Vous êtes sur la page 1sur 63

Delivering Reliable and Quality Power

14 February 2012

1
Copyright Singapore Power Group. All rights reserved.

World Map

Distance Between Saudi Arabia & Singapore 6637.6km hours (flight duration) 8.5

Copyright Singapore Power Group. All rights reserved.

Asia Middle-East

Singapore Island size: 712 sq km East-west: 42km North-south: 23km Population 5 million

Copyright Singapore Power Group. All rights reserved.

Singapore Power Group Assets


Total Assets: S$31.1B

Australia 69% ~ S$21.5B Singapore

Singapore 31% ~ S$9.6B

Australia

Australian Business is a Significant Part of SP


Copyright Singapore Power Group. All rights reserved.
4

Singapore Power
Singapore Power Limited
Singapore Operations
Main Businesses Other Businesses SP Training & Consultancy Company SP Telecommunications Singapore District Cooling (60%) Power Automation (51%) SP AusNet (51%) SPI Management Services (SPIMS) SPI (Australia) Assets Jemena Asset Mgt Co (JAM)

Australia Operations

SP PowerAssets (SPPA)
PowerGas SP PowerGrid (SPPG) SP Services

Asset Company

Management Company

Copyright Singapore Power Group. All rights reserved.

Group Business Profile


Our Focus
Generation Transmission

Distribution

Retail

ELECTRICITY

Singapore
Australia
Production

SPPA SPN
Transmission

SPPA SPN SPIAA


Distribution

SPS

(Billing & Market Support)


Retail

GAS
Singapore Australia SPIAA PGas PGas SPN SPIAA

Our Electricity and Gas T&D


Copyright Singapore Power Group. All rights reserved.
6

Generation
GW h
44,000 42,000 40,000 38,000 36,000 34,000 32,000 30,000 28,000 26,000 24,000 22,000 20,000 18,000 16,000 14,000 12,000 10,000 8,000 6,000 4,000 2,000 0

Electricity Demand (GWh)


34,764 35,922 37,424 37,940 37,974 41,199

33,314

2004

2005

2006

2007

2008

2009

2010

Maximum Demand: 6,494 MW

6 major power generation companies (Generation capacity 10,000

MW) Large reserve margin (60%) Fuel mix: 80% natural gas, 20% fuel oil
Copyright Singapore Power Group. All rights reserved.
7

Singapore T & D Network


400kV Network

230kV Network

66kV Network

22kV and 6.6kV Network

Low Tension Network 400/230 Volts

Low Tension Consumers


Copyright Singapore Power Group. All rights reserved.

1.3 million customers

Maximum demand : 6,494 MW

Electricity Network Assets

Transmission

Distribution

Substations: 104 Transmission Cables: 6,236km Cable Joints: 27,050

Substations: 10,093 Distribution Cables: 23,519km Cable Joints: 233,207

As at 31 Mar 2011

Copyright Singapore Power Group. All rights reserved.

Fully Underground Cable Network

Singapores Network Performance


Time (min)
35

System Average Interruption Duration Index, SAIDI

30

25

SCADA & closed ring operation of 22kV network


33.1

20

15

27.4

Application of Condition Monitoring


10 10.7 7.4 6.2 3.9 5 3.9 3.7 4 3.9 2.2 2 2.2 1.5 0.5 1.2 1.14 0.69 0.3 0.7

91/92 92/93 93/94 94/95 95/96 96/97 97/98 98/99 99/00 00/01 01/02 02/03 03/04 04/05 05/06 06/07 07/08 08/09 09/10 10/11

Copyright Singapore Power Group. All rights reserved.

Continual Improvement in SAIDI

10

International Benchmarking
(mins/cust/year)

Distribution Reliability Index - SAIDI

Copyright Singapore Power Group. All rights reserved.

Source: KEMA Price and Performance Benchmarking Report 2010

11

Singapores Network Performance


0.5

System Average Interruption Frequency Index, SAIFI


0.4

0.3

0.44

0.2

0.31 0.23

0.1
0.17 0.14 0.12 0.11 0.07 0.09
0.1

0.07

0.07

0.05

0.04

0.03

0.01

0.03

0.023

0.007 0.016

0.04

0
91/92 92/93 93/94 94/95 95/96 96/97 97/98 98/99 99/00 00/01 01/02 02/03 03/04 04/05 05/06 06/07 07/08

08/09

09/10 10/11

Copyright Singapore Power Group. All rights reserved.

Continual Improvement in SAIFI

12

International Benchmarking
(Interruptions/cust/year)

Distribution Reliability Index - SAIFI

Copyright Singapore Power Group. All rights reserved.

Source: KEMA Price and Performance Benchmarking Report 2010

13

Number of Incident-Free Days


( FY 05/06 to FY 10/11)
5.5 mths

No. of 150 Incident-free Days


3.7 mths

4.6 mths 4.0 mths 3.7 mths

100

3.1 mths

167 113 93 122 141 112

50

0 FY 05/06 FY 06/07 FY 07/08 FY 08/09 FY 09/10 FY 10/11

15

FY 11/1
14

Copyright Singapore Power Group. All rights reserved.

Grid Charge

Copyright Singapore Power Group. All rights reserved.

15

Industrial Customer
HT Connected at 22kV
Low Price Low Performance Low Price High Performance

Singapore (2006)

SAIDI (mins/cust/year)
Hong Kong (2006)

Tokyo (2006) New York

Low Performance
Copyright Singapore Power Group. All rights reserved.

High Price

High Performance
Source: KEMA Grid Price and Performance Benchmarking Report, 2010
16

High Price

The Roles of T&D Companies


Deliver comfort and convenience to customers at affordable tariff rate Powering the economy of the country, state, city served

Copyright Singapore Power Group. All rights reserved.

17

Common Challenges Faced by Most Utilities


Inadequate capital for strengthening the network Mindset problems

Copyright Singapore Power Group. All rights reserved.

18

Inadequate Capital?

Preventing equipment failures will save capital fund


Copyright Singapore Power Group. All rights reserved.
19

Termination Failure Unable to Find the Root Causes

Copyright Singapore Power Group. All rights reserved.

20

Changing The Mindset

Key Challenges: Inherited Culture Historical Experience Perception of Norms Exposure

Copyright Singapore Power Group. All rights reserved.

Unlearning and Relearning

21
21

The People
Quality Workforce:
Dedication Knowledgeable Professionalism Openness Willingness

22
Copyright Singapore Power Group. All rights reserved.
22

Asset Management Objectives


Cost Efficiency Reliability Quality

Asset Management Policies

Network Planning

Engineering & Procurement

Project Implementation

Operation & Maintenance

Renewal

Balance between resources & performance


Copyright Singapore Power Group. All rights reserved.
23

At the Macro Level


Asset Management Strategy
Setting Policies Defining Processes

The People

The Equipment

Copyright Singapore Power Group. All rights reserved.

24

Are we doing things first time right?

Copyright Singapore Power Group. All rights reserved.

25

Network Planning
Planning Guidelines and Criteria
No overloading Available alternative Simple to operate

Other Consideration
Planned Network Redundancy Spare capacity for load growth Flexibility for network expansion

26
Copyright Singapore Power Group. All rights reserved.
26

Network Construction
Quality Management System
Contractor workers registration system Contractor workers training Enforcement for using proper tools

Doing Things First Time Right


No repeating of same known mistakes Root cause analysis Information sharing and education

Five Years Warranty

Copyright Singapore Power Group. All rights reserved.

27

Evolution of Maintenance Practices


Historical

Post-Fault Repairs
Preventive

Predictive
Condition-Based

New Approach

Copyright Singapore Power Group. All rights reserved.

28

Condition-Based Maintenance

Copyright Singapore Power Group. All rights reserved.

29

Maintenance Policy

Adoption of Condition-based Maintenance Regime

Combination of scheduled

periodic and condition-based


Time-based Maintenance OEM Recommendation Leverage condition results to fine-tune maintenance cycles maintenance

Copyright Singapore Power Group. All rights reserved.

30

Network Health Screening

Condition Monitoring Systems


Thermal Scanning Dissolved Gas Analysis Oil Pressure Monitoring Distributed Temperature Sensing

What they detect


Overheating Abnormal oil contents Low pressure Hot spots

Applied to
Equipment Equipment & cables Cables Cables

Oscillating Wave Test System


Partial Discharge Monitoring Operating Mechanism Monitoring
Copyright Singapore Power Group. All rights reserved.

Low insulation
Minute current leakage Abnormal operation

Cables
Equipment & cables Equipment
31

Condition Dashboard for 230kV Cable Joints

Oil Sampling at Cable Joint

Copyright Singapore Power Group. All rights reserved.

Dissolved Gas Analysis

32

Cable Oil Pressure Monitoring System

Copyright Singapore Power Group. All rights reserved.

Keeping underground cables healthy

33

Security & Operation Surveillance

Copyright Singapore Power Group. All rights reserved.

Keeping close watch on vital Installations

34

Network Failures Averted


Network FY 01/02 FY 02/03 FY 03/04 FY 04/05 FY 05/06 FY 06/07 FY 07/08 FY 08/09 FY 09/10 FY 10/11 FY 11/12 Total

400kV

11

230kV

10

51

66kV

13

11

56

22kV

27

11

23

31

36

45

11

15

15

40

24

278

6.6kV

41

39

34

39

14

23

31

16

246

Total

30

23

67

80

55

93

69

43

55

81

46

642*

*Up to 31 Dec 2011


Copyright Singapore Power Group. All rights reserved.
35

Condition Monitoring on Underground Cables


Journey of OWTS 2007 22kV & 6.6kV Cables Successfully averted 132 potential cable failures 2008 66kV Cables 2009 230kV Cables Worlds first test

Copyright Singapore Power Group. All rights reserved. Copyright Singapore Power Ltd. All rights reserved.

Oscillating Waveform Testing Fleet

36

Benefits of Condition Monitoring


Higher Reliability of Network Cost Savings

Condition Monitoring More Effective Maintenance Policy Safer Working Environment

Learning will form basis for a long-term Condition Monitoring program

Copyright Singapore Power Group. All rights reserved.

37

Benefits of Condition Monitoring for Asset Management


Preserving reliability and quality of supply
Less faults to weaken network Short downtime

Rectification cost is much cheaper than repair cost


Evidence of root cause not destroyed

Copyright Singapore Power Group. All rights reserved.

38

Network Asset Management Process


Doers
Assets
Online Equipment & Cables Manual

Detection
Current leakage High temperature Low pressure Dissolved gases Gas quality Manual Download

Data Management Data Transmission


Optical Fibre Network Expert System Man-machine Interface

Reliability & Quality Enhancement


Repair Replacement Review monitoring programme Review maintenance Review design Decision

Specialist Diagnosis

Trending Analysis

Thinkers

Copyright Singapore Power Group. All rights reserved.

Thinkers & Doers working closely together

39

Network Asset Management System


High Quality

Customers

Low Price

Reduce Failures Condition Monitoring Programme

Optimise Costs Condition-Based Maintenance Programme

Network Asset Management

Condition Monitoring
Copyright Singapore Power Group. All rights reserved.
40

Copyright Singapore Power Group. All rights reserved.

41

Fast Response and Customer Satisfaction

Copyright Singapore Power Group. All rights reserved.

42

Commitment to Customers
Fast response
12.5 kVA generator set

Copyright Singapore Power Group. All rights reserved.

43

Mobile Generators

Copyright Singapore Power Group. All rights reserved.

44

Important Message to Customers

Copyright Singapore Power Group. All rights reserved.

45

Constant Update to Customers

Supply Restored

Outage in progress

Copyright Singapore Power Group. All rights reserved.

46

Special Arrangements for Customers

Portable Lighting

Small generator set

Copyright Singapore Power Group. All rights reserved.

Serving Customer with a Heart

47

Customer Relations
Customer Manager Programme Power Quality Advisory Panel

Power Quality Interest Groups


Knowledge Sharing with Customers E-Bulletin POWERCONNECT

Customer Satisfaction Survey

Copyright Singapore Power Group. All rights reserved.

48

Customer Manager Programme

Copyright Singapore Power Group. All rights reserved.

49

Power Quality Advisor Panel

Copyright Singapore Power Group. All rights reserved.

50

Power Quality Interest Groups


Semiconductor Petrochemical Pharmaceutical

Essential Services Finance & Banking

Copyright Singapore Power Group. All rights reserved.

51

Knowledge Sharing with Customers

Copyright Singapore Power Group. All rights reserved.

Working together to improve Power Quality

52

PowerConnect

Copyright Singapore Power Group. All rights reserved.

53

Annual Customer Satisfaction Survey


2010 2009
8.6 8.6 8.4 8.3 8.1 7.5 6.6

2008
2007

2006
2005 2004

0.00

2.00
Very Poor

4.00
Poor

6.00
Average

8.00
Good

10.00
Very Good
54

Copyright Singapore Power Group. All rights reserved.

Customer-Centric Service
Past
Network Planning Customers Engineering Design Network Development Maintenance & Operation

Electricity Supply Chain Electricity Supply Ring

Present

Our work Our performance Our service


Customers

Copyright Singapore Power Group. All rights reserved.

Engage customers through customer managers

55

Holistic & Systemic Approach


Network Planning & Design
Asset Management Quality Management

Industrial/ Commercial/ Residential & VIP Customers

Network Operations & Maintenance


Risk Management
Copyright Singapore Power Group. All rights reserved.

Network Creation

56

Structure

People

The Critical Success Factors Policies Processes

Systems

Copyright Singapore Power Group. All rights reserved.

57

Our Technology Applications


Wide Range of Applications
Remote control Remote status monitoring Remote measurement Remote CCTV Remote meter reading Security surveillance system Authorized fire alarm monitoring centre Mobile phone authentication for access control Fleet management system

ExpertSystem
1 2 4 5 7 8 * 8 3 6 9 #

IPPhone
Equipment

ISOS Substation

Substation

IES

Substation

PDM

1 2 4 5 7 8 * 8

3 6 9 #

IPPhone RTU IndustrialPC IndustrialPC RTU

COP

SCM Video

Substation PDM

ISOSS

DVR IES

BACS CONTROLLER

Communications Network

NetworkMangement

Cable Substation

COP

NMS-I RTU

1 2 3

IPPhone
Equipment

NMS-II

4 5 6 7 8 9 * 8 #

Substation Sub Station IPPhone HMI SCM

1 2 3 4 5 6 7 8 9 * 8 #

Communication Network

Copyright Singapore Power Group. All rights reserved.

Elements for Smart Grid and ECO City Application

58

Managing the Transmission and Distribution Business

An Art or A Science
Copyright Singapore Power Group. All rights reserved.
59

Reliability and Quality Roadmap


Condition Monitoring Programme Condition Based Quality Maintenance Programme Management System

Systemized Contingency Operation Plan

Asset Replacement Programme

Prevention Containment
Operational Readiness and Fast Response Business Continuity Management

Asset Security and Protection

Reliability & Quality - Power Delivery


Generators Mobilisation

Network Protection System

Remote Control and Monitoring Capability

Systemized Contingency Operation Plan

Copyright Singapore Power Group. All rights reserved.

60

Sharing SPs Expertise Overseas

CESC Limited, India

2010 Shanghai World Expo

2008 Beijing Olympics

2010 Guangzhou Asian Games World Cup 2010 Johannesburg, South Africa

Help Others to Make Dreams Come True


Copyright Singapore Power Group. All rights reserved.
61

Modes of Co-operation
Sharing of knowledge and experience at Utilities Companies Skills transfer for condition monitoring Singapore as the Training Centre for potential leaders and engineers

Seeing is Believing
Copyright Singapore Power Group. All rights reserved.
62

See You in Singapore

Tan Teck Lee


teckleetan@singaporepower.com.sg Telephone: (+65) 63788849
63
Copyright Singapore Power Group. All rights reserved.

Vous aimerez peut-être aussi