15
88.72
117.32
61.79
67.37
90.93
120.72
62.39
67.96
91.53
121.64
Pointing
Pointingonbrickworkwithcementmortar1:3
BW0050
BW0051
BW0052
BW0053
Flushpointing
Ruledpointing
Cut,weatherstruckpointing
Raised&cutpointing
DepartmentofEngineeringServices,MoWHS
19
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
cu.m
cu.m
cu.m
cu.m
cu.m
7302.34
7127.14
7077.08
7026.69
6800.13
8550.80
8337.76
8277.54
8216.40
7931.84
8582.77
8360.59
8298.36
8234.73
7931.84
cu.m
cu.m
130.23
73.05
130.23
73.05
130.23
73.05
cu.m
31.53
31.53
31.53
InterlockingCementEarthBlock(300mmX150mmX100mm)
Providing&layingICEB(300mmX150mmX100mm)inFoundation&Plinth
BW0060
BW0061
BW0062
BW0063
BW0064
Incementmortar1:3
Incementmortar1:4
Incementmortar1:5
Incementmortar1:6
Inmudmortar
Extras
BW0070
BW0071
BW0072
ExtraforICEBworkinsquareorrectangularpillars
ExtraforICEBworkinsuperstructureaboveplinthlevel,uptofloor
twolevel
ExtraforICEBworkinsuperstructureabovefloortwolevel...perfloor
InterlockingCementEarthBlock(300mmX150mmX100mm)
Providing&layingICEB(300mmX150mmX100mm)insuperstructurebelowfloor2level
BW0080
BW0081
Incementmortar1:3
Incementmortar1:4
sq.m
sq.m
1078.94
1073.16
1256.00
1248.99
1257.94
1250.65
sq.m
7.41
7.41
7.41
Extras
BW0090
ExtraforICEBworkinsuperstructureabovefloor2level...perfloor
DepartmentofEngineeringServices,MoWHS
20
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
cu.m
cu.m
cu.m
cu.m
cu.m
6942.36
6864.84
6790.14
6785.07
6620.13
8154.40
8060.35
7969.73
7963.58
7754.95
8175.80
8077.91
7983.59
7977.20
7754.95
cu.m
cu.m
186.07
104.37
186.07
104.37
186.07
104.37
cu.m
45.04
45.04
45.04
InterlockingCementEarthBlock(250mmX125mmX100mm)
Providing&layingICEB(250mmX125mmX100mm)inFoundation&Plinth
BW0100
BW0101
BW0102
BW0103
BW0104
Incementmortar1:3
Incementmortar1:4
Incementmortar1:5
Incementmortar1:6
Inmudmortar
Extras
BW0110
BW0111
BW0112
ExtraforICEBworkinsquareorrectangularpillars
ExtraforICEBworkinsuperstructureaboveplinthlevel,uptofloor
twolevel
ExtraforICEBworkinsuperstructureabovefloortwolevel...perfloor
InterlockingCementEarthBlock(250mmX125mmX100mm)
Providing&layingICEB(250mmX125mmX100mm)insuperstructurebelowfloor2level
BW0120
BW0121
Incementmortar1:3
Incementmortar1:4
sq.m
sq.m
899.02
892.01
1049.54
1041.03
1051.90
1043.05
sq.m
8.98
8.98
8.98
Extras
BW0130
ExtraforICEBworkinsuperstructureabovefloor2level...perfloor
DepartmentofEngineeringServices,MoWHS
21
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
460.99
454.02
452.78
cu.m
cu.m
cu.m
cu.m
1922.35
1786.27
1669.62
1182.77
2248.99
2083.90
1942.40
1319.84
2337.22
2165.40
2018.12
1354.84
cu.m
183.78
183.78
183.78
cu.m
60.47
60.47
60.47
cu.m
267.19
267.19
267.19
cu.m
529.75
529.75
529.75
cu.m
98.37
91.72
91.72
Chapter10:STONE/MUD
RammedMudWork
SM0001
Constructingrammedmudwallsinsuperstructureincludingthecostof
formwork
cu.m
RandomRubbleMasonry
Providing&layingRandomRubbleMasonrywithhardstoneinfoundation&plinth
SM0005
SM0006
SM0007
SM0008
Incementmortar1:4
Incementmortar1:5
Incementmortar1:6
Hammerdressed,inmudmortar
Extras
SM0015
SM0016
SM0017
SM0018
SM0019
Extraforrandomrubblemasonrywithhardstoneinsuperstructure
aboveplinth,below&includingfloor2level
Extraforrandomrubblemasonrywithhardstoneinsuperstructure
abovefloor2level
Extraforrandomrubblemasonryworkwithhardstoneinsquareor
rectangularpillars
Extraforrandomrubblemasonryworkwithhardstoneincircular
pillars
Extraforrandomrubblemasonryworkwithhardstoneformixing
waterproofingmaterialsincementmortar
CoursedRubbleMasonry
Providing&layingCoursedRubbleMasonrywithhardstonehammerdressedinfoundation&plinth
SM0025
SM0026
SM0027
SM0028
Incementmortar1:3
Incementmortar1:4
Incementmortar1:5
Incementmortar1:6
cu.m
cu.m
cu.m
cu.m
2347.09
2117.33
1993.62
1887.58
2719.17
2440.45
2290.37
2161.73
2817.43
2527.34
2371.14
2237.25
ExtraforC.R.masonrywithhardstoneinsuperstructureaboveplinth,
below&includingfloor2level
ExtraforC.R.masonrywithhardstoneinsuperstructureabovefloor2
level
ExtraforC.Rmasonrywithhardstoneinsquareorrectangularpillars
cu.m
173.22
173.22
173.22
cu.m
60.47
60.47
60.47
cu.m
278.26
278.26
278.26
ExtraforC.Rmasonrywithhardstoneincircularpillars
ExtraforC.Rmasonrywithhardstonechiseldressedinfoundations
andplinth
ExtraforC.Rmasonrywithhardstonechiseldressedinsuperstructure
aboveplinth,below&includingfloor2level
ExtraforC.Rmasonrywithhardstoneformixingwaterproofing
materials
cu.m
cu.m
672.07
59.03
715.93
59.03
727.13
59.03
cu.m
191.43
191.43
191.43
cu.m
118.44
110.39
110.39
SM0050
Dryhandpackedrubblemasonrywithstoneboulders>0.01Cu.m cu.m
832.00
969.07
1004.06
SM0051
Dryhandpackedrubblemasonryhammerdressed(facing),withstone
boulder>0.01cu.m
Dryhandpackedrubblemasonrychiseldressed(facing)withstone
boulder>0.01cu.m
cu.m
923.71
1074.48
1112.98
cu.m
1033.59
1184.37
1222.86
Extras
SM0035
SM0036
SM0037
SM0038
SM0039
SM0040
SM0041
DryHandPackedRubbleMasonry
SM0052
DepartmentofEngineeringServices,MoWHS
22
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
StoneMasonryinConcreteMortar
SM0060
Providingandlayingwithhardstone(averagevolume0.008Cu.m)
handpackedstonemasonryincementconcretemortar1:2:4,20mm
aggregates
Providing&layingwithhardstone(averagevolume0.008Cu.m)hand
packedstonemasonryincementconcretemortar1:3:6,20mm
aggregates
cu.m
2020.05
2332.66
2452.20
cu.m
1822.71
2095.73
2208.53
SM0062
Providingandlayinghammerdressedstonemasonrywithhardstone
(averagevolume0.008Cu.m)incementconcretemortar1:2:420mm
aggregates
cu.m
2108.54
2434.86
2557.90
SM0063
Providingandlayinghammerdressedstonemasonrywithhardstone
(averagevolume0.008Cu.m)inconcretemortar1:3:620mm
aggregates
cu.m
1929.97
2216.70
2333.00
SM0064
Providingandlayingrubblemasonrychiseldressed(facing)withhard
stone(averagevolume0.008cu.m)inconcretemortar1:2:420mm
aggregates
cu.m
2548.34
2874.66
2997.70
SM0065
Providingandlayingrubblemasonrychiseldressed(facing)withhard
stone(averagevolume0.008cu.m)inconcretemortar1:3:620mm
aggregates
cu.m
2369.77
2656.49
2772.80
SM0070
SM0071
SM0072
ProvidingandlayingHammerdresseddrystonesoling
cu.m
ProvidingandlayingChiseldresseddrystonesoling
cu.m
ProvidingandlayingHandpackedstonefillingorsolingwithstones cu.m
599.32
656.25
442.58
750.10
807.02
579.65
788.60
845.52
614.65
SM0073
ProvidingandlayingHammerdressedstoneedging150x250mmwith
stonesincludingexcavation,refillinganddisposalofsurplusearth
within30mlead
43.27
49.58
51.19
SM0061
StoneSolingFilling&Edging
StonePavementHammerDressed
Providingandlayinghammerdressed150mmthickflatstonepavementwithhammerdressedstoneedging150mmwide&250mm
deeponbothsides,includinggroutingjoints
SM0080
SM0081
SM0082
Withcementconcretemortar1:3:6,12mmaggregate
Withcementmortar1:3
Withsandorearthetc.
sq.m
sq.m
sq.m
244.26
185.81
194.46
285.32
214.04
228.11
300.38
221.28
236.75
FlatStone(Dolep)Paving
Providing&layinghammerdressedflatstonepavingincementmortar1:6onpreparedbedding(excludingthecostofbedding)
SM0090
SM0091
SM0092
20mm
30mm
40mm
sq.m
sq.m
sq.m
298.52
384.23
469.95
302.08
389.37
476.67
303.01
390.71
478.40
Providingandlayinghammerdresseddrydoleppavingincludingpreparationofbed
SM0093 30mm
sq.m
382.26
386.99
388.20
SM0094 40mm
sq.m
467.98
474.29
475.90
Providing&layingallsideschiseldressedflatstonepavingincementmortar1:6onpreparedbedding(excludingthecostof
bedding)
SM0100
SM0101
SM0102
20mm
30mm
40mm
sq.m
sq.m
sq.m
DepartmentofEngineeringServices,MoWHS
381.92
467.64
581.16
385.48
472.78
587.87
386.41
474.11
589.61
23
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
465.67
579.19
470.40
585.49
471.60
587.10
60.30
64.27
118.94
62.00
65.96
121.75
62.45
66.42
122.51
Providingandlayingchiseldresseddrydoleppavingincludingpreparationofbed
SM0103
SM0104
30mm
40mm
sq.m
sq.m
Pointing
Providing&layingpointingonstoneworkwithcementmortar1:3
SM0110
SM0111
SM0112
Flushpointing
Ruledpointing
Raisedandcutpointing
sq.m
sq.m
sq.m
GabionWork
Providing&fillinghandpackedstoneinG.Imesh4mm(8swg)includingsupplyingandweavingofmeshcomplete
SM0120
SM0121
SM0122
Doubleknottedmesh....100mm
Doubleknottedmesh....150mm
Chainlinkmesh....100mm
cu.m
cu.m
cu.m
1550.21
1307.56
1550.21
1780.60
1547.29
1850.59
1899.59
1605.62
1890.44
SM0130 30cmsthick
sq.m
857.21
928.88
SM0131 20cmsthick
sq.m
576.61
624.97
Providing&layingPrecastStoneMasonryblocks(1:5:8)incementmortar1:6insuperstructureuptofloortwolevel
973.79
655.88
SM0140
SM0141
SM0142
PrecastStoneMasonry
Providing&layingPrecastStoneMasonryblocks(1:5:8)incementmortar1:6infoundationandplinth
20cmsthick
15cmsthick
10cmsthick
sq.m
sq.m
sq.m
579.21
434.91
294.32
627.57
471.26
318.53
658.48
494.49
334.06
sq.m
60.47
60.47
60.47
ExtraforPrecastStoneMasonryblocks
SM0150
ExtraforPrecastStoneMasonryblocksinsuperstructureabovefloor
twolevel...perfloor
DepartmentofEngineeringServices,MoWHS
24
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Chapter11:WOODWORK
DressedTimberFraming
Providing&fixinginpositiondressedwoodworkinframesofdoors,windows,clerestorywindowsandotherframes,wroughtand
framed
WW0001 Bluepine
cu.m
17213.95
15996.42
15721.14
WW0002 Champwood
cu.m
17213.95
15996.42
15721.14
WW0003 MixedConifer
cu.m
17167.21
15626.79
15351.51
Providing&fixingbluepinemouldedbeadingtodoor,windowframeswithironscrewsincludingplugs,primingcoatonunexposed
surfaces
WW0010 50x12mm
m
49.61
WW0011 50x20mm
m
54.87
Providing&fixingjoists,includinghoisting,applyingwoodpreservativeonunexposedsurfaces
48.92
53.69
48.74
53.39
WW0020 Bluepine
cu.m
15443.29
WW0021 MixedConifer
cu.m
15396.55
Providing&fixingEavesboard(225x25mm)withmouldingfittedandfixedwithnecessaryscrews
14223.31
13853.68
13952.93
13583.30
103.38
101.78
WW0030 MixedConifer
112.32
TraditionalCornices
Providing,making&fixingwoodworkdressedintraditionalcornicescompleteasperstandarddesigninMixedConifer,including
applyingwoodpreservativeonunexposedsurfaces,excludingdecorative
painting(Measurementtobetakenalongthecorniceandwalljunctionline)
WW0035 Atflooronelevelincludinglhanglag
m
1594.84
WW0036 Atallotherfloorlevels(excludingphana)
m
2223.82
WW0037 Forsinglestoriedstructureincludingphana
m
1970.79
WW0038 Phana
m
927.32
WW0039 Lintellevel
m
1393.63
Providing&fixingtraditionalwoodenTshegayforwindows\railingetc.asperstandarddesign
1493.63
2075.66
1823.31
876.03
1282.13
1480.63
2056.81
1805.35
871.94
1262.21
WW0045 Inmixedconifer
WW0046 Inbluepine
sq.m
sq.m
2112.82
2114.24
2065.87
2077.13
2057.48
2068.75
cu.m
15605.86
14065.44
13790.16
UndressedTimberFraming
WW0055 Providing&fixingMixedConifer(undressed)inwallframesetc.
Providing&fixingroofframing,intrusses,purlins,rafters,posts,postplatesincludinghoisting,etc.(excludingsteelitems)
WW0060 MixedConifer
cu.m
WW0061 BluePine
cu.m
Providing&fixinggussetsfortimbertrussesincludingwoodpreservative(coaltar)
WW0070 12mmphenolicplywood
18492.58
18539.32
16952.16
17321.79
16676.88
17046.52
352.37
308.94
302.02
sq.m
DepartmentofEngineeringServices,MoWHS
25
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
WallandceilingLinings
Providingandfixingtoframes(wallorceiling)Gypsumplasterboardincludingfinishingofjointssmoothcomplete(excludingcost
offrame)
WW0080 10mmthick
sq.m
330.72
330.72
330.72
WW0081 12mmthick
sq.m
351.47
351.47
351.47
WW0082 15mmthick
sq.m
384.48
384.48
384.48
Providing&fixingtoframes(wallorceiling)bluepineplainlining,tonguedandgrooved,includingnecessaryfixtures,woodenplugs
andprimingcoatonunexposedsurfaces(excludingcostofframes)
WW0090 12mmthick
WW0091 20mmthick
sq.m
sq.m
257.19
328.32
242.89
302.81
239.38
297.04
Providing&fixingtoframes(wallorceiling)PlainParticleBoardLiningwithnecessarynailsetc.complete(excludingcostofframes)
WW0100 6mm
sq.m
421.12
448.34
WW0101 10mm
sq.m
471.67
518.33
WW0102 12mm
sq.m
510.95
559.16
WW0103 18mm
sq.m
662.60
634.99
Providing&fixingPrelaminatedParticleBoardLiningwithnecessarynailsetc.complete(excludingcostofframe)
460.01
524.17
553.33
681.65
WW0110
WW0111
WW0112
WW0113
585.99
658.32
728.31
961.62
8mm
10mm
12mm
18mm
sq.m
sq.m
sq.m
sq.m
643.15
658.32
762.14
949.96
576.66
676.98
763.31
1078.28
BisonPanel
Providing&fixingbisonpanel(prelaminatedbothsidesforwall/ceiling)liningwithnecessarynails/screwsetc.complete,excluding
thecostofframe
WW0120 6mm
sq.m
449.44
449.44
WW0121 8mm
sq.m
469.90
469.90
WW0122 10mm
sq.m
517.57
517.57
WW0123 12mm
sq.m
514.83
514.83
WW0124 16mm
sq.m
649.10
649.10
WW0125 20mm
sq.m
776.14
776.14
Providing&fixingPlywoodliningwithnecessarynailsetc.includingbeadingcomplete(excludingcostofframe)
449.44
469.90
517.57
514.83
649.10
776.14
WW0130 4mm,commercial
sq.m
376.87
364.67
359.55
WW0131 4mm,teak
sq.m
564.02
582.36
541.45
WW0132 6mm,commercial
sq.m
485.77
436.18
428.15
Providing&fixingPrefabricatedwallpanellingprofileswithnecessarynailsetc.completebutexcludingthecostofframe)
WW0140 19mm,bluepine
sq.m
744.06
WW0141 19mm,mixedconifer
sq.m
634.99
WW0142 15mm,bluepine
sq.m
1231.26
Providing&fixingwoodenskirtinginmixedconiferwithnecessarynailsorscrewscomplete
744.06
634.99
1231.26
744.06
634.99
1231.26
WW0150 20mm
WW0151 25mm
1018.99
1071.48
1013.44
1064.55
sq.m
sq.m
1048.79
1109.07
DepartmentofEngineeringServices,MoWHS
26
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
sq.m
576.25
606.95
597.26
sq.m
557.81
584.58
573.98
sq.m
541.97
565.35
553.97
sq.m
326.86
331.83
314.92
sq.m
375.81
380.77
363.86
sq.m
93.03
85.38
94.56
BambooWalling
WW0160 Providing&fixing75mmthicksplitbamboowallincludinggrooving
frames,20mmplastercementmortar1:4bothsides(excludingcostof
frame)
WW0161 Providing&fixing75mmthicksplitbamboowallincludinggrooving
frames,20mmplastercementmortar1:5bothsides(excludingcostof
frame)
WW0162 Providing&fixing75mmthicksplitbamboowallincludinggrooving
frames,20mmplastercementmortar1:6bothsides(excludingcostof
frame)
WW0163 Providing&fixing75mmthicksplitbamboowallincludinggrooving
frames,20mmmudplasterbothsides(excludingcostofframe)
WW0164 Providing&fixing150mmthicksplitbamboowallincludinggrooving
frames,60mmmudplasterbothsides(excludingcostofframe)
WW0165 Providing&fixingsplitBamboomatting(excludingthecostofframing
andbeading)
Partitions
Providing&fixingPanelledorPanelled&Glazedpartition,singlecentralpanellingincludingframeetc.complete
WW0170
WW0171
WW0172
WW0173
100mmframing,38mmthickMixedConiferpanelling
75mmframing,38mmthickMixedConiferpanelling
100mmframing,38mmthickChamporBluePinepanelling
75mmframing,38mmthickChamporBluePinepanelling
sq.m
sq.m
sq.m
sq.m
1599.35
1501.55
1601.69
1503.63
1514.29
1425.27
1532.78
1441.65
1498.20
1410.75
1516.69
1427.13
Providing&fixingPanelledorPanelled&Glazed,Plywoodpanellingfrombothsidesincludingframe
WW0180 100mmframing,4mmCommercialPly
sq.m
869.86
825.92
811.16
WW0181 75mmframing,4mmCommercialPly
sq.m
780.96
745.80
732.61
WW0182 100mmframing,4mmTeakPly
sq.m
1261.99
1282.02
1192.27
WW0183 75mmframing,4mmTeakPly
sq.m
1167.50
1196.08
1107.91
Providing&fixingPanelledwithPrefabricatedprofilesfrombothsidesincludingtheframeandprimecoatonconcealedface
WW0190
WW0191
WW0192
WW0193
WW0194
WW0195
100mm,12mmbluepine
75mm,12mmbluepine
100mm,12mmmixedconifer
75mm,12mmmixedconifer
100mm,12mmchampwood
75mm,12mmchampwood
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
1551.98
1457.49
1551.98
1457.49
1698.26
1603.77
1520.68
1434.73
1520.68
1434.73
1666.96
1581.02
1514.34
1429.97
1514.34
1429.97
1660.63
1576.26
WW0200 Champwood
sq.m
1282.44
1239.04
WW0201 MixedConifer
sq.m
1088.74
1037.97
Providing&fixing35mmthickPanelledorglazeddoorsandwindowsShuttersetc.completeincludinghinges
1193.25
992.18
WW0210 Champwood
sq.m
1456.13
1413.18
WW0211 MixedConifer
sq.m
1265.70
1212.91
Providing&fixing38mmthickPanelledorglazeddoorsandwindowsShuttersetc.completeincludinghinges
1365.29
1165.02
WW0220 Champwood
WW0221 MixedConifer
1385.28
1184.31
Door&WindowShutters
Providing&fixing25mmthickPanelledorglazedShuttersforcupboardsetc.completeincludinghinges
sq.m
sq.m
1478.97
1288.45
DepartmentofEngineeringServices,MoWHS
1433.70
1232.72
27
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
WW0230 Champwood
sq.m
1515.19
1466.33
WW0231 MixedConifer
sq.m
1323.42
1263.15
Providing&fixing50mmthickPanelledorglazeddoorsandwindowsShuttersetc.completeincludinghinges
1417.10
1213.92
Providing&fixing44mmthickPanelledorglazeddoorsandwindowsShuttersetc.completeincludinghinges
WW0240 Champwood
sq.m
1571.13
1516.59
1466.07
WW0241 MixedConifer
sq.m
1405.53
1328.35
1289.50
Providing&fixingWiregauzeShutters25mmfordoors&windowsusinggalvanisedM.Swiregauze0.56mmdiawireincludingthe
costofhinges
WW0250 Champwood
sq.m
1056.13
1058.36
1043.84
WW0251 MixedConifer
sq.m
812.61
809.30
794.78
Providing&fixingWiregauzeShutters35mmfordoors&windowsusinggalvanisedM.Swiregauze0.56mmdiawireincludingthe
costofhinges
WW0260 Champwood
sq.m
1125.77
1120.93
1104.81
WW0261 MixedConifer
sq.m
881.98
869.72
853.60
Providing&fixingWiregauzeShutters38mmfordoors&windowsusinggalvanisedM.Swiregauze0.56mmdiawireincludingthe
costofhinges
WW0270 Champwood
sq.m
1147.46
1140.41
1123.80
WW0271 MixedConifer
sq.m
903.58
888.54
871.92
Providing&fixingBatteneddoor&windowshutters20mm,withledgesandbraces(25mm),includingthecostofhinges
WW0280 Champwood
sq.m
932.14
892.34
901.17
WW0281 Bluepine
sq.m
932.14
892.34
901.17
WW0282 MixedConifer
sq.m
930.54
879.67
888.50
Providing&fixingbattenedgaragedoorwithledgesandbraces(38mm)inMixedConifer,includingmountingsetc.complete
WW0290 22mm
sq.m
973.22
Providing&fixingbattenedandframeddoorshutters,MixedConiferexcludingthecostofhinges
924.55
912.59
WW0295 38mm
sq.m
844.38
805.03
815.48
sq.m
927.06
900.81
919.08
sq.m
333.24
325.76
324.42
sq.m
559.17
534.23
529.77
sq.m
999.79
963.76
988.32
VenetianWorks
WW0300 Providing&fixing38mmthicklouveredshuttersforwindows,doors
withfixed12mmvenetians,inMixedConiferexcludingthecostof
hinges
WW0301 Providing&fixingMixedConifervenetians50mmwide,10mmthickat
45mmapartinventilatorsabovedoors(excludingframe)
Trellis
WW0310 Providing&fixingplaintrellisof38x12mmlathswith38mmgap
(excludingframes)includingfixingbeading50x12mmwithMixed
Conifer
WW0311 Providing&fixingDoor&windowshuttersofplaintrellisof38x12mm
lathswith38mmgap(excludingframe)includingfixingbeading
50x12mmwithMixedconifer
DepartmentofEngineeringServices,MoWHS
28
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
1175.67
1208.19
1199.34
CompoundGates
WW0320 Providing&fixingCompoundGateincludinghingesupportscomplete
asper
sq.m
WindowAccessories
WW0325 Providing&fixingM.S.roundorsquarebarsinwindowframes
kg
72.95
86.42
86.42
WW0326 Providing&fixingM.S.roundorsquarebarswithM.S.flatsinwindow
frames
WW0327 Providing&fixingornamentalsteelgrillsinframeswithM.S.flats&
barsincludingroundheadedboltsandnutsetc.
WW0328 Providing&fixingexpandedmetal20x60mmstrands3.25x1.6mm
including60x20mmbeadingofMixedConifer
kg
67.54
80.91
80.95
kg
119.70
131.89
132.11
sq.m
450.25
435.95
448.88
WW0335 25mm
sq.m
705.82
WW0336 30mm
sq.m
903.44
Providing&fixingFlushDoorshutters(prefabricated),blockboardcorewithcommercialplyveneer
705.82
903.44
705.82
903.44
WW0345 25mm
sq.m
997.34
WW0346 30mm
sq.m
1201.49
WW0347 35mm
sq.m
1353.14
WW0348 40mm
sq.m
1586.45
Providing&fixingflushdoorshutters(prefabricated),blockboardcorewithteakplyveneer
1095.92
1320.48
1487.29
1743.93
1125.49
1356.17
1527.54
1791.18
WW0355 25mm
sq.m
1586.45
1743.93
WW0356 30mm
sq.m
1819.76
2054.82
WW0357 35mm
sq.m
2169.73
2385.54
WW0358 40mm
sq.m
2461.36
2706.34
Providing&fixingflushdoorshutters(prefabricated),blockboardcorewithplyveneer,chemicallytreated
1791.18
2054.82
2450.28
2779.83
WW0365 25mm
sq.m
1154.83
1269.15
WW0366 30mm
sq.m
1353.14
1487.29
WW0367 35mm
sq.m
1586.45
1743.93
WW0368 40mm
sq.m
1819.76
2000.58
Providing&fixingpanelleddoors,with12mmparticleboardpanelswithhorizontalmiddlerailincludingprimecoat
1303.45
1527.54
1791.18
2054.82
WW0375 30mm
sq.m
1570.70
1570.70
WW0376 35mm
sq.m
1589.95
1589.95
WW0377 40mm
sq.m
1602.78
1602.78
Providing&fixingpanelleddoors,with12mmplywoodpanelswithhorizontalmiddlerailincludingprimecoat
1570.70
1589.95
1602.78
WW0385 30mm
sq.m
1153.66
1153.66
WW0386 35mm
sq.m
1167.78
1167.78
WW0387 40mm
sq.m
1251.18
1251.18
Providing&fixingpanelleddoors,with9mmplywoodpanelswithhorizontalmiddlerailincludingprimecoat
1153.66
1167.78
1251.18
WW0395 30mm
WW0396 35mm
WW0397 40mm
1131.85
1143.39
1151.09
Prefabricatedshutters
Providing&fixingFlushDoorshutterswithprelaminatedbisonpanel
sq.m
sq.m
sq.m
1131.85
1143.39
1151.09
DepartmentofEngineeringServices,MoWHS
1131.85
1143.39
1151.09
29
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Providing&fixingpanelleddoors,with12mmparticleboardpanelswithhorizontalsinglelockrail&stileincludingprimecoat
WW0400 30mm
sq.m
1624.60
1624.60
WW0401 35mm
sq.m
1629.73
1629.73
WW0402 40mm
sq.m
1632.30
1632.30
Providing&fixingpanelleddoors,with12mmplywoodpanelswithhorizontalsinglelockrail&stileincludingprimecoat
1624.60
1629.73
1632.30
WW0410 30mm
sq.m
1208.84
1208.84
WW0411 35mm
sq.m
1211.40
1211.40
WW0412 40mm
sq.m
1216.54
1216.54
Providing&fixingpanelleddoors,with9mmplywoodpanelswithhorizontalsinglelockrail&stileincludingprimecoat
1208.84
1211.40
1216.54
WW0420 30mm
sq.m
1165.21
1165.21
1165.21
WW0421 35mm
sq.m
1170.34
1170.34
1170.34
WW0422 40mm
sq.m
1176.76
1176.76
1176.76
Providing&fixingpanelleddoors,with12mmparticleboardpanelswithhorizontaldoublelockrail&stileincludingprimecoat
WW0430 30mm
sq.m
1641.92
1641.92
1641.92
WW0431 35mm
sq.m
1677.21
1677.21
1677.21
WW0432 40mm
sq.m
1681.06
1681.06
1681.06
Providing&fixingpanelleddoors,with12mmplywoodpanelswithhorizontaldoublelockrail&stileincludingprimecoat
WW0440 30mm
sq.m
1225.84
1225.84
WW0441 35mm
sq.m
1228.41
1228.41
WW0442 40mm
sq.m
1235.79
1235.79
Providing&fixingpanelleddoors,with9mmplywoodpanelswithhorizontaldoublelockrail&stileincludingprimecoat
1225.84
1228.41
1235.79
WW0450 30mm
sq.m
1179.65
1179.65
WW0451 35mm
sq.m
1187.34
1187.34
WW0452 40mm
sq.m
1197.61
1197.61
Providing&fixingpanelleddoors,with9mmplywoodpanelswithhorizontaldoublelockrail&stileincludingprimecoat
1179.65
1187.34
1197.61
WW0460 30mm
WW0461 35mm
WW0462 40mm
sq.m
sq.m
sq.m
626.26
636.53
641.66
626.26
636.53
641.66
626.26
636.53
641.66
Shelving&Cupboards
Providing&fixing38mmthickwoodenshelvessupportedon40x40x6mm`T'or`L'ironbracketsfixedatsuitabledistancebutnot
exceeding75cmapartin7.5x7.5x15cmblocksofcementconcrete1:3:6,20mmaggregates
WW0470 MixedConifer
sq.m
764.83
706.61
696.97
Providing&fixing25mmthickCupboard(900x2000x450mm...LxHxD)withglazedorpanelledshutters,25mmthickpartitionsand
shelvessupportedon25x25mmwoodenrunners,50x20mmarchitravesand
25mmdiacurtainrodmountedonwoodenbrackets,includingwithAnodisedAluminiumHingesandframeinmixedconifer
WW0475 MixedConifer
WW0476 Champwood
each
each
4629.74
4939.65
DepartmentofEngineeringServices,MoWHS
4423.35
4745.06
4375.93
4697.65
30
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
50mm
100mm
229.62
427.14
219.88
420.23
221.03
423.17
100mm
425.68
418.77
421.71
100mm
329.49
321.47
323.27
100mm
328.60
320.58
322.38
ExtrasforCupboardsincludingframeofmixedconifer
WW0485 Foradditionaldepthof50mmorpartthereof
WW0486 Foradditionalwidthof100mmorpartthereofincludingshuttersof
Mixedconifer
WW0487 Foradditionalwidthof100mmorpartthereof,includingshuttersof
Champwood
WW0488 Foradditionalheightof100mmorpartthereof,includingshuttersof
Mixedconifer
WW0489 Foradditionalheightof100mmorpartthereof,includingshuttersof
Champwood
Railing
Providing&fixingrailingwith90x60mmtop&bottomrails,trellis60x45mmincluding2coatsofpaintetc.allcomplete
WW0495
WW0496
WW0497
WW0498
WW0499
WW0500
900mmhigh,Champwood
900mmhigh,MixedConifer
1000mmhigh,Champwood
1000mmhigh,MixedConifer
1200mmhigh,Champwood
1200mmhigh,MixedConifer
m
m
m
m
m
m
424.31
418.00
488.58
487.62
577.54
576.40
403.07
390.92
464.35
456.71
548.96
539.94
404.20
392.05
465.84
458.20
550.75
541.73
Pelmets
Providing&fixing100x12mm,with25mmdia.woodencurtainrodandbracketsincludingM.Sflats25x3x100mmandplugsetc.
complete
WW0505 Champwood
m
130.96
127.42
126.48
WW0506 MixedConifer
m
127.70
123.04
122.10
Providing&fixing150x12mm,with25mmdia.woodencurtainrodandbracketsincludingM.Sflats25x3x100mmandplugsetc.
complete
WW0515 Champwood
WW0516 MixedConifer
m
m
137.47
135.60
133.27
129.78
132.18
128.68
36.07
28.88
20.32
37.05
31.21
23.92
46.18
36.46
25.58
59.03
47.23
37.50
76.52
48.19
30.70
119.64
115.74
106.03
132.27
114.77
97.28
ShuttersFittings
Providing&fixingM.S.pressedbutthingeswithnecessaryscrewsetc.complete
WW0525 100mm
each
WW0526 75mm
each
WW0527 50mm
each
Providing&fixingM.Stowerbolt(barreltype)withnecessaryscrewsetc.complete
WW0535 250mm
each
50.28
WW0536 150mm
each
37.50
WW0537 100mm
each
27.78
Providing&fixingM.S.slidingdoorbolt,brightfinished,enamelledwithnecessaryscrewsetc.complete
WW0545 300mm
WW0546 250mm
WW0547 200mm
each
each
each
DepartmentofEngineeringServices,MoWHS
115.16
105.44
91.83
31
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
WW0555 150mm
each
WW0556 125mm
each
WW0557 100mm
each
WW0558 75mm
each
Providing&fixingM.S.hookandeyewithnecessaryscrewsetc.complete
39.55
31.97
25.85
20.89
37.22
31.39
24.39
19.72
45.97
34.30
28.47
22.64
WW0565
WW0566
WW0567
WW0568
58.22
39.55
22.06
18.56
72.22
45.97
27.30
20.89
60.55
39.17
27.50
21.67
WW0575 Providing&fixingM.S.doorstopperwithnutsandnecessaryscrews
each
81.47
complete
Providing&fixinganodisedaluminiumbutthingeswithnecessaryaluminiumscrewsetc.complete
76.32
79.53
WW0580 100mm
each
63.78
WW0581 75mm
each
52.11
Providing&fixinganodisedaluminiumtowerbolt(barreltype)withaluminiumscrewsetc.complete
63.78
52.11
57.95
40.45
WW0590 200mm
each
56.43
WW0591 150mm
each
43.86
WW0592 100mm
each
29.28
Providing&fixinganodisedaluminiumslidingdoorboltswithnutsandaluminiumscrewsetc.complete
79.76
43.86
35.11
68.10
43.86
32.19
WW0600 300mm
each
194.06
WW0601 250mm
each
159.06
WW0602 200mm
each
141.57
Providing&fixinganodisedaluminiumhandlewithnecessaryaluminiumscrewsetc.complete
182.40
164.90
147.40
176.56
159.06
144.48
WW0610 150mm
each
33.34
WW0611 125mm
each
25.75
WW0612 100mm
each
21.09
WW0613 75mm
each
18.75
Providing&fixinganodisedaluminiumhookandeyewithnecessaryscrewsetc.complete
37.42
31.59
24.59
19.92
36.84
30.42
24.59
18.75
WW0620
WW0621
WW0622
WW0623
54.92
43.25
25.75
21.09
72.42
49.08
25.75
19.92
89.91
49.08
32.75
20.31
481.83
493.49
499.32
89.40
68.99
48.57
101.07
83.57
66.07
89.40
61.99
42.74
Providing&fixingM.S.handlewithnecessaryscrewsetc.complete
300mm
200mm
150mm
100mm
each
each
each
each
M.Sdoorstopper
300mm
200mm
150mm
100mm
each
each
each
each
Kickingplate
WW0630 Providing&fixinganodisedaluminiumkickingplate,4mmthickwith
sq.m
necessaryaluminiumscrewsetc.complete
Providing&fixingbrasspressedbutthingeswithnecessaryscrewsetc.complete
WW0635 100mm
WW0636 75mm
WW0637 50mm
each
each
each
DepartmentofEngineeringServices,MoWHS
32
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
WW0645 250mm
each
WW0646 150mm
each
WW0647 100mm
each
Providing&fixingbrassslidingdoorboltwithnutsnecessaryscrewsetc.complete
184.75
127.85
91.69
167.25
134.27
99.27
173.09
143.01
90.52
WW0655 300mm
each
WW0656 250mm
each
WW0657 200mm
each
Providing&fixingbrasshandlewithnecessaryscrewsetc.complete
598.42
573.14
522.59
575.09
470.10
446.77
712.16
583.83
519.67
each
each
each
each
65.12
56.38
50.54
43.25
78.25
66.58
54.92
49.08
107.41
89.91
72.42
49.08
each
764.62
997.93
857.94
each
656.74
773.40
831.73
each
918.60
1058.58
1116.91
each
113.49
WW0678 Providing&fixingbrightfinishedbrassdoorstopperwithnutsand
necessaryscrewsetc.complete
Providing&fixingbrightfinishedbrasshookandeyewithnecessaryscrewsetc.complete
101.82
119.32
Providing&fixingbrasstowerbolt(barreltype)withnecessaryscrewsetc.complete
WW0665
WW0666
WW0667
WW0668
150mm
125mm
100mm
75mm
Otherfittings
WW0675 Providing&fixingbrightfinishbrass100mmmortiselatch&pairof
levers,handleswithnecessaryscrewsetc.complete
WW0676 Providing&fixingbrightfinishbrassspringloaded,hingeddoorcloser
withnecessaryscrewsetc.complete
WW0677 Providing&fixingbrightfinishbrasshydraulicdoorcloser
WW0685 150mm
WW0686 100mm
each
each
45.59
38.88
58.42
46.75
60.75
49.08
each
66.34
72.83
74.07
cu.m
517.98
488.81
517.98
sq.m
1041.73
1044.14
1046.71
sq.m
908.51
908.51
908.51
FixingAccessories
WW0695 P&f40x3mmM.S.holdfast400mmlong,fixingtoframewith10mm
bolts&nuts,plugs,concreteblocks300x100x150mmwith1:3:6,20mm
aggregate
CeilingInsulation
WW0700 Providing&layingdryearthinceilingsinproportion1:5(1straw:5dry
earth)includingplasticunderlay
Skylight
WW0705 Providing&fixingskylighttranslucentdiffuserpanelincluding50x12
beadingetc.complete
TimberCarving
WW0710 Providing&fixingDecorativeTraditionalTimberCarving
DepartmentofEngineeringServices,MoWHS
33
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
76.73
77.16
77.58
79.80
77.38
81.47
Chapter12:STEEL
SingleSections
Steelworkinsinglesectionincludingcutting,hoisting,fixingandapplyingprimingcoatofredleadpaint
SW0001 InR.S.joists
kg
77.35
SW0002 InFlats
kg
65.53
SW0003 InTees,anglesandchannels
kg
74.52
Fabricated&BuitupSections
Steelworkrivetedorbolted,inbuiltupsections,trusses,frameworks,includingcutting,hoisting,fixingandappl.primingcoatof
redleadpaint
SW0010 InR.S.joists
kg
77.09
76.49
81.46
SW0011 InTees,angles,flatsandchannels
kg
127.75
133.57
136.47
Steelworkwelded,inbuiltupsections,trusses,frameworksincludingcutting,hoisting,fixingandappl.primingcoatofredlead
paint
SW0020
SW0021
SW0022
InR.S.joists
InTees,angles,flatsandchannels
InTubularsections
kg
kg
kg
78.20
74.57
65.89
76.23
80.45
65.21
81.11
83.24
68.77
Doors/Windows&Accessories
Providing&fixinginpositionwithverticalchannels20x10x2mmandbracedwithflatiron,diagonals20x5mmwithtopandbottom
railsofTiron40x40x6mmwith38mmdiasteelpulleyscompletewith
bolts,nuts,lockingarrangement,stoppershandlesincludingapplyingaprimingcoatofredleadpaint
SW0030 Collapsiblesteelshutters
sq.m
Providing&fixinginpositionincludingapplyingaprimingcoatofredleadpaint
3723.22
3990.77
4044.11
SW0035
1343.64
1343.64
1343.64
Rollingshutters,includingallaccessoriescompletebutexcludingtop
cover
Topcoverforrollingshutters
sq.m
SW0036
m
580.12
580.12
580.12
Providing&fixinganodisedAluminiumsectionfordoors,windows,ventilators,partitionsframing,falseceilingframingofspecified
sectionsincludingallaccessoriessuchasUrubbergasketforfixing
glasspanes,weatherstripsorweatherseals,roller,springs,etccomplete(excludingthecostofglasspanesorboardsincaseof
partitions/doors/windowsandceilingboardsincaseofceiling)
SW0045 Sliding,openableandpivotedwindows
kg
434.91
434.91
434.91
SW0046 Slidingandopenabledoors
kg
436.30
436.30
436.30
SW0047 Partitionframing
kg
432.13
432.13
432.13
kg
431.02
431.02
431.02
SW0048 Falseceilingframing
Extraforprovidingandfixingplainglasspanesonaluminiumsectioncomplete(excludingthecostofaluminiumframe&
accessories)
SW0055 4mmthickplainglass
sq.m
542.22
550.25
556.08
SW0056 5.5mmthick,plainglass
sq.m
754.98
765.01
775.04
SW0057 5.5mmthickfrostedglass
sq.m
830.92
740.39
719.40
Providing&fixingsteelglazeddoors,windows,ventilatorsofstandardrolledsteelsectionsjointsmitredandweldedwith15x3mm
lugsembeddedasrequiredincludingp&fglasspanesandacoatofprimer
SW0065 Doors
sq.m
1824.49
1797.30
1789.59
SW0066 Windowsfixed
sq.m
991.82
964.97
957.36
SW0067 Windowssidehung
sq.m
1280.26
1252.98
1245.24
SW0068 Ventilatorstophung
sq.m
1274.13
1247.27
1239.66
SW0069 Ventilatorscentrehung
sq.m
1440.95
1414.09
1406.48
DepartmentofEngineeringServices,MoWHS
34
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
sq.m
243.35
247.65
258.49
kg
59.55
69.13
70.54
kg
kg
116.68
123.51
122.51
123.51
122.51
132.26
kg
67.94
72.58
76.46
each
112.58
133.40
133.40
ExtraforBhutantypeArchitraves
SW0075
ExtraforProviding&fixingBhutantypearchitraveswith24Gsteel
sheet....persq.m.ofwindowarea
SteelFasteners
SW0080
SW0081
SW0082
Providing&fixingM.S.roundholddownboltswithnutsandwasher
plates
Providing&fixingboltsofvarioussizesincludingnuts&washers
Providing&fixingM.S.rivetsofvarioussizes
Plates
SW0090
Providing,makingandfixingM.S.straps,flats,soleplatesetc.
FanClamps
SW0095
Providing&fixingM.S.fanclampsof16mmdia.inR.C.slabs,including
paintingwithredleadpaint
DepartmentofEngineeringServices,MoWHS
35
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
577.01
555.28
505.70
623.76
597.33
537.19
604.36
576.81
513.79
407.20
387.78
319.75
439.87
416.43
339.52
428.81
404.49
325.16
sq.m
FL0020
Flushpointing
FL0021
Ruledpointing
sq.m
Providing&layingpointingonbrickflooringwithcementmortar1:4
45.41
49.20
46.56
50.34
46.88
50.67
FL0030
Flushpointing
sq.m
FL0031
Ruledpointing
sq.m
Providing&layingPointingonbrickflooringwithcementmortar1:6
45.41
49.20
46.56
50.34
46.88
50.67
FL0040
FL0041
43.88
47.66
44.70
48.49
44.95
48.73
FL0050
12mmaggregates,25mmthick
sq.m
166.93
FL0051
20mmaggregates,40mmthick
sq.m
226.15
FL0052
20mmaggregates,50mmthick
sq.m
262.16
FL0053
20mmaggregates,75mmthick
sq.m
347.98
FL0054
20mmrivergravel,40mmthick
sq.m
424.35
FL0055
20mmrivergravel,50mmthick
sq.m
509.71
Providing&layingcementconcreteflooring1:3:6,finishedwithafloatingcoatofneatcement
182.91
250.20
291.55
390.02
468.51
564.18
189.90
261.09
305.01
409.74
477.86
575.69
FL0060
FL0061
260.53
235.34
273.44
240.05
Chapter13:FLOORING
BrickFlooring
Providing&laying2ndclassBrickonedgeflooring
FL0001
FL0002
FL0003
Incementmortar1:4
Incementmortar1:6
Indrybrick,includingfillingjointswithsandonbeddingof12.5mm
mudmortar
Providing&laying2ndclassFlatbrickflooring
sq.m
sq.m
sq.m
FL0010
FL0011
FL0012
sq.m
sq.m
sq.m
Incementmortar1:4
Incementmortar1:6
Indrybrick,fillingjointswithsand,onabaseof12.5mmmudmortar
Providing&layingpointingonbrickflooringwithcementmortar1:2
Flushpointing
Ruledpointing
sq.m
sq.m
ConcreteFlooring
Palcementconcreteflooring1:2:4,finishedwithfloatingcoatofneatcement
20mmaggregates,50mm
20mmrivergravel,50mm
sq.m
sq.m
236.18
214.56
RedOxideFlooring
Providing&laying40mmredoxideflooring,finishedwithafloatingcoatofneatcement(redoxidemixed)includingcementslurry
etc.complete
FL0070
Underlayerof30mmthickcementconcrete1:2:4,12.5mmaggregates
andtoplayerof10mmthickplasterofcementredoxidemixed
sq.m
DepartmentofEngineeringServices,MoWHS
528.28
552.42
566.52
36
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
SurfaceHardening
Providing&laying62mmthickflooringwithsublayercementconcrete1:2:420mmaggregates,toplayerwithmetalliccement
hardenerconsistingofmix1:2(1cementhardener:26mmstoneaggregate),
themetallichardeningcompoundismixedbyvolumeintheratio4partsofcement&1partofmetallichardeningcompound
includingcementslurry
FL0075
50mmthicksublayerand12mmtopping
sq.m
452.93
481.44
499.06
sq.m
20.04
20.04
20.04
ExtraforConcreteflooring
FL0080
Extraformakingchequersonconcretefloors,steps,landings,
pavementsetc.
TerrazzoMarbleChipFlooring
Providing&laying40mmthickmarblechipsflooringtoplayer6mmthickwithwhite,blackorblackandwhitemarblechipsof
nominalsize1.53mminproportion1:2(cement:chips),on34mmthickconcrete
baseincementconcrete1:2:4,12.5mmaggregate(cementandmarblepowdermixshallbeoftheratio3partofcementto1part
ofmarblepowder)
FL0085
FL0086
Ingreycement
Inwhitecement
sq.m
sq.m
592.96
698.08
613.63
719.06
625.56
731.62
sq.m
40.60
40.09
41.61
sq.m
65.33
64.51
66.96
Extraforcolouredchips
FL0095
FL0096
Extraforcolouredchipsinsteadofblack,whiteorblackandwhite
chipsintop6mmlayerofmarblechipsflooring
Extraforcolouredchipsinsteadofblack,whiteorblackandwhite
chipsintop10mmlayermarblechipsflooring
Providing&laying40mmthickmarblechipsflooringtoplayer10mmthickwithwhite,blackorblackandwhitemarblechipsofsize
6mminproportion1:2(cement:chips),on30mmcementconcrete1:2:4base,12.5mmaggregate
FL0105
FL0106
Ingreycement
Inwhitecement
sq.m
sq.m
619.40
759.13
639.46
778.65
652.50
792.28
ExtraforTerrazzoFlooring
FL0115
ExtraforProviding&fixingglassstripsinjointsofterrazzofloors
FL0116
Extraforterrazzoflooringlaidasfloorborders,margins,bands,75<
width>300mm
Extraforlayingterrazzoflooringonstaircasetreads,width<300mm
includingformingnosing
Extraforlayingterrazzoinnarrowbandswidth<75mm
Extraformakingmouldednosinginterrazzo,includingmoulded
returns,ends,angles
Providing&fixingaluminiumstrip40x1.6mminjointsofterrazzofloor
FL0117
FL0118
FL0119
FL0120
15.09
15.09
15.09
sq.m
16.60
16.60
16.60
sq.m
24.90
24.90
24.90
m
m
1.76
67.28
1.76
67.28
1.76
67.28
107.58
101.74
101.74
DepartmentofEngineeringServices,MoWHS
37
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Skirting
Providing&layingCementplasterskirting<300mmheightwithcementmortar1:3withafloatingcoatofneatcementincluding
roundingoffjunctionswithfloor
FL0130
20mm
sq.m
209.32
228.03
233.03
FL0131
22mm
sq.m
219.83
240.75
246.35
Providing&fixingTerrazzoorMarblechipsskirting<300mmheighttoplayer6mmthickwithwhiteorblack,blackandwhite
marblechipssize4mminproportion1:2,laidon12.5mmthickcementplaster1:3base
FL0140
FL0141
Ingreycement
Inwhitecement
sq.m
sq.m
580.38
680.45
596.07
695.76
602.82
702.93
MarbleStoneFlooring
Providing&layingmarblestoneflooringover20mmthickbaseofcementmortar1:4,jointedwithgreycementslurrymixedwith
pigmentwherenecessary,rubbing&polishingcomplete
FL0150
20mmthickblackmarble
sq.m
2074.89
2086.64
2071.41
FL0151
20mmthickwhitemarble
sq.m
2077.29
2090.00
2074.95
FL0152
20mmthickblackandwhitemarble
sq.m
2041.07
2090.00
2074.95
FL0153
20mmthickcolouredmarble
sq.m
2057.44
2076.58
2081.65
FL0154
40mmthickblackmarble
sq.m
1875.63
1895.28
1900.46
FL0155
40mmthickwhitemarble
sq.m
1798.20
1817.85
1823.03
FL0156
40mmthickblackandwhitemarble
sq.m
1963.21
1982.85
1988.04
FL0157
40mmthickcolouredmarble
sq.m
2221.41
2090.00
2074.95
Providing&layingKotastoneflooringover20mmthickbaseofcementmortar1:4,jointedwithgreycementslurrymixedwith
pigmentwherenecessary,rubbing&polishingcomplete
FL0160
FL0161
20mm
40mm
sq.m
sq.m
1797.58
2766.40
1816.72
2785.54
1821.79
2790.61
206.72
206.72
206.72
173.77
173.77
173.77
FL0180
25mm
sq.m
850.63
850.63
FL0181
30mm
sq.m
1058.12
1058.12
Providing&fixingPlainParticleBoardFlooringfixingwithnecessaryscrewsetc.complete,excludingcostofframe
850.63
1058.12
FL0190
25mm
sq.m
829.42
818.14
FL0191
35mm
sq.m
1099.27
1157.60
Providing&fixingMixedConiferFlooringincludingfixingwithironscrewsetc.complete,excludingthecostofframe
821.64
1183.27
ExtrasforMarblestoneflooring
FL0170
FL0171
Extraformarblestoneflooringforlayinginsteptreads,width<300
mm
Extraformarblestoneflooringfornosinginsteptreads
TimberFlooring
Providing&fixingbisonpanelflooringincludingnails/screwsetc.completeexcludingthecostofframe
FL0200
FL0201
FL0202
FL0203
FL0204
FL0205
25mmthick,T&G
25mmthick,halflapped
40mmthick,T&G
40mmthick,halflapped
45mmthick,T&G
45mmthick,halflapped
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
DepartmentofEngineeringServices,MoWHS
448.92
425.54
640.76
634.39
690.14
680.12
405.19
381.80
573.27
566.90
617.52
607.50
397.37
373.99
561.22
554.84
604.55
594.52
38
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Parquetflooring
Providing&fixingParquet(woodblock)flooringincludingblownbitumenunderlayandironscrewsetc.complete,excludingcostof
frame
FL0210
38mmthick,champwood
sq.m
2388.38
2339.91
Providing&fixingPreFabricatedFlooringProfilesinmixedconiferincludingnecessaryscrewsetc.complete
FL0215
FL0216
25mmthick
38mmthick
sq.m
sq.m
706.85
763.31
706.85
763.31
2328.96
706.85
763.31
Vinyl&LinoleumFlooring
Providing&fixing2mmthickVinylorLinoleumsheet1.3mmlaidwithspecialadhesive,including2coatofbitumenappliedover
subflooronpreparedsurface@1.5kg/sq.meachcoatincludingthecostofbaseconcrete
FL0225
Overbaseof25mmthickcementconcrete1:2:4,12.5mmaggregate
sq.m
805.46
833.10
845.96
sq.m
74.17
74.17
74.17
Mudflooring
FL0230
Providing&layingrammedmudflooringcomplete
DepartmentofEngineeringServices,MoWHS
39
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
1615.92
1757.43
1472.46
Chapter14:TILINGWALL&FLOOR
GL0001
Providing&fixingwhite/colouredGlazedtiles,150x150mmin
skirting,steprisers,dado,finishedwithflushpointinginwhitecement
sq.m
Providing&fixingwhite/colouredglazedtilesinflooring,treadsofstepsandlandingslaidonbedof12mmthickcementmortar1:3
finishedwithflushpointinginwhitecement:
GL0005 for150x150mm
GL0006 for100x100mm
GL0007 for200x100mm
GL0008 for200x200mm
GL0009 for300x300mm
Extraforlayingglazedtiles
sq.m
sq.m
sq.m
sq.m
sq.m
1432.49
2943.97
1820.11
1203.80
828.47
1574.00
2958.44
1834.58
1196.40
894.03
1289.03
2962.20
1896.66
1200.15
855.79
GL0015
GL0016
sq.m
sq.m
92.44
532.77
92.44
532.77
92.44
532.77
Intreadsofsteps,width<300mm
Inskirting,risersofsteps,dadowheretilesarerequiredtobecut(only
areaofportionofcuttilestobemeasured)
DepartmentofEngineeringServices,MoWHS
40
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Chapter15:ROOFING
C.G.ISheeting
Providing&fixingCorrugatedGalvanisedIron(CGI)sheeting,includingbolts,hooksandnuts8mmdia.withbitumenandG.Ilimpet
washersfilledwithwhiteleadforconnection,excludingthecostofpurlins,rafterandtrusses
RF0001 24g
sq.m
649.93
649.93
649.93
Providing&fixing600mmridgesorhipsinplainG.I.includingbolts,hooksandnuts8mmdiaG.Ilimpetandbitumenwashersfor
connection
RF0005 24g.
m
553.92
524.79
Providing&fixing450mmoverallsemicircularplainG.Igutter,includingbrackets,bolts,nuts,washers&rainwaterpipes
connections,excludingthecostofpipes
504.49
RF0010
24gsheet
417.39
408.43
395.94
7.05
7.09
7.05
7.09
7.05
7.09
133.22
133.22
133.22
each
each
each
20.61
50.60
75.90
20.61
50.60
75.90
20.61
50.60
75.90
122.21
144.37
144.77
sq.m
685.26
715.28
655.23
sq.m
351.67
375.58
327.75
1298.09
1330.43
1265.76
sq.m
702.69
702.69
702.69
ExtraforGalvanisedIron
RF0015
RF0016
RF0017
ExtraforProviding&fixingcurvedC.G.I.sheetinroofing
ExtraforProviding&fixingC.G.I.sheetsverticallyortoapitch>60
degrees
Extraformakingstraightcutopenings(in24g)forchimney,skylights
sq.m
sq.m
ExtraformakingopeningorrecessinCGIroofingofgirth<1metre
RF0025
RF0026
RF0027
Areaupto0.01sq.m
0.01<Area<0.04sq.m
Area>0.04sq.m
WindBracing
RF0060
Providing&fixingwindtieof40x6mmflats
ThatchedRoofing
RF0065
RF0066
RF0067
Providing&fixing150mmthatchedroofing,includingstraws/grass
bundles,halfsplitbamboofillet,tyingstringscomplete
Providing&fixing25mmdia.bamboosat225mmapartincluding
moonjban(rope)orstring
Providing&fixingthatchedcopingtoridgesandhips,girth<1metre
includingtyingandsplitbamboowindtiecomplete
SlateRoofing
RF0075
Providing&fixingsingleslateroofingincludingbitumenfeltwater
proofingetccomplete,excludingthecostofwoodenreapers,trusses
DepartmentofEngineeringServices,MoWHS
41
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
ConcreteTilesRoofing
Providing&fixingPLAINPantileorRomanIIconcretetiles500mmx250mmincludingtyingwiresbutexcludingthecostofframe
work
RF0080 6mm
sq.m
198.59
198.59
198.59
RF0081 8mm
sq.m
230.67
230.67
230.67
RF0082 10mm
sq.m
238.69
238.69
238.69
Providing&fixingCOLOUREDPantileorRomanconcretetiles500mmx250mmincludingtyingwiresbutexcludingthecostof
framework
RF0090 6mm
sq.m
246.71
246.71
246.71
RF0091 8mm
sq.m
254.73
254.73
254.73
RF0092 10mm
sq.m
262.75
262.75
262.75
Providing&fixingPLAINSuperRomanconcretetiles600mmx330mmincludingtyingwiresbutexcludingthecostofframework
RF0100 10mm
sq.m
283.14
283.14
283.14
Providing&fixingCOLOUREDSuperRomanconcretetiles600mmx330mmincludingtyingwiresbutexcludingthecostofframe
work
RF0105 10mm
sq.m
313.94
313.94
313.94
Providing&fixingPLAINSemiSheetconcretetiles600mmx600mmincludingtyingwiresbutexcludingthecostofframework
RF0110 8mm
sq.m
153.66
153.66
153.66
Providing&fixingCOLOUREDSemiSheetconcretetiles600mmx600mmincludingtyingwiresbutexcludingthecostofframework
RF0115 8mm
sq.m
Providingandfixingconcretetilesridgesorhipsincludingtyingwireetc.complete
235.78
235.78
235.78
RF0120
RF0121
78.23
121.86
78.23
121.86
78.23
121.86
281.26
289.48
291.58
Plain
Coloured
m
m
ShinglepRoofing
RF0130
Providing&fixingshingleproofingwithshinglepofsize
sq.m
1350x125x12mmin3layersincludingtying,upliftprotectioncomplete
RedMudPlasticSheeting
RF0135
Providing&fixingredmudcorrugatedplasticsheeting,1.5mmthick
sq.m
500.35
500.35
500.35
RF0136
Providing&fixingredmudplasticsheet600mmridging,1.3mmthick
444.99
444.99
444.99
sq.m
1444.81
1444.81
1444.81
CorrugatedFibreglassSheeting
RF0150
P&f1.2mmtransparentsheetincluding8mmG.IJorLhooks,bitumen
&G.Ilimpetwashersetccomplete,excludingcostofframe
DepartmentofEngineeringServices,MoWHS
42
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
ConcreteTerracingOnRoofs
Providing&layinglimeconcreteterracingonroofing,averagedepth100mm
RF0155
includingdrainagefall,ramming,roundingatparapets
sq.m
694.77
700.30
651.50
RF0156
includingdrainagefall,ramming,roundingatparapetsandundercoat
ofhotbitumen80/100
sq.m
796.52
802.05
753.27
Providing&layingcementconcreteterracingonroofwithcementconcrete1:3:6,20mmaggregatesoverabasecoatofbitumen
80\100mixedwithcoarsesand
RF0165
RF0166
115mmaveragethickness
Paintingroofwithbitumenincludingspreadingsand,cleaningslabetc.
complete
sq.m
sq.m
461.72
107.89
506.75
108.14
535.74
108.60
RainWaterPipe
Providing&fixingC.I.rainwaterpipes&fittingswithnecessaryscrewsonthewallfaceincludingfillingjointsetc.complete
RF0175 100mmdiaC.Ipipes
m
1323.38
RF0176 100mmdiaC.I.headforpipe
each
293.25
RF0177 100mmdiaC.I.bendforpipe
each
316.58
RF0178 100mmdiaC.I.shoesforpipe
each
503.23
Providing&fixing100mmdiaC.I.offsetforrainwaterpipeonwallfaceincludingfillingjoints
RF0185
RF0186
75mmprojection
150mmprojection
each
each
421.57
643.21
1445.87
299.08
336.41
526.56
1323.38
293.25
316.58
584.89
374.91
640.88
351.58
701.54
ProvidingandfixingonwallfacesinglesocketedrigidPVC(WorkingPressure4kgfpersq.cm)rainwaterpipesincludingjointing
withsealringleaving10mmgapforthermalexpansioncomplete
RF0190
RF0191
RF0192
75mmdia
90mmdia
110mmdia
m
m
m
319.66
368.69
426.03
318.76
405.08
433.86
330.03
362.31
377.47
ProvidingandfixingonwallfacePVCcouplerforrigidrainwaterpipesincludingjointingwithsealringleaving10mmgapfor
thermalexpansioncomplete
RF0195
RF0196
RF0197
75mm
90mm
110mm
each
each
each
169.74
204.68
230.76
184.73
218.56
250.64
165.36
217.22
249.86
ProvidingandfixingonwallfacePVCSingleteewithdoorforrigidrainwaterpipesincludingjointingwithsealringleaving10mm
gapforthermalexpansioncomplete
RF0200
RF0201
RF0202
75mm
90mm
110mm
each
each
each
218.60
281.43
343.26
244.81
292.63
360.29
209.81
287.97
346.30
ProvidingandfixingonwallfacePVCplainSingleteeforrigidrainwaterpipesincludingjointingwithsealringleaving10mmgap
forthermalexpansioncomplete
RF0205
RF0206
RF0207
75mm
90mm
110mm
each
each
each
DepartmentofEngineeringServices,MoWHS
209.81
268.37
321.80
230.81
304.30
342.80
187.64
279.80
308.97
43
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
ProvidingandfixingonwallfacePVCbendforrigidrainwaterpipesincludingjointingwithsealringleaving10mmgapforthermal
expansioncomplete
RF0210
RF0211
RF0212
75mm
90mm
110mm
each
each
each
187.64
242.47
271.64
209.81
257.64
301.97
214.47
279.80
324.13
ProvidingandfixingonwallfacePVCshoeforrigidrainwaterpipesincludingjointingwithsealringleaving10mmgapforthermal
expansioncomplete
RF0215
RF0216
RF0217
75mm
90mm
110mm
each
each
each
DepartmentofEngineeringServices,MoWHS
231.97
275.14
326.46
238.97
286.80
336.96
236.64
295.55
353.29
44
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
PI0001
15mm
m
PI0002
20mm
m
PI0003
25mm
m
PI0004
32mm
m
PI0005
40mm
m
PI0006
50mm
m
Providing&fixingH.D.P.Epipesincludingclamps&repairwallsetc.complete
149.30
176.02
235.60
305.81
374.39
473.50
174.17
235.31
288.79
378.14
451.94
564.52
178.61
210.59
282.95
372.64
432.68
563.53
PI0010
PI0011
PI0012
PI0013
PI0014
75.32
90.99
160.29
165.92
227.87
75.32
94.34
174.15
214.80
270.27
75.32
96.01
161.04
172.70
248.14
Chapter16:PLUMBINGINDOORWORK
WaterSupply
Providing&fixingG.I.pipesincludingG.I.fittings&clamps&repairwalls
20mm
25mm
32mm
40mm
50mm
m
m
m
m
m
StorageTanks
Providing&fixingstoragetankofM.S.sheetweldedallround,including40mmG.Iscourpipe,25mmG.Ioverflow,15mmballvalve
,padsforinletandoutletpipes,redleadprimer&twocoatsofbitumasticpaint
PI0020
270litrecapacityof2mmsteelsheet
each
PI0021
810litrecapacityof2.8mmsteelsheet
each
PI0022
1620litrecapacityof3.15mmsteelsheet
each
Providing&fixingplastictankincludingallaccessoriescomplete
PI0030
PI0031
PI0032
PI0033
PI0034
270litrecapacity
500litrecapacity
1000litrecapacity
2000litrecapacity
3000litrecapacity
each
each
each
each
each
6913.41
14739.70
22600.34
7144.50
15179.50
23241.47
7439.35
15209.42
23274.36
2508.07
4388.74
7351.93
14184.76
21902.36
2360.64
4779.54
7952.70
15427.13
22993.09
2488.47
4230.29
7806.88
15281.31
21418.24
Pans&Cisterns
Providing&fixingIndiantypevitreouschinaw.csquattingpan,including100mmH.C.IPorStrap,10litlowlevelvitreouschina
cistern&fittings,repairwalls
PI0040
500mm,white
each
3771.89
3637.15
3946.29
PI0041
580mm,whiteOrissamodel
each
4420.20
4561.64
4975.77
PI0042
580mm,colourOrissamodel
each
5146.86
5104.09
5404.48
Providing&fixingEuropeantypevitreouschinaw.cpedestalincludingseatandlidwithc.pbrasshinges,15litwhitevitreouschina
lowlevelcistern,fittings,brackets,repairwalls
PI0050
PI0051
white,withplasticseat&lid
coloured,withplasticseat&lid
each
each
4273.79
5617.65
4375.57
6985.72
4947.18
6993.89
pair
163.75
149.17
131.67
FootRests
PI0060
Providing&fixingwhitevitreouschinafootrests(250x130x30mm)for
IndianW.C
DepartmentofEngineeringServices,MoWHS
45
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Urinals
Providing&fixingwhitevitreouschinaflatback,lippedfronturinalbasin430x260x350mmincludingC.Icistern&fittings,brackets,
G.I.flushpipe&spreaders,brassunions,G.I.clamps,painting,repairwalls
PI0065
Onebowl5litres.C.I.cistern
each
3682.77
3546.75
3920.04
PI0066
Twobowls10litres.C.I.cistern
each
5375.09
5632.67
6081.21
PI0067
Threebowls10litres.C.I.cistern
each
6833.94
7159.64
7771.50
Baths
Providingandfixingbathtubswithfittingsandaccessoriescomplete
PI0075
PI0076
PI0077
Porcelain,whiteenamelled,withapairof20mmC.Ppillartap,40mm
C.Pbrasswaste,32mmC.Pbrassoverflow,rubberplug,40mmC.P
trapetc.
Fibreglasstub,white
PTrap,heavyduty,forbathtub
each
19995.65
20552.97
20564.63
each
each
17069.45
111.79
18589.17
136.29
18134.22
121.13
Basins&Sinks
Providing&fixingwhitevitreouschinawashbasin,includingC.Ibrackets,15mmC.P.brasspillartaps,c.p.chain&rubberplug,
32mmpvcwaste,32mmdia.trap&union,repairwalls
PI0085
PI0086
PI0087
PI0088
Flatbackwashbasin630x450mmwithapairof15mmc.p.brasspillar
taps
Flatbackwashbasin630x450mmwithsingle15mmc.p.brasspillar
taps
Flatbackwashbasin550x400mmwithapairof15mmc.p.brasspillar
taps
Flatbackwashbasin550x400mmwithsingle15mmc.p.brasspillartap
each
4465.54
4120.93
4054.44
each
3912.20
3713.46
3679.04
each
3614.16
3279.85
3173.69
each
3060.81
2872.37
2798.30
Providing&fixingwhitevitreouschinaanglebackwashbasin400x400mmincludingbrackets,15mmc.pbrasspillartaps,c.pbrass
chain&rubberplug,32mmc.pbrasswaste,32mmdiac.pbrasstrapandM.Iunionandrepairwalls
PI0095
PI0096
Withsingle15mmc.p.brasspillartap
Withpairof15mmc.p.brasspillartaps
each
each
2987.71
3541.05
2943.53
3351.01
2833.29
3208.69
FlushValve&Bend
PI0105
PI0106
Providing&fixingc.p.flushvalve,32mmwith40mmoutlet
Providing&fixingc.p.concealedflushvalve,32mmwith40mmoutlet
each
each
1206.02
1372.83
1211.85
1381.00
1215.35
1391.50
PI0107
PI0108
Providing&fixingc.p.flushbend,long
Providing&fixingc.p.flushvalveelbow
each
each
511.92
436.09
517.75
441.93
552.75
453.59
DepartmentofEngineeringServices,MoWHS
46
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
1329.77
1302.94
1431.26
3981.23
1048.90
1328.87
4531.55
1189.40
1340.54
4315.74
1048.90
1282.21
1501.90
2010.81
1847.49
2594.08
1800.83
1975.81
2273.28
2804.06
2209.12
2996.05
1777.50
2127.46
3182.70
1800.83
2360.77
3206.03
1719.17
2302.45
4115.94
3905.96
4255.92
4430.90
4372.58
4104.27
each
892.46
1172.43
1522.39
each
108.39
118.89
142.22
each
each
each
89.49
203.85
292.41
89.73
229.71
282.21
101.39
223.88
270.54
each
each
each
each
each
each
each
6355.08
6722.04
7436.25
9038.50
11186.22
16574.22
20200.21
7452.97
7380.37
8488.01
10004.52
13245.33
16179.20
21631.65
6348.16
6446.36
8199.24
9132.48
14747.93
15914.48
23210.30
PI0175
Showerwithrevolvingjoint,15mm,
PI0176
Adjustableshower,withlockingkey,15mm
PI0177
Showerarm,standard15mm
PI0178
Showerarm,heavyduty15mm
PI0179
Flexibleshowertube&shower
Providing&fixingc.p.brassstopcock
each
each
each
each
each
669.40
791.89
581.91
377.77
1043.21
611.08
870.63
436.09
436.09
1124.87
552.75
838.55
587.75
482.76
1171.53
PI0185
PI0186
PI0187
PI0188
PI0189
each
each
each
each
each
541.08
600.58
794.46
844.62
559.94
508.42
537.19
669.40
664.74
532.33
538.17
605.24
1074.20
815.22
395.26
Pedestals&KitchenSinks
PI0115
Providing&fixingpedestalsforbasins,whitevitreouschina,recessedba each
Providing&fixingKitchenSinksincludingallconnectionsandfittings
PI0120
PI0121
PI0122
PI0123
Whiteglazedvitreouschina600x450x250mmincludingaccessories
andrepairstowallsetc.
Stainlesssteel,450x400x150mm,singlebowl
Stainlesssteel,580x480x175mm,singlebowl
Stainlesssteel,940x460x160mm,singlebowl&drainboard
each
each
each
each
PI0124
PI0125
Stainlesssteel,1080x520x175mm,singlebowl&drainboard
Stainlesssteel,1150x515x175mm,singlebowl&drainboard
each
each
PI0126
Stainlesssteel,1740x520x200mm,singlebowl&doubledrainboard each
PI0127
PI0128
PI0129
Stainlesssteel,940x460x160mm,doublebowl
each
Stainlesssteel,1150x520x160mm,singlebowl
each
Stainlesssteel,1740x520x200mm,doublebowl&singledrainboard each
PI0130
Stainlesssteel,1740x520x200mm,doublebowl&doubledrain
board
each
DrainBoard,Rubberplug
PI0140
PI0141
Providing&fixingstainlesssteeldrainboard,610x460mmwithall
necessaryfittings
Providing&fixingc.p.brasschain&rubberplugforbasinandsink
Wastes
PI0150
PI0151
PI0152
Providing&fixing32mmdiapvc.waste
Providing&fixing32mmc.p.brasswaste
Providing&fixing40mmc.p.brasswaste
WaterHeaters
Providing&fixingElectricwaterheaterincludingnecessaryfittings
PI0160
PI0161
PI0162
PI0163
PI0164
PI0165
PI0166
10litres
15litres
25litres
35litres
50litres
70litres
100litres
WaterSupplyFittings
Providing&fixingC.P.Brassshowerfittings
15mm,standard,c.pknob
20mm,standard,c.pknob
20mm,heavyduty,c.pknob
15mm,concealed,c.pknob
15mm,angle,c.pknob
DepartmentofEngineeringServices,MoWHS
47
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Providing&fixingc.p.brasspillarcock
PI0195
15mm,standard,c.pknob
PI0196
15mm,swanneck,c.pknob
Providing&fixingc.p.brassbibcock
each
each
564.46
1070.46
418.60
707.51
386.52
599.41
PI0205
15mm,standardvertical,c.pknob
PI0206
15mm,inclined,c.p.knob
PI0207
15mm,longnose,c.p.knob
PI0208
15mm,longbody,c.p.knob
Providing&fixingc.p.brassmixers,15mm
each
each
each
each
541.08
637.32
695.26
691.92
491.50
451.65
529.42
604.08
490.92
609.91
606.41
669.40
PI0215
PI0216
PI0217
PI0218
PI0219
PI0220
PI0221
PI0222
PI0223
PI0224
PI0225
PI0226
PI0227
each
each
each
each
each
each
each
each
each
each
each
each
each
2242.38
1893.11
2476.68
2826.12
1599.73
1475.26
821.06
2386.57
3073.66
3079.73
2535.88
1489.26
189.66
2127.59
1730.96
2477.56
2640.87
1602.64
1485.99
786.06
2512.55
3123.82
3089.99
2057.60
1489.26
196.95
2244.25
1742.63
2570.88
2710.87
1777.63
1544.32
844.39
2337.57
3177.49
3136.66
2244.25
1334.34
202.78
each
each
each
3037.50
4183.33
3087.66
2885.85
4110.73
3177.49
2932.51
3970.74
3270.81
each
1544.32
1497.65
1602.64
each
each
515.52
1020.63
521.35
1046.30
505.80
1063.80
each
962.61
962.61
985.94
each
584.40
598.98
604.82
each
608.89
603.99
690.31
each
551.61
530.11
661.15
each
500.28
471.79
509.50
PI0255
Providing&fixingtoiletpaperholder
each
387.39
398.82
397.65
PI0260
PI0261
PI0262
PI0263
each
each
each
each
452.11
912.90
786.06
768.56
441.90
901.23
809.39
796.56
492.94
788.08
704.40
674.07
PI0228
PI0229
PI0230
PI0231
Forbasin,singlehole,castedspout
Forbasin,closehole
Forbasin,elbowaction,surgical
Forbasin,elbowaction,surgicalwithshower
Forsink,withspoutJpipe
Forsink,withcastedspoutswinging
Forsink,withswivelspout
Forwall,nontelephonictype
Forwall,telephonictypewithcrutchandtel.shower
Forwall,telephonictypewithoutcrutchandtel.shower
Forwall,telephonictypewithcrutchandwithouttel.shower
Forwall,telephonictypewithC.Pbend&flanges
Forwall,withtelephonicshowerarrangementwith115mmlongbend
pipeforoverheadshowerconnection
Threeholemixerwithoutpopup
Threeholemixerwithpopup
Forbath,withexposedadjustablelegswithtelephoneshower
arrangementwithcrutch
Forshower,threeinone,withbendflexibletube,andshower&hook
Providing&fixingWallSpouts
PI0240
PI0241
C.p.,standard,15mm
Withdiverter,forusewithsinglelevermixers
BathroomAccessories
PI0250
PI0251
PI0252
PI0253
PI0254
Providing&fixing600x450mmbevellededgemirror(superiorglass)
incl.4mmA.Csheetbasefixedtowoodencleats
Providing&fixing450x120mmglassshelf,includingc.pbrassbrackets
fixedtowoodencleats
Providing&fixingc.p.towelrail750x20mmwithc.pbrassbrackets
fixedtowoodencleats
Providing&fixingc.p.towelrail600x20mmwithc.pbrassbrackets
fixedtowoodencleats
Providing&fixingc.p.towelrail450x20mmwithc.pbrassbrackets
fixedtowoodencleats
Providing&fixingc.p.towelring
C.P.brass
Recessedceramic,200x100mm,coloured,
Recessedceramic,200x100mm,white
Recessedceramic,rolltype,150x150mm
DepartmentofEngineeringServices,MoWHS
48
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
each
463.78
527.94
516.27
PI0275
includingbrackets,woodencleats,c.p.brassscrews
PI0276
Recessed,ceramic,150x150mm
PI0277
Recessed,ceramic,200x100mm
Providing&fixingc.pcoathook
each
each
each
399.62
226.11
335.77
341.29
237.78
307.77
335.46
226.11
290.27
PI0285
PI0286
each
each
228.50
327.66
218.30
305.79
222.67
281.77
SoapContainer,CoatHooks
PI0270
Providing&fixingLiquidsoapcontainer,c.p,includingc.pbrasslid&
brackets,woodencleats,c.pbrassscrews
Providing&fixingsoapdish
Single
Double
DepartmentofEngineeringServices,MoWHS
49
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Chapter17:PLUMBINGOUTDOORWORK
ExternalWaterSupplyPipework
Providing&layingG.I.pipesincludingG.I.fittings(excludingtrenching,refilling&thrustblock)
PO0001 15mm
m
106.32
131.19
135.64
PO0002 20mm
m
128.47
187.77
163.05
PO0003 25mm
m
186.68
239.87
234.03
PO0004 32mm
m
249.79
322.13
316.63
PO0005 40mm
m
302.14
379.70
360.43
PO0006 50mm
m
382.58
473.60
472.61
PO0007 65mm
m
500.69
611.85
611.52
PO0008 80mm
m
637.68
777.22
778.34
PO0009 100mm
m
894.42
1034.91
1113.49
PO0010 150mm
m
1388.90
1804.39
1934.07
Providing&layingH.D.P.Epipes,pressureclass10kg/sq.m,includingH.D.P.Efittings(excludingtrenching,refilling&thrustblock)
PO0015 25mm
m
42.07
45.42
47.09
PO0016 32mm
m
63.30
77.15
64.04
PO0017 40mm
m
93.67
142.55
100.45
PO0018 50mm
m
136.95
179.35
157.22
PO0019 63mm
m
222.18
233.85
252.59
PO0020 75mm
m
301.47
335.34
358.01
PO0021 90mm
m
429.38
481.87
485.68
PO0022 110mm
m
625.03
718.24
730.84
PO0023 140mm
m
1012.59
1115.25
1153.04
PO0024 160mm
m
1300.89
1511.88
1500.31
PO0025 225mm
m
2507.53
2839.02
2923.71
Providing&layingH.D.P.EPipesincludingH.D.P.Efittingspressureclass6kg/sq.cm(excludingtrenching,refilling&thrustblock)
PO0030 32mm
m
46.63
59.51
57.17
PO0031 40mm
m
68.30
91.10
74.53
PO0032 50mm
m
97.81
117.35
105.41
PO0033 63mm
m
157.73
176.11
188.75
PO0034 75mm
m
209.99
222.77
255.88
PO0035 90mm
m
297.99
305.14
366.47
PO0036 110mm
m
428.20
430.69
467.40
PO0037 140mm
m
685.96
810.20
767.81
PO0038 160mm
m
880.31
1018.42
982.50
PO0039 225mm
m
1682.11
1832.68
1892.72
Providing&layingH.D.P.EPipesincludingH.D.P.Efittingspressureclass4kg/sq.cm(excludingtrenching,refilling&thrustblock)
PO0045
PO0046
PO0047
PO0048
PO0049
PO0050
PO0051
PO0052
PO0053
40mm
50mm
63mm
75mm
90mm
110mm
140mm
160mm
225mm
m
m
m
m
m
m
m
m
m
65.44
72.44
116.67
156.86
221.22
309.42
423.99
689.46
1201.15
DepartmentofEngineeringServices,MoWHS
70.57
87.02
127.11
181.94
246.81
338.53
520.31
705.79
1356.72
71.60
77.61
122.11
169.53
236.97
331.69
537.11
701.59
1359.91
50
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Providing&layingH.D.P.EPipesincludingH.D.P.Efittingspressureclass2.5kg/sq.cm(excludingtrenching,refilling&thrustblock)
PO0060
PO0061
PO0062
PO0063
110mm
140mm
160mm
225mm
m
m
m
m
218.96
346.76
431.81
798.37
263.29
456.15
537.81
1004.43
266.79
420.45
532.44
1041.99
m
m
m
m
m
m
m
m
m
m
m
1009.83
1166.25
1720.59
2338.99
3126.19
3975.14
4921.92
5908.11
6977.92
8153.65
11607.45
1009.83
1166.25
1720.59
2338.99
3126.19
3975.14
4921.92
5908.11
6977.92
8153.65
11607.45
1009.83
1166.25
1720.59
2338.99
3126.19
3975.14
4921.92
5908.11
6977.92
8153.65
11607.45
m
m
m
m
m
m
m
m
m
m
1011.09
1514.14
1972.42
2598.71
3313.46
4089.58
4904.23
5756.01
6766.21
9861.83
1011.09
1514.14
1972.42
2598.71
3313.46
4089.58
4904.23
5756.01
6766.21
9861.83
1011.09
1514.14
1972.42
2598.71
3313.46
4089.58
4904.23
5756.01
6766.21
9861.83
2031.14
2927.55
4116.37
5413.49
6714.27
8321.52
9976.36
13464.84
15856.19
20683.74
2031.14
2927.55
4116.37
5413.49
6714.27
8321.52
9976.36
13464.84
15856.19
20683.74
2031.14
2927.55
4116.37
5413.49
6714.27
8321.52
9976.36
13464.84
15856.19
20683.74
ProvidingandLayingDuctileIronK9pipes
PO0065
PO0066
PO0067
PO0068
PO0069
PO0070
PO0071
PO0072
PO0073
PO0074
PO0075
80mm
100mm
150mm
200mm
250mm
300mm
350mm
400mm
450mm
500mm
600mm
ProvidingandLayingDuctileIronK7pipes
PO0078
PO0079
PO0080
PO0081
PO0082
PO0083
PO0084
PO0085
PO0086
PO0087
100mm
150mm
200mm
250mm
300mm
350mm
400mm
450mm
500mm
600mm
ProvidingandLayingDoubleFlanged(ScrewedorWelded)CentrifugallySpunDuctileIronK9Pipes
PO0090
PO0091
PO0092
PO0093
PO0094
PO0095
PO0096
PO0097
PO0098
PO0099
100mm
150mm
200mm
250mm
300mm
350mm
400mm
450mm
500mm
600mm
m
m
m
m
m
m
m
m
m
m
BrassFittings
Providing&fixingbrassstopcock
PO0100 15mm
PO0101 20mm
PO0102 25mm
Providing&fixingbrassfullwayvalvewithwheel
each
each
each
332.19
347.94
473.35
317.03
332.19
437.18
320.53
349.69
466.35
PO0105
PO0106
PO0107
PO0108
PO0109
each
each
each
each
each
915.82
1229.85
1772.53
2257.00
3009.43
915.47
1265.43
2163.68
3796.85
4380.12
1049.62
1485.13
2014.36
3260.23
4380.12
32mm
40mm
50mm
65mm
80mm
DepartmentofEngineeringServices,MoWHS
51
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Providing&fixingnonreturnvalve
PO0110 50mm
PO0111 65mm
PO0112 80mm
Providing&fixingbrassbibcock
each
each
each
1679.56
2749.29
4170.14
1654.28
2921.94
3855.18
1743.72
3008.84
3907.67
PO0114
each
209.71
204.66
209.71
each
each
each
each
each
each
each
each
50.41
66.37
103.11
226.04
142.05
390.52
530.51
1755.39
58.05
81.39
116.38
186.38
320.53
454.68
740.49
2303.66
41.34
55.28
82.76
160.19
292.30
409.65
708.70
2752.44
PO0125 32mm
PO0126 50mm
PO0127 63mm
PO0128 90mm
PO0129 110mm
Providing&fixingH.D.P.EReducer
each
each
each
each
each
35.31
89.55
119.30
346.78
460.51
104.72
338.03
373.02
384.69
448.85
62.66
125.39
227.93
317.38
571.63
PO0130 90x50mm
PO0131 90x63mm
PO0132 110x63mm
PO0133 110x90mm
Providing&fixingH.D.P.EBlankEnd(Cap)
each
each
each
each
238.87
244.70
244.70
693.82
262.20
268.62
268.62
762.65
273.87
280.57
280.57
797.06
PO0140
PO0141
PO0142
PO0143
PO0144
each
each
each
each
each
118.72
151.38
289.03
332.19
565.50
130.03
165.96
317.38
364.86
621.50
135.69
173.25
331.55
381.19
649.50
69.50
83.12
132.79
205.85
266.95
365.94
402.75
564.96
610.38
664.93
1109.12
69.50
83.12
132.79
205.85
266.95
365.94
402.75
564.96
610.38
664.93
1109.12
15mm,brass
H.D.P.EFittings(ButtWeldedType)
Providing&fixingH.D.P.E,EqualTeebuttweldedtypefittings
PO0115
PO0116
PO0117
PO0118
PO0119
PO0120
PO0121
PO0122
20mm
25mm
32mm
50mm
63mm
90mm
110mm
160mm
Providing&fixingH.D.P.EElbow
50mm
63mm
90mm
110mm
160mm
ProvidingandfixingpushonjointstoCentrifugallySpunD.Ipipesincludingthecostofrubbergaskets
PO0150
PO0151
PO0152
PO0153
PO0154
PO0155
PO0156
PO0157
PO0158
PO0159
PO0160
80mm
100mm
150mm
200mm
250mm
300mm
350mm
400mm
450mm
500mm
600mm
each
each
each
each
each
each
each
each
each
each
each
69.50
83.12
132.79
205.85
266.95
365.94
402.75
564.96
610.38
664.93
1109.12
DepartmentofEngineeringServices,MoWHS
52
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
each
each
each
each
124.10
149.58
174.68
271.61
130.39
156.76
182.68
285.98
136.68
163.95
190.68
300.35
m
m
m
m
406.11
528.86
634.44
1023.45
321.53
665.87
827.27
1177.38
321.53
539.01
719.01
1099.57
PO0170 50mmdia
PO0171 75mmdia
PO0172 100mmdia
Providing&fixingC.Iplainbendincludingfittings
each
each
each
245.17
240.04
303.03
250.54
332.19
361.36
247.62
350.86
373.02
PO0180 50mmdia
PO0181 75mmdia
PO0182 100mmdia
Providing&fixingC.Iheelrestbend
each
each
each
180.54
206.21
349.69
203.87
215.54
338.03
200.96
227.20
352.61
PO0190 50mm
each
PO0191 75mm
each
PO0192 100mm
each
Providing&fixingC.Idoubleequaldoorjunctionincludingfittings
150.21
303.03
378.86
145.55
300.70
448.85
180.54
273.87
355.53
PO0200
PO0201
PO0202
each
each
each
497.84
380.61
298.36
460.51
320.53
268.03
545.09
308.86
262.20
PO0210 100mm
each
PO0211 75mm
each
PO0212 50mm
each
Providing&fixingC.Isingleequaldoorjunctionincludingfittings
640.16
429.02
343.86
577.17
291.36
244.70
653.00
308.86
262.20
PO0220 150mm
PO0221 100mm
PO0222 75mm
PO0223 50mm
Providing&fixingC.Isingleequalplainjunctionincludingfittings
each
each
each
each
373.02
349.69
257.54
203.87
460.51
361.36
252.87
211.46
501.34
384.69
268.03
227.20
PO0230 100mm
each
PO0231 75mm
each
PO0232 50mm
each
Providing&fixingC.Idoubleunequaldoorjunctionincludingfittings
507.18
373.02
250.54
448.85
343.86
244.70
530.51
326.36
238.87
PO0240
PO0241
437.18
384.69
436.02
384.69
460.51
402.19
SoilWastePipework
ProvidingleadcaulkedjointstoC.Ipipesandfittings
PO0162 50mmdiapipe
PO0163 75mmdiapipe
PO0164 100mmdiapipe
PO0165 150mmdiapipe
Providing&fixingC.ISoilWasteandVentpipes
PO0166
PO0167
PO0168
PO0169
50mmdia
75mmdia
100mmdia
150mmdia
WasteFittings&Accessories
Providing&fixingC.Idoorbendincludingfittings
100mm
75mm
50mm
Providing&fixingC.Idoubleequalplainjunctionincludingfittings
100x75mm
100x50mm
each
each
DepartmentofEngineeringServices,MoWHS
53
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Providing&fixingC.Idoubleunequalplainjunction
PO0250 100x75mm
PO0251 100x50mm
Providing&fixingC.Isingleunequaldoorjunction
each
each
425.52
367.19
419.69
373.02
437.18
384.69
PO0260 100x75mm
PO0261 100x50mm
PO0262 75x50mm
Providing&fixingC.Isingleunequalplainjunction
each
each
each
433.68
408.02
268.62
444.18
408.02
274.45
451.77
425.52
285.53
PO0270 100x75mm
PO0271 100x50mm
PO0272 75x50mm
Providing&fixingC.IdoubleequalYJunction
each
each
each
378.86
326.36
250.54
385.86
338.03
261.03
390.52
346.19
262.20
PO0280 100mm
PO0281 75mm
PO0282 50mm
Providing&fixingC.IsingleequalYJunction
each
each
each
640.16
479.18
343.86
571.34
378.86
308.86
410.35
349.69
285.53
PO0290 100mm
PO0291 75mm
PO0292 50mm
Providing&fixingsingleunequalplaininvertedbranch
each
each
each
600.50
433.68
227.20
583.00
413.85
198.04
530.51
285.53
250.54
PO0300 100x50mm
PO0301 75x50mm
Providing&fixingS.C.Ioffsets100mmOffsets
each
each
447.68
323.45
453.52
332.19
468.68
347.36
PO0310 75mmprojection
PO0311 150mmprojection
Providing&fixingS.C.Ioffsets75mmoffset
each
each
308.86
454.68
317.03
443.02
326.36
443.02
PO0320 75mmprojection
PO0321 150mmprojection
Providing&fixingS.C.Ioffsets50mmoffset
each
each
308.86
431.35
317.03
431.35
326.36
443.02
PO0330 75mmprojection
PO0331 150mmprojection
Providing&fixingC.Iterminalguard
each
each
317.61
455.85
285.53
460.51
262.20
466.35
PO0340 150mm
PO0341 100mm
PO0342 75mm
PO0343 50mm
Providing&fixingC.Icollar
each
each
each
each
635.50
361.36
238.87
145.55
635.50
355.53
252.87
151.38
568.42
355.53
289.62
209.71
PO0350
PO0351
PO0352
each
each
each
257.54
181.71
132.71
361.36
227.20
180.54
384.69
227.20
192.21
100mm
75mm
50mm
DepartmentofEngineeringServices,MoWHS
54
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Providing&fixingC.IPTypeNahanitrap
PO0360 100mminlet&75mmoutlet
each
439.20
545.94
560.52
PO0361 100mminlet&50mmoutlet
each
252.55
405.95
467.19
Providing&fixingP.V.Csoilwasteandventpipes,singleordoublesocketed,includingpipeclipcomplete(excludingthecostofPVC
fittings)
PO0370 75mmdia
PO0371 90mmdia
PO0372 110mmdia
Providing&fixingP.V.CPipeconnector
m
m
m
155.23
210.73
277.40
151.31
222.49
282.10
149.68
206.81
286.80
PO0380 110mmdia
Providing&fixingP.V.CCoupler
each
207.14
215.54
227.50
PO0385 75mmdia
PO0386 90mmdia
PO0387 110mmdia
Providing&fixingP.V.CReducer
each
each
each
69.31
80.92
95.34
79.64
94.80
105.88
67.27
88.79
100.44
PO0395 90x75mm
PO0396 110x75mm
PO0397 110x90mm
Providing&fixingP.V.Cplainbend
each
each
each
107.05
116.38
136.21
143.21
142.63
180.54
111.54
140.41
166.19
PO0405 75mmdia
PO0406 90mmdia
PO0407 110mmdia
Providing&fixingP.V.Cdoorbend
each
each
each
87.22
118.72
136.21
104.72
133.88
157.21
116.38
151.38
174.71
PO0415 75mmdia
PO0416 90mmdia
PO0417 110mmdia
Providing&fixingP.V.CLongarmbendwithdoor
each
each
each
116.38
136.21
178.21
128.05
163.04
192.21
136.21
172.38
168.88
PO0425 75mmdia
PO0426 90mmdia
PO0427 110mmdia
Providing&fixingP.V.CSingleTeeplain
each
each
each
198.04
293.70
399.85
209.71
301.86
390.52
255.28
350.66
416.19
PO0435 75mmdia
PO0436 90mmdia
PO0437 110mmdia
Providing&fixingP.V.CSingleTeewithdoor
each
each
each
109.38
144.61
186.38
125.71
180.54
198.04
89.55
151.38
159.54
PO0445 75mmdia
PO0446 90mmdia
PO0447 110mmdia
Providing&fixingP.V.CDoubleTeeplain
each
each
each
118.17
157.68
207.84
139.71
168.88
215.54
111.72
159.54
196.87
PO0455
PO0456
PO0457
each
each
each
182.10
251.94
328.54
159.54
245.87
279.70
180.54
256.37
354.36
75mmdia
90mmdia
110mmdia
DepartmentofEngineeringServices,MoWHS
55
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Providing&fixingP.V.CDoubleTeewithdoor
PO0465 75mmdia
PO0466 90mmdia
PO0467 110mmdia
Providing&fixingP.V.CSingleY,plain
each
each
each
264.53
322.86
360.81
317.03
417.94
452.93
256.37
250.54
361.36
PO0475 75mmdia
PO0476 90mmdia
PO0477 110mmdia
Providing&fixingP.V.CSingleY,withdoor
each
each
each
139.71
164.21
244.70
163.04
268.03
311.97
179.38
253.45
277.91
PO0485
PO0486
PO0487
each
each
each
320.53
207.14
311.20
421.75
312.36
405.69
426.88
314.93
325.00
PO0495 75mmdia
PO0496 90mmdia
PO0497 110mmdia
Providing&fixingP.V.CDoubleY,withdoor
each
each
each
192.21
332.19
325.19
265.70
370.69
413.27
222.13
422.02
378.91
PO0505 75mmdia
PO0506 90mmdia
PO0507 110mmdia
Providing&fixingP.V.COffset,75mmdia
each
each
each
264.53
282.73
425.52
308.86
395.77
468.10
343.86
422.02
341.53
PO0515 With75mmprojection
PO0516 With150mmprojection
Providing&fixingP.V.COffset,90mmdia
each
each
217.41
253.80
236.54
332.19
227.20
297.20
PO0525 With75mmprojection
PO0526 With150mmprojection
Providing&fixingP.V.COffset,110mmdia
each
each
364.86
515.11
389.36
478.01
289.56
462.85
PO0535 With75mmprojection
PO0536 With150mmprojection
Providing&fixingP.V.CTerminalguard
each
each
343.86
388.88
432.52
483.85
294.09
342.69
PO0545 75mmdia
PO0546 90mmdia
PO0547 110mmdia
Providing&fixingP.V.CPTrap,withoutairvent
each
each
each
96.55
104.72
110.55
109.38
122.22
125.71
107.05
116.38
128.05
PO0555 Big
PO0556 Small
Providing&fixingP.V.CNahaniTrap
each
each
396.35
373.02
476.85
413.85
460.51
402.19
PO0565
each
147.88
145.55
145.55
75mmdia
90mmdia
110mmdia
Providing&fixingP.V.CDoubleY,plain
110mminlet&75mmoutlet
DepartmentofEngineeringServices,MoWHS
56
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
PO0570 15mmdiapipe
m
3.67
PO0571 20mmdiapipe
m
4.92
PO0572 25mmdiapipe
m
6.10
PO0573 32mmdiapipe
m
7.82
PaintingC.Ispunsoilwasteventpipes&fittingsincludingprimer,topcoat(anycolour),fornewwork
3.44
4.61
5.71
7.32
3.65
4.89
6.06
7.77
PaintingG.IPipes&Fittings
PaintingG.Ipipesandfittingsincludingprimer&whitecoat,fornewwork
PO0580 50mm
m
PO0581 75mm
m
PO0582 100mm
m
RepaintingC.Ispunsoilwasteventpipes&fittingsincludingpaintsofanycolour
12.60
6.35
25.19
11.78
6.62
23.56
12.54
6.89
25.09
PO0590
PO0591
PO0592
6.07
9.10
12.13
5.53
8.30
11.07
6.03
9.05
12.06
50mm
75mm
100mm
m
m
m
Soakpits&SepticTanks
ConstructingSoakPit
PO0600
PO0601
Size1200x1200x1200mm,filledwithbrickbatsincluding100mmSW
drainpipeX1200mmlong
Size2500dia.x3000mmdepthincluding450x450mmdrybrick
honeycombshaftandSWdrainpipeX1800mmlong
each
3186.27
2884.15
2757.67
each
22479.11
19941.52
19042.54
15users
25users
50users
75users
100users
each
each
each
each
each
ConstructingSepticTanks,inR.RMasonryincementmortar1:6,includingfittings,C.Icoverwithframe,40mmthickconcrete
flooring(40mmaggregates)cementplasterconcretebaseinC.C1:4:8etc.completeasperstandarddesign
PO0610
PO0611
PO0612
PO0613
PO0614
22691.68
27386.71
38797.75
45063.71
54246.40
24464.72
29711.31
42355.87
49239.78
58997.71
25119.13
30584.83
43871.85
51059.63
61254.57
ConstructingSepticTanks,in2ndclassbrickmasonryincementmortar1:4,includingfittings,C.Icoverwithframe,40mmthick
concreteflooring(40mmaggregates)cementplasterconcretebaseinC.C1:4:8etc.completeasperstandarddesign
PO0620 15users
each
24894.50
26475.03
26609.57
PO0621 25users
each
31245.10
33902.40
33734.22
PO0622 50users
each
43800.36
47817.79
47684.45
PO0623 75users
each
52891.82
57898.58
57794.36
PO0624 100users
each
64086.27
69788.69
69686.02
ConstructingSepticTanks,inreinforcedconcrete1:2:4(20mmaggregates)includingfittings,C.Icoverwithframe,40mmthick
concreteflooring(40mmaggregates)cementplasterconcretebaseinC.C1:4:8etc.completeasperstandarddesign
PO0630
PO0631
PO0632
PO0633
PO0634
15users
25users
50users
75users
100users
each
each
each
each
each
28917.51
37145.46
53067.72
65547.82
80899.72
DepartmentofEngineeringServices,MoWHS
30434.35
39675.75
56872.09
70125.88
85868.83
30919.96
40027.37
57555.71
71032.39
86926.65
57
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
sq.m
sq.m
68.18
72.33
68.18
72.33
68.18
72.33
sq.m
sq.m
sq.m
76.00
70.53
1.67
81.30
74.67
1.67
82.74
75.83
1.67
PL0020 C.M1:3
sq.m
PL0021 C.M1:4
sq.m
PL0022 C.M1:5
sq.m
PL0023 C.M1:6
sq.m
Providing&laying15mmcementplasteronroughsideofsingleorhalfbrickwall
106.94
95.92
89.97
84.91
117.56
104.19
96.97
90.83
120.42
106.52
99.00
92.61
PL0030 C.M1:3
PL0031 C.M1:4
PL0032 C.M1:5
PL0033 C.M1:6
Providing&laying20mmcementplaster
sq.m
sq.m
sq.m
sq.m
125.93
112.80
105.67
99.60
138.62
122.68
114.04
106.67
142.05
125.46
116.46
108.80
PL0040 C.M1:3
sq.m
PL0041 C.M1:4
sq.m
PL0042 C.M1:5
sq.m
PL0043 C.M1:6
sq.m
Providing&laying12mmplaincementmortarbandinC.M1:4
155.82
138.68
129.43
121.53
172.34
151.54
140.32
130.75
176.80
155.16
143.48
133.51
PL0050 Flushband
sq.m
PL0051 Sunkband
sq.m
PL0052 Raisedband
sq.m
Providing&laying20mmplaincementmortarbandinC.M1:4
210.55
228.34
257.75
218.59
236.38
265.79
220.85
238.64
268.05
PL0060 Flushband
sq.m
PL0061 Sunkband
sq.m
PL0062 Raisedband
sq.m
Providing&layingcementplaster,finishedwithfloatingcoatofneatcement
261.40
282.33
317.92
272.89
293.82
329.41
276.12
297.05
332.63
PL0070
PL0071
PL0072
PL0073
PL0074
PL0075
PL0076
134.98
153.98
183.86
123.97
140.84
166.72
109.28
148.36
169.43
203.15
135.00
153.49
182.35
117.59
151.87
173.49
208.25
137.96
156.91
186.60
119.43
Chapter18:PLASTERING
MudPlaster
Providing&layingmudplasterincludingneatfinish
PL0001
PL0002
15mm
20mm
CementPlaster
Providing&laying6mmcementplaster(inceilings)
PL0010 C.M1:3
PL0011 C.M1:4
PL0012 Extraforplastertoceilingheight>5m......peradditionalmetre.ht
Providing&laying12mmcementplaster
12mmplasterinC.M1:3
15mmplasterinC.M1:3
20mmplasterinC.M1:3
12mmplasterinC.M1:4
15mmplasterinC.M1:4
20mmplasterinC.M1:4
6mmcementplasterinC.M1:3,includinglimewashontopofwall
whendryforbearingR.Cslabsandbeams
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
DepartmentofEngineeringServices,MoWHS
58
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Roughcastplasterwithamixtureofsandandgravelorcrushedstone212mmincludingplasterin2layers12mm1:4,&10mm1:3
hydratedlimecement
PL0080 Greycement
sq.m
247.73
268.01
272.15
PL0081 Whitecement
sq.m
396.47
422.69
428.81
Pebbledashplasterwithamixtureofwashedpebbleorcrushedstone6mmto12mmnominalsizedashedoverfreshplasterinthe
layers,underlayer12mmcementplaster1:4andtoplayer10mm
cementplastermixedwithfinallygroundhydratedlimebyvolumeofcement
PL0090
Greycement
sq.m
246.24
266.52
270.65
CementPlasterin2coats
PL0091
18mmcementplasterintwocoats;underlayer12mmC.P1:5(1
cement:5sand)andtoplayer6mmthickC.P1:4(1cement:6sand)
finishedevenandsmoothandcuringetc.complete
sq.m
82.32
82.46
82.49
Pl0092
18mmcementplasterintwocoats;underlayer12mmC.P1:5(1
cement:5sand)andtoplayer6mmthickC.P1:3(1cement:6sand)
finishedevenandsmoothandcuringetc.complete
sq.m
82.29
82.41
82.45
sq.m
144.79
151.66
156.29
sq.m
63.36
63.36
63.36
CementLimePlaster
PL0095
PL0096
12mmcementlimeplasterofmixonfairsideofbrickwork1:1:6(1
cement:1lime:6sand)finishedevenandsmoothandcuringetc.
complete
12mmcementlimeplasterofmixonroughsideofbrickwork1:1:6(
1cement:1lime:6sand)finishedevenandsmoothandcuringetc.
complete
Extraforprovidingandmixingwaterproofingmaterialsinproportionrecommendedbythemanufacturers
PL0100
PL0101
PL0102
PL0103
PL0104
PL0105
12mmplasterinC.M1:3
12mmplasterinC.M1:4
15mmplasterinC.M1:3
15mmplasterinC.M1:4
20mmplasterinC.M1:3
20mmplasterinC.M1:4
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
9.51
7.85
10.34
8.71
12.33
10.16
8.99
7.45
9.76
8.24
11.62
9.60
8.99
7.45
9.76
8.24
11.62
9.60
sq.m
28.04
30.81
31.45
601.92
31.96
601.92
31.96
Extraforcementplastering
PL0110
Neatcementpunning
PlasterofParis
Providing&fixing12mmPlasterofParis(gypsumanhydrous)tiles,renderedsmoothwithPlasterofParis
PL0120
PL0121
Heightabovefloor<5m
Extraforheightsabovefloor>5m.....permetreheight
sq.m
sq.m
DepartmentofEngineeringServices,MoWHS
508.02
31.96
59
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
sq.m
sq.m
4.44
5.48
4.44
5.48
4.44
5.48
PT0010 Cementprimer
PT0011 Metalworksyntheticredoxideprimer
PT0012 Woodworkpinkprimer
PT0013 Woodworkwhiteprimer
PT0014 Redleadprimer
Providing&applyingwhiteorcolourwashing
sq.m
sq.m
sq.m
sq.m
sq.m
27.00
21.28
24.31
22.01
21.85
26.92
21.35
25.32
21.78
21.75
27.32
21.14
25.27
21.85
21.85
PT0020
PT0021
PT0022
PT0023
sq.m
sq.m
sq.m
sq.m
17.04
10.34
5.83
17.04
17.22
10.46
5.89
17.22
17.74
10.81
6.06
17.74
PT0024
PT0025
FinishingwallwithWaterProofCementPaint
sq.m
sq.m
10.34
5.83
10.46
5.89
10.81
6.06
PT0030 Newwork,threecoats
PT0031 Oldwork,onecoats
Providingandapplyingfinishingcoats
sq.m
sq.m
49.57
23.53
53.08
24.94
57.23
26.61
PT0040
Drydistemper,twocoatsonnewwork,includingwhiteprimingcoat sq.m
42.63
42.95
43.53
PT0041
PT0042
sq.m
sq.m
19.58
59.39
19.75
59.13
20.02
61.57
PT0043
PT0044
PT0045
PT0046
Drydistemper,onecoatonoldwork
Acrylicwashabledistemper,twocoatsonnewwork,includingcement
primercoat
Acrylicwashabledistemper,onecoatonoldwork
Bituminasticenamel,forsteelwork,twocoatsonnewwork
Bituminasticenamel,forsteelwork,onecoatonoldwork
Syntheticenamel,forsteel&woodwork\onecoatonoldwork
sq.m
sq.m
sq.m
sq.m
19.17
49.25
31.46
33.86
19.05
50.47
32.20
33.65
20.40
51.47
32.79
36.68
PT0047
Syntheticenamel,forsteel&woodwork,twocoatsonnewwork
sq.m
53.47
53.12
58.17
PT0048
Highglosssyntheticenamel\forsteel&woodwork,twocoatsonnew
work
Highglosssyntheticenamel,forsteel&woodwork\onecoatonold
work
Redcorrugal,readymixed\onG.I.sheets,twocoatsonnewwork
Redcorrugal,readymixed,onG.I.sheets\onecoatonoldwork
sq.m
56.88
51.88
56.54
sq.m
37.92
34.58
37.69
sq.m
sq.m
41.26
26.41
41.93
26.80
46.52
29.44
sq.m
74.50
75.91
75.91
sq.m
sq.m
sq.m
35.72
30.00
47.93
37.22
30.25
48.35
35.56
29.80
47.58
Chapter19:PAINTING&WALLPAPER
SurfacePreparation
Surfacepreparationremovingbyscraping,sandpapering,includingscratchrepairs
PT0001
PT0002
Whitecolourwash
Dryoilbounddistemper
PaintingItems
Providing&applyingonecoatofprimers
PT0049
PT0050
PT0051
PT0052
PT0053
PT0054
PT0055
Whitewashingwithlimenewworkthreecoats
Whitewashingwithlime,oldwork,twocoats
Whitewashingwithlime,oldwork,onecoat
Colourwashing\newwork,twocoats,includingbasecoatofwhite
washwithlime
Colourwashingwithlime,oldwork,twocoats
Colourwashingwithlime,oldwork,onecoat
Vinylplasticemulsionpaint,forcement,masonry,plaster,twocoats
onnewwork
Acrylicemulsion,onecoat
Aluminiumpaint,onecoatonoldwork
Aluminiumpaint,twocoatsonnewwork
DepartmentofEngineeringServices,MoWHS
60
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
sq.m
sq.m
sq.m
57.59
66.62
119.56
56.12
66.78
119.82
54.89
70.41
125.74
sq.m
sq.m
71.87
128.12
72.46
129.07
73.04
130.02
sq.m
sq.m
sq.m
sq.m
23.82
18.66
41.37
21.98
22.65
17.71
39.73
21.28
24.98
19.60
40.55
21.63
sq.m
sq.m
380.99
513.28
384.67
521.85
389.56
530.43
PT0090 Rab
sq.m
PT0091 Ding
sq.m
PT0092 Thamar
sq.m
Providing,preparingandapplyingDangtshonpainting(Notwashable)
449.14
319.61
234.11
451.88
321.96
236.45
451.41
321.28
235.77
PT0100 Rab
sq.m
PT0101 Ding
sq.m
PT0102 Thamar
sq.m
Providing,preparingandapplyingSumdangwashablepainting
620.15
462.12
319.61
622.89
464.47
321.96
622.42
463.78
321.28
PT0110 Rab
sq.m
PT0111 Ding
sq.m
PT0112 Thamar
sq.m
Providing,preparingandapplyingDangtshonwashablepainting
496.13
375.15
281.10
497.45
376.08
282.02
500.01
378.42
284.37
PT0120 Rab
PT0121 Ding
PT0122 Thamar
Providing,preparingandapplyingYutshonpainting(plain)
630.09
480.61
349.50
631.41
481.54
350.43
633.97
483.88
352.77
Providingandapplyingwoodstains,varnishes&polishes
PT0060
PT0061
PT0062
PT0063
PT0064
Woodstain(variouscolours),onecoat
Syntheticvarnish(clear)onecoat,onoldwork
Syntheticvarnish(clear)twocoats,includingcoatofwoodfilleron
newwork
Frenchpolishonecoat,onoldwork
Frenchpolishtwocoats,onnewwork
WoodPreservatives
Providingandapplyingwoodpreservatives
PT0070
PT0071
PT0072
PT0073
Brown,twocoatsonnewwork
Brown,onecoatonoldwork
Coaltar,twocoatsonnewwork
Coaltar,onecoatonoldwork
WallPaper
Providing&fixingwallpaper
PT0080
PT0081
StandardQuality
HighQuality
TraditionalPainting
Providing,preparingandapplyingSumdangpainting(Notwashable)
sq.m
sq.m
sq.m
PT0130 Washable
sq.m
129.86
130.70
133.08
PT0131 NotWashable
sq.m
108.45
109.39
110.15
Providing,preparingandapplyingflowernaturalpaintingforwalldecorationdesignsuchasTashitageysymbols,TashiZeegay,Za
Tshering,etc.
PT0140
PT0141
DangtshonRab
SumdangRab
sq.m
sq.m
DepartmentofEngineeringServices,MoWHS
85.96
81.69
95.82
91.54
91.77
87.50
61
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Chapter20:ADDITIONS,ALTERATIONS&REPAIRS
RepairtoPlasters
Repairtoplasterincludingcuttingtoshape,surfacepreparation,provingandapplyingcementplastertothesurface,disposal
rubbishwithin50mlead
AA0001
Patcharea<2.5sq.m
sq.m
147.06
157.40
160.30
GlassPanes
Providing&fixingglasspaneswithputty,nailsincludingremaining.brokenglasspanes
AA0005
AA0006
AA0007
AA0008
AA0009
3mmthickplain
4mmthickplain
5.5mmthickplain
3mmthickfrosted
5.5mmthickfrosted
sq.m
sq.m
sq.m
sq.m
sq.m
699.01
678.63
912.66
678.63
996.20
662.78
688.45
924.69
643.54
897.61
651.01
693.87
934.73
629.71
873.52
AA0015
AA0016
Cuttingholes<300x300mminbrickwallsincludingrepairwall each
Cuttingholes<150x150mminR.Cfloorsorroofincludingmakingleak
each
proofingwithconcrete1:2:4,20mmaggregates
Makingchases<75x75mminwallsincludingrepairafterfixingG.Ipipe
m
etc.
179.05
109.22
187.24
110.40
184.90
110.96
54.83
56.40
57.30
CuttingWalls
AA0017
AluminiumStripEdging
Providing&fixingAluminiumstripedgingtostaircasesincludingrawlplugsandscrews,athinlayerofcementmortar1:3
AA0025
AA0026
57mmx12mmx3mm
38mmx12mmx3mm
m
m
DepartmentofEngineeringServices,MoWHS
489.73
140.64
489.73
146.77
477.48
144.20
62
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Chapter21:ROADWORKS
ContractorWork/Labourcamp
RW0001
RW0002
Installationoflabourcamps,includingwatersupply,pitlatrines,solid
wastedisposaletc.accordingtoEnvironmentCodeofPractice
item
Restorationoflabourcamps:Restorationofcampsitesincluding
disposalofwreckage,rubbish,restorationofsiteusingbioengineering,
enclosureoftemporaryaccessaccordingtoEnvironmentCodeof
Practice
item
Lumpsum
Lumpsum
Excavation
Earthworkinexcavationoverareas,exceeding300mmindepth,1.5minwidthaswellas10sq.monplanincludingdisposalof
excavatedearth(disposedearthtobelevelledandneatlydressed)
RW0006
RW0007
RW0008
RW0009
RW0010
OrdinarySoil
HardSoil
OrdinaryRockwithorwithoutblasting
Hardrockrequiringblasting
Hardrockrequiringchiselling(whereblastingisprohibited)
sq.m
sq.m
sq.m
sq.m
sq.m
SamerateasforitemsEW0030toEW0034
Excavationofroadformation/trace/boxcutting,withbulldozerincludingseparatedepositionofsoil,rocksandstoneswithin50m
forreuse
RW0011
RW0012
Alltypesofsoil
Alltypesofrock
cu.m
cu.m
SamerateasforitemsEW0046andEW0047
Excavationofroadformation/trace/boxcutting,withexcavatorincludingseparatedepositionofsoil,rocksandstoneswithin50m
forreuse
RW0013
RW0014
Alltypesofsoil
cu.m
cu.m
Alltypesofrock
59.71
203.21
59.71
203.21
59.71
203.21
EarthworkinExcavationinfoundationtrenchesordrainsincludingdressingofsidesandrammingofbottom,disposalofsurplus
excavatedsoilwithin50mlead
RW0015
RW0016
RW0017
RW0018
OrdinarySoil
HardSoil
OrdinaryRockwithorwithoutblasting
Hardrockrequiringblasting
cu.m
cu.m
cu.m
cu.m
SamerateasforitemsEW0105toEW0109
TransportationofLooseSoils
Transportofloosesoilmaterialsindesignatedlocationsincludingloading/unloading,dressingofdumpsitesandplantationof
vegetationaftercompletionofdumping
RW0019
RW0020
RW0021
Beyond50upto200m
Beyond200upto500m
Beyond500upto1000m
cu.m
cu.m
cu.m
AnalyseasperprocedureinLMC2011
cu.m
RatesameasEW0195
FillingofTrenches
RW0035
Fillingoftrenches,sidesoffoundations,walls,etcincludingfilter
material(600mmwide)with100to200mmstoneswherever
applicableincludingfillingwithselectedsuitableexcavated
materialinlayernotexceeding200mmindepth(compacted),
consolidatingeachlayerwithpowerrollerorportablecompactor,
wateringetc.within50mlead
DepartmentofEngineeringServices,MoWHS
63
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Quarries
RW0040
RW0041
Opening,runningandrestorationofquarriesaccordingto
environmentalcodeofpracticeandaspertechnicalspecifications
item
Opening,runningandrestorationofsandquarriesaccordingto
environmentalcodeofpracticeforHighwaysandRoads,andasperthe
technicalspecification
item
Lumpsum
Lumpsum
SupplyandStacking
Supplying/collectionandstackingofstoneaggregate
RW0044
RW0045
RW0046
RW0047
RW0048
RW0049
RW0050
100mm
75mm
50mm
6340mm
20mm
126mm
5020mm
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
1062.77
1021.06
1031.49
1031.49
1083.13
1093.56
1053.19
1157.58
1115.87
1126.30
1126.30
1182.06
1192.49
1149.65
1267.06
1225.35
1235.78
1235.78
1341.04
1351.47
1278.93
cu.m
cu.m
cu.m
229.47
501.33
271.70
229.47
501.33
271.70
229.47
501.33
271.70
Supplying/collectionandstackingatsite
RW0055
RW0056
RW0057
Blindingmaterials
Gravel/Coarsesand
Boulder
Walls
ConstructionofGabionwallasperdrawings,includingexcavationoffoundationsinalltypesofsoils,sidesandbackfilling,delivery
ofmaterialsetc.complete
RW0065
RW0066
RW0067
RW0068
RW0069
RW0070
RW0071
RW0072
RW0073
Heightupto1.0m
Heightupto2.0m
Heightupto3.0m
Heightupto4.0m
Heightupto5.0m
Heightupto6.0m
Heightupto7.0m
Heightupto8.0m
Heightupto9.0m
m
m
m
m
m
m
m
m
m
2131.71
4278.45
7601.99
7230.81
17237.26
23613.21
31140.39
39343.87
49039.44
2474.97
4971.96
8836.64
8169.28
20042.81
27459.03
36213.87
45755.38
57032.35
2449.30
4918.30
8735.73
8344.61
19817.66
27153.39
35809.66
45260.18
56409.42
ProvidingandConstructionLighttimbercribwalls
RW0075
RW0076
Withtimbersectionof100to150mmdiameterincludingexcavationin
alltypesofsoilandbackfilling
Withtimbersectionof250to300mmdiameterincludingexcavationin
alltypesofsoilandbackfilling
sq.m
913.23
930.87
930.87
sq.m
807.15
843.72
843.72
Providingandconstructingboulderbarrier,heightnotexceeding1.5
m,max.inclinationof20deg.totheroadalignmentandwidthnotless
than900mmwithin50mlead
90.36
90.36
90.36
Barriers
RW0081
DepartmentofEngineeringServices,MoWHS
64
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Drains
ConstructionofFrenchdrain,includingjungleclearance,earthworkinexcavation,levellingofexcavatedearthtothesides,filling
drainwith50100mmstones,completeasperdesign
RW0095
RW0096
DrainSize0.6mX1.0m
DrainSize1.0mX1.5m
m
m
1778.00
3982.01
1911.00
4295.52
2064.58
4657.55
RW0100
Constructionoffoundationdrainsofminimumsize200mmwide&250
mmdeepwithstonefillofaveragesize50100mmasperdrawingor
asdirectedbytheengineer
includingexcavationanddeliveryofmaterials
197.92
202.31
207.38
ConstructionofVshapedstonepitcheddrainincludingexcavation,levellinganddisposalofsurplusearthwithin50m
RW0105
RW0106
depth300mm,width600mm
depth300mmandwidth450mm
m
m
160.83
94.37
190.99
108.07
198.69
111.57
ConstructionofVshapedearthendrainincludingexcavation,levellinganddisposalofsurplusexcavatedearthwithin50m
RW0107
depth500mmandwidth600mm
21.46
21.46
21.46
RW0108
ConstructionofLinedVShapeddrain600X300with50mmthickPCC
1:2:4,150mmthickstonesoling,RRMinCM1:5onsides,finishedwith
20mmthick1:4cementplaster
includingexcavation,levellinganddisposalofsurplusearthwithin50m
436.50
508.14
532.19
RW0120
ProvidingandlayingHammerdressedstoneedging150x250mmwith
stonesincludingexcavation,refillinganddisposalofsurplusearth
within30mlead
43.27
49.58
51.19
Subgrade
Preparationofsubgradewithpropercamberbyexcavatingearthtodepthequaltopavementthickness,consolidationwithroller,
disposalofsurplusearthupto50m
RW0121
RW0122
Allkindsofsoil
BlastedRock
cu.m
cu.m
30.86
106.68
30.86
106.68
30.86
106.68
Consolidationofsubgradewithroller,andmakinggoodthe
undulationwithearthandrerollingthesubgrade
Extraforcompactionofearthinembankmentsundersuitablemoisture
conditionstogiveatleast95%oftheproctordensity
sq.m
6.43
6.43
6.43
cu.m
13.90
13.90
13.90
cu.m
1124.23
1179.69
1193.81
cu.m
1482.10
1553.49
1645.40
RW0123
RW0124
GranularSubbase
RW0130
ProvidingandlayingGranularsubbasecourse(GSB)torequired
degreeofcompactionwithproperformationofcrossfallusingmotor
graderforlayingandcompactedtorequired
densityaspermaterialgradationandaggregatequalityspecified
WetMixMacadam
RW0131
Providingandlayingwetmixmacadamgradedaggregatebasecourse
torequireddegreeofcompactionwithproperformationofcrossfall
byusingwellgradedcrushed
aggregatespremixedwithOMCusingsuitablemixer,motorgraderas
permaterialgradationandaaggregatesqualityspecified
DepartmentofEngineeringServices,MoWHS
65
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
DenseBituminousMacadam
ProvidingandLayingDenseBituminousMacadam(DBM)torequireddegreeofcompactionbasedonmixturedesign(jobmix
formula)approvedbythesupervisingengineerincludingpreparationof
surfacewithroadbroom,applicationofprimecoat@0.75kg/sq.mbymechanizedmethodusingasphaltplant,paver,steelroller,
tyrerolleretc.complete
RW0132
RW0133
RW0134
RW0135
50mm
60mm
70mm
80mm
sq.m
sq.m
sq.m
sq.m
507.47
590.86
673.53
756.49
512.59
596.99
680.68
764.67
518.69
604.31
689.23
774.43
Asphalt/BituminousConcrete
ProvidingandLayingAsphalt/BituminousConcretetorequireddegreeofcompactionbasedonthejobmixturedesignapprovedby
thesupervisingengineerusingasphaltplant,paver,steelroller,tyreroller
etc.aspermaterialgradationandaggregatequalityspecified
RW0136
RW0137
RW0138
RW0139
25mm
30mm
35mm
40mm
sq.m
sq.m
sq.m
sq.m
299.54
347.77
396.00
443.54
302.02
350.73
399.47
447.50
304.70
353.95
403.23
451.79
sq.m
28.12
28.12
28.12
158.52
160.89
163.62
Scarifying
RW0145
Scarifyingmetalled(waterbound)roadsurfacedisposalofrubbishup
to50mandconsolidationoftheaggregatereceivedfromscarifying
RepairofRoads
Cuttingandrepairingofroads,includingsupplyofrequiredquantitiesofaggregatescomplete
RW0146
Waterboundmacadamroad
sq.m
WearingCourse
Layingwearingcourseincludingscreening,sorting,spreadingtotemplateandconsolidation(measurementofwearingcoursetobe
takenequaltothequantityofaggregateused,excludingblindingmaterials)Withstoneaggregatesandblindingmaterials
RW0147
Withstoneaggregatesandblindingmaterials
cu.m
599.21
599.21
599.21
471.71
475.23
UsingBitumenEmulsion
Cutting&repairingbituminousroadincludingsupplyofrequiredquantityofaggregate&bitumenemulsion
RW0150
Manually
cu.m
468.41
CuttingbituminousroadalongwithW.B.Mlayer&solingandmakinggoodthesameincludingsupplyofextraquantitiesof
aggregate,grit&bitumenemulsionrequiredcomplete
RW0151 Manually
sq.m
858.70
870.55
884.24
Paintingtwocoatswithbitumenemulsion(coat112kgemulsionand0.1cu.m,12mmaggregatesper10sq.m,coat21.6kg
emulsion0.06cu.m,10mmaggregatesper10sq.m)complete
RW0152
Mechanized
sq.m
DepartmentofEngineeringServices,MoWHS
164.30
165.88
168.42
66
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Repaintingonecoatwithbitumenemulsion@2.3kgofemulsionand0.002cu.mof10mmnominalsizestonechipspersq.mof
surfaceareacomplete
RW0153 Mechanized
sq.m
122.99
123.19
Premixconsolidatedcarpetsurfacingincludingatackcoat@0.75kgbitumenemulsionpersq.mofroadsurface
123.51
RW0154
RW0155
RW0156
50mmthickwith6.0cu.mofaggregate10mmnominalsizeper100
sq.musing96kgofemulsionofapprovedqualitypercu.mofstone
aggregate(Mechanized)
25mmthickwith2.7cu.mofstoneaggregate,10mmnominalsizeper
100sq.musing149kgofbitumenemulsionpercu.mofstone
aggregate(Mechanized)
20mmthickwith2.10cu.mofstoneaggregate,10mmnominalsize
per100sq.musing147kgofbitumenemulsionpercu.mofstone
aggregate(Mechanized)
sq.m
344.64
349.76
355.68
sq.m
262.91
265.88
270.65
sq.m
214.45
216.83
220.64
82.10
83.37
41.83
42.04
Providingsealcoatwithbitumenemulsion
RW0157
Using1.3kgofemulsionand0.80cu.mstoneaggregateof10mmper
10sq.mofroadsurfacecomplete
sq.m
Providingsealcoatofpremixedsandwithbitumenemulsion
RW0158
Using5.3kgofemulsionand0.045cu.mcoarsesandper10sq.mof
roadsurfacecomplete
complete
81.31
sq.m
41.42
UsingBitumen80/100
Cuttingandrepairingofroads,includingsupplyofrequiredquantitiesofaggregate,gritandbitumen
RW0160 Bituminousroad
sq.m
540.97
540.39
550.18
Cuttingbituminousroadandmakinggoodthesameincludingsupplyofextraquantitiesofaggregate,grit&bitumenrequired
complete
RW0161
BituminousroadalongwithW.B.Mlayer&soling(mechanized) sq.m
891.14
897.51
914.17
Paintingtwocoatsofbitumen80\100(coat12kgofbitumen,0.015cu.m,12.5mmaggregatepersq.m;coat21kgofbitumen,
0.009cu.m,10mmaggregates,persq.mcomplete)
RW0165
RW0166
Mechanized
Manually
sq.m
sq.m
199.42
237.78
201.79
234.67
205.61
241.47
sq.m
288.49
294.43
303.97
sq.m
187.96
190.93
195.70
sq.m
145.73
148.00
150.63
Premixcarpetsurfacingincludingatackcoat@0.75kgbitumenpersq.mofroadsurface
RW0167
RW0168
RW0169
50mmthickwith6cu.mofaggregate10mmnominalsizeper100sq.m
using51.5kgofbitumen80/100gradepercu.mofstoneaggregate
(Mechanized)
25mmthickwith3cu.mofstoneaggregateper100sq.mand51.5kg
ofbitumen80/100gradepercu.mofstoneaggregate(Mechanised)
20mmthickwith2.40cu.mofstoneaggregate10mmnominalsizeper
100sq.mand51.5kgofbitumen80/100gradepercu.mofstone
aggregate(Mechanized)
DepartmentofEngineeringServices,MoWHS
67
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
PremixCarpetingwith64kgofbitumen80\100percu.mofaggregatesincludingatackcoatwithbitumenofsamequality@0.75kg
persq.mofroadsurface
RW0170
20mmthickwith2.4cu.m,10mmaggregateper100sq.m(Manually)
sq.m
188.89
187.05
193.15
RW0171
25mmthickwith3.0cu.m,10mmaggregateper100sq.m(Manually)
sq.m
219.41
217.46
224.90
Repainting,onecoatofbitumen80\100@1kgofbitumen;0.009cu.m,10mmaggregatepersq.mofroadsurface
RW0175
RW0176
Manually
Mechanised
sq.m
sq.m
82.60
67.60
81.67
68.49
84.09
69.92
Providingsealcoatwithbitumen80/100gradeofapprovedqualityusing1.12cu.mofstoneaggregate10mmsizeper100sq.mand
56kgofbitumen80/100gradepercu.mofstoneaggregatewithatackcoat
of0.75kgofbitumenpersq.mofroadsurfacecomplete
RW0177 Mechanized
sq.m
98.18
99.28
101.06
Providingsealcoatwithbitumen80\100using1.5kgofbitumenpersq.mwith1.05cu.m,10mmaggregateper100sq.mofroad
surface
RW0178 Manually
sq.m
111.67
109.97
113.13
Providingsealcoatofpremixedsandwithbitumen80\100using128kgofbitumenpercu.mofsandand0.75cu.mofcoarsesand
per100sq.mofroadsurface
RW0179
Manually
sq.m
71.64
70.56
71.87
each
each
each
1594.49
2317.48
2482.10
1707.31
2453.64
2632.98
1713.66
2477.55
2659.45
each
3.45
3.45
3.45
Providing&fixingRCnameboardincludingprimerandwhitezincpaint
RW0180
RW0181
RW0182
Rectangularwithpost
Flatwithoutpostforonedirectiononly
Flatwithoutpostfortwodirectionsonly
RoadSigns
RW0183
Engravinglettersonhardstone.......perletterpercentimetreheight
Providing&fixingprecastboundarystoneofRC1:2:4(20mmaggregate)includingfinishingwithmortar1:3(costofexcavation,
refillingetctobepaidseparately)
RW0185 150mmdiax900mmhigh
each
343.55
363.91
367.98
Providing&fixingprecastkilometrestoneofRC1:2:4(20mmaggregate)includingfinishingwithmortar1:3completeasper
standarddesign(costofexcavation,concreting,paintingetc.shallbepaidseparately)
RW0186
RW0187
RW0188
35cmx111cmx25cm
50cmx152.5cmx25cm
35cmx93.5cmx18cm
each
each
each
1086.43
1905.79
704.00
1187.75
2103.34
763.01
1211.63
2149.47
777.17
each
1.06
1.06
1.07
each
0.82
0.82
0.83
Letterings
RW0189
RW0190
Letteringwithpaintofapprovedbrandandmanufacture......perletter
percentimetreht
Reletteringwithpaintofapprovedbrandandmanufacture......per
letterpercentimetreht
DepartmentofEngineeringServices,MoWHS
68
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
Fencing
Supplyingposts&struts
RW0195
RW0196
RW0197
RW0198
RW0199
RW0200
Localballies,250mmmin.girth
Localballies250mmmingirth,1.8mlong
PrecastR.Cposts,1.8mlong
PrecastR.Cstruts2.0mlong
RCCposts&struts,1.8mlong
RCCposts&struts,2mlong
m
each
each
each
m
m
61.11
147.54
713.87
542.29
955.88
593.42
61.11
147.54
766.83
571.42
1036.06
626.43
61.11
147.54
773.68
575.13
1057.64
632.24
Providing&fixingG.IbarbedWireNettingincludingfixingofpostorstruts,G.Istaples,coaltarringincaseofballiescomplete
(posts/struts,earthwork,concretepaidseparately)
RW0202
2.5mm,(12SWG),4barbsformbytwistingtwopointwires,eachtwo
turns,pitchofbarbs75mm
14.07
15.69
16.66
Providing&fixingG.Idoubleknottedmeshincludingfixingofpostorstruts,G.Istaples,coaltarringincaseofballiescomplete
(excludingthecostofposts/struts,earthwork,concrete)
RW0205 4mm(8SWG)x100mm
sq.m
237.13
260.46
281.46
RW0206 2.5mm(12SWG)x100mm
sq.m
184.64
237.13
244.13
RW0207 4mm(8SWG)x150mm
sq.m
176.47
202.13
207.97
RW0208 2.5mm(12SWG)x150mm
sq.m
143.81
167.14
178.80
Providing&fixingG.Ichainlinkmeshincludingfixingofpostorstruts,G.Istaples(excludingthecostofposts/struts,earthwork,
concreteetc.)
RW0209
RW0210
RW0211
RW0212
RW0213
RW0214
4mm(8SWG)x50mm
2.5mm(12SWG)x50mm
4mm(8SWG)x75mm
2.5mm(12SWG)x75mm
4mm(8SWG)x100mm
2.5mm(12SWG)x100mm
sq.m
sq.m
sq.m
sq.m
sq.m
sq.m
DepartmentofEngineeringServices,MoWHS
295.46
213.80
213.80
155.47
237.13
184.64
382.95
382.95
302.46
283.79
277.96
237.13
379.64
379.64
291.74
291.74
279.17
244.13
69
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
ProvidingandFixingBarbedWire(Min.10kg/100m)fencing
RW0215
1.2mhighfencingwith1.8mR.C.Cpostsofstandarddesignplaced
every3mapart,embeddedincementconcreteblocks,every15th
post,lastbutoneendpostandcornerpostshallbestruttedonboth
sidesandendpostonesideonly,
providedwithninehorizontallinesandtwodiagonalsofbarbedwire
betweentwopostsfittedandfixedwithGIstaplesonwoodenplugsor
GIbindingwiretiedto6mmbars
nibsfixedwhilecastingthepost(costofRCCposts,struts,earthwork
andconcretetobepaidforseparately)
149.21
167.32
178.13
RW0216
1.2mhighfencingwith1.8mballiposts250mmgirth(min)placed
every2.5mapart,embeddedincementconcreteblocks,every15th
post,lastbutoneendpostandcornerpostshallbestruttedonboth
sidesandendpostonesideonly,
providedwithsixhorizontallinesandtwodiagonalsofbarbedwire
betweentwopostsfittedandfixedwithGI
staplesdrivenintothepostscomplete(costofRCCposts,struts,
earthworkandconcretetobepaidforseparately)
124.93
137.72
145.83
RW0217
2.4mhighfencingwith3.3mballiposts250mmgirth(min)placed
every2.5mapart,embeddedincementconcreteblocks,every15th
post,lastbutoneendpostandcornerpostshallbestruttedonboth
sidesandendpostonesideonly,
217.98
240.98
255.53
88.34
88.34
88.34
146.99
164.99
175.74
192.76
215.90
229.71
providedwithtwelvehorizontallinesandtwodiagonalsofbarbed
wirebetweentwopostfittedandfixedwithGIstaples
drivenintothepostscomplete(costofRCCposts,struts,earthwork
andconcretetobepaidforseparately)
RW0218
RW0219
RW0220
1.3mhighconcreterailandpalefencingwith1.8mR.C.Cposts2.2m
railsand1.25mpalesplacedevery2.5mapart,embeddedincement
concreteblocks
(450mmx450mmx700mm),ofmix1:5:10(1cement:5sand:10
gradedcrushedrock40mmnominalsize)(costofearthworkin
excavation,concretework,posts,railsandpalestobepaidfor
separately)
1.2mhighfencingwith1.2mangleposts(40mmx40mmx6mm)
placedevery3mapart,embeddedincementconcreteblocks,every
15thpost,lastbutoneendpostandcornerpostshallbestruttedon
bothsidesandendpostonesideonly,
providedwithninehorizontallinesandtwodiagonalsofbarbedwire
betweentwopostfittedandfixedwithGIstaples,turnbuckles
complete(costof,posts,struts,earthworkandconcretetobepaid
forseparately)
1.8mhighfencingwith1.8mangleposts(50mmx50mmx6mm)
placedevery3mapart,embeddedincementconcreteblocks,every
15thpost,lastbutoneendpostandcornerpostshallbestruttedon
bothsidesandendpostonesideonly,
providedwithninehorizontallinesandtwodiagonalsofbarbedwire
betweentwopostfittedandfixedwithGIstaples,turnbuckles
complete(costof,posts,struts,earthworkandconcretetobepaid
forseparately)
DepartmentofEngineeringServices,MoWHS
70
BhutanScheduleofRates2011
Code Description
Units
PL
GP
SJ
kg
320.66
320.66
320.66
sq.m
35.45
35.45
35.45
sq.m
35.45
35.45
35.45
43.12
43.12
43.12
51.01
51.01
51.01
no
138.81
138.81
138.81
Bioengineering
SeedsCollection,treatmentandstorage
RW0230
Grassandpioneerplantseedcollection,includingseparation,dryingin
thesun&storing
Broadcasting
RW0231
Broadcastingofgrass/pioneerplantsseedsonslopes;seedingrate25
gmperm2
DirectSeeding
RW0232
Directseedingofshrubsortreeseedsat30cmspacingincluding
diggingholesupto5cmdepthandcoveringwithsoil,withtwoseeds
perplantinghole
LiveStacking/Palisade
RW0233
Preparationofmaterials(woodycuttings24cmdiameterand50cm
length)andstakingthemofthecuttingsinthesoil
Brushlayer/HedgeBrushLayer
RW0234
Collectionandpreparationofmaterials(woodycuttings24cm
diameterand60cmlength)andstakingthemofthecuttingsinthe
Plantingofseedlings/wildings
RW0235
Plantingofseedlingsorwildlings(includingthecollectionofwildlings
fromthewild)andplantingtheminapitsize30cmx30cm
Sodding/Turfing
RW0236
Soddingofslopeswithsods,eglemongrass(30cmscentretocentre),
titepati(1metrecentretocentre)incontourlines.Thesodsshouldbe
placedevenclosertoeachotheriftheslopeisgreaterthan25degree
sq.m
41.40
40.82
41.40
RW0237
Turfingofembankmentwith30x30cmturfsandfixedtotheground
withwoodenpegs,ifslopeisgreaterthan25
sq.m
76.35
76.35
76.35
sq.m
18.59
18.59
18.59
GrassSlipsPlanting
RW0238
Grassslipsplantingonslopes(randomorinline)at10cmapartand5
cmdeep.
DepartmentofEngineeringServices,MoWHS
BhutanScheduleofRates2011
4.COSTINDICES
5.APPROVEDMATERIALBRANDS
BhutanScheduleofRates2011
COSTINDEXCALCULATION
Anyratescalculatedaddingcostindexshallnotbeusedformakingpaymenttocontractorsorparties
Paymenttocontractorsshallbestrictlyasperthecontractagreementonly
Thesixexamples,thatfollow,areforpurposeofguidanceandengineersareencouragedtocalculate
costindicesontheirown.
I
ProcedureforcalculationofcostIndex:
a)
b)
c)
d)
e)
Col.(4)=
Col.(5)=
Col.(6)=
Col.(7)=
Col.(8)=
II
Weightage
Basicratesatnearestbasetown
Ratesattheprojectlocation
[{col.5/col.4}1]x100
Weightageshallremainfixed
{Col.(6)xCol.(7)}/100
Weightageofaparticularmaterialisthepercentageofitscostfromthetotalcostoftheproject.
II
Thecostindexshallnotbeapplicablefor:
a)
b)
Allbasicrates
Anyworkswhereonlylabourisinvolvedsuchas:
Dismantlinganddemolition.
Earthwork
Installation,testing,commissioning
Forsuchworksactuallabourrequirementshallbeworkedoutandadditionalamountaddedforanyincreaseinlabourrates
II
Procedureforcalculationofratesattheprojectlocation
a)
Toderivetheapproximateitemrateatanylocation,theBSRitemratesofthenearestbasetownshallbeenhancedbythe
costindexcalculatedabove.
b)
Sameweightageshallbeapplicableforsimilarworksatanylocation
c)
Weightagediffersfordifferentkindsofprojectsandengineerscancalculateweightagesusingratesofitemsofthenearest
basetowns
SAMPLECALCULATIONSOFCOSTINDICES
1.BuildingWorkswithBrickInfillwallsandsteeltrusses
Sl.No. Description
(1)
(2)
Unit
(3)
CostatabaseTown
(4)
CostatProject
Location
(5)
%Increase
Weightage
CostIndex
(6)
(7)
(8)
Cement
MT
4770.00
5689.00
19.27
17.00
3.28
SteelReinforcement
MT
31500.00
33500.00
6.35
14.00
0.89
RolledSteel
MT
32300.00
34400.00
6.50
3.00
0.20
C.G.ISheet
MT
44000.00
50600.00
15.00
5.00
0.75
Brick/ICEB
Nos
4650.00
6830.00
46.88
9.50
4.45
StoneBoulders
cu.m
180.00
530.00
194.44
1.50
2.92
RoughSawnTimber
cu.m
7800.66
8122.45
4.13
17.00
0.70
StoneAggregates
(20mm)
cu.m
618.00
883.00
42.88
4.50
1.93
Sand
cu.m
180.00
534.00
196.67
2.00
3.93
10
Labour:Average
Cat.ItoIV
each
130.00
145.00
11.54
11.50
1.33
Cat.V
each
108.00
108.00
0.00
15.00
0.00
Remarks
(9)
100.00
CostIndex=
20.37 %
2.BuildingWorkswithBrickInfillwallsandtimbertrusses
Sl.No. Description
(1)
1
(2)
Cement
Unit
(3)
MT
CostatabaseTown
(4)
4770.00
CostatProject
Location
(5)
5689.00
%Increase
Weightage
CostIndex
(6)
(7)
(8)
19.27
17.00
3.28
SteelReinforcement
MT
31500.00
33500.00
6.35
14.00
0.89
C.G.ISheet
MT
46000.00
50600.00
10.00
5.00
0.50
Brick/ICEB
Nos
4630.00
6830.00
47.52
10.50
4.99
StoneBoulders
cu.m
180.00
530.00
194.44
1.50
2.92
RoughSawnTimber
cu.m
7800.66
8122.45
4.13
19.00
0.78
StoneAggregates
(20mm)
cu.m
618.00
883.00
42.88
4.50
1.93
Sand
cu.m
180.00
534.00
196.67
2.00
3.93
Remarks
Labour:Average
Cat.ItoIV
each
130.00
145.00
11.54
11.50
1.33
Cat.V
each
108.00
108.00
0.00
15.00
0.00
100.00
CostIndex=
20.54 %
(9)
BhutanScheduleofRates2011
3.BuildingWorkswithstonemasonryInfillwalls
Costatbasetown
Sl.No. Description
(1)
(2)
Unit
(3)
CostatProject
Location
%Increase
Weightage
CostIndex Remarks
(4)
(5)
(6)
(7)
(8)
(9)
Cement
MT
4770.00
5689.00
19.27
17.00
3.28
SteelReinforcement
MT
31500.00
33500.00
6.35
5.00
0.32
C.G.ISheet
MT
46000.00
50600.00
10.00
8.00
0.80
Stoneboulders
cu.m
180.00
534.00
196.67
6.00
11.80
Bricks/ICEB
1000#
4650.00
6830.00
46.88
1.00
0.47
RoughSawnTimber
cu.m
7800.66
8122.45
4.13
22.00
0.91
StoneAggregates
(20mm)
cu.m
618.00
883.00
42.88
3.00
1.29
Sand
cu.m
180.00
530.00
194.44
3.00
5.83
Labour:Average
Cat.ItoIV
each
130.00
145.00
11.54
20.00
2.31
Cat.V
each
108.00
108.00
0.00
15.00
0.00
100.00
CostIndex=
27.00 %
Weightage
CostIndex Remarks
4.BitumenSealingWorks
Sl.No. Description
Unit
Costatabase
town
(4)
32189.00
3928.00
535.00
(1)
1
2
3
(2)
Bitumen***
RoadRoller(810T)
Firewood**
(3)
MT
day
cu.m
StoneAggregates.
20mm
cu.m
618.00
each
each
Labour:Average
Cat.ItoIV
Cat.V
CostatProject
Location
(5)
34389.00
3928.00
650.00
%Increase
(6)
6.83
0.00
21.50
(7)
63.00
9.00
3.00
(8)
4.31
0.00
0.64
635.70
2.86
14.00
0.40
130.00
145.00
108.00
108.00
11.54
0.00
0.50
10.50
0.06
0.00
100.00
CostIndex=
***
**
Bitumen80/100orEmulsionasappropreate
Firewoodmeasuredinstackedvolume
5.41 %
(9)
BhutanScheduleofRates2011
5.RoadPermanentWorksRetainingWalls,Culvertandothersimilarworks
Sl.No. Description
(1)
(2)
Unit
(3)
Costatabasetown CostatProject
Location
(4)
(5)
%Increase
Weightage
CostIndex Remarks
(6)
(7)
(8)
Cement
MT
4770.00
5689.00
19.27
30.00
5.78
Stoneboulder
cu.m
180.00
205.00
13.89
20.00
2.78
StoneAggregates
(20mm)
cu.m
618.00
700.00
13.27
3.00
0.40
Sand
cu.m
180.00
534.00
196.67
5.00
9.83
Labour:Average
Cat.ItoIV
each
130.00
145.00
11.54
16.00
1.85
Cat.V
each
108.00
108.00
0.00
26.00
0.00
(9)
100.00
CostIndex=
20.64 %
6.RoadWorksBaseCourse
Sl.No. Description
(1)
(2)
Unit
(3)
Weightage
CostIndex Remarks
(4)
(5)
(6)
(7)
(8)
205.00
13.89
5.00
0.69
day
3440.00
3440.00
0.00
32.00
0.00
cu.m
70.00
70.00
0.00
3.75
0.00
cu.m
618.00
700.00
13.27
42.00
5.57
each
each
130.00
145.00
108.00
108.00
11.54
0.00
0.25
17.00
0.03
0.00
StoneBoulder
cu.m
RoadRoller(810T)
Blindingmaterials
StoneAggregates20
mm
Labour:Average
Cat.ItoIV
Cat.V
%Increase
180.00
Costatabasetown CostatProject
Location
100.00
CostIndex=
6.30 %
(9)
BhutanScheduleofRate2011
LATESTAPPROVEDCONSTRUCTIONMATERIALS(CIVIL)
I.PLUMBINGMATERIALS
Sl.No
1
a.
b.
c.
d.
e.
f.
g.
2
a.
b.
c.
d.
e.
f.
g.
3
a.
Materials
ApprovedBrands
Pipes
GI
BABA(2565mmonly)
HDPE
AJAPLAS,Supreme,Duraline
PVC
PPR
SFMC
CPVC
DI
Nirmaldhara,TataMetaliks,Lanco,Kejriwal,BalajiShakti,JindalSaw
CI
Kejriwal
PipeFittings(Union,Socket,Elbow,Tee,Plug,Bend,Tanknipple,Barrelnipple,Flanges)
GI
JSI
HDPE
AJAPLAS,Duraline,Supreme
PVC
PPR
SFMC
CPVC
DI
Electrosteel,Kejriwal
CI
Kejriwal
Valves&Cocks
Bibcocks,Stopcocks,
R,Zoloto(Ferrous&NonFerrous),Coats
Pushcocks,Liftcocks,Gate
valves,Floatvalves,Nonreturn
valves,etc.
DI&CIvalves
Kejriwal
SanitaryAppliances
Sinks,Washbasins,WCpans,
Simpolo,Commander
Cistern,Urinals,Bathtubs,
Bidets,etc.
WaterStorageTanks
WaterStorageTanks
PolyFoam,PolyExport,PolyP4
b.
4
a.
5
a.
BhutanScheduleofRate2011
II.OTHERMATERIALS
Sl.No
1
a.
b.
2
a.
b.
Materials
ApprovedBrands
ReinforcementSteel
Fe415
KarmaTMT,PCMLhakiTMT,PeldenThermex
Fe500
Willbenotifiedlater
RoofingSheet/Tiles/Tubularpipes(Thisisinadditiontothelocallyavailablematerials)
CGI
AartiSuraksha
ColourRoof
1.Everestmetalroofing(ER32251profileonly)
2.CRIL(i.Hispan,ii.Histern975,iii.SteelLock,iv.StileRainbow,
v.RiverClack,vi.Versatileprofilesonly)
Basemetal
Metashield(SeCladonly)
Roofingtiles
EverestHiTech
Tubularpipes(M.Spipes)
BABA
WhitePortlandCement
FlooringandWallTiles
Bitumen/Emulsion
CationicEmulsion
Bhubit
80/100
Bricks/HollowBlocks&Others
InterlockingCementEarth
DSE
Blocks
Boards
Cementfibreboards
Everest
Cements
Willbenotifiedlater
33Grade
Willbenotifiedlater
43Grade
Willbenotifiedlater
PSC
c.
d.
e.
3
a.
4.
a.
5
a.
b.
6
a.
7
a.
8
a.
b.