Prestaciones Sociales y Aportes en Obreros de Construccin

menos de 2 S.M.L.V
CONCEPTO

Para empleados con

Aporte Empleador

% Total

Aporte Empleado

PRESTACIONES SOCIALES
Cesanta

8.33%

8.33%

Intereses Cesanta

1.00%

1.00%

Prima Legal

8.33%

8.33%

Vacaciones

4.17%

4.17%

Salud

12.50%

8.50%

4%

Pensiones

15.50%

11.625%

3.88%

8.70%

8.70%

58.53%

50.66%

Subsidio Familiar

4.00%

4.00%

Sena

2.00%

2.00%

FIC

2.50%

2.50%

I.C.B.F.

3.00%

3.00%

11.50%

11.50%

5.28%

5.28%

75.31%

67.44%

Riesgos Profesionales
SUBTOTAL

7.88%

APORTES PARAFISCALES

SUBTOTAL

Vestido de Labor **

TOTAL

7.88%

CALCULO DE COSTOS DE PERSONAL

Salario de mano de obra

Mensual
Auxilio de transporte mensual
Salario mnimo mensual

Diario

63,600

535,600

2,120

17,853

Jornales diarios de mano de obra

OFICIAL DE CONSTRUCCIN

AYUDANTE DE OBRA

Salario pacto

30,000.00

Salario mnimo legal

17,853

Auxilio de transporte

2,120.00

Auxilio de transporte

2,120

Vestido y calzado

1,584.00

Vestido y calzado

943

Total jornal diario

33,704.00

Total jornal diario

20,916

CALCULO DE VALORES DE CUADRILLAS


Prestaciones Sociales

58.53%

Aportes Parafiscales

11.50%

Otros Aportes

5.28%

Valor Total P.

75.31%

Valor Hora
Hombre

Cuadrillas 1- MAMPOSTERIA
1-A. Cuadrilla Tipo 1: Un Oficial - Un Ayudante

HH

Cuadrillas 1- MAMPOSTERIA
1-B. Cuadrilla Tipo 1: Un Oficial - Dos Ayudantes

Jornal Diario Oficial

33,704.00

4,213.00

Jornal Diario Oficial

33,704.00

Jornal Diario Ayudante

20,916

2,614.50

Jornal Diario Dos Ayudantes

41,831.98

Jornal diario Base

54,619.99

6,827.50

Jornal diario Base

75,535.98

Prestaciones Sociales y Aportes

41,134.31

5,141.79

Prestaciones Sociales y Aportes

56,886.15

95,754.30

11,969.29

132,422.12

TOTAL CUADRILLA 1-A

Valor Hora
Hombre

Cuadrillas 1- MAMPOSTERIA
1-C. Cuadrilla Tipo 1: Un Oficial - Tres Ayudantes

HH

Jornal Diario Oficial

33,704.00

Jornal Diario Tres Ayudantes

62,747.97

Jornal diario Base

96,451.97

Prestaciones Sociales y Aportes

72,637.98

9,079.75

169,089.95

21,136.24

TOTAL CUADRILLA 1-C

TOTAL CUADRILLA 1-B

Cuadrillas 1- MAMPOSTERIA
1-D. Cuadrilla Tipo 1: Dos Oficiales - Dos Ayudantes

4,213.00

Jornal Diario Dos Oficiales

7,843.50

Jornal Diario Dos Ayudantes

41,831.98

12,056.50

Jornal diario Base

109,239.98

Prestaciones Sociales y Aportes

82,268.63

191,508.61

TOTAL CUADRILLA 1-D

67,408.00

CALCULO DE VALORES DE CUADRILLAS ESPECIALES

Prestaciones Sociales

58.53%

Aportes Parafiscales

11.50%

Otros Aportes

5.28%

Valor Total P.

75.31%

Valor Hora
Hombre

Cuadrillas 1- HIDRAULICOS
2-A. Cuadrilla Tipo 2: TECNICO PLOMERO - Un Ayudante PLOMERO

HH

Cuadrillas 3- ELECTRICOS
3-A. Cuadrilla Tipo 1:TECNICO ELECTRICO - Un AYUDANTE E,

Jornal Tecnico Plomero

40,000.00

5,000.00

Jornal Tecnico Electrico.

43,000.00

Jornal Diario Ayudante

30,000

3,750.00

Jornal Diario Ayudante

28,000.00

Jornal diario Base

70,000.00

8,750.00

Jornal diario Base

71,000.00

Prestaciones Sociales y Aportes

52,717.00

6,589.63

Prestaciones Sociales y Aportes

53,470.10

122,717.00

15,339.63

124,470.10

TOTAL CUADRILLA 2-A

TOTAL CUADRILLA 3-A

UNIVERSIDAD COOPERATIVA
DE COLOMBIA SEDE NEIVA
MATERIA CONSTRUCCION 2

ITEM

UNIDAD

CANTIDAD

RENDIMIENT
O

M2

73.80

14

ACTIVIDADES PRELIMINARES

1.

1.1

Limpieza y Descapote e =10 cm

1.2

Cerramiento

h=2m

ML

36.30

11

1.3

Localizacion y replanteo

M2

73.80

40

1.4

Campamento

GB

1.00

0.1

EXCAVACIONES

2.

2.1

Excavacion Zapatas

M3

20.28

2.6

2.2

Excavacion Vigas Cimentacion

M3

2.61

1.1

M3

4.41

2.2

M3

6.08

2.4

CIMENTACIONES

3.

3.1

ZAPATAS CONCRETO

3.2

VIGAS CONCRETO

3000 P.S.I
3000 P.S.I

ESTRUCTURA

4.

4.1

vigas

M3

19.03

2.4

4.2

Columnas

ML

10.30

1.26

4.3

Muros

M2

271.24

13.5

4.4

Placa Entrepiso

M3

33.76

13

5.1

PISOS

M2

157.99

15

5.2

PAETE

M2

542.48

32

ACABADO

5.

6.

DESCRIPCION

INSTALACIONES ELECTRICAS

6.1

SALIDA PARCIAL HASTA 30 M

UND

16.00

6.2

Tablero automatico de 4 circuitos

UND

3.00

ML

82.00

10

INSTALACIONES HIDROSANITARIAS

7.

7.1

Tuberia de desague en PVC 3"

TOTAL DIARIO
TOTAL SEMANA
TOTAL ACOMULADO

TIEMPO EN
DIAS

COSTO DIRECTO
ACTIVIDAD
SEMANA 1
1

698,053.77

713,511.89

244,318.82

10

12,465,901.85

1,318,901.57

401,204.32

3,848,468.69

6,715,165.38

15,714,871.34

10,543,803.33

21

15,470,646.24

68,438,328.81

11

12,665,622.32

17

11,831,183.61

116,342.29 $

116,342.29 $

116,342.29

285,404.76 $

107,026.78

6,232,950.92

ADO

5,930,536.00

615,591.00

1,525,093.40
$

116,342.29 $

401,747.05 $

6,456,320.00

116,342.29 $

518,089.35 $

6,974,409.35

$
$

FLUJO DE CAJA Y
SEMANA 1

SEM
4

116,342.29 $

116,342.29 $

116,342.29

107,026.78 $

107,026.78 $

107,026.78

623,295.09 $

623,295.09 $

122,159.41 $

122,159.41

623,295.09 $

623,295.09 $

623,295.09

164,862.70 $

164,862.70

846,664.17

846,664.17

846,664.17

910,317.20

910,317.20

10,424,719.06 $

11,335,036.26

9,514,401.86 $
$

7,821,073.52 $

8,667,737.69

9,514,401.86 $

E CAJA Y PROGRAMACION CO
SEMANA 2
3

623,295.09 $

623,295.09 $

623,295.09 $

623,295.09 $

623,295.09

164,862.70 $

164,862.70 $

164,862.70 $

164,862.70 $

164,862.70

133,734.77 $

133,734.77

788,157.79

788,157.79

788,157.79

921,892.56

921,892.56

5,107,000.33 $
$

12,123,194.04 $

12,911,351.83 $

13,699,509.62 $

14,621,402.19 $

15,543,294.75

CION CONSTRUCCION (80%) VI


SEMANA 3
2

164,862.70

133,734.77

1,924,234.34 $

641,411.45 $

641,411.45 $
$

641,411.45
3,357,582.69 $

1,119,194.23

$
$

2,222,831.81

641,411.45

3,558,321.60 $

296,526.80

915,056.04 $

67,781.93 $

67,781.93

1,556,467.49

7,625,097.67

1,483,502.96

14,451,203.94
$

17,766,126.56 $

18,407,538.01

19,964,005.50 $

27,589,103.16

29,072,606.12

N (80%) VIVIENDA UNIFAMILIAR


SEMANA 4
1

1,119,194.23 $

1,119,194.23

7,857,435.67 $

982,179.46 $

5,271,901.67 $

585,766.85 $

585,766.85 $

585,766.85

6,188,258.50 $

442,018.46 $

442,018.46 $

982,179.46

442,018.46

$
$

296,526.80 $

67,781.93 $
6,755,404.63

296,526.80 $

67,781.93 $
8,257,528.31

296,526.80 $

67,781.93 $
9,249,529.72

296,526.80 $

296,526.80

369,354.60

67,781.93 $

67,781.93

2,374,273.50

$
$

2,157,861.25

30,665,182.86
35,828,010.75

44,085,539.06

53,335,068.77

55,709,342.28

57,867,203.53

FAMILIAR "ASOVITA" MUNICIP


SEMANA 5
6

982,179.46

442,018.46 $

442,018.46 $

442,018.46 $

20,531,498.64 $

11,406,388.14 $

5,066,248.93 $

690,852.13 $

690,852.13

4,732,473.44 $

417,571.19 $

417,571.19 $

417,571.19

442,018.46 $

442,018.46

11,406,388.14

296,526.80 $

82,078.80 $

82,078.80 $

67,781.93 $

67,781.93

1,870,585.45 $

30,665,182.86

296,526.80

26,152,378.08 $

82,078.80

17,414,305.51 $

12,956,829.91 $

1,550,441.78

$ 59,737,788.98 $

85,890,167.06

103,304,472.57

$ 116,261,302.49

$ 117,811,744.26

MUNICIPIO DE GIGANTE HUILA


TIEMPO (7 SEMANAS)

A5

SEMANA 6
5

982,179.46 $

982,179.46

585,766.85 $

585,766.85 $

585,766.85

442,018.46 $

442,018.46 $

442,018.46 $

442,018.46

690,852.13 $

690,852.13 $

690,852.13 $

690,852.13

417,571.19 $

417,571.19 $

417,571.19 $

417,571.19

2,136,208.63

2,136,208.63

3,118,388.09 $

2,532,621.24

62,346,372.54 $
$

119,947,952.89 $

122,084,161.52 $

125,202,549.61

127,735,170.84

GANTE HUILA
TIEMPO (7 SEMANAS)
SEMANA 6
3

982,179.46

442,018.46 $

442,018.46 $

13,687,665.76 $

417,571.19 $

417,571.19 $

442,018.46 $

442,018.46

11,406,388.14

417,571.19 $

417,571.19

1,841,769.11

14,547,255.41

12,265,977.79

859,589.65

35,165,601.28
$

129,576,939.95 $

144,124,195.37

156,390,173.15

$ 157,249,762.80

SEMANA 7
1

982,179.46 $

982,179.46

585,766.85 $

585,766.85 $

585,766.85

442,018.46 $

442,018.46 $

442,018.46 $

442,018.46

690,852.13 $

690,852.13 $

690,852.13 $

690,852.13

417,571.19 $

417,571.19 $

417,571.19 $

417,571.19

2,136,208.63

2,136,208.63 $

3,118,388.09

2,532,621.24

$
$

11,891
159,385,971.43 $

161,522,180.06

$ 164,640,568.15 $

167,173,189.38

EMANA 7
5

442,018.46

690,852.13

417,571.19 $

417,571.19

1,550,441.78 $

417,571.19

11,891,439.54
$

168,723,631.16

169,141,202.35

ADMINISTRACIN - IMPREVISTOS - UTILIDADES (A.I.U.)


1. ADMINISTRACION
1.1 PERSONAL TECNICO Y ADMINISTRATIVO
Descripcion

Cant.

Duracion
(meses)

Director de Obra
Residente de obra
Auxiliar de ingenieria
Topografo
Cadeneros
Patinador
Secretaria
Contador

1
1
1
1
1
1
1
1

1.75
1.75
1.75
1.20
1.75
1.75
1.75
1.75

Dedicacin (%) Salario Basico


0.50
0.80
1.00
0.10
0.10
1.00
0.10
0.05

$
$
$
$
$
$
$
$

Factor
prestacional

2,900,000
1,650,000
800,000
750,000
535,600
535,600
535,600
900,000
SUBTOTAL

1.75
1.75
1.75
1.75
1.75
1.75
1.75
1.75

Total obra
$ 4,448,491
$ 4,042,500
$ 2,454,340
$
157,779
$
164,318
$ 1,643,181
$
164,318
$
138,057
$ 13,212,984

1.2 SOSTENIMIENTO DE LA OFICINA


SERVICIOS

Cant.

Gastos de Oficina
Arriendo
Agua
Electricidad
Telefono
Materiales e insumos de oficina
Materiales
de (computador,
Limpieza
Equipo
de Oficina
calculadora, fax, copiadora, ,A.A.)

1
1
1
1
1
1
1
1

Duracion
(meses)
2
2
2
2
2
2
2
2

Costo
mensual
1.0
$
55,000
1.0
$ 320,000
1.0
$
30,000
1.0
$
50,000
1.0
$
40,000
1.0
$
50,000
1.0
$
20,000
1.0
$ 100,000
SUBTOTAL

Dedicacin (%)

Valor total
$
$
$
$
$
$
$
$

110,000
640,000
60,000
100,000
80,000
100,000
40,000
200,000

1,330,000

1.3 COMPRA HERRAMIENTA MENOR


DESCRIPCION
PALA
PALUSTRE
CARRETILLA
ASADON
FLEXOMETRO
SERRUCHO
HOJAS SEGUETA
BALDES
PICAS

CANTIDAD

V/ UNITARIO

15.0
$
30,000 $
10.0
$
10,000 $
5.0
$ 100,000 $
2.0
$
25,000 $
8.0
$
15,000 $
3.0
$
30,000 $
50.0
$
1,200 $
20.0
$
7,000 $
5.0
$
20,000 $
SUBTOTAL
$

VALOR TOTAL
450,000
100,000
500,000
50,000
120,000
90,000
60,000
140,000
100,000
1,610,000

1.4 GASTOS LEGALES

DESCRIPCION
Polizas de Seguros
Rete fuente 1%
Impuesto de industria y
comercio
SUB TOTAL

VALOR
$
$
$
$

635,000.00
1,691,412.02
300,000.00
2,626,412

1.5 GASTOS ADICIONALES

DESCRIPCION
Ensayos de laboratorio
Diseos de mezclas
Ensayos de suelo
SUB TOTAL

VALOR
$
$
$
$

400,000
300,000
500,000
1,200,000

TOTAL COSTOS ADMINISTRACIN


DESCRIPCION

VALOR

PERSONAL TECNICO Y ADMINISTRATIVO


$ 13,212,984
SOSTENIMIENTO DE LA OFICINA
$
1,330,000
HERRAMIENTAS MENORES
$
1,610,000
GASTOS LEGALES
$ 2,626,412
GASTOS ADICIONALES
$ 1,200,000
ALQUILER DE EQUIPOS
$ 1,300,000
VALOR TOTAL
$ 19,669,396

PORCENTAGE TOTAL DE ADMINISTRACION


Valor de la contruccion
Costo Total de la construccion Valor Total
AREA CONSTRUCCION(m)
(m)
$
1,055,483 $
169,141,202
160.25
11.6%

2. IMPREVISTOS
IMPREVISTOS (%)
Por alza de jornales
Por alza de materiales
Por alza de combustibles
Por actividades no remuneradas
% TOTAL
NOTA:

1.25%
1.25%
1.25%
1.25%
5%

Se estima de imprevistos 5% de los costos directos asumiendo que en la zona durante ya varios meses
se esta propagando una dificil ola invernal.

3. PORCENTAJE DE UTILIDAD
3,1 UTILIDAD DEL CONTRATO

10%

NOTA: Lo que estima el contratista es un 10% de utilidad del


contrato.

TOTAL COSTOS INDIRECTOS


A.IU

TOTAL (%)

ADMINISTRACIN
IMPREVISTOS
UTILIDADES

11.6%
5%
10%

TOTAL

26.6%