First Entry Ship Report For The Consideration Of The Committee Of Indian Register Of Shipping

Reports attached : FE-2/FE-3/FE-4/FE-5/FE-9/FE-ML/Continued Sheet Report(s) attached for additional class notations : Name of Ship Port Port Of Survey Type Of Ship BON VENT MUMBAI MUMBAI OIL/CHEMICAL TANKER Yes Last survey Date 30/04/2011 Auxiliary machinery fitted Yes Date of last survey in DD 10/09/2010 I.R. No Report No No.Of Screws 39427 BOM11F008 1

Propelling machinery fitted First survey Date

28/04/2011

Important dates during construction Date of building contract Date fabrication commenced Date Keel laid Date of launch Date of trials Date of build Date of major conversion, if any Date of Delivery 14/12/2000 14/12/2000 17/05/2000 30/09/2000 09/06/1999

Statutory Certificates Safety equipment certificate valid upto : Radiotelegraph/phone certificate valid upto : Oil pollution prevention certificate valid upto : Load line certificate valid upto : Safety construction certificate valid upto : Validity of short term certificates, if issued now Safety construction certificate valid upto : Load line certificate valid upto : Oil pollution prevention certificate valid upto : 29/09/2011 29/09/2011 29/09/2011 13/12/2015 13/12/2015 13/12/2015 13/12/2015 13/12/2015

Forgings, castings and fabricated parts ( To be reported upon if certificates not forwarded ) Item Forging/casting/ fabricated Maker's name and, if fabricated,manufacturer Port & Certificate No. of any forging or casting used in its construction

SHAFT BRACKETS STERN FRAME RUDDER RUDDER MAINPIECE STEAM BAR RUDDER HEAD QUADRANT TILLER

FABRICATED FORGED FORGED FORGED

ASAKAWA SHIPBUILDING CO.LTD. ASAKAWA SHIPBUILDING CO.LTD ASAKAWA SHIPBUILDING CO.LTD ASAKAWA SHIPBUILDING CO.LTD

ONOMICHI,JAPAN ONOMICHI,JAPAN ONOMICHI,JAPAN ONOMICHI,JAPAN

Report On Construction Steel Has the steel been manufactured at works recognised by the Committee and tested in accordance with No the Rules? Item Plates Sections Name of manufacturer APPROVED BY NKK APPROVED BY NKK Process of manufacture OPEN HEARTH OPEN HEARTH

If steel of grade other than Grade A mild steel used, give grade, thickness and location : Grade Thickness Location

FE-1 (Rev.0)

Page 1 of 4

First Entry Ship Report For The Consideration Of The Committee Of Indian Register Of Shipping

Welding Were the electrodes used of the approved type? Yes Were the welding procedures and the welders approved in accordance with the Rules? BUILT UNDER THE SPECIAL SURVEY OF CLASS NK Other materials Are parts of structure of material other than of steel? Fire Detection and Extinction INDIAN REGISTER OF SHIPPING Name of authority issuing safety equipment certificate : Fire detection system If a fire detection system is installed, state the maker and type : Maker Type NOHMI BOSAI LTD JAPAN FAC 5118-15L What spaces are covered by the detection system? ACCOMODATION,ENGINE ROOM,PUMP ROOM AND STEERING GEAR COMPARTMENT Location of fire detection control panel : BRIDGE Does the fire detection system have an audible alarm which has a tone that will distinguish it from Yes other alarm systems? Fire extinguishing arrangements Describe below the fire extinguishing arrangements for following spaces : Cargo holds Main deck in case of tankers Pump room Boiler rooms Main machinery spaces Auxiliary machinery spaces Accommodation General Bunker capacity: Kind of fuel used: Average consumption per day: LOW EXPANSION FOAM DISCHARGED THROUGH DEDICATED FOAM NOZZLES CARBON DIOXIDE PART OF MACHINERY SPACES FIXED CARBON DIOXIDE,PORTABLE MECH.50 LITRES FOAM,PORTABLE 9 LITRES CO2 AND 5 KG DCP EXTINGUISHERS PART OF MACHINERY SPACES DCP/CO2/WATER FIRE EXTINGUISHERS/FIRE HYDRANTS FO:585 MT; DO:97 MT M/E:HO ; A/E:DO ;BOILER:BOTH No Yes Give details of the welds which were examined by radiography or other non-destructive means :

HO:13 MT; DO:01 MT DURING SEA PASSAGE AND 02 MT DURING DISCHARGING OPERATIONS Parts of bottom plating in single bottom ships and in bottom tanks NOT APPLICABLE below boilers on which cement or an approved composition is laid: NOT APPLICABLE Particulars of compositions, if used instead of cement: If corrosion control fitted in tanks (including water ballast tanks),give the tank numbers and the details of system,extent,manufacturer,trade name and material of anodes and/or coating and mean thickness of coating: Has a reduction in scantlings been approved for the class notation "KN" and is this associated with a particular cargo or defined ballasting?

FE-1 (Rev.0)

Page 2 of 4

First Entry Ship Report For The Consideration Of The Committee Of Indian Register Of Shipping

NOT APPLICABLE Do the plans show the full rule scantlings and identify those items where reduced scantlings have been approved? PLANS SHOW FULL RULE SCANTLINGS AT ALL SPACES If external cathodic protection fitted, state extent and type: State Extent UNDERWATER AREA AND APPENDAGES If external anti-fouling system fitted, state type: TBT FREE PAINT APPLIED TO UNDERWATER HULL AREA Has ship's structure been shot blasted? If stabiliser fitted, state type : If permanent ballast fitted, state material and locations : Give details of insulated cargo spaces : Additional Information Is the ship strengthened for navigation in ice? If yes, give ice class required : If the ship not an oil tanker, is it fitted for carrying oil as cargo? If yes, state flashpoint of oil cargo : Particulars of any special loading conditions, for which plans have been approved : Rudders and Steering Gear Rudders State type of rudder ( Attach a sketch, if required ) and the means to support weight : SEMI-BALANCED Type of rudder bush THORDON Steering gear Describe briefly the main steering gear and control : ELECTR-HYDRAULIC,TWO INDEPENDENT POWER UNITS CONSISTING OF HYDRAULIC CYLINDERS,CONTROLLABLE FROM WHEELHOUSE AND LOCAL Describe briefly the auxiliary steering gear and control : ANY ONE OF THE POWER UNITS Describe the rudder brake mechanism : HYDRAULIC Will the steering gear stop before the rudder stops take effect? Y While under way at maximum continuous shaft RPM, how long does it take for the rudder to travel 35 deg to 30 deg in both directions? OIL/CHEMICAL TANKE ' C No No NO NO State Type SACRIFICIAL ALUMINIUIM ANODES

FE-1 (Rev.0)

Page 3 of 4

First Entry Ship Report For The Consideration Of The Committee Of Indian Register Of Shipping

23 SECONDS If the steering gear is hydraulic, what is the setting of the protective devices? RELIEF VALVES,LIMIT SWITCHES Recommended SRL Appendix Entries

Remarks

The ship and its equipment reported herein has been built under survey in accordance with the Rules. The ship and its equipment reported herein had been built under special survey of NIPPON KAIJI KYOKAI and is present classed with NK and the ship and its equipment has now been examined in accordance with the modified procedure adapted by us. The scantlings and arrangements of the ship as built have been checked and found to be in accordance with the approved plans or with equivalent arrangements. All modifications and/or additions to the approved arrangements have been approved locally in accordance with or equivalent to Rule Require-ments and have been indicated on the approved/as built plans now forwarded. The fire extinguishing arrangements are in accordance with the Rules and also comply with the Statutory requirements. The materials and workmanship are good. The loadline marks have been painted on both sides of the ship and their correct position verified.

The stability information is available on board and has been approved by CLASS NK. The ship is eligible in my opinion to be classed with the following class notations SUL, OIL TANKER, ESP DOUBLE HULL Capt. Vishvesh J. Mehta,M. S. Ramesh,Sandeep Kumar Surveyor(s) to Indian Register of Shipping 30/04/2011 Date