PTD EA13/Fu
17.09.2007
7 SS52 Siemens D www.siprotec.com Distributed bus bar/Breaker failure Protection SIPROTEC 7 SS52 low impedance measurement; fully numeric; stabilized differential current measuring principle, realtime processing, check zone, 3 self adapting algorithms (Fourier, 1 of 1, 2 of 2), 50/60 Hz, 20 Samples/cyc, single phase measurement (phase segregated), separate earth fault characteristic, BU synchronized by CU each ms 3 of 3 tripping criterium, (even/odd samples+ check zone); overcurrent criterion, add. criteria by separate relay/ BI release < 15 ms (I > 4 Iset), < 25 ms (I < 4 Iset), independent of configuration Ts > 2 ms (stability;) Ts > 3 ms (tripping) basically not limited, matching via software NC(89B) AND NO(89A) decentralized, 1 CU with BUs in star configuration (2 fiber-optic cables)
REB 500 (sys) ABB S/CH www.abb.com Numerical busbars and circuit-breaker failure protection low impedance measurement; fully numeric; stabilized differential current principle; phasor processing;
P740 Areva T&D/(former Alstom) F www.areva-td.com Numerical bus bar Protection low impedance measurement; fully numeric; realtime processing (like 7SS52!) saturation detector; stabilized differential current principle; check zone, ground fault characteristic; 2.4kHz sampling rate BU synchronized by CU each ms
DRS-BB VA TECH A www.sat-automation.com Distributed digital busbar protection DRS-BB low impedance measurement; fully numeric; stabilized differential current principle; check zone; 16.7/50/60 Hz; Measurement preprocessing in BU; saturation detector, BU synchronized by CU each ms; single phase measurement; FFT algorithm for earth fault characteristic diff. current discrim zone (CU slave unit) & diff. current check-zone (CU master unit) & fast overcurrent criterion (BU) 15 ms at I> 4 Iset; < 22 ms at 1.1 Iset (50/60Hz) or < 25 ms at 1.1 Iset (16.7Hz), fast trip relays Ts > 1 ms (stability;) Ts > 3 ms (tripping) basically not limited, matching via software NC(89B) AND 2x NO(89A)
SEL-487B Schweitzer USA www.selinc.com Bus bar and Breaker Failure Protection, Automation and Control system low impedance measurement; fully numeric; stabilized differential current principle; check zone optional; 50/60 Hz; Saturation detector 2nd characteristic for external faults; direction measuring by phase comparison with ref. feeder);
Tripping criteria
differential current, current direction comparison, differential current, check zone; overcurrent overcurrent criterion, check zone criterion; add. criteria by separate relay/ BI release 20...30 ms (I > 5 Iset) (according to data sheet; "formerly longer"); dependent on no. of bays (?) Ts > 2 ms n.a. NO/NC, adjustment required decentralized, 1 or more CU with BUs in star configuration (2 fiber-optic cables); up to 18 BU on one CU, quadruple bus plus transfer bus 32 59 (in groups of 9) CU 19", 6 HE BU: 1/2 19" U . 1/3 19" (central. arrangement) typ. 15 ms (data sheet), resp.12-18 ms
differential current AND (direction element OR fault detec. Logic); check zone, overcurrent, undervoltage < 20 ms (50 Hz) / < 16.7 ms (60 Hz) "subcycle tripping" (including high speed output contact closure) Ts > 2 ms 10:1 NC(89B) AND/OR NO(89A)
Tripping time
Current transformer saturation CT conditions, ratio Isolator auxiliary contacts (NC=89B; NO=89A) Topology
Ts > 2 ms 40:1 (sep. CT calculation required) n.a. decentralized, 1 CU with BUs in star configuration (2 fiber-optic cables)
System performance
up to 12 12 48, (incl. couplers), groups of 8 5 disconnectors CU 7SS522: 19", 6 HE BU 7SS525: 1/3 19" of 6 HE (flush mounting) BU 7SS523: 1/2 19" of 6 HE (flush/cubicle mounting) Weidmller modul blocks (SIPROTEC V3-relays) dedicated PCB, double Eurosize
triple bus+? 8 (formerly 16!) 28 (in groups of 4;) (2 CUs linkable?) CU P741: 19 " (80 T), 4 HE BU P742: 8 " (40 T), 4 HE BU P743: 12 " (60 T), 4 HE
Construction
no limit in topology (not limited for standard topologies), limited to 16 (24) zones 16 80, 6 disconnectors CU: 19", 9 HE, BU (LBB): 1/4 19", 6 HE, BU (CBB): 1/2 19", 6HE Phoenix-Contact
n.a. ("for multiple BB") 2 (1 unit) or 6 (3 units) 6 (1 unit)/18 (3 units) 19", 16"/9 U, 9"
Terminals Technology
PHOENIX Combicon? dedicated PCB, double Eurosize MiCOM series; presumable system I/Os; same displays with CU and BU inflexible; Expansion causes new configuration by manufacturer 4 X J (1/5A selectable)
easy to extend later on, no precautions, few type of components as spare parts 3+1 x J (1A, 5A)
CU: double Eurosize PCB, system " MRB" BU: system " DRS-Light"; add. comm.-board DSR-SR Expansions by a new configuration by means of "graph theory" 1A / 5A
Basic equipment with 4 I/O boards, expandable 18 x J (1A, 5A) not adjustable; 3 x U
Binary inputs
CU: 12 BI; 16 DO BU 7 SS523: 20 BI; 12 DO BU 7 SS525: 10 BI, 11 DO BI, DO partly routed CU: LCD of 4 x20; 34 LED; 24 keys BU: LCD of 4 x16; 18 LEDs; 12 keys (7 SS523)
CU: 12/24 BI; 7 CR, 2 AR BU: 16 BI; 8 CR, 8 AR BI threshold by FW adjustable; 2s root
Display, keys
Power supply
Functionality
Busbar protection 87 BB (/) P/(87 BB/N)/(87 CZ) Breaker failure (50 BF) Voltage protection (27/59) Supervision Disturbance recording
CU: LCD of 2 x16; 12 LEDs, 7 keys BU P742: LCD of 2 x16; 12 LEDs, 7 keys BU P743: LCD of 2 x16; 12 LEDs, 7 keys CU: 3 ranges (48-60 VDC, 110-125 VDC, 220-250 CU and BU: 1 range (48-250 VDC); Redundancy 3 ranges (24-54 VDC, 48-125 VDC/30-100 VAC, CU:4 ranges (24 V, 48-60 VDC, 110-125 VDC, VDC) possible 110-250 VDC/100-240 VAC) 220-250 VDC) BU: 1 range (48-250 VDC) BU: 2 ranges (20-72 VDC, 80-350 VDC or AC rms 50/60Hz) x/x/x x/x/x/x/x x/x/x
BU: LCD, 4 x18; 6 keys; 3 LEDs; detachable CU: LCD, 4 x18; 6 keys, 3 LEDs
CU: 8 (16, 24, 32) BI; 6 (12, 18) BO (15x1NO), 3 AR BU (LBB): 15 BI, 3 CR (2x1NO, 1x2NO), 1 AR BU (CBB): 23 BI, 8 CR (4x1NO, 4x2NO), 1 AR 6 isolators possible, add. BI via CAN bus CU: LCD 2 rows; 10 LEDs, 6 keys BU: LCD 2 rows; 10 LEDS, 6 keys
Basic equipment: 7 BI; 8 DO (5NO, 3ChO) 4 x I/0, each: 18 BI (partly rooted); 2 DO (2NO); 6 DO high speed (2NO)
LCD 128 x128 pixels (3"x3"); 6 keys; 18 LEDs; 8 function keys/LEDs; 3 ranges (18-60 VDC, 38-140 VDC, 85-300 VDC/85-264 VAC)
x/-/ x
2 stages (opt.) x
2 stages -/-
ct circuits, internal trip circuits 1 kHz; max. 5 s; 8 records 3xJ (feeder) and Idiff/Istab (zones)
x max. 2.4 kHz; max. 1.5 s (2.4 kHz)/6 s (0.6 kHz) 4xJ, 4xU (feeder)
open CTs (delta algorithm?) 1.2 kHz; 20x10.5s s (BU), 8x1.2 s (CU), 8 analog, 32 digital channels (CU), 4 analog, 32 digital channels (BU) Test function (simulation of the BI)
ct circuits (3 different principles), internal trip circuits BU (feeder) 4 records a' 75 cycles; CU max. 10 s (zones)
2 stages (definite time elements) internal; external 2 stages (27/59) negative sequence system, zero-sequence system CT fault 24 s/cyc; 15 cyc; 20 records (no Idiff/Istab)
Automation Other
programmable control functions (with SELogic) 6 parameter sets Coupler needs 2 CT cores/ bays
Back-up protection 50/51 (/P); 67P 50/51 (/N); 67N Other functions
End fault protection Overcurrent release Pole discrepancy supervision Ground fault Diff. protection (effectiveness doubtful (BEWAG)!)
Ordering form
End fault protection CB control, CFC 4 parameter sets CT supervision by zero-sequence system Trip circuit supervision with CFC (how?) Test mode with I/O stimulation Sensitive earthfault characteristic HW order by order code, configuration and tests done plant specific
50/51P, 2-stage def.time OR inverse time with highset; 50/51N, 2-stage def.time OR inveret time with highset; End fault protection Overcurrent release optional electrical lockout
DBN ZIV E www.ziv.es DBN bus bar of differential Protection terminal low impedance measurement; fully numeric; stabilized differential current principle; check zone optional; 50/60 Hz; Saturation detector
RED 521 ABB S /CH www.abb.com General differential protection fully numeric; stabilized differential current principle; 50/60 Hz
REB 670 ABB S / CH www.abb.com Busbar differential protection IED fully numeric; stabilized differential current principle; 50/60 Hz
GRB100 Toshiba TM T & D J www.tmt-d.com Numerical centralized bus bar protection relay low impedance measurement; fully numeric; stabilized difference current principle; saturation detector; 50/60Hz; checking zone and undervoltage (opt)
B-PRO nxtphase CAN www.nxtphase.com bus protection relay (three phase or single phase) low impedance measurement; fully numeric; stabilized difference current principle; saturation detector;
B90 GE CAN www.Geindustrial.com/multilin Bus differential relay low impedance measurement; fully numeric; stabilized difference current principle; saturation detector; additional direction criterion at saturation (2 out-of 2), 64 s/C;
B30 GE CAN www.Geindustrial.com/multilin Bus differential relay low impedance measurement; fully numeric; stabilized difference current principle; saturation detector; additional direction criterion at saturation (2 out-of 2), 64 s/C;
differential current
differential current
12-18 ms
12-19 ms
8-20 ms typical
typ. 16 ms
typ. 16 ms
n.a.
n.a. adaptable
Ts > 2 ms 32:1; range 1...50000 A n.a. centralized, 3 equipments "IED" (each singlephase), additional equipment for BFP or I/O expansion, connection via optical doubleended ring 3-BB, transfer bus 4 8, 16, 24 19" , 180 mm (3 U), 250 mm
Ts > 2 ms
n.a.
n.a.
1-BB or 2-BB 1 or 2 3-phase up to 6 feeders 1-phase up to 18 feeders (3 equipments) CU: 19", 6 HE No drawout of current inputs
1-BB or 2-BB 1 or 2 3-phase up to 8 feeders 1-phase up to 24 feeders (3 equipments) CU: 1/1 resp. 1/2 19", 6 HE
centralized (in the past also decentralized!), 1 centralized, 1 equipment (3-ph) or 3 CU with Bus in star configuration (2 fiber-optic equipments (1-ph) cables) only up to 8 m 2 feeders per BU 2-BB +transfer bus 1 1 to 4 32 in groups of 8 CU: 3/4 19", 6 HE, 310 mm BU: 1/2 19", 6 HE, 310 mm 1 (+1 transformer) 6 or 18 19", 133 mm (3U), 305 mm
centralized
n.a. System family GR, double Eurosize boards Universal relay (UR) platform, Universal relay (UR) platform,
Boards (uP, AIM, BIM, BOM) of REx 5xx-System see IED 670 System data
Expansions by manufacturer DBP-B: 3 x J? (1 A, 5A) DBP A: 3 x U? CU: 7/14 BI, 7/14 DO BU: 8/16 BI, 2 CR (2NO)+4 CR ??, 8/16 AR
Functionality by ordering size fixed (9 or 18 X J) 1A/5A adjustable 18 x J 16 (3-ph) / 32-48 (1-ph) BI 24 DO not marshallable
see IED 670 System data 1A or 5A 12/24 x J see IED 670 System data
Expandable CU: 0/6/12 x U BU 2 x3 x J (1 A, 5A) not switch-selectable CU: 5 BI; 13 DO BU GRB100 B100: 2 x13 BI; 2 x6 DO BU GRB100 B200: 2 x13 BI; 2 x10 DO BI and DO partly rooted CU: LCD 4x40; 8 LED; 19 keys; 3 test jacks BU: 1 LED 3 ranges (48 VDC, 110-125 VDC, 220-250 VDC), no 60 VDC
6 plug-in slots, numerous I/O boards (U, I, BI, DO, DO fast) 3 x8 J (1A/5A) resp. 3 x7 J/1 x3 U per equipment up to 96 BI, up to 48 DO
6 plug-in slots, numerous I/O boards (U, I, BI, DO, DO fast); practically only 3 I/O 18 J (1A/5A) bzw. 15 J/3 U up to 96 BI, up to 48 DO
CU: 13 LEDs, display, 20 keys BU: 5 LEDs, 1 key 3 ranges (24-48 VDC, 110-125 VDC, 220-250 VDC), no 60 VDC
attached operating panel 3 LED, 4 x16 LCD, 6 keys 2 ranges (110-125 VDC, 220-250 VDC), no 60 VDC
14 or 42 there strappable
LCD 2x20; 14 LED fixed, 48 LED marshallable, 16 function keys marshallable, 22 keys 2 ranges (24-48 VDC, 125-250 VDC/AC), no 60 VDC !
LCD 2x20; 14 LED fixed, 48 LED marshallable, 16 function keys marshallable, 22 keys 2 ranges (24-48 VDC, 125-250 VDC/AC), no 60 VDC !
x/-/x
x/-/-
x/-/x
x/-/x
1 characteristic
1 stage 27
2 stages (opt.)
2-stage, int. and ext., very simple, no. BI small over/undervoltage, 2-stage
x/x/x 1 characteristic, 2-folded 87 BB/N with separate B90 2 stages (opt.) Undervoltage, 1-stage
Undervoltage, 2-stage
CT fault
open CT, Idiff, Checkzone powerful (see IED 670 System data)
CT fault Isolator (vague description) 400,800 ms; 3 records at 800 ms each, 32 analog and digital signals, no Idiff/Istab no in earlier catalog sheets the system was introduced as a decentralized system! CT dimensioning in accordance with high impedance rule
3 parameter sets
no autoreclosure (79) for BB faults 6 parameter sets separate sensisitive characteristic (as with 7SS52!) 50/51 4 stages (opt.)
using FlexLogic 2 inputs for transformer protection; Frequency protection (81 O/U), neg. sequence overcurr. (46/50/51/67); sensitive definite time elements (50 LS, > 0.1A) 50P,51P,67P, 50 N, 51 N, 67N 50, 51, 1-stage
using FlexLogic Check zone by ext. parallel connection of separate CTs and use of a current input, not stabilized!
50
Undervoltage release
Remote communication
DIGSI4 (engl/ge/fr/sp/it/rus) Program REBWIN especially for REB 500; CU centralised resp. decentralised controllable also by BU RS232/RS485/Ethernet universal software, freely graphically configurable, Configuration only by ABB possible integrated in DIGSI, easily changeable by user all voltage levels, all types of system groundings
Application range
MiCOM S1; (engl/fr/ge/span) centralized or dezentralized RS232 protocol "Courier" Configuration only by Alstom staff possible; tool "TOPOLOGY "; intensive individual test required all voltage levels, all types of system groundings all voltage levels; high-impedancely earthed
IEC60870-5-103, DrsWin-protocol via modem or 4 x RS232 (ASCII, specific); DNP3.0 telnet-server IEC61850-8-1 1 x Ethernet (FTP, telnet) no IEC61850 interface Inter equipment communication by means of SEL "Mirrored bit" Drs-Win4 (engl/ge/fr), BU RS485 SEL-5601 Analytic Assistant for analysis, PC CU RS232, communication on ASCII base Plant image generated by means of "graph AcSelerator SEL-5030 for configuration (ASCII, theory", generation and modification with tabular); isolator replica with an individual logic maintenance software ELTAS (only internal CU) all voltage levels, all types of system groundings n.a.
Highlights
security by 3-of-3 trip decision, incl. check zone, add. OC release, short tripping times, low aux contact requirements, modular and flexible system, comfortably operated by DIGSI KEMA (particularly algorithms)
Redundancy by optical double-ring and 3-of-3 trip decision (discrim.zone&check-zone&OC release); comfortable and simple fully graphical operation software DrsWin functionality and algorithms by KEMA; EMC by Austrian research centers ARSENAL n.a.
very project dependent, no list prices; range 7SS52 -20% ... +100% (mostly 20%) Introduction Market share References Advantage 1997 high-end : 40-60 % (country dependent) 1000 Systems worldwide well accepted, user friendly system, extensive basic functionality, experiences since 1989 with 7SS50 1995
February 2003 <5% 150 (Sept2006); not accepted at RWE no-one; P470 is "a good copy of the 7 SS52" to large portions; BI voltage programmable
2003 ? some cheap (at least for small plants), CFC, compact construction
Position vs 7 SS52
Disadvantage
High-end: 40-60 % (country dependent) worldwide high market acceptance, comparable with 7SS5; many additional functions; integrated distance/transformer diff protection (REB500sys), additional tripping criterion "current direction" (Spec argument!) Many specs ares influenced by ABB, no integrated slower tripping times; closed system with a high voltage protection, no integrated distance manufacturer relationship (configuration, protection commissioning, expansion "only by ABB"); isolator aux contacts require adjustment Undervoltage as additional tripping criterion by separate voltage relay (by zone); Redundant power supply as the one and only redundant component is senseless as it has similar reliability. Check zone should be integrated because of faulty There is not a single bus fault known that would isolator image risk; have demanded for an additional direction criterion in 7SS52. Why are several parameter sets required reasons, example?
Argumentation, comment
missing acceptance is inexplicable (only because of few references?) Areva tries to increase their market share by price dumping!
centralized, medium amount of I/O, "low level" operation and uncomfortable configuration, no renowned references, no IEC interface, needs adjusted isolator aux contacts; no integrated isolator replica pricewise attractive, if function sufficient and no references/experiences are required "ext. Fault detection logic" uses dI/dT criterion! Isolator logic "Not open= closed" same as SIEMENS!
no IEC interface
Lon bus
IEC 60870-5-103
operating panel
RSM 100 operating program, centralized, RS232 (front) or RS485 (rear) only examples listed
Keyboard / display or operating program EnerVista UR PC; application orientated, by logic design and FlexLogic implementation, normally by GE all voltage levels, all types of system groundings
3-ph for small buses, generators, T connections, motors, "meshed corners" 1-ph for larger buses Integrated isolator replica for 2-BB; external bistable relays required/ recommended
3-ph for small buses, generators, T connections, n.a. motors, "meshed corners" 1-ph for larger buses Integrated isolator replica for 2-BB actually no-one, plain equipment
KEMA test?
n.a. n.a.
approx. 2002 < 5% some in Brazil Attempt on market share increase by an aggressive pricing policy
2006
2002 -- 2003?
Hardware (UR) since 2000, B90 since 07/2002; Algorithm of the small B30
6 plug-in slots, numerous I/O boards (U, I, BI, DO, DO fast) of the UR family; extensive FlexLogik ("CFC")
few references; no IEC interface; only 4 zones, 1- centralized construction step BFP no additional functions (e.g. BFP) not expandable
only 1 zone
ABB arguments: no check zone required "because of stability against CT interruption", not as Siemens, "against faulty isolator replica"! Related to high impedance schemes! "Setting below Imaxload possible, as CT interruption is detected and protection is blocked in time"
Checkzone is available (to satisfy specifications!) difficult, too little information about price, Could become a quite strong rival for 7SS52 and references etc. REB500 because of functionality and/or price! Takes advantage of universal IED 670 platform! Note: 1A/5A not adjustable! 4 ranges for binary inputs!?
difficult, too little information about price, references etc. Actually a n-leg differential protection for 1BB/1.5 CB plants Quantity structure very similar to the SEL487B basic equipment
only 4 zones, (incl. CZ); incommodious configuration (CFC like;) centralized; no IEC60870-5-103; very complicated CT calculation and setting instruction for characteristic difficult, too little information about price, references etc. Actually a n-leg differential protection based on the B30 Current direction criterion is no advantage but necessity! Direction criterion is for stability at saturation and external fault. 7SS doesnt need additional criteria as the fast 1-of-1-algo is faster than saturation.
only 1 zone
difficult, too little information about price, references etc. Actually a n-leg differential protection for 1BB/1.5 CB plants Current direction criterion is no advantage but necessity! Direction criterion is for stability at saturation and external fault. 7SS doesnt need additional criteria as the fast 1-of-1-algo is faster than saturation.