Académique Documents
Professionnel Documents
Culture Documents
IMPORTANT DATE
S ynopsis Approval Last Date Project S ubmission Date MBA S ynopsis Approval Last Date MBA Project S ubmission Date : : : : 20/05/2011 27/07/2011 30/05/2011 10/08/2011
IMPORTANT INFORMATION
MCA-6th S em Project Coordinator PGDCA-2nd S em Project Coordinator BCA-6th Sem Project Coordinator MBA- 4th S em Project Coordinator : Mrs Seema S rivastava : Mr.Gangesh Kumar :Mr.Deepak Mishra Ph:9451686685 :Mr. Jitendra Kumar Keswani Ph: 8081313153
th
th
nd
th
nd
2. Certificate of originality from organization about your stay (Project Duration) at that place and about submission of work done under external guide at the place of training. 3. Certificate from your guide about the submission of work done under his/her guidance, Internal Supervisor. 4. Table of Contents, abstract of the project (abstract of actual work done). 5. A brief o verview of the organization (regarding function area, location, division in which you are working, turnover) 6. Profile of problems assigned. 7. Study of existing system, if any. 8. System requirements 9. Product Definition 10. Problem Statement 11. Function to be Provided 12. Processing Environment: H/W, S/W. 13. Solution Strategy 14. Acceptance Criteria 15. Feasibility Analysis 16. Project Plan 17. Team Structure
NIPS COLLEGE OF IT & MANAGEMENT ALLAHABAD Ph: 0532-3291133
18. Development Schedule 19. Programming Languages And Development Tools 20. System Requirement Specifications 21. Developing / Operating / Maintenance Environments 22. External Interface And Data Flows 23. User display and report format, user command summary 24. High level DFD and data dictionary 25. Functional and performance specifications 26. Design 27. Detailed DFDs and structure diagrams 28. Data structures, database and file specifications 29. Pseudo code 30. Test Plan 31. Functional, Performance, Stress tests etc. 32. Implementation / Conversion Plan 33. Project Legacy 34. Current status of project 35. Remaining areas of concern 36. Technical and managerial lessons learnt 37. Future recommendations 38. Bibliography 39. Source Code Note: - The above is meant to serve as a guideline for preparation of your project report. You may add to, modify or omit some of the above-mentioned points depending upon
MCAMCA-6 Semester
Project Report Format
1. Title Cover 2. Certificate from organization about your stay (Project Duration) at that place and about submission of work done under external guide at the place of training. 3. Certificate from your guide about the submission of work done under his/her guidance, Internal Supervisor. 4. Table of Contents, abstract of the project (abstract of actual work done). 5. A brief o verview of the organization (regarding function area, location, division in which you are working, turnover) 6. Profile of problems assigned. 7. Study of e xisting system, if any. 8. System requirements a. Function to be Provided b. Product Definition c. Problem Statement d. Processing Environment: H/W, S/W.
NIPS COLLEGE OF IT & MANAGEMENT ALLAHABAD Ph: 0532-3291133
th
e. Solution Strategy f. Acceptance Criteria 9. Feasibility Analysis 10. Project Plan a. Team Structure b. Development Schedule c. Programming Languages And Development Tools 11. System Requirement Specifications a. Developing / Operating / Maintenance Environments b. External Interface And Data Flows c. User display and report format, user command summary d. High level DFD and data dictionary e. Functional and performance specifications 12. Design Phase a. Detailed DFDs and structure diagrams b. Data structures, database and file specifications c. Pseudo Code 13. Test Plan a. Functional, Performance, Stress tests etc. 14. Implementation / Conversion Plan a. Project Legacy b. Current status of project c. Remaining areas of concern d. Technical and managerial lessons learnt
Note: - The above is meant to serve as a guideline for preparation of the project report. The students m ay add to, m odify or om it some of the above-mentioned points depending upon their relevance to the project and w ith the consultation of the project guide for the same. Joint project w ill be allowed and joint project report will be also being accepted.
In case of Joint Project the team should not consist of m ore than 3 mem bers. Individual project will be recognized and the student should highlight their contribution in a joint project report.
MBA-4 Semester
Synopsis/Project Synopsis/Project Report Format
a. COVER PAGE ( Onl y the given format is to be followed. An y other format will not be entertained STRICTLY.) b. CERTIFICATE of HOD c. DECLARATION
NIPS COLLEGE OF IT & MANAGEMENT ALLAHABAD Ph: 0532-3291133
th
d. ACKNOWLEDGEMENT e. PREFACE f. INDEX (containing page numbers of items of report) g. LIST OF CHARTS AND TABLES (IF AN Y) h. LIST OF FIGURES (IF AN Y) i. INTRODUCTION j. THE OBJECTIVES AND SCOPE OF THE STUDY k. RESEARCH METHODOLOGY, Research Design, Sample Design. l. DATA COLLECTION AND METHOD m. AN ALYSIS OF D ATA COLLECTED a) TEXT b) TABLE c) FIGURES n. RATIONAL OF THE STUDY o. CONCLUSIONS p. LIMITATION OF THE STUD Y q. RECOMMENDATIONS r. APPENDIX s. BIBLIOGR APHY.
NOTE: A certificate of the Head of the MBA program certifying the authenticity of the report shall be attached therewith. The student will submit two copies of the report to the Faculty Guide. The number of pages in the report will be 75 or more. The report should be typed in A-4 size paper. FONT TYPE = TIMES NEW ROMAN, MAIN HEADING FONT SIZE = 16, SUB HEADING FONT SIZE = 14, TEXT FONT SIZE =- 12
Finance
1-Study of stock exchange 2-Mutual fund 3-Forex and treasury 4-private sector banks 5-Corporate finance 6-Deficit financing 7-Finance scams in India 8-Working capital management
NIPS COLLEGE OF IT & MANAGEMENT ALLAHABAD Ph: 0532-3291133
Human Resource
1-Trade union movements in India 2-Labour welfare scheme 3-Performance appraisals 4-Conflict management 5-Organisational culture in Indian organisation 6-Time management 7-Proffesional stress 8-Motivation 9-Group dynamics 10-Recruitment in Indian organization
INFORMATION TECHNOLOGY
1. Bank Transactions Management 2. Hotel Management 3. Gas Agency Management 4. Office Automation 5. Railway Reservation 6. Computerization Course Registration 7. Hostel Management 8. Hospital Management
10
IMPORTANT DATE
S ynopsis Approval Last Date Project S ubmission Date MBA S ynopsis Approval Last Date MBA Project S ubmission Date : : : : 20/05/2011 27/07/2011 30/05/2011 10/08/2011
IMPORTANT INFORMATION
MCA-6th S em Project Coordinator PGDCA-2nd S em Project Coordinator BCA-6th Sem Project Coordinator MBA- 4th S em Project Coordinator : Mrs Seema S rivastava : Mr.Gangesh Kumar :Mr.Deepak Mishra Ph:9451686685 :Mr. Jitendra Kumar Keswani Ph: 8081313153
THETHE-END
11