Vous êtes sur la page 1sur 2

STAGES OF QUALITY SYSTEM

1.1

Design & preparation of Quality System Apex Manual, which is the base of quality system will be prepared according to your existing structure and with some modifications, if required, so that the manual is as per the standard of ISO 9001: 2008 Quality System requirements.

1.2

Training of your staff Training on ISO 9001 : 2008 series and on Internal Quality Audit will be conducted. Design & Preparation of 2nd and 3rd level Documents All departmental procedure, their system of implementation, quality plans will be prepared and implemented in accordance to the required standards. Design & Implementation of 4th level documents All forms / formats related to the Marketing, Purchase, service, Inspection up to the stage of final inspection & dispatch will be reviewed, redesigned to incorporate traceability at all stages even at the customer end.

1.3

1.4

Computerisation process if required will be also be reviewed in this regard.

1.5

Management Review and Internal Audit A system of Management Review of the Quality System will be defined and implemented after each Internal Quality Audit. First Internal Quality Audit and Management Review will be conducted under our guidance to bring perfection in the system.

COMMERCIAL TERMS & CONDITIONS 2.1 2.2 2.3 2.4 2.5 2.6 At the time of acceptance of your contract After completion of Apex Manual & Procedures After acceptance of documents by certification body After completion of first Internal Quality Audit After Pre-assessment Audit Completion of certification Audit TOTAL (For Consultancy) Rs. 5,000 / Rs. 5,000 / -------Rs. 5,000 -------Rs. 5,000 / Rs. 20,000 / -

2.7

NAME & FEES OF WORLDS LEADING CERTIFICATION BODIES WITH ACCREDITATION NAME DNV URS ( UKAS ) KBS (JAN-ANZ) KVQA (NORSK) FEES ( App. ) Rs. 45,000 Rs. 30,500 / Rs . 25,000 /Rs. 15,000/-

OTHER COMMERCIAL TERMS & CONDITIONS The following expenses are at your account 3.1 3.2 3.3 Pick and drop facility or conveyance charges to certification body on the day of audit. Any changes / modification done in your plant for the purpose of ISO 9001 : 2008 certification All expenses towards boarding & lodging for overnight stay of consultant / Auditor if such is required for the purpose of Quality System implementation / Audit.

Vous aimerez peut-être aussi