Project Cost (Phase I) Site Area (Phase I) Total GFA (Phase I)

$16M 5000 m2 228 m2

Project Inception (Phase I) Feb 2000 Commencement (Phase I) Jul 2000 Completion (Phase I) Dec 2000

Wetland Park Visitor Centre (Phase I)

ARCHITECTURAL SERVICES DEPARTMENT

ArchSD

Case Study

Project Data

Wetland Park Visitor Centre (Phase I)

ARCHITECTURAL SERVICES DEPARTMENT

ArchSD

Case Study

The Site

Millennium project for HKs Eco-tourism Architecture harmonize with adjacent wetland environmental friendly convey message :

Respect Ecosystem

Westland Park Visitor Centre (Phase I)

ARCHITECTURAL SERVICES DEPARTMENT

ArchSD

Case Study

The Goals

Visitor Centre (Phase I)

Wetland Park Visitor Centre (Phase I)

ARCHITECTURAL SERVICES DEPARTMENT

ArchSD

Case Study

Master Layout

Building echoes adjacent wetland Low rise, simple massing, use of natural finish materials, sculptures of wetland animals

Wetland Park Visitor Centre (Phase I)

ARCHITECTURAL SERVICES DEPARTMENT

ArchSD

Case Study

Visual Impact

Roof Insulation

Deep overhang Double Wall Minimum opening Timber Screen

Wetland Park Visitor Centre (Phase I)

ARCHITECTURAL SERVICES DEPARTMENT

ArchSD

Case Study

Building Envelop

OTTV = 4.32W/m2 Statutory requirement = 70W/m2(podium), 30W/m2 (tower block)

Wetland Park Visitor Centre (Phase I)

ARCHITECTURAL SERVICES DEPARTMENT

ArchSD

Case Study

OTTV

Photo cell to switch on lighting when illumination level is low Wind sensor to switch on extraction fan when natural air movement is insufficient

Wetland Park Visitor Centre (Phase I)

ARCHITECTURAL SERVICES DEPARTMENT

ArchSD

Case Study

Use of Natural Ventilation & Daylight

Old bricks from China Granite rock paving from boundary wall of Wanchai Police Headquarters

Wetland Park Visitor Centre (Phase I)

ARCHITECTURAL SERVICES DEPARTMENT

ArchSD

Case Study

Material Re-use

Gabion wall infill made from oyster shell from Lau Fau Shan

Wetland Park Visitor Centre (Phase I)

ARCHITECTURAL SERVICES DEPARTMENT

ArchSD

Case Study

Material Re-use

Boundary fence wall using dismantled timber formwork from concreting

Wetland Park Visitor Centre (Phase I)

ARCHITECTURAL SERVICES DEPARTMENT

ArchSD

Case Study

Material Re-use

Pulverized fuel ash (PFA) as cement replacement for all structural concrete

Use of non-depletable substances


Use of environmentally friendly refrigerant (zero ozone depletion potential) R407c for the direct expansion type A/C system

Wetland Park Visitor Centre (Phase I)

ARCHITECTURAL SERVICES DEPARTMENT

ArchSD

Case Study

Material with recycled content

Steel metal decking as permanent formwork for roof slab Prefabricated Air ducts

Use of second hand formwork from other building sites

Wetland Park Visitor Centre (Phase I)

ARCHITECTURAL SERVICES DEPARTMENT

ArchSD

Case Study

Minimize Construction Waste

Use of native wetland plant species where suitable

Wetland Park Visitor Centre (Phase I)

ARCHITECTURAL SERVICES DEPARTMENT

ArchSD

Case Study

Landscape Design