Witt&Sohn AG Aug-11
Content
Purpose Comparison Metro Road tunnel Ventilation Types/ Systems Operation Modes Pre-/ Detailed Design Summary
Witt&Sohn AG Aug-11
Purpose
Presentation:
Degree of Complexity of Metro Systems No Design Guideline No Substitution for Experts Design Basic Concept 6 months: Pre-Design Fan-Pre-Selection 2 years: Detailed Iterative Design Studies (SES, CFD), Iterative Fan Selection
Witt&Sohn AG Aug-11
Purpose
Safety (5%)
(Smoke/ Fire Control) SAFE LIFE
Witt&Sohn AG Aug-11
Requirements:
Metro Passengers/ Victims Safety Comfort Pressure Pulse/ Piston Effect Road
high (6 coaches = low 4200 persons) (< 300 cars = 400 persons) high high high Stall low low/none low - medium
Witt&Sohn AG Aug-11
Road
simple (single tube) single tube + Longitudinal rough Estimation
Topology
Q1
Q2 Q3
Q2
Qin
Qout
Qn
Witt&Sohn AG Aug-11
Ventilation Types:
Longitudinal
Jet Fan, Saccardo, Push-Pull (Axial)
piston
Witt&Sohn AG Aug-11
Ventilation Systems:
Tunnel Ventilation System (TVS)
Fire
Witt&Sohn AG Aug-11
Witt&Sohn AG Aug-11
Operation Modes
Comfort (Temperature, humidity, air quality) ECS, Tunnel Cooling System, (TES)
Witt&Sohn AG Aug-11
Operation Modes
Witt&Sohn AG Aug-11
Operation Modes
Fire Operation
Heat Resistance
Witt&Sohn AG Aug-11
Pre-Design (Macro)
Selection Criterias:
Comfort Level Environmental Restrictions Traffic Capacity Evacuation Strategy (Fire) Civil Engineering: Construction of tunnel Investment Cost Operation & Maintenance Cost (Life Cycle Costs)
Witt&Sohn AG Aug-11
Pre-Design (Macro)
Calculation Tools:
SES (Subway Environment Simulation)
T, Q, vcrit, input data CFD
Witt&Sohn AG Aug-11
Pre-Design (Macro)
Steps:
Boundary Conditions Performance/ Size of Ventilation System
Qi in Network
critical air speed (comfort + fire)
p-Calculation
Witt&Sohn AG Aug-11
Pre-Design (Macro)
Steps:
Environmental Conditions (CFD)
Station Evacuation Path
Witt&Sohn AG Aug-11
by Experience
Witt&Sohn AG Aug-11
Bad Effects
Sound Waves Discomfort Fan Stall
t [s]
Witt&Sohn AG Aug-11
Energyout
by Air Exchange inside Metro System
external (cool) intermediate
by AC-System (ECS)
Optimisation
Witt&Sohn AG Aug-11
Energyin
by Train
AC Power Consumpt. Aerodynamic Losses
T [ C]
by Air Exchange
external (hot) intermediate
II s [km]
Witt&Sohn AG Aug-11
Witt&Sohn AG Aug-11
Summary
complex:
Witt&Sohn AG Aug-11
Summary
Requirement for Metro tunnels are more stringent than Road tunnels Design of ventilation system is very complex Different type of ventilation systems are required in Metro applications
(TVS, TES, ECS)
SES/CFD has to be conducted by experienced consultants Special fan design to enable operation of fans despite piston effect (pressure waves) generated by the trains Therefore: Design of Metro Systems should be only done by:
Consultants
Witt&Sohn AG Aug-11
Witt&Sohn AG Aug-11
Boundary Conditions
Witt&Sohn AG Aug-11
Boundary Conditions
Train Dimension Performance (speed) Operation Scheme/ Frequency Heat Release (Normal/ Congested) Fire Size
Witt&Sohn AG Aug-11
Boundary Conditions
Witt&Sohn AG Aug-11
Boundary Conditions
Comfort (Limits)
Air Quality Humidity Temperature Pressure Pulse
Witt&Sohn AG Aug-11
Boundary Samples
emp T
ur es e r at
Tunnel Scheme
Witt&Sohn AG Aug-11
Tunnel Scheme
Witt&Sohn AG Aug-11
780 80
860
Witt&Sohn AG Aug-11
Grid
ulse re p ssu re ulse re p ssu re
Witt&Sohn AG Aug-11
Pressure Pulse
Pressure Pulse Magnitude [Pa] Typical Symptom (human ear)
400 - 700 Perceptible feeling of fullness in the ear 700 - 1300 Increased feeling of fullness in the ear 1300 - 2000 Disinct feeling of fullness in the ear; decreased sound intensity
2000 - 4000
Witt&Sohn AG Aug-11