Académique Documents
Professionnel Documents
Culture Documents
YEAR
MONTH
18
2012
JUNE
S.No
Region
Territory
Railways
Date IN
Time IN
Section
AM (HQ)
Duct
FAILURE CODE
Date RT
Time RT
RM
Customers Affected
E1's
E1's RM
P/ NP
Agency
Remarks
Status
Maint. (RCIL/Rly)
Date
NR
LKO
NR
18/6/12
9:45
Utratia-Raibareli-Pratapgarh
Raibareli
PRATAPGARH - RAIBAREILLY(STM16/T)
FCRC
18/6/12
12:00
2:15:00
NIL
NIL
OFC cut at 50Km from Raibareli towards Pratapgarh by Rly Engineering Deptt at Km no-953/1,RLY Quad cable not present ,Duct present & Bricks not present,Cable was at depth of 1m at a distance of 9.5m from the nearest track and Cable as per ABD.
Closed
RCIL
18/6/2012
39000
9:55
NR
CDG
NR
18/6/12
12:00
Haridwar
RCIL
18/6/12
12:35
0:35:00
NIL
NIL
Sky Lark
Media disturbed at 4.5km from DDN towards HW by Team during Rectification of break Fiber,RLY Quad cable not present ,Duct present & Bricks not present,Cable was Closed at depth of 1m at a distance of 30m from the nearest track and Cable as per ABD. Media one way b/w NIC/CGO2 - ERNET(STM4/T) due to Patch Chord Disturbed by Unknown at NIC/CGO end Closed and delay due to entry not permitted at NIC/CGO & ERNET End. Media one way b/w HW - IIP/DDN(STM4/T) and restored after JO-JI & Cooling the SFP at HW End,A.C Faulty at HW end due to which high temperature issue at HW. Overhead OFC Cut at 120m & 240m from DGS&D towards DAAK/BHAWAN by Unknown,Cable in LMC Area.Delay due to DGS&D Closed in Sunday and team busy in restoration THRD - VAISH BANK. OFC cut at 10.4Km from NDLS towards GZB by labour of S&T Deptt,RLY Quad cable not present ,Duct not present & Bricks not present,Cable was Temporary Overhead at a distance of 2m from the nearest track and Cable as per ABD.AIRCEL ckt was down due to Airtel/kapashera - GGN and NDLS - GZB and Came up after NDLS - GZB restored. Overhead OFC Cut at 520m from TV9 towards Andra Bank by JC Damaged Unknown,Cable in LMC Area. Overhead OFC Cut at 7km from GGN towards Airtel/Kapashera by Miscreants,Cable in LMC Area,Delay due to Team busy another Fault.Idea Dark Fiber down and Came up after Cut restored. OFC cut at 4.5Km from PALI towards MARWAR by JCB of R.S.E.B Deptt during N.H Work,RLY Quad cable present and Damaged ,Duct not present & Bricks present,Cable was at depth of 1.2m at a distance of 10m from the nearest track and Cable not as per ABD.SBI ckt was down and came up after OFC cut Restored. Media one way at NBPGR/PUSA - NDLS6(STM16/T) and restored after Cleaning patch chord at NDLS end,Rx=-25.6dbm. DS Alarm at UMB(25) from KUN(28) in STM16/A Link due to losses in JC at SZM & MOY & Alarm cleared after Resplicing b/w SZM & MOY, This failure attend by Rohtak Team,Delay due to Rohtak team busy in another Activity. Overhead OFC cut at 600m from BOT towards SBI/Bangla Sahib by Unknown,Cable in LMC Area. Overhead OFC cut at 400m from DSCB towards RBI by Unknown,Cable in LMC Area. Overhead OFC cut at 1500m,2KM from THRD towards VAISH by Unknown,Cable in LMC Area.
Closed
RCIL
18/6/2012
12:05
NR
DLI
NR
17/6/12
18:10
South - East Delhi incl.Ghaziabad & Noida section Saharanpur-LaksarNaziababad& Laksar-Dehradun LMC DDN,HW,RK
Thomson Road
NIC/CGO2 - ERNET(STM4/T)
PTB
18/6/12
12:35
18:25:00
NIL
NIL
M.S.Contractor
RCIL
18/6/2012
38345
NR
CDG
NR
18/6/12
15:45
Haridwar
HW - IIP/DDN(STM4/T)
HWT
18/6/12
18:00
2:15:00
NIL
NIL
Sky Lark
RCIL
18/6/2012
39070
NR
DLI
NR
17/6/12
15:45
Thomson Road
FBO
18/6/12
15:35
23:50
NIL
NIL
Maruti
Closed
RCIL
18/6/2012
38976
12:30
NR
DLI
NR
18/6/12
15:15
Thomson Road
FCRC
18/6/12
18:30
3:15
3:15:00
M.S.Contractor
Closed
RCIL
18/6/2012
39071
15:30
NR
DLI
NR
18/6/12
13:50
Thomson Road
FBO
18/6/12
16:30
2:40
NIL
NIL
Maruti
Closed
RCIL
18/6/2012
39015
16:00
NR
DLI
NR
18/6/12
13:35
Thomson Road
GGN - AIRTEL/KAPASHERA(STM16/T)
FBO
18/6/12
21:35
8:00
8:00:00
Maruti
Closed
RCIL
18/6/2012
39013
18:30
NR
JP
NWR
18/6/12
16:00
Sendra-Marwar-Jodhpur
Pali
MIS
18/6/12
21:00
5:00:00
5:00:00
NP
ITPL
Closed
RCIL
18/6/2012
39067
16:30
10
NR
DLI
NR
18/6/12
9:00
Thomson Road
NBPGR/PUSA - NDLS6(STM16/T)
PTB
18/6/12
9:40
0:40
NIL
NIL
Maruti
Closed
RCIL
18/6/2012
38997
11
NR
CDG
NR
17/6/12
21:20
Panipat
FBO
18/6/12
10:00
12:40:00
NIL
NIL
Sky Lark
Closed
RCIL
18/6/2012
38980
12
NR
DLI
NR
16/6/12
13:00
OFC/DLI/IDRBT/BOT - SBI/BANGLA/SAHIB
FBO
16/6/12
19:35
6:35
NIL
NIL
Maruti
Closed
RCIL
18/6/2012
38884
13
NR
DLI
NR
15/6/12
10:30
OFC/DLI/IDRBT/DSCB - SPMCIL
FBO
16/6/12
14:37
28:07:00
NIL
NIL
Maruti
Closed
RCIL
18/6/2012
38836
14
NR
DLI
NR
17/6/12
10:30
OFC/DLI/IDRBT/THRD - VAISH
FBO
17/6/12
13:45
3:15:00
NIL
NIL
Maruti
Closed
RCIL
18/6/2012
38836
11:30
12:05
12:00
16:00
15:45
18:00
17:00
9:10
5:00
DAY
YEAR
MONTH
18
2012
JUNE
S.No
Region
Territory
Railways
Date IN
Time IN
1 2 3 4
NR NR NR NR
NR NR NR NR
5 6
NR NR
CDG LKO
NR NCR
18/6/12 18/6/12
19:45 18:25
Section Ludhiana-Sanehwal-Sirhind -Una & LMC at Ropar North - West incl.Gurgaon Section North - West incl.Gurgaon Section Saharanpur-Laksar-Naziababad& Laksar-Dehradun LMC DDN,HW,RK Moradabad-Bareilly-Shajahanpur Bharwari-Allahabad-Meja Rd& Allahabad-Manikpur
AM (HQ)
Bareilly
Allahabad
Duct
Failure Code LF LF LF LF
Date RT
LF LF
18/6/12 19/6/12
Time RT
RM
Customers Affected N N N N
E1's
23:25 6:35
3:40:00 12:10:00
N N
NIL NIL
E1's RM
P / NP
Agency
P P P P
NIL NIL
P P
Remarks
Status
Date
Partial OFC Cut and Fiber Maintained by HFCL OFC Cut and Fiber Maintained by IDEA. Media disturbed and Fiber Maintained by IPCON Media disturbed and Fiber Maintained by TCL OFC Cut and Fiber Maintained by MULTI CHANNEL Media disturbed and Fiber Maintained by Northern Railway.
Closed Closed
RCIL RCIL
18/6/2012 18/6/2012
Team Reached Fault Card OTDR Done at site At No. At (hh:mm) (hh:mm) 38959 38996 38977
39077 39068
DAY
YEAR
MONTH
18
2012
JUNE
S.No
Region
Territory
Railways
Date IN
Time IN
NR
CDG
NR
16/6/12
6:40
NR
CDG
NR
18/6/12
11:35
Section Saharanpur-Laksar-Naziababad& LaksarDehradun LMC DDN,HW,RK Ludhiana-Sanehwal-Sirhind -Una & LMC at Ropar
AM (HQ)
Haridwar
Ropar
Duct
Failure Code AC
RCIL/DDN2 - DEAL/DDN(STM4/T)
ROPAR(A) - IIT/ROPAR(T)(STM16)
AC
Date RT
Time RT
RM
Custome rs Affected N
18/6/12
14:40
8:00:00
18/6/12
12:00
0:25:00
E1's
E1's RM
P / NP
NIL
NIL
NIL
NIL
Agency
Remarks Power supply issue at DEAL/DDN and Maintained by same. Power supply issue at IIT/ROPAR and Maintained by same.
Status
DEAL/DDN
Closed
IIT/ROPAR
Closed
Date
18/6/2012
RCIL
18/6/2012
39006
FORMAT FOR SUMMARY OF FAILURES OF NORTHERN REGION (UPDATED : 05/11/2011) S.No Region Territory Railways Date IN Time IN Section AM (HQ) From-To (STATION/FAILURE SECTION) Duct Failure Date RT Code Time RT RM Custome rs Affected N E1's E1's RM P / NP Agency Remarks Status Maint. (RCIL/Rly) Date
NR
CDG
NR
0:00
Pathankot-Jammu Tawi-Udhampur Ludhiana-Sanehwal-Sirhind -Una & LMC at Ropar Rampur-Rudrapur-Kathgodam & Lalkua-Bareli City Jalandhar-Amritsar-Pathankot
Jammu
0:00
0:00:00
NIL
NIL
RCIL
NR
CDG
NR
0:00
Ropar
0:00
0:00:00
NIL
NIL
RCIL
NR
CDG
NER
0:00
Rudrapur
0:00
0:00:00
NIL
NIL
Deptt. Team
RCIL
NR
CDG
NR
0:00
Amritsar
0:00
0:00:00
NIL
NIL
RCIL
NR
CDG
NR
0:00
Shakurbasti-Rohtak-Bhatinda
Rohtak
0:00
0:00:00
NIL
NIL
NP
RCIL
NR
CDG
NR
0:00
Panipat
0:00
0:00:00
NIL
NIL
NP
No Team
RCIL
NR
CDG
NR
0:00
Moradabad-Bareilly-Shajahanpur Saharanpur-Ambala-Sirhind, AmbalaChandigarh ,including Ambala yard & Ambala LMC Chandigarh- Kalka-Shimla including KLK LMC Ludhiana-Jalandhar-Pathankot Saharanpur-Laksar-Naziababad& Laksar-Dehradun LMC DDN,HW,RK Narela-Ambala including LMC at Sonepat & Karnal Nazibabad- Moradabad-AmrohaHapur, North - Central Delhi section North - West incl.Gurgaon Section South - East Delhi incl.Ghaziabad & Noida section Delhi Area arial IDRBT team Hapur-Gaziabad-Aligarh-Pora Gaziabad-Meerut-Saharanpur
Bareilly
0:00
0:00:00
NIL
NIL
Deptt. Team
RCIL
NR
CDG
NR
0:00
Ambala
0:00
0:00:00
NIL
NIL
Sunny Electronics
RCIL
NR
CDG
NR
0:00
CDG
0:00
0:00:00
NIL
NIL
RCIL
10
NR
CDG
NR
0:00
Jalandhar
0:00
0:00:00
NIL
NIL
RCIL
11
NR
CDG
NR
0:00
Haridwar
0:00
0:00:00
NIL
NIL
RCIL
12
NR
CDG
NR
0:00
Panipat
0:00
0:00:00
NIL
NIL
Sky Lark
RCIL
13 14 15 16 17 18 19
NR NR NR NR NR NR NR
NR NR NR NR NR NCR NR
Moradabad Thomson Road Thomson Road Thomson Road Thomson Road Aligarh Meerut
N N N N N N N
P P P P P P P
20
NR
DLI
NCR
0:00
Pora-Sikhobad, Tundla-Agra-Dholpur
Agra
0:00
0:00
NIL
NIL
ITPL
RCIL
21 22 23 24 25 26 27 28 29
NR NR NR NR NR NR NR NR NR
Dholpur-Dabra-Jhansi Faridabad-Mathura-Agra Jhansi-Lalitpur-Bina Shajahanpur-Hardoi-Lucknow Meja Rd.-MGS-BSB-Aurihar Luckhnow local Area- LMC Bhatni-Siwan-Chhapra Deoria-Gorakhpur-Kalilabad& GKPValmikiNagar Incl LMC-GKP Nihalgarh-Jaunpur-Varanasi Pratapgarh-Janghai-Zafrabad& Janghai-ALD Aurihar-Bhatni-Deoria
N N N N N N N N N
P P P P P NP P P P
Deptt. Team ITPL Uma Construction RST infocom MS Contractor Deptt. Team Uma Construction UMA Constt. RST infocom
30
NR
LKO
NR
0:00
Lucknow
0:00
0:00:00
NIL
NIL
Mehta Infocom
RCIL
31
NR
LKO
NER
0:00
Mau
0:00
0:00:00
NIL
NIL
MS Contractor
RCIL
32 33 34 35 36 37
NR NR NR NR NR NR
Ajgain-Kanpur-Fatehpur-Bharwari Khalilabad-Gonda-Bhurwal Sikhoabad-Etawah-Kanpur Utratia-Raibareli-Pratapgarh Burhwal-Lucknow-Ajgain, &LucknowNihalgarh Bharwari-Allahabad-Meja Rd& Allahabad-Manikpur Jaipur-Ajmer-Sendra
N N N N N N
P P P P P P
ITPL UK Traders M.S Contractor Triveni Metal works RST INFOCOM RST infocom Gujrat Scale Industries Anarc Networking ITPL V.Tech ITPL Deptt. Team
38
NR
JP
NWR
0:00
Ajmer
0:00
0:00:00
NIL
NIL
NP
RCIL
39 40 41 42 43
NR NR NR NR NR
JP JP JP JP JP
N N N N N
P P P NP P
Brief Description
Fiber improvement Block.
Detailed Description
Code
Miscellaneous Block.
3 4 5
OFC cut by Railway Contractors. OFC cut by Miscreants. OFC damage due to fire, flood or other agencies (other than railway contractors). Damage of system of Agitation, theft of equipments etc. OFC break in Joint Closer, damage by ants in JC. Overhead/Aerial OFC damage/theft/break. Pigtail cut by rat/or dust in pigtail connector/patch chord. Failure due to staff mistake. Charger Problem. Battery discharge. AC power failure/DG failure.
Change of a portion of OFC, block for reducing losses, Change or any FIB work in FMS, repair of broken unused fiber, Replacement of broken JC. Eqpt. shifting, Eqpt/card Change, Work of power supply such as MB change of battery charger/batteries, provision of second source of supply, under gounding the temporary aerial OFC, new connectivity, RUB/ROB works related blocks. Partial or complete cut by Railway contractor or Railway staff. FCRC Partial or complete cut by miscreants. FCM
Only OFC related problems not covered in FCRC, FCM, FBJC,FBO, MIS PTB, RCIL to be included and Damage of system of Agitation, theft of equipments. Any JC related problem, fiber break in FMS, or one fiber break at unknown place, Fiber swapping All Aerial problems to be mentioned here. Pig tail broken, cut by rat or bent, Patch chord problem of any type, 0dB connector/ attenuator problem, OFC/EQPT related failures caused by staff intentionally or unintentionally, Alcatel booster door open. Charger, UPS, AC to DC converter, stabilizer problem. Battery discharged due to any reason, DC MCB tripped, reason unknown for node down/reboot Prolonged AC mains failure, AC MCB tripped, AC wiring burnt. FBJC FBO PTB RCIL CH BD AC HWA SWA HWT SWT HWW SWW HWF SWF HWU
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Hardware problem in Alcatel equipment. H/W problems due to any reason may be high temp, seepage, flood, smoke etc. Software problem with Alcatel Misbehaving eqpt., hanging of Eqpt., equipment. Hardware problem in Tejas equipment. H/W problems due to any reason may be high temp, seepage, flood, smoke etc. Software problem with Tejas equipment. Misbehaving eqpt., hanging of Eqpt., Hardware problem in WRI equipment. Software problem with WRI equipment. H/W problems due to any reason may be high temp, seepage, flood, smoke etc. Misbehaving eqpt., hanging of Eqpt.,
22 23
Hardware problem in Fibcom equipment. H/W problems due to any reason may be high temp, seepage, flood, smoke etc. Software problem with Fibcom Misbehaving eqpt., hanging of Eqpt., equipment Hardware problem in UT Starcom By the time new code is created, all Eqpt problems related to the equipment. eqpts other than mentioned here to be included in this column. Switch problem, media converter, MRO TEK problem, Router Software problem with UT Starcom equipment. Leased fiber.
SWU LF