CALCULO DE BOLSAS DE CEMENTO EMPLEADAS EN OBRA

tem

03
03.06
03.08
04
04.01
04.02
04.03
04.04
04.05
04.06
05
05.01
05.01.01
05.02
05.02.01
05.02.02
05.03
05.03.01
05.03.02
05.03.04
05.04
05.04.01
05.04.03
05.05
05.05.01

CALCULO DE BOLSAS DE CEMENTO EMPLEADAS EN OBRA

Descripcin

MOVIMIENTO DE TIERRAS
RELLENO CON MATERIAL PROPIO
CONFORMACION DE SUBRASANTE
PAVIMENTOS
SUB BASE GRANULAR
BASE GRANULAR
IMPRIMACION ASFALTICA
RIEGO DE LIGA ASFALTICA
CARPETA ASFALTICA (e=1")
SELLO ASFALTICO
OBRAS DE ARTE
VEREDAS LONGITUDINALES
CONCRETO F'C=140 KG/CM2 PARA VEREDAS
CUNETAS
CONCRETO FC=175 KG/CM2 P / PISO DE CUNETA
CONCRETO F'C=140 KG/CM2 PARA MUROS DE CUNETA
MUROS DE CONTENCION
CONCRETO F'C=210 KG/CM2 P/ MURO
CONCRETO FC=175 KG/CM2 P/ ZAPATA
ACERO FY = 4200 KG/CM2
MURETE DE CONFINAMIENTO
CONCRETO F'C=140 KG/CM2
ACERO FY = 4200 KG/CM2
GRADERIAS DE CONCRETO
CONCRETO F'C=140 KG/CM2 PARA GRADERIAS

1m3 =

1 pie3 =
1m3 =
cemento =

14.1259034

arena =

piedra =

0.028317
9.50
2.50
3.00

concreto f'c = 140 kg/cm2


concreto f'c = 175 kg/cm2
concreto f'c = 210 kg/cm2

EMPLEADAS EN OBRA

Und.

Metrado

Precio
Unitario

CEMENTO

ARENA

PIEDRA

m3

545.20

34.93

m2

1,818.25

2.31

m3

272.74

87.10

m3

272.74

218.19

m2

2,532.31

5.83

m2

2,532.31

10.06

m2

2,532.31

34.90

m2

2,532.31

12.00

M3

98.22

427.80

688

7.00

8.40

m3

20.04

464.75

1.50

1.80

m3

65.13

428.60

161
456

m3

117.84

525.37

m3

129.04

498.53

1061
1033

8.40
9.20

10.10
11.00

8,560.98

5.50

28

0.30

0.40

19

0.20

0.30

3446

26.60

kg
m3
kg
m3

3.95

539.13

108.23

5.50

2.70

458.53

32.00

o f'c = 175 kg/cm2


o f'c = 210 kg/cm2

bls/m3
pie3
pie3

=
=
=
=
=

0.070792 m3
0.08495
7.00 bls/m3
8.00 bls/m3
9.00 bls/m3