Vous êtes sur la page 1sur 4

A Practicum Report Presented to

The Department of Hospitality and Tourism Management School of Accountancy and Business Management

In Partial Fulfillment of the Course Requirement in Practicum 2

Submitted by: Soliven, Jerrife B. S.Y. 2011-2012

Submitted to: Maam Joni Therese Razote Practicum Adviser

TABLE OF CONTENTS

Title Page

Acknowledgment

Dedication

Resume

I.

Institutional Information

a. History

b. Facilities

c. General Standard Operating Procedures

II.

Weekly Report

III.

Recommendations

IV.

Changes in Life

Philex Mining Corporation was born in July 1955. Most Philexians assume that the first ton of ore was mined in the same year. However, the 1st 2 years of the company was mainly concentrated on the exploration activities and mine development in the field and paper works in Manila. About 9,000 feet of diamond drill cores and 1,530 feet of auditing/crosscuts outlined the Sto. Tomas II ore body measuring 400 feet by 1,000 feet by 600 feet depth with 18 million tons mineable reserve. A portion of thaty reserve was extractable via open pit method. The Padcal Mill (now the area occupied by the Mine Engineering/ Safety, Administration, Security, Padcal Time Keeping, Corehouse and Adjacent buildings) was constructed by1957 to initially process 2,000 tons ore daily.

Vous aimerez peut-être aussi