Depressurizing a Test Separator from HP to LP static

OBJECTIVE: Liquid Transfer from Test Separator on HP static to Surge Vessel AIM: To free the content of the Test Separator into the Surge Vessel TOOLS: PRE-CHECKS:
valves (ii) Check to confirm that the MSDV, by-pass valves and Oil

Ligament Valve Handle


(i) Check for leaks on the Test Separator, header & ligament

outlet valves are shut

PROCESS OVERVIEW What is done

INSTRUCTION & EXPLANATION How it is done

REASONS Why it is done

KEY POINT IMAGES

Sta rt Initiate Facility Automation Obtain authorization based on risk assessment/SIL classification

Isolate the test flow meter

1. Close main liquid meter Isolation valve (10XXX01).

This is to Isolate the liquid meter from the process

2. Close Isolation valve to the 1 Rotron meter (10XXX02) 3. Close Isolation valve (10XXX03) to the 2 Rotron meter 4. The 3 liquid meter line valve (10XXX04 ) is already isolated

5. Close the isolation valves (10XXX22 & 10XXX23) downstream of the liquid meters Depressurize the Test Separator from HP to LP static

This

Re-instate Facility Stop Automation

1. Close the isolation valve (10XXX05) on the HP gas outlet line, and then gradually open the isolation valve (10XXX06) on the LP gas outlet line.

action depressurize s the Test at HP to LP Static.