REV: A

DONG FANG STEAM TURBINE WORKS

PROJECT: CLIENT: LOCATION: CONTRACTOR:

REFERENCE ONLY

JOB. NO:

E03033

PT. SUMBER SECARA PRIMADAYA KARANG TALUN VILLAGE, CILACAP, ENTRAL JAVA, INDONESIA CHENGDA ENGINEERING CORPORATION OF CHINA

N300-16.7/537/537-8

Start-up and Operational Manual for Steam Turbine

STD NO. (WE) D300N-000106ASM

STD NO. (WE) D300N-000106ASM

DES CHECK VER MFG

STD ENGR APP

STD NO. (WE) D300N-000106ASM

DES CHECK VER MFG

STD ENGR APP

Start-up and Operational Manual for Steam Turbine

(WE)D300N-000106ASM

Content

No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

Chapter -Section Preface 1 1-1 2 2-1 2-2 2-3 3 3-1 3-2 3-3 4 4-1 4-2 4-3 5 5-1 5-2 5-3 6 6-1 6-2 6-3 6-4 7

Name

Page 2 1 2 1 7 5 6 1 14 5 6 1 2 2 2 1 2 1 2 1 and 1 5 2 2 1 Start-up

Remark

Essential Conditions for Start-up Inspection before Start-up Start-up with IP casing (IP) Start-up under Cold State (IP) Start-up under Warm State (IP) Start-up under Hot State and Extremely Hot State (IP) Combined Start-up of HIP Casing (HIP) Start-up under Cold State (HIP) Start-up under Warm State (HIP) Start-up under Hot State and Extremely Hot State (HIP) Operation Normal Operation Varying Duty Operation Abnormal Operation Shutdown Slide Parameter Shutdown Rated Parameter Shutdown Emergency Shutdown Restrictions for Start-up and Operation Restrictions Operation for Prohibiting

Limits for Start-up and Operation General Precautions Regular Check and Test Auxiliary Operation of Start-up and Shutdown

Start-up and Operational Manual for Steam Turbine

(WE)D300N-000106ASM

26 27 28

7-1 7-2 7-3

Pre-warming of HP casing Heating System of HP casing Interlayer Water Spray System of LP casing of Steam Turbine Emergency Discharge System

2 2 1 1

29

7-4

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

Preface The start-up mode described in this manual is proposed according to the structural features of main body of 300MW steam turbine made by our factory and by referring to the technical characteristics of imported digital electro-hydraulic control system (DEH) for HP hydraulic oil, which applies to our new generation of full electronic control type of 300MW steam turbine. There are three kinds of start-up operation modes for the steam turbine, namely "Self-Starting Mode", "Operator Automatic Mode" and "Manual Mode". The operating personnel may choose one of them according to the actual conditions. Under " Self-Starting Mode ", the ATS of DEH control system is under " Control State ". The ATS controls the steam turbine based on the state of assembling unit to automatically complete the start-up process including turbine rolling, raising speed, synchronous incorporating in power network, picking up initial load. The detailed operational and monitoring requirements about the " Self-Starting Mode " can be found in the " Operation Instruction for Digital Electro-Hydraulic Control System (DEH) for HP Hydraulic Oil " (provided by the supplier of DEH). Under " Operator Automatic Mode", the ATS of DEH control system is under Monitoring Mode instead of participating in controlling. The operator manually sets the target values and rates of change for the speed or load on the operation board according to the condition of main body of steam turbine and the start-up operation procedure provided in the manual. The basic control system of DEH automatically completes the operations of turbine rolling, raising speed, synchronization and picking up the load according to the target values and rates of change set by the operator. The DEH system automatically monitors the start-up parameters through the CRT display, sends out the signal "Alarm" or " Shutoff" when exceeding the limits, guides the operator and prints the current data and historical data for the operator to study and analyze.

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

Under Manual Mode, the valve position multi-functional processing of DEH control system controls the set according to the button of VALVE LOWER or VALVE RAISE on the operation board controlled by the operator. Under this operation condition, the set shall be controlled by skilled operating personnel according to relevant limits and operating procedures in the manual as well as relevant rules of power plant. The operator shall closely monitor various changes of parameters displayed on the CRT and alarm signals to ensure the safe operation of set. The procedures for start-up and shutdown specified in this manual only apply to Operator Automatic Mode (i.e. ATS monitoring state). The user shall compile the site operation regulations according to the manual and correct them during the actual operation based on the accumulated operating experience. However, each control parameter in the start-up operation shall follow the requirement in the manual. For a new machine, the initial start-up shall properly reduce the rates of raising speed and increasing load. Stable operating time shall be extended properly for each load point. When a new machine is put into operation, the evenness between the contact surfaces and the glidability between the glide surfaces of various parts need certain operating time to improve. Therefore, when a new machine is put into operation, it must experience at least 6 months operation under the complete cycle mode until the set reaches the stable state. Refer to the technical documentation, drawings and manuals supplied with the machine by us for relevant technical data, structural features, etc. about the steam turbine (refer to Delivery List). The start-up state of steam turbine is determined by the metal temperature of inner wall (stage adjusting place) of upper half of HP inner casing. Specifically as follows: Start-up under cold state: 150 Start-up under warm state: 150 300 Start-up under hot state: 300 400 2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

Start-up under extremely hot state: 400 The set has two operating modes: IP casing start-up as well as HP and IP casing combined start-up. It is recommended that the IP casing start-up be considered first. If the boiler and by-pass system are not adaptable, it is possible to only use the HP and IP casing combined start-up; if the IP casing start-up is adopted, the user needs to buy the VV valve and by-pass system required by the IP casing start-up. When the new machine is going to perform the load rejection test, the manufacturer shall be notified. The test requirements shall be discussed by the manufacturer and user jointly. The steam pressure in the manual is absolute pressure and the oil pressure is gauge pressure. The vacuum is converted according to the standard atmosphere, i.e.: Vacuum Mercury Column (mmHg)=760(mmHg)-Exhaust Absolute Pressure (MPa)7500(mmHg/MPa) The user shall make corrections to the following formula according to local sea level height and the climate condition at that time: Vacuum Mercury Column (mmHg)=Local Atmosphere (mmHg)-Exhaust

Absolute Pressure (MPa)7500(mmHg/MPa) The curve attached in the manual is only for ModelN300-16.7/537/537-8 instead of other types.

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

1 Essential Conditions for Start-up a. Each part shall be complete. Each part and system shall be installed, rinsed and adjusted according to the drawings, documentation and installation requirements from the manufacturer. Each part and system shall be firmly connected without looseness and leakage. Each kinetic part shall act flexibly without get stuck. The cleanness of each part and system must reach relevant requirements in JB/T4058-1999 Steam Turbine Cleanness Standard. b. When a new set is installed or the operational set completes inspection and repairing, before it is put into operation, the oil system must be rinsed by oil. The rinse acceptance must meet relevant regulations in Operation Instruction for Rinsing Oil System. The acceptance for the hydraulic oil system must meet relevant regulations in Operation Instruction for Adjustment and Security System. c. Parts and systems need to be separately tested must pass the tests and meet the installation test requirements of manufacturer. d. All the instruments, meters and measuring points for the set shall be complete. Installation and connection shall be correct and firm. All the instruments, meters and cables shall be inspected and qualified. e. The set must have good heat preservation. The turbine proper shall have heat preservation according to the Design Specification for Steam Turbine Heat Preservation provided by the manufacturer. The heat preservation for the pipeline and auxiliary devices shall be done according to relevant regulations for the power industry. The insulating layer shall not have the phenomena such as crack, come off, water and oil immersion. There shall be sufficient expansion gap reserved between the insulating layer and the foundation or other fixed parts. f. There shall not have any temporary facilities that hinder the operation (according to the safety rules for the power industry) g. The operating and maintenance personnel must go through special training and get familiar with the position, structure, principle, performance, operating method and emergency action of each responsible device.

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

1-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

1-1 Inspection before Start-up The inspection applies to HIP casing combined start-up (HIP) and IP casing start-up (IP). The time between the completion of inspection and formal start-up shall not be too long (normally not exceeding 10 days). a. Supply power to the DEH system and check whether the functions of each functional module are normal. Check whether the I/O interface communication with the CCS system and TBS system (by-pass control system) is normal. b. Check the functions of TSI system. c. Check whether the central control room and local instruments work properly. d. Check the oil level in the lubricant box and hydraulic oil box. The oil indicators shall indicate the highest oil levels and the test of oil level alarm shall be performed. e. Check the working performance of each auxiliary oil pump. The electric control system must ensure various kinds of auxiliary oil pump can be switched properly. f. Check the working performance of each oil pump in the hydraulic oil system. The electric control system must ensure various oil pumps can be switched properly. g. Check whether the lubricant oil temperature, pressure and level are normal. h. Check whether the temperature, pressure and level of hydraulic oil are normal. i. Check the working performance of jacking oil pump. The jacking test shall be performed at the initial start-up: adjust the opening of throttle valve according to the jacking oil pressure and pushed up height in the bearing pad. j. Start the smoke discharge fan and check its working performance. When the fan is working the negative pressure in the oil box shall keep within 196 245Pa and the Specification for Oil Pipeline of Jacking Device and record the pushing up oil pressure and pushed up height of each

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

1-1-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

negative pressure in the bearing box shall keep within 98 196Pa. The negative pressure in the oil box shall not be too high. Otherwise, water can easily get into the oil and dust can be sucked into. k. Check whether the working performances of various parts in the adjusting and security system meet the requirements. l. Check whether the working performances of various parts in the oil supply system of hydraulic oil meet the requirements. m. Start the jacking oil pump and confirm the rotor is jacking before performing turning gear engagement and disengagement. Adopt the reverse mode of turning gear motor for disengagement. Note: When the lubricant pressure is less than 0.08Mpa and the pressure of jacking piping-main is less than 9.8Mpa, the auto and manual auto engagement at zero speed of the turning gear will not work. This is realized by the pressure switch through electric interlock so as to prevent the friction of bearing Babbitt caused by inadequate oil supply. The details can be found in the Operation Instruction of Turning Gear. n. When the turning gear is engaged, check and record the eccentricity of rotor, compare with the original value of rotor (the variance shall not exceed 0.03mm), confirm that the rotor does not bend as well as monitor whether there is friction sound in the through flow part. Note: The original value of rotor is the eccentricity of rotor measured at a specific position by a mechanical type rotor bend meter when rotating the rotor initially after the connection of axis series on the site, i.e.excircle runout. The value shall not exceed 0.02mm.

1-1-2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

o. Close the vacuum breaking valve, add water to the hot well of steam condenser, engage the main vapor extractor to run the steam condenser and check whether the devices in the steam condensing system work properly. p. Check whether the steam supply regulating station, temperature control station and overflow station of each steam source in the self-seal gland seal system work properly. q. Check whether each electric stop valve in the drainage system works properly and perform the regular switch test for the system. r. Check whether the HP exhaust non return valve f and all the check valves of steam extraction work properly. Perform the linkage test. s. Check whether the RFV, ventilator valve(VV), emergency blowdown valve(BDV) and electric stop valve for interlayer heating work properly and perform the regular switch test. Check whether the working characteristics of electromagnetic valve of ventilator valve works properly. t. When the condense pump is engaged, the parameters for the sprayer of LP casing shall be reset. The reset values shall be: automatic engagement when the exhaust temperature 80 ; automatic removal when the exhaust temperature 65 . The regular switch test for the cooling system of LP casing sprayer shall also be performed. v. The HP main stop valve, IP reheat stop valve and HP control valve and IP control valve shall go through static test and be reset. w. Before turbine rolling, the protection test for axial displacement and other electric test shall be performed. All the inspections and tests above shall be performed according to relevant instructions.

1-1-3

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

2 Start-up with IP Casing (IP)

Start-up with the IP casing is to utilize the reheat steam that has higher temperature and bigger flow to raise the temperature of IP casing more rapidly. This makes the IP exhaust temperature exceed the fragility transforming temperature of rotor so as to avoid the fracture of rotating shaft due to fragility, reduce the heat impact of HP casing, prevent the exhaust temperature of HP casing from exceeding the limit, realize the matching between the temperature of main steam and reheat steam as well as the metal temperature at the HP control stage and IP Stage 1, and achieve the purpose of shortening the start-up time and reducing the life loss of set. Start-up with the IP casing has better flexibility and is in favor of peaking operation in two shifts. For start-up with the IP casing, it is required that the by-pass capacity shall meet the requirement of 35%MCR and the by-pass system shall be engaged normally. It is best to set it under the automatic state.

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

2-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

2-1

Start-up under Cold State (IP)

1 Preparation before Turbine Rolling a. Supply power to the DEH. The panel and system shall all be in normal

condition; b. Start the lubricant pump and jacking oil pump and confirm whether the

lubricant system and jacking system are in normal working conditions; c. d. Start the hydraulic oil pump; Engage the turning gear and ensure that before turbine rolling the turning

gearing time is no less than 4h; e. Recheck the lubricant system, hydraulic oil system, DEH, TSI system and

turning gear according to Section 1-1; f. After confirming there is no water in the gland seal steam pipeline, engage

the auxiliary steam source of gland seal system. The pressure of gland seal piping-main shall be 0.123Mpa and temperature shall be under 150 260 g Create the vacuum for the steam condenser. The pressure in the condenser

shall be below 16.7kPa. h. i. Press the LATCH button and the set will be turned on; Press the PREWARM button to pre-warm the HP casing, main steam pipe

and valve shell. See Section 7-1; j. Open the drain valves in the HP, IP and LP sections (refer to Section 3-1 for

the drainage in various sections); k. l. m. Confirm whether the HP exhaust non return valve is closed completely; The TSI measured data display is in the permissible range; Confirm Steam Parameters for Turbine Rolling refer to Section 3-1 for the

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

2-1-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

definition principle ; (1) Main steam pressure: 3.45MPa; (2) Reheat steam pressure: 0.686MPa; (3) Main steam temperature: 300 ; (4) Reheat steam temperature: 237 n. Define Change Rate of Steam Temperature During Start-up See Item n in Article 1 of Section 3-1; p. Operating Requirements for LP By-pass before Turbine Rolling

Along with the start-up of boiler, the valve opening of LP by-pass increases gradually. When the reheat steam pressure increases to 0.686MPa, the LP by-pass shall get the auto control of pressure feedback engaged. 2 Turbine Rolling a. b. Confirm whether the slide valve of emergency governor is engaged; Confirm whether the HP IP START/IP START button is under the HP

IP START state; c. d. e Press the RUN button and start the HP and IP reheat stop valves; Confirm whether the ventilator valve (VV valve) is at the closed state; Select the speed of 500r/min for TARGET; the accelerating rate of

100r/min/min for ACCELERATE; f. After pressing the GO button, the HP control valve opens gradually until

the speed increases to 500r/min. The set increases the speed according to the given accelerating rate; when the speed is more than the turning speed, the turning gaer shall come away automatically. Otherwise, the brake shall disengaged be 2-1-2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

and the machine shall be stopped. 3 Inspection at 500r/min

At this speed, perform overall inspection for the set. Mainly inspect whether there is friction between the static and dynamic parts, whether the ventilator valve is at the close position, whether the HP exhaust non return valve is at the open position. The stop time shall not exceed 5 min. Note: When inspecting various start-up states at 500r/min in the situation of start-up with the HP casing, the HP and IP control valves shall be closed. The inspection shall be done at the idling speed. Re-charge before the speed is more than 50r/min. a. b Select the speed of 1200r/min for TARGET; Press the GO button, slightly open the HP control valve until the speed

increases to 500r/min; c When the speed increases to 500r/min, the opening of HP control valve is

locked and the equilibrated valve of IP control valve opens gradually to increase the speed of steam turbine to 1200 r/min at the original accelerating rate; 4 Warming up at Medium Speed of 1200r/min a. b. c. Confirm whether the jacking oil pump is stopped; Check all the monitoring instruments; At this speed, warm up for 30min. During the warming up, the speed of

steam turbine is controlled by the equilibrated valve of IP regulation. During the period, the metal temperature of the HIP casing exhaust shall be monitored. When the metal temperature of HP exhaust lower half inner wall of reaches 200 , the VV valve shall be opened and adjusted for its manual door opening to control the metal temperature around 200 . d. Completion of Warming up 2-1-3

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

(1)

If the metal temperature of HP exhaust lower half inner wall reaches 200

and the metal temperature of IP exhaust lower half inner wall reaches 130 , TARGET can directly select 3000r/min. (2) After the completion of warming up, check and confirm whether the HP

control valve is closed completely and the ventilator valve is fully opened. (3) If the metal temperature of HP and IP exhaust lower half inner wall fail to

reach the above requirements, the "TARGET" selects the speed of 2000r/min for high speed warming up. During the process of raising speed afterwards, the set shall rapidly and steadily pass each step critical speed of axis series. The vibration of bearing cover at the critical speed shall be no more than 0.10mm (peak-peak value). Otherwise, the brake shall be disengaged and the machine shall be stopped. Warming up at the high speed can be done through adjusting the opening of manual valve after the ventilator valve to control the metal temperature of lower half inner wall to reach 200 around. If the temperature still can not reach the requirement at this time, the manual valve before the reverse warming valve can be opened properly. When the metal temperature of HP exhaust lower half inner wall reaches 200 and the metal temperature of IP exhaust lower half inner wall reaches 200 , the warming up shall continue for 30min. Then the warming up at the high speed finishes. TARGET selects the speed of 3000r/min. e. Press the GO button to increase the speed.

5 Rated Speed 3000r/min At this speed, perform warming up under zero load for 30min; a. The pressure of steam condenser shall be less than 13kPa and the vacuum 2-1-4

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

protection shall be engaged; b. When the exhaust temperature is 80 , the sprayer of LP casing shall

engage automatically. Otherwise, it shall be started manually. c. The TSI monitoring items shall be within the permissible range; d. Check Lubricant System

(1) The switch between the main oil pump and AC lubricant pump shall be completed; (2) The outlet oil pressure of main oil pump shall be at the normal value. See Article a in 2.1 of Section 6-2; (3) The lubricant pressure shall be at the normal value. See Article a in 1.2 of Section 6-2; (4) The inlet temperature of lubricant shall be at the normal value. See Article c in 1.2 of Section 6-2. e. Check Hydraulic Oil System

The pressure of hydraulic oil shall be at the normal value. See Article b in 1.2 of Section 6-2. f. Requirements for Parameters

(1) The main steam pressure shall reach 5.88MPa; (2) The change rates of main steam temperature and reheat steam temperature shall not exceed the selected value before turbine rolling; g. Operating Requirements for HP and LP By-pass

When the pressure of main steam reaches 5.88MPa, the HP by-pass shall have the auto control of pressure feedback engaged;

2-1-5

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

Perform following system tests before incorporating in power network (for new

machine start-up or after heavy repair of set): a. Oil spray test of emergency governor; b. On-line test of HP emergency governor IC (HPT) electromagnetic valve; c. On-line test of overspeed limit IC (OSP) electromagnetic valve; d. Manual shutdown button test; e. Speed acceleration test of emergency governor (before performing the acceleration test, the set shall run no less than 3h for warming up with20% load); f. Electric overspeed protection test The specific requirements for various tests above can be found in the Specification for Adjusting and Security System, Specification for Safety Monitoring Device of Steam Turbine and Specification for Electrical Appliance Monitoring and Protection System of Steam Turbine 7 Incorporating in Power Network After the completion of test and inspection of steam turbine generator set, inform the operator that it is permissible to incorporate the set in power network. Select AUTO SYNC IN(DEH internal automatic incorporating in power network) or AUTO SYNC OUT(external electric incorporating in power network). After incorporating in power network, the control system will add 3% ---minimum load, and then get into the control of load increase. Maintain the pressure in front of HP main stop valve during the process of accelerating, incorporating in power network and picking up the load. 8 Load Increase

2-1-6

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

a.

Select the final stable operating target load for "TARGET"; select the load

increase rate of 1.2MW/min for "LOAD RATE"; b. Press the "GO" button to increase the load;

Afterwards, the by-pass valve closes gradually. 9 Switching HP and IP casings a. Before switching the HP and IP casings, pay attention to the matching of

steam temperature and metal temperature of main steam after the work done by the HP control stage. Refer to (2) in Item m of Section 3-1 for the calculation method; Under normal condition, the followings shall be controlled: Main Steam: Reheat Steam: b. 5.88MPa 0.686MPa 400 430 350 380

When it is changed from the sole steam admission through the HP casing to

the combined steam admission through the HP and IP casings, the parameters and flows of main steam and reheat steam shall be kept stable basically. c. When the by-pass valve is fully closed, (at this time, the load is about

40MW) the TBS system sends signals to the DEH to maintain the load; d. When the by-pass is fully closed, perform warming up at low load. Monitor

the metal temperature of HP exhaust lower half inner wall. It shall reach 170 . Adjust the opening of manual valve in the back of ventilator valve to control the metal temperature of HP exhaust lower half inner wall within 220--250 for 30min; When all the above items are completed, the operator presses the "VALVE CHANGE" button to change the valves. The HP control valve gradually opens in the mode of single valve. After about 1 min, the HP and IP control valves start to enter into proportional relationship and the change is over by then; e. After the change is over, at the rate of 3MW/min increase the load to 2-1-7

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

42MW and warm up for 30min; f. Check the following items during the change over period:

(1) The ventilator valve (VV valve) is closed; (2) The HP exhaust non-return valve opens automatically. g. When the change is over, engage the interlayer heating device based on the

concrete situation of HP casing temperature and expansion difference. h. When warming up is completed, the DEH system sends signals to the TBS

and the set starts to increase load. With the increase of load, the HP by-pass closes gradually. When the load reaches the downslide point, the HP by-pass valve releases the auto control of pressure feedback. 10 Increase Load to Target Value a. When the load reaches the downslide point, the DEH system sends signals

to the CCS system. The set starts to slide the parameters and increase the load along with the boiler. b. The set gets to the downslide point when the load is about 105MW. At this

time, the HP control valve approachs to 90% rated valve position. The DEH control system sends signals to the CCS system. The set starts to increase the load along with the pressure increase of boiler. At this time, the DEH control system does not participate in the adjustment (i.e. not participate in the load control) until the load approachs to 90% ECR. c Stop using the heating system of cylinder interlayer at any time according to

Section 7-2. d. Check the closing sequences of drainage system under the following

operating states: (1) At 15% rated load, close the drainage of HP section;

2-1-8

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

(2) (3) e.

At 20% rated load, close the drainage of IP section; At 30% rated load, close the drainage of LP section. When the target load is reached and the temperature of each measuring

point of proper gets stable, press the SEQ VALVE button to change to the control state of sequence valve for better economical efficiency. f. system. (1) Close the inlet electric door of air extractor, the vacuum of steam condenser shall drop slowly. If the drop rate 0.13kPa/min (1mmHg/min), If the drop rate 0.27kPa/min (2mmHg/min), If the drop rate 0.4kPa/min (3mmHg/min), excellent good qualified When the steam turbine runs stably upwards of 225MW and the air

extractor works properly, it is possible to perform the tightness test of vacuum

When the drop rate of vacuum is more than 0.67kPa/min (5mmHg/min), the machine shall be stopped for identifying the root cause. Restart the machine when the trouble is eliminated. (2) During the test, if the IP exhaust pressure increases to 17.86kPa (or vacuum decreases to 626mmHg) and the temperature is higher than 58 , the test shall be stopped. When the test is finished, open the electric valve immediately to recover the rated vacuum value.

2-1-9

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

2-2 Start-up Under Warm State (IP) 1 a. Preparation Before Turbine Rolling Supply power to the DEH. The panel and system shall all be in normal

condition; b. Start the lubricant pump and jacking oil pump and confirm whether the

lubricant system and jacking system are in normal working conditions; c. d. Start the hydraulic oil pump; Engage the turning gear and ensure that the turning time is no less than 4h

before turbine rolling; e. Before turbine rolling, the auxiliary steam source of gland seal system shall

be engaged. It is required that the pressure of gland seal piping-main shall be 0.123Mpa and the temperator shall be under 150 260 . f. When the gland seal system runs properly, the vacuum of steam condenser

shall be created. It is required the pressure of steam condenser shall be below 16.7Kpa; g. h. Press the LATCH button and the set will be turned on; Open the drain valves for the HP, IP and LP sections;

i. The TSI measured data display shall be in the permissible range. The eccentricity shall not exceed 0.03mm of original value. Otherwise, the turning gearing shall be continued before start-up until the requirements are met. j. k. Confirm whether the HP exhaust non-return valve has closed completely; Define Steam Parameters for Turbine Rolling: main steam pressure: 5.88MPa; reheat steam pressure: 0.686MPa;
Checked by Reviewed by Standardized by Entered by

1 2
Prepared by

2-2-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

3 4 3-1. l.

recommended temperature for main steam: 370 ; Selection of Reheat Steam Temperature: refer to (2) in Item m of Section

Define change rate of steam temperature during start-up: refer to Item n in

Article 1 of Section 3-1. m. Operating Requirements for HP and LP By-pass before Turbine Rolling

With the start-up of boiler, the openings of HP and LP by-pass valves increase gradually. When the main steam pressure increases to 5.88MPa, the auto control of pressure feedback shall be engaged in the HP by-pass; when the reheat steam pressure increases to 0.686MPa, the auto control of pressure feedback shall be engaged in the LP by-pass. 2 Turbine Rolling a. b. Confirm whether the slide valve of emergency governor is engaged; Confirm whether the HP IP START/IP START button is under the HP

IP START state; c. d. e. Press the RUN button and start the HP and IP reheat stop valves; Confirm whether the ventilator valve VV valve is closed; Select the speed of 500r/min for "TARGET"; select the accelerating rate of

200r/min/min for "ACCELERATE"; f. After pressing the go button, the HP and IP control valves open gradually.

The set increases the speed according to the given accelerating rate. When the speed is more than the turning speed, the turning gaer shall come away automatically. Otherwise, the brake shall be disengaged and the machine shall be stopped. 3 Inspection at 500r/min At this speed, perform overall inspection for the set. Mainly check whether there 2-2-2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

is friction between the static and dynamic parts. The stop time shall not exceed 5 min. a. b. Select the speed of 3000r/min for TARGET; Press the GO button to increase the speed;

Based on the metal temperature of HP exhaust lower half inner wall, control the temperature to reach 200 or so through adjusting the opening of manual valve in the back of ventilator valve. 4 Rated Speed 3000r/min a. The pressure of steam condenser shall be less than 13kPa and the vacuum

protection shall be engaged; b. When the exhaust temperature is 80 , the sprayer of LP casing shall

engage automatically. Otherwise, it shall be started manually. c. d. The TSI monitoring items shall be within the permissible range; Check Lubricant System

(1) The change over between the main oil pump and AC lubricant pump shall be completed; (2) The outlet oil pressure of main oil pump shall be at the normal value. See Article a in 2.1 of Section 6-2; (3) The lubricant pressure shall be at the normal value. See Article a in 1.2 of Section 6-2; (4) The inlet temperature of lubricant shall be at the normal value. See Article c in 1.2 of Section 6-2. (5) Stop the jacking oil pump when the speed reaches 1200r/min. e. Check Hydraulic Oil System

2-2-3

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

The pressure of hydraulic oil shall be at the normal value. See Article b in 1.2 of Section 6-2; g. Requirements for Steam Parameters

The change rates of main steam temperature and reheat steam temperature shall not exceed the selected values before turbine rolling; 5 Incorporating in Power Network After the completion of inspection of steam turbine generator set, inform the operator that it is permissible to incorporate the set in power network. Select AUTO SYNC IN(DEH internal automatic incorporating in power network) or AUTO SYNC OUT(external electric incorporating in power network). After incorporating in power network, the control system will add 3% ---minimum load, and then get into the control of load increase. 6 Load Increase Select the load of 30MW for TARGET and the load increase rate of 3MW/min for LOAD RATE; Afterwards, the LP by-pass valve closes gradually. 7 Change over between HP and IP Casings a. Before changing over between HP and IP casings, pay attention to the

matching of steam temperature and metal temperature of main steam after the work done by the HP control stage. Refer to (2) in Item m of Section 3-1 for the calculation method; b. When it is changed from the sole steam admission through the HP casing to

the combined steam admission through the HP and IP casings, the parameters and flows of main steam and reheat steam shall be kept stable basically. c. When it is changed from the sole steam admission through the HP casing to 2-2-4

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

the combined steam admission through the HP and IP casings, the parameters and flows of main steam and reheat steam shall be kept stable basically. d. When the by-pass is fully closed, perform warming up at low load. Monitor

the metal temperature of IP exhaust lower half inner wall. It shall reach 170 . Adjust the opening of manual valve in the back of ventilator valve to control the metal temperature of HP exhaust lower half inner wall within 220--250 for 15 min; e. When all the above items are completed, the operator presses the "VALVE

CHANGE" button to change the valves. The HP control valve gradually opens in the mode of single valve. After about 1 min, the HP and IP control valves start to enter into proportional relationship and the change is over by then; f. Check the following items during the change over period:

(1) The ventilator valve (VV valve) is closed; (2) g. The HP exhaust non-return valve opens automatically. When the change is over, engage the interlayer heating device based on the

concrete situation of HP casing temperature and expansion difference. h. When the change over is completed, the DEH system sends signals to the

TBS and the set starts to increase load. With the increase of load, the HP by-pass closes gradually. When the load reaches the downslide point, the HP by-pass valve releases the auto control of pressure feedback. 8 Increase Load to Target Value a. When the load reaches the downslide point, the DEH system sends signals to the CCS system. The set starts to slide the parameters and increase the load along with the boiler. b. The set gets to the downslide point when the load is about 135MW. At this time, the HP control valve approachs to 90% rated valve position. The DEH control system sends signals to the CCS system. The set starts to increase the load along with 2-2-5

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

the pressure increase of boiler. At this time, the DEH control system does not participate in the adjustment (i.e. not participate in the load control) until the load approachs to 90% ECR. c. Stop using the heating system of cylinder interlayer at any time according to

Section 7-2. d. Check the closing sequences of drainage system under the following

operating states: (1) (2) (3) At 10% rated load, close the drainage of HP section; At 20% rated load, close the drainage of IP section; At 30% rated load, close the drainage of LP section.

e. When the target load is reached and the temperature of each measuring point of proper gets stable, press the SEQ VALVE button to change to the control state of sequence valve for better economical efficiency.

2-2-6

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

2-3 1 a.

Start-up Under Hot State and Extremely Hot State (IP)

Preparation before Turbine Rolling Supply power to the DEH. The panel and system shall all be in normal

condition; b. Start the lubricant pump and jacking oil pump and confirm whether the

lubricant system and jacking system are in normal working conditions; c. d. Start the hydraulic oil pump During the period from shutdown to restart, the set shall be at continuous

turning gearing state; e. Before turbine rolling , steam shall be sent to the gland seal. Then the

vacuum of steam condenser shall be extracted. It is required that the pressure of gland seal piping-main shall be 0.123MPa and the temperator shall be under 250 350 f. Create the vacuum for the steam condenser after the gland seal system runs

normally. The pressure for the condenser shall be below 16.7kPa; g. h. i. Press the LATCH button and the set will be turned on; Open the drain valves in the HP, IP and LP sections; The TSI measured data display shall be in the permissible range. The

eccentricity shall not exceed 0.03mm of original value. Otherwise, the turning shall be continued before start-up until the requirements are met; j. k. Confirm whether the exhaust non-return valve is closed completely; Define the steam parameters for turbine rolling: pay attention to the

matching of reheat steam temperature after the work done by IP Stage 1 and metal temperature. (1) Pressure of Main Steam: hot state 7.85MPa, extremely hot state 9.81MPa;
Prepared by Checked by Reviewed by Standardized by Entered by

2-3-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

(2) Reheat Steam Pressure: 0.883MPa; (3) Temperature of Main Steam: hot state 450 , extremely hot state 460 ; (4) Selection of Reheat Steam Temperature: refer to (2) in Item m in Article 1 ofSection 3-1; m. Define the change rate of steam temperature during start-up: refer to Item n

in Article 1 of Section 3-1. n. Operating Requirements for HP and LP By-pass before Turbine Rolling Along with the start-up of boiler, the valve openings of HP and LP by-pass increase gradually. When the main steam pressure increases to 7.85MPa for hot state and 9.81MPa for extremely hot state, the HP by-pass shall get the auto control of pressure feedback engaged. When the pressure of reheat steam increases to 0.883MPa, LP by-pass shall also get the auto control of pressure feedback engaged. 2 Turbine Rolling a. b. Confirm whether the slide valve of emergency governor is engaged; Confirm whether the HP IP START/IP START button is under the HP

IP START state; c. d. Press the RUN button and start the HP and IP reheat stop valves; Select the speed of 500r/min for TARGET;

Selection for ACCELERATE: hot state: 200r/min/min and extremely hot state: 300r/min/min e. After pressing the go button, the IP control valves open gradually. The set

increases the speed according to the given accelerating rate. The ventilator valve is opened. When the speed is more than the turning speed, the turning gaer shall come away automatically. Otherwise, the machine shall be stopped. 2-3-2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

Inspection at 500r/min At this speed, perform overall inspection for the set. Mainly check whether there

is friction between the static and dynamic parts. The stop time shall not exceed 5 min. a. b. Select the speed of 3000r/min for TARGET; Press the GO button to increase the speed;

4 Rated Speed 3000r/min a. The pressure of steam condenser shall be less than 13kPa and the vacuum

protection shall be engaged; b. When the exhaust temperature is 80 , the sprayer of LP casing shall

engage automatically. Otherwise, it shall be started manually. c. d. The TSI monitoring items shall be within the permissible range; Check Lubricant System

(1) The switch between the main oil pump and AC lubricant pump shall be completed; The outlet oil pressure of main oil pump shall be at the normal value. See Article a in 2.1 of Section 6-2; (2) The lubricant pressure shall be at the normal value. See Article a in 1.2 of Section 6-2; (4) The lubricant pressure shall be at the normal value. See Article c in 1.2 of Section 6-2; (5) Stop the jacking oil pump when the speed reaches 1200r/min. e. Check Hydraulic Oil System

The pressure of hydraulic oil shall be at the normal value. See Article b in 1.2 of Section 6-2; 2-3-3

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

f.

Requirements for Steam Parameters

The change rates of main and reheat steam temperature shall not exceed the selected values before turbine rolling; 5 Incorporating in Power Network After the completion of inspection of steam turbine generator set, inform the operator that it is permissible to incorporate the set in power network. Select AUTO SYNC IN(DEH internal automatic incorporating in power network) or AUTO SYNC OUT(external electric incorporating in power network). After incorporating in power network, the control system will add 3% ---minimum load, and then get into the control of load increase. 6 Load Increase Select the final stable operating target load for TARGET; selection for LOAD RATE: hot state: 4.8MW/min extremely hot state: 7MW/min

Afterwards, the LP by-pass valve closes gradually. 7 Change over between HP and IP casings a. Before changing over between HP and IP casings, pay attention to the

matching of steam temperature and metal temperature of main steam after the work done by the HP control stage. Refer to (2) in Item m of Section 3-1 for the calculation method; b. After the LP by-pass valve is fully closed, the TBS system sends signals to

the DEH to maintain the load; c. When all the above items are completed, the operator presses the "VALVE

CHANGE" button to change the valves. The HP control valve gradually opens in the mode of single valve. After about 1 min, the HP and IP control valves start to enter into proportional relationship and the change is over by then;

2-3-4

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

d.

Check the following items during the change over period:

1 The ventilator valve (VV valve) is closed; 2 The HP exhaust non-return valve opens automatically. When the change over is completed, the DEH system sends signals to the TBS and the set starts to increase load. With the increase of load, the HP by-pass closes gradually. When the load reaches the downslide point, the HP by-pass valve releases the auto control of pressure feedback. 8 Increase Load to Target Value a. When the load reaches the downslide point, the DEH system sends signals to

the CCS system. The set starts to slide the parameters and increase the load along with the boiler. b. The set gets to the downslide point when the load is about 165MW. At this

time, the HP control valve approachs to 90% rated valve position. The DEH control system sends signals to the CCS system. The set starts to increase the load along with the pressure increase of boiler. At this time, the DEH control system does not participate in the adjustment (i.e. not participate in the load control) until the load approachs to 90% ECR. c. Check the closing sequences of drainage system under the following

operating states: (1) (2) (3) e. At 10% rated load, close the drainage of HP section At 20% rated load, close the drainage of IP section; At 30% rated load, close the drainage of LP section. When the target load is reached and the temperature of each measuring

point of proper gets stable, press the SEQ VALVE button to change to the control state of sequence valve for better economical efficiency.

2-3-5

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

3 Combined Start-up of HIP Casing (HIP)

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

3-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

3-1 Start-up under Cold State (HIP) 1 Preparation before Turbine Rolling a. Supply power to the DEH. The panel and system shall all be in normal condition; b. Start the lubricant pump and jacking oil pump etc and confirm whether the

lubricant system and jacking system are in normal working conditions; c. Start the hydraulic oil pump; d. Engage the turning gear and ensure that before turbine rolling the continuous turning gearing time is no less than 4h; e. Recheck the lubricant system, hydraulic oil system, DEH, TSI system and turning gear according to Section 1-1; f. Create the vacuum for the steam condenser. The pressure for the condenser shall be below 16.7kPa; g. After confirming there is no water in the gland seal steam pipeline, engage the auxiliary steam source of gland seal system. The pressure of gland seal piping-main shall be 0.123MPa and the temperature shall be under 150 260 ; h. Press the LATCH button and the set will be turned on; i. Press the PREWARM button to pre-heat the HP casing, main steam pipe and valve shell. See Section 7-1; j. Open the drain valves in the casing proper and steam pipeing: a) HP Section 1 upper valve body drainage of HP main stop valve; 2 lower valve body drainage of HP main stop valve;

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

3-1-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

3 drainage of HP main steam pipe; 4 drainage of HP inner casing; 5) drainage of casing interlayer heating connection with steam combination box and its inlet tube; 6 drainage of interlayer between HIP inner and outer casings 7 drainage of exhaust check valves at Stage 1 and 2 and valve front; b) IP Section 1 Drainage of IP steam admission chamber; 2 Drainage of valve front and back of HP exhaust check valve; 3 drainage of exhaust check valves at Stage 3 and 4 and valve front; 4 drainage of IP combined steam valve; 5 drainage of steam drain of IP casing; c) LP Section 1 drainage of exhaust check valves at Stage 5 and 6 and valve front; 2 drainage of self-seal system and shaft seal steam supply pipe; All the drainage valves in the HP, IP and LP sections mentioned above must be opened when the set is under cold, warm, hot and extremely hot states to prevent water hammer during turbine rolling. The specific close sequences can be found in Paragraph 11 of this section. k. The TSI measured data display is within the permissible range. Following major records shall be noted before turbine rolling: 1 absolute expansion of cylinder; 3-1-2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

2 expansion difference; 3 axial displacement; 4 shaft eccentricity and turning current; 5 upper and lower half inner wall temperature at HP inner casing adjusting stage; 6 each bearing pad temperature and return oil temperature; 7 temperature of inner and outer wall of valve shell of HP main stop valve; 8 temperature of inner and outer wall of valve shell of HP control valve; m. Define Parameters of Turbine Rolling Steam 1) main steam pressure: 3.45MPa; 2) Selection of turbine rolling steam temperature The selection criteria is to make the temperature of main steam and reheat steam after the HP control stage or doing work at HP Stage 1 match the metal temperature. Selection of main steam temperature: determine the steam temperature after the HP control stage according to the metal temperature after the HP control stage before turbine rolling and the temperature difference between the metal and steam in Article 2.4 of Section 6-2. Then based on Fig.3-1-1, determine the temperature of main steam according to the pressure of main steam and steam temperature after the control stage

3-1-3

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

For example: Calculation Procedure Metal temperature after the control stage and pre-warming of HP casing before turbine rolling According to Article 2.4 of Section 6-2 Calculation Basis Measured Calculati on Result 150

t selected

90 240 320

Steam temperature after the control t+ metal temperature stage after the control stage Temperature of main steam Find in Fig.3-1-1

Selection of reheat steam temperature: determine the steam temperature after IP Stage 1 according to the metal temperature after IP Stage 1 before turbine rolling and Article 2.4 of Section 6-2 (temperature difference between the metal and steam). Then determine the reheat steam temperature according to the temperature drop (about 37 ) of IP Stage 1. For example: Calculation Procedure Calculation Basis Calcul ation Result 50

Metal temperature after MP Stage 1 before turbine rolling According to 2.4 of Section 6-2 Article

Measured

t selected t+ metal temperature after IP Stage

150 200 237

Steam temperature after IP Stage 1 1 Reheat temperature steam

Steam temperature after IP Stage 1 + temperature drop 37 after IP Stage 1

3-1-4

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

n. Define Change Rate of Steam Temperature During Start-up When the ATC does not get the control engaged, it is necessary to select a rational change rate of metal temperature (equivalent to the change rate of steam temperature) by adopting the rotor life loss curve so as to ensure the safe operation of set. (1) Selection of Change Rate of Main Steam Temperature: Before start-up, the operator sets a target stable operating load for the set, calculates the temperature after the HP control stage according to Fig. 3-1-2, Fig.3-1-3 or Fig.3-1-4, determines the change of metal temperature of HP casing (change of metal temperature in short), and then selects the change rate of metal temperature after the HP control stage according to the HP rotor life loss curve. For example: Calculation Procedure Calculation Basis Calcul ation Result 500

Set the target load as 50%ECR and Steam temperature after the HP control stage at a main steam pressure as 10.79MPa, and adopt single valve for steam admission. target stable operating load Find the temperature drop at the control stage in Fig.3-1-2 and 3-1-3. 537 -temperature drop at control stage Metal temperature after the HP control stage before turbine rolling Change temperature of metal Measured

150

Steam temperature after the control stage-metal temperature after the control stage Find the normal loss in Fig.3-1-5.

350

Change rate of main steam temperature

57 /h

(2) Selection of Change Rate of Reheat Steam Temperature 3-1-5

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

The steam temperature after IP Stage 1 under various working conditions is the difference between the IP steam admission temperature and the temperature drop at IP Stage 1 under the rated working condition. Compare it with the metal temperature at IP Stage 1 before turbine rolling to get the change of metal temperature of MP casing. Then select the change rate of metal temperature at IP Stage 1 according to the IP rotor life loss curve (Fig. 3-1-6) (equivalent to the change rate of reheat steam temperature). For example: Calculation Procedure Calculation Basis Calcul ation Result 50

Metal temperature after IP Stage 1 before turbine rolling Steam temperature after IP Stage 1 Change temperature of metal

Measured

537-37 Steam temperature after Stage 1-metal temperature after IP Stage 1 Find the normal loss in Fig.3-1-6.

500 450 84 /h

Change rate of reheat steam temperature 2 Turbine Rolling

a. Confirm whether the slide valve of emergency governor is engaged; b. Engage the heating for the cylinder interlayer and refer to Section 7-2 for details; c. Confirm whether the HP IP START/IP START button is under the HP IP START state; d. Confirm whether the SINGLE VALVE/SEQ VALVE button is under the SINGLE VALVE state; 3-1-6

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

e. Press the RUN button and start the HP and IP reheat stop valves; Select the speed of 500r/min for TARGET; the accelerating rate of 100r/min/min for ACCELERATE; g. After pressing the go button, the HP and IP control valves open gradually. The set increases the speed according to the given accelerating rate. When the speed is more than the turning speed, the turning gaer shall come away automatically. Otherwise, the brake shall be disengaged and the machine shall be stopped. 3 Inspection at 500r/min At this speed, perform overall inspection for the set. Mainly inspect whether there is friction between the static and dynamic parts, whether the ventilator valve is at the close position, whether the HP exhaust non return valve is at the open position. The stop time shall not exceed 5 min. Note: under various start-up states for the HIP combined start-up, when performing inspection at 500r/min, the HP and IP control valves shall be closed and it shall be done at idling speed. Before the speed is more than 50r/min, re-open the HP and IP control valves and raise the speed to 1200r/min according to the accelerating rate. a. Select the speed of 1200r/min for TARGET; b. Press the GO button; 4 Warming up at Medium Speed of 1200r/min Warming up at the speed for 30min. a. Stop the oil pump for jacking; b. Inspect all the monitoring instruments; c. Select the speed of 2000r/min for the "TARGET; 3-1-7

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

d. Press the GO button to increase the speed; During the process of raising speed afterwards, the set shall rapidly (at the accelerating rate of 250 300r/min/min) and steadily pass the critical speed at each step in the axis series. The vibration of bearing cover at the critical speed shall be no more than 0.10mm (peak-peak). Otherwise, the brake shall be disengaged and the machine shall be stopped. 5 Warming up at High Speed of 2000r/min At this speed, monitor the metal temperature of IP exhaust lower half inner wall no more than 130 and keep warming up for 60 min. After the completion of warming up, the following values shall be met: Metal temperature after the control stage of upper half inner wall of HP inner casing: more than 250 ; Expansion of HP and IP casings: more than 7mm; Expansion of HP and IP less than 3.5mm and getting stable; a. Select the speed of 3000r/min for TARGET; b. Press the GO button to increase the speed. 6 Rated Speed 3000r/min: At this speed, perform warming up under zero load for 30min; a. The pressure of steam condenser shall be less than 13kPa and the vacuum protection shall be engaged; b. When the exhaust temperature is 80 , the sprayer of LP casing shall engage automatically. Otherwise, it shall be started manually. c. The TSI monitoring items shall be within the permissible range;

3-1-8

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

d. Check Lubricant System (1) The switch between the main oil pump and AC lubricant pump shall be completed; (2) The outlet oil pressure of main oil pump shall be at the normal value. See Article a in 2.1 of Section 6-2; (3) The lubricant pressure shall be at the normal value. See Article a in 1.2 of Section 6-2; (4) The inlet temperature of lubricant shall be at the normal value. See Article c in 1.2 of Section 6-2. e. Check Hydraulic Oil System The pressure of hydraulic oil shall be at the normal value. See Article b in 1.2 of Section 6-2. f. Requirements for Steam Parameters (1) The main steam pressure shall reach 5.88MPa and main steam temperature shall reach 370 ; (2) Before incorporating in power network, the difference between the main steam temperature and reheat steam temperature shall meet Article c in 2.3 of Section 6-2; (3) The change rates of main steam temperature and reheat steam temperature shall not exceed the selected value before turbine rolling; 7 Perform following system tests before incorporating in power network (for new

machine start-up or after heavy repair of set) a. Oil spray test of emergency governor; b. On-line test of HP emergency governor IC (HPT) electromagnetic valve; 3-1-9

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

c. On-line test of overspeed limit IC (OSP) electromagnetic valve; d. Manual shutdown button test; e. Speed acceleration test of emergency governor (before performing the acceleration test, the set shall run no less than 3h for warming up with 20% load); f. Electric overspeed protection test The specific requirements for various tests above can be found in the Specification for Adjusting and Security System, Specification for Safety Monitoring Device of Steam Turbine and Specification for Electrical Appliance Monitoring and Protection System of Steam Turbine 8 Incorporating in Power Network After the completion of test and inspection of steam turbine generator set, inform the operator that it is permissible to incorporate the set in power network. Select AUTO SYNC IN(DEH internal automatic incorporating in power network) or AUTO SYNC OUT(external electric incorporating in power network). After incorporating in power network, the control system will add 3% ---minimum load, and then get into the control of load increase. 9 Load Increase a. Select the load of 30MW for TARGET, the load increase rate of1MW/min as the LOAD RATE; b. Press the GO button to increase the load. 10 Warming up Under Low load

3-1-10

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

Perform steadily under the low load of 30MW, ensure the metal temperature of IP exhaust lower half inner wall more than 176 and keep warming up for 30 min; a. Select the final stable target operating load for TARGET; the load increase rate of 1MW/min as the LOAD RATE; b. Press the GO button to increase the load. 11 Increase Load to Target Value a. The set gets to the downslide point when the load is about 105MW. At this time, the HP control valve approachs to 90% rated valve position. The DEH control system sends signals to the CCS system. The set starts to increase the load along with the pressure increase of boiler. At this time, the DEH control system does not participate in the adjustment (i.e. not participate in the load control) until the load approachs to 90% ECR. b. Stop using the heating system of cylinder interlayer at any time according to Section 7-2. c. Check the closing sequences of drainage system under the following operating states: (1) At 10% rated load, close the drainage of HP section; (2) At 20% rated load, close the drainage of IP section; (3) At 30% rated load, close the drainage of LP section. d. When the target load is reached and the temperature of each measuring point of proper gets stable, press the SEQ VALVE button to change to the control state of sequence valve for better economical efficiency. e. When the steam turbine runs stably upwards of 225MW and the air extractor works properly, it is possible to perform the tightness test of vacuum system. 3-1-11

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

(1) Close the inlet electric door of air extractor, the vacuum of steam condenser shall drop slowly. If the drop rate 0.13kPa/min (1mmHg/min), If the drop rate 0.27kPa/min (2mmHg/min), If the drop rate 0.4kPa/min (3mmHg/min), excellent good qualified

When the drop rate of vacuum is more than 0.67kPa/min (5mmHg/min), the machine shall be stopped for identifying the root cause. Restart the machine when the trouble is eliminated. (2) During the test, if the exhaust pressure increases to 17.86kPa (or vacuum decreases to 626mmHg) and the exhaust temperature is higher than 58 , the test shall be stopped. (3) When the test is finished, open the electric valve immediately to recover the rated vacuum value.

3-1-12

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

Main Steam Temperature

Parameters on the left side and line are prohibited

Main Steam Pressure

Steam Temperature after Control Stage Fig.3-1-1 Relation Curve of Steam Temperature Under Steam Pressure during Initial Turbine Rolling and Steam Temperature after Control Stage

3-1-13

Parameters above the line are prohibited during turbine rolling

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

3-2 Start-up Under Warm State (HIP) 1 Preparation Before Turbine Rolling a Supply power to the DEH. The panel and system shall all be in normal condition; b. Start the lubricant pump and jacking oil pump and confirm whether the lubricant system and jacking system are in normal working conditions; c. Start the hydraulic oil pump; d. Engage the turning gear and ensure that the turning time is no less than 4h before turbine rolling; e. Before turbine rolling, the auxiliary steam source of gland seal system shall be engaged. It is required that the pressure of gland seal piping-main shall be 0.123MPa and the temperature shall be under 150 260 . f. When the gland seal system runs properly, the vacuum of steam condenser shall be created. It is required the pressure of steam condenser shall be below 16.7Kpa; g. Press the LATCH button and the set will be turned on; h. Open the drain valves for the HP, IP and LP sections; i. The TSI measured data display shall be in the permissible range. The eccentricity shall not exceed 0.03mm of original value. Otherwise, the turning gearing shall be continued before start-up until the requirements are met. j. Define Steam Parameters for Turbine Rolling (1) Recommended pressure for main steam: 7.84MPa; (2) Refer to (2) in Item m of Article 1 of Section 3-1 for the selection of steam temperature for turbine rolling.

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

3-2-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

Selection of Main Steam Temperature: For example: Calculation Procedure Metal temperature after the control stage of HP casing before turbine rolling According to Article 2.4 in Section 6-2 Steam temperature after the control stage Main steam temperature Calculation Basis Measured t selected t+ metal temperature after the control stage Find in Fig.3-1-1 Calculation Result 180 130 310 410

Selection of Reheat Steam Temperature: For example: Calculation Procedure Calculation Basis Calculation Result 140 150 290

Metal temperature after IP Stage 1 before Measured turbine rolling According to Article 2.4 in Section 6-2 Steam temperature after IP Stage 1 t selected t+ metal temperature after IP Stage 1 Steam temperature after IP Stage 1+ temperature drop after IP Stage 1 37

Reheat steam temperature

327

k. Define the change rate of steam temperature during start-up: refer to Item n in Article 1 of Section 3-1 (1) Selection of Change Rate of Main Steam Temperature

3-2-2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

For example: Calculation Procedure Calculation Basis Calculation Result

Set the target load as 100% ECR and main steam pressure as 16.67MPa, and Steam temperature after the adopt single valve for steam admission. HP control stage at a target Find the temperature drop at the control stable operating load stage in Fig.3-1-2 and 3-1-3. 537 -temperature drop at control stage Metal temperature after the HP control stage before Measured turbine rolling Change of metal temperature Steam temperature after the control stage-metal temperature after the control stage

504

180

324

Change rate of main steam Find the normal loss in Fig.3-1-5. temperature (2) Selection of Change Rate of Reheat Steam Temperature For example: Calculation Procedure Metal temperature after IP Stage 1 before turbine rolling Steam temperature after IP 537-37 Stage 1 Change of metal temperature Steam temperature after Stage 1-metal temperature after IP Stage 1 Calculation Basis Measured

57 /h

Calculation Result 140 500 360 84 /h

Change rate of reheat steam Find the normal loss in Fig.3-1-6 temperature

3-2-3

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

Turbine Rolling a. Confirm whether the slide valve of emergency governor is engaged; b. Engage the heating for the cylinder interlayer according to the expansion

difference of set; c. Confirm whether the HP IP START/IP START button is under the HP IP START state; d. Confirm whether the SINGLE VALVE/SEQ VALVE button is under the SINGLE VALVE state; e. Press the RUN button and start the HP and IP reheat stop valves; f. Select the speed of 500r/min for TARGET; the accelerating rate of 100r/min/min for ACCELERATE; g. After pressing the go button, the HP and IP control valves open gradually. The set increases the speed according to the given accelerating rate. When the speed is more than the turning speed, the turning gaer shall come away automatically. Otherwise, the brake shall be disengaged and the machine shall be stopped. 3 Inspection at 500r/min Running at this speed, perform overall inspection for the set. Mainly check whether there is friction between the static and dynamic parts, whether the ventilator valve and emergency blowdown valve are at the closed position, whether the HP exhaust non-return valve is at the opened position. The stop time shall not exceed 5 min. a. Select the speed of 3000r/min for TARGET; b. Press the GO button to increase the speed; 4 Rated Speed 3000r/min

3-2-4

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

a. The pressure of steam condenser shall be less than 13kPa and the vacuum protection shall be engaged; b. When the exhaust temperature of LP casing is 80 , the sprayer of LP casing shall engage automatically. Otherwise, it shall be started manually. c. The TSI monitoring items shall be within the permissible range; d. Check Lubricant System (1) The switch between the main oil pump and AC lubricant pump shall be completed; (2) The outlet oil pressure of main oil pump shall be at the normal value. See Article a in 2.1 of Section 6-2; (3) The lubricant pressure shall be at the normal value. See Article a in 1.2 of Section 6-2; (4) The inlet temperature of lubricant shall be at the normal value. See Article c in 1.2 of Section 6-2. (5) Stop the oil pump for jacking when the speed reaches 1200r/min. e. Check Hydraulic Oil System The pressure of hydraulic oil shall be at the normal value. See Article b in 1.2 of Section 6-2; f. Confirm Steam Parameters (1) Main steam pressure: 7.84MPa; (2) Before incorporating in power network, the difference between the main steam temperature and reheat steam temperature shall meet Article c in 2.3 of Section 6-2;

3-2-5

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

(3) The change rates of main steam temperature and reheat steam temperature shall meet the selected value before turbine rolling; 5 Incorporating in Power Network After the completion of inspection of steam turbine generator set, inform the operator that it is permissible to incorporate the set in power network. Select AUTO SYNC IN(DEH internal automatic incorporating in power network) or AUTO SYNC OUT(external electric incorporating in power network). After incorporating in power network, the control system will add 3% ---minimum load, and then get into the control of load increase. 6 Load Increase a. Select the load of 30MW for TARGET, the load increase rate of 3MW/min as the LOAD RATE; b. Press the GO button to increase the load. 7 Warming up under Low Load Operate steadily under the low load of 30MW, ensure the metal temperature of IP exhaust lower half inner wall more than 176 and keep warming up for 20 min; a. Select the final stable target operating load for TARGET; b. Select the load increase rate of 3MW/min as the LOAD RATE; c. Press the GO button to increase the load. 8 Increase Load to Target Value a. The set gets to the downslide point when the load is about 135MW. At this time, the HP control valve approachs to 90% rated valve position. The DEH control system sends signals to the CCS system. The set starts to increase the load along with the pressure increase of boiler. At this time, the DEH control system does not participate in the adjustment until theload approachs to 90% ECR. 3-2-6

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

b. Stop using the heating system of cylinder interlayer at any time according to Section 7-2. c. Check the closing sequences of drainage system under the following operating states: (1) (2) (3) At 10% rated load, close the drainage of HP section; At 20% rated load, close the drainage of IP section; At 30% rated load, close the drainage of LP section.

d. When the target load is reached and the temperature of each measuring point of proper gets stable, press the SEQ VALVE button to change to the control state of sequence valve for better economical efficiency.

3-2-7

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

3-3 Start-up Under Hot State and Extremely Hot State (HIP) 1 Preparation before Turbine Rolling a. Supply power to the DEH. The panel and system shall all be in normal condition; b. Start the lubricant pump and jacking oil pump etc and confirm whether the lubricant system and jacking system are in normal working conditions; c. Start the hydraulic oil pump and enable it under normal working condition; d. During the period from shutdown to restart, the set shall be at continuous turning gearing state; e. Before turbine rolling, steam shall be sent to the gland seal. Then the vacuum of steam condenser shall be extracted. It is required that the pressure of gland seal piping-main shall be 0.123MPa and the temperature shall be under 250 350 ; f. Create the vacuum for the steam condenser after the gland seal system runs normally. The pressure for the condenser shall be below 16.7kPa; g. Press the LATCH button and the set will be turned on; h. Confirm the difference between the rolling steam temperature and the main stop valve metal temperature of inner wall. If it is more than 120 , the valve shall be pre-heated; i. Open the drain valves in the HP, IP and LP sections; j. The TSI measured data display shall be in the permissible range. The eccentricity shall not exceed 0.03mm of original value. Otherwise, the turning gearing shall be continued before start-up until the requirements are met; k. Define Steam Parameters for Turbine Rolling (1) Main steam pressure: hot state: 9.81MPa extremely hot state: 11.76MPa

(2) Refer to (2) in Item m of Article 1 of Section 3-1 for the selection of steam
Prepared by Checked by Reviewed by Standardized by Entered by

3-3-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

temperature for turbine rolling Selection of Main Steam Temperature: For example: Calculation Result Calculation Procedure Calculation Basis Hot State Extremely Hot State 420

Metal temperature after the control stage of HP casing before turbine rolling According to Section 6-2 Article 2.4 in

Measured

310

t selected

30 340 450

10 430 510

Steam temperature control stage

after

the t+ metal temperature after the control stage Find in Fig.2-1-1

Main steam temperature

Note: The pressure of main steam shall not exceed 11.7Mpa during start-up under the extremely hot state. The temperature of main steam shall not exceed 510 as much as possible. In the meanwhile, attention shall be paid to the constraints of load compatibility in Article 2.4 of Section 6-2. 3 Selection of Reheat Steam Temperature:

For example: Calculation Result Calculation Procedure Calculation Basis Hot State 290 90 Extremely Hot State 440 10

Metal temperature after IP Stage Measured 1 before turbine rolling According to Section 6-2 Article 2.4 in t selected

3-3-2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

Steam temperature after t+ metal temperature after IP Stage 1 IP Stage 1 Reheat temperature steam Steam temperature after IP Stage 1+ temperature drop after IP Stage 1 37

380 417

450 487

m. Define the change rate of steam temperature during start-up: refer to Item n in Article 1 of Section 3-1. (1) Selection of Change Rate of Main Steam Temperature

For example: Calculation Result Calculation Procedure Calculation Basis Hot State Extremely Hot State

Steam temperature after the HP control stage at a target stable operating load

Set the target load as 100% ECR and main steam pressure as 16.67MPa, and adopt single valve for steam admission. Find the temperature drop at the control stage in Fig.3-1-2 and 3-1-3. 537 -temperature drop at control stage

504

504

Metal temperature after Measured the HP control stage before turbine rolling Change of temperature metal Steam temperature after the control stage-metal temperature after the control stage

310

420

194

84

Change rate of main Find the normal loss in Fig.3-1-5. steam temperature (2) Selection of Change Rate of Reheat Steam Temperature For example:

62 /h

80 /h

3-3-3

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

Calculation Procedure

Calculation Basis Hot State

Calculation Result Extremely Hot State 440

Metal temperature after IP Stage 1 before turbine rolling Steam temperature after IP Stage 1

Measured 290 537-37

500 210 95 /h

500 60 >300 /h

Change of metal Steam temperature after Stage temperature 1-metal temperature after IP Stage 1 Change reheat temperature 2 rate of Find steam Fig.3-1-6 the normal loss in

Turbine Rolling a. Confirm whether the slide valve of emergency governor is engaged; b. Confirm whether the HP IP START/IP START button is under the HP

IP START state; c. Confirm whether the SINGLE VALVE/SEQ VALVE button is under the SINGLE VALVE state; d. Press the RUN button and start the HP and IP reheat stop valves; select the speed of 500r/min for TARGET; e. Selection for ACCELERATE: hot state: 200r/min/min and extremely hot state: 300r/min/min f. After pressing the go button, the HP and IP control valves open gradually. The set increases the speed according to the given accelerating rate. When the speed is more than the turning speed, the turning gaer shall come away automatically.

3-3-4

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

the brake shall be disengaged and the machine shall be stopped. 3 Inspection at 500r/min Running at this speed, perform overall inspection for the set. Mainly check whether there is friction between the static and dynamic parts, whetherthe ventilator valve and emergency blowdown valve are at the closed position, whether the HP exhaust non-return valve is at the opened position. The stop time shall not exceed 5 min. a. Select the speed of 3000r/min for TARGET; b. Press the GO button to increase the speed; 4 Rated Speed 3000r/min a. The pressure of steam condenser shall be less than 13kPa and the vacuum protection shall be engaged; b. When the exhaust temperature is 80 , the sprayer of LP casing shall engage automatically. Otherwise, it shall be started manually. c. The TSI monitoring items shall be within the permissible range; d. Check Lubricant System (1) The switch between the main oil pump and AC lubricant pump shall be completed; (2) The outlet oil pressure of main oil pump shall be at the normal value. See Article a in 2.1 of Section 6-2; (3) The lubricant pressure shall be at the normal value. See Article a in 1.2 of Section 6-2;

3-3-5

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

(4) The inlet temperature of lubricant shall be at the normal value. See Article c in 1.2 of Section 6-2. (5) Stop the jacking oil pump when the speed reaches 1200r/min. e. Check Hydraulic Oil System The pressure of hydraulic oil shall be at the normal value. See Article b in 1.2 of Section 6-2; 5 Incorporating in Power Network After the completion of inspection of steam turbine generator set, inform the operator that it is permissible to incorporate the set in power network. Select AUTO SYNC IN(DEH internal automatic incorporating in power network) or AUTO SYNC OUT(external electric incorporating in power network). After incorporating in power network, the control system will add 3% ---minimum load, and then get into the control of load increase. 6 Load Increase a. Select the final stable operating target load for TARGET; selection forLOAD RATE: hot state: 4MW/min extremely hot state: 6MW/min

b. Press the GO button to increase the load. 7 Increase Load to Target Value a. The set gets to the downslide point when the load is about 165MW. At this time, the HP control valve approachs to 90% rated valve position. The DEH control system sends signals to the CCS system. The set starts to increase the load along with the pressure increase of boiler. At this time, the DEH control system does not participate in the adjustment until the load approachs to 90% ECR.

3-3-6

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

b. Check the closing sequences of drainage system under the following operating states: (1) (2) (3) At 10% rated load, close the drainage of HP section; At 20% rated load, close the drainage of IP section; At 30% rated load, close the drainage of LP section.

c. When the target load is reached and the temperature of each measuring point of proper gets stable, press the SEQ VALVE button to change to the control state of sequence valve for better economical efficiency.

3-3-7

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

4 Operations

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

4-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

4-1 1

Normal Operation

When the steam turbine is in the normal operation period, the following items

shall be within the normal value ranges defined in Section 6-1 Limited Values for Set Start-up and Operation: a. controlling oil pressure (refer to the security and hydraulic oil pressures)

and bearing lubricant pressure; b. c. d. e. f. g. h. i. j. shaft and bearing pad vibration; HIP and LP expansion differences; temperatures of bearing inlet oil, return oil and tungsten steel; axial displacement; metal temperature; pressure of steam condenser; exhaust temperature of LP casing; steam temperature of HP casing exhaust; oil levels of main and hydraulic oil tanks.

In order to ensure the set safe operation for long term, regular inspection and test shall be performed according to Section 6-4. 2 2.1 Precautions of Normal Operation Permissible Variable Ranges for Steam Parameters a. Pressure of Main Steam refer to the pressure before the HP main stop valve 16.7MPa not exceeding Po
Entered by

Rated Pressure Po: Mean annual Pressure of Continuous Operation:


Prepared by Checked by Reviewed by

Standardized by

4-1-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

Pressure Permissible for Continuous Operation While Ensuring the Mean annual Pressure: not exceeding 1.05Po

Under abnormal conditions, the permissible pressure variance shall not exceed 1.20Po. However the total time of this value in any years operation shall not exceed 12h. b. Main and Reheat Steam Temperatures refer to the temperatures before the

HP and IP reheat stop valves Rated Temperature To: Mean annual Temperature of Continuous Operation: 537 not exceeding To

Temperature Permissible for Continuous Operation While Ensuring the Mean annual Temperature: not exceeding To+8

The total operating time no more than To+14 shall not exceed 400h; it is allowed to vary between 551 and 565 . However, the continuous operating time shall not exceed 15min and the total operating time in any year shall not exceed 80h. 2.2 Partial Periodicity operation Periodicity f Unit Hz f<47.0Hz 47.0Hz f<47.5Hz 47.5Hz f<48.0Hz 48.0Hz f<48.5Hz 48.5Hz f<50.5Hz Permissible Operating Time Each Time sec Total min

Non-permissible Operation 15 65 350 Continuous Operation 4-1-2 15 65 350

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

50.5Hz f<51.0Hz 51.0Hz f<51.5Hz 51.5Hz f<52.0Hz 52.0Hz f<52.5Hz f>52.5Hz Note:

200 35 5 2

200 35 5 2

Non-permissible Operation

Above partial periodicity operation restrictions apply to the process from partial to full load. The partial Periodicities occurred during the period of no load operation, shutdown and overspeed shall not be counted into the restricted time. Refer to Section 6-2 and 6-3 for others.

4-1-3

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

4-2 1 Operating Mode

Varying Duty Operation

The set can operate in two modes: constant pressure and constant-slide-constant pressure. During peaking operation, the operating mode of constant-slide-constant is recommended, i.e. adopt the operating mode of constant pressure when the sets runs at more than 90% rated load; adopt the operating mode of slide operation when the sets runs between 90%-40% rated load; adopt the operating mode of constant pressure when the sets runs under 40% rated load. This operating mode can improve the heat economical efficiency, reduce the temperature difference of steam admission part and temperature change when the load changes, thus reduce the fatigue damage of low periodicity. When the set adopts the operating mode of nozzle adjustment (i.e. sequential valves), if the load reaches 90% rated load, No.I and II control valves are fully opened and No.III control valve is slightly opened. When the set runs between 90 40 , the boiler enters into the operation of slide pressure. The main steam pressure reduces along with the load while the opening of HP valve remains almost the same within this range. When the load is smaller than 40% rated load, the set enters the operation of constant pressure. In this phase, the HP control valve is used to change the load. When the load is smaller than 30% rated load, the IP control valve participates in the load adjustment. Refer to Fig. 4-2-1 for the variable curve of slide pressure operation.

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

4-2-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

When the mean annual operating time is no less than 7500h, the permissible stable

operating time for the peaking operating: Load ( ECR) 100 75 40 Hour/Year 4500 2000 1000

Note: The operating time for 75% and 40% load is not allowed to exceed the above time 3 Change Rate of Load: Under 20% nameplate power, no more than 2 ECR/min; From 50% to 20% nameplate power, no more than 3 ECR/min; From 100% to 50% nameplate power, no more than 5 ECR/min and permissible variable range: 20% 4 During the normal operation period under high load, if the load varies frequently

and the change rate is bigger, in order to have the minimum temperature change in the HP casing and minimum thermal stress, the throttle-governing mode (i.e. single valve adjustment) shall be used. However, if the set stably runs below the rated load for long term, the nozzle-governing mode (sequential valve governing) shall be used to obtain higher economical efficiency.

4-2-2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

Main Steam Pressure

Load

Fig. 4-2-1 Varying Curve of Slide Pressure Operation

4-2-3

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

4-3 Abnormal Operation When the steam turbine operates, if one or several limited values in Section 6-2 are out of limit and enter into the alarming state but none of them reaches the shutdown value and the power plant does not want to shut down the machine immediately, the short operation under this state is called as abnormal operation. When the steam turbine operates abnormally, close attention shall be paid to the trends of various overrun, the root causes shall be found out as soon as possible and proper measures shall be taken to eliminate them. Once the overrun value becomes the shutdown value, the machine shall be shut down immediately. Followings are the contents to be checked when some of limited values enter into the alarming state. Overrun Project Major Inspection Content Remark

1) Check whether the parameters of main and reheat steam as well as 1 Big Axial the vacuum fluctuate greatly. Displacement 2) Check the temperature of bearing pad and discharged oil and confirm whether the tungsten steel is worn. 1) Big HIP Expansion Difference a Confirm the direction of expansion difference Positive expansion difference or negative expansion difference decreases b Maintain the load on the set and reduce the fluctuation of main steam temperature. Check the exhaust temperature of HP casing. c If the positive expansion difference increases, the temperature of main steam shall be reduced or the load on the set shall be decreased gradually. d If the negative expansion difference increases, the temperature of main steam shall be increased or the load on the set shall be increased gradually. Or other measures shall be taken to raise the cylinder temperature.

2 Big Expansion Difference

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

4-3-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

2) Big expansion Difference of LP Casing Limited value for positive expansion difference only a Maintain the load on the set and reduce the fluctuation of reheat steam temperature. Check the exhaust temperature of LP casing. b Reduce the temperature of reheat steam and gradually reduce the load on the set. 1) Pay attention to the vibration trend of each bearing and ascertain the vibration type. 2) Check whether the following indications are normal a Temperature of Bearing Tungsten Steel and Inlet Oil; b Pressure of Oil Film on Each Pad; c Whether the unmatched value between the temperature of main and reheat steam vs. temperature of cylinder metal is too big; d Pressure of steam condenser and LP exhaust temperature; 3 Big Vibration e Temperature Difference of HIP Cylinder Metal; f Cylinder Expansion and Expansion Difference; g Check shaft bend value when shutdown; h Measure vibration frequency spectrum and axes track, etc. 3 If the vibration is too severe during the start-up period of steam turbine, the set shall not operate in the range of critical speed. If excessive vibration occurs during the load increase period, the load increase shall be stopped and the steam shall operate under the original load. Increase the load again after the cause is found out and eliminated. If the vibration in the accelerating period exceeds the limit, the machine shall be shutdown for inspection. It is not allowed to operate at a reduced speed. 1) Check the oil level of main steam oil box; 4 Low Lubricant 2) Check whether the lubricant system has leakage; Pressure 3) Check whether the main oil pump and oil injector are normal.

4-3-2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

1) Check the pressure of oil film of bearing; 5 High Temperature of 2) Check the lubricant quality and confirm whether there is any impurity in the oil; Supporting Bearing Pad and 3) Check whether the inlet oil temperature is normal; Return Oil 4) Check whether the gland seal leakage is severe. 6 High Temperature of Thrust Bearing Pad and Return Oil 1) Check whether the axial displacement is too big; 2) Check lubricant quality and confirm whether there is impurity in the oil; 3) Check whether the inlet oil temperature is normal.

1) When the oil level of main oil tank is low, check whether there is 7 High or Low leakage in the lubricant system. Oil Level of 2) When the oil level of main oil box is high, check whether there is Main Oil Tank water leakage in the oil cooler or whether the pending in the main oil tank is too much. 1) Check whether the LP exhaust temperature is normal;

2) check whether the vacuum breaking valve and emergency blowdown valve are closed; 8 Low Vacuum 3) Check whether the feeding pressure for the gland seal before and of Steam after the LP casing; Condenser 4) Check whether the cycling water temperature and level of steam condenser are normal; 5) If it is under the LP spray state, check whether the water spray is normal.

4-3-3

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

5 Shutdowns The set shutdown includes slide parameter shutdown, rated parameter shutdown and emergency shutdown. Slide parameter shutdown: mainly to reduce the cylinder metal temperature after shutdown to a lower temperature level. Normally it applies to light repair, heavy repair and other planned shutdown. Rated parameter shutdown: mainly to enable timely start-up after short time trouble-shooting. Therefore, it is desired to maintain a higher temperature level for the cylinder metal to shorten the star-up time. Emergency Shutdown: mainly applies to the accidents, dangers and sudden nature disasters. Preparations before the slide and rated parameter shutdown: a. Test AC and DC lubricant pumps, jacking oil pump and turning gear motor.

All shall work properly; b. Confirm whether the main steam valve, control valve and extraction non

return valve are agile without stuck; c. Heat the pipelines for the shaft seal auxiliary steam source and backup steam

source for the deaerator.

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

5-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

5-1 Slide Parameter Shutdown The steam turbine follows the boiler to slide the pressure to reduce the load according to the slide pressure curve. In the meanwhile, the speed governing port opens gradually and fully. During the load decrease period, the operator shall monitor the metal temperature after the control stage of HP inner casing and metal temperature change gradient of steam admission area of IP casing. Under the Manual and Operator Auto states, the limited value for the load decrease rate is given by the operation board. Refer to the operating procedures of set start-up for the operating modes. a. Limitations for the reduction of temperature, pressure and load according to

the slide parameter shutdown curve of boiler descending speed of main and reheat steam temperature: less than 1 /min; descending speed of main and reheat steam pressure: less than 0.098MPa/min; degree of superheating of main and reheat steam: more than 50 ; b. descending speed of cylinder metal temperature: not exceeding 1 /min; c. When the main steam temperature descends 30 or so, the state shall be kept for 5 10min before further temperature reduction. The purpose is to control the temperature difference between the main and reheat steam as well as the heat expansion and expansion difference of steam turbine; d. When the steam temperature after the control stage is 30 lower than the

metal temperature of flange inner wall at the control stage of HP inner casing, the reduction of temperature shall be paused; e. Attention shall be paid to the change of expansion difference of HIP casing

during the load reduction process. When the negative expansion difference reaches -1mm, stop reducing the load. If the negative expansion difference continues to increase and no effect is shown by taking measures, which affects the safety of set, the load shall be rapidly reduced to zero;

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

5-1-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

f.

During the load reduction process, engage the by-pass system and the spray

cooling system of LP casing according to the operation situation; g. During the load reduction process, pay attention to the change over of shaft

seal and steam source of deaerator; h. Control of drainage system during the load reduction process

1 At 30 rated load, open the drainage in the LP section; 2 At 20 rated load, open the drainage in the IP section; 3 At 10 rated load, open the drainage in the HP section; i. When the load is reduced to 50MW, open the condensed water recirculating

door to ensure the normal working of condensing pump and water level of steam condenser; j. When the new steam pressure reduces to 4.9 5.88MPa and steam

temperature reduces to 330 360 , if reducing the load to 5% rated load under the constant pressure, after the completion of inspection without finding abnormal, the machine shall be shutdown and the HIP reheat stop valve, control valve and exhaust non return valve shall all be closed; k. When the steam turbine trips, the AC lubricant pump shall start

automatically. Otherwise, it shall be started manually and start to record/plot the idling curve of steam turbine; l. m. When the speed reduces to 1200r/min, start the jacking oil pump; When the set idles at 300r/min, open the vacuum breaking valve to break

the vacuum (if the boiler is not stopped, it is not necessary to open the vacuum breaking valve). When the set speed reduces to zero, engage continuous turning gear, stop the water-jet ejector and record the shaft bend value and turning gear current at the same time; n. When the vacuum becomes zero, stop the steam supply and blower for the

gland seal; 5-1-2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

o.

When the HP inner casing upper half inner wall temperature of reduces 200

, interval turning gear can be used. Turn over 180 every half hour. When the temperature reduces below 150 , stop the turning gear and jacking.oil pump. After the turning gear is stopped for 8h, stop the lubricant pump; p. After shutdown, confirm there is no oil smoke in the main oil tank before

stopping the smoke discharge fan; r. period: 1 When sliding the parameters to reduce the load, closely monitor the set vibration. Should there by any abnormal vibration, stop the reduction of temperature and pressure. And stop the machine immediately; 2 During turning gear, if there is any friction sound or other abnormal situations, continuous turning gear shall be changed to regular turning gear. If there is hot bending, use the mode of regular turning gear to eliminate it, and then continuously perform turning gear for over 4 hours; 3 After shutting down, closely monitor and take measures to prevent cold steam and water from pouring into the cylinder, which will cause shaft bend and cylinder deformation. Following points shall be monitored during the load reduction and shut down

5-1-3

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

5-2

Rated Parameter Shutdown

The rated parameter shutdown normally applies to temporary shutdown. If it is planned to repair the set after shutdown, it is beneficial to adopt the nozzle governing mode. Because the metal temperature is lower if the set is shut down with this mode, the cooling time can be shortened. For the peaking set whose shutdown time only has a few hours or other short temporary shutdown, in order to have higher metal temperature after shutdown to facilitate quick re-start, normally the throttle governing mode is adopted. Based on different shutdown purposes, it is possible to select the valve management mode on the operation boardsingle valve control or sequential valve control (i.e. throttle governing or nozzle governing). a. b. time; c. When reducing the load, watch the changes of expansion differences of HIP Select 1MW/min as the rate of load reduction on the operation board; Based on the boiler operating situation, engage the by-pass system at any

casing and LP casing. If the expansion difference is too big, the load reduction speed shall be slowed down. Check to see whether the steam source for the gland seal needs to be changed over. When the expansion difference reaches 1mm, stop reducing the load and keep stable operation. If the negative expansion difference continues to increase and the measures taken are non-effective, which affect the set safety, the load shall be rapidly reduced to zero; or the set shall be disengaged and shut down; d. During the load reduction process, pay attention to the change over of steam

source for the deaerator; e. During the load reduction process, refer to Article h in Section 5-1 for the

control of drainage system; f. When the load is reduced to 50MW, open the recycling door of condensed

water to ensure the normal working of condensed water pump and water level of steam condenser;

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

5-2-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

g.

When the load reduces to 5% rated load, check whether the set has

abnormal. Press the tripping button of steam turbine to disconnect the motor. The HIP reheat stop valve, control valve and exhaust non-return valve shall all be closed; h. Other operations are the same as the slide parameter shutdown. Refer to

Article k to r in Section 5-1.

5-2-2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

5-3 Emergency Shutdown 1 Principle of Management for Emergency Shutdown a. Accident management shall follow the principle of ensuring personal safety,

not damaging equipment or damaging equipment as less as possible; b. When an accident occurs, the faulty equipment shall be stopped immediately

and relevant measures shall be taken to prevent the expansion of accident. If necessary, the non-faulty equipment shall continue working; c. d. Accident management shall be done quickly, precisely and promptly; The spot shall be maintained, in particular the data recorded in the

instruments and meters before the accident and at the time of accident for the references when investigating the root cause and working out corrective measures; e. When an accident is eliminated, the on-duty personnel shall completely and

precisely record the phenomena observed, operating parameters at that time, course of accident management and occurring time to facilitate the inquiries made by relevant people when analyzing the root cause. 2 Under the following circumstances, after the set is disengaged, the vacuum shall

be broken for emergency shutdown a. The set vibrates intensively with the amplitude of pad vibration reaching

over 0.10mm; b. c. Clear metal friction and impact sound in the steam turbine or generator; Water hammer occurs in the steam turbine or the temperature of main or

reheat steam drastically drops over 50 in 10min; d. Return oil temperature of any bearing rises to 75 or any bearing runs out

of oil and smokes; e Babbitt alloy temperature of any support bearing rises to 115 or Babbitt

alloy temperature of thrust bearing rises to 110 ;


Prepared by Checked by Reviewed by Standardized by Entered by

5-3-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

f. g.

Shaft seal or oil ring rubs seriously and sparks occur; When the lubricant pressure drops to 0.039MPa and no effect occurs even

starting auxiliary oil pump; h. When the oil level of main oil tank drops below the shutdown value of low

oil level and no effect occurs even refilling the oil; i. j. The oil system catches file; The axial displacement exceeds the tripping value, but the protection device

for axial displacement does not act; k. The speed of steam turbine exceeds 3360r/min, but the emergency governor

does not act; l. m n 3 The pressure of steam condenser rises to more than 19.7kPa; The cycling water discontinued and can not be recovered immediately; HP casing exhaust temperature 420 .

Under the following circumstances, after the set is disengaged, it is possible not to

break the vacuum for shutdown. a. b. The pipelines of main and reheat steam break and the set can not operate; The condensing water pump is in trouble and the water level of steam

condenser is too high but the back-up pump can not be engaged; c. The set idles after the load is rejected or runs with the plant power for more

than 15min; d. Due to the trouble of DEH system and governing security system, the set can

not maintain normal operation; e. Expansion differences of HIP and LP casings increase and exceed the limited

values after non-effective adjustment;

5-3-2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

f. 4

The sets operating time under the motor state exceeds 1min.

Precautions for Emergency Shutdown a. The HP and IP reheat stop valves as well as control valves shall be closed

immediately; b. All the extraction and exhaust non-return valves shall be closed

immediately; c. d. e. The AC or DC lubricant pump shall be engaged immediately; All the drainage valves for the steam turbine shall be opened; When the speed drops to 1200r/min, the jacking oil pump shall be started.

5-3-3

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

6 Restrictions for Start-up and Operation

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

6-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

6-1 Restrictions for Prohibiting Start-up and Operation Before start-up or during turbine rolling to pick up the load, confirm whether the following circumstances occur. If yes, start-up shall be prohibited or shut down for inspection. a. b. c. Failure of any safety protection device; The protection action value does not meet the requirement; The speed governing system of steam turbine can not maintain no load

operation. After the load rejection, the set can not control the speed below that causes the emergency governor acting; d. Any main steam valve, control valve, exhaust non-return valve is stuck or

not closed tightly; e. value; f. When turning gear, there is clear metal friction sound or the current for The rotor bend value of steam turbine is 0.03mm more than the original

turning gear increases obviously or swings greatly; g. Main display instruments (such as the sensors and display instruments for

measuring speed, vibration, axial displacement, relevant expansion, speed modulation, lubricant pressure, hydraulic oil pressure, outlet oil temperature of oil cooler, temperature of bearing return oil, pressure and temperature of main and reheat steam, vacuum of steam condenser, the pressure switch of governing and security system, the double-branch thermocouple and display instrument for measuring the cylinder metal temperature, etc.) are not complete or out of order; h. The AC and DC auxiliary oil pump, lubricant system and hydraulic oil

supply system are in trouble. The jacking device and turning gaer are out of order; i. The lubricant and hydraulic oil are not qualified. The inlet temperature of

lubricant is abnormal and return oil temperature is too high;

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

6-1-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

j.

In the heat recoup system, the main governing and control systems (such as

the water level of deaerator, pressure auto governing, by-pass system protection and auto governing, control system for the steam (electric) feed pump, etc.) are out of order; k. l. m. Water flooding into the steam turbine; Incomplete heat conservation for the set; During start-up and operation, the set exceeds the limited values; (see the

limited values for start-up operation in Section 6-2) n. The water vapor quality does not meet the requirement; for details, refer to

Water Vapor Quality Standard for Thermal Power Generator Sets and Steam Dynamic Devices (GB12145-89); p Trouble of DEH control system.

6-1-2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

6-2 Limits for Start-up and Operation 1 1.1 Alarming and Shutdown Value TSI a. Axial displacement: (The rotor positions itself at the working pad at the

generator side. The displacement of rotor towards to the direction of generator is positive, vise versa, it is negative) Alarming value: Shutdown value: b. -1.05mm -1.65mm +0.6mm +1.2mm

Under the state of turning gear, it alarms when the eccentricity exceeds

0.03mm of the original value. If it is more than 0.03mm, continue to turn the gear until it becomes less than 0.03mm before start-up; c. Expansion difference -3mm / -4mm / +6mm +14mm +7mm +15mm

Alarming value: HIP expansion difference LP expansion difference Shutdown value: HIP expansion difference LP expansion difference d. Shaft vibration: (peak, peak value) 0.076mm 0.127mm 0.25mm

Normal value: Alarming value: Shutdown value: e.

Vibration of bearing cover: (peak, peak value)

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

6-2-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

Normal value: Alarming value: Shutdown value: 1.2 Oil System a.

0.025mm 0.05mm 0.08mm(manual)

Lubricant pressure value at bearing midsplit surface 0.0785 0.0981MPa 0.049MPa 0.039MPa 0.029Mpa

Normal value: Alarming value: Shutdown value: Stop turning gear: b.

Pressure of hydraulic oil 14MPa 11.2MPa

Normal value: Alarming value: c.

Lubricant temperature 40 45

Normal working range of inlet oil temperature Oil return temperature: Normal value: less than Alarming value: Shutdown value: d. 65 65 75 ( manual)

Babbitt temperature of support bearing 105 115 6-2-2

Alarming value: Shutdown value:

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

e.

Thrust pad temperature of thrust bearing 100 110

Alarming value: Shutdown value: f.

Oil level of lubricant tank

Highest oil level: Lowest oil level: Alarming value: Alarming value for low oil level: Shutdown value for low oil level: g. Oil level of hydraulic oil tank see Specification for Lubricating System

Highest oil level: Lowest oil level: Alarming value: see the operation instruction for hydraulic oil system from the supplier Alarming value for low oil level: 1.3. Pressure of Steam Condenser Normal value: Alarming value: Shutdown value: 1.4. 5.8kPa 14.7kPa 19.7kPa

Steam Temperature at Steam Drain of HP Outer Casing Normal value: less than340

6-2-3

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

Alarming value: Shutdown value: 1.5.

380 420

Exhaust Temperature of LP Casing: Normal value: less than Alarming value: Shutdown value: 36 80 engaging the water spray 110 ( manual)

1.6.

When operating at the rated load, if the temperatures of main and reheat steam

are lower than 520 , the set shall reduce the load. During the load reduction, if the steam temperature recovers, the load reduction shall be stopped. Otherwise, the load reduction shall continue. When the steam temperature reduces to 450 , the load shall be reduced to zero. If the steam temperature continuously drops to 430 and cannot be recovered, the set shall be manually stopped. 1.7. During start-up, load variation and shutdown, the dropped values for the

temperatures of main and reheat steam shall be less than 50 in the period of continuous 15 min. If it reaches over 80 , the set shall be manually stopped. 2 Operation Surveillance 2.1 Oil System a. Outlet Oil Pressure of Main Oil Pump 1.9 2.05MPa

Normal Working Range: b.

Temperature of Hydraulic Oil 35 54

Normal Working Range:

When the oil temperature is lower than 18 , start-up is prohibited.

6-2-4

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

2.2 Metal State When a failure is found during the ATSs rotor stress surveillance, the following restrictions on start-up operation shall be monitored for the set proper: a. Temperature rising rate of HIP cylinder wall metal less than 1.5 /min

(inner wall metal at Stage 1 of HP and IP casings); b. Temperature differences between the HP and IP outer casings as well as the

inner and outer walls of HP inner casing less than 50 respectively; c. Temperature difference between the inner and outer walls of HP main stop

valve casing; d. Temperature difference between the inner wall of HIP casing and outer wall

of HP inner casing less than 50 ; e. Temperature difference between the upper and lower half of outer wall of

HIP outer casing less than 50 ; f. Temperature difference between the upper and lower half of outer wall of HP

inner casing less than 35 ; g. Temperature difference between the inner and outer wall of flange of HIP

outer casing less than 80 ; h. Temperature difference between the left and right flanges of upper half of

HIP outer casing less than 10 ; Temperature difference between the upper and lower half flanges of HIP outer casing less than 10 .

6-2-5

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

2.3 Steam a. b. c. Temperature rising rate of main steam not exceeding 1.5 /min; Temperature rising rate of reheat steam 2 /min; The limited value for the temperature difference between the main steam (in

front of main steam valve) and reheat steam (in front of IP combined steam valve) is in Fig.6-2-1; e. The difference of steam temperature of each main steam pipeline and that of

each reheat steam pipeline shall not exceed 17 ; f. When the temperature difference between the flooding proof thermocouples

on each section of extraction pipeline is more than 40 , it can be regarded as the flooding of cylinder. Measures shall be taken immediately to remove the ponding; g. When the set operates at 5%-10% rated load, the maximum permissible

exhaust pressure of LP casing of steam turbine shall be 13kPa and the exhaust temperature of LP casing is not more than 52 . In this load section, long term operation is prohibited; h. When the set is allowed to run at 30%-100% rated load for long term, at this

time the maximum exhaust pressure shall be 14.7kPa. When exceeding the value, the condensing system shall be checked; if exceeding the value but not exceeding the shutdown value, the operating time shall be less than 60min. Otherwise, the set shall be stopped; i. The highest permissible exhaust pressure during idling after the load

rejection shall be 13.8kPa, the exhaust temperature shall be less than 80 and operating time shall be less than 15 min. Otherwise, the set shall be stopped; j. Limite value for each section of extraction pressure and control stage

pressure during the start-up and operation period

6-2-6

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

After the control stage: 1# steam extraction 2# steam extraction 3# steam extraction 4# steam extraction 5# steam extraction 6# steam extraction 7# steam extraction 8# steam extraction 2.4

13.78MPa 6.56MPa 3.98MPa 1.86MPa 0.89MPa 0.525MPa 0.29MPa 0.154MPa 0.071MPa

Temperature Difference Between Metal and Steam: (main and reheat steam)

Before start-up, the steam temperature after the HP control stage or IP Stage 1 shall match the metal temperature. The temperature difference between the metal and steam temperatures of cylinder inner wall after the HP control stage or IP Stage 1 shall meet the following requirement: t=steam temperature-metal temperature t ideal value 10 t permissible value 90 -20 t limit 150 -50

6-2-7

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

(Main Steam Temperature-Reheat Steam Temperature=) Temperature Difference

Prohibited Operating Area Permissible Operating Area

Load Prohibited Operating Area

Fig. 6-2-1 Permissible Temperature Difference Between Main Steam and Reheat Steam

6-2-8

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

6-3 General Precautions a. The set is not permitted to operate for long term when the main steam value

opens at one side and closes at the other side; b. c. Long term operation at less than 30% rated load shall be avoided; Before the set is disconnected, the operating time of motor shall not exceed

1 min and the vacuum of steam condenser shall be normal; d. seal; e. When the exhaust temperature is high, watch the changes of expansion Before engaging the turning gear, steam shall not be supplied to the gland

difference, vibration, bearing oil temperature and bearing metal temperature. When the exhaust temperature reaches the alarming value, besides engaging the spray system, other methods such as increasing the degree of vacuum or load shall be taken as well; f. Except that emergency shutdown requires to break the vacuum immediately,

normally, the vacuum shall be maintained if the set trips until it drops to 10% rated speed under the idling state; g. The drainage systems of steam proper, main steam pipe, hot section of reheat

steam pipe, cold section of reheat steam pipe and steam extraction pipe shall keep unblocked during start-up and shutdown; h. The overspeed test can not be performed right after the oil spray test in order

to avoid the inaccuracy of overspeed test due to accumulated oil; i. When the set runs at 50%-60% rated load, the steam condenser is allowed to

be cleaned and repaired at the half side. However, the changes of vibration, oil temperature and metal temperature of 3# and 4# bearings shall be watched out;

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

6-3-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

j.

When the set is out of power grid and uses the plant power, any continuous When all the HP heaters are removed, the rated

operating time shall not exceed 15 min. During the life time of 30 years, the total times shall not exceed 10 times;k. output (300MW) can be ensured, but no exceeding is allowed; The removal of HP heater shall be performed from HP to LP. If the LP heater needs to be removed as well, the steam turbine generator set must reduce the load; When the heaters are removed, the pressure after the control stage and the extraction pressure of each stage shall not exceed the limited value. See Article J in Section 6-2; l. When engaging the heaters, they shall be engaged with the start-up from LP

to HP in turns; m. During the accelerating process, the set shall rapidly pass through the

following critical speeds of various steps. During this phase, the vibration of bearing pad shall not exceed 0.10mm; Shafting Critical Speed (calculated value) Step 1(Step 1 of Generator Rotor) Step 2(Step 1 of LP Rotor) Step 3 (Step 1 of HIP Rotor) Step 4 (Step 2 of Generator Rotor) 1370r/min 1688r/min 1750r/min 3517r/min

For the initial start-up of newly installed set, the shafting critical speeds shall be recorded. After confirmation, the actual measured values shall be used for the actual shafting critical speed. n. The speeds of Step 1 vibration type of long blade at the last two stages of LP

casing and harmonic resonance of k6 are lower than the working speed. In order to ensure the safety of blades, warming up and stop in the resonance speed range are not allowed. The shade line part in Fig. 6-3-1 represents the resonance speed range to be avoided; p. Manual Mode control can not be used as the control mode for long term

operation;

6-3-2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

q.

During the entire operation period, monitoring and inspection shall be

enhanced. Any found problem shall be handled timely to avoid accidents.

At this speed, listen to the soundsand check the monitoring instruments

Warming up Speed at Medium Speed

Warming up Speed at High Speed

Rated Speed

Fig.6-3-1

6-3-3

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

6-4

Regular Check and Test

Besides the tests performed during the start-up period, regular performance tests are necessary to ensure the reliability of set operation. The tests shall be performed strictly in accordance with relevant test regulations and specifications. Any defective part found shall be repaired or replaced immediately. a. Valve Movement Test once per week

Before doing the valve movement test, the set load shall be reduced to 50%-70% rated load. Otherwise, the main steam parameters or reheat steam parameters and boiler level will change greatly during the test period, which affects stable operation. When performing the test, follow the valve test buttons on the operation board. After a group of valves are tested in sequences, test another group of valves. The sequence of valve test follows the arrangement on the operation board. Test process of IP valve group: close Control valveclose Main Steam Valveopen Main Steam Valveopen Control valve, return to normal. The HP valve test is not restricted in this way. During the valve movement test period, the pressure feedback of control stage shall be engaged. b. c. d. Start-up test of AC and DC lubricant pump Change over test of hydraulic oil pump once every 15 days once every week

Movement test of extraction check valve (except for the HP exhaust non once every month

return valve) e.

Vacuum tightness test, see Item e of Article 11 in Section 3-1 once every month

f. valves

Tightness test of HP and IP reheat stop valves as well as HP and IP control once every six month

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

6-4-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

(1) The test shall be performed at the rated steam pressure, normal vacuum and zero load; (2) When the HP and IP reheat stop valves as well as HP and IP regulating values are fully closed respectively, the steam turbine speed shall be reduced below 1000r/min;When the main steam pressure is low but not lower than 50% rated, the dropped value n of steam turbine steam can be corrected by the following formula: n=(p/p. )x1000r/min n the formula: p ---main steam pressure during test

p. ---rated main steam pressure Note: The valve tightness test shall be performed after each disintegrated repairing of HP and IP reheat stop valves as well as HP and IP control valves, set heavy repair and load rejection test. g. h. i. Oil spray test of emergency governor Raising speed test of emergency governor On-line test of HP emergency governor IC (HPT) electromagnetic valve; j. On-line test of overspeed limit IC (OSP) electromagnetic valve; k. Check whether the TSI, steam temperature and pressure as well as other according to Specifications for Governing and Security System

meters are normal and precise once every month l. Protection device test of low lubricant pressure verify during light repair

6-4-2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

m. n.

Other tests for the DEH system can be found in the DEH manual Check whether the sprayer of spray device of LP casing is blocked check

during heavy repair

6-4-3

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

7 Auxiliary Operation of Start-up and Shutdown The auxiliary operation of start-up and shutdown mainly refers to the operations of pre-warming system of HP casing, interlayer heating system of HP casing, emergency discharge system and ventilator valve system. Because the operating sequence of ventilator valve has been explained in the section of start-up with the IP casing, there is no more explanation in this section.

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

7-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

7-1 1 Inspection before Warming up

Pre-warming of HP Casing

1.1 Confirm whether the HP control valve is closed and the steam parameters: Steam pressure: 0.4 0.8MPa; steam temperature: 200 250 maintain

over 50 degree of superheating. 1.2 Confirm whether the operation of turning gear after engagement is over two hours. 1.3 Confirm whether the gland seal at the shaft end of HIP casing is engaged. 1.4 Confirm whether the pressure of steam condenser does not exceed 19.6kPa. 1.5 Confirm whether the metal temperature at the control stage of HP inner casing is under 150 . 2 Operation Process of Warming up The operator runs the warming up system on the operation board according to the set state displayed on the CRT. 2.1 Operation Preparation a. Fully open the drain valve on the HP main steam pipe, forcibly close the

exhaust non-return flap of HP casing and confirm that each extraction non-return flap of HP casing is closed; b. casing; c. d. Fully open the drain valve of HP inner casing; Fully open the ventilator valve (VV valve). Fully open the drain valve in front of the exhaust non-return flap of HP

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

7-1-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

2.2

Warming up Operation Gradually open the RFV to let the warming steam flow into the HP casing. Part

of steam enters into the drainage system through each drain hole. Another part of steam leaks into the IP casing through the gland seal between the HP and IP casings. Then it is discharged into the steam condenser through the connecting pipe and LP casing. Maintain the pressure in the casing within 0.4 0.5MPa by adjusting the RFV and drain valve. During the warming up period, the operator shall not let the temperature rising rate exceed 50 /h. The temperature difference and expansion difference of each cylinder wall shall be maintained within the permissible range (by adjusting the RFV and drain valve of each section in the HP casing). When the metal temperature of upper half inner wall at the control stage of HP inner casing reaches 150 over, the throttle valve in front of the RFV opens 10%. Refer to Fig.7-1-1 for the warming up maintaining time. 2.3 Finishing Warming up Operation a. b. 3 When warming up is finished, the RFV shall be closed (RFV); Fully close all the drain valves of HP casing;

Pre-warming of HP Control valve When the inner or outer wall temperature of HP main steam control valve is

lower than 150 , during the pre-warming of HP casing, the HP main steam control valve casing shall be pre-warmed. During the pre-warming of HP main steam control valve casing, the HP main stop valve is at the closed state. The main steam for pre-warming enters into the control valve casing through No.2 Main Steam Valve. The pre-warming operational method is as follows:

7-1-2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

a. b. c.

Confirm that the HP main stop valve and control valve are fully closed; Open the drain valve on the HP main stop valve casing; Open the electric main steam valve, turn No.2 Main Steam Valve of HP

casing to the pre-warming position. At this time, actions shall be taken to prevent the rotor from turbine rolling and turning gear from being released due to the untightness of governing port. d. Monitor the temperature difference between the inner and outer walls of

control valve, when it exceeds 80 , close No.2 HP Main Stop Valve when it is less than 70 , return No.2 HP Main Stop Valve to the pre-warming position. Repeat the process until the metal temperatures of inner and outer walls of valve casing rise to 150 over and reach the requirement of valve pre-warming. e. f. When the pre-warming is finished, close the HP main stop valve; Close the drain valve of HP main stop valve casing.

7-1-3

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

Heat Conservation Time Metal Temperature of Upper Half of Inner Wall at Control Stage of HP Inner Casing before Pre-warming

Fig.7-1-1 Curve of Heat Conservation Time

7-1-4

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

7-2 1

Heating System of HP Casing Interlayer

System Composition and Function The system composition is shown in Fig.7-2-1. The function is to introduce the

main steam into the interlayer between the HP inner and outer casings to heat them so as to reduce the positive expansion difference of HIP casing and the temperature difference of inner and outer walls of HP inner casing as well as make the temperature of HP outer casing even along the axial direction. The control means is to change the flow to control the heating speed by adjusting the interlayer steam admission pressure. The steam admission box pressure of cylinder interlayer: Normal Value: 0.98--4.9Mpa 6.5Mpa

Maximum Value: 2 Test Before System Engaged a. b. c. 3

The safety valve is reset according to 6.5MPa; The electric valve and manual valve are agile; The thermocouple and pressure gauge are installed and work properly.

Preparation before System Engaged a. Confirm the drain valve of heating steam admission box of cylinder

interlayer is opened; b. Confirm the metal temperature of upper half inner wall of HP outer casing is

less than 300 ;

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

7-2-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

c.

The operator manually opens the manual stop valve in the back of heating

steam admission box of cylinder interlayer (the manual stop valve in front of the steam admission box is closed). 4 System Operation a. Open the electric stop valve in front of heating steam admission of cylinder

interlayer; b. Before the new machine is put into operation, the operator manually adjusts

the manual stop valve in front of the heating steam admission box of cylinder interlayer to let its pressure lower than that of main steam when engaging the system so as to reach the normal working pressure; c. During the process of acceleration or picking up the load, the operator

adjusts the manual stop valve in the back of heating steam admission box of cylinder interlayer to control the interlayer steam volume according to the HIP expansion difference, upper and lower temperature difference of outer walls of HP inner casing as well as the upper and lower temperature difference of inner walls of HP outer casing; d. Closely monitor the temperature rising rate of cylinder not to exceed 50 /h,

the upper and lower temperature difference of outer walls of HP inner casing and the upper and lower temperature difference of inner walls of HP outer casing not exceed 50 . e. When the outer wall metal temperature of HP outer casing lower half at the

steam inlet exceeds 350 and the HIP expansion difference is within the permissible range, the heating system of cylinder interlayer can be stopped.

7-2-2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

Finishing Operation Close the electric stop valve in front of the steam admission box; Close the manual stop valve in front of the steam admission box; Close the electric stop valve in the back of the steam admission box; Close the drain valve. Pressure Thermocouple Gauge Relief Valve

Manual Electric Valve Valve Connect to left half of interlayer chamber

New Steam

Steam Admission Box of Cylinder Interlayer

Interlayer Chamber of HP Inner and Outer Casings

To HP Exhaust

Connect to right half of interlayer chamber

Drainage to Steam Condenser

Fig.7-2-1 Diagram of Heating Interlayer System of HP Casing

7-2-3

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

7-3 1

Water Spray of LP Casing of Steam Turbine

Composition, Function and Control The spray system consists of atomization sprayer, electric valve, manual throttle

valve, manual stop valve, sieve, pressure gauge and steel tube. Refer to Spray Device System Diagram for the detailed composition. During the initial start-up, in order to prevent the steam condenser system from not timely taking the exhaust steam of LP casing and heat of LP by-pass steam, which causes the temperature rise of exhaust temperature of LP casing, as well as the exhaust temperature rise of LP casing due to the blast of LP stage when the set has low load and high back pressure, which impacts the movable blades of last several stages of LP casing and LP through flow, the water spray system of LP casing is built. The control can be manual and auto: 1.1 Auto Control: When the exhaust temperature at any point before or after the LP casing equals or is more than 80 , the water spray is engaged. When the temperature of each point before or after equals or is less than 65 , stop the water spray. 1.2 Manual Control When the spray control is under the manual control state, the temperature does not control the spray. The operator can start or stop the spray system based on the concrete situation. Note: For the auto or manual control, the start or stop of water spray shall be done at the front and rear sides at the same time.

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

7-3-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

2 Test before Spray System Engaged a In the system , all the electric and manual valves shall be agile; b before connecting to water (water source is the condensed water from the desalting device), fully open the electric and manual valves, remove the sprayer, and then connect to water to rinse the system until there is no impurity left on the sieve. Install the sprayer and firmly fix it by spot welding; c Start the electric valve after the manual throttle valve and adjust its opening so as to control the spray pressure after the throttle valve within 0.49 0.784MPa; d Check the atomization of sprayer and spraying angle. They are adjustable through changing the spraying pressure. After the adjustment is done, record the opening of throttle valve and spraying pressure. Note: a The electric valve on the spray pipe shall be opened before start-up and closed after shutdown. b The normal engagement and shutdown are controlled by the electric valve after the throttle valve. When it fails to act, the manual by-pass valve can be used for that purpose.

7-3-2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

7-4 1

Emergency Discharge System

Composition, Function and Control The system consists of emergency blowdown valve, electromagnetic control

ventilator valve and steel tube. Refer to Diagram of Auxiliary System of Steam Turbine Proper for details. When the set rejects the load, in order to prevent the residual steam in the HP casing and HP steam guiding pipe from fleeing into the IP and LP casings from the HIP gland seal gap and impacts the set, the BDV is installed. When the gland seal teeth wear and the gap becomes bigger, the overspeed possibility will increase. When the set trips, the BDV opens rapidly and directly guide the residual steam at the HIP gland seal to the steam condenser to prevent the overspeed of set. The BDV open and close are controlled by the oil servo motor stroke of IP control valve: When the oil servo motor stroke of IP control valve is 30mm, the BDV is closed. When the oil servo motor stroke of IP control valve is <30mm, the BDV is opened. 2 Test Before Start-up aCheck and confirm that the compressed air enters into the upper part of piston of BDV when the electromagnetic control ventilator valve excitates. The piston overcomes the downward shift of spring force to close the valve. When the electromagnetic control ventilator valve dis-excitates, the upper part of piston of BDV connects with the exhausted air to release the air pressure. Under the action of spring force, the piston moves upward to open the valve. b The controlling compressed air pressure shall be within 0.4 0.7MPa to ensure the close of BDV.

Prepared by

Checked by

Reviewed by

Standardized by

Entered by

7-4-1

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM

Note: it is better to take the higer value of compressed air. c Check and confirm the correctness of electric control interlock.

7-4-2

Start-up and Operational Manual for Steam Turbine

(WE) D300N-000106ASM