Académique Documents
Professionnel Documents
Culture Documents
REVISIONS
Rev.
1
Date
26-07-2011
Descriptions
Cluster 2
Approval
ZTE RF Manager
8/18/2012
Approval
PMCL RF optimization Manager
Page1, Total22
Table of Contents
1 INTRODUCTION.................................................................................................................................3
1.1 SWAP DATE...............................................................................................................................3
1.2 BENCHMARKING PERIOD.................................................................................................................3
2 MAP OF SWAPPED CLUSTER........................................................................................................3
3 CLUSTER SITES AND DT ROUTE..................................................................................................4
4 DT BENCHMARKING........................................................................................................................5
4.1 DT CALL SUMMARY......................................................................................................................5
4.2 RX LEVEL (IDLE MODE).............................................................................................................5
4.3 RX LEVEL (DEDICATED MODE).....................................................................................................7
4.4 RXQUAL MAP RXQUAL.............................................................................................................9
4.5 SPEECH QUALITY INDEX (SQI).....................................................................................................11
4.6 CARRIER TO INTERFERENCE RATIO MAP- C/I WORST.........................................................................13
4.7 TIMING ADVANCE- TA................................................................................................................15
4.8 GPRS/EDGE DL.....................................................................................................................17
5 DATA TESTING SUMMARY..........................................................................................................19
5.1 GPRS/EDGE DL THROUGHPUT.................................................................................................19
6 SMS SUCCESS RATE.......................................................................................................................20
6.1 SMS END TO END DELIVERY TIME (SEC).....................................................................................21
8/18/2012
Page2, Total22
1 INTRODUCTION
1.1 SWAP Date
8/18/2012
Page3, Total22
8/18/2012
Site ID
Lat
Lon
Cluster
TSD2542
34.7393
71.8806
TSD2544
34.7517
71.8368
MKI2861
34.7944
71.7567
SHM2117
34.7424
71.8553
BJR2106
34.8066
71.6673
MDD2537
34.8487
71.6747
MDD2536
34.8054
71.7048
MVD1053
34.8889
71.6642
MDD1829
34.8238
71.6825
HWY1643
34.7916
71.8230
Page4, Total22
4 DT BENCHMARKING
4.1 DT Call Summary
KPI
Calls Attempted
Call Setup
Calls Established
Blocked Calls
Dropped Calls
Handover
Handover (Intracell)
Handover Failure
Handover (Intracell) Failure
RXLEV-Idle
Operator (dBm)
8/18/2012
-0to-70
-70to-80
-80to-90
-90to-100
-100to-110
Page5, Total22
PMCL(SAMPLES)
28717
15684
137553
7261
534
PMCL %
15.13
8.27
72.49
3.83
0.28
Page6, Total22
RXLEV-Dedicated
8/18/2012
Page7, Total22
Operator (dBm)
-0to-70
-70to-80
-80to-90
-90to-100
-100to-110
PMCL(SAMPLES)
20481
91442
74777
35181
6202
PMCL %
8.98
40.09
32.78
15.42
2.72
8/18/2012
Page8, Total22
RX Qual
8/18/2012
Page9, Total22
Operator
0<= to =<2
2<= to =<4
4<= to =<6
6<= to =<8
PMCL(SAMPLES)
207688
11928
10920
7529
PMCL %
87.24
5.01
4.59
3.16
Tabular- Rx Qual
8/18/2012
Page10, Total22
SQI
Operator
8/18/2012
0<= to =<16
16<= to =<22
22<= to =<30
Page11, Total22
PMCL(SAMPLES)
155701
55098
12212
PMCL %
69.82
24.71
5.48
Tabular- SQI
Graph- SQI
8/18/2012
Page12, Total22
4.6
-5<= to =<0
0<= to =<5
5<= to =<9
9<= to =<12
12<= to =<25
PMCL(SAMPLES)
1073
5161
8639
11609
199199
8/18/2012
Page13, Total22
PMCL %
0.48
2.29
3.83
5.14
88.27
Graph- C/I
8/18/2012
Page14, Total22
4.7
Timing Advance- TA
TA
Operator
8/18/2012
0<= to =<3
3<= to =<5
5<= to =<132
13<= to =<63
Page15, Total22
PMCL(SAMPLES)
158869
55136
23998
62
PMCL %
66.73
23.16
10.08
0.03
Tabular- TA
Graph- TA
8/18/2012
Page16, Total22
4.8
GPRS/EDGE DL
8/18/2012
0<= to =<10
10<= to =<20
20<= to =<40
40 & Above
Page17, Total22
PMCL(SAMPLES)
294475
155688
138116
86410
PMCL %
43.65
23.08
20.47
12.81
Tabular- GPRS/EDGE
8/18/2012
Page18, Total22
GPRS/EDGE DL Throughput
8/18/2012
17.55
Page19, Total22
3.06
8/18/2012
200
200
100
Page20, Total22
6.1
8/18/2012
SMS Received
time(sec)
1.04
E2E Delivery
time(sec)
3.74
Page21, Total22
End of Report
8/18/2012
Page22, Total22