Vous êtes sur la page 1sur 17

N

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Local authority boundary Wapping Order limits

Tunnel

Shaft Main tunnel

Mean low water

Shad Thames

London Borough of Tower Hamlets


Mean low water Main tunnel

London Borough of Southwark

C h a m b e r sS t r e e t

Chambers Wharf
S te r et

J a m

R o a d

B ev i ng t on

a i c a

d a a o c i R a a Jm

100m

100m

Greenwich connection tunnel Southwark Park

Scale 1:2500 at A1 1:5000 if reproduced at A3

Bermondsey

FOR INFORMATION

Location

Chambers Wharf London Borough of Southwark


Document Information

Section 48 publicity Location plan Book of plans - section 19


S48-PP-19X-CHAWF-000248 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: This drawing

North elev.

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Me a nl o w

Key:
w ae tr
Limits of land to be acquired or used (LLAU) Authorised channel

Springalls Wharf Thames Water land purchased for the project

Thames Path

At uh oi re sd ca hn nl e

+ 105.40m

Existing levels (shown in metres above tunnel datum) Existing trees within surveyed area

Notes :
River View Heights Jetty 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of St Saviours House structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic Tempus Wharf survey base, both of which have been used in the preparation of this drawing.

Steps

Luna House

Fl c t o ko n Ste re t

Dolphin Meridian Court


Ea s L t a n e

Vacant site + 103.91

+ 103.95 Axis Court


Ho u s e

Fountain Green Square

Br o wn lw o

Electrical sub-station building

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

St Michaels Catholic School

Lo fi t e

C h a mb e r sS t r e e t

+ 102.66

St r ee t

F o u n t a i n H o u s e

Br em od ns e W y aE l a l s t

u e e n Fl m i g Ho s
Jh F l o n eo t Ra n od

FOR INFORMATION

Location

Chambers Wharf
S o u ee t lv h .

London Borough of Southwark


Document Information

Section 48 publicity As existing site features plan Book of plans - section 19


S48-PP-19X-CHAWF-000249 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: This drawing Authorised channel

Me a nL o w

Wa tr e

1 to 29

Springalls Wharf
2 5

River View Heights

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Dolphin

Limits of land to be acquired or used (LLAU)

Tempus Wharf

Shingle
Me a nH i g hW ae tr

Existing public right of way

1 to 12

St Saviours House

6 0

FL C O KT ON S TREE T

1 to 42

EAS TL AN E

Meridian Court

1 2

Br 1t o o wn l w 25 o Ho u s e

1 3

1 4

El Sub Sta

FT I E

S t Mi ca h es l C ah to l iS c (e S cn co o h d ay o r) l

EE T

C H A M B E R S

ST R

LO

PH

E E T

S T R

B E

13

F A R

JH FL O N ET O N R O D A

El Sub Sta

E E T

3 4 Oi v r e H o s u e

B E V I N

TO

S TR

R E T E T L C T NS FO K O

S c h o o l k e e H p o e u r s s e

1t o

9 4

2 0 6

E l S b S u t a

2 0 8

4 0

3 8

1 0 t o 2 8

3 2

3 0

2 8

2 6

2 1

Ap Ac Notes:

Access to permanent works Access to construction works

Thames Path

Sterling Wharf Stairs


Bollard

2 9

1. This plan does not show stopping up and diversions of limited duration (eg hoarding
1 to 47
B oa lr ld s

erection, minor utility diversions and minor highway works). 2. Only rights of way in or close to worksites are shown. The full extents of rights of way are not shown where they cease to be relevant to the project.

3 3

Luna House

Dolphin

Thames Path

1 to 59

Axis Court

D W
Fountain Green Square
3 2

Chambers Wharf Ap
4 7

S T R E E T

1 t o 1 0
F o u n t a i n H o u s e

B E R MO N D S E Y

Ac

WA L E L A S T

10m
96

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

Depot
2

FOR APPROVAL

46

Location

Chambers Wharf
60

London Borough of Southwark


El Sub Sta

50

52

Document Information

Section 48 publicity Access plan


4o 4 3 t4

10

Book of plans - section 19


S48-AC-19X-CHAWF-000018 July 2012

58 56

c Thames Water Utilities Ltd 2008

Shingle
Me a nH i g hW ae tr
River Thames

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: This drawing

Sterling Wharf Stairs


O pi t oa oj nl f ad d e t t i oa (e t t b i n d p yo ed sc n a erm l e t e w i ok o no ri n v t n oe n gm . cn d eh to o t rc at d. os ) r

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. Mean low water

Key:
Limits of land to be acquired or used (LLAU)

1 to 47

B oa lr ld s
Notes:

Above ground structures to be removed Below ground structures to be removed or infilled

Luna House

1. Minor items to be removed (e.g. barriers, bollards etc.) are not shown. 2. General activities of site clearance such as removal of hardstanding and foundations, Void (buried electrical services decommissioned by others prior to demolition) Indicative line of existing river wall stripping of topsoil and clearance of minor vegetation not shown.

Electrical sub-station building (To be demolished after power supply is decommissioned by others) Jetty, flood defence wall and river wall

Mound of building demolition waste Location of basement areas

Chambers Wharf
10m 0 10m

Scale 1:250 at A1 1:500 if reproduced at A3

FOR APPROVAL
Lo fi t e St r ee t

Location

Chambers Wharf London Borough of Southwark


Document Information

C h a mb e r sS t r e e t

1 t o 1 0
F o u n t a i n H o u s e

Section 48 publicity Demolition and site clearance Book of plans - section 19


S48-PP-19X-CHAWF-000250 July 2012

E l S b S u t a
c Thames Water Utilities Ltd 2008

Table 1
Above ground permanent structure Maximum height above finished ground level (Minimum heights are in brackets where applicable) 8.0m (4.0m) Maximum extent of top of river/parapet wall (See Typical Section A)

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: This drawing

Ventilation column(s) serving the shaft Electrical and control kiosk(s)

2.5m

Zone within which Work No. 19b may be located


Me a nl o w

w ae tr

River View Heights

Zone within which Work No. 19a would be located

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Dolphin

Key:
Shingle
Me a nH i g hW ae tr
Sterling Wharf Stairs
Bollard

Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1) Zone within which ventilation column(s) serving the shaft may be located Maximum extent of top of river/ parapet wall

Tempus Wharf

2 9

FL C O KT ON S TREE T

Meridian Court

1 to 42

EAS TL AN E

1 2

Br 1t o o wn l w 25 o Ho u s e

1 3

1 4

El Sub Sta

FT I E

S t Mi ca h es l C ah to l iS c (e S cn co o h d ay o r) l

EE T

C H A M B E R S

ST R

LO

Top of river/parapet wall 106.10m maximum 105.28m minimum


2

PH

E E T

S T R

B E

13

F A R

O NF L O H ET N

Fenders
10

River foreshore (level varies)


E E T

Foreshore structure

Ol ie v r Ho u e s

TO

S c h o o l k e e H p o e u r s s e

S TR

B E V I N

Typical Section A
(Not to scale)

c ho ol

ar y

9 4

Maximum extent of top of river/parapet wall

2 0 6

E l S b S u t a

96

Depot

El Sub Sta

4o 4 3 t4

T R E T E July 2012 M AS E B

0 22

2 0 8

4 0

3 8

1 0 t o 2 8

3 2

3 0

2 8

2 6 3 3
1 to 59

1 to 47

B oa lr ld s

Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.

Luna House

Zone within which electrical and control kiosk(s) may be located


Dolphin

Axis Court

D W
Fountain Green Square
3 2

Chambers Wharf
4 7

S T R E E T

1 t o 1 0
F o u n t a i n H o u s e

B E R MO N D S E Y

WA L E L A S T

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

FOR APPROVAL

46

Location
60

Chambers Wharf London Borough of Southwark


Document Information

50

52

Section 48 publicity Site works parameter plan


58 56

Book of plans - section 19


S48-PP-19X-CHAWF-000251

6 2
c Thames Water Utilities Ltd 2008

U p p e r P o o l

B oo r C o nt s , G LA s lC y o nt s& L BB d y C C L W

U p p e r P o o l

B oo r C o nt s , G LA s lC y o nt s& L BB d y C C L W

U p p e r P o o l

B oo r C o nt s , G LA s lC y o nt s& L BB d y C C L W

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: This drawing Zone within which Work No. 19b would be located Zone within which Work No. 19a would be located Zone within which ventilation column(s) serving the shaft may be located

River View Heights

River View Heights

River View Heights

Dolphin

Dolphin

Dolphin

Tempus Wharf

Shingle
Me a nH i g hW ae tr
Sterling Wharf Stairs
Bollard

Tempus Wharf

Shingle
Me a nH i g hW ae tr

Tempus Wharf

Shingle
Me a nH i g hW ae tr
Sterling Wharf Stairs
Bollard

Sterling Wharf Stairs


Bollard

2 9

2 9

2 9

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
B oa lr ld s

1 to 47

EAST

EAST

Meridian Court

Dolphin

Meridian Court

Dolphin

Meridian Court

EAS TL AN

L AN

L AN

1 to 42

1 to 42

1 to 42

Axis Court
1 2
1 3

D W
Fountain Green Square
3 2
1 4

Axis Court
1 2

1 to 59

1 to 59

D W
1 3

1 2

Fountain Green Square


3 2

1 3

1 4

1 4

Chambers
1 0 t o 2 8

Chambers
1 0 t o 2 8

Wharf
8

Wharf
8

FT I E

FT I E

Depot
2 2

Depot
2

PH

PH

PH

E E T

E E T

S T R

S T R

S T R

E E T

B E

B E

13

13

13

B E

F A R

F A R

4o 4 3 t4
56

4o 4 3 t4
56

F A R

E E T

E E T

TO

TO

B E V I N

B E V I N

B E V I N

TO

S c h o o l k e e H p o e u r s s e

S c h o o l k e e H p o e u r s s e

E E T

S c h o o l k e e H p o e u r s s e

S TR

S TR

S TR

S c ho ol

S c ho ol

1t ry a o b u n 72 r Ho u s e

1t ry a o b u n 72 r Ho u s e

1t ry a o b u n 72 r Ho u s e

ar y

ar y

P rm i

P rm i

i v er s i de

i v er s i de

House

House

House

U p p e r P o o l

U p p e r P o o l

EA ST

EA ST

EA ST

i v er s i de

Schoolkeepers

B oo r C o nt s , G LA s lC y o nt s& L BB d y C C L W

Schoolkeepers

B oo r C o nt s , G LA s lC y o nt s& L BB d y C C L W

Schoolkeepers

L AN

L AN

L AN

P rm i

ar y

S c ho ol

Zone within which electrical and control kiosk(s) may be located

River View Heights

River View Heights

Dolphin

Dolphin

Tempus Wharf

Shingle
Me a nH i g hW ae tr
Sterling Wharf Stairs
Bollard

Tempus Wharf

Shingle
Me a nH i g hW ae tr

Sterling Wharf Stairs


Bollard

2 9

2 9

1 to 47

EAST

1 to 59

EAST

Meridian Court

Dolphin

Meridian Court

L AN

L AN

1 to 42

1 to 42

Axis Court
1 2
1 3

D W
Fountain Green Square
3 2
1 4

1 2

1 3

1 4

Chambers
1 0 t o 2 8

Wharf
8

FT I E

PH

PH

Depot
2 2

S T R

S T R

E E T

E E T

B E

13

13

B E

F A R

F A R

4o 4 3 t4
56

E E T

TO

B E V I N

B E V I N

TO

S c h o o l k e e H p o e u r s s e

E E T

S c h o o l k e e H p o e u r s s e

S TR

S TR

S c ho ol

1t ry a o b u n 72 r Ho u s e

1t ry a o b u n 72 r Ho u s e

ar y

P rm i

i v er s i de

House

House

EA ST

EA ST

i v er s i de

Schoolkeepers

Schoolkeepers

L AN

L AN

P rm i

ar y

S c ho ol

9 4

2 0 6

9 4

2 0 6

E l S b S u t a

E l S b S u t a

2 0 8

2 0 8

F o u n t a i n H o u s e

WA L E L A S T

FT I E

S t Mi ca h es l C ah to l iS c (e S cn co o h d ay o r) l

EE T

1 t o 1 0

B E R MO N D S E Y

EE T

C H A M B E R S

ST R

ST R

S T R E E T

S t Mi ca h es l C ah to l iS c (e S cn co o h d ay o r) l

LO

LO

4 0

3 8

3 2

3 0

3 3
3 2

Luna House

2 8

B oa lr ld s

1 to 47

B oa lr ld s

3 3

Luna House

Dolphin

1 to 59

Axis Court

D W
Fountain Green Square
3 2

Chambers Wharf
4 4

C H A M B E R S

S T R E E T

1 t o 1 0
F o u n t a i n H o u s e

B E R MO N D S E Y

WA L E L A S T

Depot

4o 4 3 t4
56

9 4

2 0 6

9 4

2 0 6

9 4

2 0 6

E l S b S u t a

E l S b S u t a

E l S b S u t a

2 0 8

2 0 8

2 0 8

F o u n t a i n H o u s e

WA L E L A S T

F o u n t a i n H o u s e

WA L E L A S T

FT I E

S t Mi ca h es l C ah to l iS c (e S cn co o h d ay o r) l

EE T

EE T

EE T

C H A M B E R S

ST R

ST R

1 t o 1 0

1 t o 1 0

ST R

S T R E E T

B E R MO N D S E Y

S t Mi ca h es l C ah to l iS c (e S cn co o h d ay o r) l

C H A M B E R S

S T R E E T

B E R MO N D S E Y

S t Mi ca h es l C ah to l iS c (e S cn co o h d ay o r) l

C H A M B E R S

LO

LO

LO

4 0

3 8

3 2

3 0

4 0

3 8

3 2

3 0

3 3

Luna House

3 3

Luna House

2 8
4 7
46
60 50 52
10

2 8
4 7
46
60 50 52
10

B oa lr ld s

1 to 47

B oa lr ld s

1 to 47

4 0

4 0

3 8

3 8

1 0 t o 2 8

1 0 t o 2 8

3 2
58

3 0 3 0

2 8 2 8

3 3

Luna House

Key:
Limits of land to be acquired or used (LLAU)
Dolphin

1 to 59

Zone within which all permanent site structures would be located


D W
Fountain Green Square
3 2

Axis Court

Chambers Wharf
4 7

Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1) Maximum extent of foreshore structures

S T R E E T

1 t o 1 0
F o u n t a i n H o u s e

B E R MO N D S E Y

WA L E L A S T

Notes:
Depot

4o 4 3 t4
56

1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.

46

60

50

52

10

58

58

6 2

6 2

6 2

AY ANEW J
7
46
60 50 52

AY ANEW J
7

AY ANEW J

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Chambers Wharf London Borough of Southwark


Document Information

Section 48 publicity Site works parameter key plan Book of plans - section 19
S48-PP-19X-CHAWF-000252 July 2012
46

60

50

52

10

10

58

58

6 2

6 2

AY ANEW J

AY ANEW J

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: This drawing


0 1 5 1 0 1 t0 / / a1: e n o 2 t L e n 0 o L wWa r i

Mean low water New river wall to replace existing. Flood defence level to be maintained and tied into existing adjacent flood walls in front of Luna House and Fountain Green

3 No. 1.2m internal dia ventilation columns of 4m minimum to 8m maximum height

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Passive filter chamber

Ventilation duct

Zone within which ventilation column(s) serving the shaft may be located

Key:
Limits of land to be acquired or used (LLAU) Proposed access cover + 104.10m Existing Level (shown in metres above tunnel datum) Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located

Work No. 1d. 7.2m internal dia main tunnel to Abbey Mills Pumping Station

104.50

Work No. 1c. 7.2m internal dia main tunnel to Kirtling Street Zone within which Work No. 19b would be located Zone within which Work No. 19a would be located

Notes:
B W R

1. All dimensions and levels are approximate.


B W

2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the

105.00

Ordnance Survey base and topographical survey base, both of which have been used

Work No. 19a. Main tunnel shaft (25m internal dia)


BW

in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan. 4. Future residential development (by others)

1 in 3 earthwork slope until future residential development forms new landscaped area

layout shown taken from third party drawing no. 7153AL_SITE(00)011. Electrical and control kiosk 4m x 2.5m x 2.5m high

+ 104.00m

Zone within which electrical and control kiosk(s) may be located Access for maintenance vehicles Vehicle barrier Scale 1:200 at A1 1:400 if reproduced at A3 Site boundary security fence

Future residential development building outline by others

10m

10m

EE T

Existing flood wall

New flood wall

ST R

Ta r m

ac

Access road for maintenance vehicle

L o w

Wa tr e L i n eo n2 00 /5 /1 1 a t 1 01 :0

ILLUSTRATIVE

Location
Lw o Wa tr e L i n eo n2 00 /5 /1 1 a1 t0 :0 1

Chambers Wharf London Borough of Southwark


0 1 5 1 0 1 t0 / / a1: e n o 2 t L e n 0 o L wWa r i

FT I E

Document Information

LO

Section 48 publicity
Plan View 2

Permanent works layout Book of plans - section 19


S48-PP-19X-CHAWF-000253
BW

Work No. 20. 5m internal dia connection tunnel to Greenwich Pumping Station

BRW

BW

Plan View 1

July 2012

LO

Plan View 2 Scale 1:200

Plan View 1 Scale 1:200

Inset View Scale 1:1000

FT I E

ST R

Tar m

EE T

Luna House

C H A M B E R S

S T R E E T

ac

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
Rv i r eT hm a e s

This drawing

Mean low water

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) + 105.40m Existing levels (shown in metres above tunnel datum) Proposed levels (shown in metres above tunnel datum)

105.40

Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used Dolphin in the preparation of this drawing. 3. This drawing shows the finished site levels at completion of project works.

105.28

+ 105.09

105.00

Access road for maintenance vehicles until future development is constructed

105.00 Ramp

10m 104.00

10m

Scale 1:200 at A1 1:400 if reproduced at A3

Loftie Street

FOR APPROVAL
Site access Location

Site boundary security fence

Chambers Wharf London Borough of Southwark


Document Information

Section 48 publicity
Fill slope until future residential development forms new landscaped area
Br em od ns e y Wa l la Es t

Finished site levels Book of plans - section 19


S48-PP-19X-CHAWF-000254 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: This drawing

North elev.

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
M a e no l w w a t e r

Limits of land to be acquired or used (LLAU) Zone within which permanent above ground structures would be located Thames Path + 105.40m Existing levels (shown in metres above tunnel datum) Proposed levels (shown in metres above tunnel datum) Consented development footprint (by others)

105.40

N e wr i vr e w a l lo cn su t rc tn i o tr o el p ae c ei x sn tg i

Railing or parapet as appropriate, by others

Notes:
Dolphin 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing. Thames Path to be opened upon completion of residential development, by others 105.28 3. Access covers not shown on this drawing. Refer to the Permanent works layout for an indication of the extent of access covers required. 105.09

Landscape key:
Natural stone material 3No. Ventilation columns of 4m minimum to 8m maximum height

105.00

This drawing shows paving and finishing that will only exist upon completion of the residential development by others

104.75 Residential development building overhang shown dotted, by others Electrical and control kiosk 2.5m high with brown roof

Footprint of the approved residential development by others Ramp

Entrance to proposed residential development by others 10m 0 10m

Scale 1:200 at A1 1:400 if reproduced at A3

Loftie Street

ILLUSTRATIVE
Save for scale of kiosk and ventilation structure(s) which is indicative

B e r m o n d s e y W

Location

Chambers Wharf
a lE l a s t

London Borough of Southwark


Document Information

S o u ee t lv h .

Section 48 publicity Proposed site features plan Book of plans - section 19


S48-PP-19X-CHAWF-000255 July 2012

AA

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Residential development by others in grey

Keyplan: This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Passive filter chamber

Notes:
1. All dimensions and levels are approximate.

3No. Ventilation columns of 4m minimum to 8m maximum height

2. The purpose of this section is to illustrate the scale of the below ground infrastructure to be provided.

Railing or parapet as appropriate, by others Ventilation chamber

Flood Defence Level 105.28m ATD Mean High Water Springs 103.90m ATD

New river wall, final finish to be agreed with residential developer

Mean Low Water Springs 97.20m ATD

Section AA

Main tunnel shaft (beyond section)

10m

10m

Scale 1:200 at A1 1:400 if reproduced at A3

ILLUSTRATIVE

Location

Chambers Wharf London Borough of Southwark


Document Information

Section 48 publicity Post residential development


FL OCKTO N STREE T

EAST

Connection tunnel from Greenwich Pumping Station Main tunnel to Abbey Mills Pumping Station

Section AA Book of plans - section 19


S48-PP-19X-CHAWF-000256 July 2012

L ANE

ST RE ET

C H A MB E R S

S T R E E T

FT I E

B E R MO N D S E Y

E t l s l a y e Wa ns od em Br

WA L E L A S T

LO

Depot

L ED R I E F U T B T E L S CO

JH FL O N ET O N R O D A

E E T

FA R

B E

S TR

E E T

S TR

T R E T E M AS E B

B E V I N

c Thames Water Utilities Ltd 2008

TO

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. St. Michaels RC School

Electrical sub-station building (to be demolished after power supply is decommissioned by others)

Notes:
1. All dimensions and levels are approximate.

Jetty to be removed

Residential housing Bermondsey Wall East

Fountain Green Square

Chambers Wharf

Luna House

Tempus Wharf

River View Heights

As existing North elevation

New river wall Residential development by others in grey 3No. Ventilation columns of 4m minimum to 8m maxiumum height

Electrical and control kiosk 2.5m high

Remaining section of existing decking /jetty Railing, or parapet as appropriate, by others New river wall shown with vertical timber fenders final finish to be agreed
N

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

Chambers Wharf

ILLUSTRATIVE
Post residential development North elevation
Location

Chambers Wharf
N ot r he l ea vt i o n

London Borough of Southwark


Document Information

Section 48 publicity As existing and post residential


STREE T

Development north elevation


EAST L ANE

FL OCKTON

Book of plans - section 19


S48-PP-19X-CHAWF-000257 July 2012
EE T
C H A MB E R S S T R E E T
B E R MO N D S E Y

E t l s l a y e Wa ns od em Br

FTI E

ST R

WA L E L A S T

LO

Depot

L ED R I E F U T B T E L S CO

R A O D

E E T

FA R

B E

S TR

E E T

S TR

T R E T E M AS E B

B E V I N

TO

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: This drawing

Electrical sub-station building (to be demolished after power supply is decommissioned by others)

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes:
River wall and jetty 1. All dimensions and levels are approximate.

Meridian Court

East Lane

Axis Court

Chambers Wharf

Loftie Street

Residential

Residential Farncome St Bevington St

Residential

As existing South elevation


Residential development by others in grey

3No. Ventilation columns of 4m minimum to 8m maximum height . Located behind residential development Vehicle entrance via Loftie Street Electrical and control kiosk, 2.5m high

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3 Chambers Wharf proposed residential development by others
N

ILLUSTRATIVE

Post residential development South elevation

Location

Chambers Wharf London Borough of Southwark


Document Information

Section 48 publicity As existing and post residential Development south elevation Book of plans - section 19
S48-PP-19X-CHAWF-000258

S o u t h ee lv a t in o

July 2012

c Thames Water Utilities Ltd 2008

N Barge

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Authorised channel
N

Keyplan: Existing concrete deck and piles to be demolished after construction of temporary working area This drawing

Fluvial training wall

Me a nl o w

Indicative line of existing river wall


w ae tr

Wharf extended to allow working area and deep berthing

Jackup barge servicing piling operations Piling rig Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

River View Heights Fluvial training wall

Key:
Limits of land to be acquired or used (LLAU) Hoarding

Dolphin

Tempus Wharf

Shingle
Me a nH i g hW ae tr
Sterling Wharf Stairs Maximum extent of working area

Existing public right of way

Demolition materials handling area


2 9

Bollard

Site access

Access / haul route

Sheet piles
2 6

Excavator
3 0

1 to 47

B oa lr ld s

Temporary working area

3 3
3 2

Luna House

Extent of temporary working area over the foreshore

FL C O KT ON S TREE T

1 to 42

EAS TL AN E

Meridian Court

1 2

1 3

1 4

El Sub Sta

FT I E

LO

Site power structure

Workshop buildings / storage (open area or containerised)

PH

E E T

Security office

Transformer
13

S T R

B E

F A R

Construction access, right turn in, left turn out


10

El Sub Sta

New pedestrian crossing


2 t3 2o

4o 4 3 t4

E E T

TO

S c h o o l k e e H p o e u r s s e

S TR

T R E T E M AS E B

rHo u e s

B E V I N

3 4

Ol i v

1t o

9 4

2 0 6

E l S b S u t a

96

Depot
2

L ED R I E F U T B T E L S CO

9 18

0 22

2 0 8

F o u n t a i n H o u s e

WA L E L A S T

9 14

S t Mi ca h es l C ah to l iS c (e S cn co o h d ay o r) l

Offices and welfare building (3 storey)

EE T

ST R

4 0

3 8

1 0 t o 2 8

2 8

Notes :
1. These construction phasing plans have been prepared to illustrate possible site layouts for the principle construction phases. Contractors may choose to lay sites out differently during
Dolphin

construction depending on their preferred construction methods subject to any controls Thames Path on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction

1 to 59

Axis Court

D W
Fountain Green Square
Fountain

phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown.
3 2
Stairs

Chambers Wharf
4

3. Utility supplies for the construction of the works would be agreed with the relevant utility company.

DW

4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing. 5. Existing flood defence levels to be maintained

C H A M B E R S

at all times.
7

S T R E E T

1 t o 1 0

B E R MO N D S E Y

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

ILLUSTRATIVE

46

Location

Chambers Wharf London Borough of Southwark

60

50

Document Information

52

Section 48 publicity Construction phases - phase 1 Site setup Book of plans - section 19
S48-PP-19X-CHAWF-000259 July 2012

58 56

6 2

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Barge Authorised channel

Keyplan: This drawing

Fluvial training wall Long reach excavator

Barge Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. River View Heights Excavated material storage and handling area
Dolphin

Fluvial training wall

Key:
Limits of land to be acquired or used (LLAU) Hoarding

Tempus Wharf

Shingle
Me a nH i g hW ae tr
Sterling Wharf Stairs
Bollard

Maximum extent of working area

Existing public right of way Steel reinforcement preparation

Site access

2 9

Access / haul route Storage (open area or containerised) Crane Sheet piles
1 to 47
B oa lr ld s

FL C O KT ON S TREE T

EAS TL AN E

1 to 42

Meridian Court

1 2

1 3

1 4

El Sub Sta

FT I E

PH

Site power structure


Depot
7
2

E E T

Security office
13

S T R

Transformer Workshop buildings / storage (open area or containerised)

B E

El Sub Sta

F A R

4o 4 3 t4

2 t3 2o

E E T

TO

S c h o o l k e e H p o e u r s s e

S TR

T R E T E M AS E B

rHo u e s

B E V I N

3 4

Ol i v

1t o

Construction access, right turn in, left turn out

9 4

2 0 6

E l S b S u t a

2 0 8

Offices and welfare building (3 storey)

LO

96

L ED R I E F U T B T E L S CO

9 18

0 22

F o u n t a i n H o u s e

WA L E L A S T

9 14

S t Mi ca h es l C ah to l iS c (e S cn co o h d ay o r) l

EE T

ST R

4 0

3 8

1 0 t o 2 8

3 2

3 0

2 8

2 6 3 3
1 to 59

Luna House

Indicative line of existing river wall

Extent of temporary working area over the foreshore

Notes :
M a l wt e no w a r e
1. These construction phasing plans have been prepared to illustrate possible site layouts for Piling rig
Dolphin

the principle construction phases. Contractors may choose to lay sites out differently during construction depending on their preferred

Shaft Thames Path Crane

construction methods subject to any controls on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction

Axis Court

D W
Fountain Green Square
Fountain

phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown.
3 2
Stairs

Chambers Wharf
4

3. Utility supplies for the construction of the works would be agreed with the relevant utility company.

DW

4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing. 5. Existing flood defence levels to be maintained

C H A M B E R S

at all times.
7

S T R E E T

1 t o 1 0

B E R MO N D S E Y

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

ILLUSTRATIVE

46

Location

Chambers Wharf London Borough of Southwark

60

50

Document Information

52

Section 48 publicity Construction phases - phase 2 Shaft construction Book of plans - section 19
S48-PP-19X-CHAWF-000260 July 2012

10

58 56

6 2

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Authorised channel

Barge

Keyplan: This drawing

Fluvial training wall Long reach excavator

Barge Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. River View Heights Excavated material storage and handling area Fluvial training wall

Key:
Limits of land to be acquired or used (LLAU) Hoarding

Dolphin

Tempus Wharf

Shingle
Me a nH i g hW ae tr
Sterling Wharf Stairs
Bollard

Maximum extent of working area Ventilation Existing public right of way

Site access

2 9

Segment storage

Access / haul route

Sheet piles
2 6
1 to 47
B oa lr ld s

3 3
3 2

Luna House

Storage (open area or containerised)

Extent of temporary working area over the foreshore

FL C O KT ON S TREE T

1 to 42

EAS TL AN E

Meridian Court

1 2

1 3

1 4

El Sub Sta

FT I E

PH

Site power structure


7

Workshop buildings / storage (open area or containerised)


2

E E T

Security office
13

S T R

Shaft Grout production Transformer

B E

El Sub Sta

F A R

4o 4 3 t4

2 t3 2o

E E T

TO

S c h o o l k e e H p o e u r s s e

S TR

T R E T E M AS E B

rHo u e s

B E V I N

3 4

Ol i v

1t o

Construction access, right turn in, left turn out

9 4

2 0 6

E l S b S u t a

2 0 8

Offices and welfare building (3 storey)

LO

96

Depot

L ED R I E F U T B T E L S CO

9 18

0 22

F o u n t a i n H o u s e

WA L E L A S T

9 14

S t Mi ca h es l C ah to l iS c (e S cn co o h d ay o r) l

EE T

ST R

4 0

3 8

1 0 t o 2 8

3 0

2 8

M a l wt e no w a r e
Indicative line of existing river wall Gantry crane
Dolphin

Noise enclosure over shaft and gantry crane

Notes :
1. These construction phasing plans have been prepared to illustrate possible site layouts for the principle construction phases. Contractors

Gantry crane loading bay

1 to 59

may choose to lay sites out differently during Thames Path construction depending on their preferred construction methods subject to any controls

Axis Court

D W
Fountain Green Square
3 2
Stairs

on layout imposed through the planning submission and approval process.


Fountain

2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where

Chambers Wharf
4

DW

appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise

C H A M B E R S

barriers may be required but is not shown on this drawing.

S T R E E T

5. Existing flood defence levels to be maintained


1 t o 1 0
B E R MO N D S E Y

at all times.

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

ILLUSTRATIVE

46

Location

Chambers Wharf London Borough of Southwark

60

50

Document Information

52

Section 48 publicity Construction phases - phase 3 Tunnelling Book of plans - section 19


S48-PP-19X-CHAWF-000261 July 2012

10

58 56

6 2

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Barge Authorised channel Fluvial training wall Long reach excavator

Keyplan: This drawing

Barge Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. River View Heights Fluvial training wall

Key:
Dolphin

Limits of land to be acquired or used (LLAU) Hoarding

Tempus Wharf

Shingle
Me a nH i g hW ae tr
Sterling Wharf Stairs
Bollard

Maximum extent of working area

Existing public right of way Ventilation

Concrete batching plant washout area

Site access

2 9

Storage (open area or containerised)


1 to 47
B oa lr ld s

Access / haul route

Sheet piles
2 6

3 3
3 2

Luna House

Noise enclosure over shaft and gantry crane

FL C O KT ON S TREE T

Concrete batching plant and aggregate storage area


3
1 to 42

EAS TL AN E

Meridian Court

1 2

1 3

1 4

El Sub Sta

FT I E

Site power structure

PH

Construction access, right turn in, left turn out

E E T

Security office

13

B E

Workshop buildings / storage (open area or containerised)

Shaft

S T R

El Sub Sta

Transformer
10

F A R

4o 4 3 t4

2 t3 2o

E E T

TO

S c h o o l k e e H p o e u r s s e

S TR

T R E T E M AS E B

rHo u e s

B E V I N

3 4

Ol i v

1t o

9 4

2 0 6

E l S b S u t a

2 0 8

Offices and welfare building (3 storey)

LO

96

Depot
2

L ED R I E F U T B T E L S CO

9 18

0 22

F o u n t a i n H o u s e

WA L E L A S T

9 14

S t Mi ca h es l C ah to l iS c (e S cn co o h d ay o r) l

EE T

ST R

4 0

3 8

1 0 t o 2 8

3 0

2 8

Notes :
M a l wt e no w a r e
Indicative line of existing river wall Gantry crane
Dolphin

1. These construction phasing plans have been prepared to illustrate possible site layouts for the principle construction phases. Contractors may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls

Gantry crane loading bay

1 to 59

Thames Path

on layout imposed through the planning submission and approval process.

Axis Court

D W
Fountain Green Square

2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where
Fountain

appropriate, outline traffic management arrangements are shown.

Stairs

Chambers Wharf
4

3. Utility supplies for the construction of the works DW would be agreed with the relevant utility company. 4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing. 5. Existing flood defence levels to be maintained

C H A M B E R S

at all times.

S T R E E T

1 t o 1 0

B E R MO N D S E Y

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

ILLUSTRATIVE

46

Location

Chambers Wharf London Borough of Southwark

60

50

Document Information

52

Section 48 publicity Construction phases - phase 4 Secondary lining Book of plans - section 19
S48-PP-19X-CHAWF-000262 July 2012

58 56

6 2

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Authorised channel

Keyplan: This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. River View Heights

Key:
Dolphin

Limits of land to be acquired or used (LLAU) Hoarding

Tempus Wharf

Shingle
Me a nH i g hW ae tr
Sterling Wharf Stairs
Bollard

Maximum extent of working area

Existing public right of way

Site access

2 9

Cofferdam sheet piles and infill removed and foreshore reinstated


1 to 47
B oa lr ld s

Access / haul route

Sheet piles Extent of temporary working area over the foreshore

FL C O KT ON S TREE T

Meridian Court

1 to 42

EAS TL AN E

1 2

1 3

1 4

El Sub Sta

FT I E

t a

Construction facilities removed and hoarding left for future owner / developer

PH

Access/haul route removed and site reinstated

E E T

Shaft
13

S T R

B E

El Sub Sta

Transformer
10

F A R

4o 4 3 t4

2 t3 2o

E E T

TO

S c h o o l k e e H p o e u r s s e

S TR

T R E T E M AS E B

rHo u e s

B E V I N

3 4

Ol i v

1t o

9 4

2 0 6

Construction phase facilities E l S and storage areas removed b S u

2 0 8

t a i n H o u s e

LO

96

Depot
2

L ED R I E F U T B T E L S CO

9 14

9 18

S t Mi ca h es l C ah to l iS c (e S cn co o h d ay o r) l

EE T

C H A M B E R S

ST R

0 22

4 0

3 8

1 0 t o 2 8

3 2

3 0

2 8

2 6 3 3
1 to 59

Luna House

M a l wt e no w a r e

Dolphin

Thames Path

Axis Court

D W
Fountain Green Square
Fountain

Stairs

Chambers Wharf
4 7

DW

S T R E E T

B E R MO N D S E Y Hoarded area for Thames Water WA L E F L A o S u T operational use n

1 t o 1 0

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

ILLUSTRATIVE

46

Location

Chambers Wharf London Borough of Southwark

60

50

Document Information

52

Section 48 publicity Construction phases - phase 5 Site demobilisation Book of plans - section 19
S48-PP-19X-CHAWF-000263 July 2012

58 56

6 2

c Thames Water Utilities Ltd 2008