ACTIVITY CFA PILING PREPARED BY : ROGELIO M. SAMONITINA

ASSESSMENT DETAILS
PAGE NUMBER 2 OF 5
ASSESSMENT REF.#: RA-NSCC-
ASSESSMENT DATE
RISK ASSESSMENT REVISION 00

Section 2: TRANSPORT OF REBAR CAGES


RISK RATIN RISK RATING
(RR) RISK (RR) RESULTANT RISK
HAZARDS RISKS CONTROL MEASURES
RANKING RANKING
E L RR E L RR
Lifting of rebar cages
 #Breakage of lifting
5 5 25 HIGH
 #Only well maintained and in
5 1 5 LOW RISK
gears good condition equipment to
be used
 #Band and body 5 5 25 5 1 5
injury due to HIGH  #Only certified rigging gear to
handling/lifting be utilized LOW RISK
5 5 25 5 1 5
 #Falling Object  #Competent foreman to be
HIGH assigned to supervise the
activity LOW RISK
 #Unnecessary personnel to be
kept away from the work area
 #Connections of all the parts
will be checked thoroughly
Note: E=Effect of Hazard L=Likelihoodprior
oftooccurrence
operation Risk Rating Score (RR) = EXL
 #Appropriate PPE to be strictly
used in the activity
 #All the risk and the control
measures mentioned above
will be discussed in the task
briefing and will continuously
be monitorea by in charged
foreman/engineers and revise
as needed.

Note: E=Effect of Hazard L=Likelihood of occurrence Risk Rating Score (RR) = EXL