Veronica Martinez 2/14/2012

Water Calculations
Civil Engineering Habitat House Client: Mary Pearson

Veronica Martinez 2/14/2012

Water Runoff
y y y Ignored the sidewalk Does not have a driveway House is in Indiana

Before/Pre:
Q=CfCia C=.02: I used this number because it is the runoff coefficient depending on the surface type I=2.2in/hr: I used this number because this is the rainfall intensity for the state of Indiana A=.58: I used this number because this is the size of the acre Cf=1.1: I used this number for a 25 year storm and according to the chart it is 1.1

Q=.2(2.2 in/hr).58 acre (1.1) =.2807ft

After/Post:
C=.85: I used this number because of the shingled roof of my house I=2.2: I used this number because it is the rainfall intensity according to the chart A=.01719: I used this number because that is the size of the acre

Q=.85(1.1) (2.2in/hr).01719 acre=.0345ft Q=.15(2.2in/hr) (.58-01719 acre) (1.1)=.2043ft .2043+.0345=.2388 ft TOTAL RUNOFF

Veronica Martinez 2/14/2012

Wastewater
y y House at ground level=769.5ft Instead of a septic tank I used the city main City Main=760

Pre
Q=(.2)(1.2)(1.6)(.5 acres) Q=.192ft cubed/sec

Post
Sidewalk Q=(.38)(1.2)(1.6)(.0337)
Shingled Roof unit accordin g to data chart

Q=.0806 ft/sec House


AREA OF HOUSE

Q=(.95)(1.2)(1.6)(1,065) Q=1942.56 ft/sec Lawn Q=(.05)(1.2)(1.6)(1,065) Q=102.24 ft /sec


According to the City Main Pipes Slope=rise Run 765 -(760-7 1/12) .80 =5.5833 .80 Total amount of Slope=.059.79 wastewater Percent=6.979%

Water Supply

Veronica Martinez 2/14/2012

Hf: the head loss (energy loss due to friction)


C=1.85: the coefficient D=4.8655: Diameter of piped L=110ft: Length of pipe Q=17,358.8ft: The flow in g/min

7(14) +3(5.2) +11(30) +6(3.2) =426.8ft Amount of pipe converted to feet instead of miles

3.2 miles=16,896ft

L=16,896ft+462.8ft=17,358.8ft

Hf=10.44(110) (17,358.8) 1 psi is equal to 2.31 100(10) Static Head=1487-1246=241ft Ending Pressure=238.06 Dynamic Head=238 (1psi) (2.31) TOTAL WATER SUPPLY

=103.06psi

Total Water Runoff=.2388 Total Wastewater=6.979ft Total Water Supply=103.06ft

Veronica Martinez 2/14/2012

Foundation
y y y

4 REBAR AND 10 LENGTH LOW BEARING WALLS THE TYPE IS CONTINUOUS FOOTING 8in. (1/12) (8) (532.5) =2840ft
Conversion

Foundation:

Length of Strip Footing

+
Length of Strip Footing

Footing:

8in. (1/12) (16) (1/12) (532.5) =473.3ft

Frost Line Measurement

=
2

3,315.3ft then converted to yards

532.5(4) = 9.5

224.2 =112 TOTAL PIECES OF 4 REBAR