Vous êtes sur la page 1sur 19

GASECOM CONSTRUCCIONES

Carrera 19 No 8-03 local 03


7466579
CODIGO S.I.C 11138

DISEO RED MATRIZ MULTIFAMILIAR


CONSTRUCTORA GEOCASAMAESTRA
LA CORUA II

BARRIO PUERTO ESPEJO MZA 42


7411020

ARMENIA

GASECOM CONSTRUCCIONES
Carrera 19 No. 8-03 LOCAL 03
7466579
CODIGO S.I.C 11138

DISEO RED MATRIZ LA CORUA II


Presion atm=

863 mbar

V max =

20 m/s

Densid Rel

0.65

Psn Final mbar > 310.264

ECUACION DE MUELLER LINEAL


TRAMO

L. REAL
(m)

Q Simult
(m3/h)

Diametro
(PULG)

Diametro
(mm)

DP
(mbar)

Presion
Inicial (mbar)

Presion
Final (mbar)

Velocidad
(m/s)

Resultado
Velocidad

12.70

85.692

1 1/2" AG

40.890

20.420

344.738

324.317

15.281

OK

0.60

17.138

3/4" AG

20.930

1.403

324.317

322.914

11.678

OK

0.20

8.569

1/2 " AG

15.800

0.531

322.914

322.383

10.251

OK

1.20

8.569

1/2 " AG

15.800

3.187

322.914

319.727

10.274

OK

12.20

68.554

1 1/2" AG

40.890

13.307

324.317

311.010

12.363

OK

0.60

17.138

3/4" AG

20.930

1.403

311.010

309.607

11.811

OK

0.20

8.569

1/2 " AG

15.800

0.531

309.607

309.076

10.367

OK

1.20

8.569

1/2 " AG

15.800

3.187

309.607

306.420

10.391

OK

12.70

51.415

1 1/4" AG

35.050

17.435

311.010

293.575

12.810

OK

10

0.60

17.138

3/4" AG

20.930

1.403

293.575

292.172

11.989

OK

11

0.20

8.569

1/2 " AG

15.800

0.531

292.172

291.641

10.524

OK

12

1.20

8.569

1/2 " AG

15.800

3.187

292.172

288.985

10.548

OK

13

12.70

34.277

1" AG

26.640

31.613

293.575

261.962

15.198

OK

14

0.60

17.138

3/4" AG

20.930

1.403

261.962

260.559

12.326

OK

15

0.20

8.569

1/2 " AG

15.800

0.531

260.559

260.028

10.820

OK

16

1.20

8.569

1/2 " AG

15.800

3.187

260.559

257.372

10.846

OK

17

13.30

17.138

3/4" AG

20.930

31.108

261.962

230.854

12.661

OK

18

0.20

8.569

1/2 " AG

15.800

0.531

230.854

230.323

11.114

OK

19

1.20

8.569

1/2 " AG

15.800

3.187

230.854

227.667

11.141

OK

GASODOMESTICOS, CONSUMOS ACTUALES O FUTUROS A INSTALAR


GASODOMESTICOS

POTENCIA BTU / H

CAUDAL M3 / H

CANTIDAD DE
GASODOMESTICOS

ESTUFA 4Q RES

24566

40.34625513

58

CALENTADOR DE PASO 5 LTS//MIN

37873

62.20116098

58

HORNO RESIDENCIAL

12000

19.70833923

TOTAL
CONSUMO PROM. APARTAMENTO 1
CONSUMO PROM. APARTAMENTO 2

1.93 m3/hora

74439

TOTAL

122.2557553

58
174

Psn Final >


Densid Rel

310.264
0.65

mbar

863 mbar
20 m/s

PARA CONVERTIR

CONSUMO TOTAL POR PISOS

mbar

221.48

PSI

3.21

PSI

5.00

mbar

344.74

FACTOR DE
SIMULTANE
IDAD

pulg H2O

mbar

mbar

pulg H2O

135.949714
9.3387471

CAUDAL X FACTOR DE
SIMULTANEIDAD

Centro de Medicion A (12 APTOS)


Centro de Medicion B (12 APTOS)
Centro de Medicion C (12 APTOS)
Centro de Medicion D (12 APTOS)
Centro de Medicion E (12 APTOS)
Centro de Medicion F (12 APTOS)
Centro de Medicion G (12 APTOS)
Centro de Medicion H (12 APTOS)

0.72
0.72
0.72
0.72
0.72
0.72
0.72
0.72

8.5692
8.5692
8.5692
8.5692
8.5692
8.5692
8.5692
8.5692

Centro de Medicion I (12 APTOS)

0.72

8.5692

Centro de Medicion J (12 APTOS)

0.72

8.5692

85.692

Para el diseo de la Red Matriz se tendra en cuenta


Los caudales afectados por el factor de simultaneidad
Para cada piso.

17.1384

T11
CENTRO DE MEDICION
SEPTIMO PISO

T10

T9

T8

T7

CENTRO DE MEDICION
SEXTO PISO

GASECOM CONSTRUCCIONES
Carrera 19 No. 8-03 LOCAL 03
TEL 7466579

CENTRO DE MEDICION
QUINTO PISO

T6

T5

CENTRO DE MEDICION
CUARTO PISO

CODIGO S.I.C 11138

CONTIENE:
PLANO ISOMETRICO

T4
CENTRO DE MEDICION
TERCER PISO

T3

OBSERVACIONES:

INSTALACION RED
MATRIZ

CENTRO DE MEDICION
SEGUNDO PISO

T2

ESCALA:
SIN ESCALA

REGULADOR DE PRIMERA
ETAPA

EDIFICIO:
APARTAMENTOS TERRA

T1

TUBERIA ACERO AL CARBON SCH 40 1"


TUBERIA ACERO AL CARBON SCH 40 3/4"

TUBERIA ACERO AL CARBON SCH 40 1/2"

REALIZO:
Ing. Cristhian A Fajardo Britto
T.P. 63202-104123 QND

REDES INTERNAS RESIDENCIALES

INSTALACION INTERNA HASTA 23 MTS 18 UND APTOS 101-105-109-113-201-205-209-213-217-103-107111-115-203-207-211-215-219


DESCRIPCION
MTS PEALPE 3/4
MTS PEALPE 1/2
MACHO PEALPE 1/2"
MACHO PEALPE 3/4"
HEMBRA PEALPE 3/4"
HEMBRA PEALPE 1/2"
TEE 3/4" AG
TEE PEALPE 1/2
VALVULA PEALPE 1/2
UNION 3/4" PEALPE
UNION 1/2" PEALPE
CODO 3/4" AG 90
CODO CALLE 3/4" AG 90
NIPLE 3/4" AG X 5 CMS
TAPON 3/4" AG MACHO
TAPON 1/2" AG MACHO
BUSHING 3/4" X 1/2" AG
ABRAZADERA 1/2"
CHAZO + TORNILLO
CONDUFLEX
MANO DE OBRA INSTALACION RED INTERNA
MANO DE OBRA INSTALACION PUNTOS ADICIONALES
MANO DE OBRA PRUEBA DE HERMETICIDAD
MANO DE OBRA REGATA EN MUROS
PAPELERIA
HERRAMIENTA

CANT
9
14
2
1
1
3
1
1
3
1
1
1
1
1
1
3
2
30
30
2
1
2
1
4
1
2

VALOR UNITARIO
2950
1920
3464
4343
4232
3690
1206
8080
9163
6498
4684
1124
1507
1160
740
700
530
103
90
950
25000
5000
1500
1600
300
500
TOTAL

INSTALACION INTERNA HASTA 26 MTS 10 UND APTOS 301-303-305-307-309-311-313-315-317-319


DESCRIPCION
MTS PEALPE 3/4
MTS PEALPE 1/2
MACHO PEALPE 1/2"
MACHO PEALPE 3/4"
HEMBRA PEALPE 3/4"
HEMBRA PEALPE 1/2"
TEE 3/4" AG
TEE PEALPE 1/2
VALVULA PEALPE 1/2
UNION 3/4" PEALPE
UNION 1/2" PEALPE
CODO 3/4" AG 90
CODO CALLE 3/4" AG 90
NIPLE 3/4" AG X 5 CMS

CANT
12
14
2
1
1
3
1
1
3
1
1
1
1
1

VALOR UNITARIO
2950
1920
3464
4343
4232
3690
1206
8080
9163
6498
4684
1124
1507
1160

TAPON 3/4" AG MACHO


TAPON 1/2" AG MACHO
BUSHING 3/4" X 1/2" AG
ABRAZADERA 1/2"
CHAZO + TORNILLO
CONDUFLEX
MANO DE OBRA INSTALACION RED INTERNA
MANO DE OBRA INSTALACION PUNTOS ADICIONALES
MANO DE OBRA PRUEBA DE HERMETICIDAD
MANO DE OBRA REGATA EN MUROS
PAPELERIA
HERRAMIENTA

1
3
2
30
30
2
1
2
1
4
1
2

740
700
530
103
90
950
25000
5000
1500
1600
300
500
TOTAL

INSTALACION INTERNA HASTA 23 MTS 20 UND APTOS 102-106-110-114-118-104-108-112-116-120-202206-210-214-218-204-208-212-216-220


DESCRIPCION
MTS PEALPE 3/4
MTS PEALPE 1/2
MACHO PEALPE 1/2"
MACHO PEALPE 3/4"
HEMBRA PEALPE 3/4"
HEMBRA PEALPE 1/2"
TEE 3/4" AG
TEE PEALPE 1/2
VALVULA PEALPE 1/2
UNION 3/4" PEALPE
UNION 1/2" PEALPE
CODO 3/4" AG 90
CODO CALLE 3/4" AG 90
NIPLE 3/4" AG X 5 CMS
TAPON 3/4" AG MACHO
TAPON 1/2" AG MACHO
BUSHING 3/4" X 1/2" AG
ABRAZADERA 1/2"
CHAZO + TORNILLO
CONDUFLEX
MANO DE OBRA INSTALACION RED INTERNA
MANO DE OBRA INSTALACION PUNTOS ADICIONALES
MANO DE OBRA PRUEBA DE HERMETICIDAD
MANO DE OBRA REGATA EN MUROS
PAPELERIA
HERRAMIENTA

CANT
10
13
2
1
1
3
1
1
3
1
1
1
1
1
1
3
2
30
30
2
1
2
1
4
1
2

VALOR UNITARIO
2950
1920
3464
4343
4232
3690
1206
8080
9163
6498
4684
1124
1507
1160
740
700
530
103
90
950
25000
5000
1500
1600
300
500
TOTAL

INSTALACION INTERNA HASTA 26 MTS 10 UND APTOS 302-306-310-314-318-304-308-312-316-320


DESCRIPCION
MTS PEALPE 3/4
MTS PEALPE 1/2
MACHO PEALPE 1/2"

CANT
13
13
2

VALOR UNITARIO
2950
1920
3464

MACHO PEALPE 3/4"


HEMBRA PEALPE 3/4"
HEMBRA PEALPE 1/2"
TEE 3/4" AG
TEE PEALPE 1/2
VALVULA PEALPE 1/2
UNION 3/4" PEALPE
UNION 1/2" PEALPE
CODO 3/4" AG 90
CODO CALLE 3/4" AG 90
NIPLE 3/4" AG X 5 CMS
TAPON 3/4" AG MACHO
TAPON 1/2" AG MACHO
BUSHING 3/4" X 1/2" AG
ABRAZADERA 1/2"
CHAZO + TORNILLO
CONDUFLEX
MANO DE OBRA INSTALACION RED INTERNA
MANO DE OBRA INSTALACION PUNTOS ADICIONALES
MANO DE OBRA PRUEBA DE HERMETICIDAD
MANO DE OBRA REGATA EN MUROS
PAPELERIA
HERRAMIENTA

1
1
3
1
1
3
1
1
1
1
1
1
3
2
30
30
2
1
2
1
4
1
2

4343
4232
3690
1206
8080
9163
6498
4684
1124
1507
1160
740
700
530
103
90
950
25000
5000
1500
1600
300
500
TOTAL

INSTALACION RED MATRIZ


DESCRIPCION
NICHO REGULADOR
TUBERIA ACERO AL CARBON 2"
TUBERIA ACERO AL CARBON 1 1/2"
TUBERIA ACERO AL CARBON 1 1/4"
TUBERIA ACERO AL CARBON 1 "
TUBERIA ACERO AL CARBON 3/4"
TUBERIA ACERO AL CARBON 1/2"
TEE 2" AG
TEE 1 1/2" AG
TEE 1 1/4" AG
TEE 1" AG
TEE 3/4" AG
BUSHING 2" X 1/2" AG
BUSHING 2" X 1 1/2" AG
BUSHING 1 1/2" X 3/4" AG
BUSHING 1 1/2" X 1 1/4" AG
BUSHING 1 1/4" X 3/4" AG
BUSHING 1 1/4" X 1" AG
BUSHING 1 " X 1/2" AG
BUSHING 1 " X 3/4" AG
BUSHING 3/4" X 1/2" AG
UNION 2" AG
UNION 1 1/2" AG
UNION 1 1/4" AG
UNION 1" AG

CANT

VALOR UNITARIO
1
28
13
13
18
9
2
1
1
5

2
1
1
1
2
10
8
3
3

120000
25962
19620
16319
11872
7935
5850
7300
4048
3630
3174
1210
3300
3300
2200
2200
1520
1520
1250
1250
626
3500
3100
2200
1750

UNION 3/4" AG
CODO 2" AG
CODO 1 1/2" AG
CODO 1 1/4" AG
CODO 1" AG
CODO 3/4" AG
CODO 1/2" AG 90
NIPLE 1/2" X 10 CMS AG
VALVULA NPT 1/2"
TAPON MACHO 1/2" AG
TAPON MACHO 2" AG
SELLANTE FUERZA ALTA 40 GRS
CHAZO 1/4" X 11/4"
PLATINA
PINTURA ANTICORROSIVA GLB
MANO DE OBRA INSTALACION NICHO
MANO DE OBRA TUBERIA ACERO AL CARBON
MANO DE OBRA PUNTOS ADICIONALES
MANO DE OBRA ANCLAJES
MANO DE OBRA PINTURA TUBERIA

850
5100
3100
2350
2300

8
3
3
10
5
19
10
10
1
3
50
3
1
1
81
10
30
81

731
1786
6300
487
1950
5800
90
1100
25000
7000
4200
5500
500
500
TOTAL

INSTALACION CENTROS DE MEDICION 6 MEDIDORES 10 UND


DESCRIPCION
NICHO CENTRO DE MEDICION
REGULADOR OARA 95
VALVULA NPT 1/2"
TAPON MACHO 1/2" AG
UNIVERSAL PLANA 3/4"
TUBERIA COBRE RIGIDO 1/2"
TUBERIA COBRE RIGIDO 3/4"
TEE 1/2" COBRE RIGIDO
TEE 3/4" COBRE RIGIDO
TEE 3/4" X 1/2" COBRE RIGIDO
CODO 3/4" COBRE RIGIDO
CODO 1/2" COBRE RIGIDO
MACHO 1/2" COBRE RIGIDO
HEMBRA 1/2" COBRE RIGIDO
HEMBRA 1/2" COBRE RIGIDO
RED COPA 3/4" X 1/2"
CHAZO 1/4" X 11/4"
ABRAZADERA 1/2"
ML SOLDADURA ESTAO PLATA
TARRO FUNDENTE
PIED DE AMIGO (SOPORTE FLAUTAS)
MANO DE OBRA INSTALACION NICHO
MANO DE OBRA INSTALACION REGULADOR
MANO DE OBRA FLAUTA CENTRO DE MEDICION

CANT

VALOR UNITARIO
1
1
6
6
2
1.2
2.5

130000
175000
6300
500
7500
10200
24900
1026
3143
3143
1415
629
1314
1890
2978
1773
90
103
12670
4486
1000
4000
3200
36000

3
2
2
9
6
1
4
30
15
0.7
0.2
4
1
1
1
TOTAL

205-209-213-217-103-107-

VALOR TOTAL
26550
26880
6928
4343
4232
11070
1206
8080
27489
6498
4684
1124
1507
1160
740
2100
1060
3090
2700
1900
25000
10000
1500
6400
300
1000
187541

PRECIO COSTO

PRECIO UNITARIO + AIU

3375738

412590.2

09-311-313-315-317-319
VALOR TOTAL
35400
26880
6928
4343
4232
11070
1206
8080
27489
6498
4684
1124
1507
1160

PRECIO COSTO

PRECIO UNITARIO + AIU

740
2100
1060
3090
2700
1900
25000
10000
1500
6400
300
1000
196391

1963910

432060.2

104-108-112-116-120-202-

VALOR TOTAL
29500
24960
6928
4343
4232
11070
1206
8080
27489
6498
4684
1124
1507
1160
740
2100
1060
3090
2700
1900
25000
10000
1500
6400
300
1000
188571

PRECIO COSTO

PRECIO UNITARIO + AIU

3771420

414856.2

18-304-308-312-316-320
VALOR TOTAL
38350
24960
6928

PRECIO COSTO

PRECIO UNITARIO + AIU

4343
4232
11070
1206
8080
27489
6498
4684
1124
1507
1160
740
2100
1060
3090
2700
1900
25000
10000
1500
6400
300
1000
197421

VALOR TOTAL
120000
0
549360
212147
154336
142830
52650
0
8096
3630
3174
6050
0
0
4400
2200
1520
1520
0
2500
6260
0
24800
6600
5250

1974210

434326.2

2550
0
24800
7050
6900
3655
33934
63000
4870
1950
17400
4500
3300
25000
7000
340200
55000
15000
40500
1963932

1963932

3338684.4

5386612

915724.04

UND
VALOR TOTAL
130000
175000
37800
3000
15000
12240
62250
0
9429
6286
2830
5661
7884
0
2978
7092
2700
1545
8869
897.2
4000
4000
3200
36000
538661.2

COSTO TOTAL DE LA OBRA

18435822

AIU TOTAL OBRA


%AIU TOTAL OBRA
COSTO PROMEDIO APTO

18447714.4
100.064507
635923.0414

PRECIO TOTAL+AIU

7426623.6

PRECIO TOTAL+AIU

4320602

PRECIO TOTAL+AIU

8297124

PRECIO TOTAL+AIU

4343262

3338684.4

9157240.4

36883536.4