Method Statement For Galvanized sheet metal duct work

Table of Contents
1. Purpose 2. Scope 3. References 4. Definitions 5. Responsibilities 6. Equipment 7. Procedure 8. Safety

1. PURPOSE Providing guidance for assessing the installation activities for sheet metal duct works & air distribution systems to ensure compliance with the projects standards, consultant recommendations, applicable standards & legal requirements. 2. SCOPE - This method statement details handling, storage, delivery & installation instructions to be followed during the manufacturing of Sheet metal duct works & air distribution systems for Egyptian company for food industries (EGYFOOD). 3. REFERENCES: 3.1. Specifications & project consultant recommendations - Section 15880 Sheet Metal Duct Work - Section 15932 Grills, Registers & Diffusers 3.2. Standards & Codes - SMACNA HVAC duct construction standards - SMACNA HVAC duct Leakage test manual - ASHRAE Systems & Equipments Handbook Duct construction - ASHRAE Fundamentals Handbook Duct Design

4. DEFINITIONS: PM: Project Manager CM: Construction Manager SE: Site Engineer Owner: EGYFOOD Consultant: Shaker Consultancy group rep. Contractor: Consukorra Co. rep.

5. RESPONSIBILTIES: The following site personnel shall be involved and responsible for the Stainless steel piping installation & joining works: 5.1 Project Manager: Overall implementation and monitoring of construction works in accordance with procedures, specifications and construction drawings, Define Work Breakdown Structure, Develop Time Schedule and/or Progress Monitoring, Manage materials and tools availability at work site in time, Check quality and condition of received materials, Co-ordination between work teams and members, Following up execution of work according to work Plans, Strategy and Instructions, 3

5.2 5.3 5.4 -

Revision to ensure correct application of technical specifications and requirements, Receipt the completed works, test witness and issue work's quality approval, Carry out risks assessments and give safety instructions, Gives safety and environment protection awareness and Monitor application of safety and environment requirement application, Jobs delivery to the customer. Construction Manager: Site Engineer: Foreman: Manage works direction execution Grant safe operation at site Implement works as per project time plan, Directly control and give instruction to labors, Ensure usage of proper, sound and safe tools and equipment at site, Enforce the workers to use the personnel protective equipment and maintain safe work place, Control availability of materials and equipment at site warehouse in due time.

5.5 Worker: 5.6 Warehouse Keeper: 6. EQUIPMENT: - Grinders fitted with guards & plugged cable ends. - Drillers with plugged cable ends. - Hand tools (Scissors Screws Hammers Riveters Silicon guns - Wrenches ..) of required size as per application. - Lifting tools (Ratchets Chain blocks Hydraulic jacks - .) of appropriate calibrated capacities.

7. PROCEDURES: 7.1 General: - All project documents & drawings shall be verified & ensured for construction approval prior to execution of work. - Sheet duct metal gauges will be as described in the following table: Item Duct size (L max) Gauge Duct size (L max) Gauge Largest Dimension (mm) for low pressure application (0<P<500 pa) 760 1220 Fans & Fan Coils 0.7 0.85 Largest Dimension (mm) for medium pressure application (500<P<1500 pa) 760 1220 Air Handling Units 0.85 1.31

Note: Leakage allowance is according to SMACNA Handbook for leakage testing. 4

7.2 Handling & Storage: