Rectify the fixation of the rubber seal, sealant application and cutting of aluminum channel in the joint of fin glass & glass partition.

Improve & Rectify the fixation of the Fin glass to the joint fixation of two (2)- glass partition, gap of 12mm. Apply silicon in a quality manner.

Rectify the mighty joint fixation of the aluminum channel. Must be Hairline joint fixation.

Rectify the cover at the termination of the aluminum channel at door.

Rectify the mighty joint fixation of the aluminum channel. Must be Hairline joint fixation.

Rectify the mighty joint fixation of the aluminum channel. Must be Hairline joint fixation. Gap of 5mm.

Rectify the Rubber seal installation at the bottom channel.

Rectify the mighty joint fixation of the aluminum channel. Must be Hairline joint fixation. Gap of 5mm.

Replace the top aluminum channel. The Channel must align between the joint fixation of the 2-glass partition. Joint fixation must be Hairline joint.

Rectify the mighty joint fixation of the aluminum channel. Must be Hairline joint fixation. Gap of 5mm.

Align the fixation of the Glass Door Panel & the glass partition. It must be within the curve alignment of the glass partition and gap must be maintain at 5mm at the sides of door to the glass partition.

Rectify the mighty joint fixation of the aluminum channel. Must be Hairline joint fixation. Gap of 5mm.

Align the fixation of the top aluminum channel. It must be within the curve alignment of the glass partition and joint must be hairline joint fixation.

Rectify the fixation of the mighty joint of the aluminum channel.

Replace the top aluminum channel. The Channel must align between the joint fixation of the 2-glass partition. Joint fixation must be Hairline joint

Replace the top aluminum channel. The Channel must align between the joint fixation of the 2-glass partition. Joint fixation must be Hairline joint. Improve the sealant application between the glass partition.

Align the fixation of the Bottom aluminum channel. It must be within the curve alignment of the glass partition and joint must be hairline joint fixation. Improve the sealant application between the two(2) glass partition.

Replace the top aluminum channel. The Channel must align between the joint fixation of the 2-glass partition. Joint fixation must be Hairline joint. Improve the sealant application between the glass partition.

Replace the top aluminum channel. The Channel must align between the joint fixation of the 2-glass partition. Joint fixation must be Hairline joint. Improve the sealant application between the glass partition. Touch up paint must be the same as the RAL Color of the Aluminum channel.

Rectify the cover at the termination of the aluminum channel at door.

Rectify the Rubber seal installation at the top channel.

Replace the top aluminum channel. The Channel must align between the joint fixation of the 2-glass partition. Joint fixation must be Hairline joint.

Rectify the corner fixation of glass & aluminum channel. Mighty joint must be hairline, NO touch up Paint & Silicon sealant application must be in the BEST quality & NO GAP between the glass.

Replace the top aluminum channel. The Channel must align between the joint fixation of the 2-glass partition. Joint fixation must be Hairline joint.

Replace the Bottom aluminum channel. The Channel must align between the joint fixation of the 2-glass partition. Joint fixation must be Hairline joint.

Replace the top aluminum channel. Must be in Hairline joint fixation, No GAP, No touch up paint and alignment must be in curve of the glass partition wall.

Rectify the mighty joint fixation of the aluminum channel. Must be Hairline joint fixation. Gap of 5mm.

Replace the top aluminum channel. The Channel must align between the joint fixation of the 2-glass partition. Joint fixation must be Hairline joint.

Rectify the fixation of the top aluminum channel. Gaps are visible.

Replace the top aluminum channel. The Channel must align between the joint fixation of the 2-glass partition. Joint fixation must be Hairline joint.

Align the fixation of the Top aluminum channel. It must be within the curve alignment of the glass partition and joint must be hairline joint fixation. Improve the sealant application between the two(2) glass partition.

Align the fixation of the Top aluminum channel. It must be within the curve alignment of the glass partition and joint must be hairline joint fixation. Improve the sealant application between the two(2) glass partition.

Improve the sealant application at the perimeter of the aluminum channel. Gaps are visible.

Align the fixation of the top aluminum channel near the door. Install firmly the channel. THIS IS THE OFFICE OF QFA PROJECT MANAGER AT LEVEL 35.