ABTRACT

Estimate Estimate
No. of Works Estimate Amount No of works No of works
Name of the Scheme Length Length Amount (Rs Length Amount (Rs in Remarks
Sanctioned (Rs in Lakhs) completed in Progress
in Lakhs) Lakhs)
1 2 3 4 5 6 7 8 9 10 11

SR WORKS 10 61.08 720.10 7 25.88 329.55 3 35.20 390.55

1 Work by 30-09-09
12th FINANCE 7 66.50 650.80 5 49.00 453.80 2 17.50 197.00 1 works by 30-10-09

1 Work by 30-04-09
NABARD 5 37.40 2248.00 2 10.80 323.00 3 26.60 1925.00 2 Works Tenders
received on 3-1-09

ROAD SAFETY ENGINEERING 17 62.00 16 59.50 1 2.50 1 Work by 31-01-09

Road Safety Engineering (ST) Area 5 -- 26.5 5 Works tenders


to be received on
9/1/2009
ROAD SAFETY INTERVENTIONS
(HUDCO) 26 161.10 23 95.00 3 66.1 2 Works completed.
1 Work by 31-03-2009

MINOR WORKS 17 17.00 17 17.00 0 0

ST PLAN WORKS (Jerrila Project) 19 33.5 5334.00 0 0 19 33.50 5334.00 3 Works agency setteled
by the Govt
16 works tenders to be
CORE NET WORK Called for
2 12.7 190.00 2 12.7 190.00 0 0 0

Executive Engineer
(R&B) PADERU
(R&B) DEPARTMENT ::
(R&B) DIVISION :: PADERU

Funds
Expdr.
Estimate R.E/ Balance requireme Date of Expected
Sl Length in Sanction ref. Contract Expdr. Up During the Cumulative Detailed stage of Date of
Name of the work Amount (Rs W.E Ref. value of nt for commence date of Remarks
No Kms No Value to 31-3-08 year up to Expenditure work completion
in Lakhs) No work 2008-09 ment completion
12/08
(9+11)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
SCHEME:: SR WORKS

1 S.Rs to NCS Road from km 30/0 to 30/8, 33/2 8.50 SRP 2006- 100.00 82.36 80.89 0.34 81.23 0.0 0.34 Work completed
to 36/0, 48/0 to 55/0 and CPL Branch Road 07 in all respects
from km 0/0 to 0/900

2 S.Rs to NCS (R&B) road to B.C.Colony (via) 3.30 SRP 2007- 55.00 52.90 0.00 55.36 55.36 55.36 Work completed. 23-1-07 22.10.07
Laxmipuram, Nagaram from Km. 2/3 to 5/6 08 Final bill paid
3 a) S.Rs to Kylasapatnam to Rachapalli road 6.80 SRP 2007- 56.50 53.63 43.67 13.30 56.97 13.30 Work completed. 29-6-07 28.3.08
from Km. 0/0 to 6/0 and 08 Final bill to be
(b) S.Rs to Kotavuratla toGiduturu from Km. paid
0/0 to 0/800
4 Providing Revetment and protection work to Bridge SRP 2007- 14.25 13.93 0.00 13.30 13.30 13.30 Work completed. 9-07-08
the bridge at Km.34/6 of Paderu-Araku road. 08 Final bill to be
paid.
5 a) S.Rs to Narsipatnam-Tallapalem road 6.60 SRP 2006- 83.80 81.05 83.56 7.70 91.26 7.70 Work completed. 19-1-07 18.9.07
fromKM. 2/0 to 3/0, 5/0 to 7/0 10/4 to 12/0 07 Final bill paid
and
(b) S.Rs Narsipatnam - Revupolavaram road
from Km. 7/0 to 9/0
6 S.Rs to Madugula (R&B) roat to Paderu (R&B) 0.20 SRP 2006- 10.00 9.28 5.08 0.00 5.08 0.00 Work completed. 9-3-07 12.5.07
road (via) Dabbagunta, K.J.Puram from Km. 07 Final bill to be
4/2-4 in Visakhapatnam District paid.
7 S.Rs to Madugula (R&B) road to Paderu (R&B) 0.48 SRP 2006- 10.00 9.27 7.76 0.00 7.76 2.24 2.24 Work completed. 9-3-07 8.5.07
road (via) Dabbagunta, K.J.Puram from Km. 07 Final bill to be
4/720 to 5/200 in Visakhapatnam District paid.

8 S.Rs to Lambasingi - Tagangi road from Km. 6.00 SRP 2007- 68.30 65.41 0.00 0.00 0.00 68.30 68.30 WBM completed. 18.9.07 17.6.08 17.1.09
0/0 to 6/0 08 SDBC in
progress
9 S.Rs to Kothakota-Makavaram road from km 9.00 SRP 2007- 78.50 0.00 0.74 0.74 77.76 78.50 Work on 30-05-08 28-02-09 28-02-09
14/0 to 18/0,N.R.Road from km 14/0 to 17/0 08 Kothakota-
& D.Yerravaram to Kothuru (via) Cherlopalem Makavaripalem
from km 4/0 to 6/0 road completed
Remaining work
to be done

10 S.Rs to Rachapalli to Koduru road from km 12.00 SRP 2007- 124.50 0.00 1.20 1.20 123.30 124.50 Work is in 30-05-08 28-02-09 28-02-09
0/0 to 4/0 (R&B) Road to L.V.K.Road from km 08 progress
12/0 to 14/0,Narsipatnam-Revupolavaram
Road from km 5/0 to 7/0 & D.Yerravaram to
Kothuru (via) Cheropalem from km 0/0 to 4/0
in VSP Dist.

11 S.Rs to Narsipatnam- Chintapalli Sileru road 1.20 SRP 2005- 12.25 0.00 0.00 0.00 12.25 12.25 Tenders Received . Tenders
Agency to be settled. Received .
from Km. 75/0 to 78/4 06
Agency to be
settled.
12 S.Rs to NCS Road from km 40/0 to 43/0, 7.00 SRP 2006- 107.00 0.00 0.00 0.00 107.00 107.00 Work differred. No response
P.C.Road from km 41/0 to 42/0, K.D.Peta to 07 Revised estimate for tenders for
Chintapalli road from km 28/0 to 31/0 in VSP submitted for twice & work
Dist. sanction. differed

TOTAL 61.08 0.00 720.10 0.00 367.83 220.96 91.94 312.90 390.85 482.79
SCHEME:: 12th FINANCE
1 a) Repairs to N.C.S.Road from km 45/0 to 10.00 12th Fin. 71.80 69.35 58.35 15.00 73.35 15.00 Work completed 23.1.07 22.10.07
48/0, 81/0 to 83/0 and 100/0 to 103/0 2006-07 final bill to be
paid
b) Repairs to P.C.Road from 54/0 to 56/0 in 0.00 0.00
VSP Dist.
2 a)Repairs to Waddadi-Paderu road from km 11.60 12th Fin. 76.00 53.77 23.45 77.22 23.45 Work completed 29.6.07 28.3.08
4/0 to 6/0,18/0 to 20/0 and 26/4 to 27/0 2006-07 final bill paid
b) Ravikamathim-Kinthali road from km 0/0 to 0.00 0.00
3/0
c) B.N.Road from km 73/4 to 75/0,94/0 to 95/4 0.00 0.00
in VSP Dist.
3 a) Repairs to R&B Road to LVK Road from 10.50 12 Fin.
th
140.00 0.00 0.00 Agreement to be 30-09-2009 No Response for
tenders due to
km 3/4 to 8/40 2006-07 concluded Agency area work.
Conractor informed
b) K.D.Peta Chintapalli road from km 21/0 to 0.00 0.00 by telegram 22-12-
22/0 and 27/0 to 28/0 and 35/0 to 36/0 2008 . Agreement to
be conlcuded.
c) Vemulapudi-Velagapudi road from km 0/0 to 0.00 0.00
2/50 in VSP Dist.

4 a) Repairs to Paderu-Arukuroad from km 16/0 7.00 12th Fin. 57.00 0.00 0.00 Once work 31-10-2009 T/S issued on
to 17/0 and 18/0 to 19/0 2006-07 entrusted and 23-12-2008 .
canelled duly Tenders to be
called for on
forfieting deposits
27-12-2008.

b) Paderu-Chintapalli road from km 11/0 to 0.00 0.00


13/0 and
c) Paderu-Sujanakota-Duduma road from km 0.00 0.00
17/0 to 20/0 in VSP Dist.
5 Repairs to Waddadi-Paderu road from km 9.00 12th Fin. 110.50 120.22 120.22 120.22 Work completed 1.12.07 1.9.08
34/0 to 40/0 and km 42/0 to 43/0 and 2007-08 final bill paid
P.C.Road from km 0/0 to 1/0 and km 13/0 to
14/0 in Visakhapatnam District.(By hot mix
process)

6 Repairs to Paderu-Aruku Road from km 13/0 to 16/0 8.00 12th Fin. 100.00 97.46 1.11 88.14 89.25 10.75 98.89 Work completed 1.12.07 1.9.08
and Paderu-Sujanakota-Duduma road from km 5/0 2007-08 final bill to be
to 7/0, 35/0 to 36/0 and km 51/0 to 53/0 in paid
Visakhapatnam District.(By hot mix process)

7 Repairs to Waddadi-Kinthali road from km 0/0 to 10.40 12th Fin. 95.50 93.92 0.22 85.26 85.48 85.26 Work completed 1.12.07 1.3.08
2/0,Waddadi-Kintali road (via) Gottivada from km 2007-08 final bill paid
3/0 to 8/4 and Waddadi-Paderu road from km 7/0 to
10/0 in Visakhapatnam District.(By hot mix process)

TOTAL 66.50 0.00 650.80 0.00 260.73 113.45 332.07 445.52 10.75 342.82
SCHEME:: NABARD
1 Improvements to Nathavaram- East Godavari 9.40 GOMs No.221 223.00 218.08 20.31 154.04 174.35 48.65 202.69 Work completed 18.6.07 17.6.08
T, R&B R-II
District limits from Km 0/0 to 10/0 (via) Chi Dept. dt.10-10-- in all respects
kkudupalem in Visakhapatnam district 2005
2 Improvements to Waddadi- Kinthali (R&B) 1.40 100.00 93.75 37.93 37.93 62.07 100.00 Work completed 9.7.08 8.4.09
road to Ravikamatham- Kinthali (R&B) road in all respects
(via) Vommali, VJ puram from Km 1/4 to 5/0 in
Visakhapatnam District
3 Construction of Degree college at Chintapalli Building G O Ms No 125.00 115.5 28.51 28.51 86.99 115.50 Centering for the 27.12.07 26.12.08 30-04-2009
in VSP district 777 dt slab in progress
13.12.2006
4 Improvements to PL Road to Bangarumitta 10.00 400.00 0.00 0.00 Tenders received Tenders
Received on 3-1-
from Km 41/0 to 51/0 in Visakhapatnam on 03-01-2009 09 and agency to
District be finalised.
5 Improvements to PL Road to Bangarumitta 16.60 1400.00 0.00 0.00 Tenders to be Tenders to be
from Km 23/4 to 40/0 in Visakhapatnam called for called for
District
TOTAL 37.40 2248.00 427.33 20.31 220.48 240.79 197.71 418.19
SCHEME:: ROAD SAFETY ENGINEERING
1 RSE by improvements to the curve (accident DR.No. 4.50 4.99 4.37 0.67 5.04 0.00 0.67 Work completed 3-3-08 2.5.08
prone area) at Km 60/6 of Narsipatnam- 150/07-08 final bill paid.
Chintapalli- Sileru Road
2 RSE by improvements to the curve (accident DR.No. 5.00 5.01 3.08 1.84 4.92 0.00 1.84 Work completed 3-3-08 2.5.08
prone area) at Km 73/6 of Narsipatnam- 158/07-08 final bill paid.
Chintapalli- Sileru Road
3 RSE by Construction of Retaining wall and DR.No. 5.00 5.03 0.00 5.09 5.09 0.00 5.09 Work completed 3-3-08 5.2.08
widening the formation (Ghat Portion) at Km 153/07-08 final bill paid.
13/6-10 of K.D.Peta -Chintapalli Road.
4 RSE by repairs to Handrails to minor bridge at DR.No. 2.50 2.50 0.00 0.00 0.00 0.00 0.00 Work in Progress 0 31-01-09
Km 10/2-4, 13/6-8, 40/8-10 18/0-2, 28/4-6 of 152/07-08
Paderu-Sujanakota-Duduma Road.
5 RSE by providing soling to erroded berms in DR.No. 3.00 2.74 0.00 2.58 2.58 0.42 3.00 Work completed 10-4-08
Km 3/456 to 5/0, 18/0 to 21/0 & 29/0 to 32/0, 156/07-08 final bill to be
37/0 to 45/0 to 55/0-4 of Paderu- Sujanakota- paid.
Duduma Road.
6 RSE by Improvements to Road by widening DR.No. 2.00 1.89 1.76 0.14 1.90 0.00 0.14 Work completed 8-3-08 5.7.08
and Strenghting carriageway at Km 4/4 of 164/07-08 final bill paid.
Paderu - Sujanakota -Duduma Road.
7 RSE by improvements to Curve at Km 18/4-8 DR.No. 5.00 4.92 0.00 5.25 5.25 5.25 Work completed 11-3-08 10.5.08
of Narsipatnam-Revupolavaram Road 148/07-08 final bill paid.
8 RSE by improvements to the Curve at km DR.No. 4.50 3.89 0.64 1.33 1.97 2.53 3.86 Work completed 3-3-08 2.5.08
17/2-6 of Narsipatnam-Revupolavaram Road 151/07-08 final bill to be
paid.
9 RSE by improvements to the sight distance in DR.No. 4.00 3.43 0.49 0.84 1.33 2.67 3.51 Work completed 3-3-08 2.5.08
Ghat Portion (By widening) at Km 18/6-10 of 157/07-08 final bill to be
Narsipatnam- Revupolavaram Road paid.
10 RSE by improvements to Junction at Km 13/0 DR.No. 3.00 2.42 0.00 2.35 2.35 2.35 Work completed 26-2-08 25.4.08
of Narsipatnam -Tallapalem Road. 159/07-08 final bill paid.
11 RSE by improvements to Junction at Km 11/8- DR.No. 3.00 2.57 0.00 0.00 0.00 3.00 3.00 Work completed 26-2-08 25.4.08
10 of Narsipatnam -Revupolavaram Road. 160/07-08 final bill paid to
be paid
12 RSE by improvements to Junction at Km 8/8- DR.No. 4.00 3.22 1.76 1.56 3.32 1.56 Work completed 26-2-08 25.4.08
10 of Narsipatnam -Revupolavaram Road. 161/07-08 final bill paid.
13 RSE by construction of Retaining Wall and DR.No. 4.00 3.99 0.00 4.23 4.23 4.23 Work completed 25-4-08 24.5.08
widening the formation (Ghat Portion) at Km 149/07-08 final bill paid.
24/2 of Paderu-Araku Road.
14 RSE by Providing Soling to the erroded berms DR.No. 4.00 3.94 0.00 3.67 3.67 0.33 4.00 Work completed 8-3-08 5.7.08
in Ghat section in Km 16/4 to 30/0 of 154/07-08 final bill to be
Waddadi - Paderu Road paid.
15 RSE by Providing Soling to erroded berms in DR.No. 3.00 3.44 0.00 2.98 2.98 2.98 Work completed 17-3-08
Ghat Section in Km 30/0 to 40/0 of Waddadi- 155/07-08 final bill paid.
Paderu Road.
16 RSE by providing Soling to erroded berms in DR.No. 2.00 0.00 1.85 0.00 1.85 1.15 1.15 Work completed 3-3-08 5.2.08
Ghat Section in km 4/0 to 7/0 of Paderu- 162/07-08 final bill to be
Araku Raod. paid.
17 RSE by providing Soling to erroded berms in DR.No. 3.50 3.44 0.00 3.19 3.19 0.25 3.44 Work completed 25.4.08 24.6.08
Ghat Section in km 23/0 to 38/0 of Paderu- 163/07-08 final bill to be
Araku Raod. paid.
TOTAL 62.00 57.42 13.95 35.72 49.67 10.35 46.07
SCHEME:: ROAD SAFETY INTERVENTIONS (HUDCO)
1 Construction of Retaining wall at Km 23/4 of 122/ 07- 1.30 1.28 1.16 0.00 1.16 0.14 0.14 Work completed 2.7.08 4.6.08
Paderu Araku Road 08 final bill to be
paid.
2 Widening the Culvert at Km 14/4 of 123/ 07- 5.00 5.04 2.80 2.52 5.32 2.52 Work completed 22-02-08 21-04-08
Narsipatnam - Thallapalem Road. 08 final bill paid.
3 Widening the culvert at km 14/6 of 124/ 07- 6.00 5.33 4.06 1.88 5.94 1.88 Work completed 26-02-08 25.4.08
Narsipatnam - Thallapalem Road 08 final bill paid.
4 Improvements to the bridge approaches at Km 125/ 07- 10.00 10.06 0 6.48 6.48 6.48 Widening 26-02-08 25.4.08 31-12-08
9/0-4 of Narsipatnam - Thallapalem Road. 08 completed. BT to
be laid
5 Re-Decking to Minor Bridge at Km 16/4 of 126/ 07- 9.95 7.77 1.65 7.57 9.22 7.57 Work completed 2.6.08 4.5.08
Narsipatnam - Revupolavaram Road 08 final bill paid.
6 Urgent Repairs to damaged culvert at Km 14/4 127/ 07- 2.00 1.99 0 2.11 2.11 2.11 Work completed 26-02-08 25/04/08
of Narsipatnam - Revupolavaram Road. 08 final bill paid.
7 Reconstruction of culvert at Km 1/4 of 128/ 07- 1.60 1.88 0.66 0.79 1.45 0.79 Work completed 2.5.08 4.4.08
D.Yerravaram to Thandava Project Road. 08 final bill paid.
8 Reconstruction of culvert at km 90/2 of 129/ 07- 1.90 1.88 0.67 1.17 1.84 1.17 Work completed 2.10.08 4.9.08
Bheemunipatnam - Narsipatnam Road. 08 final bill paid.
9 Reconstruction of 800mm dia pipe culvert at 130/ 07- 3.20 3.15 0 3.10 3.10 3.10 Work completed 26-02-08 25-04-08
Km 25/8 of Narsipatnam - Devipatnam Road. 08 final bill paid.
10 Reconstruction of 1.00 m dia. Pipe culvert at 131/ 07- 2.00 1.93 0 2.05 2.05 2.05 Work completed 22-02-08 21-04-08
Km 29/8 of Narsipatnam - Devipatnam Road 08 final bill paid.

11 Providing Parapets in Ghat Portion from Km 132/ 07- 9.00 7.18 4.02 2.93 6.95 2.93 Work completed 2.5.08 4.4.08
16/0 to 30/0 of Narsipatnam Chintapalli - Sileru 08 final bill paid.
Road.
12 Widening the slab culvert at Km 2/4 of 133/ 07- 5.30 4.67 3.58 1.37 4.95 1.37 Work completed 2.5.08 4.4.08
Narsipatnam - Chintapalli - Sileru Road. 08 final bill paid.
13 Improvements to the Junction at Km 46 of 134/ 07- 2.00 1.96 0 2.00 2.00 2.00 Work completed 17-04-08 16.06.08
Paderu - Chintapalli Road. 08 final bill to be
paid.
14 Improvements to accident Prone area at Km 135/ 07- 5.80 5.81 4.01 0.22 4.23 0.22 Work completed 15-02-08 14-04-08
42/6 of Narsipatnam - Chintapalli - Sileru 08 final bill to be
Road. paid.
15 Improvements to accident Prone area at km 136/ 07- 2.25 2.12 1.97 0.16 2.13 0.16 Work completed 2.5.08 4.4.08
54/2 of Narsipatnam Chintapalli - Sileru Road. 08 final bill to be
paid.
16 Improvements to accident Prone area at Km 137/ 07- 2.30 2.11 1.97 0.58 2.55 0.58 Work completed 2.5.08 4.4.08
61/8 of Narsipatnam - Chintapalli - Sileru 08 final bill to be
Road. paid.
17 Providing Retaining wall at Km 43/2 on Right 138/ 07- 5.00 4.96 4.50 3.40 7.90 3.40 Work completed 05-02-08 04-04-08
side of Narsipatnam - Chintapalli - Sileru 08 final bill to be
Road. paid.
18 Providing parapets in Ghat Portion from km 139/ 07- 5.60 5.38 2.00 0.00 2.00 0.00 Work completed 22-02-08 21-04-08
95/0 to 115/0 Narsipatnam - Chintapalli - 08 final bill to be
Sileru Road. paid.
19 Construction of retaining wall at Km 20 of 140/ 07- 5.50 5.45 0 0.00 0.00 0.00 Work completed 17.04.08 16.06.08
Paderu -Chintapalli Road. 08 final bill to be
paid.
20 Improvements to Road at Km 10/6 to 11/4 of 141/ 07- 9.00 8.92 0 0.00 0.00 0.00 Widening 3.8.08 5.7.08 31-12-2008
Paderu - Chintapalli Road. 08 completed.
Retaining wall to
be done
21 Reconstruction and widening the weak and 142/ 07- 8.10 8.04 3.66 4.65 8.31 4.65 Work completed 26-02-08 25-04-08
narrow culvert at Km 88/2 88/6 and 89/2 of 08 final bill paid.
Bheemunipatnam Narsipatnam Road.
22 Construciton of Retaining wall at Km 21/6 of 143/ 07- 2.40 2.09 0 2.12 2.12 2.12 Work completed 2.5.08 4.4.08
Paderu - Araku Road. 08 final bill paid.
23 Construction of Retaining wall at Km 4/2 to 5/2 144/ 07- 2.40 1.65 1.33 0.33 1.66 0.33 Work completed 25-02-08 24-04-08
of Paderu - Araku Road. 08 final bill paid.
24 Construction of Retaining wall at Km 5/10 to 145/ 07- 3.40 2.68 2.19 0.18 2.37 0.18 Work completed 3.3.08 5.2.08
6/4 of Paderu - Araku Road 08 final bill paid.
25 Improvements to road and culvert at Km 4/2 of 146/ 07- 1.60 1.07 0 1.01 1.01 1.01 Work completed 3.8.08 5.7.08
Paderu - Araku (R&B) Road to Bakuru Road. 08 final bill to be
paid.
26 Widening and Reducking of Steel Girder CR 10/2008- 48.50 0 0.00 0.00 0.00 Diversion road in 31-03-2009
Bridge at Km 81/6 of BN Road. 09 Progress
TOTAL 161.10 104.40 40.23 46.62 86.85 0.14 46.76
SCHEME:: MINOR WORKS
1 Construction of Retaining wall at km 19 of 166/ 07- 1.00 0.95 0.00 0.00 0.00 0.95 0.95 Work completed 26.2.08 25.4.08
P.L.Road to Bhangarumetta Road. 08 final bill to be paid.
2 Construction of Retaining wall at km 2/0 of 167/ 07- 1.00 0.98 0.83 0.00 0.83 0.00 Work completed 26.2.08 25.4.08
Rachapalli to G.Koduru(Via) Venkatapuram 08 final bill paid.
Road.
3 Construction fo Parapet walls at Km 29 of 169/ 07- 1.00 0.98 0.00 0.96 0.96 0.96 Work completed 26.2.08 25.4.08
Waddadi - Paderu Road 08 final bill paid.
4 Construction of Retaining wall at Km 15/2 of 168/ 07- 1.00 0.98 0.00 0.98 0.98 0.98 Work completed 26.2.08 25.4.08
Kothakota -Makavarapalem Road. 08 final bill paid.
5 Construction of Retaining wall at Km 1/0 of 175/ 07- 1.00 0.97 0.00 0.94 0.94 0.94 Work completed 26.2.08 25.4.08
Kylasapatnam- Giduturu Road. 08 final bill paid.
6 Construction of Rt wall in km 4/0 to 5/0 of 174/ 07- 1.00 0.97 0.00 0.91 0.91 0.91 Work completed 26.2.08 25.4.08
Sujanakota Branch Road 08 final bill paid.
7 Construction of Retaining wall at Km15/2 of 176/ 07- 1.00 1.00 0.00 0.00 0.00 1.00 1.00 Work completed 26.2.08 25.4.08
Narsipatnam - Tallapalem Road 08 final bill to be paid.

8 Construciton of Parapets of Paderu - 178/ 07- 1.00 0.98 0.00 0.00 0.00 0.98 0.98 Work completed 26.2.08 25.4.08
Sujanakota - Duduma Road Km 6/0 to 7/0 08 final bill to be paid.

9 Construciton of Parapets of Paderu - 180/ 07- 1.00 0.97 0.00 0.00 0.00 0.97 0.97 Work completed 26.2.08 25.4.08
Sujanakota - Duduma Road km 42/0 to 45/2 08 final bill to be paid.

10 Widening and Re-construction of culvert at km 110/ 07-08 1.00 1.00 0.00 0.00 0.00 1.00 1.00 Work completed 26.2.08 25.4.08
8/2-4 of Yendapalli to Kondala Agraharam final bill to be paid.
Road
11 Widening and Re-construction of culvert at km 111/ 07-08 1.00 1.00 0.00 0.00 0.00 1.00 1.00 Work completed 26.2.08 25.4.08
4/0 of Rachapalli to G.Kodutur (via) final bill to be paid.
Venkatapuram Road
12 Construction of Parapet walls at Km 20 of 112/ 07-08 1.00 0.96 0.00 0.00 0.00 0.96 0.96 Work completed 26.2.08 25.4.08
Waddadi -Paderu Road final bill to be paid.

13 Widening and Re-construction of culvert at km 116/ 07-08 1.00 1.01 0.77 0.21 0.98 0.21 Work completed 26.2.08 25.4.08
65/10 of Narsipatnam-Chintapalli Road final bill paid.

14 Widening and Reconstruction of culvert at km 117/ 07-08 1.00 0.99 0.46 0.51 0.97 0.51 Work completed 26.2.08 25.4.08
8/4 of Narsipatnam-Tallapalem road final bill paid.
15 Widening and Re-construction of culvert at km 118/ 07-08 1.00 0.99 0.00 0.00 0.00 0.99 0.99 Work completed 26.2.08 25.4.08
1/2 of Kondala Agraharam to Rolugunta(via) final bill to be paid.
Lachannapalem Road
16 Widening and Reconstruction of culvertat km 119/ 07-08 1.00 0.96 0.46 0.50 0.96 0.50 Work completed 26.2.08 25.4.08
2/6 of Narsipatnam-Tallapalem Road. final bill paid.
17 Widening and Re-construction of culvert at km 120/ 07- 1.00 1.00 0.00 0.95 0.95 0.95 Work completed 26.2.08 25.4.08
57/6 of Narsipatnam-Chintapalli Road. 08 final bill paid.
TOTAL 17.00 16.69 2.52 5.96 8.48 7.85 13.81
SCHEME:: FLOOD DAMAGE REPAIRS
1 F.D.R.to the damaged road surface of Narsipatnam- 26/ 07- 4.90 4.62 1.77 2.90 4.67 2.90 Work completed 23-7-07 22-9-07
Chintapalli-Sileru Road from km 120/0 to 122/0 08 Final Bill paid
and 138/0 to 140/0 for the year 2006-07

2 CDRs to road surface damages to 18/ 06- 15.00 14.99 0.00 14.02 14.02 14.02 Work completed 09-01-07 8-4-07
Narsipatnam-Chintpalli- Sileru road from Km 07 Final Bill to be
54/0 to 65/0 paid
3 CDRs to road surface damages to 19/ 06- 35.00 35.20 0.00 32.19 32.19 32.19 Work completed 12-01-07 11-4-07
Narsipatnam-Chintpalli-Sileru road from Km 07 Final Bill to be
73/0 to 91/0 paid
4 C.D.Rs to culvert at km 9/6 of Paderu- 131/ 06- 7.00 6.21 4.90 0.73 5.63 0.73 Work completed 9-2-07 8-4-07
Chintapalli road 07 Final Bill paid
5 C.D.Rs to culvert at km 16/8 of Paderu- 132/ 06- 9.90 9.85 9.03 0.76 9.79 0.76 Work completed 9-2-07 8-4-07
Chintapalli road 07 Final Bill paid
6 C.D.Rs to culvert at km 17/6-8 of Paderu- 130/ 06- 3.30 2.14 1.44 0.19 1.63 0.19 Work completed 1-2-07 30-3-07
Chintapalli road 07 Final Bill paid
7 C.D.Rs to culvert at km 34/6 of Paderu- 23/ 06- 12.30 12.33 0.00 10.20 10.20 10.20 Work completed 9-1-07 8-4-07
Chintapalli road 07 Final Bill paid
8 C.D.Rs to culvert at km 12/0 of P.L.Road to 124/ 06- 2.30 1.47 1.47 0.12 1.59 0.12 Work completed 1-2-07 30-3-07
Bangarumetta road 07 Final Bill paid
9 C.D.Rs to Scours at km 17/6-8 of Paderu- 133/ 06- 9.95 9.88 0.00 9.47 9.47 9.47 Work completed 9-2-07 8-4-07
Chintapalli road 07 Final Bill paid
10 C.D.Rs to scours at km 1/4 of P.L.Road to 127/ 06- 3.10 2.24 1.51 0.11 1.62 0.11 Work completed 1-2-07 30-3-07
Bangarumetta road 07 Final Bill paid
11 CDRs to berms scoured in Km 39/40 of 134/ 06- 6.85 6.87 6.00 0.49 6.49 0.49 Work completed 16-12-06 15-2-08
Paderu-Sujanakota-Duduma road. 07 Final Bill paid
12 C.D.Rs to scours culvert at km 4/8-10 of 128/ 06- 4.00 2.67 2.68 0.19 2.87 0.19 Work completed 1-2-07 30-3-07
P.L.Road to Bangarumetta road 07 Final Bill paid
13 CDRs to damaged minor bridge at km 74/4-6 74/ 06-07 9.50 9.35 6.70 2.25 8.95 2.25 Work completed 30-11-06 1-3-07
of Narsipatnam-Chintpalli-Sileru road Final Bill paid
14 C.D.Rs to scours at km 7/2 of P.L.Road to 129/ 06- 3.20 2.09 1.37 0.11 1.48 0.11 Work completed 1-2-07 30-3-08
Bangarumetta road 07 Final Bill paid
15 C.D.R to damaged Road Surface from km 62/ 06- 1.50 1.48 1.23 0.10 1.33 0.10 Work completed 9-2-07 8-4-07
0/0to9/6 of Kylasapatnam To Giduturu Road 07 Final Bill paid

16 U.Rs to damaged Road Surface due to 26/ 07- 4.95 4.84 1.68 2.96 4.64 2.96 Work completed 23-7-07 27-9-07
Cycloneic rains in NCS road from km 95/0 to 08 Final Bill paid
140/0.
17 C.D.Rs to road surface damages to N.TL.Road from 20/ 06- 35.00 34.90 32.86 2.65 35.51 2.65 Work completed 9-1-07 8-4-07
km 3/60 to 5/0 and NCS Road from km 15/0 to 16/0 07 Final Bill paid
& K.D.peta Chintapalli Road from km 15/0 to 17/0 &
Sarabannapalem branch Road from km 0/0 to 1/0

TOTAL 167.75 161.13 72.64 79.44 152.08 0.00 79.44


SCHEME:: ST PLAN WORKS (Jerrila Project)
1 Formation of Byepass road from km 2/0 of 7.4 2000.00 0.00 0.00 0.00 2000.00 Tenders to be Tenders to be
NCS Road to 2/2 of Narsipatnam-Tallapalem settled settled
Road (via) B.N.Road
2 Impts to N.C.S.Road from km 2/0 to 3/5 1.5 177.00 0.00 0.00 0.00 177.00
3 Impts to N.C.S.Road from km 3/5 to 5/0 1.5 178.00 0.00 0.00 0.00 178.00
4 Impts to N.C.S.Road from km 5/0 to 6/5 1.5 179.00 0.00 0.00 0.00 179.00
5 Impts to N.C.S.Road from km 6/5 to 8/0 1.5 182.00 0.00 0.00 0.00 182.00
6 Impts to N.C.S.Road from km 8/0 to 9/5 1.5 185.00 0.00 0.00 0.00 185.00
7 Impts to N.C.S.Road from km 9/5 to 10/4 0.9 108.00 0.00 0.00 0.00 108.00
8 Impts to N.C.S.Road from km 10/4 to 12/0 1.6 188.00 0.00 0.00 0.00 188.00
9 Imptss to N.C.S.Road from km 12/0 to 13/5 1.5 183.00 0.00 0.00 0.00 183.00
10 Impts to N.C.S.Road from km 13/5 to 15/0 1.5 184.00 0.00 0.00 0.00 184.00
11 Impts to N.C.S.Road from km 30/5 to 31/5 1.5 200.00 0.00 0.00 0.00 200.00
12 Impts to N.C.S.Road from km 31/5 to 33/0 1.5 200.00 0.00 0.00 0.00 200.00
13 Impts to N.C.S.Road from km 33/0 to 34/5 1.5 200.00 0.00 0.00 0.00 200.00
14 Impts to N.C.S.Road from km 34/5 to 36/0 1.5 200.00 0.00 0.00 0.00 200.00
15 Impts to N.C.S.Road from km 36/0 to 37/5 1.5 200.00 0.00 0.00 0.00 200.00
16 Impts to N.C.S.Road from km 37/5 to 39/0 1.5 200.00 0.00 0.00 0.00 200.00
17 Impts to N.C.S.Road from km 39/0 to 40/5 1.5 200.00 0.00 0.00 0.00 200.00
18 Impts to N.C.S.Road from km 40/5 to 42/0 1.5 200.00 0.00 0.00 0.00 200.00
19 Impts to N.C.S.Road from km 46/5 to 47/6 1.1 150.00 0.00 0.00 0.00 150.00
20 Formation of Byepass Road to Chintapalli 10.00 0.00 0.00 0.00 10.00
from KM 48/0 of Narsipatnam - Chintapalli -
Sileru road to 2/0 of Jerrilla road in Vsp
District
21 Construction of 1000mm dia NP3 two pipe 10.00 0.00 0.00 0.00 10.00
culvert at KM 0/400 of Chintapalli Bye pass
road

TOTAL 33.5 5334.00 5334.00


SCHEME:: CORE NET WORK
1 Periodical maintenance to Narsipatnam- 11 150.00 149.12 139.11 -- 139.11 24.30 24.30 Work completed in all 30-6-07 29-06-08 Final bill to be
respects. Final bill to
Deviptnam road from km 0/0 to 1/0, 12/0 to be paid
paid
13/0 18/0 to 20/0, 21/0 to 24/0,26/0 to 28/0
and 42/0 to 44/0 in Visakhapatnam District

2 Periodical maintenance to Narsipatnam-Tuni 1.7 40.00 40.39 33.62 -- 33.62 4.15 4.15 Work completed in all 18-9-07 18-3-08 Final bill to be
respects. Final bill to
Road from km 0/0 to 1/6, 21/0 to 22/30 in be paid
paid
Visakhpatnam District
TOTAL 12.7 190.00