Measurement A Assignment 02: Measurements of super structure, Preparation of a BOQ for Tender Purpose Ms. S. Kavitha ID 16th March 2012 Date Due Re-Submission Date QS/MTL/21/____

9th April 2012

Initially

On Resubmission

Assessor Feedback

BTEC HND in Quantity Surveying


Assessed by (name): Signature: Student Signature & Comments Date Assessed :

Important Information for Students

The criteria each task relates to are shown against that task where possible.

Please note that plagiarism is treated as a serious offence and therefore the work you produce must be individual and original although may work in groups in some instances (Please refer to Student Handbook on Plagiarism & Cheating). All sources of information must be referenced using Harvard referencing where a reference list/Bibliography should be included at the end of the assignment.

Please note that the submission date given for this assignment is the final date that you can hand over the assignment. A one week grace period maybe extended with prior approval from the Program Manager Undergraduate. However, note that submissions handed in one week late will be graded lower (Please refer to the Student Handbook on Assessments Late Submissions & Penalties).

Assignments returned to students for re-working must be re-submitted within 10 days (Please refer to Student Handbook on Assignments Re-submission).

Failure to re-submit the previously marked assignment with the re-submitted assignment will mean that results cannot be released for the respective unit.

Please read, follow and reference both the contents of the unit outline and the grading criteria of the assignment before completing this assignment.
Measurement of Work A Assignment 2 International College of Business and Technology

BTEC HND in Quantity Surveying


Plagiarism:

While research and discussion are an essential part of an assignment, the deliberate copying of someone elses work or unacknowledged copying from printed or electronic sources is NOT permitted. You may be subject to disciplinary procedure if you do this. You should sign this sheet to show that you comply with these regulations. Students Signature: .. Students Comments: .... ........ .... .... Date: ...

Internal Verifier Name: Signature :

Dr. Lesly Ekanayaka Dr. Lesly Ekanayaka Date Verified : 13/3/2012

Measurement of Work A Assignment 2

International College of Business and Technology

BTEC HND in Quantity Surveying


Assignment 02 1. As the continuation of the project of SEAVIEW HOTEL, the Senior Quantity Surveyor asks you to do the following, a. Take off the quantities of superstructure as per SMM7 & prepare TDS Sheets. When details are lacking, you are allowed to take any reasonable assumptions by mentioning them in the query sheet. (P2.1, P2.2, P2.3) Scope of Take off i. ii. iii. iv. Walls Finishes Doors & Windows Roof

b. Prepare Abstract sheets & produce Bill of Quantities. (P3.1, P3.2) c. Produce an appropriate preliminary Bill. (P3.3) 2. Explain the terms Prime Cost (PC) & Provisional Sums (PS) & elaborate on their usage. Allow a provisional sum of Rs.5,000,000.00 for the installment of Services (Providing Electricity & Water) (P3.4) Note: The drawing of a typical cottage has been attached in next page. 3. Several forms of Bills of Quantities & Contract Documents are used in Construction Industry. a. Analyse the different forms of Bills of Quantities & Contract Documents (P4.1) b. Determine the correct form of contract documentation for the project SEAVIEW HOTEL (P4.2)

Measurement of Work A Assignment 2

International College of Business and Technology

BTEC HND in Quantity Surveying


Merit Grade: Merit grade is achieved by meeting all following grade descriptors. Performance Descriptors M1 Identify and apply strategies to find appropriate solutions Indicative Characteristics Contextualized evidence

Effective judgments to be made when Complex problems with more than one variable preparing the Query have been explored sheet. Construction An effective approach to study and research has technique to be used for assumptions been applied Effective judgments have been made Preparing Take off list prior to take off A range of methods and techniques have been & following the principles of TDS & applied Abstract A range of sources of information has been used Relevant theories and techniques have been applied The selection of methods and techniques/sources has been justified the design of methods/techniques has been justified Complex information/data has been synthesized and processed appropriate learning methods/techniques have been applied

M2 Select/design and apply appropriate methods/ techniques

M3 Present and communicate findings

The appropriate structure and approach has been Presenting BOQ in the standard format. used Dividing the BOQ as Coherent, logical development of per Trades or Elements & principles/concepts for the intended audience A range of methods of presentation have been used preparing summary page and technical language has been accurately used Communication has taken place in familiar and unfamiliar contexts The communication is appropriate for familiar and unfamiliar audiences and appropriate media have been used

Measurement of Work A Assignment 2

International College of Business and Technology

BTEC HND in Quantity Surveying


Distinction Grade: Distinction grade is achieved by meeting all following grade descriptors. Performance Descriptors D 1 Use critical reflection to evaluate own work and justify valid conclusions. Indicative Characteristics Conclusions have been arrived at through synthesis of ideas and have been justified The validity of results has been evaluated using defined criteria Self-criticism of approach has taken place Realistic improvements have been proposed against defined characteristics for success D 2 Take responsibility for managing and organizing activities Autonomy/independence demonstrated Substantial activities, projects or has been Plan & Organizing themselves to work on time, submitting the completed assignment on the due date. Contextualized evidence Taking off has to be defined as per the given drawing. More details are welcome.

investigations have been planned, managed and organized Activities have been managed The unforeseen has been accommodated The importance of interdependence has been recognized and achieved D 3Demonstrate convergent/lateral/ creative thinking Ideas have been generated and decisions taken Self-evaluation has taken place Convergent and lateral thinking have been applied Problems have been solved Innovation and creative thought have been applied Receptiveness to new ideas is evident Effective thinking has taken place in

Student provides his/her own ideas/ findings/ comments & conclusions on the use of measurements in various stages by various parties.

unfamiliar contexts
Measurement of Work A Assignment 2 International College of Business and Technology

BTEC HND in Quantity Surveying


Grading Matrix

Grading P1.1 P1.2 P2.1 P2.2 P2.3 P3.1 P3.2 P3.3 P3.4 P4.1 P4.2 M1 M2 M3 D1 D2 D3

Assignments 01

Assignments 02

Measurement of Work A Assignment 2

International College of Business and Technology

Vous aimerez peut-être aussi