REFERENCE DATA SERIES No.

2
2012 Edition

Nuclear
Power
Reactors
in the World

INTERNATIONAL ATOMIC ENERGY AGENCY


VIENNA
ISBN 9789201323101
ISSN 10112642

REFERENCE DATA SERIES No. 2

NUCLEAR POWER REACTORS


IN THE WORLD
2012 Edition

INTERNATIONAL ATOMIC ENERGY AGENCY


VIENNA, 2012

NUCLEAR POWER REACTORS IN THE WORLD


IAEA, VIENNA, 2012
IAEA-RDS-2/31
ISBN 9789201323101
ISSN 10112642
Printed by the IAEA in Austria
June 2012

CONTENTS
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Table 1. Reactors in operation, in long term shutdown
and under construction, 31 Dec. 2011. . . . . 10
Table 2. Type and net electrical power of reactors
connected to the grid, 31 Dec. 2011 . . . . . . 12
Table 3. Type and net electrical power of reactors
under construction, 31 Dec. 2011 . . . . . . . . 13
Table 4. Reactor years of experience, up to
31 Dec. 2011 . . . . . . . . . . . . . . . . . . . . . . . . 14
Table 5. Operating reactors and net electrical power,
1980 to 2011 . . . . . . . . . . . . . . . . . . . . . . . . 16
Table 6. Nuclear electricity production and share,
1980 to 2011 . . . . . . . . . . . . . . . . . . . . . . . . 18
Table 7. Annual construction starts and
connections to the grid, 1954 to 2011 . . . . 20
Table 8. Number of new reactors connected
to the grid and median construction time
in months . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Table 9. Construction starts during 2011 . . . . . . . . . 22
Table 10. Connections to the grid during 2011 . . . . . 23
Table 11. Scheduled connections to the grid during
2012 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Table 12. Reactors planned for construction
as known on 31 Dec. 2011 . . . . . . . . . . . . . 24
Table 13. Reactors under construction,
31 Dec. 2011 . . . . . . . . . . . . . . . . . . . . . . . 28
Table 14. Reactors in operation, 31 Dec. 2011 . . . . . 31
Table 15. Reactors in long term shutdown,
31 Dec. 2011 . . . . . . . . . . . . . . . . . . . . . . . 47
Table 16. Reactors permanently shut down,
31 Dec. 2011 . . . . . . . . . . . . . . . . . . . . . . . . 48
Table 17. Reactors in decommissioning process or
decommissioned, 31 Dec. 2011 . . . . . . . . . 53

Table 18. Performance factors by reactor category,


2009 to 2011 . . . . . . . . . . . . . . . . . . . . . . . . 58
Table 19. Full outage statistics during 2011 . . . . . . . 59
Table 20. Direct causes of full outages during 2011 . 60
Table 21. Direct causes of full outages,
2007 to 2011 . . . . . . . . . . . . . . . . . . . . . . . 61
Table 22. Countries: abbreviations and summary . . . 62
Table 23. Reactor types: abbreviations and
summary . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Table 24. Operators: abbreviations and summary . . 65
Table 25. NSSS suppliers: abbreviations and
summary . . . . . . . . . . . . . . . . . . . . . . . . . . 71
Figure 1. Number of operational reactors by type and
net electrical power (as of 31 Dec. 2011) . 74
Figure 2. Reactors under construction by type and
net electrical power (as of 31 Dec. 2011) . 75
Figure 3. Nuclear share of electricity generation
(as of 31 Dec. 2011) . . . . . . . . . . . . . . . . . 76
Figure 4. Worldwide median construction time in
months (as of 31 Dec. 2011) . . . . . . . . . . . 77
Figure 5. Number of reactors in operation by age
(as of 31 Dec. 2011) . . . . . . . . . . . . . . . . . 78
Figure 6. Annual construction starts and connections
to the grid, 1954 to 2011 . . . . . . . . . . . . . . . 79

INTRODUCTION
Nuclear Power Reactors in the World is an annual
publication that presents the most recent data pertaining
to nuclear power reactors in IAEA Member States.
This thirty-second edition of Reference Data Series
No.2 provides a detailed comparison of various statistics
through 31 December 2011. The tables and figures
contain the following information:
General statistics on nuclear reactors in IAEA Member
States;
Technical data on specific reactors that are either

planned, under construction or operational, or that
have been shut down or decommissioned.
Performance data on reactors operating in IAEA

Member States, as reported to the IAEA.
The data compiled in this publication is a product of the
IAEA's Power Reactor Information System (PRIS). The
PRIS database is a comprehensive source of data on all
nuclear power reactors in the world. It includes
specification and performance history data on operational
reactors as well as on reactors under construction or in
the decommissioning process. The IAEA collects this data
through designated national correspondents in Member
States.
PRIS outputs are available in the IAEAs annual
publications and on the PRIS web page (http://www.iaea.
org/pris). Detailed outputs are accessible to registered
users through on-line applications. Enquiries should be
addressed to:
Director

Division of Nuclear Power

International Atomic Energy Agency

Vienna International Centre

PO Box 100

1400 Vienna, Austria

Email: PrisAdmin@iaea.org
5

Definitions
Performance factors
(REG PEL UEL XEL)
100
EAF (%) =


REG
(REG PEL UEL)
UCF (%) =
100


REG
UEL
UCL (%) =
100
REG
PEL
PCL (%) =
100
REG

EG
LF (%) =
100
REG
On-line Hours
OF (%) =
100

Total Hours
where
EAF is the energy availability factor, expressed in
per cent.
UCF is the unit capability factor, expressed in
per cent.
UCL is the unplanned capability loss factor,
expressed in per cent.
PCL is the planned capability loss factor, expressed
in per cent.
LF
is the load factor, expressed in per cent.
OF
is the operating factor, expressed in per cent.
REG reference energy generation: The net electrical
energy (MWh) supplied by a unit continuously
operated at the reference unit power during the
entire reference period.

PEL planned energy loss: The energy (MWh) that


was not supplied during the period because of
planned shutdowns or load reductions due to
causes under plant management control.
Energy losses are considered to be planned if
they are scheduled at least four weeks in
advance.
UEL unplanned energy loss: The energy (MWh) that
was not supplied during the period because of
unplanned shutdowns, outage extensions, or
load reductions due to causes under plant management control. Energy losses are considered
to be unplanned if they are not scheduled at
least four weeks in advance.
XEL external energy loss: The energy (MWh) that
was not supplied due to constraints beyond
plant management control that reduced plant
availability.
EG the net electrical energy supplied during the reference period as measured at the unit outlet
terminals after deducting the electrical energy
taken by unit auxiliaries and the losses in transformers that are considered to be integral parts
of the unit.
Construction Start
Date when first major placing of concrete, usually for the
base mat of the reactor building, is done.
First Criticality
Date when the reactor is made critical for the first time.
Grid Connection
Date when the plant is first connected to the electrical grid
for the supply of power. After this date, the plant is considered to be in operation.
Commercial Operation
Date when the plant is handed over by the contractors to
the owner and declared to be officially in commercial
operation.
Permanent Shutdown
Date when the plant is officially declared to be shut down
by the owner and taken out of operation permanently.
8

Long Term Shutdown


A unit is considered to be in long term shutdown status if
it has been shut down for an extended period (usually
several years) without any firm recovery schedule at the
beginning, but there is the intention to restart the unit
eventually.
Units and Energy Conversion
1 terawatt-hour (TWh) = 106 megawatt-hours (MWh).
For an average power plant,
1 TWh = 0.39 megatonnes of coal equivalent (input)

= 0.23 megatonnes of oil equivalent (input).

10

ARGENTINA
ARMENIA
BELGIUM
BRAZIL
BULGARIA
CANADA
CHINA
CZECH REP.
FINLAND
FRANCE
GERMANY
HUNGARY
INDIA
IRAN, ISL.REP.
JAPAN
KOREA, REP. OF
MEXICO
NETHERLANDS
PAKISTAN
ROMANIA
RUSSIA
SLOVAKIA
SLOVENIA
SOUTH AFRICA
SPAIN
SWEDEN
SWITZERLAND
UK

Country

2
1
7
2
2
18
16
6
4
58
9
4
20
1
50
21
2
1
3
2
33
4
1
2
8
10
5
18

No. of
Units

935
375
5927
1884
1906
12604
11816
3766
2736
63130
12068
1889
4391
915
44215
18751
1300
482
725
1300
23643
1816
688
1830
7567
9326
3263
9953

Total
MW(e)

Reactors in operation
Total
MW(e)

2726

246

No. of
Units

Reactors in long term shutdown

1600
1600
4824

1
1
7

630
8188
782

2
10
2

2650
5560

26620

26

2
5

1245
1906

1
2

692

Total
MW(e)

No. of
Units

Reactors under construction

5.9
2.4
45.9
14.8
15.3
88.3
82.6
26.7
22.3
423.5
102.3
14.7
29.0
0.1
156.2
147.8
9.3
3.9
3.8
10.8
162.0
14.3
5.9
12.9
55.1
58.1
25.7
62.7

TW(e)h
5.0
33.2
54.0
3.2
32.6
15.3
1.9
33.0
31.6
77.7
17.8
43.3
3.7
0.0
18.1
34.6
3.6
3.6
3.8
19.0
17.6
54.0
41.7
5.2
19.5
39.6
40.9
17.8

Nuclear electricity
supplied in 2011
% of
total

TABLE 1. REACTORS IN OPERATION, IN LONG TERM SHUTDOWN AND UNDER CONSTRUCTION, 31 DEC. 2011

11

435

Total

368791

13107
101465

Total
MW(e)

No. of
Units
2972

Total
MW(e)

Reactors in long term shutdown

40.37 TW(e)h of nuclear electricity generation, representing 19.02% of the total electricity generated there.

6 units, 5018 MW in operation; 2 units, 2600 MW under construction;

Note: The total includes the following data from Taiwan, China:

15
104

No. of
Units

Reactors in operation

UKRAINE
USA

Country

65

2
1

No. of
Units
61962

1900
1165

Total
MW(e)

Reactors under construction

2518.0

84.9
790.4

TW(e)h

NA

47.2
19.3

Nuclear electricity
supplied in 2011
% of
total

TABLE 1. REACTORS IN OPERATION, IN LONG TERM SHUTDOWN AND UNDER CONSTRUCTION, 31 DEC. 2011 continued

12

482
600

12864
1816
688
1830
6057
2811
1700
1191
13107
67368

1
2

17
4
1
2
6
3
3
1
15
69

248364

915
19284
15966

1
24
17

270

10496
3766
976
63130
9496
1889

13
6
2
58
7
4

MW(e)

375
5927
1884
1906

PWR

1
7
2
2

No.

During 2011, 7 reactors, 4004 MW were newly connected to the grid.

77726

34097

35

84

1510
6515
1563

1300

2
7
2

300

24931

26

2572

MW(e)

1760

BWR

No.

Note: The totals include 6 units, 5018 MW in Taiwan, China.

TOTAL

ARGENTINA
ARMENIA
BELGIUM
BRAZIL
BULGARIA
CANADA
CHINA
CZECH REP.
FINLAND
FRANCE
GERMANY
HUNGARY
INDIA
IRAN, ISL. REP.
JAPAN
KOREA, REP. OF
MEXICO
NETHERLANDS
PAKISTAN
ROMANIA
RUSSIA
SLOVAKIA
SLOVENIA
SOUTH AFRICA
SPAIN
SWEDEN
SWITZERLAND
UK
UKRAINE
USA

Country

17

17

No.

GCR

8762

8762

MW(e)

47

1
2

23140

125
1300

2785

4091

12604
1300

18
2

18

935

PHWR
No.
MW(e)

15

15

10219

10219

LWGR
No.
MW(e)

No.

FBR

580

560

20

MW(e)

435

2
1
7
2
2
18
16
6
4
58
9
4
20
1
50
21
2
1
3
2
33
4
1
2
8
10
5
18
15
104

No.

TABLE 2. TYPE AND NET ELECTRICAL POWER Of REACTORS CONNECTED TO THE GRID, 31 DEC. 2011
Total

368791

935
375
5927
1884
1906
12604
11816
3766
2736
63130
12068
1889
4391
915
44215
18751
1300
482
725
1300
23643
1816
688
1830
7567
9326
3263
9953
13107
101465

MW(e)

13

53

51326

5560
630
6484
782
1900
1165

5
2
8
2
2
1

MW(e)

1245
1906
26620
1600
1600
1834

PWR

1
2
26
1
1
2

No.

During 2011, construction started on 4 reactors, 1890 MW.

Note: The totals include 2 units ( 2xBWR), 2600 MW in Taiwan, China.

TOTAL

ARGENTINA
BRAZIL
BULGARIA
CHINA
FINLAND
FRANCE
INDIA
JAPAN
KOREA, REP. OF
PAKISTAN
RUSSIA
SLOVAKIA
UKRAINE
USA

Country

No.

BWR

5250

2650

MW(e)

No.

PHWR

3212

2520

692

MW(e)

No.

LWGR

915

915

MW(e)

No.

FBR

TABLE 3. TYPE AND NET ELECTRICAL POWER Of REACTORS UNDER CONSTRUCTION, 31 DEC. 2011

1259

789

470

MW(e)

65

1
1
2
26
1
1
7
2
5
2
10
2
2
1

No.

Total

61962

692
1245
1906
26620
1600
1600
4824
2650
5560
630
8188
782
1900
1165

MW(e)

14

ARGENTINA
ARMENIA
BELGIUM
BRAZIL
BULGARIA
CANADA
CHINA
CZECH REP.
FINLAND
FRANCE
GERMANY
HUNGARY
INDIA
IRAN, ISL. REP.
ITALY
JAPAN
KAZAKHSTAN
KOREA, REP. OF
LITHUANIA
MEXICO
NETHERLANDS
PAKISTAN
ROMANIA
RUSSIA
SLOVAKIA
SLOVENIA
SOUTH AFRICA
SPAIN

Country

935
375
5927
1884
1906
12604
11816
3766
2736
63130
12068
1889
4391
915

44215

18751

1300
482
725
1300
23643
1816
688
1830
7567

2
1
7
2
2
18
16
6
4
58
9
4
20
1

50

21

2
1
3
2
33
4
1
2
8

Reactors connected
to the grid
Capacity
No.
MW(e) Net

246

2726

Reactors in long term


shutdown
Net capacity
No.
MW(e)
376
10
1632
478

3789
14301

1423
4337
52
2370
55
786
909
621

1
1
4
3

12
27

4
9
1
2
1
5
3
2

Permanently shutdown
reactors
Net capacity
No.
MW(e)

TABLE 4. REACTOR YEARS Of EXPERIENCE, UP TO 31 DEC. 2011

No.
2
2
8
2
6
25
16
6
4
70
36
4
20
1
4
60
1
21
2
2
2
3
2
38
7
1
2
10

935
751
5937
1884
3538
15808
11816
3766
2736
66919
26369
1889
4391
915
1423
48798
52
18751
2370
1300
537
725
1300
24429
2725
688
1830
8188

Total, Operating
and Shutdown
Net capacity
MW(e)

81
1546
25
381
43
39
67
52
19
1058
140
30
54
285

66
37
247
41
151
618
125
122
131
1816
782
106
357

8
11
4
7
3
3
6

4
10
1
6
11

7
8
7
3
3
2
6
10
4
4
9
2
3
4

Experience
Years
Months

15

435

Total

368791

9326
3263
9953
13107
101465

2. Operating experience is counted from the grid connection excluding any long term shutdown period.

2972

Reactors in long term


shutdown
Net capacity
No.
MW(e)

reactors connected to the grid: 6 units, 5018 MW; experience: 182 years, 1 month.

1. The total includes the following data from Taiwan, China:

Notes:

10
5
18
15
104

Reactors connected
to the grid
Net capacity
No.
MW(e)

SWEDEN
SWITZERLAND
UK
UKRAINE
USA

Country

138

3
1
27
4
28

1210
6
3518
3515
9764

49152

Permanently shutdown
reactors
Net capacity
No.
MW(e)

TABLE 4. REACTOR YEARS Of EXPERIENCE, UP TO 31 DEC. 2011 continued

No.

578

13
6
45
19
132
420915

10536
3269
13471
16622
111229

Total, operating
and shutdown
Net capacity
MW(e)

14792

392
184
1495
398
3707

6
11
2
6
11

Experience
Years
Months

16

ARGENTINA
ARMENIA
BELGIUM
BRAZIL
BULGARIA
CANADA
CHINA
CZECH REP.
FINLAND
FRANCE
GERMANY
HUNGARY
INDIA
IRAN, ISL. REP.
ITALY
JAPAN
KAZAKHSTAN
KOREA, REP. OF
LITHUANIA
MEXICO
NETHERLANDS
PAKISTAN
ROMANIA
RUSSIA
SLOVAKIA
SLOVENIA
SOUTH AFRICA
SPAIN
SWEDEN

Country

832

1112
14918
135
564

498
125

8596
780

1073
5510

4
23
1
1

2
1

20
2

3
8

2208
14388
10323

4
22
19

1224
5172

335
816
1670

MW(e)

3
10

1
2
4

No.

1980

28
4
1
2
8
12

2
1

3
33
1
5
1

1
4
43
24
2
6

2
2
8
1
4
16

No.

1985

15841
1632
632
1840
5608
9455

508
137

1273
23612
135
3692
1380

391
2300
37478
18110
825
1143

935
816
5464
626
1632
9741

29
4
1
2
9
12

41
1
9
2
1
2
1

18898
1632
620
1840
7099
9826

30867
135
7220
2760
640
539
125

1632
2310
55808
21250
1710
1324

5501
626
2585
13993

7
1
5
20

4
4
56
21
4
7

935

30
4
1
2
9
12

50
1
11
2
2
2
1

2
1
7
1
6
21
3
4
4
56
19
4
10

19848
1632
620
1840
7097
10043

39625
50
9115
2370
1256
510
125

935
376
5631
626
3538
14902
2188
1782
2310
58573
20972
1729
1746

978
376
5712
1976
3760
9998
2188
2611
2656
63080
21283
1729
2508

43245
12990
2370
1290
449
425
655
19848
2440
676
1840
7468
9412

52
16
2
2
1
2
1
30
6
1
2
9
11

2
1
7
2
6
14
3
5
4
59
19
4
14

2
1
7
2
4
18
9
6
4
59
17
4
15

935
376
5801
1901
2722
12584
6587
3373
2676
63260
20339
1755
2993

20
1
2
1
2
1
31
6
1
2
9
10

55
16810
1185
1360
450
425
655
21743
2442
656
1800
7591
8905

47593

Number of units and net capacity (MW(e)) connected to the grid at 31 Dec. of given year
1990
1995
2000
2005
MW(e)
No.
MW(e)
No.
MW(e)
No.
MW(e)
No.
MW(e)

TABLE 5. OPERATING REACTORS AND NET ELECTRICAL POWER,1980 TO 2011

1300
482
425
1300
22693
1816
666
1800
7514
9303

2
1
2
2
32
4
1
2
8
10

46821

935
375
5926
1884
1906
12604
10065
3678
2716
63130
20490
1889
4189

MW(e)

18698

2010

21

54

2
1
7
2
2
18
13
6
4
58
17
4
19

No.

2
1
3
2
33
4
1
2
8
10

21

50

2
1
7
2
2
18
16
6
4
58
9
4
20
1

No.

2011

1300
482
725
1300
23643
1816
688
1830
7567
9326

18751

44215

935
375
5927
1884
1906
12604
11816
3766
2736
63130
12068
1889
4391
915

MW(e)

17

245

4
33
3
69

No.

1980

133037

1940
6423
2306
50881

MW(e)

363

5
38
10
90

No.

1985

245779

2881
10077
8324
74401

318253

2942
11360
13020
96228

434

5
35
15
108

341402

3056
12910
13045
98068

435

5
33
13
103

349999

3170
12490
11195
96297

441

5
23
15
103

3220
11852
13107
98145

368125

441

5
19
15
104

No.

2010

375280

3238
10137
13107
101211

MW(e)

1980: 2 units, 1208 MW; 1985: 6 units, 4890 MW; 1990: 6 units, 4828 MW; 1995: 6 units, 4884 MW; 2000: 6 units, 4884 MW; 2005: 6 units, 4884 MW; 2010: 6 units, 4982 MW; 2011: 6 units, 5018 MW.

416

5
37
15
108

Number of units and net capacity (MW(e)) connected to the grid at 31 Dec. of given year
1990
1995
2000
2005
MW(e)
No.
MW(e)
No.
MW(e)
No.
MW(e)
No.
MW(e)

Note: The world total includes the following data in Taiwan, China:

WORLD

SWITZERLAND
UK
UKRAINE
USA

Country

TABLE 5. OPERATING REACTORS AND NET ELECTRICAL POWER,1980 TO 2011 continued

435

5
18
15
104

No.

2011

368791

3263
9953
13107
101465

MW(e)

18

ARGENTINA
ARMENIA
BELGIUM
BRAZIL
BULGARIA
CANADA
CHINA
CZECH REP.
FINLAND
FRANCE
GERMANY
HUNGARY
INDIA
IRAN, ISL. REP.
ITALY
JAPAN
KAZAKHSTAN
KOREA, REP. OF
LITHUANIA
MEXICO
NETHERLANDS
PAKISTAN
ROMANIA
RUSSIA
SLOVAKIA
SLOVENIA
SOUTH AFRICA
SPAIN
SWEDEN

Country

NA

NA

NA
NA

NA
NA
NA

NA

NA
NA

NA

NA
0.5

NA
NA

NA
NA

2.18

11.86

5.71
38.02

6.68
57.31
41.44

2.77

2.11
79.11

3.26

3.97
0.07

43.78
4.52

4.98
25.42

88.26
8.70
3.85
5.39
26.83
55.89

3.69
0.26

12.36
8.75

NA
NA
NA
4.2
24.0
42.3

6.1
1.0

23.2
NA

3.8
22.7

NA
38.2
64.8
31.2
23.6
2.2

1.99
17.98
213.28
119.59
6.10
3.87

6.46
145.37

59.8
1.7
31.6
12.7

11.7

29.25
3.17
12.17
59.47

5.25

109.62
11.16
4.39
8.47
51.98
65.27

50.26
15.70
2.78
3.29
0.38

187.19

11.77
18.13
297.61
139.37
12.89
5.29

40.59
2.06
13.51
69.87

6.72

NA
NA
NA
5.6
35.9
45.9

49.1
NA
2.6
4.9
1.1

27.1

NA
35.1
74.5
33.1
51.4
2.2

60.1
1.0
35.7
14.8

19.8

91.59
11.35
4.57
11.29
53.49
67.17

275.51
0.08
60.21
10.64
7.53
3.78
0.46

39.30
2.33
16.22
93.98
12.13
12.23
18.13
358.71
146.13
13.20
6.99

6.57

11.8
44.1
39.5
6.5
34.1
46.6

33.4
0.1
36.1
86.1
6.0
4.9
0.9

55.5
1.0
46.4
17.3
1.2
20.0
29.9
76.1
29.6
42.3
1.9

11.8

103.54
7.42
7.92
3.70
0.90
5.05
120.10
15.17
4.55
13.00
59.49
51.88

306.24

5.74
1.84
45.81
5.59
16.79
69.12
16.02
12.71
21.58
395.39
160.66
13.35
14.23

7.3
33.0
56.8
1.9
45.0
11.8
1.2
18.7
32.2
76.4
30.6
40.6
3.1

6.37
2.50
45.34
9.20
17.38
86.83
50.33
23.25
22.36
431.18
154.61
13.02
15.73

6.9
42.7
55.6
2.5
44.1
14.5
2.0
30.5
32.9
78.5
26.6
37.2
2.8

6.69
2.29
45.73
13.77
14.24
85.50
70.96
26.44
21.89
410.09
133.01
14.66
20.48

5.9
39.4
51.2
3.1
33.1
15.1
1.8
33.3
28.4
74.1
22.6
42.1
2.9

5.89
2.36
45.94
14.79
15.26
88.32
82.57
26.70
22.27
423.51
102.31
14.71
28.95
0.10

5.0
33.2
54.0
3.2
32.6
15.3
1.9
33.0
31.6
77.7
17.8
43.3
3.7
0.0

40.7
73.9
3.9
4.3
1.7
10.9
15.0
53.4
37.4
6.6
27.6
39.0

33.8
137.59
9.54
10.32
3.77
2.41
5.11
137.64
16.34
5.61
12.24
54.99
69.58

280.50
44.7
70.3
5.0
3.9
2.8
8.6
15.8
56.1
42.4
5.5
19.6
44.9

29.3

32.2
3.6
3.4
2.6
19.5
17.1
51.8
37.3
5.2
20.1
38.1

5.59
3.75
2.56
10.70
159.41
13.54
5.38
12.90
59.26
55.73

29.2
141.89

280.25

9.31
3.92
3.84
10.81
162.02
14.34
5.90
12.94
55.12
58.10

147.76

156.18

3.6
3.6
3.8
19.0
17.6
54.0
41.7
5.2
19.5
39.6

34.6

18.1

Nuclear capacity (TW(e)h) of reactors connected to the grid at 31 Dec. of given year
1980
1985
1990
1995
2000
2005
2010
2011
TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total

TABLE 6. NUCLEAR ELECTRICITY PRODUCTION AND SHARE, 1980 TO 2011

19

635.36

WORLD

NA
NA
NA
NA

1327.43

21.28
53.73
35.81
378.68

39.8
19.6
NA
15.5

1890.35

22.40
58.77
71.26
578.08

42.6
19.7
NA
20.6

2190.91

23.58
70.64
65.78
673.52

2011: 40.37 TW(e)h of nuclear electricity generation, representing 19.02% of the total electricity generated there.

2010: 39.89 TW(e)h of nuclear electricity generation, representing 19.3% of the total electricity generated there;

2005: 38.4 TW(e)h of nuclear electricity generation, representing 17.93% of the total electricity generated there;

2000: 37 TW(e)h of nuclear electricity generation, representing 21.19% of the total electricity generated there;

1995: 33.8 TW(e)h of nuclear electricity generation, representing 28.79% of the total electricity generated there;

1990: 31.54 TW(e)h of nuclear electricity generation, representing 38.32% of the total electricity generated there;

Note: The world total includes the following data from Taiwan, China:

13.63
32.32
6.38
249.84

39.9
25.4
37.8
22.5

2440.94

25.05
72.99
72.56
755.55

38.2
21.9
47.3
19.8

2626.34

22.11
75.34
83.40
783.35

38.0
20.0
48.5
19.3

25.34
56.85
83.95
807.08

38.0
15.5
48.1
19.6

25.69
62.66
84.89
790.44

40.9
17.8
47.2
19.3

2629.82

2517.97

Nuclear capacity (TW(e)h) of reactors connected to the grid at 31 Dec. of given year
1980
1985
1990
1995
2000
2005
2010
2011
TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total TW(e)h
% of total

SWITZERLAND
UK
UKRAINE
USA

Country

TABLE 6. NUCLEAR ELECTRICITY PRODUCTION AND SHARE, 1980 TO 2011 continued

TABLE 7. ANNUAL CONSTRUCTION STARTS AND


CONNECTIONS TO THE GRID, 1954 TO 2011
Construction
starts
Year

20

Number
of units

Connections
to the grid

Design
capacity
(MW(e))

Number
of units

Reactors
in operation

Design
capacity
(MW(e))

Number
of units

Updated
capacity
(MW(e))

1954
1955

1
8

60
260

1
1

5
5

1956
1957
1958
1959
1960

5
13
6
7
11

577
1836
476
976
1010

1
3
1
5
4

35
119
35
176
438

2
5
6
11
15

65
209
269
548
1087

1961
1962
1963
1964
1965

7
8
5
9
9

1531
1379
1722
2866
3291

1
9
9
8
8

15
955
500
1022
1879

16
25
33
40
48

1104
2223
2677
3686
5910

1966
1967
1968
1969
1970

15
25
37
13
37

7052
16287
26859
9277
25526

8
11
7
10
6

1530
2165
1020
3670
3410

55
64
69
78
84

7539
9595
10648
14121
17656

1971
1972
1973
1974
1975

18
29
29
38
38

12660
22335
23492
35222
36449

16
16
20
26
15

7711
8880
12727
17149
10236

99
113
132
154
169

24320
32797
43761
61021
70414

1976
1977
1978
1979
1980

42
24
23
28
20

40656
22691
21735
23909
19134

19
18
20
8
21

14269
13243
15782
6909
15088

186
200
219
225
245

83992
96385
111923
117814
133037

1981
1982
1983
1984
1985

16
19
16
10
20

15149
19765
12218
9528
16286

23
19
23
33
33

20389
15317
19253
31001
31042

267
284
306
336
363

153832
168317
187756
218452
245779

1986
1987
1988
1989
1990

8
13
7
6
5

7201
11019
7722
4018
3366

27
22
14
12
10

27212
22191
13621
10457
10543

389
407
416
420
416

272074
295812
305212
311942
318253

1991
1992
1993
1994
1995

2
3
4
2

2246
3105
3715
1330

4
6
9
5
5

3668
4809
9012
4176
3635

415
418
427
429
434

321924
325261
333914
336934
341402

1996
1997
1998
1999
2000

1
5
3
4
7

610
4386
2096
4583
5399

6
3
4
4
6

7080
3568
3152
2704
3063

438
434
430
432
435

347296
347895
344915
347368
349999

2001
2002
2003
2004
2005

1
6
1
2
3

1304
3440
202
1336
2900

3
6
2
5
4

2696
4998
1700
4785
3923

438
439
437
438
441

352730
357296
359842
364688
368125

2006
2007
2008
2009
2010

4
8
10
12
16

3400
6519
10499
13165
15846

2
3

1435
1785

2
5

1068
3763

435
439
438
437
441

369581
371645
371495
370705
375280

2011

1890

3997

435

368791

21

ARGENTINA
ARMENIA
BELGIUM
BRAZIL
BULGARIA
CANADA
CHINA
CZECH REP.
FINLAND
FRANCE
GERMANY
HUNGARY
INDIA
IRAN, ISL. REP.
ITALY
JAPAN
KOREA, REP. OF
LITHUANIA
MEXICO
PAKISTAN
ROMANIA
RUSSIA
SLOVAKIA
SLOVENIA
SOUTH AFRICA
SPAIN
SWEDEN

Country

73

87
69

63
66
68

152

101
61
63

74
89

85

1
4

4
13
9

1
11
1

6
2

1976
to
1980
No. Months

74

68
100
112
154

24
7
2
2

9
2
1
2
5
4

73
99
80
102
112
74

46
65
80

80
132
104
98

4
1
1
7

10
4
1

109

1981
to
1985
No. Months

72

96

49
62
116
151

86
103
90
152

93

89
101

8
4
1
1

15
6
2
1

1
5

1986
to
1990
No. Months

109

210

1
1

46
61

120

93

113
97
73

10
2

1
2
3

1991
to
1995
No. Months

83
169
118

42
59

122

124

167

175

1
1

3
5

1996
to
2000
No. Months

4
4

6
1

233

47
54

64

60
191

2001
to
2005
No. Months

1
1

1
1

160
323

53
51

81

68

2006
to
2010
No. Months

TABLE 8. NUMBER Of NEW REACTORS CONNECTED TO THE GRID AND MEDIAN CONSTRUCTION TIME IN MONTHS

1
1

107

64

105
221

60

No. Months

2011

22

86

TOTAL

74

63
106
89
100

131

1
6
7
25

99

125
186
64
126

1981
to
1985
No. Months

85

4
6
22

95

98
57
146

1986
to
1990
No. Months

29

1
1
1

PK -5
PK -4

PAKISTAN

Reactor

CHASNUPP 4
CHASNUPP 3

RAJASTHAN-7
RAJASTHAN-8

Name

Note: During 2011, construction was started on 4 reactors (1890 MW).

IN -21
IN -22

Code

INDIA

Country

Model

PWR
PWR

CNP-300
CNP-300

PHWR Horizontal Pre


PHWR Horizontal Pre

Type

TABLE 9. CONSTRUCTION STARTS DURING 2011

1981 to 1985: 4 units, 72 months.

1976 to 1980: 2 units, 64 months;

The totals include the following data from Taiwan, China:

999
999

2177
2177

Thermal

340
340

700
700

Gross

Capacity (MW)

103

80
113
221

1991
to
1995
No. Months

Note: Construction time is measured from the first pouring of concrete to the connection of the unit to the grid.

1
4
3
18

1976
to
1980
No. Months

SWITZERLAND
UK
UKRAINE
USA

Country

315
315

630
630

Net

PAEC
PAEC

NPCIL
NPCIL

CZEC
CZEC

NPCIL
NPCIL

NSSS
supplier

123

278

Operator

23

1996
to
2000
No. Months

20

2011-12
2011-5

2011-7
2011-9

Construction
start

64

227

2001
to
2005
No. Months

2017-7
2016-9

2016-3
2016-9

Grid
connection

12

75

2006
to
2010
No. Months

2017-10
2016-12

2016-6
2016-12

105

No. Months

2011

Commercial
operation

TABLE 8. NUMBER Of NEW REACTORS CONNECTED TO THE GRID AND MEDIAN CONSTRUCTION TIME IN MONTHS continued

23

RU -37

RUSSIA

BN-20
CPR-1000
CNP 600

Model

PWR

PWR

PWR

VVER V-320

PWR

VVER V-446

PHWR Horizontal Pre

FBR
PWR
PWR

Type

3200

999

3000

800

65
2905
1930

1000

325

1000

220

25
1080
650

Gross

Capacity (MW)

Thermal

IN -26

KR -22
KR -23

SK -10

US -391

KOREA, REP. OF

SLOVAKIA

USA

Reactor

WATTS BAR-2

MOCHOVCE-3

SHIN-KORI-2
SHIN-WOLSONG-1

KUDANKULAM-2

ATUCHA-2

Name

Model

PWR

PWR

PWR
PWR

PWR

W (4-loop)

VVER V-213

OPR-1000
OPR-1000

VVER V-412

PHWR PHWR KWU

Type

Note: During 2012, 6 reactors (5085 MW) are expected to achieve connection to grid.

AR -3

INDIA

Code

ARGENTINA

Country

950

300

915

202

20
1000
610

Net

3425

1375

2825
2825

3000

2160

Thermal
745

1218

440

1000
1000

1000

Gross

Capacity (MW)

TABLE 11. SCHEDULED CONNECTIONS TO THE GRID DURING 2012

Note: During 2011, 7 reactors (3997 MW) were newly connected to the grid.

KALININ-4

CHASNUPP 2

PK -3

PAKISTAN

KAIGA-4

BUSHEHR 1

IN -16

INDIA

Reactor

CEFR
LINGAO 4
QINSHAN 2-4

Name

IRAN, ISL. REP. IR -1

CN -84
CN -13
CN -15

Code

CHINA

Country

TABLE 10. CONNECTIONS TO THE GRID DURING 2011

1165

391

960
960

917

692

Net

REA

TVA

EMO

KHNP
KHNP

NPCIL

WH

SKODA

DHICKOPC
DHICKOPC

MAEP

SIEMENS

NSSS
supplier

ROSATOM

CNNC

ASE

NPCIL

IZ
DFEC
CNNC

NSSS
supplier

Operator
NASA

PAEC

NPPDCO

NPCIL

CIAE
LDNPC
NPQJVC

Operator

1972-12

1987-1

2007-6
2007-11

2002-7

1981-7

2012-12

2011-12
2012-1

2012-6

First
criticality

2011-11

2011-2

2011-5

2010-11

2010-7
2011-2
2011-11

First
criticality

Construction
start

1986-8

2005-12

1975-5

2002-5

2000-5
2006-6
2007-1

Construction
start

2012-8

2012-12

2012-1
2012-1

2012-7

2012-7

Grid
connection

2011-3

2011-9

2011-1

2011-5
2011-11

Grid connection

24

CHINA

Country

Code

CN -42
CN -53
CN -54
CN -57
CN -58
CN -59
CN -60
CN -48
CN -49
CN -50
CN -76
CN -77
CN -26
CN -27
CN -80
CN -81
CN -65
CN -66
CN -67
CN -68
CN -61
CN -62
CN -63
CN -64
CN -78
CN -79
CN -70
CN -71
CN -69

Name

BAMAOSHAN
CHANGJIANG 3
CHANGJIANG 4
FANGCHENGGANG 3
FANGCHENGGANG 4
FANGCHENGGANG 5
FANGCHENGGANG 6
FUQING 4
FUQING 5
FUQING 6
HAIYANG 3
HAIYANG 4
HONGSHIDING 1
HONGSHIDING 2
HONGYANHE 5
HONGYANHE 6
JIYANG 1
JIYANG 2
JIYANG 3
JIYANG 4
PENGZE 1
PENGZE 2
PENGZE 3
PENGZE 4
SANMEN 3
SANMEN 4
SANMING-1
SANMING-2
SHIDAOWAN 1

Reactor

PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
FBR
FBR
HTGR

Type
2905
1930
1930

2905
2905
2905
3750
3750
2905
2905

3750
3750
2100
2100
500

CPR-1000
CPR-1000
CPR-1000
AP-1000
AP-1000

CPR-1000
CPR-1000

AP-1000
AP-1000
BN-800
BN-800
HTGR-PM

Thermal

1250
1250
860
860
200

1080
1080

1087
1087
1087
1250
1250

1080
650
650

Gross

Capacity (MW)

CPR-1000

Model

TABLE 12. REACTORS PLANNED fOR CONSTRUCTION AS KNOWN ON 31 DEC. 2011

900
610
610
1000
1000
1000
1000
1000
1000
1000
1000
1000
0
0
1000
1000
1000
1000
1000
1000
1250
1250
1250
1250
1000
1000
800
800
200

Net

WH/MHI
WH/MHI

DFEC
DFEC
DFEC

HONGYANH
LHNPC
LHNPC

SMNPC
SMNPC
FSNPC
FSNPC
HSNPC

DFEC
DFEC
DFEC
WH
WH

NSSS
supplier

FQNP
FQNP
FQNP
SNPC
SNPC

Operator

Expected
construction
start

25

IR -2
IR -5
IR -9

JP -76
JP -69
JP -74
JP -72
JP -62
JP -63
JP -73
JP -75
JP -67
JP -68

KR -27

JAPAN

KOREA, REP. OF

Code

CN -32
CN -33
CN -72
CN -73
CN -74
CN -75
CN -40
CN -41
CN -82
CN -83
CN -44
CN -45
CN -46

IRAN, ISL. REP.

Country

Name

SHIN-ULCHIN-1

HAMAOKA-6
HIGASHI DORI 1 (TEPCO)
HIGASHI DORI 2 (TEPCO)
HIGASHI DORI 2 (TOHOKU)
KAMINOSEKI 1
KAMINOSEKI 2
NAMIE-ODAKA
SENDAI-3
TSURUGA-3
TSURUGA-4

BUSHEHR 2
BUSHEHR 3
DARKHOVAIN

TAOHUAJIANG 1
TAOHUAJIANG 2
TIANWAN 3
TIANWAN 4
TIANWAN 5
TIANWAN 6
XIANNING 1
XIANNING 2
XUDABU 1
XUDABU 2
YANGJIANG 4
YANGJIANG 5
YANGJIANG 6

Reactor

PWR

BWR
BWR
BWR
BWR
BWR
BWR
BWR
PWR
PWR
PWR

PWR
PWR
PWR

PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR

Type

APR-1400

ABWR
ABWR
ABWR
ABWR
ABWR
ABWR
BWR
APWR
APWR
APWR
1590
1590
1590

4466
4466
4466
1400

1373
1373

3926
3926

3938

1400
1385
1385

1000
1000
360

1080
1080
1087
1087
1087

1000
1000
1080
1080

Gross

3926
3926
3926

3000
3000
1113

2905
2905
2905
2905
2905

CPR-1000
CPR-1000
CPR-1000
CPR-1000
CPR-1000

VVER V-446
IR-360

3000
3000
2905
2905

Thermal

Capacity (MW)

VVER V-428
VVER V-428
CNP-1000
CNP-1000

Model

1340

1350
1343
1343
1067
1325
1325
825
1538
1538
1538

915
915
330

0
0
933
933
1000
1000
0
0
1000
1000
1000
1000
1000

Net

KHNP

CHUBU
TEPCO
TEPCO
TOHOKU
CHUGOKU
CHUGOKU
TOHOKU
KYUSHU
JAPCO
JAPCO

NPPDCO
NPPDCO
NPPDCO

LNPC
LNPC
YJNPC
YJNPC
YJNPC

JNPC
JNPC
JNPC
JNPC

Operator

TABLE 12. REACTORS PLANNED fOR CONSTRUCTION AS KNOWN ON 31 DEC. 2011 continued

DHICKOPC

MHI
MHI

TBD
ASE

DFEC
DFEC
DFEC
DFEC
DFEC

IZ
IZ
DFEC
DFEC

NSSS
supplier

2013-7
2013-7
2015-6

Expected
construction
start

26

RUSSIA

Country

RU -170
RU -171
RU -202
RU -203
RU -177
RU -178
RU -185
RU -186
RU -175
RU -176
RU -166
RU -189
RU -190
RU -191
RU -165
RU -167
RU -181
RU -182
RU -179
RU -180
RU -196
RU -197
RU -187
RU -188
RU -198
RU -199
RU -204
RU -205

Code

KR -28

Name

BALTIISK-1
BALTIISK-2
BASHKIR-1
BASHKIR-2
CENTRAL-1
CENTRAL-2
CENTRAL-3
CENTRAL-4
KOLA 2-1
KOLA 2-2
KURSK 2-1
KURSK 2-2
KURSK 2-3
KURSK 2-4
LENINGRAD 2-3
LENINGRAD 2-4
NIZHEGORODSK-1
NIZHEGORODSK-2
PEVEK-1
PEVEK-2
PRIMORSK-1
PRIMORSK-2
SEVERSK-1
SEVERSK-2
SMOLENSK 2-1
SMOLENSK 2-2
SOUTH URALS 1
SOUTH URALS 2

SHIN-ULCHIN-2

Reactor

PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR

PWR

Type

KLT-40S
KLT-40S

VVER V-491
VVER V-491

VVER V-491
VVER V-491

APR-1400

Model

3200
3200
3200
3200
3200
3200
3200
3200
3200
3200
3200
3200
3200
3200
3200
3200
3200
3200
150
150
3200
3200
3200
3200
3200
3200
3000
3000

3983

Thermal
1194
1194
1200
1200
1200
1200
1200
1200
1200
1200
1200
1200
1200
1200
1170
1170
1200
1200
35
35
1200
1200
1200
1200
1200
1200
1200
1200

1400

Gross

Capacity (MW)

1109
1109
1115
1115
1115
1115
1115
1115
1115
1115
1115
1115
1115
1115
1085
1085
1115
1115
32
32
1115
1115
1115
1115
1115
1115
1115
1115

Net

1340
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA

KHNP

Operator

TABLE 12. REACTORS PLANNED fOR CONSTRUCTION AS KNOWN ON 31 DEC. 2011 continued

ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM

DHICKOPC

NSSS
supplier

2012-2

Expected
construction
start

27

VN -1
VN -2

VIETNAM

Name

PHUOC DINH 1
PHUOC DINH 2

BELL BEND
CALVERT CLIFFS-3
COMANCHE PEAK-3
COMANCHE PEAK-4
ENRICO FERMI-3
LEVY COUNTY-1
LEVY COUNTY-2
NORTH ANNA-3
SHEARON HARRIS-2
SHEARON HARRIS-3
SOUTH TEXAS-3
SOUTH TEXAS-4
TURKEY POINT-6
TURKEY POINT-7
VIRGIL C. SUMMER-2
VIRGIL C. SUMMER-3
VOGTLE-3
VOGTLE-4
WILLIAM STATES LEE III -1
WILLIAM STATES LEE III -2

SOUTH URALS 3
TATAR-1
TATAR-2
TVERSK-1
TVERSK-2
TVERSK-3
TVERSK-4

Reactor

PWR
PWR

PWR
PWR
PWR
PWR
BWR
PWR
PWR
PWR
PWR
PWR
BWR
BWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR

PWR
PWR
PWR
PWR
PWR
PWR
PWR

Type

Note: Status as of 31 December 2011, 114 reactors (117329 MW) were known as being planned.

US -5039
US -5016
US -5034
US -5035
US -5033
US -5029
US -5030
US -5017
US -5022
US -5023
US -5012
US -5013
US -5040
US -5041
US -5027
US -5028
US -5025
US -5026
US -5018
US -5019

Code

RU -206
RU -200
RU -201
RU -192
RU -193
RU -194
RU -195

USA

Country

EPR
US-EPR
US-APWR
US-APWR
ESBWR
AP-1000
AP-1000
US-APWR
AP-1000
AP-1000
ABWR
ABWR
AP-1000
AP-1000
AP-1000
AP-1000
AP-1000
AP-1000
AP-1000
AP-1000

Model

1720
1720
1600
1250
1250
1250
1250
1400
1400
1250
1250
1250
1250
1250
1250
1250
1250

4500
3750
3750
3750
3750
3926
3926
3750
3750
3750
3750
3750
3750
3750
3750

1200
1200
1200
1200
1200
1200
1200

Gross

4300
4300

3000
3200
3200
3200
3200
3200
3200

Thermal

Capacity (MW)

1000
1000

1600
1600
1700
1700
1520
1117
1117
1500
1117
1117
1350
1350
1117
1117
1117
1117
1117
1117
1117
1117

Net

1115
1115
1115
1115
1115
1115
1115

EVN
EVN

PROGRESS

REA
REA
REA
REA
REA
REA
REA

Operator

TABLE 12. REACTORS PLANNED fOR CONSTRUCTION AS KNOWN ON 31 DEC. 2011 continued

ROSATOM
ROSATOM

WH
WH

AREVA

ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM

NSSS
supplier

Expected
construction
start

28

BG -7
BG -8

BR -3

CN -51
CN -52
CN -55
CN -56
CN -28
CN -29
CN -30
CN -31
CN -47
CN -24
CN -25
CN -20
CN -21
CN -22
CN -23
CN -36
CN -37
CN -38
CN -39
CN -16
CN -17
CN -34

BULGARIA

BRAZIL

CHINA

Code

AR -3

ARGENTINA

Country

CHANGJIANG 1
CHANGJIANG 2
FANGCHENGGANG 1
FANGCHENGGANG 2
FANGJIASHAN 1
FANGJIASHAN 2
FUQING 1
FUQING 2
FUQING 3
HAIYANG 1
HAIYANG 2
HONGYANHE 1
HONGYANHE 2
HONGYANHE 3
HONGYANHE 4
NINGDE 1
NINGDE 2
NINGDE 3
NINGDE 4
SANMEN 1
SANMEN 2
TAISHAN 1

ANGRA-3

BELENE-1
BELENE-2

Name

ATUCHA-2

Reactor

Model

PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR

PWR

PWR
PWR

CNP-600
CNP-600
CPR-1000
CPR-1000
CNP-1000
CNP-1000
CPR-1000
CPR-1000
CPR-1000
AP-1000
AP-1000
CPR-1000
CPR-1000
CPR-1000
CPR-1000
CPR-1000
CPR-1000
CPR-1000
CPR-1000
AP-1000
AP-1000
EPR-1700

PRE KONVOI

VVER V-466
VVER V-466

PHWR PHWR KWU

Type

1930
1930
2905
2905
2905
2905
2905
2905
2905
3750
3750
2905
2905
2905
2905
2905
2905
2905
2905
3750
3750
4500

3765

3000
3000

2160

Thermal

650
650
1087
1087
1087
1087
1087
1087
1087
1250
1250
1080
1080
1080
1080
1087
1080
1080
1080
1250
1250
1750

1350

1000
1000

745

Gross

Capacity (MW)

TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2011

610
610
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1700

1245

953
953

692

Net
ASE
ASE

SIEMENS

NSSS
supplier

HNPC
HNPC
GFNPC
GFNPC
QNPC
QNPC
FQNP
FQNP
FQNP
SNPC
SNPC
LHNPC
LHNPC
LHNPC
LHNPC
NDNPC
NDNPC
NDNPC
NDNPC
SMNPC
SMNPC
TNPC

DFEC
DFEC
DFEC
DFEC
DFEC
DFEC
DFEC
DFEC
DFEC
WH
WH
DFEC
DFEC
DFEC
DFEC
DFEC
DFEC
DFEC
DFEC
WH/MHI
WH/MHI
AREVA

ELETRONU KWU

KOZNPP
KOZNPP

NASA

Operator

2010-4
2010-11
2010-7
2010-12
2008-12
2009-7
2008-11
2009-6
2010-12
2009-9
2010-6
2007-8
2008-3
2009-3
2009-8
2008-2
2008-11
2010-1
2010-9
2009-4
2009-12
2009-10

2010-6

1987-1
1987-3

1981-7

Construction First
start
criticality

2012-7

Grid
connection

2015-12

2015-7

2016-1

Commercial
operation

29

FI -5

FR -74

IN -30
IN -31
IN -25
IN -26
IN -29
IN -21
IN -22

JP -66
JP -65

KR -22
KR -25
KR -26
KR -23
KR -24

PK -4
PK -5

RU -151

FRANCE

INDIA

JAPAN

KOREA, REP. OF

PAKISTAN

RUSSIA

Code

CN -35
CN -18
CN -19
CN -43

FINLAND

Country

AKADEMIK LOMONOSOV 1

CHASNUPP 3
CHASNUPP 4

SHIN-KORI-2
SHIN-KORI-3
SHIN-KORI-4
SHIN-WOLSONG-1
SHIN-WOLSONG-2

OHMA
SHIMANE-3

KAKRAPAR-3
KAKRAPAR-4
KUDANKULAM-1
KUDANKULAM-2
PFBR
RAJASTHAN-7
RAJASTHAN-8

FLAMANVILLE-3

OLKILUOTO-3

Name

TAISHAN 2
YANGJIANG 1
YANGJIANG 2
YANGJIANG 3

Reactor

PWR

PWR
PWR

PWR
PWR
PWR
PWR
PWR

BWR
BWR

PHWR
PHWR
PWR
PWR
FBR
PHWR
PHWR

PWR

PWR

PWR
PWR
PWR
PWR

Type

KLT-40S 'Float

CNP-300
CNP-300

OPR-1000
APR-1400
APR-1400
OPR-1000
OPR-1000

ABWR
ABWR

Horizontal Pre
Horizontal Pre

PHWR-700
PHWR-700
VVER V-412
VVER V-412

EPR

EPR

EPR-1700
CPR-1000
CPR-1000
CPR-1000

Model

150

999
999

2825
3983
3938
2825
2825

3926
3926

2166
2166
3000
3000
1253
2177
2177

4300

4300

4500
2905
2905
2905

Thermal

35

340
340

1000
1400
1400
1000
1000

1383
1373

700
700
1000
1000
500
700
700

1650

1720

1750
1087
1087
1087

Gross

Capacity (MW)

32

315
315

960
1340
1340
960
960

1325
1325

630
630
917
917
470
630
630

1600

1600

Net

1700
1000
1000
1000

NPCIL
NPCIL

NPCIL
NPCIL
MAEP
MAEP

AREVA

AREVA

AREVA
DFEC
DFEC
DFEC

NSSS
supplier

REA

PAEC
PAEC

KHNP
KHNP
KHNP
KHNP
KHNP

ROSATOM

CZEC
CZEC

DHICKOPC
DHICKOPC
DHICKOPC
DHICKOPC
DHICKOPC

EPDC
H/G
CHUGOKU HITACHI

NPCIL
NPCIL
NPCIL
NPCIL
BHAVINI
NPCIL
NPCIL

EDF

TVO

TNPC
YJNPC
YJNPC
YJNPC

Operator

TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2011 continued

2007-4

2011-5
2011-12

2007-6
2008-10
2009-8
2007-11
2008-9

2010-5
2007-10

2010-11
2010-11
2002-3
2002-7
2004-10
2011-7
2011-9

2007-12

2005-8

2010-4
2008-12
2009-6
2010-11

2016-8
2017-6

2011-12

2012-1

2014-12
2015-6

2012-6

2015-12
2016-6

2016-12

Construction First
start
criticality

2016-9
2017-7

2012-1

2012-1

2015-3
2015-9

2012-7

2016-3
2016-9

2016-12

Grid
connection

2013-12

2016-12
2017-10

2013-9
2014-9

2014-11

2015-6
2015-12

2012-8

2016-6
2016-12

2013-8

Commercial
operation

30

PWR

W (4-loop) (IC

VVER V-392B
VVER V-392B
3425

3200
3200

1375
1375

150
2100
3200
3200
3200
3200
3200
3000
3000

1218

1000
1000

440
440

35
864
1000
1170
1170
1200
1200
1070
1070

Gross

Capacity (MW)

Thermal

1165

950
950

391
391

32
789
915
1085
1085
1114
1114
1011
1011

Net

NNEGC
NNEGC

EMO
EMO

REA
REA
REA
REA
REA
REA
REA
REA
REA

Operator

ASE
ASE

SKODA
SKODA

ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM

NSSS
supplier

GE
GE

WATTS BAR-2

PWR
PWR

VVER V-213
VVER V-213

KLT-40S 'Float
BN-800
RBMK-1000
VVER V-491
VVER V-491
VVER V-392M
VVER V-392M
VVER V-320
VVER V-320

Model

Note: Status as of 31 December 2011, 65 reactors (61962 MW) were under construction, including 2 units (2600 MW) in Taiwan, China:
TAIWAN, CN
TW -7
LUNGMEN 1
BWR ABWR
3926
1350
1300 TPC
TAIWAN, CN
TW -8
LUNGMEN 2
BWR ABWR
3926
1350
1300 TPC

US -391

USA

KHMELNITSKI-3
KHMELNITSKI-4

PWR
PWR

PWR
FBR
LWGR
PWR
PWR
PWR
PWR
PWR
PWR

Type

WH

UA -51
UA -52

UKRAINE

MOCHOVCE-3
MOCHOVCE-4

AKADEMIK LOMONOSOV 2
BELOYARSKY-4 (BN-800)
KURSK-5
LENINGRAD 2-1
LENINGRAD 2-2
NOVOVORONEZH 2-1
NOVOVORONEZH 2-2
ROSTOV-3
ROSTOV-4

Reactor

Name

TVA

SK -10
SK -11

RU -152
RU -116
RU -120
RU -163
RU -164
RU -161
RU -162
RU -63
RU -64

Code

SLOVAKIA

Country

TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2011 continued

1999-3
1999-8

1972-12

1986-3
1987-2

1987-1
1987-1

2007-4
2006-7
1985-12
2008-10
2010-4
2008-6
2009-7
2009-9
2010-6

2012-12
2013-8

Construction First
start
criticality

2012-8

2015-1
2016-1

2012-12
2013-9

Grid
connection

2013-2
2013-10

2013-12

2013-12

Commercial
operation

31

Reactor

BE -2
BE -4
BE -5
BE -7
BE -3
BE -6
BE -8

BR -1
BR -2

BG -5
BG -6

CA -10
CA -11
CA -18
CA -19
CA -20
CA -21
CA -22
CA -23
CA -24
CA -25

BELGIUM

BRAZIL

BULGARIA

CANADA

Model

PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR

PWR
PWR

PWR
PWR

PWR
PWR
PWR
PWR
PWR
PWR
PWR

PWR

CANDU 750A
CANDU 750A
CANDU 750B
CANDU 750B
CANDU 750B
CANDU 750B
CANDU 850
CANDU 850
CANDU 850
CANDU 850

VVER V-320
VVER V-320

2-loop WE
PRE KONVOI

WE (2 loops)
WE (2 loops)
WE 3-loops
WE 3-loops
Framatome 3 lo
WE 3-loops
WE 3-loops

VVER V-270

PHWR PHWR KWU


PHWR CANDU 6

Type

2832
2832
2832
2690
2832
2690
2776
2776
2776
2776

3000
3000

1882
3764

1311
1311
3054
2988
2873
3064
3000

1375

1179
2015

805
805
872
891
872
845
934
934
934
934

1000
1000

640
1350

454
454
1056
1090
1009
1055
1094

408

357
648

Gross

Capacity (MW)

Thermal

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DH district heating.

BRUCE-3
BRUCE-4
BRUCE-5
BRUCE-6
BRUCE-7
BRUCE-8
DARLINGTON-1
DARLINGTON-2
DARLINGTON-3
DARLINGTON-4

KOZLODUY-5
KOZLODUY-6

ANGRA-1
ANGRA-2

DOEL-1
DOEL-2
DOEL-3
DOEL-4
TIHANGE-1
TIHANGE-2
TIHANGE-3

AM -19 ARMENIA-2

ARMENIA

ATUCHA-1
EMBALSE

Name

AR -1
AR -2

Code

ARGENTINA

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011

730
730
817
817
817
817
878
878
878
878

953
953

609
1275

433
433
1006
1039
962
1008
1046

375

335
600

Net

BRUCEPOW
BRUCEPOW
BRUCEPOW
BRUCEPOW
BRUCEPOW
BRUCEPOW
OPG
OPG
OPG
OPG

KOZNPP
KOZNPP

ELETRONU
ELETRONU

ELECTRAB
ELECTRAB
ELECTRAB
ELECTRAB
ELECTRAB
ELECTRAB
ELECTRAB

ANPPJSC

NASA
NASA

Operator

OH/AECL
OH/AECL
OH/AECL
OH/AECL
OH/AECL
OH/AECL
OH/AECL
OH/AECL
OH/AECL
OH/AECL

AEE
AEE

WH
KWU

ACECOWEN
ACECOWEN
FRAMACEC
ACECOWEN
ACLF
FRAMACEC
ACECOWEN

FAEA

SIEMENS
AECL

NSSS
supplier

1972-7
1972-9
1978-6
1978-1
1979-5
1979-8
1982-4
1981-9
1984-9
1985-7

1980-7
1982-4

1971-5
1976-1

1969-7
1971-9
1975-1
1978-12
1970-6
1976-4
1978-11

1975-7

1968-6
1974-4

1977-12
1978-12
1984-12
1984-6
1986-2
1987-3
1990-12
1990-1
1992-12
1993-4

1987-11
1991-8

1982-4
2000-7

1974-8
1975-8
1982-6
1985-4
1975-3
1982-10
1985-6

1980-1

1974-3
1983-4

Construction Grid
Start
connection

1978-2
1979-1
1985-3
1984-9
1986-4
1987-5
1992-11
1990-10
1993-2
1993-6

1988-12
1993-12

1985-1
2001-2

1975-2
1975-12
1982-10
1985-7
1975-10
1983-6
1985-9

1980-5

1974-6
1984-1

Commercial
operation

76.6
86.9
90.7
85.8
89.9
91.7
88.5
89.5
92.5
87.8

86.3
86.1

73.0
90.3

84.9
90.7
86.8
86.4
87.1
89.8
88.3

71.2

87.4
80.1

77.2
87.4
91.0
85.9
90.0
91.9
89.6
90.4
93.4
88.6

86.7
86.7

73.1
90.9

84.9
90.7
87.1
86.4
88.1
90.1
88.9

72.3

87.6
80.2

DH
DH

EAF % UCF %
Non2007 2007 electrical
2011
2011
applics

32

CN -84
CN -2
CN -3
CN -6
CN -7
CN -12
CN -13
CN -1
CN -4
CN -5
CN -14
CN -15
CN -8
CN -9
CN -10
CN -11

CZ -4
CZ -5
CZ -8
CZ -9

CZECH REP.

Code

CA -12
CA -4
CA -7
CA -13
CA -14
CA -15
CA -16
CA -17

CHINA

Country

Name

DUKOVANY-1
DUKOVANY-2
DUKOVANY-3
DUKOVANY-4

CEFR
GUANGDONG-1
GUANGDONG-2
LINGAO 1
LINGAO 2
LINGAO 3
LINGAO 4
QINSHAN 1
QINSHAN 2-1
QINSHAN 2-2
QINSHAN 2-3
QINSHAN 2-4
QINSHAN 3-1
QINSHAN 3-2
TIANWAN 1
TIANWAN 2

GENTILLY-2
PICKERING-1
PICKERING-4
PICKERING-5
PICKERING-6
PICKERING-7
PICKERING-8
POINT LEPREAU

Reactor

PWR
PWR
PWR
PWR

FBR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PHWR
PHWR
PWR
PWR

PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR

Type

VVER V-213
VVER V-213
VVER V-213
VVER V-213

BN-20
M310
M310
M310
M310
CPR-1000
CPR-1000
CNP-300
CNP-600
CNP-600
CNP-600
CNP 600
CANDU 6
CANDU 6
VVER V-428
VVER V-428

CANDU 6
CANDU 500A
CANDU 500A
CANDU 500B
CANDU 500B
CANDU 500B
CANDU 500B
CANDU 6

Model

1375
1375
1444
1375

65
2905
2905
2905
2905
2905
2905
966
1930
1930
1930
1930
2064
2064
3000
3000

2156
1744
1744
1744
1744
1744
1744
2180

Thermal

498
456
498
498

25
984
984
990
990
1080
1080
310
650
650
650
650
700
700
1060
1060

675
542
542
540
540
540
540
680

Gross

Capacity (MW)
635
515
515
516
516
516
516
635

471
427
471
471

20
944
944
938
938
1007
1007
298
610
610
610
610
650
650
990
990

Net

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 continued

CEZ
CEZ
CEZ
CEZ

CIAE
GNPJVC
GNPJVC
LANPC
LANPC
LDNPC
LDNPC
QNPC
NPQJVC
NPQJVC
NPQJVC
NPQJVC
TQNPC
TQNPC
JNPC
JNPC

HQ
OPG
OPG
OPG
OPG
OPG
OPG
NBEPC

Operator

SKODA
SKODA
SKODA
SKODA

IZ
FRAM
FRAM
FRAM
FRAM
DFEC
DFEC
CNNC
CNNC
CNNC
CNNC
CNNC
AECL
AECL
IZ
IZ

AECL
OH/AECL
OH/AECL
OH/AECL
OH/AECL
OH/AECL
OH/AECL
AECL

NSSS
supplier

1979-1
1979-1
1979-3
1979-3

2000-5
1987-8
1988-4
1997-5
1997-11
2005-12
2006-6
1985-3
1996-6
1997-4
2006-3
2007-1
1998-6
1998-9
1999-10
2000-10

1974-4
1966-6
1968-5
1974-11
1975-10
1976-3
1976-9
1975-5

1985-2
1986-1
1986-11
1987-6

2011-7
1993-8
1994-2
2002-2
2002-12
2010-7
2011-5
1991-12
2002-2
2004-3
2010-8
2011-11
2002-11
2003-6
2006-5
2007-5

1982-12
1971-4
1973-5
1982-12
1983-11
1984-11
1986-1
1982-9

Construction Grid
start
connection

1985-5
1986-3
1986-12
1987-7

1994-2
1994-5
2002-5
2003-1
2010-9
2011-8
1994-4
2002-4
2004-5
2010-10
2011-12
2002-12
2003-7
2007-5
2007-8

1983-10
1971-7
1973-6
1983-5
1984-2
1985-1
1986-2
1983-2

Commercial
operation

87.4
89.3
86.0
85.8

90.4
92.7
80.1
84.2

90.3
92.5
80.1
84.2
87.2
88.8
85.3
85.2

94.2
90.8
90.1
89.7
73.2
99.5
87.3
79.5
87.9
83.1

69.6
65.4
57.1
69.3
80.5
74.5
80.5
22.0
94.2
90.8
89.9
89.7
73.2
99.5
87.2
79.5
87.8
83.1

66.7
65.2
56.9
68.6
80.2
74.2
79.7
22.0

EAF % UCF %
Non2007 2007 electrical
2011
2011
applics

33

FR -54
FR -55
FR -32
FR -33
FR -34
FR -35
FR -13
FR -14
FR -15
FR -16
FR -50
FR -53
FR -60
FR -65
FR -40
FR -41
FR -56
FR -57
FR -62
FR -70
FR -72
FR -73

FRANCE

Name

BELLEVILLE-1
BELLEVILLE-2
BLAYAIS-1
BLAYAIS-2
BLAYAIS-3
BLAYAIS-4
BUGEY-2
BUGEY-3
BUGEY-4
BUGEY-5
CATTENOM-1
CATTENOM-2
CATTENOM-3
CATTENOM-4
CHINON-B-1
CHINON-B-2
CHINON-B-3
CHINON-B-4
CHOOZ-B-1
CHOOZ-B-2
CIVAUX-1
CIVAUX-2

LOVIISA-1
LOVIISA-2
OLKILUOTO-1
OLKILUOTO-2

TEMELIN-1
TEMELIN-2

Reactor

PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR

PWR
PWR
BWR
BWR

PWR
PWR

Type

P4 REP 1300
P4 REP 1300
CP1
CP1
CP1
CP1
CP0
CP0
CP0
CP0
P4 REP 1300
P4 REP 1300
P4 REP 1300
P4 REP 1300
CP2
CP2
CP2
CP2
N4 REP 1450
N4 REP 1450
N4 REP 1450
N4 REP 1450

VVER V-213
VVER V-213
BWR-2500
BWR-2500

VVER V-320
VVER V-320

Model

3817
3817
2785
2785
2785
2785
2785
2785
2785
2785
3817
3817
3817
3817
2785
2785
2785
2785
4270
4270
4270
4270

1500
1500
2500
2500

3000
3000

Thermal

1363
1363
951
951
951
951
945
945
917
917
1362
1362
1362
1362
954
954
954
954
1560
1560
1561
1561

510
510
910
910

1013
1013

Gross

Capacity (MW)

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DH district heating.

FI -1
FI -2
FI -3
FI -4

Code

CZ -23
CZ -24

FINLAND

Country
963
963

1310
1310
910
910
910
910
910
910
880
880
1300
1300
1300
1300
905
905
905
905
1500
1500
1495
1495

488
488
880
880

Net

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 continued

EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF

FORTUMPH
FORTUMPH
TVO
TVO

CEZ
CEZ

Operator

FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM

AEE
AEE
ASEASTAL
ASEASTAL

SKODA
SKODA

NSSS
supplier

1980-5
1980-8
1977-1
1977-1
1978-4
1978-4
1972-11
1973-9
1974-6
1974-7
1979-10
1980-7
1982-6
1983-9
1977-3
1977-3
1980-10
1981-2
1984-1
1985-12
1988-10
1991-4

1971-5
1972-8
1974-2
1975-11

1987-2
1987-2

1987-10
1988-7
1981-6
1982-7
1983-8
1983-5
1978-5
1978-9
1979-3
1979-7
1986-11
1987-9
1990-7
1991-5
1982-11
1983-11
1986-10
1987-11
1996-8
1997-4
1997-12
1999-12

1977-2
1980-11
1978-9
1980-2

2000-12
2002-12

Construction Grid
start
connection

1988-6
1989-1
1981-12
1983-2
1983-11
1983-10
1979-3
1979-3
1979-7
1980-1
1987-4
1988-2
1991-2
1992-1
1984-2
1984-8
1987-3
1988-4
2000-5
2000-9
2002-1
2002-4

1977-5
1981-1
1979-10
1982-7

2002-6
2003-4

Commercial
operation

70.6
80.5
79.4
79.6
84.3
78.8
73.8
56.3
71.8
73.9
84.9
78.8
77.4
83.7
65.2
75.8
72.7
73.7
77.5
81.4
73.5
84.4

91.7
92.7
94.6
93.7

68.8
78.7

71.6
83.3
83.3
82.0
87.3
81.8
76.1
61.5
73.8
77.8
87.4
81.8
78.8
85.8
70.9
77.6
75.2
78.2
78.8
84.1
74.6
87.2

92.1
93.4
95.1
94.4

68.9
79.2

DH
DH

EAF % UCF %
Non2007 2007 electrical
2011
2011
applics

34

Country

Code

FR -42
FR -43
FR -44
FR -45
FR -22
FR -29
FR -30
FR -31
FR -11
FR -12
FR -46
FR -47
FR -61
FR -68
FR -20
FR -21
FR -27
FR -28
FR -51
FR -52
FR -58
FR -59
FR -36
FR -37
FR -38
FR -39
FR -63
FR -64
FR -48
FR -49

Name

CRUAS-1
CRUAS-2
CRUAS-3
CRUAS-4
DAMPIERRE-1
DAMPIERRE-2
DAMPIERRE-3
DAMPIERRE-4
FESSENHEIM-1
FESSENHEIM-2
FLAMANVILLE-1
FLAMANVILLE-2
GOLFECH-1
GOLFECH-2
GRAVELINES-1
GRAVELINES-2
GRAVELINES-3
GRAVELINES-4
GRAVELINES-5
GRAVELINES-6
NOGENT-1
NOGENT-2
PALUEL-1
PALUEL-2
PALUEL-3
PALUEL-4
PENLY-1
PENLY-2
ST. ALBAN-1
ST. ALBAN-2

Reactor

PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR

Type

CP2
CP2
CP2
CP2
CP1
CP1
CP1
CP1
CP0
CP0
P4 REP 1300
P4 REP 1300
P4 REP 1300
P4 REP 1300
CP1
CP1
CP1
CP1
CP1
CP1
P4 REP 1300
P4 REP 1300
P4 REP 1300
P4 REP 1300
P4 REP 1300
P4 REP 1300
P4 REP 1300
P4 REP 1300
P4 REP 1300
P4 REP 1300

Model

2785
2785
2785
2785
2785
2785
2785
2785
2660
2660
3817
3817
3817
3817
2785
2785
2785
2785
2785
2785
3817
3817
3817
3817
3817
3817
3817
3817
3817
3817

Thermal
956
956
956
956
937
937
937
937
920
920
1382
1382
1363
1363
951
951
951
951
951
951
1363
1363
1382
1382
1382
1382
1382
1382
1381
1381

Gross

Capacity (MW)
915
915
915
915
890
890
890
890
880
880
1330
1330
1310
1310
910
910
910
910
910
910
1310
1310
1330
1330
1330
1330
1330
1330
1335
1335

Net

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 continued

EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF
EDF

Operator
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM
FRAM

NSSS
supplier
1978-8
1978-11
1979-4
1979-10
1975-2
1975-4
1975-9
1975-12
1971-9
1972-2
1979-12
1980-5
1982-11
1984-10
1975-2
1975-3
1975-12
1976-4
1979-10
1979-10
1981-5
1982-1
1977-8
1978-1
1979-2
1980-2
1982-9
1984-8
1979-1
1979-7

1983-4
1984-9
1984-5
1984-10
1980-3
1980-12
1981-1
1981-8
1977-4
1977-10
1985-12
1986-7
1990-6
1993-6
1980-3
1980-8
1980-12
1981-6
1984-8
1985-8
1987-10
1988-12
1984-6
1984-9
1985-9
1986-4
1990-5
1992-2
1985-8
1986-7

Construction Grid
start
connection
1984-4
1985-4
1984-9
1985-2
1980-9
1981-2
1981-5
1981-11
1978-1
1978-4
1986-12
1987-3
1991-2
1994-3
1980-11
1980-12
1981-6
1981-10
1985-1
1985-10
1988-2
1989-5
1985-12
1985-12
1986-2
1986-6
1990-12
1992-11
1986-5
1987-3

Commercial
operation
70.7
68.2
74.4
74.3
78.3
83.5
80.4
79.4
66.8
57.3
71.5
74.3
88.5
85.5
75.1
80.7
74.6
83.3
83.3
79.6
83.1
75.6
79.8
81.3
62.5
77.5
77.7
85.1
65.0
79.0

74.9
72.0
76.4
76.8
81.4
85.5
82.3
82.0
67.8
59.5
73.5
77.2
90.1
87.3
76.8
82.3
76.5
84.6
84.9
80.0
86.5
76.8
84.9
83.4
64.6
79.3
78.4
87.0
66.4
81.4

EAF % UCF %
Non2007 2007 electrical
2011
2011
applics

35

HU -1
HU -2
HU -3
HU -4

IN -13
IN -14
IN -15
IN -16
IN -9
IN -10
IN -5
IN -6

HUNGARY

INDIA

Name

KAIGA-1
KAIGA-2
KAIGA-3
KAIGA-4
KAKRAPAR-1
KAKRAPAR-2
MADRAS-1
MADRAS-2

PAKS-1
PAKS-2
PAKS-3
PAKS-4

BROKDORF (KBR)
EMSLAND (KKE)
GRAFENRHEINFELD (KKG)
GROHNDE (KWG)
GUNDREMMINGEN-B (GUN-B)
GUNDREMMINGEN-C (GUN-C)
ISAR-2 (KKI 2)
NECKARWESTHEIM-2 (GKN 2)
PHILIPPSBURG-2 (KKP 2)

ST. LAURENT-B-1
ST. LAURENT-B-2
TRICASTIN-1
TRICASTIN-2
TRICASTIN-3
TRICASTIN-4

Reactor

PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR

PWR
PWR
PWR
PWR

PWR
PWR
PWR
PWR
BWR
BWR
PWR
PWR
PWR

PWR
PWR
PWR
PWR
PWR
PWR

Type

Horizontal Pre
Horizontal Pre
Horizontal Pre
Horizontal Pre
Horizontal Pre
Horizontal Pre
Horizontal Pre
Horizontal Pre

VVER V-213
VVER V-213
VVER V-213
VVER V-213

PWR
Konvoi
PWR
PWR
BWR-72
BWR-72
Konvoi
Konvoi
PWR

CP2
CP2
CP1
CP1
CP1
CP1

Model

801
801
800
800
801
801
801
801

1485
1485
1485
1485

3900
3850
3765
3900
3840
3840
3950
3850
3950

2785
2785
2785
2785
2785
2785

Thermal

220
220
220
220
220
220
220
220

500
500
500
500

1480
1400
1345
1430
1344
1344
1485
1400
1468

956
956
955
955
955
955

Gross

Capacity (MW)
915
915
915
915
915
915

202
202
202
202
202
202
205
205

470
473
473
473

1410
1329
1275
1360
1284
1288
1410
1310
1402

Net

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DH district heating, DS desalination.

DE -32
DE -33
DE -23
DE -27
DE -26
DE -28
DE -31
DE -44
DE -24

Code

FR -17
FR -23
FR -18
FR -19
FR -25
FR -26

GERMANY

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 continued

NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL

PAKS Zrt
PAKS Zrt
PAKS Zrt
PAKS Zrt

E.ON
KLE
E.ON
KWG
KGG
KGG
E.ON
EnKK
EnKK

EDF
EDF
EDF
EDF
EDF
EDF

Operator

NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL

AEE
AEE
AEE
AEE

KWU
KWU
KWU
KWU
KWU
KWU
KWU
KWU
KWU

FRAM
FRAM
FRAM
FRAM
FRAM
FRAM

NSSS
supplier

1989-9
1989-12
2002-3
2002-5
1984-12
1985-4
1971-1
1972-10

1974-8
1974-8
1979-10
1979-10

1976-1
1982-8
1975-1
1976-6
1976-7
1976-7
1982-9
1982-11
1977-7

1976-5
1976-7
1974-11
1974-12
1975-4
1975-5

2000-10
1999-12
2007-4
2011-1
1992-11
1995-3
1983-7
1985-9

1982-12
1984-9
1986-9
1987-8

1986-10
1988-4
1981-12
1984-9
1984-3
1984-11
1988-1
1989-1
1984-12

1981-1
1981-6
1980-5
1980-8
1981-2
1981-6

Construction Grid
start
connection

2000-11
2000-3
2007-5
2011-1
1993-5
1995-9
1984-1
1986-3

1983-8
1984-11
1986-12
1987-11

1986-12
1988-6
1982-6
1985-2
1984-7
1985-1
1988-4
1989-4
1985-4

1983-8
1983-8
1980-12
1980-12
1981-5
1981-11

Commercial
operation

57.6
56.4
45.1
71.7
35.9
62.5
47.5
50.9

86.7
87.6
88.2
88.3

91.0
94.1
84.2
90.1
88.9
88.3
93.8
92.5
90.7

81.3
77.6
78.5
74.9
78.3
83.2

90.0
92.6
72.9
93.5
45.3
94.3
80.7
91.2

86.7
87.6
88.2
88.3

91.2
94.2
84.3
91.4
89.1
88.4
93.9
92.8
91.9

85.1
80.7
80.6
77.0
79.6
84.9

DS
DS

DH
DH
DH

EAF % UCF %
Non2007 2007 electrical
2011
2011
applics

36

JP -17
JP -18
JP -25
JP -26
JP -35
JP -38
JP -12
JP -27
JP -45
JP -46
JP -36
JP -49
JP -60
JP -58
JP -23

Name

FUKUSHIMA-DAIICHI-5
FUKUSHIMA-DAIICHI-6
FUKUSHIMA-DAINI-1
FUKUSHIMA-DAINI-2
FUKUSHIMA-DAINI-3
FUKUSHIMA-DAINI-4
GENKAI-1
GENKAI-2
GENKAI-3
GENKAI-4
HAMAOKA-3
HAMAOKA-4
HAMAOKA-5
HIGASHI DORI 1 (TOHOKU)
IKATA-1

BUSHEHR 1

NARORA-1
NARORA-2
RAJASTHAN-1
RAJASTHAN-2
RAJASTHAN-3
RAJASTHAN-4
RAJASTHAN-5
RAJASTHAN-6
TARAPUR-1
TARAPUR-2
TARAPUR-3
TARAPUR-4

Reactor

BWR
BWR
BWR
BWR
BWR
BWR
PWR
PWR
PWR
PWR
BWR
BWR
BWR
BWR
PWR

PWR

PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
PHWR
BWR
BWR
PHWR
PHWR

Type

BWR-4
BWR-5
BWR-5
BWR-5
BWR-5
BWR-5
M (2-loop)
M (2-loop)
M (4-loop)
M (4-loop)
BWR-5
BWR-5
ABWR
BWR-5
M (2-loop)

VVER V-446

Horizontal Pre
Horizontal Pre
Horizontal Pre
Horizontal Pre
Horizontal Pre
Horizontal Pre
Horizontal Pre
Horizontal Pre
BWR-1, Mark 2
BWR-1, Mark 2
Horizontal Pre
Horizontal Pre

Model

2381
3293
3293
3293
3293
3293
1650
1650
3423
3423
3293
3293
3926
3293
1650

3000

801
801
346
693
801
801
801
801
530
530
1730
1730

Thermal

784
1100
1100
1100
1100
1100
559
559
1180
1180
1100
1137
1380
1100
566

1000

220
220
100
200
220
220
220
220
160
160
540
540

Gross

Capacity (MW)
202
202
90
187
202
202
202
202
150
150
490
490

760
1067
1067
1067
1067
1067
529
529
1127
1127
1056
1092
1325
1067
538

915

Net

TEPCO
TEPCO
TEPCO
TEPCO
TEPCO
TEPCO
KYUSHU
KYUSHU
KYUSHU
KYUSHU
CHUBU
CHUBU
CHUBU
TOHOKU
SHIKOKU

NPPDCO

NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL

Operator

Note: The column "Non-electrical applications" indicates the use of the facility to provide: PH process heating, DS desalination.

IR -1

JAPAN

Code

IN -7
IN -8
IN -3
IN -4
IN -11
IN -12
IN -19
IN -20
IN -1
IN -2
IN -23
IN -24

IRAN, ISL. REP.

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 continued

TOSHIBA
GE/T
TOSHIBA
HITACHI
TOSHIBA
HITACHI
MHI
MHI
MHI
MHI
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
MHI

ASE

NPCIL
NPCIL
AECL
AECL/DAE
NPCIL
NPCIL
NPCIL
NPCIL
GE
GE
NPCIL
NPCIL

NSSS
supplier

1972-5
1973-10
1976-3
1979-5
1981-3
1981-5
1971-9
1977-2
1988-6
1992-7
1983-4
1989-10
2000-7
2000-11
1973-9

1975-5

1976-12
1977-11
1965-8
1968-4
1990-2
1990-10
2002-9
2003-1
1964-10
1964-10
2000-5
2000-3

1977-9
1979-5
1981-7
1983-6
1984-12
1986-12
1975-2
1980-6
1993-6
1996-11
1987-1
1993-1
2004-4
2005-3
1977-2

2011-9

1989-7
1992-1
1972-11
1980-11
2000-3
2000-11
2009-12
2010-3
1969-4
1969-5
2006-6
2005-6

Construction Grid
start
connection

1978-4
1979-10
1982-4
1984-2
1985-6
1987-8
1975-10
1981-3
1994-3
1997-7
1987-8
1993-9
2005-1
2005-12
1977-9

2012-7

1991-1
1992-7
1973-12
1981-4
2000-6
2000-12
2010-2
2010-3
1969-10
1969-10
2006-8
2005-9

Commercial
operation

61.6
59.0
69.1
65.4
68.5
62.3
85.0
64.4
67.0
86.6
66.7
79.1
49.2
63.9
76.4

36.8
18.7
0.0
50.3
71.5
70.1
90.7
65.3
85.8
91.4
66.3
56.1

61.6
60.4
70.2
66.6
69.7
63.5
85.0
64.4
67.0
86.6
67.0
81.2
61.0
63.9
76.5

68.0
34.8
0.0
53.4
91.4
89.6
91.7
66.1
86.4
91.9
92.1
84.9

DS
DS
DS

PH
PH
PH
PH
-

EAF % UCF %
Non2007 2007 electrical
2011
2011
applics

37

Code

JP -32
JP -47
JP -33
JP -39
JP -52
JP -53
JP -40
JP -55
JP -56
JP -4
JP -6
JP -14
JP -15
JP -19
JP -50
JP -51
JP -22
JP -54
JP -57
JP -28
JP -37
JP -48
JP -59
JP -7
JP -41
JP -8
JP -13
JP -29
JP -30
JP -21

Name

IKATA-2
IKATA-3
KASHIWAZAKI KARIWA-1
KASHIWAZAKI KARIWA-2
KASHIWAZAKI KARIWA-3
KASHIWAZAKI KARIWA-4
KASHIWAZAKI KARIWA-5
KASHIWAZAKI KARIWA-6
KASHIWAZAKI KARIWA-7
MIHAMA-1
MIHAMA-2
MIHAMA-3
OHI-1
OHI-2
OHI-3
OHI-4
ONAGAWA-1
ONAGAWA-2
ONAGAWA-3
SENDAI-1
SENDAI-2
SHIKA-1
SHIKA-2
SHIMANE-1
SHIMANE-2
TAKAHAMA-1
TAKAHAMA-2
TAKAHAMA-3
TAKAHAMA-4
TOKAI-2

Reactor

PWR
PWR
BWR
BWR
BWR
BWR
BWR
BWR
BWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
BWR
BWR
BWR
PWR
PWR
BWR
BWR
BWR
BWR
PWR
PWR
PWR
PWR
BWR

Type

M (2-loop)
M (3-loop)
BWR-5
BWR-5
BWR-5
BWR-5
BWR-5
ABWR
ABWR
W (2-loop)
M (2-loop)
M (3-loop)
W (4-loop)
W (4-loop)
M (4-loop)
M (4-loop)
BWR-4
BWR-5
BWR-5
M (3-loop)
M (3-loop)
BWR-5
ABWR
BWR-3
BWR-5
M (3-loop)
M (3-loop)
M (3-loop)
M (3-loop)
BWR-5

Model

1650
2660
3293
3293
3293
3293
3293
3926
3926
1031
1456
2440
3423
3423
3423
3423
1593
2436
2436
2660
2660
1593
3926
1380
2436
2440
2440
2660
2660
3293

Thermal
566
890
1100
1100
1100
1100
1100
1356
1356
340
500
826
1175
1175
1180
1180
524
825
825
890
890
540
1206
460
820
826
826
870
870
1100

Gross

Capacity (MW)

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DS desalination.

Country
538
846
1067
1067
1067
1067
1067
1315
1315
320
470
780
1120
1120
1127
1127
498
796
796
846
846
505
1108
439
789
780
780
830
830
1060

Net

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 continued

SHIKOKU
SHIKOKU
TEPCO
TEPCO
TEPCO
TEPCO
TEPCO
TEPCO
TEPCO
KEPCO
KEPCO
KEPCO
KEPCO
KEPCO
KEPCO
KEPCO
TOHOKU
TOHOKU
TOHOKU
KYUSHU
KYUSHU
HOKURIKU
HOKURIKU
CHUGOKU
CHUGOKU
KEPCO
KEPCO
KEPCO
KEPCO
JAPCO

Operator
MHI
MHI
TOSHIBA
TOSHIBA
TOSHIBA
HITACHI
HITACHI
TOSHIBA
HITACHI
WH
MHI
MHI
WH
WH
MHI
MHI
TOSHIBA
TOSHIBA
TOSHIBA
MHI
MHI
HITACHI
HITACHI
HITACHI
HITACHI
WH/MHI
MHI
MHI
MHI
GE

NSSS
supplier
1978-8
1990-10
1980-6
1985-11
1989-3
1990-3
1985-6
1992-11
1993-7
1967-2
1968-5
1972-8
1972-10
1972-12
1987-10
1988-6
1980-7
1991-4
1998-1
1979-12
1981-10
1989-7
2001-8
1970-7
1985-2
1970-4
1971-3
1980-12
1981-3
1973-10

1981-8
1994-3
1985-2
1990-2
1992-12
1993-12
1989-9
1996-1
1996-12
1970-8
1972-4
1976-2
1977-12
1978-10
1991-6
1992-6
1983-11
1994-12
2001-5
1983-9
1985-4
1993-1
2005-7
1973-12
1988-7
1974-3
1975-1
1984-5
1984-11
1978-3

Construction Grid
start
connection
1982-3
1994-12
1985-9
1990-9
1993-8
1994-8
1990-4
1996-11
1997-7
1970-11
1972-7
1976-12
1979-3
1979-12
1991-12
1993-2
1984-6
1995-7
2002-1
1984-7
1985-11
1993-7
2006-3
1974-3
1989-2
1974-11
1975-11
1985-1
1985-6
1978-11

Commercial
operation
85.1
77.7
29.9
4.0
10.7
10.8
21.7
47.2
47.9
53.1
64.2
71.6
63.5
77.0
62.0
75.8
42.4
59.8
52.4
69.0
78.7
35.9
42.7
46.4
70.6
67.4
71.2
76.8
73.2
56.1

85.2
77.7
35.5
4.0
14.3
20.0
31.9
55.4
54.6
53.4
64.4
71.6
63.5
77.0
62.0
75.8
52.3
69.2
62.4
69.0
78.7
35.9
42.7
46.4
70.6
67.4
71.2
76.8
73.2
59.9

DS
DS
DS
DS
DS
DS
-

EAF % UCF %
Non2007 2007 electrical
2011
2011
applics

38

KR -1
KR -2
KR -5
KR -6
KR -21
KR -9
KR -10
KR -13
KR -14
KR -19
KR -20
KR -3
KR -4
KR -15
KR -16
KR -7
KR -8
KR -11
KR -12
KR -17
KR -18

MX -1
MX -2

MEXICO

Code

JP -43
JP -44
JP -64
JP -3
JP -34

KOREA, REP. OF

Country

Name

LAGUNA VERDE-1
LAGUNA VERDE-2

KORI-1
KORI-2
KORI-3
KORI-4
SHIN-KORI-1
ULCHIN-1
ULCHIN-2
ULCHIN-3
ULCHIN-4
ULCHIN-5
ULCHIN-6
WOLSONG-1
WOLSONG-2
WOLSONG-3
WOLSONG-4
YONGGWANG-1
YONGGWANG-2
YONGGWANG-3
YONGGWANG-4
YONGGWANG-5
YONGGWANG-6

TOMARI-1
TOMARI-2
TOMARI-3
TSURUGA-1
TSURUGA-2

Reactor

BWR
BWR

PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PHWR
PHWR
PHWR
PHWR
PWR
PWR
PWR
PWR
PWR
PWR

PWR
PWR
PWR
BWR
PWR

Type

BWR-5
BWR-5

WH △60
WH F
WH F
WH F
OPR-1000
France CPI
France CPI
OPR-1000
OPR-1000
OPR-1000
OPR-1000
CANDU 6
CANDU 6
CANDU 6
CANDU 6
WH F
WH F
OPR-1000
OPR-1000
OPR-1000
OPR-1000

M (2-loop)
M (2-loop)
M (3-loop)
BWR-2
M (4-loop)

Model

2027
2027

1729
1882
2912
2912
2825
2785
2775
2825
2825
2815
2825
2061
2061
2061
2061
2787
2787
2825
2825
2825
2825

1650
1650
2660
1070
3411

Thermal

682
682

603
675
1042
1042
1038
985
984
1047
1045
1048
1048
689
740
729
730
985
978
1039
1039
1046
1050

579
579
912
357
1160

Gross

Capacity (MW)

650
650

576
637
1011
1009
985
945
942
994
998
997
997
660
710
707
708
953
947
997
994
988
996

550
550
866
340
1108

Net

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 continued

CFE
CFE

KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP
KHNP

HEPCO
HEPCO
HEPCO
JAPCO
JAPCO

Operator

GE
GE

WH
WH
WH
WH
DHICKOPC
FRAM
FRAM
DHICKOPC
DHICKOPC
DHICKOPC
DHICKOPC
AECL
AECL/DHI
AECL/DHI
AECL/DHI
WH
WH
DHICKAEC
DHICKAEC
DHICKOPC
DHICKOPC

MHI
MHI
MHI
GE
MHI

NSSS
supplier

1976-10
1977-6

1972-4
1977-12
1979-10
1980-4
2006-6
1983-1
1983-7
1993-7
1993-11
1999-10
2000-9
1977-10
1992-6
1994-3
1994-7
1981-6
1981-12
1989-12
1990-5
1997-6
1997-11

1985-4
1985-6
2004-11
1966-11
1982-11

1989-4
1994-11

1977-6
1983-4
1985-1
1985-11
2010-8
1988-4
1989-4
1998-1
1998-12
2003-12
2005-1
1982-12
1997-4
1998-3
1999-5
1986-3
1986-11
1994-10
1995-7
2001-12
2002-9

1988-12
1990-8
2009-3
1969-11
1986-6

Construction Grid
start
connection

1990-7
1995-4

1978-4
1983-7
1985-9
1986-4
2011-2
1988-9
1989-9
1998-8
1999-12
2004-7
2005-4
1983-4
1997-7
1998-7
1999-10
1986-8
1987-6
1995-3
1996-1
2002-5
2002-12

1989-6
1991-4
2009-12
1970-3
1987-2

Commercial
operation

75.8
82.3

94.4
91.4
92.9
92.2
99.6
93.4
89.6
93.0
88.5
93.6
93.4
50.1
93.5
94.7
93.3
91.6
90.5
92.3
91.5
94.2
92.5

71.1
74.6
91.4
42.8
50.9

76.1
82.8

95.0
91.4
92.9
92.4
100.0
93.6
89.6
93.1
88.6
93.7
93.6
50.1
93.7
94.8
93.4
91.9
90.8
92.5
91.8
94.2
92.8

71.1
74.6
91.4
43.0
51.7

EAF % UCF %
Non2007 2007 electrical
2011
2011
applics

39

PK -2
PK -3
PK -1

RO -1
RO -2

RU -96
RU -97
RU -98
RU -99
RU -21
RU -141
RU -142
RU -143
RU -144
RU -30
RU -31
RU -36
RU -37
RU -12
RU -13
RU -32
RU -33
RU -17
RU -22
RU -38
RU -39

ROMANIA

RUSSIA

Reactor

BALAKOVO-1
BALAKOVO-2
BALAKOVO-3
BALAKOVO-4
BELOYARSKY-3 (BN-600)
BILIBINO-1
BILIBINO-2
BILIBINO-3
BILIBINO-4
KALININ-1
KALININ-2
KALININ-3
KALININ-4
KOLA-1
KOLA-2
KOLA-3
KOLA-4
KURSK-1
KURSK-2
KURSK-3
KURSK-4

CERNAVODA-1
CERNAVODA-2

CHASNUPP 1
CHASNUPP 2
KANUPP

BORSSELE

Name

LWR - PWR

Model

PWR
PWR
PWR
PWR
FBR
LWGR
LWGR
LWGR
LWGR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
LWGR
LWGR
LWGR
LWGR

VVER V-320
VVER V-320
VVER V-320
VVER V-320
BN-600
EGP-6
EGP-6
EGP-6
EGP-6
VVER V-338
VVER V-338
VVER V-320
VVER V-320
VVER V-230
VVER V-230
VVER V-213
VVER V-213
RBMK-1000
RBMK-1000
RBMK-1000
RBMK-1000

PHWR CANDU 6
PHWR CANDU 6

3000
3000
3000
3200
1470
62
62
62
62
3000
3000
3200
3200
1375
1375
1375
1375
3200
3200
3200
3200

2180
2180

999
999
433

1366

1000
1000
1000
1000
600
12
12
12
12
1000
1000
1000
1000
440
440
440
440
1000
1000
1000
1000

706
706

325
325
137

515

Gross

Capacity (MW)

Thermal

PWR CNP-300
PWR PWR
PHWR CANDU-137 MW

PWR

Type
482

950
950
950
950
560
11
11
11
11
950
950
950
950
411
411
411
411
925
925
925
925

650
650

300
300
125

Net

REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA

SNN
SNN

PAEC
PAEC
PAEC

EPZ

Operator

ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM

AECL
AECL

CNNC
CNNC
CGE

S/KWU

NSSS
supplier

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DS desalination, DH district heating, PH process heating.

NL -2

PAKISTAN

Code

NETHERLANDS

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 continued

1980-12
1981-8
1982-11
1984-4
1969-1
1970-1
1970-1
1970-1
1970-1
1977-2
1982-2
1985-10
1986-8
1970-5
1970-5
1977-4
1976-8
1972-6
1973-1
1978-4
1981-5

1982-7
1983-7

1993-8
2005-12
1966-8

1969-7

1985-12
1987-10
1988-12
1993-4
1980-4
1974-1
1974-12
1975-12
1976-12
1984-5
1986-12
2004-12
2011-11
1973-6
1974-12
1981-3
1984-10
1976-12
1979-1
1983-10
1985-12

1996-7
2007-8

2000-6
2011-3
1971-10

1973-7

Construction Grid
start
connection

1986-5
1988-1
1989-4
1993-12
1981-11
1974-4
1975-2
1976-2
1977-1
1985-6
1987-3
2005-11

1973-12
1975-2
1982-12
1984-12
1977-10
1979-8
1984-3
1986-2

1996-12
2007-10

2000-9
2011-5
1972-12

1973-10

Commercial
operation

87.4
89.2
89.5
88.8
76.6
53.3
84.8
85.7
83.4
84.9
86.2
85.3
85.7
86.0
78.7
84.6
84.8
78.6
71.4
75.6

82.4
82.4
72.2
80.9
82.8
78.4
70.7
74.7

94.1
94.6

74.1
88.3
45.7

93.0

86.9
88.1
88.5
88.0
76.5
44.3
75.5
76.3
74.2
84.7
85.9
85.1

93.6
93.8

74.0
88.3
45.7

92.7

DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH
DH
DH
DH
DH, PH
DH, PH
PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH

DH
DH

DS

EAF % UCF %
Non2007 2007 electrical
2011
2011
applics

40

SI -1

ZA -1
ZA -2

ES -6
ES -7
ES -8
ES -9
ES -10
ES -2
ES -11

SLOVENIA

SOUTH AFRICA

SPAIN

Name

ALMARAZ-1
ALMARAZ-2
ASCO-1
ASCO-2
COFRENTES
SANTA MARIA DE GARONA
TRILLO-1

KOEBERG-1
KOEBERG-2

KRSKO

BOHUNICE-3
BOHUNICE-4
MOCHOVCE-1
MOCHOVCE-2

LENINGRAD-1
LENINGRAD-2
LENINGRAD-3
LENINGRAD-4
NOVOVORONEZH-3
NOVOVORONEZH-4
NOVOVORONEZH-5
ROSTOV-1
ROSTOV-2
SMOLENSK-1
SMOLENSK-2
SMOLENSK-3

Reactor

PWR
PWR
PWR
PWR
BWR
BWR
PWR

PWR
PWR

PWR

PWR
PWR
PWR
PWR

LWGR
LWGR
LWGR
LWGR
PWR
PWR
PWR
PWR
PWR
LWGR
LWGR
LWGR

Type

WE 3-loops
WE 3-loops
WE 3-loops
WE 3-loops
BWR-6
BWR-3
PWR 3 loops

CP1
CP1

Westinghouse 2

VVER V-213
VVER V-213
VVER V-213
VVER V-213

RBMK-1000
RBMK-1000
RBMK-1000
RBMK-1000
VVER V-179
VVER V-179
VVER V-187
VVER V-320I
VVER V-320I
RBMK-1000
RBMK-1000
RBMK-1000

Model

2947
2947
2941
2941
3237
1381
3010

2775
2775

1994

1471
1471
1471
1471

3200
3200
3200
3200
1375
1375
3000
3200
3200
3200
3200
3200

Thermal

1045
1044
1033
1027
1092
466
1066

970
940

727

505
505
470
470

1000
1000
1000
1000
417
417
1000
1000
1000
1000
1000
1000

Gross

Capacity (MW)
925
925
925
925
385
385
950
950
950
925
925
925

1011
1006
995
997
1064
446
1003

930
900

688

472
472
436
436

Net

CNAT
CNAT
ANAV
ANAV
ID
NUCLENOR
CNAT

ESKOM
ESKOM

NEK

SE,plc
SE,plc
SE,plc
SE,plc

REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA
REA

Operator

Note: The column "Non-electrical applications" indicates the use of the facility to provide: DH district heating, PH process heating.

SK -13
SK -14
SK -6
SK -7

Code

RU -15
RU -16
RU -34
RU -35
RU -9
RU -11
RU -20
RU -59
RU -62
RU -23
RU -24
RU -67

SLOVAKIA

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 continued

WH
WH
WH
WH
GE
GE
KWU

FRAM
FRAM

WH

SKODA
SKODA
SKODA
SKODA

ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM
ROSATOM

NSSS
supplier

1973-7
1973-7
1974-5
1975-3
1975-9
1966-9
1979-8

1976-7
1976-7

1975-3

1976-12
1976-12
1983-10
1983-10

1970-3
1970-6
1973-12
1975-2
1967-7
1967-7
1974-3
1981-9
1983-5
1975-10
1976-6
1984-5

1981-5
1983-10
1983-8
1985-10
1984-10
1971-3
1988-5

1984-4
1985-7

1981-10

1984-8
1985-8
1998-7
1999-12

1973-12
1975-7
1979-12
1981-2
1971-12
1972-12
1980-5
2001-3
2010-3
1982-12
1985-5
1990-1

Construction Grid
start
connection

1983-9
1984-7
1984-12
1986-3
1985-3
1971-5
1988-8

1984-7
1985-11

1983-1

1985-2
1985-12
1998-10
2000-4

1974-11
1976-2
1980-6
1981-8
1972-6
1973-3
1981-2
2001-12
2010-12
1983-9
1985-7
1990-10

Commercial
operation

88.6
87.8
80.8
83.8
82.4
91.1
87.9

80.9
79.1

93.7

83.5
84.7
89.2
89.1

79.2
86.9
71.3
70.5
65.2
80.6
67.0
88.2
89.4
75.9
79.7
79.1

89.6
88.8
82.0
85.6
83.9
91.5
88.3

81.4
81.8

93.8

85.8
86.7
89.6
89.8

80.2
87.3
72.8
71.7
66.0
81.8
67.8
88.3
90.2
76.3
80.2
79.3

DH, PH
DH, PH
-

DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH
DH, PH

EAF % UCF %
Non2007 2007 electrical
2011
2011
applics

41

CH -1
CH -3
CH -4
CH -5
CH -2

GB -18A
GB -18B
GB -19A
GB -19B
GB -20A
GB -20B
GB -22A
GB -22B
GB -16A
GB -16B
GB -17A

SWITZERLAND

UK

Reactor

DUNGENESS-B1
DUNGENESS-B2
HARTLEPOOL-A1
HARTLEPOOL-A2
HEYSHAM-A1
HEYSHAM-A2
HEYSHAM-B1
HEYSHAM-B2
HINKLEY POINT-B1
HINKLEY POINT-B2
HUNTERSTON-B1

BEZNAU-1
BEZNAU-2
GOESGEN
LEIBSTADT
MUEHLEBERG

FORSMARK-1
FORSMARK-2
FORSMARK-3
OSKARSHAMN-1
OSKARSHAMN-2
OSKARSHAMN-3
RINGHALS-1
RINGHALS-2
RINGHALS-3
RINGHALS-4

VANDELLOS-2

Name

GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR

PWR
PWR
PWR
BWR
BWR

BWR
BWR
BWR
BWR
BWR
BWR
BWR
PWR
PWR
PWR

PWR

Type

AGR
AGR
AGR
AGR
AGR
AGR
AGR
AGR
AGR
AGR
AGR

WH - 2 loops
WH - 2 loops
PWR 3 Loop
BWR-6
BWR-4

BWR-75
BWR-75
BWR-3000
ABB BWR
ABB BWR
BWR-75
BWR
WE (3 loops)
WE (3 loops)
WE (3 loops)

WE 3-loops

Model

1500
1500
1500
1500
1500
1500
1550
1550
1494
1494
1496

1130
1130
3002
3600
1097

2928
2928
3300
1375
1800
3900
2540
2660
3135
2775

2941

615
615
655
655
625
625
680
680
655
655
644

380
380
1035
1245
390

1022
1034
1212
492
661
1450
893
917
1102
981

1087

Gross

Capacity (MW)

Thermal

520
520
595
595
585
575
605
605
435
435
460

365
365
970
1190
373

984
996
1170
473
638
1400
854
809
1057
945

1045

Net

BE
BE
BE
BE
BE
BE
BE
BE
BE
BE
BE

Axpo AG
Axpo AG
KKG
KKL
BKW

FKA
FKA
FKA
OKG
OKG
OKG
RAB
RAB
RAB
RAB

ANAV

Operator

Note: The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating, PH process heating,

SE -9
SE -11
SE -14
SE -2
SE -3
SE -12
SE -4
SE -5
SE -7
SE -10

ES -16

Code

SWEDEN

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 continued

APC
APC
NPC
NPC
NPC
NPC
NPC
NPC
TNPG
TNPG
TNPG

WH
WH
KWU
GETSCO
GETSCO

ABBATOM
ABBATOM
ABBATOM
ABBATOM
ABBATOM
ABBATOM
ABBATOM
WH
WH
WH

WH

NSSS
supplier

1965-10
1965-10
1968-10
1968-10
1970-12
1970-12
1980-8
1980-8
1967-9
1967-9
1967-11

1965-9
1968-1
1973-12
1974-1
1967-3

1973-6
1975-1
1979-1
1966-8
1969-9
1980-5
1969-2
1970-10
1972-9
1973-11

1980-12

1983-4
1985-12
1983-8
1984-10
1983-7
1984-10
1988-7
1988-11
1976-10
1976-2
1976-2

1969-7
1971-10
1979-2
1984-5
1971-7

1980-6
1981-1
1985-3
1971-8
1974-10
1985-3
1974-10
1974-8
1980-9
1982-6

1987-12

Construction Grid
start
connection

1985-4
1989-4
1989-4
1989-4
1989-4
1989-4
1989-4
1989-4
1978-10
1976-9
1976-2

1969-9
1971-12
1979-11
1984-12
1972-11

1980-12
1981-7
1985-8
1972-2
1975-1
1985-8
1976-1
1975-5
1981-9
1983-11

1988-3

Commercial
operation

36.3
45.1
56.6
55.7
52.6
48.6
82.4
69.5
67.6
70.4
67.9

93.1
90.0
93.2
90.3
87.9

84.1
71.9
81.3
73.8
81.4
54.7
56.9
61.2
80.1
81.1

72.2

36.3
45.1
56.6
55.7
52.6
48.6
82.7
70.0
67.9
70.4
67.9

93.1
90.0
93.4
91.2
88.0

84.7
72.4
82.1
75.1
82.8
55.6
58.1
62.5
82.1
82.9

73.2

DH
DH
PH
-

EAF % UCF %
Non2007 2007 electrical
2011
2011
applics

42

US -313
US -368
US -334
US -412
US -456
US -457

USA

Name

ARKANSAS ONE-1
ARKANSAS ONE-2
BEAVER VALLEY-1
BEAVER VALLEY-2
BRAIDWOOD-1
BRAIDWOOD-2

KHMELNITSKI-1
KHMELNITSKI-2
ROVNO-1
ROVNO-2
ROVNO-3
ROVNO-4
SOUTH UKRAINE-1
SOUTH UKRAINE-2
SOUTH UKRAINE-3
ZAPOROZHE-1
ZAPOROZHE-2
ZAPOROZHE-3
ZAPOROZHE-4
ZAPOROZHE-5
ZAPOROZHE-6

HUNTERSTON-B2
OLDBURY-A1
SIZEWELL-B
TORNESS 1
TORNESS 2
WYLFA 1
WYLFA 2

Reactor

PWR
PWR
PWR
PWR
PWR
PWR

PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR

GCR
GCR
PWR
GCR
GCR
GCR
GCR

Type

B&W (L-loop) D
CE (2-loop) DR
W (3-loop)
W (3-loop)
W (4-loop)
W (4-loop) DRY

VVER V-320
VVER V-320
VVER V-213
VVER V-213
VVER V-320
VVER V-320
VVER V-302
VVER V-338
VVER V-320
VVER V-320
VVER V-320
VVER V-320
VVER V-320
VVER V-320
VVER V-320

AGR
MAGNOX
SNUPPS
AGR
AGR
MAGNOX
MAGNOX

Model

2568
3026
2689
2689
3587
3587

3000
3000
1375
1375
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000
3000

1496
730
3425
1623
1623
1920
1920

Thermal

880
1040
923
923
1240
1213

1000
1000
420
415
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000

644
230
1250
682
682
540
540

Gross

Capacity (MW)

Note: The column Non-Electrical Applications indicates the use of the facility to provide: DH district heating,

UA -40
UA -41
UA -27
UA -28
UA -29
UA -69
UA -44
UA -45
UA -48
UA -54
UA -56
UA -78
UA -79
UA -126
UA -127

Code

GB -17B
GB -11A
GB -24
GB -23A
GB -23B
GB -13A
GB -13B

UKRAINE

Country

842
993
892
885
1178
1152

950
950
381
376
950
950
950
950
950
950
950
950
950
950
950

430
217
1191
600
605
490
490

Net

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 continued

ENTERGY
ENTERGY
FENOC
FENOC
EXELON
EXELON

NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC
NNEGC

BE
MEL
BE
BE
BE
MEL
MEL

Operator

B&W
CE
WH
WH
WH
WH

PAIP
PAIP
PAIP
PAIP
PAIP
PAA
PAA
PAA
PAA
PAIP
PAIP
PAIP
PAIP
PAIP
PAIP

TNPG
TNPG
PPC
NNC
NNC
EE/B&W/T
EE/B&W/T

NSSS
supplier

1968-10
1968-12
1970-6
1974-5
1975-8
1975-8

1981-11
1985-2
1973-8
1973-10
1980-2
1986-8
1977-3
1979-10
1985-2
1980-4
1981-1
1982-4
1983-4
1985-11
1986-6

1967-11
1962-5
1988-7
1980-8
1980-8
1963-9
1963-9

1974-8
1978-12
1976-6
1987-8
1987-7
1988-5

1987-12
2004-8
1980-12
1981-12
1986-12
2004-10
1982-12
1985-1
1989-9
1984-12
1985-7
1986-12
1987-12
1989-8
1995-10

1977-3
1967-11
1995-2
1988-5
1989-2
1971-1
1971-7

Construction Grid
start
connection

1974-12
1980-3
1976-10
1987-11
1988-7
1988-10

1988-8
2005-12
1981-9
1982-7
1987-5
2006-4
1983-10
1985-4
1989-12
1985-12
1986-2
1987-3
1988-4
1989-10
1996-9

1977-3
1967-12
1995-9
1988-5
1989-2
1971-11
1972-1

Commercial
operation

91.4
93.9
94.6
93.0
95.2
95.2

80.7
74.0
58.0
70.7
67.1
70.0
73.1
77.7
65.5
80.4
81.0
82.8
82.1
81.7
82.4

70.0
41.1
80.7
75.5
84.8
63.4
59.4

91.4
93.9
94.6
93.0
95.3
95.3

81.4
74.8
58.4
71.4
69.1
72.6
77.7
79.5
71.4
81.4
82.1
85.5
83.6
83.0
82.8

70.1
41.1
80.7
76.1
85.8
63.7
59.6

DH
DH
DH
DH
DH
DH
DH
DH
DH
DH
DH
DH
DH
DH
DH

EAF % UCF %
Non2007 2007 electrical
2011
2011
applics

43

Country

US -259
US -260
US -296
US -325
US -324
US -454
US -455
US -483
US -317
US -318
US -413
US -414
US -461
US -397
US -445
US -446
US -298
US -302
US -346
US -275
US -323
US -315
US -316
US -237
US -249
US -331
US -341
US -348
US -364
US -333

Code

Reactor

BROWNS FERRY-1
BROWNS FERRY-2
BROWNS FERRY-3
BRUNSWICK-1
BRUNSWICK-2
BYRON-1
BYRON-2
CALLAWAY-1
CALVERT CLIFFS-1
CALVERT CLIFFS-2
CATAWBA-1
CATAWBA-2
CLINTON-1
COLUMBIA
COMANCHE PEAK-1
COMANCHE PEAK-2
COOPER
CRYSTAL RIVER-3
DAVIS BESSE-1
DIABLO CANYON-1
DIABLO CANYON-2
DONALD COOK-1
DONALD COOK-2
DRESDEN-2
DRESDEN-3
DUANE ARNOLD-1
ENRICO FERMI-2
FARLEY-1
FARLEY-2
FITZPATRICK

Name

BWR
BWR
BWR
BWR
BWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
BWR
BWR
PWR
PWR
BWR
PWR
PWR
PWR
PWR
PWR
PWR
BWR
BWR
BWR
BWR
PWR
PWR
BWR

Type

BWR-4 (Mark 1
BWR-4 (Mark 1
BWR-4 (Mark 1
BWR-4 (Mark 1
BWR-4 (Mark 1
W (4-loop) (DR
W (4-Loop) (DR
W (4-loop) DRY
CE (2-loop) (D
CE (2-loop) (D
W (4-loop) (IC
W (4-loop) (IC
BWR-6 (Mark 3
BWR-5 (Mark 2
W (4-loop) DRY
W (4-loop) DRY
BWR-4 (Mark 1
B&W (L-loop)
B&W (R-loop)
W (4-loop)
W (4-loop)
W (4-loop) ICE
W (4-loop) ICE
BWR-3 (Mark 1
BWR-3 (Mark 1
BWR-4 (Mark 1
BWR-4 (Mark 1
W (3-loop)
W (3-loop) DRY
BWR-4 (Mark 1

Model

3458
3458
3458
2923
2923
3587
3587
3565
2700
2700
3411
3411
3473
3486
3612
3458
2381
2568
2772
3338
3411
3304
3468
2527
2527
1912
3430
2775
2775
2536

Thermal
1152
1155
1400
990
989
1225
1196
1236
918
911
1188
1188
1098
1200
1259
1250
801
890
925
1136
1164
1077
1133
913
913
614
1154
895
905
882

Gross

Capacity (MW)
1101
1104
1105
938
920
1164
1136
1190
855
850
1129
1129
1065
1131
1209
1197
774
860
894
1122
1118
1009
1077
867
867
601
1085
874
860
855

Net

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 continued

TVA
TVA
TVA
PROGRESS
PROGRESS
EXELON
EXELON
AmerenUE
CONSTELL
CONSTELL
DUKEENER
DUKEENER
EXELON
ENERGYNW
LUMINANT
LUMINANT
ENTERGY
PROGRESS
FENOC
PG&E
PG&E
AEP
AEP
EXELON
EXELON
NEXTERA
DTEDISON
SOUTHERN
SOUTHERN
ENTERGY

Operator
GE
GE
GE
GE
GE
WH
WH
WH
CE
CE
WH
WH
GE
GE
WH
WH
GE
B&W
B&W
WH
WH
WH
WH
GE
GE
GE
GE
WH
WH
GE

NSSS
supplier
1967-5
1967-5
1968-7
1970-2
1970-2
1975-4
1975-4
1975-9
1968-6
1968-6
1974-5
1974-5
1975-10
1972-8
1974-12
1974-12
1968-6
1968-9
1970-9
1968-4
1970-12
1969-3
1969-3
1966-1
1966-10
1970-6
1972-9
1970-10
1970-10
1968-9

1973-10
1974-8
1976-9
1976-12
1975-4
1985-3
1987-2
1984-10
1975-1
1976-12
1985-1
1986-5
1987-4
1984-5
1990-4
1993-4
1974-5
1977-1
1977-8
1984-11
1985-10
1975-2
1978-3
1970-4
1971-7
1974-5
1986-9
1977-8
1981-5
1975-2

Construction Grid
start
connection
1974-8
1975-3
1977-3
1977-3
1975-11
1985-9
1987-8
1984-12
1975-5
1977-4
1985-6
1986-8
1987-11
1984-12
1990-8
1993-8
1974-7
1977-3
1978-7
1985-5
1986-3
1975-8
1978-7
1970-6
1971-11
1975-2
1988-1
1977-12
1981-7
1975-7

Commercial
operation
90.3
87.6
88.6
91.6
88.5
94.6
94.1
89.4
96.1
94.6
92.3
92.2
94.8
81.4
92.7
95.9
91.6
50.8
85.7
92.3
90.0
68.5
90.4
95.2
96.4
92.2
89.1
93.0
90.2
95.5

91.7
89.1
90.5
91.6
88.5
94.6
94.1
89.4
96.3
94.6
92.3
92.2
94.8
81.6
92.7
95.9
91.6
50.8
85.7
92.3
90.2
68.5
90.4
95.2
96.4
92.2
89.1
93.0
90.2
96.1

EAF % UCF %
Non2007 2007 electrical
2011
2011
applics

44

Country

Code

US -285
US -416
US -261
US -321
US -366
US -354
US -247
US -286
US -305
US -373
US -374
US -352
US -353
US -369
US -370
US -336
US -423
US -263
US -220
US -410
US -338
US -339
US -269
US -270
US -287
US -219
US -255
US -528
US -529
US -530

Name

FORT CALHOUN-1
GRAND GULF-1
H.B. ROBINSON-2
HATCH-1
HATCH-2
HOPE CREEK-1
INDIAN POINT-2
INDIAN POINT-3
KEWAUNEE
LASALLE-1
LASALLE-2
LIMERICK-1
LIMERICK-2
MCGUIRE-1
MCGUIRE-2
MILLSTONE-2
MILLSTONE-3
MONTICELLO
NINE MILE POINT-1
NINE MILE POINT-2
NORTH ANNA-1
NORTH ANNA-2
OCONEE-1
OCONEE-2
OCONEE-3
OYSTER CREEK
PALISADES
PALO VERDE-1
PALO VERDE-2
PALO VERDE-3

Reactor

PWR
BWR
PWR
BWR
BWR
BWR
PWR
PWR
PWR
BWR
BWR
BWR
BWR
PWR
PWR
PWR
PWR
BWR
BWR
BWR
PWR
PWR
PWR
PWR
PWR
BWR
PWR
PWR
PWR
PWR

Type

CE (2-loop)
BWR-6 (Mark 3
W (3-loop) DRY
BWR-4 (Mark 1
BWR-4 (Mark 1
BWR-4 (Mark 1
W (4-loop) DRY
W (4-loop) DRY
W (2-loop) DRY
BWR-5 (Mark 2
BWR-5 (Mark 2
BWR-4 (Mark 2
BWR-4 (Mark 2
W (4-loop) ICE
W (4-loop) (IC
COMB CE DRY
W (4-loop) DRY
BWR-3
BWR-2 (Mark 1
BWR-5 (Mark 2
W (3-loop)
W (3-loop)
B&W (L-loop)
B&W (L-loop)
B&W (L-loop)
BWR-2 (Mark 1
CE (2-loop) DR
CE (2-loop) DR
COMB CE80 DR
COMB CE80 DR

Model

1500
3833
2339
2804
2804
3339
3216
3216
1772
3489
3489
3458
3458
3411
3411
2700
3411
1775
1850
3467
2893
2940
2568
2568
2568
1930
2565
3990
3990
3990

Thermal
512
1333
745
898
921
1376
1062
1065
581
1177
1179
1194
1194
1158
1158
910
1253
600
642
1205
973
994
891
891
891
652
842
1414
1414
1346

Gross

Capacity (MW)
Net

482
1251
724
876
883
1191
1022
1040
566
1118
1120
1130
1134
1100
1100
869
1233
572
621
1119
920
943
846
846
846
619
793
1311
1314
1312

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 continued

OPPD
ENTERGY
PROGRESS
SOUTHERN
SOUTHERN
PSEG
ENTERGY
ENTERGY
DOMINION
EXELON
EXELON
EXELON
EXELON
DUKEENER
DUKEENER
DOMINION
DOMINION
NSP
CONSTELL
CONSTELL
DOMINION
DOMINION
DUKEENER
DUKEENER
DUKEENER
EXELON
ENTERGY
APS
APS
APS

Operator
CE
GE
WH
GE
GE
GE
WH
WH
WH
GE
GE
GE
GE
WH
WH
CE
WH
GE
GE
GE
WH
WH
B&W
B&W
B&W
GE
CE
CE
CE
CE

NSSS
supplier
1968-6
1974-5
1967-4
1968-9
1972-2
1976-3
1966-10
1968-11
1968-8
1973-9
1973-9
1974-6
1974-6
1971-4
1971-4
1969-11
1974-8
1967-6
1965-4
1975-8
1971-2
1971-2
1967-11
1967-11
1967-11
1964-12
1967-3
1976-5
1976-6
1976-6

1973-8
1984-10
1970-9
1974-11
1978-9
1986-8
1973-6
1976-4
1974-4
1982-9
1984-4
1985-4
1989-9
1981-9
1983-5
1975-11
1986-2
1971-3
1969-11
1987-8
1978-4
1980-8
1973-5
1973-12
1974-9
1969-9
1971-12
1985-6
1986-5
1987-11

Construction Grid
start
connection
1973-9
1985-7
1971-3
1975-12
1979-9
1986-12
1974-8
1976-8
1974-6
1984-1
1984-10
1986-2
1990-1
1981-12
1984-3
1975-12
1986-4
1971-6
1969-12
1988-3
1978-6
1980-12
1973-7
1974-9
1974-12
1969-12
1971-12
1986-1
1986-9
1988-1

Commercial
operation
78.9
92.9
85.6
93.2
87.3
94.4
94.4
92.8
93.3
96.1
96.1
96.6
94.5
88.5
93.1
90.7
89.6
86.0
94.0
94.7
88.8
84.4
89.3
91.4
93.3
93.3
91.4
86.2
88.8
86.6

78.9
92.9
85.6
93.2
87.3
94.4
94.4
92.8
93.3
96.1
96.1
96.6
94.5
88.5
93.1
91.1
89.6
86.0
94.0
94.7
93.3
89.6
89.3
91.4
93.3
93.4
91.4
86.2
88.8
86.6

EAF % UCF %
Non2007 2007 electrical
2011
2011
applics

45

Country

US -277
US -278
US -440
US -293
US -266
US -301
US -282
US -306
US -254
US -265
US -244
US -458
US -272
US -311
US -361
US -362
US -443
US -327
US -328
US -400
US -498
US -499
US -335
US -389
US -280
US -281
US -387
US -388
US -289
US -250

Code

Reactor

PEACH BOTTOM-2
PEACH BOTTOM-3
PERRY-1
PILGRIM-1
POINT BEACH-1
POINT BEACH-2
PRAIRIE ISLAND-1
PRAIRIE ISLAND-2
QUAD CITIES-1
QUAD CITIES-2
R.E. GINNA
RIVER BEND-1
SALEM-1
SALEM-2
SAN ONOFRE-2
SAN ONOFRE-3
SEABROOK-1
SEQUOYAH-1
SEQUOYAH-2
SHEARON HARRIS-1
SOUTH TEXAS-1
SOUTH TEXAS-2
ST. LUCIE-1
ST. LUCIE-2
SURRY-1
SURRY-2
SUSQUEHANNA-1
SUSQUEHANNA-2
THREE MILE ISLAND-1
TURKEY POINT-3

Name

BWR
BWR
BWR
BWR
PWR
PWR
PWR
PWR
BWR
BWR
PWR
BWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
PWR
BWR
BWR
PWR
PWR

Type

BWR-4 (Mark 1
BWR-4 (Mark 1
BWR-6 (Mark 3
BWR-3 (Mark 1
W (2-loop) DRY
W (2-loop) DRY
W (2-loop) DRY
W (2-loop) DRY
BWR-3 (Mark 1
BWR-3 (Mark 1
W (2-loop)
BWR-6 (Mark 3
W (4-loop) DRY
W (4-loop) DRY
CE (2-loop) DR
CE (2-loop) DR
W (4-loop) DRY
W (4-loop) ICE
W (4-loop) (IC
W (3-loop) DRY
W (4-loop)
W (4-loop) DRY
COMB CE DRY
COMB CE DRY
W (3-loop) DRY
W (3-loop) DRY
BWR-4 (Mark 2
BWR-4 (Mark 2
B&W (L-loop)
W (3-loop) DRY

Model

3514
3514
3758
2028
1540
1800
1650
1650
2957
2511
1775
3091
3459
3459
3438
3438
3587
3411
3411
2900
3853
3853
2700
2700
2546
2546
3952
3489
2568
2300

Thermal
1171
1171
1303
711
543
645
566
640
913
913
608
1036
1228
1170
1127
1127
1296
1221
1221
960
1354
1354
883
883
848
848
1298
1300
837
729

Gross

Capacity (MW)
1122
1122
1240
685
512
586
521
519
882
892
580
967
1174
1158
1070
1080
1247
1152
1126
900
1280
1280
839
839
839
839
1260
1260
805
693

Net

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 continued

EXELON
EXELON
FENOC
ENTERGY
NEXTERA
NEXTERA
NSP
NSP
EXELON
EXELON
CONSTELL
ENTERGY
PSEG
PSEG
SCE
SCE
NEXTERA
TVA
TVA
PROGRESS
STP
STP
FPL
FPL
DOMINION
DOMINION
PPL SUSQ
PPL SUSQ
EXELON
FPL

Operator
GE
GE
GE
GE
WH
WH
WH
WH
GE
GE
WH
GE
WH
WH
CE
CE
WH
WH
WH
WH
WH
WH
CE
CE
WH
WH
GE
GE
B&W
WH

NSSS
supplier
1968-1
1968-1
1974-10
1968-8
1967-7
1968-7
1968-6
1969-6
1967-2
1967-2
1966-4
1977-3
1968-9
1968-9
1974-3
1974-3
1976-7
1970-5
1970-5
1978-1
1975-12
1975-12
1970-7
1977-6
1968-6
1968-6
1973-11
1973-11
1968-5
1967-4

1974-2
1974-9
1986-12
1972-7
1970-11
1972-8
1973-12
1974-12
1972-4
1972-5
1969-12
1985-12
1976-12
1981-6
1982-9
1983-9
1990-5
1980-7
1981-12
1987-1
1988-3
1989-4
1976-5
1983-6
1972-7
1973-3
1982-11
1984-7
1974-6
1972-11

Construction Grid
start
connection
1974-7
1974-12
1987-11
1972-12
1970-12
1972-10
1973-12
1974-12
1973-2
1973-3
1970-7
1986-6
1977-6
1981-10
1983-8
1984-4
1990-8
1981-7
1982-6
1987-5
1988-8
1989-6
1976-12
1983-8
1972-12
1973-5
1983-6
1985-2
1974-9
1972-12

Commercial
operation
96.6
94.5
85.1
93.4
87.9
88.6
90.4
93.9
94.6
95.7
94.5
90.0
92.0
92.0
81.9
85.1
89.7
92.2
93.3
94.3
93.5
89.6
88.0
81.2
93.2
92.3
89.9
90.3
91.4
89.6

96.6
94.5
85.1
93.6
87.9
88.6
90.4
93.9
94.6
95.7
94.5
91.1
92.3
92.0
82.0
85.3
89.7
92.2
93.3
94.3
93.5
89.6
88.0
81.2
93.6
92.3
89.9
90.3
91.4
90.0

EAF % UCF %
Non2007 2007 electrical
2011
2011
applics

46

Name

W (3-loop) DRY
BWR-4 (Mark 1
W (3-loop) DRY
W (4-loop) DRY
W (4-loop) DRY
CE (2-loop)
W (4-loop) (IC
W (4-loop)

2300
1912
2900
3565
3565
3716
3459
3565

Thermal
729
650
1003
1203
1202
1200
1202
1213

Gross

Capacity (MW)
693
620
966
1150
1152
1168
1123
1195

Net
FPL
ENTERGY
SCE&G
SOUTHERN
SOUTHERN
ENTERGY
TVA
WCNOC

Operator

NSSS
supplier

1977-11
1978-12
1981-5
1982-6
1984-5
1985-2

1973-6
1972-9
1982-11
1987-3
1989-4
1985-3
1996-2
1985-6

Construction Grid
start
connection

1972-6
1973-12
1975-11
1976-3
1978-8
1979-2

PWR
BWR
PWR
PWR
PWR
PWR
PWR
PWR

Model

Note: Status as of 31 December 2011, 435 reactors (368791 MW) were connected to the grid, including 6 units (5018 MW) in Taiwan, China:
TAIWAN, CN
TW -1 CHIN SHAN-1
BWR BWR-4
1804
636
604 TPC
GE
TAIWAN, CN
TW -2 CHIN SHAN-2
BWR BWR-4
1804
636
604 TPC
GE
TAIWAN, CN
TW -3 KUOSHENG-1
BWR BWR-6
2943
1019
985 TPC
GE
TAIWAN, CN
TW -4 KUOSHENG-2
BWR BWR-6
2943
1020
985 TPC
GE
TAIWAN, CN
TW -5 MAANSHAN-1
PWR WE 312 (3 loop
2822
956
918 TPC
WH
TAIWAN, CN
TW -6 MAANSHAN-2
PWR WE 312 (3 loop
2822
958
922 TPC
WH

TURKEY POINT-4
VERMONT YANKEE
VIRGIL C. SUMMER-1
VOGTLE-1
VOGTLE-2
WATERFORD-3
WATTS BAR-1
WOLF CREEK

Type
1967-4
1967-12
1973-3
1976-8
1976-8
1974-11
1973-1
1977-5

Code

US -251
US -271
US -395
US -424
US -425
US -382
US -390
US -482

Reactor
WH
GE
WH
WH
WH
CE
WH
WH

Country

TABLE 14. REACTORS IN OPERATION, 31 DEC. 2011 continued

1978-12
1979-7
1981-12
1983-3
1984-7
1985-5

1973-9
1972-11
1984-1
1987-6
1989-5
1985-9
1996-5
1985-9

Commercial
operation

87.0
90.6
91.6
88.8
94.3
93.3

89.9
94.1
90.3
94.0
91.2
92.3
91.3
86.9

87.2
90.9
92.4
90.3
94.4
93.3

90.0
94.1
90.3
94.0
91.2
92.8
91.3
86.9

EAF % UCF %
Non2007 2007 electrical
2011
2011
applics

47

JP -31

Name

MONJU

BRUCE-1
BRUCE-2
PICKERING-2
PICKERING-3

Reactor

FBR

PHWR
PHWR
PHWR
PHWR

Type

CANDU 791
CANDU 791
CANDU 500A
CANDU 500A

Model

Note: Status as of 31 December 2011, 5 reactors (2972 MW) were in long term shutdown.

JAPAN

Code

CA -8
CA -9
CA -5
CA -6

CANADA

Country
824
824
542
542
280

714

Gross

2832
2832
1744
1744

Thermal

Capacity (MW)

TABLE 15. REACTORS IN LONG TERM SHUTDOWN, 31 DEC. 2011

246

848
848
515
515

Net

JAEA

BRUCEPOW
BRUCEPOW
OPG
OPG

Operator

T/H/F/M

OH/AECL
OH/AECL
OH/AECL
OH/AECL

NSSS
supplier

1986-5

1971-6
1970-12
1966-9
1967-12

Construction
start

1995-8

1977-1
1976-9
1971-10
1972-5

Grid
connection

1977-9
1977-9
1971-12
1972-6

Commercial
operation

1995-12

1997-10
1995-10
1997-12
1997-12

Long term
shutdown
date

48

AM -18

BE -1

BG -1
BG -2
BG -3
BG -4

CA -2
CA -3
CA -1

FR -9
FR -2
FR -3
FR -4
FR -5
FR -6
FR -1B
FR -1
FR -10
FR -7
FR -8
FR -24

DE -4
DE -12
DE -18
DE -13
DE -502

BELGIUM

BULGARIA

CANADA

FRANCE

GERMANY

Code

ARMENIA

Country

Reactor

AVR JUELICH (AVR)


BIBLIS-A (KWB A)
BIBLIS-B (KWB B)
BRUNSBUETTEL (KKB)
GREIFSWALD-1 (KGR 1)

BUGEY-1
CHINON-A1
CHINON-A2
CHINON-A3
CHOOZ-A (ARDENNES)
EL-4 (MONTS D'ARREE)
G-2 (MARCOULE)
G-3 (MARCOULE)
PHENIX
ST. LAURENT-A1
ST. LAURENT-A2
SUPER-PHENIX

DOUGLAS POINT
GENTILLY-1
ROLPHTON NPD

KOZLODUY-1
KOZLODUY-2
KOZLODUY-3
KOZLODUY-4

BR-3

ARMENIA-1

Name

HTGR
PWR
PWR
BWR
PWR

GCR
GCR
GCR
GCR
PWR
HWGCR
GCR
GCR
FBR
GCR
GCR
FBR

PHWR
HWLWR
PHWR

PWR
PWR
PWR
PWR

PWR

PWR

Type

46
3517
3733
2292
1375

1954
300
800
1170
1040
250
260
260
345
1650
1475
3000

704
792
92

1375
1375
1375
1375

41

1375

Thermal

15
1225
1300
806
440

555
80
230
480
320
75
43
43
142
500
530
1242

218
266
25

440
440
440
440

12

408

Gross

Capacity (MW)

13
1167
1240
771
408

540
70
180
360
305
70
39
40
130
390
465
1200

206
250
22

408
408
408
408

10

376

Net

TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2011

AVR
RWE
RWE
KKB
EWN

EDF
EDF
EDF
EDF
SENA
EDF
COGEMA
COGEMA
CEA/EDF
EDF
EDF
EDF

OH
HQ
OH

KOZNPP
KOZNPP
KOZNPP
KOZNPP

CEN/SCK

ANPPJSC

Operator

BBK
KWU
KWU
KWU
AtEE

FRAM
LEVIVIER
LEVIVIER
GTM
A/F/W
GAAA
SACM
SACM
CNCLNEY
FRAM
FRAM
ASPALDO

AECL
AECL
CGE

AEE
AEE
AEE
AEE

WH

FAEA

NSSS
supplier

1961-8
1970-1
1972-2
1970-4
1970-3

1965-12
1957-2
1959-8
1961-3
1962-1
1962-7
1955-3
1956-3
1968-11
1963-10
1966-1
1976-12

1960-2
1966-9
1958-1

1970-4
1970-4
1973-10
1973-10

1957-11

1969-7

Construction
start

1967-12
1974-8
1976-4
1976-7
1973-12

1972-4
1963-6
1965-2
1966-8
1967-4
1967-7
1959-4
1960-4
1973-12
1969-3
1971-8
1986-1

1967-1
1971-4
1962-6

1974-7
1975-8
1980-12
1982-5

1962-10

1976-12

Grid
connection

1969-5
1975-2
1977-1
1977-2
1974-7

1972-7
1964-2
1965-2
1966-8
1967-4
1968-6
1959-4
1960-4
1974-7
1969-6
1971-11
1986-12

1968-9
1972-5
1962-10

1974-10
1975-11
1981-1
1982-6

1962-10

1977-10

Commercial
operation

1988-12
2011-8
2011-8
2011-8
1990-2

1994-5
1973-4
1985-6
1990-6
1991-10
1985-7
1980-2
1984-6
2010-2
1990-4
1992-5
1998-12

1984-5
1977-6
1987-8

2002-12
2002-12
2006-12
2006-12

1987-6

1989-2

Shut down

49

DE -503
DE -504
DE -505
DE -506
DE -3
DE -7
DE -16
DE -8
DE -20
DE -6
DE -22
DE -2
DE -15
DE -11
DE -5
DE -14
DE -501
DE -10
DE -19
DE -17
DE -1
DE -9

IT -4
IT -3
IT -2
IT -1

JP -20
JP -5
JP -9
JP -10

ITALY

JAPAN

Code

GERMANY

Country

Reactor

FUGEN ATR
FUKUSHIMA-DAIICHI-1
FUKUSHIMA-DAIICHI-2
FUKUSHIMA-DAIICHI-3

CAORSO
ENRICO FERMI (TRINO)
GARIGLIANO
LATINA

GREIFSWALD-2 (KGR 2)
GREIFSWALD-3 (KGR 3)
GREIFSWALD-4 (KGR 4)
GREIFSWALD-5 (KGR 5)
GUNDREMMINGEN-A (KRB A)
HDR GROSSWELZHEIM
ISAR-1 (KKI 1)
KNK II
KRUEMMEL (KKK)
LINGEN (KWL)
MUELHEIM-KAERLICH (KMK)
MZFR
NECKARWESTHEIM-1 (GKN 1)
NIEDERAICHBACH (KKN)
OBRIGHEIM (KWO)
PHILIPPSBURG-1 (KKP 1)
RHEINSBERG (KKR)
STADE (KKS)
THTR-300
UNTERWESER (KKU)
VAK KAHL
WUERGASSEN (KWW)

Name

HWLWR
BWR
BWR
BWR

BWR
PWR
BWR
GCR

PWR
PWR
PWR
PWR
BWR
BWR
BWR
FBR
BWR
BWR
PWR
PHWR
PWR
HWGCR
PWR
BWR
PWR
PWR
HTGR
PWR
BWR
BWR

Type

557
1380
2381
2381

2651
870
506
660

1375
1375
1375
1375
801
100
2575
58
3690
520
3760
200
2497
321
1050
2575
265
1900
750
3900
60
1912

Thermal

165
460
784
784

882
270
160
160

440
440
440
440
250
25
912
21
1402
268
1302
57
840
106
357
926
70
672
308
1410
16
670

Gross

Capacity (MW)

148
439
760
760

860
260
150
153

408
408
408
408
237
25
878
17
1346
183
1219
52
785
100
340
890
62
640
296
1345
15
640

Net

JAEA
TEPCO
TEPCO
TEPCO

SOGIN
SOGIN
SOGIN
SOGIN

EWN
EWN
EWN
EWN
KGB
HDR
E.ON
KBG
KKK
KWL
KGG
KBG
EnKK
KKN
EnBW
EnKK
EWN
E.ON
HKG
E.ON
VAK
PE

Operator

HITACHI
GE/GETSC
GE/T
TOSHIBA

AMN/GETS
EL/WEST
GE
TNPG

AtEE
AtEE
AtEE
AtEE
AEG,GE
AEG,KWU
KWU
IA
KWU
AEG
BBR
SIEMENS
KWU
SIEM,KWU
SIEM,KWU
KWU
AtEE
KWU
HRB
KWU
GE,AEG
AEG,KWU

NSSS
supplier

TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2011 continued

1972-5
1967-7
1969-6
1970-12

1970-1
1961-7
1959-11
1958-11

1970-3
1972-4
1972-4
1976-12
1962-12
1965-1
1972-5
1974-9
1974-4
1964-10
1975-1
1961-12
1972-2
1966-6
1965-3
1970-10
1960-1
1967-12
1971-5
1972-7
1958-7
1968-1

Construction
start

1978-7
1970-11
1973-12
1974-10

1978-5
1964-10
1964-1
1963-5

1974-12
1977-10
1979-9
1989-4
1966-12
1969-10
1977-12
1978-4
1983-9
1968-7
1986-3
1966-3
1976-6
1973-1
1968-10
1979-5
1966-5
1972-1
1985-11
1978-9
1961-6
1971-12

Grid
connection

1979-3
1971-3
1974-7
1976-3

1981-12
1965-1
1964-6
1964-1

1975-4
1978-5
1979-11
1989-11
1967-4
1970-8
1979-3
1979-3
1984-3
1968-10
1987-8
1966-12
1976-12
1973-1
1969-3
1980-3
1966-10
1972-5
1987-6
1979-9
1962-2
1975-11

Commercial
operation
Shut down

2003-3
2011-5
2011-5
2011-5

1990-7
1990-7
1982-3
1987-12

1990-2
1990-2
1990-7
1989-11
1977-1
1971-4
2011-8
1991-8
2011-8
1979-1
1988-9
1984-5
2011-8
1974-7
2005-5
2011-8
1990-6
2003-11
1988-4
2011-8
1985-11
1994-8

50

JP -16
JP -11
JP -24
JP -1
JP -2

KZ -10

LT -46
LT -47

NL -1

RU -1
RU -3
RU -6
RU -4
RU -8

SK -1
SK -2
SK -3

ES -1
ES -3

SE -1
SE -6
SE -8

CH -8

GB -3A

KAZAKHSTAN

LITHUANIA

NETHERLANDS

RUSSIA

SLOVAKIA

SPAIN

SWEDEN

SWITZERLAND

UK

Code

JAPAN

Country

BERKELEY 1

LUCENS

AGESTA
BARSEBACK-1
BARSEBACK-2

JOSE CABRERA-1 (ZORITA)


VANDELLOS-1

BOHUNICE A1
BOHUNICE-1
BOHUNICE-2

APS-1 OBNINSK
BELOYARSKY-1
BELOYARSKY-2
NOVOVORONEZH-1
NOVOVORONEZH-2

DODEWAARD

IGNALINA-1
IGNALINA-2

BN-350

FUKUSHIMA-DAIICHI-4
HAMAOKA-1
HAMAOKA-2
JPDR
TOKAI-1

Name

Reactor

GCR

HWGCR

PHWR
BWR
BWR

PWR
GCR

HWGCR
PWR
PWR

LWGR
LWGR
LWGR
PWR
PWR

BWR

LWGR
LWGR

FBR

BWR
BWR
BWR
BWR
GCR

Type

620

28

80
1800
1800

510
1670

560
1375
1375

30
286
530
760
1320

183

4800
4800

1000

2381
1593
2436
90
587

Thermal

166

12
615
615

150
500

143
440
440

6
108
160
210
365

60

1300
1300

90

784
540
840
13
166

Gross

Capacity (MW)

138

10
600
600

141
480

93
408
408

5
102
146
197
336

55

1185
1185

52

760
515
806
12
137

Net

MEL

EOS

BKAB
BKAB
BKAB

UFG
HIFRENSA

JAVYS
JAVYS
JAVYS

REA
REA
REA
REA
REA

BV GKN

INPP
INPP

MAEC-KAZ

TEPCO
CHUBU
CHUBU
JAEA
JAPCO

Operator

TNPG

NGA

ABBATOM
ASEASTAL
ABBATOM

WH
CEA

SKODA
AEE
AEE

MSM
MSM
MSM
MSM
MSM

RDM

MAEP
MAEP

MAEC-KAZ

HITACHI
TOSHIBA
TOSHIBA
GE
GEC

NSSS
supplier

TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2011 continued

1957-1

1962-4

1957-12
1971-2
1973-1

1964-6
1968-6

1958-8
1972-4
1972-4

1951-1
1958-6
1962-1
1957-7
1964-6

1965-5

1977-5
1978-1

1964-10

1973-2
1971-6
1974-6
1960-12
1961-3

Construction
start

1962-6

1968-1

1964-5
1975-5
1977-3

1968-7
1972-5

1972-12
1978-12
1980-3

1954-6
1964-4
1967-12
1964-9
1969-12

1968-10

1983-12
1987-8

1973-7

1978-2
1974-8
1978-5
1963-10
1965-11

Grid
connection

1962-6

NA

1964-5
1975-7
1977-7

1969-8
1972-8

1972-12
1980-4
1981-1

1954-12
1964-4
1969-12
1964-12
1970-4

1969-3

1984-5
1987-8

1973-7

1978-10
1976-3
1978-11
1965-3
1966-7

Commercial
operation

1989-3

1969-1

1974-6
1999-11
2005-5

2006-4
1990-7

1977-2
2006-12
2008-12

2002-4
1983-1
1990-1
1988-2
1990-8

1997-3

2004-12
2009-12

1999-4

2011-5
2009-1
2009-1
1976-3
1998-3

Shut down

51

GB -3B
GB -4A
GB -4B
GB -1A
GB -1B
GB -1C
GB -1D
GB -2A
GB -2B
GB -2C
GB -2D
GB -14
GB -15
GB -9A
GB -9B
GB -7A
GB -7B
GB -6A
GB -6B
GB -11B
GB -10A
GB -10B
GB -8A
GB -8B
GB -5
GB -12

UA -25
UA -26
UA -42
UA -43

US -155

UKRAINE

USA

Code

UK

Country

Reactor

BIG ROCK POINT

CHERNOBYL-1
CHERNOBYL-2
CHERNOBYL-3
CHERNOBYL-4

BERKELEY 2
BRADWELL 1
BRADWELL 2
CALDER HALL 1
CALDER HALL 2
CALDER HALL 3
CALDER HALL 4
CHAPELCROSS 1
CHAPELCROSS 2
CHAPELCROSS 3
CHAPELCROSS 4
DOUNREAY DFR
DOUNREAY PFR
DUNGENESS-A1
DUNGENESS-A2
HINKLEY POINT-A1
HINKLEY POINT-A2
HUNTERSTON-A1
HUNTERSTON-A2
OLDBURY-A2
SIZEWELL-A1
SIZEWELL-A2
TRAWSFYNYDD 1
TRAWSFYNYDD 2
WINDSCALE AGR
WINFRITH SGHWR

Name

BWR

LWGR
LWGR
LWGR
LWGR

GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
FBR
FBR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
GCR
SGHWR

Type

240

3200
3200
3200
3200

620
481
481
268
268
268
268
260
260
260
260
60
600
840
840
900
900
595
595
660
1010
1010
850
850
120
318

Thermal

71

800
1000
1000
1000

166
146
146
60
60
60
60
60
60
60
60
15
250
230
230
267
267
173
173
230
245
245
235
235
36
100

Gross

Capacity (MW)

67

740
925
925
925

138
123
123
49
49
49
49
48
48
48
48
11
234
225
225
235
235
150
150
217
210
210
195
195
24
92

Net

CPC

MTE
MTE
MTE
MTE

MEL
MEL
MEL
MEL
MEL
MEL
MEL
MEL
MEL
MEL
MEL
UKAEA
UKAEA
MEL
MEL
MEL
MEL
MEL
MEL
MEL
MEL
MEL
MEL
MEL
UKAEA
UKAEA

Operator

GE

FAEA
FAEA
FAEA
FAEA

TNPG
TNPG
TNPG
UKAEA
UKAEA
UKAEA
UKAEA
UKAEA
UKAEA
UKAEA
UKAEA
UKAEA
TNPG
TNPG
TNPG
EE/B&W/T
EE/B&W/T
GEC
GEC
TNPG
EE/B&W/T
EE/B&W/T
APC
APC
UKAEA
ICL/FE

NSSS
supplier

TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2011 continued

1960-5

1970-3
1973-2
1976-3
1979-4

1957-1
1957-1
1957-1
1953-8
1953-8
1955-8
1955-8
1955-10
1955-10
1955-10
1955-10
1955-3
1966-1
1960-7
1960-7
1957-11
1957-11
1957-10
1957-10
1962-5
1961-4
1961-4
1959-7
1959-7
1958-11
1963-5

Construction
start

1962-12

1977-9
1978-12
1981-12
1983-12

1962-6
1962-7
1962-7
1956-8
1957-2
1958-3
1959-4
1959-2
1959-7
1959-11
1960-1
1962-10
1975-1
1965-9
1965-11
1965-2
1965-3
1964-2
1964-6
1968-4
1966-1
1966-4
1965-1
1965-2
1963-2
1967-12

Grid
connection

1963-3

1978-5
1979-5
1982-6
1984-3

1962-10
1962-7
1962-11
1956-10
1957-2
1958-5
1959-4
1959-3
1959-8
1959-12
1960-3
1962-10
1976-7
1965-10
1965-12
1965-3
1965-5
1964-2
1964-7
1968-9
1966-3
1966-9
1965-3
1965-3
1963-3
1968-1

Commercial
operation
Shut down

1997-8

1996-11
1991-10
2000-12
1986-4

1988-10
2002-3
2002-3
2003-3
2003-3
2003-3
2003-3
2004-6
2004-6
2004-6
2004-6
1977-3
1994-3
2006-12
2006-12
2000-5
2000-5
1990-3
1989-12
2011-6
2006-12
2006-12
1991-2
1991-2
1981-4
1990-9

52

US -014
US -144
US -10
US -011
US -16
US -267
US -018
US -213
US -077
US -133
US -013
US -409
US -309
US -245
US -130
US -171
US -012
US -312
US -206
US -146
US -001
US -322
US -320
US -344
US -29
US -295
US -304

Code

BONUS
CVTR
DRESDEN-1
ELK RIVER
ENRICO FERMI-1
FORT ST. VRAIN
GE VALLECITOS
HADDAM NECK
HALLAM
HUMBOLDT BAY
INDIAN POINT-1
LACROSSE
MAINE YANKEE
MILLSTONE-1
PATHFINDER
PEACH BOTTOM-1
PIQUA
RANCHO SECO-1
SAN ONOFRE-1
SAXTON
SHIPPINGPORT
SHOREHAM
THREE MILE ISLAND-2
TROJAN
YANKEE NPS
ZION-1
ZION-2

Name

Reactor

BWR
PHWR
BWR
BWR
FBR
HTGR
BWR
PWR
X
BWR
PWR
BWR
PWR
BWR
BWR
HTGR
X
PWR
PWR
PWR
PWR
BWR
PWR
PWR
PWR
PWR
PWR

Type

50
65
700
58
200
842
50
1825
256
220
615
165
2630
2011
220
115
46
2772
1347
24
236
2436
2772
3411
600
3250
3250

Thermal
18
19
207
24
65
342
24
603
84
65
277
55
900
684
63
42
12
917
456
3
68
849
959
1155
180
1085
1085

Gross

Capacity (MW)

Note: Status as of 31 December 2011, 138 reactors (49152 MW) have been permanently shut down.

USA

Country
17
17
197
22
61
330
24
560
75
63
257
48
860
641
59
40
12
873
436
3
60
820
880
1095
167
1040
1040

Net
DOE/PRWR
CVPA
EXELON
RCPA
DTEDISON
PSCC
GE
CYAPC
AEC/NPPD
PG&E
ENTERGY
DPC
MYAPC
DOMINION
NMC
EXELON
CofPiqua
SMUD
SCE
SNEC
DOE DUQU
LIPA
GPU
PORTGE
YAEC
EXELON
EXELON

Operator
GNEPRWRA
WH
GE
AC
UEC
GA
GE
WH
GE
GE
B&W
AC
CE
GE
AC
GA
GE
B&W
WH
GE
WH
GE
B&W
WH
WH
WH
WH

NSSS
supplier

TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2011 continued

1960-1
1960-1
1956-5
1959-1
1956-8
1968-9
1956-1
1964-5
1959-1
1960-11
1956-5
1963-3
1968-10
1966-5
1959-1
1962-2
1960-1
1969-4
1964-5
1960-1
1954-1
1972-11
1969-11
1970-2
1957-11
1968-12
1968-12

Construction
start
1964-8
1963-12
1960-4
1963-8
1966-8
1976-12
1957-10
1967-8
1963-9
1963-4
1962-9
1968-4
1972-11
1970-11
1966-7
1967-1
1963-7
1974-10
1967-7
1967-3
1957-12
1986-8
1978-4
1975-12
1960-11
1973-6
1973-12

Grid
connection
1965-9
NA
1960-7
1964-7
NA
1979-7
1957-10
1968-1
1963-11
1963-8
1962-10
1969-11
1972-12
1971-3
NA
1967-6
1963-11
1975-4
1968-1
1967-3
1958-5
NA
1978-12
1976-5
1961-7
1973-12
1974-9

Commercial
operation
1968-6
1967-1
1978-10
1968-2
1972-11
1989-8
1963-12
1996-12
1964-9
1976-7
1974-10
1987-4
1997-8
1998-7
1967-10
1974-11
1966-1
1989-6
1992-11
1972-5
1982-10
1989-5
1979-3
1992-11
1991-10
1998-2
1998-2

Shut down

53

ITALY

GERMANY

FRANCE

CANADA

ARMENIA
BELGIUM
BULGARIA

Country

AM -18
BE -1
BG -1
BG -2
BG -3
BG -4
CA -1
CA -2
CA -3
FR -10
FR -2
FR -24
FR -3
FR -4
FR -5
FR -6
FR -7
FR -8
FR -9
DE -10
DE -3
DE -4
DE -501
DE -502
DE -503
DE -504
DE -505
DE -506
DE -6
DE -9
IT -1

Code

Reactor

ARMENIA-1
BR-3
KOZLODUY-1
KOZLODUY-2
KOZLODUY-3
KOZLODUY-4
ROLPHTON NPD
DOUGLAS POINT
GENTILLY-1
PHENIX
CHINON-A1
SUPER-PHENIX
CHINON-A2
CHINON-A3
CHOOZ-A (ARDENNES)
EL-4 (MONTS D'ARREE)
ST. LAURENT-A1
ST. LAURENT-A2
BUGEY-1
STADE (KKS)
GUNDREMMINGEN-A (KRB A)
AVR JUELICH (AVR)
RHEINSBERG (KKR)
GREIFSWALD-1 (KGR 1)
GREIFSWALD-2 (KGR 2)
GREIFSWALD-3 (KGR 3)
GREIFSWALD-4 (KGR 4)
GREIFSWALD-5 (KGR 5)
LINGEN (KWL)
WUERGASSEN (KWW)
LATINA

Name

1989-2
1987-6
2002-12
2002-12
2006-12
2006-12
1987-8
1984-5
1977-6
2010-2
1973-4
1998-12
1985-6
1990-6
1991-10
1985-7
1990-4
1992-5
1994-5
2003-11
1977-1
1988-12
1990-6
1990-2
1990-2
1990-2
1990-7
1989-11
1979-1
1994-8
1987-12

Shut
down
Other
2,5
7,Other
7,Other
7,Other
7,Other
2
2
2
Other
1,2
Other
1,2
1,2
Other
1,2
1,2
1,2
1,2
2
6,8
7
1
3,6,7
3,6,7
3,6
3,5,7
3,6,7
2
2
7,Other

Shutdown reason
Other
Imdte.dism.
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+SE
Dd+PD+SE
Imdte.dism.
Imdte.dism.
Imdte.dism.
Imdte.dism.
Imdte.dism.
Imdte.dism.
Imdte.dism.
Imdte.dism.
Imdte.dism.
Imdte.dism.
Imdte.dism.
Imdte.dism.
Imdte.dism.
Imdte.dism.
Imdte.dism.
Imdte.dism.
Imdte.dism.
Imdte.dism.
Imdte.dism.
Dd+PD+SE
Imdte.dism.
Imdte.dism.

Decom.
strategy

3,9
3
3
3
1,3
8
3,4,6
3,4,9

3,4,9

9
3,4,6

3
3
3

4
4

3,6

6
4,9
9

7
7

4
3,6,7
3,6,7
2,6,7
2,7

Current fuel
management
phase

4,9
6,7
6,7
7
7
8
8
8

Current decom.
phase

TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2011

ANPPJSC
CEN/SCK
E-03492
E-03493
E-00174
E-0008
AECL
AECL
AECL
EDF
NERSA
EDF
EDF
SENA
EDF
EDF
EDF
EDF
E.ON
KGG
xxxx
G 01 KKR
G 01
G 01
G 01
G 01
G 01
KWL GmbH
E.ON
SOGIN

Decom.
licensee

2014
2018

2019
2015
2027
2025
2020
2014

2025

2036
2036
2036
2036

Licence
terminated

54

SWITZERLAND
UK

SWEDEN

SPAIN

SLOVAKIA

NETHERLANDS
RUSSIA

KAZAKHSTAN
LITHUANIA

JAPAN

ITALY

Country

IT -2
IT -3
IT -4
JP -1
JP -11
JP -2
JP -20
JP -24
KZ -10
LT -46
LT -47
NL -1
RU -3
RU -4
RU -6
RU -8
SK -1
SK -2
SK -3
ES -1
ES -3
SE -1
SE -6
SE -8
CH -8
GB -10A
GB -10B
GB -12
GB -14
GB -15
GB -1A
GB -1B

Code

Reactor

GARIGLIANO
ENRICO FERMI (TRINO)
CAORSO
JPDR
HAMAOKA-1
TOKAI-1
FUGEN ATR
HAMAOKA-2
BN-350
IGNALINA-1
IGNALINA-2
DODEWAARD
BELOYARSKY-1
NOVOVORONEZH-1
BELOYARSKY-2
NOVOVORONEZH-2
BOHUNICE A1
BOHUNICE-1
BOHUNICE-2
JOSE CABRERA-1 (ZORITA)
VANDELLOS-1
AGESTA
BARSEBACK-1
BARSEBACK-2
LUCENS
SIZEWELL-A1
SIZEWELL-A2
WINFRITH SGHWR
DOUNREAY DFR
DOUNREAY PFR
CALDER HALL 1
CALDER HALL 2

Name

1982-3
1990-7
1990-7
1976-3
2009-1
1998-3
2003-3
2009-1
1999-4
2004-12
2009-12
1997-3
1983-1
1988-2
1990-1
1990-8
1977-2
2006-12
2008-12
2006-4
1990-7
1974-6
1999-11
2005-5
1969-1
2006-12
2006-12
1990-9
1977-3
1994-3
2003-3
2003-3

Shut
down
3,4,Other
7,Other
7,Other
Other
6
2
2
6
2,5
7,Other
7,Other
2,Other
Other
Other
Other
Other
4
7
7
Other
4
2,3
Other
Other
4
2,8
2,8
Other
Other
Other
2,8
2,8

Shutdown reason
Imdte.dism.
Imdte.dism.
Imdte.dism.
Imdte.dism.
Dd+SE
Dd+PD+SE
Dd+SE
Dd+SE
Dd+PD+SE
Imdte.dism.
Imdte.dism.
Dd+SE
Other
Other
Other
Other
Dd+PD+SE
Imdte.dism.
Imdte.dism.
Imdte.dism.
Dd+PD+SE
Dd+SE
Other
Other
Dd+SE
Dd+SE
Dd+SE
Imdte.dism.
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE

Decom.
strategy

1
2,3,5,6
2,3,5,6
3,4,9,10
2,5
5
3,5,6,8
3,5,6,8

3,6
3,4,9
3,4,9
3,4,9
8
7

3,4
3,4,9
3,4
3
1,6,7
3,4,6,7,9
1,3,5
1,6,7
1,5,6
3
2,3
7

Current decom.
phase

4
4

3,6
2,3,6
3,7

2,5
2
2,4,7

3,5

Current fuel
management
phase
SOGIN
SOGIN
SOGIN
JAERI
CHUBU DL
JAPCO
JAEA
CHUBU DL
MAEC-KAZ
INPP
INPP
BV GKN
EA
EA
EA
EA
JAVYS
JAVYS
JAVYS
UFG
ENRESA
BKAB
BKAB
BKAB
EOS
Magnox S
Magnox S
UKAEA
DSR
Magnox N
SL
SL

Decom.
licensee

2025
2025
2004
2110
2110
2019
2333
2333
2117
2117

2015
2032

2030
2030
2055

2019
2013
2019
2002
2037
2018
2029
2037

Licence
terminated

TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2011 continued

55

USA

UK

Country

GB -1C
GB -1D
GB -2A
GB -2B
GB -2C
GB -2D
GB -3A
GB -3B
GB -4A
GB -4B
GB -5
GB -6A
GB -6B
GB -7A
GB -7B
GB -8A
GB -8B
GB -9A
GB -9B
US -001
US -011
US -012
US -013
US -014
US -018
US -077
US -10
US -130
US -133
US -144
US -146
US -155

Code

Reactor

CALDER HALL 3
CALDER HALL 4
CHAPELCROSS 1
CHAPELCROSS 2
CHAPELCROSS 3
CHAPELCROSS 4
BERKELEY 1
BERKELEY 2
BRADWELL 1
BRADWELL 2
WINDSCALE AGR
HUNTERSTON-A1
HUNTERSTON-A2
HINKLEY POINT-A1
HINKLEY POINT-A2
TRAWSFYNYDD 1
TRAWSFYNYDD 2
DUNGENESS-A1
DUNGENESS-A2
SHIPPINGPORT
ELK RIVER
PIQUA
INDIAN POINT-1
BONUS
GE VALLECITOS
HALLAM
DRESDEN-1
PATHFINDER
HUMBOLDT BAY
CVTR
SAXTON
BIG ROCK POINT

Name

2003-3
2003-3
2004-6
2004-6
2004-6
2004-6
1989-3
1988-10
2002-3
2002-3
1981-4
1990-3
1989-12
2000-5
2000-5
1991-2
1991-2
2006-12
2006-12
1982-10
1968-2
1966-1
1974-10
1968-6
1963-12
1964-9
1978-10
1967-10
1976-7
1967-1
1972-5
1997-8

Shut
down
2,8
2,8
2,8
2,8
2,8
2,8
2,8
2,8
2,8
2,8
Other
2,8
2,8
2,8
2,8
2,8
2,8
2,8
2,8
3
1,Other
4,5
5
5,6
1
5
6
5
5
7,Other
Other
2,Other

Shutdown reason
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+SE
Dd+SE
Dd+SE
Dd+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Dd+PD+SE
Imdte.dism.
Imdte.dism.
in situ disp.
Dd+PD+SE
in situ disp.
Dd+SE
Dd+SE
Dd+SE
Dd+SE
Dd+PD+SE
Dd+SE
Imdte.dism.
Imdte.dism.

Decom.
strategy

11
11
3,4,6,9

11

3,5,6,8
3,5,6,8
3,5,6
3,5,6
3,5,6
3,5,6
3,8
3,8
3,5,6
3,5,6
2,3,5,6
3,5,6
3,5,6
3,5,6
3,5,6
3,5,6
3,5,6
3,5,6
3,5,6

Current decom.
phase

Current fuel
management
phase

GE&PGEC
AEC&NPPD
EXELON
NMC
PG&E
CVPA
GPUNC
CPC

SL
SL
Magnox N
Magnox N
Magnox N
Magnox N
Magnox S
Magnox S
Magnox S
Magnox S
SL
Magnox N
Magnox N
Magnox S
Magnox S
Magnox N
Magnox N
Magnox S
Magnox S
DOE DUQU
RCPA
CofPiqua
ENTERGY

Decom.
licensee

2013
2009
2005
2007

1971

1970

2117
2117
2128
2128
2128
2128
2083
2083
2104
2104
2065
2090
2090
2104
2104
2098
2098
2111
2111
1989
1974

Licence
terminated

TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2011 continued

56

USA

Country

US -16
US -171
US -206
US -213
US -245
US -267
US -29
US -295
US -304
US -309
US -312
US -320
US -322
US -344
US -409

Code

Reactor

ENRICO FERMI-1
PEACH BOTTOM-1
SAN ONOFRE-1
HADDAM NECK
MILLSTONE-1
FORT ST. VRAIN
YANKEE NPS
ZION-1
ZION-2
MAINE YANKEE
RANCHO SECO-1
THREE MILE ISLAND-2
SHOREHAM
TROJAN
LACROSSE

Name

1972-11
1974-11
1992-11
1996-12
1998-7
1989-8
1991-10
1998-2
1998-2
1997-8
1989-6
1979-3
1989-5
1992-11
1987-4

Shut
down
4,5
1
Other
6
6
1,Other
5,7
5,6
5,6
6
5,6
4,5
7,Other
6
2

Shutdown reason
Dd+SE
Dd+SE
Dd+PD+SE
Imdte.dism.
Dd+PD+SE
Imdte.dism.
Imdte.dism.
Dd+PD+SE
Dd+PD+SE
Imdte.dism.
Dd+PD+SE
Other
Imdte.dism.
Dd+PD+SE
Dd+PD+SE

Decom.
strategy

4,6
1
1
4
9
11

9,11
1
4
4,6

Current decom.
phase

Current fuel
management
phase

DTEDISON
EXELON
SCE
CYAPC
DOMINRES
PSCC
YAEC
CommonEd
COMMED
MYAPC
SMUD
GPU
LIPA
PORTGE
DPC

Decom.
licensee

1995
2005

2005
2009

1996
2005

2008
2007

2025

Licence
terminated

TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2011 continued

57

Drawing up the final decommissioning plan


Reactor core defuelling
Waste conditioning on-site (only for decommissioning waste)
Waste shipment off-site (only for decommissioning waste)
Safe enclosure preparation
Partial dismantling
Active safe enclosure period
Passive safe enclosure period

1
2
3
4
5
6
7
8
9
10
11

Description

Transfer to a reactor facility


Transfer away from reactor facility
Storage in an on-site facility
Storage in an off-site facility

Shipment to a reprocessing plant


Underwater storage
Dry storage
Encapsulation

Fuel Management

1
2
3
4

5
6
7
8

undefined

Final dismantling
Final survey
Licence terminated (legal act at the end of the decommissioning
process)

Description

Current decommissioning phase

Other technological reasons


Other economical reasons
Public acceptance reasons
Other

5
6
7
undefd

in situ disp.

Immediate dismantling and removal of all radioactive materials


Deferred dismantling, placing all radiological areas into safe enclosure
Deferred dismantling, including partial dismantling and placing
remanining radiological areas into safe enclosure
In situ disposal, involving encapsulation of radioactive materials
and subsequent restriction of access
Other

Imdte.dism.
Dd+SE
Dd+PD+SE

The technology or process being used became obsolete


The process was no longer profitable
There were changes in licensing requirements
After an operating incident

1
2
3
4

Description

Decommissioning strategy

Description

Shutdown reason

TABLE 17. DEFINITIONS FOR REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED

58

79.7

71.8

68.1

79.6

82.5

65.9

77.1

Reactors permanently shut down during 2009 to 2011 (17 units) are considered.

14.0

27.7

11.7

16.9

26.7

16.9

14.2

15.0

14.5

18.5

22.9

18.9

11.9

15.1

12.2

81.2

71.8

68.3

79.9

73.0

79.9

83.0

77.2

81.1

75.0

67.4

74.5

83.8

83.5

83.8

Capability
factor
(%)

5.9

2.8

1.3

2.7

3.7

0.7

14.6

2.7

0.4

2.7

2.0

7.9

3.9

5.7

10.7

Forced loss
rate
(%)

Reactors reporting to IAEA PRIS (see note)


Planned cap.loss
factor
(%)

Note: 2011 is the latest year for which operating experience data is currently available to the IAEA.

448

FBR

TOTAL

18

GCR

73.0

16

LWGR

12

21

PHWR >= 600 MW(e)

LWGR < 600 MW(e)

26

PHWR < 600 MW(e)

LWGR >= 600 MW(e)

79.6

47

PHWR

64.7

73.6

12

82

BWR < 600 MW(e)

BWR >= 600 MW(e)

73.0

82.7

83.2

82.7

Availability
factor
(%)

94

224

PWR >= 600 MW(e)

BWR

47

271

PWR < 600 Mw(e)

PWR

Reactor category

Number
of
units

TABLE 18. PERfORMANCE fACTORS BY REACTOR CATEGORY, 2009 to 2011


Operating
factor
(%)

80.4

62.6

76.0

81.3

64.3

76.8

82.4

76.0

78.9

74.4

68.1

73.7

83.5

83.8

83.6

Load
factor
(%)

78.9

72.8

68.2

80.2

32.1

80.0

82.2

64.9

76.6

72.2

64.6

71.8

81.8

82.0

81.8

59

435

Full outage hours


per operating
experience year

Reactors shut down during 2011 (13 units) are considered.

Note: 2011 is the latest year for which outage information is currently available to the IAEA.

ALL REACTORS

FBR

15

LWGR

17

21

PHWR >= 600 MW(e)

GCR

26

PHWR < 600 MW(e)

47

PHWR

11

74

BWR >= 600 MW(e)

LWGR >= 600 MW(e)

10

BWR < 600 MW(e)

LWGR < 600 MW(e)

84

223

PWR >= 600 MW(e)

BWR

47

270

in the world

Number of units

PWR < 600 MW(e)

PWR

Reactor Type

TABLE 19. fULL OUTAGE STATISTICS DURING 2011

1773

809

2000

1647

3216

2065

1323

1590

1471

2502

4028

2684

1488

1669

1520

Planned
outages
(%)

78.3

100.0

47.7

92.1

43.8

72.0

90.0

65.9

75.6

78.0

69.3

76.5

80.2

93.3

82.7

Unplanned
outages
(%)

15.6

0.0

51.3

5.4

2.3

4.1

9.6

31.3

22.6

7.9

19.7

10.0

17.8

5.1

15.4

External
outages
(%)

6.1

0.0

1.0

2.5

53.9

23.9

0.4

2.8

1.8

14.1

11.0

13.5

2.0

1.6

1.9

60

Note: Only reactors which have achieved full commercial operation in or before 2011 are counted.

TOTAL

Other

Fuel management limitation (including high flux tilt, stretch out or coast-down operation)

Fire

561355

788

73
100.00

0.14

0.01
666262

8760

162
100.00

1.31

0.02

578

51296

57439

41

231

1042

20.80

1.95

0.44

8.11

62.29

5.07

4251

138568

12964

2935

54034

415043

33796

Human factor related

22.47

1.65

0.35

6.05

64.34

5.00

100.00

0.07

0.40

1.81

7.40

1.01

89.30

74906

208

451

2021

5496

983

65747

100.00

0.28

0.60

2.70

7.34

1.31

87.77

Unplanned
full outages
Energy lost
Time lost
GW(e)h
%
Hours
%

Nuclear regulatory requirements

126119

9274

Major back-fitting, refurbishment or upgrading activities with refuelling

Major back-fitting, refurbishment or upgrading activities without refuelling

1946

33945

361161

28049

Planned
full outages
Energy lost
Time lost
GW(e)h
%
Hours
%

Testing of plant systems or components

Inspection, maintenance or repair without refuelling

Inspection, maintenance or repair combined with refuelling

Refuelling without maintenance

Plant equipment problem/failure

Direct outage cause

TABLE 20. DIRECT CAUSES Of fULL OUTAGES DURING 2011

61

44926

1284

Note: Only reactors which have achieved full commercial operation in or before 2011 are counted.

2481827

1579

Other

TOTAL

2725

Fuel management limitation (including high flux tilt, stretch out or coast-down operation)

External restrictions on supply and services

100.00

0.06

0.11
3050189

17522

3354
100.00

0.57

0.11

426091

793

1204

3835
0.06

12.25

5.03

0.58

9.47

68.06

Fire
1909

373676

153387

17806

288958

2076012

6780
0.02

13.05

4.10

0.29

6.94

71.31

367271

100.00

0.19

0.28

0.90

1.59

10.54

0.30

86.20

513579

1613

1133

5277

8817

53351

3045

440342

100.00

0.31

0.22

1.03

1.72

10.39

0.59

85.74

Unplanned
full outages
Energy lost
Time lost
GW(e)h
%
Hours
%

Human factor related


382

323778

Major back-fitting, refurbishment or upgrading activities without refuelling

Nuclear regulatory requirements

101683

7199

172346

1769760

Major back-fitting, refurbishment or upgrading activities with refuelling

Testing of plant systems or components

Inspection, maintenance or repair without refuelling

Inspection, maintenance or repair combined with refuelling

117563

0.00
4.13

3.85

102376

Refuelling without maintenance

Planned
full outages
Energy lost
Time lost
GW(e)h
%
Hours
%

Plant equipment problem/failure

Direct Outage Cause

TABLE 21. DIRECT CAUSES Of fULL OUTAGES, 2007 TO 2011

62

AM
AR
BE
BG
BR
CA
CH
CN
CZ
DE
ES
FI
FR
GB
HU
IN
IR
IT
JP
KR
KZ
LT
MX
NL
PK
RO
RU
SE
SI
SK

ARMENIA
ARGENTINA
BELGIUM
BULGARIA
BRAZIL
CANADA
SWITZERLAND
CHINA
CZECH REPUBLIC
GERMANY
SPAIN
FINLAND
FRANCE
UNITED KINGDOM
HUNGARY
INDIA
IRAN, ISLAMIC REPUBLIC OF
ITALY
JAPAN
KOREA, REPUBLIC OF
KAZAKHSTAN
LITHUANIA
MEXICO
NETHERLANDS
PAKISTAN
ROMANIA
RUSSIAN FEDERATION
SWEDEN
SLOVENIA
SLOVAKIA

Full name

TABLE 22. COUNTRIES: ABBREVIATIONS AND SUMMARY

Country
Code

2
1
3
2
33
10
1
4

50
21

1
2
7
2
2
18
5
16
6
9
8
4
58
18
4
20
1

Operational

1
2

4
9

12
27

27
2

3
1

5
3

1
4

10

2
5

1
1

26

2
1

Number of reactors, as of 31 Dec. 2011


Construction LT shut down
Shut down

35

10
2

42

Planned

63

6 units in operation; 2 units under construction.

Note: The total includes the following data from Taiwan, China:

TOTAL

UA
US
VN
ZA

UKRAINE
UNITED STATES OF AMERICA
VIETNAM
SOUTH AFRICA

Full name

TABLE 22. COUNTRIES: ABBREVIATIONS AND SUMMARY continued

Country
Code

435

15
104

Operational

65

2
1

138

4
28

Number of reactors, as of 31 Dec. 2011


Construction LT shut down
Shut down

114

20
2

Planned

64

TOTAL

BWR
FBR
GCR
HTGR
HWGCR
HWLWR
LWGR
PHWR
PWR
SGHWR
X

Boiling light water cooled and moderated reactor


Fast breeder reactor
Gas cooled, graphite moderated reactor
High temperature gas cooled, graphite moderated reactor
Heavy water moderated, gas cooled reactor
Heavy water moderated, boiling light water cooled reactor
Light water cooled, graphite moderated reactor
Pressurized heavy water moderated and cooled reactor
Pressurized light water moderated and cooled reactor
Steam generating heavy water reactor
Other

Full name

TABLE 23. REACTOR TYPES: ABBREVIATIONS AND SUMMARY

Type
code

65

1
5
53

15
47
270

435

4
2

138

31
7
35
4
4
2
9
5
38
1
2

Number of reactors, as of 31 Dec. 2011


Construction LT shut down
Shut down

84
2
17

Operational

114

101

10
2

Planned

65

AEC/NPPD
AEP
AmerenUE
ANAV
ANPPJSC
APS
AVR
Axpo AG
BE
BHAVINI
BKAB
BKW
BRUCEPOW
BV GKN
CEA/EDF
CEN/SCK
CEZ
CFE
CHUBU
CHUGOKU
CIAE
CNAT
CofPiqua
COGEMA
CONSTELL
CPC
CVPA
CYAPC
DOE DUQU
DOE/PRWR

ATOMIC ENERGY COMMISSION AND NEBRASKA PUBLIC POWER DISTRICT


AMERICAN ELECTRIC POWER COMPANY, INC.
AMEREN UE, UNION ELECTRIC COMPANY
ASOCIACION NUCLEAR ASCO-VANDELLOS A.I.E. (ENDESA/ID)
JOINT STOCK COMPANY ARMENIAN NPP
ARIZONA PUBLIC SERVICE CO.
ARBEITSGEMEINSCHAFT VERSUCHSREAKTOR GMBH
KERNKRAFTWERK BEZNAUCH-5312 DTTINGEN
BRITISH ENERGY
BHARATIYA NABHIKIYA VIDYUT NIGAM LIMITED
BARSEBCK KRAFT AB
BKW ENERGIE AG
BRUCE POWER
BV GEMEENSCHAPPELIJKE KERNENERGIECENTRALE NEDERLAND (BV GKN)
COMMISSARIAT L'ENERGIE ATOMIQUE (80%)ELECTRICIT DE FRANCE (20%)
CENTRE D'ETUDE DE L'ENERGIE NUCLEAIRE / STUDIECENTRUM VOOR KERNENERGIE
CZECH POWER COMPANY, CEZ A.S.
COMISION FEDERAL DE ELECTRICIDAD
CHUBU ELECTRIC POWER CO., INC.
THE CHUGOKU ELECTRIC POWER CO., INC.
CHINA INSTITUTE OF ATOMIC ENERGY
CENTRALES NUCLEARES ALMARAZ-TRILLO (ID/UFG/ENDESA/HC/NUCLENOR )
CITY OF PIQUA GOVERNMENT
COMPAGNIE GENERALE DES MATIERES NUCLEAIRES
CONSTELLATION ENERGY NUCLEAR GROUP, LLC
CONSUMERS POWER CO.
CAROLINAS-VIRGINIA NUCLEAR POWER ASSOC.
CONNECTICUT YANKEE ATOMIC POWER CO.
DEPARTMENT OF ENERGY AND DUQUESNE LIGHT CO.
DOE & PUERTO RICO WATER RESOURCES

Full name

TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY

Operator
code

6
2
3
2
1
3

1
6

2
15

2
1
3
1
3

Operational

1
2

1
1
1
1
1

1
2

1
1
1

Number of reactors, as of 31 Dec. 2011


Construction LT shut down
Shut down
Planned

1
2

66

DOMINION
DPC
DTEDISON
DUKEENER
E.ON
EDF
ELECTRAB
ELETRONU
EMO
EnBW
ENERGYNW
EnKK
ENTERGY
EOS
EPDC
EPZ
ESKOM
EVN
EWN
EXELON
FENOC
FKA
FORTUMPH
FPL
FQNP
FSNPC
GE
GFNPC
GNPJVC
GPU
HDR

DOMINION GENERATION
DAIRYLAND POWER COOPERATIVE
DETROIT EDISON CO.
DUKE ENERGY CORP.
E.ON KERNKRAFT GMBH
ELECTRICITE DE FRANCE
ELECTRABEL M. V. NUCLEAIRE PRODUKTIE
ELETROBRAS ELETRONUCLEAR S.A.
ELECTROSTATION MOCHOVCE
ENBW KRAFTWERKE AG
ENERGY NORTHWEST
ENBW KERNKRAFT GMBH (SITZ IN OBRIGHEIM)
ENTERGY NUCLEAR OPERATIONS, INC.
ENERGIE DE L'OUEST SUISSE
ELECTRIC POWER DEVELOPMENT CO.,LTD.
N.V. ELEKTRICITEITS-PRODUKTIEMAATSCHAPPIJ ZUID-NEDERLAND
ESKOM
VIETNAM ELECTRICITY
ENERGIEWERKE NORD GMBH
EXELON GENERATION CO., LLC
FIRST ENERGY NUCLEAR OPERATING CO.
FORSMARK KRAFTGRUPP AB
FORTUM POWER AND HEAT OY (FORMER IVO)
FLORIDA POWER & LIGHT CO.
CNNC FUJIAN FUQING NUCLEAR POWER CO.,LTD
FUJIAN SANMING NUCLEAR POWER CO.,LTD.
GENERAL ELECTRIC
GUANGXI FANGCHENGGANG NUCLEAR POWER COMPANY LTD
GUANDONG NUCLEAR POWER JOINT VENTURE COMPANY LIMITED (GNPJVC)
GENERAL PUBLIC UTILITIES (OWNED BY FIRSTENERGY CORP.)
HEISSDAMPFREAKTOR-BETRIEBSGESELLSCHAFT MBH.

Full Name

TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY continued

Operator
code

17
4
3
2
4

1
2

1
2
12

1
7
3
58
7
2

Operational

1
2

1
1

6
4

2
1
1

3
8

1
1
1

Number of reactors, as of 31 Dec. 2011


Construction LT shut down
Shut down
Planned

3
2

67

HEPCO
HIFRENSA
HKG
HNPC
HOKURIKU
HONGYANH
HQ
HSNPC
ID
INPP
JAEA
JAPCO
JAVYS
JNPC
KBG
KEPCO
KGB
KGG
KHNP
KKB
KKG
KKK
KKL
KKN
KLE
KOZNPP
KWG
KWL
KYUSHU
LANPC
LDNPC

HOKKAIDO ELECTRIC POWER CO.,INC.


HISPANO-FRANCESA DE ENERGIA NUCLEAR, S.A.
HOCHTEMPERATUR-KERNKRAFTWERK GMBH
HAINAN NUCLEAR POWER COMPANY
HOKURIKU ELECTRIC POWER CO.
HONGYANHE NUCLEAR POWER COMPANY
HYDRO QUEBEC
HUANENG SHANDONG SHIDAOBAY NUCLEAR POWER CO.,LTD.
IBERDROLA, S.A.
IGNALINA NUCLEAR POWER PLANT
JAPAN ATOMIC ENERGY AGENCY
JAPAN ATOMIC POWER CO.
JADROVA A VYRADOVACIA SPOLOCNOST/NUCLEAR AND DECOMMISSIONING COMPANY, PLC./
JIANGSU NUCLEAR POWER CORPORATION
KERNKRAFTWERK-BETRIEBSGESELLSCHAFT MBH
KANSAI ELECTRIC POWER CO.
KERNKRAFTWERKE GUNDREMMINGEN BETRIEBSGESELLSCHAFT MBH
KERNKRAFTWERK GUNDREMMINGEN GMBH
KOREA HYDRO AND NUCLEAR POWER CO.
KERNKRAFTWERK BRUNSBTTEL GMBH
KERNKRAFTWERK GOESGEN-DAENIKEN AG
KERNKRAFTWERK KRMMEL GMBH & CO. OHG
KERNKRAFTWERK LEIBSTADT
KERNKRAFTWERK NIEDERAICHBACH GMBH
KERNKRAFTWERKE LIPPE-EMS GMBH
KOZLODUY NPP-PLC
GEMEINSCHAFTSKERNKRAFTWERK GROHNDE GMBH & CO. OHG
KERNKRAFTWERK LINGEN GMBH
KYUSHU ELECTRIC POWER CO., INC.
LINGAO NUCLEAR POWER COMPANY LTD.
LINGDONG NUCLEAR POWER COMPANY LTD.

Full name

TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY continued

Operator
code

6
2
2

1
2
1

2
21

11

Operational

1
1

2
2
1
3

1
1

Number of reactors, as of 31 Dec. 2011


Construction LT shut down
Shut down
Planned

68

LHNPC
LIPA
LNPC
LUMINANT
MAEC-KAZ
MEL
MTE
MYAPC
NASA
NBEPC
NDNPC
NEK
NEXTERA
NMC
NNEGC
NPCIL
NPPDCO
NPQJVC
NSP
NUCLENOR
OH
OKG
OPG
OPPD
PAEC
PAKS Zrt
PE
PG&E
PORTGE
PPL SUSQ
PROGRESS

LIAONING HONGYANHE NUCLEAR POWER CO. LTD. (LHNPC)


LONG ISLAND POWER AUTHORITY
LIAONIN NUCLEAR POWER COMPANY,LMT.
LUMINANT GENERATION COMPANY LLC
MANGISHLAK ATOMIC ENERGY COMPLEX-KAZATOMPROM, LIMITED LIABILITY COMPANY
MAGNOX ELECTRIC LIMITED
MINTOPENERGO OF UKRAINE - MINISTRY OF FUEL AND ENERGY OF UKRAINE
MAINE YANKEE ATOMIC POWER CO.
NUCLEOELECTRICA ARGENTINA S.A.
NEW BRUNSWICK ELECTRIC POWER COMMISSION
NINGDE NUCLEAR POWER COMPANY LTD.
NUKLERANA ELEKTRARNA KRKO
NEXTERA ENERGY RESOURCES, LLC
NUCLEAR MANAGEMENT CO.
NATIONAL NUCLEAR ENERGY GENERATING COMPANY <ENERGOATOM>
NUCLEAR POWER CORPORATION OF INDIA LTD.
NUCLEAR POWER PRODUCTION & DEVELOPEMENT CO. OF IRAN
NUCLEAR POWER PLANT QINSHAN JOINT VENTURE COMPANY LTD.
NORTHERN STATES POWER CO. (SUBSIDIARY OF XCEL ENERGY)
NUCLENOR, S.A.
ONTARIO HYDRO
OKG AKTIEBOLAG
ONTARIO POWER GENERATION
OMAHA PUBLIC POWER DISTRICT
PAKISTAN ATOMIC ENERGY COMMISSION
PAKS NUCLEAR POWER PLANT LTD
PREUSSENELEKTRA KERNKRAFT GMBH&CO KG
PACIFIC GAS AND ELECTRIC COMPANY
PORTLAND GENERAL ELECTRIC CO.
PPL SUSQUEHANNA, LLC
PROGRESS ENERGY

Full Name

TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY continued

Operator
code

2
5

3
10
1
3
4

15
20
1
4
3
1

1
4

2
1

Operational

2
6

1
1
1

1
23
4
1

Number of reactors, as of 31 Dec. 2011


Construction LT shut down
Shut down
Planned

69

TOHOKU
TPC
TQNPC
TVA
TVO
UFG
UKAEA
VAK

PSCC
PSEG
QNPC
RAB
RCPA
REA
RWE
SCE
SCE&G
SE,plc
SENA
SHIKOKU
SMNPC
SMUD
SNEC
SNN
SNPC
SOGIN
SOUTHERN
STP
TEPCO
TNPC

PUBLIC SERVICE CO. OF COLORADO


PSEG NUCLEAR LLC PUBLIC SERVICE ELECTRIC & GAS CO.
QINSHAN NUCLEAR POWER COMPANY
RINGHALS AB
RURAL COOPERATIVE POWER ASSOC.
JOINT STOCK COMPANY CONCERN ROSENERGOATOM
RWE POWER AG
SOUTHERN CALIFORNIA EDISON CO.
SOUTH CAROLINA ELECTRIC & GAS CO.
SLOVENSK ELEKTRRNE, A.S.
SOCIETE D'ENERGIE NUCLEAIRE FRANCO-BELGE DES ARDENNES
SHIKOKU ELECTRIC POWER CO., INC
SANMEN NUCLEAR POWER CO., LTD.
SACRAMENTO MUNICIPAL UTILITY DISTRICT
SAXTON NUCLEAR EXPIRAMENTAL REACTOR CORPORATION
SOCIETATEA NATIONALA NUCLEARELECTRICA S.A.
SHANDONG NUCLEAR POWER COMPANY LTD
SOCIETA GESTIONE IMPANTI NUCLEARI S.P.A.
SOUTHERN NUCLEAR OPERATING COMPANY, INC.
STP NUCLEAR OPERATING CO.
TOKYO ELECTRIC POWER CO.,INC.
GUANGDONG TAISHAN NUCLEAR POWER JOINT VENTURE COMPANY LIMITED (TNPC) JOINT VENTURE BETWEEN
EDF (30%) AND GUANGDONG NUCLEAR POWER GROUP (CGNPC).
TOHOKU ELECTRIC POWER CO.,INC
TAI POWER CO.
THE THIRD QINSHAN JOINTED VENTURE COMPANY LTDA.
TENNESSEE VALLEY AUTHORITY
TEOLLISUUDEN VOIMA OY
UNION FENOSA GENERATION S.A.
UNITED KINGDOM ATOMIC ENERGY AUTHORITY
VERSUCHSATOMKRAFTWERK KAHL GMBH

Full Name

TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY continued

Operator
code

4
6
2
6
2

6
2
13

1
1

10

33
2
1
4

1
4
1

1
1

1
5
2
1

Number of reactors, as of 31 Dec. 2011


Construction LT Shut Down Shut down

3
1
4

Operational

35

Planned

70

TOTAL

WCNOC
YAEC
YJNPC
not specified

WOLF CREEK NUCLEAR OPERATION CORP.


YANKEE ATOMIC ELECTRIC CO.
YANGJIANG NUCLEAR POWER COMPANY

Full name

TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY continued

Operator
code

435

Operational
3
65

138

Number of reactors, as of 31 Dec. 2011


Construction LT shut down
shut down

114

3
39

Planned

71

A/F/W
ABBATOM
AC
ACECOWEN
ACLF
AECL
AECL/DAE
AECL/DHI
AEE
AEG
AEG,GE
AEG,KWU
AMN/GETS
APC
AREVA
ASE
ASEASTAL
ASPALDO
AtEE
B&W
BBK
BBR
CE
CEA
CGE
CNCLNEY
CNNC
CZEC
DFEC
DHICKAEC

ASSOCIATION ACEC, FRAMATOME ET WESTINGHOUSE


ABBATOM (FORMERLY ASEA-ATOM)
ALLIS CHALMERS
ACECOWEN (ACEC-COCKERILL-WESTINGHOUSE )
(ACECOWEN - CREUSOT LOIRE - FRAMATOME)
ATOMIC ENERGY OF CANADA LTD.
ATOMIC ENERGY OF CANADA LTDA AND DEPARTMENT OF ATOMIC ENERGY (INDIA)
ATOMIC ENERGY OF CANADA LTD./DOOSAN HEAVY INDUSTRY & CONSTRUCTION
ATOMENERGOEXPORT
ALLGEMEINE ELEKTRICITAETS-GESELLSCHAFT
ALLGEMEINE ELECTRICITAETS-GESELLSCHAFT, GENERAL ELECTRIC COMPANY (US)
ALLGEMEINE ELEKTRICITAETS GESELLSCHAFT, KRAFTWERK UNION AG
ANSALDO MECCANICO NUCLEARE SPA/GENERAL ELECTRIC TECHNICAL SERVICES CO
ATOMIC POWER CONSTRUCTION LTD.
AREVA, 27-29, RUE LE PELETIER, 75433 PARIS CEDEX 09URL: WWW.AREVA.COM
ATOMSTROYEXPORT
ASEA-ATOM/STAL-LAVAL
ASPALDO
ATOMENERGOEXPORT
BABCOCK & WILCOX CO.
BROWN BOVERI-KRUPP REAKTORBAU GMBH
BROWN BOVERI REAKTOR GMBH
COMBUSTION ENGINEERING CO.
COMMISSARIAT A L'ENERGIE ATOMIQUE
CANADIAN GENERAL ELECTRIC
CNIM-CONSTRUCTIONS NAVALES ET INDUSTRIELLES DE MEDITERRANEE CL - CREUSOT LOI
CHINA NATIONAL NUCLEAR CORPORATION
CHINA ZHONGYUAN ENGINEERING CORPORATION
DONGFANG ELECTRIC CORPORATION
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA ATOMIC ENERGY RESEARCH INSTITUTE

Full name

TABLE 25. NSSS SUPPLIERS: ABBREVIATIONS AND SUMMARY

NSSS supplier
code

2
2

14

1
2

4
1
9
1
3
8

Operational

2
20

4
4

1
1
6
3
1
1
1
1
1
1

6
1
1
2
1
2

1
2
3

Number of reactors, as of 31 Dec. 2011


Construction LT shut down Shut down

13

1
1

Planned

72

DHICKOPC
EE/B&W/T
EL/WEST
FAEA
FRAM
FRAMACEC
GA
GAAA
GE
GE,AEG
GE/GETSC
GE/T
GEC
GETSCO
GNEPRWRA
GTM
H/G
HITACHI
HRB
IA
ICL/FE
IZ
KWU
LEVIVIER
MAEC-KAZ
MAEP
MHI
MSM
NGA
NNC
NPC

DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA POWER ENGINEERING COMPA


THE ENGLISH ELECTRIC CO. LTD / BABCOCK & WILCOX CO. / TAYLOR WOODROW CONSTRU
ELETTRONUCLEARE ITALIANA / WESTINGHOUSE ELECTRIC CORP.
FEDERAL ATOMIC ENERGY AGENCY
FRAMATOME
FRAMACECO ( FRAMATOME-ACEC-COCKERILL )
GENERAL ATOMIC CORP.
GROUPEMENT ATOMIQUE ALSACIENNE ATLANTIQUE
GENERAL ELECTRIC CO.
GENERAL ELECTRIC COMPANY (US), ALLGEMEINE ELEKTRICITAETS- GESELLSCHAFT
GENERAL ELECTRIC CO./GENERAL ELECTRIC TECHNICAL SERVICES CO.
GENERAL ELECTRIC CO./TOSHIBA CORPORATION
GENERAL ELECTRIC COMPANY (UK)
GENERAL ELECTRIC TECHNICAL SERVICES CO.
GENERAL NUCLEAR ENGINEERING & PUERTO RICO WATER RESOURCES AUTHORITY (US)
GRANDS TRAVAUX DE MARSEILLE
HITACHI GE NUCLEAR ENERGY, LTD.
HITACHI LTD.
HOCHTEMPERATUR-REAKTORBAU GMBH
INTERATOM INTERNATIONALE ATOMREAKTORBAU GMBH
INTERNATIONAL COMBUSTION LTD. / FAIREY ENGINEERING LTD.
IZHORSKIYE ZAVODY
SIEMENS KRAFTWERK UNION AG
LEVIVIER
MAEC-KAZATOMPROMMANGISHLAK ATOMIC ENERGY COMPLEX-KAZATOMPROM, LIMITED LIABILITY
MINATOMENERGOPROM, MINISTRY OF NUCLEAR POWER AND INDUSTRY
MITSUBISHI HEAVY INDUSTRIES LTD.
MINISTRY OF MEDIUM MACHINE BUILDING OF THE USSR (MINSREDMASH)
NATIONAL GESELLSCHAFT ZUR FRDERUNG DER INDUSTRIELLEN ATOMTECHNIK
NATIONAL NUCLEAR CORPORATION
NUCLEAR POWER CO. LTD.

Full name

TABLE 25. NSSS SUPPLIERS: ABBREVIATIONS AND SUMMARY continued

NSSS supplier
code

2
6

3
12

20

5
1

9
2
1
2

2
1
1
1

1
1

2
1
11
1
1
1
3

4
1
5
3

Number of reactors, as of 31 Dec. 2011


Construction LT shut down Shut down

1
1

47

1
66
2

7
2

Operational

Planned

73

TOTAL

NPCIL
OH/AECL
PAA
PAIP
PPC
RDM
ROSATOM
S/KWU
SACM
SIEM,KWU
SIEMENS
SKODA
T/H/F/M
TBD
TNPG
TOSHIBA
UEC
UKAEA
WH
WH/MHI
not specified

NUCLEAR POWER CORPORATION OF INDIA LTD.VIKRAM SARABHAI BHAVAN, ANUSHAKTI NAG


ONTARIO HYDRO/ATOMIC ENERGY OF CANADA LTD.
PRODUCTION AMALGAMATION 'ATOMMASH', VOLGODONSK
PRODUCTION AMALGAMATION IZHORSKY PLANT ATOMMASH,VOLGODONSK,RUSSIA
PWR POWER PROJECTS LTD
ROTTERDAMSE DROOGDOK MAATSCHAPPIJ (RDM) IN ROTTERDAM (NL)
STATE ATOMIC ENERGY CORPORATION ROSATOM
SIEMENS/KRAFTWERK UNION AG
SOCIETE ALSACIENNE DE CONSTRUCTIONS MECANIQUES
SIEMENS AG, KRAFTWERK UNION AG
SIEMENS AG, POWER GENERATION -FRG
SKODA CONCERN NUCLEAR POWER PLANT WORKS
TOSHIBA/HITACHI/FUJI ELECTRIC HOLDINGS/MITSUBISHI HEAVY INDUSTRIES
TBD
THE NUCLEAR POWER GROUP LTD.
TOSHIBA CORPORATION
UNITED ENGINEERS AND CONTRACTORS
UNITED KINGDOM ATOMIC ENERGY AUTHORITY
WESTINGHOUSE ELECTRIC CORPORATION
WESTINGHOUSE ELECTRIC CORPORATION/MITSUBISHI HEAVY INDUSTRIES LTD.

Full name

TABLE 25. NSSS SUPPLIERS: ABBREVIATIONS AND SUMMARY continued

NSSS supplier
code

435

71
1

65

3
2
1

1
2

1
10
5
14

10

138

9
3
1
10
10

2
2
1
1

Number of reactors, as of 31 Dec. 2011


Construction LT shut down Shut down

33
1

16
16
4
11
1

Operational

114

4
2
49

37

Planned

300

Number of reactors

Number of reactors/net electrical power (GW(e))

250

248.4

270

Net electrical power (GW(e))

200

150

47

77.7

84

100

PWR

BWR

GCR

PHWR

LWGR

Reactor type
figure 1. Number of operational reactors by type and
net electrical power (as of 31 Dec. 2011).

74

0.6

15
8.8

10.2

17

23.1

50

FBR

60

Number of reactors

51.3

53

Net electrical power (GW(e))

40

30

20

2
PWR

BWR

PHWR

0.9

1
0

LWGR

1.3

3.2

5.3

10

Number of reactors/net electrical power (GW(e))

50

FBR

Reactor type
figure 2. Reactors under construction by type and
net electrical power (as of 31 Dec. 2011).

75

76

0%

5.2%
5.0%
3.8%
3.7%
3.6%
3.5%
3.2%
1.9%
0.0%

20%

19.5%
19.3%
19.0%
18.1%
17.8%
17.8%
17.6%
15.3%

40%

Nuclear share

34.6%
33.2%
33.0%
32.6%
31.6%

43.3%
41.7%
40.9%
39.6%

47.2%

Note: The nuclear share of electricity supplied in Taiwan, China, was 19.0% of the total.

figure 3. Nuclear share of electricity generation (as of 31 Dec. 2011).

FRANCE
SLOVAKIA
BELGIUM
UKRAINE
HUNGARY
SLOVENIA
SWITZERLAND
SWEDEN
KOREA, REP.
ARMENIA
CZECH REP.
BULGARIA
FINLAND
SPAIN
USA
ROMANIA
JAPAN
UK
GERMANY
RUSSIA
CANADA
SOUTH AFRICA
ARGENTINA
PAKISTAN
INDIA
NETHERLANDS
MEXICO
BRAZIL
CHINA
IRAN, ISL. REP.
54.0%
54.0%

60%

80%

77.7%

Number of reactors

2011

12

20

23

29

64
75

80

2006 2010

2001 2005

1996 2000

1991 1995

1986 1990

74

85

86

95

99

100

1981 1985

1976 1980

Number of reactors /construction time (in months)

105

103
123

131

140

120

60

40

20

Construction time

figure 4. Worldwide median construction time in months


(as of 31 Dec. 2011).

77

78

Number of reactors

10

15

20

25

30

35

6
4

33

20
18

22
19

11

13 13
11

20

13
10

12

Reactor age (in years)

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

figure 5. Number of reactors in operation by age (as of 31 Dec. 2011).

10

11

14

21

24

32

79
Number of reactors
0

10

20

30

40

50

figure 6. Annual construction starts and connections to the grid, 1954 to 2011.

1
1
8

0
1

5
13

3
6

11

4
7

8
5
8
8

9
9
9
9
15

25

11

37

7
10

13
37

6
16

18
29

16

29

20

38

26

38

15

42

19
24

18
20

23
28

8
20
21
16

23
19
19

16

23

10

33
20

33

27
13

22

14

12

5
2

10

4
3

6
4

Construction starts

9
5

5
1

6
3
3

5
4
4
4
6

3
6
6

2
2

Grid connections

1954
1955
1956
1957
1958
1959
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011

5
3

4
4
8

10

12

16

5
4

No. 22

Where to order IAEA publications

In the following countries IAEA publications may be purchased from the sources
listed below, or from major local booksellers. Payment may be made in local
currency or with UNESCO coupons.
AUSTRALIA

DA Information Services, 648 Whitehorse Road, MITCHAM 3132


Telephone: +61 3 9210 7777 Fax: +61 3 9210 7788
Email: service@dadirect.com.au Web site: http://www.dadirect.com.au

BELGIUM

Jean de Lannoy, avenue du Roi 202, B-1190 Brussels


Telephone: +32 2 538 43 08 Fax: +32 2 538 08 41
Email: jean.de.lannoy@infoboard.be Web site: http://www.jean-de-lannoy.be

CANADA

Bernan Associates, 4501 Forbes Blvd, Suite 200, Lanham, MD 20706-4346, USA
Telephone: 1-800-865-3457 Fax: 1-800-865-3450
Email: customercare@bernan.com Web site: http://www.bernan.com
Renouf Publishing Company Ltd., 1-5369 Canotek Rd., Ottawa, Ontario, K1J 9J3
Telephone: +613 745 2665 Fax: +613 745 7660
Email: order.dept@renoufbooks.com Web site: http://www.renoufbooks.com

CHINA

IAEA Publications in Chinese: China Nuclear Energy Industry Corporation, Translation Section,
P.O. Box 2103, Beijing

CZECH REPUBLIC

Suweco CZ, S.R.O., Klecakova 347, 180 21 Praha 9


Telephone: +420 26603 5364 Fax: +420 28482 1646
Email: nakup@suweco.cz Web site: http://www.suweco.cz

FINLAND

Akateeminen Kirjakauppa, PO BOX 128 (Keskuskatu 1), FIN-00101 Helsinki


Telephone: +358 9 121 41 Fax: +358 9 121 4450
Email: akatilaus@akateeminen.com Web site: http://www.akateeminen.com

FRANCE

Form-Edit, 5, rue Janssen, P.O. Box 25, F-75921 Paris Cedex 19


Telephone: +33 1 42 01 49 49 Fax: +33 1 42 01 90 90
Email: formedit@formedit.fr Web site: http://www. formedit.fr
Lavoisier SAS, 145 rue de Provigny, 94236 Cachan Cedex
Telephone: + 33 1 47 40 67 02 Fax +33 1 47 40 67 02
Email: romuald.verrier@lavoisier.fr Web site: http://www.lavoisier.fr

GERMANY

UNO-Verlag, Vertriebs- und Verlags GmbH, Am Hofgarten 10, D-53113 Bonn


Telephone: + 49 228 94 90 20 Fax: +49 228 94 90 20 or +49 228 94 90 222
Email: bestellung@uno-verlag.de Web site: http://www.uno-verlag.de

HUNGARY

Librotrade Ltd., Book Import, P.O. Box 126, H-1656 Budapest


Telephone: +36 1 257 7777 Fax: +36 1 257 7472 Email: books@librotrade.hu

INDIA

Allied Publishers Group, 1st Floor, Dubash House, 15, J. N. Heredia Marg, Ballard Estate,
Mumbai 400 001,
Telephone: +91 22 22617926/27 Fax: +91 22 22617928
Email: alliedpl@vsnl.com Web site: http://www.alliedpublishers.com
Bookwell, 2/72, Nirankari Colony, Delhi 110009
Telephone: +91 11 23268786, +91 11 23257264 Fax: +91 11 23281315
Email: bookwell@vsnl.net

ITALY

Libreria Scientifica Dott. Lucio di Biasio AEIOU, Via Coronelli 6, I-20146 Milan
Telephone: +39 02 48 95 45 52 or 48 95 45 62 Fax: +39 02 48 95 45 48
Email: info@libreriaaeiou.eu Website: www.libreriaaeiou.eu

JAPAN

Maruzen Company, Ltd., 13-6 Nihonbashi, 3 chome, Chuo-ku, Tokyo 103-0027


Telephone: +81 3 3275 8582 Fax: +81 3 3275 9072
Email: journal@maruzen.co.jp Web site: http://www.maruzen.co.jp

REPUBLIC OF KOREA

KINS Inc., Information Business Dept. Samho Bldg. 2nd Floor, 275-1 Yang Jae-dong SeoCho-G,
Seoul 137-130
Telephone: +02 589 1740 Fax: +02 589 1746 Web site: http://www.kins.re.kr

NETHERLANDS

De Lindeboom Internationale Publicaties B.V., M.A. de Ruyterstraat 20A, NL-7482 BZ


Haaksbergen
Telephone: +31 (0) 53 5740004 Fax: +31 (0) 53 5729296
Email: books@delindeboom.com Web site: http://www.delindeboom.com
Martinus Nijhoff International, Koraalrood 50, P.O. Box 1853, 2700 CZ Zoetermeer
Telephone: +31 793 684 400 Fax: +31 793 615 698
Email: info@nijhoff.nl Web site: http://www.nijhoff.nl
Swets and Zeitlinger b.v., P.O. Box 830, 2160 SZ Lisse
Telephone: +31 252 435 111 Fax: +31 252 415 888
Email: infoho@swets.nl Web site: http://www.swets.nl

NEW ZEALAND

DA Information Services, 648 Whitehorse Road, MITCHAM 3132, Australia


Telephone: +61 3 9210 7777 Fax: +61 3 9210 7788
Email: service@dadirect.com.au Web site: http://www.dadirect.com.au

SLOVENIA

Cankarjeva Zalozba d.d., Kopitarjeva 2, SI-1512 Ljubljana


Telephone: +386 1 432 31 44 Fax: +386 1 230 14 35
Email: import.books@cankarjeva-z.si Web site: http://www.cankarjeva-z.si/uvoz

SPAIN

Daz de Santos, S.A., c/ Juan Bravo, 3A, E-28006 Madrid


Telephone: +34 91 781 94 80 Fax: +34 91 575 55 63
Email: compras@diazdesantos.es, carmela@diazdesantos.es, barcelona@diazdesantos.es,
julio@diazdesantos.es
Web site: http://www.diazdesantos.es

UNITED KINGDOM

The Stationery Office Ltd, International Sales Agency, PO Box 29, Norwich, NR3 1 GN
Telephone (orders): +44 870 600 5552 (enquiries): +44 207 873 8372 Fax: +44 207 873 8203
Email (orders): book.orders@tso.co.uk (enquiries): book.enquiries@tso.co.uk Web site: http://
www.tso.co.uk
On-line orders
DELTA Int. Book Wholesalers Ltd., 39 Alexandra Road, Addlestone, Surrey, KT15 2PQ
Email: info@profbooks.com Web site: http://www.profbooks.com
Books on the Environment
Earthprint Ltd., P.O. Box 119, Stevenage SG1 4TP
Telephone: +44 1438748111 Fax: +44 1438748844
Email: orders@earthprint.com Web site: http://www.earthprint.com

UNITED NATIONS

Dept. I004, Room DC2-0853, First Avenue at 46th Street, New York, N.Y. 10017, USA
(UN) Telephone: +800 253-9646 or +212 963-8302 Fax: +212 963-3489
Email: publications@un.org Web site: http://www.un.org

UNITED STATES OF AMERICA

Bernan Associates, 4501 Forbes Blvd., Suite 200, Lanham, MD 20706-4346


Telephone: 1-800-865-3457 Fax: 1-800-865-3450
Email: customercare@bernan.com Web site: http://www.bernan.com
Renouf Publishing Company Ltd., 812 Proctor Ave., Ogdensburg, NY, 13669
Telephone: +888 551 7470 (toll-free) Fax: +888 568 8546 (toll-free)
Email: order.dept@renoufbooks.com Web site: http://www.renoufbooks.com

Orders and requests for information may also be addressed directly to:
Marketing and Sales Unit, International Atomic Energy Agency
Vienna International Centre, PO Box 100, 1400 Vienna, Austria
Telephone: +43 1 2600 22529 (or 22530) Fax: +43 1 2600 29302
Email: sales.publications@iaea.org Web site: http://www.iaea.org/books

12-24221

REFERENCE DATA SERIES No. 2


2012 Edition

Nuclear
Power
Reactors
in the World

INTERNATIONAL ATOMIC ENERGY AGENCY


VIENNA
ISBN 9789201323101
ISSN 10112642

Vous aimerez peut-être aussi