DISTRIBUTION SHEET
To Distribution Project Title/Work Order Analysis of The F l e x i b l e Receiver L i f t i n g Yoke and B l a s t S h i e l d Assembly (Tank 241SY101) (N2B2K) Name
MSlN

From

Equipment Stress Analysi s/8D430

1 Page 1 of 1
ECN No.

Date December 22, 1994 EDT No. 608387

NA
EDT/ECN Only

Text With All Attach.

Text Only

Attach./ Appendix Only

L. D. Blackburn R. M. Boger J. S. Burgess C. E. Hanson F. H. Huang J. W. Lentsch T. C. Mackey M. J. Ostrom R. B. Pan G. A. R i t t e r H. T o f f e r Central F i l e s (2 Copies)

D3-E (3tCQIr-2)

LY- 7 0

H5-67 L4-90 H5-53 H5-09 H5-67 S7-15 S2-03 H5-68 H5-53 HO-36 HO-38 L8-04

X X

x
X X X.
.

XX

X
X
I

-X

A-6000-135 (01/93) WEF067

DISCLAIMER

in electronic image products. Images ate produced from the best available original document.

IPortions of this document may be illegible

1w5 58EyGINEERlNG DATA TRANSMllTAL


I

Page 1 of
I

1 . ~ 0 ~

608 38

Distribution
5 Proj ./Prog./Dept./Div.: .

N2B2K

6 Cog. Engr.: .

Equipment Stress Analysi s/8D430

NA
7 Purchase Order N . . o:

G. A. Ritter

NA

9. Equip./Conponent

10. System/BLdg./Faci Lity:


11. Receiver Remarks:

NA
NA

N. o:

12. Major Assm. Dug. N. o:

o: 13. Permit/Permit Application N.

H-2-83687, Rev. 1
NA

I
(A1

Item
No.

14. Required Response Date:


DATA !ANSI4 TTED I

NA

(6) DocumenWDrawing No.

(C) Sheet No.

(E)Tile or Description of Data


Transmined

Impact Level

WHC-SD-WM-DA-160

NA

Analysis o f the F1 exi bl e Receiver Liftina Yoke and Blast Shi el d-Assembl y (Tank 241SY101)

SQ

Transrnittal

Disposition ;a n

lf;;

Disposition

er

Impact Level (R MRP 5.43)

Reason for Transmittal 2. Releese 3. Information

1, 2, 3, or 4 (see

1. Approval

4. Review

(GI

KEY
Disposition (H) & (I) 1 Approved . 2. Approved wlcomment 3. Disapproved wlcomment

5. Post-Review

6. Dist. (Receipt Acknow. Required1

4. Reviewed nolcomment 5. Reviewed wlcomment 6. Receipt acknowledged

Reason

Dlap.

SlGNATURElDlSTRlBUTION (See Impact Level for required signatures)


(J) Name

(K) Signature

(L) Date

(M) MSlN

(Jl Name

(Kl Signature

IL) Date

(MI MSlN

IE I :

(GI

(HI
Disp.

18.

'I
Representative for Receiving Organization '

& q&hf e.&


I4/?5or
Cog Zzantlhoject Engineer's Manager

20.

I 21.

Date

APPROVAL < i f rewired) Ltr. No. 11 Approved 11 Approved n/comnents [I Disapproved u/comnents
DOE

ED-7400-172-1(07/91)

RELEASE AUTHORIZATION
Document Number: Document Title: Release Date:

WHC-SD-WM-DA-160, REV 0

Analysis o f the Flexible Receiver Lifting Yoke and Blast Sheild Assembly (Tank 241SY101)
2 J28J95

This document was reviewed following the procedures described in WHC-CM-3-4 and is:
APPROVED FOR PUBLIC RELEASE

February 28, 1995

TRADEMARK DISCLAIMER. Reference herein t o any s p e c i f i c comnercial product, process, o r service by trade name, trademark, manufacturer, o r otherxise, does n o t necessarily c o n s t i t u t e o r imply i t s endorsement, recornnerdation, o r favoring by the United States G o v e r m n t o r any agency thereof o r i t s contractors o r subcontractors. This report has been reproduced from the best a v a i l a b l e copy. Available i n paper copy and microfiche. Printed i n the United States o f America. Available t o t h e U.S. Department o f Energy and i t s contractors from: U.S. Department o f Energy O f f i c e o f S c i e n t i f i c and Technical Information ( O S T I ) PO Box 62 .. Oak Ridge, TN 37831 Telephone: (615) 576-8401 Available.to the public from: U.S. Department o f Comnerce National Technical Information Service (NTIS) 5285 P o r t Royal Road Springfield, VA 22161 Telephone: (703) 487-4650

MASTER.
A-6001 -400.2 (09/94) WEF256

SUPPORTING DOCUMENT
2.
Title

I
3.
Nurber
~~

1.

Total Pages

$25
0

Analysis o f the Flexible Receiver Lifting Yoke and WHC-SD-WM-DA-160 Blast Shield Assembly (Tank 241SY101)
5.
Key Words

4 Rev No. .

6.

Author

Analysis, Bending, Lifting Lug, Tear-out Weld, Shear.

Name:

Signature

Z a L

F. H. Huang
/

Organization/Charge Code

I 7.

8D430/N2B2K

*Abstract

The analysis of the l i f t i n g yoke and b l a s t shield assembly considers t h e bending s t r e s s , weld strength, and resistance of t h e lug hole t o t e a r o u t . The bending s t r e s s o f t h e l i f t i n g lugs is evaluated t o ensure t h a t they meet the requirements o f the American I n s t i t u t e for Steel Construction (AISC 1989). Also considered i n the calculations i s t h e capability o f the thick lugs t o withstand t h e weight of the pump together w i t h t h a t of the container and strongback during r o t a t i o n t o the horizontal position.
OSE AND USE OF DOCUMENT

This docunent was prepar

10.

RELEASE STAMP

o f Energy F i e l d Office,

United States Government or any agency thereof.

9.

Impact Level

SQ

A-6400-073 (11/911 CEF) WEF124

Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thercof. The views and opinions of authors expressed herein do not necessarily state or reflcct those of the United States Government or any agency thereof. , -. .
_<..

T i report was prepared as an account of work sponsored by an agency of the United States hs

WHC-SD-WM-DA-160 Rev. 0 Analysis of the Flexible Receiver Lifting Yoke and B1 ast Shield Assembly (Tank 241SY101) December 1994

PREPARED BY:

P r i n M a l Scientist Materi a1 s EngineeGng


/

I7H.I Huang',

*z ,
/ q0f l

Date /24d-99

REVIEWED B Y : _ d && J. S. Burgessf Engineer Equipment Stress Analysis APPROVED BY:

Date /z/zL/pf

. B. Pan. Manaqer ' R

Date

I 7423h?

"Equi pment-Stres; Analysis

Westinghouse Hanford Company Hanford Operations and Engineering Contractor for the U. S. Department of Energy

WHC-SD-WM-DA-160 Rev. 0 DESIGN VERIFICATION METHOD The need for design verification has been reviewed with the method selected as i ndi cated bel ow:
X

A1 ternate Cal cul ati ons Qual ification. Testing Formal Design Review

Independent Review

Cognizant/fioject/Design Manager SD #WHC-SD-WM-DA-160 DWG(S) # NA ECN # NA

ii

WHC-SD-WM-DA-160 Rev. 0 TYPICAL CHECKLIST FOR INDEPENDENT REVIEW Document Revi ewed WHC-SD-WM-DA- 160 Author F. H. Huanq

[&[I [d e 1 [ I e1 [A [ I

e1

[ I
cGl

. .

[ I

Computer codes and data f 1es documented. i

Necessary assumptions explicitly stated and supported.

Problem completely defined.

Data used in calculations explicitly stated in document. Data checked for consistency with original source information as appl i cab1e. Mathematical derivations checked i ncl udi ng dimensional consistency of results.

c J [ I e1

1 [dl

[ I [ I [d

Models appropriate and used within range of validity o r use outside range of established validity justified. Hand calculations checked for errors.

[&[I

[ I

[ I [ I [.I/
e 1 e 1 [jl

Code run streams correct and consistent with analysis documentati on.

e [ I [ I 4
[4 [ I [ I

Acceptability limits on analytical results applicable and supported. Limits checked against sources. Conclusions consistent with analytical results and appl icabl e 1imits.

Code output consistent with input and with results reported in analysis documentation.

Safety margins consistent with good engineering practices. Results and conclusions address all points required in the problem statement. Software QA Log Number N/A
/ /

eYl [ I [ I
[ 4 [ 1 [ I

MANDATORY

J. S. Burqess 4 & Reviewer

Date

I z/=/ 74

iii

.
1.0

WHC-SD-WM-DA-160 Rev 0

2.0
3.0

4.0

5.0

............................... SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DISCUSSION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.1 Lugs f o r L i f t i n g t h e Yoke . . . . . . . . . . . . . . . . . . . . . . 3.2 Lugs f o r Securing t h e Yoke . . . . . . . . . . . . . . . . . . . . . . 3.3 Lug f o r L i f t i n g t h e B l a s t S h i e l d Assembly . . . . . . . . . . . . . . CONCLUSIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
INTRODUCTION
'

CONTENTS

1 1

2
2
2

1 1

APPENDICES

Appendix A Calculations f o r L i f t i n g Yoke Appendix B C a l c u l a t i o n s f o r B l a s t S h i e l d Assembly Appendix C Drawings

.................. ............. .............................

A-1 B-1 C-1

iv

..,~ ~. - ~.,., , . . .. . . . ... .- " ,

..

.... " .... .,. . .,'.L,?-T.~

.'".<.W.

.... :.

'.'

.<

.ycI. < ..

-;

. I . .

........

%.' > L

.....

WHC-SD-WM-DA-160 Rev. 0 Analysis of the Flexible Receiver Lifting Yoke and Blast Shield Assembly (Tank 241SY101)

1.0

INTRODUCTION

The f l e x i b l e receiver i s used t o maintain primary tank confinement and minimize waste s p i l l a g e during equipment removal from tank r i s e r s through pump pits. To remove t h e mixer pump, a crane i s used t o l i f t t h e l i f t i n g yoke ( H WC 1994a) t h a t i s connected t o t h e mixer pump. Before t h e pump is l i f t e d , a bag assembly w i t h a b l a s t shield ( H 1994b) is lowered over the l i f t i n g yoke and WC the mixer pump onto the load d i s t r i b u t i o n frame by t h e crane. During set up f o r pump removal, t h e l i f t i n g yoke will be s t a b i l i z e d v e r t i c a l l y by a yoke brace (WHC 1994c) while t h e crane i s disconnected from t h e yoke and connected t o the bag assembly. Each of t h e two components has four handling l u g s f o r l i f t i n g . After t h e mixer pump is pulled from the 241SY101 waste tank, i t will be inserted i n t o a v e r t i c a l container supported by a hydraulic strongback. The disposal container then i s lowered slowly t o the horizontal p o s i t i o n for transport. During t h e lowering of the container w i t h the pump, t h e l i f t i n g yoke remains attached t o the crane. A safety chain runs under the pump and is attached t o two t h i c k lugs o f the yoke. The s a f e t y chain prevents t h e yoke from bumping t h e flange of the container. The analysis i s t o ensure t h a t the l i f t i n g lugs have adequate strength. This supporting document reports on t h e s t r u c t u r a l analysis of t h e equipment based on requirements for s a f e t y c l a s s 3 (DOE-RL 1993a), t h e Manua7 of Stee7 Construction (AISC 1989), and the Hanford Hoisting and Rigging Manua7 (DOE-RL 1993b). 2.0 S M AY U MR

The analysis o f the l i f t i n g yoke and b l a s t shield assembly considers t h e bending s t r e s s , weld strength, and resistance of the l u g hole t o t e a r out. The bending stress o f the l i f t i n g lugs i s evaluated t o ensure t h a t they meet the requirements o f t h e American I n s t i t u t e for Steel Construction (AISC 1989). Also considered i n t h e calculations i s the capability of the t h i c k lugs t o withstand the weight o f the pump together w i t h t h a t o f t h e container and strongback during rotation t o t h e horizontal position.
3.0 DISCUSSION

The s t r u c t u r a l cal ;u1 a t i ons are based on the fol 1owing a1 1owabl e s t r e s s e s : 12,000 l!f/in f o r bending, tension, and bearing; 7,200 1b f / i n * for shear; 7,200 l b f / i n on e f f e c t i v e area f o r welds. According t o t h e Hanford Site Hoisting and Rigging Manua7 (DOE-RL 1993b) , the allowable s t r e s s e s except allowable shearing s t r e s s a r e one-third o f y i e l d strength.
1

WHC-SD-WM-DA-160 Rev. 0 3.1 Lugs f o r Lifting the Yoke

Four $-in.-thick lugs a r e welded on the 14- by 6-in. f l a t bar of t h e yoke The location o f t h e handling lugs i s symmetrical t o t h e center of gravi t y of t h e yoke when the yoke is l i f t e d horizontally. The calculations check t h e bending s t r e s s of the lugs when l i f t i n g w i t h o u t the use o f spreader beams. Also considered i n the analysis is t h e l i f t i n g load capacity of t h e lugs i n terms of tension, shear, bearing, and tear-out resistance (see Appendix A).

3.2

Lugs f o r Securing the Yoke

The t o t a l weight of t h e container and the pump i s approximately 80,000 l b ; the strongback weighs 30,000 l b . The lugs a r e designed on the basis of the reaction acting on the safety chain and the lugs from t h e t o t a l weight of container, pump, and strongback. The l u g s a r e full-penetration welded t o t h e yoke bar. Because t h e safety chain will bend the lugs inward, the analysis checks t h e bending of the lugs. Calculations show t h a t t h e bending s t r e s s o f a l u g 14-in thick i s acceptable (see Appendix A).
3.3 Lug f o r Lifting t h e Blast Shield Assembly

The weight o f each component of the b l a s t shield assembly i s estimated from drawing H-2-821387 (WHC 1994b). Although there a r e four l i f t i n g l u g s , the analysis assumes t h a t only two lugs share t h e t o t a l weight of t h e assembly. The assembly shall be l i f t e d by a 52-in. by 28-in. spreader bar w i t h four 15-ft-long cables. Because the dimensions o f the spreader bar i s close t o those of t h e assembly, the spreader bar l i f t s t h e lug of t h e assembly nearly v e r t i c a l l y . The thickness of the lug and t h e edge distance of t h e hole i n the lug a r e checked t o ensure adequate strength. The calculations appear i n Appendix B. 40 .

CONCLUSION

The calculations i n Appendices A and B show t h a t the + i n . - t h i c k lugs a r e qualified t o carry the weight o f the l i f t i n g yoke o r t h e b l a s t s h i e l d assembly. Also, the calculations determine t h a t t h e l+in.-thick lug i s s t r u c t u r a l l y adequate t o secure the container, pump and strong-back during rotation from 90' t o t h e horizontal p o s i t i o n .
50 .

REFERENCES

AISC

1989, Manua7 o f Stee7 Construction, N i n t h edition, American I n s t i t u t e f o r Steel Construction, Chicago, I11 inois.

WHC-SD-WM-DA-160 Rev. 0

DOE-RL 1993a, Standard Arch-Civi 7 Design Criteria, Design Loads for Faci7itiesY Hanford Plant Standard SDC-4.1, Rev. 12, U.S. Department of Energy-Rich1 and Field Office, Richl and, Washington.
DOE-RL 1993b, Hanford Site Hoisting and Rigging Manua7, DOE-RL-92-36, Department of Energy Richland Field Office, Richland, Washington.
WHC WHC WHC
U.S.

1994a, Mixer Pump Assemb7y Lifting Yoke, drawing H-2-83687, Westinghouse Hanford Company, Richl and, Washington.

Rev. 1,

1994b, HMT-F7exib7e Receiver B7ast Shie7d Assemb7y, drawing H-2-821387, Rev. 0, Westinghouse Hanford Company, Richland, Washington. 1994c, Structura7 Ana7ysis: F7exib7e Receiver Yoke Brace for the 241SY101 Mixer Pump, WHC-SD-WM-DA-157, Rev. 0, Westinghouse Hanford Company, Richland, Washington.

WHC-SO-WM-DA-160 Rev. 0

Calculations for Lifting Yoke

Appendix A

A- 1

DESIGN CALCULATION
Drawing ~ - 2 - 6 . 3 667,npa.1( 2 ) Doc. No.
,

WHC-SD-WM-DA-160
REV. 0

-.

Building Subject Originator Checker


0

( 5 ) Rev.

F/+&-

r-

W h ; b l e j'&p;v+~ :-k.h4J
I'
, -

V*&

(6 & b IY m
Date Date

PAGE A-2 OF A-8

- ._
~

6-844
t .

& A*

7/?)9+

BD-6400-060 1 (12187)

DESIGN CALCULATION

WHC-SD-WM-DA-160
REV. 0

BD-64004l60 1 (12/87)

DESiG N CALCULATION
(1) Drawing
(4) Building

/ ! - 2 - ~ 3 6 ~ 7jqp,w. I ,
.

WHC-SD-WM-DA-160 REV. 0

( 2 ) Doc. No.

(7) Subject

LUG 41

( 5 ) Rev. L,J$,*,,( \~,,/cQ 4 s 5 e m $ / , ,

(8) Originator (9) Checker

F/f / f u n , R J&m4 ,-/ & f l . 2


*-

PAGE A-4 OF A-8

Date Date

S-.k~-9q
?/Cy/+ /

4-

\-.

/
c

lk

DESIGN CALCULATI0
(1) Drawing /.-2 (4) Building
4

-9 76 87/ .p !11.1

( 2 ) Doc. No.

WHC-SD-WM-DAREV. 0

160

(7) Subject

Lu& oc

LI#;,~~J Yoke A ~ C 6 ) ~ HS P
I

(5) Rev.

PAGE A-5 OF A-8


Date Date

7/7/+4

d-/cC-qG

pr -<

ED-6400-060 1 (12187)

DESlGN CALCULATION
(1) Drawing (4) Building

/+ 2 -8 3 68 3,

RCu./(2)Doc. No.
(5) Rev.

WHC-SD-WM-DAREV. 0 PAGE A-6

I60

OF A-8

ED-6400.060 1 (12187)

DESIGN CALCULATlOh

.. .

(1) Drawing (4) Building

(2) Doc. No. ( 5 ) Rev.

WHC-SD-WM-DA-~~~ REV. 0

PAGE A-7 OF A-8


Date Date
I
I

( 7 ) Subject
(8) Originator (9) Checker

F# ,?&&A
,

6-r7-995

q&

(10)

: I

'

..

'

P-A

I"

e-

Ld

DE5 IG N CALCULATlOb

WHC-SD-WM-DA-160 REV. 0

PAGE A-8 OF A-8

A -8
80-6400.060 1 (12187)

WHC-SD-WM-DA-160 Rev. 0 Appendix B C a l c u l a t i o n s for B l a s t S h i e l d Assembly

B-1

DESIGN CALCULATI0N

(1) Drawing (4) Building

/.. -2-821 ? p7. / .u (2) &

Doc. No. ( 5 ) Rev.

WHC-SD-WM-DA-160 REV. 0 PAGE B-2 OF 8-5

. *

I -

. A

0-a,

BD 6400.060 1 (12187)

DESIGN CALCULATION /7(-2-82/jp7,hI o (2) Doc. No. (4) Building (5) Rev. (7) Subject W -/;?ex/6/~ ~ e t &/As/ 5kiUld R ~ e
(8) Originator

WHC-SD-WM-DA-160 REV. 0 PAGE B-3 (6) Jooho. 1tu


Date Date

(1) Drawing

OF B-5

(9) Checker

, e

Fd /4mrc%
r .

&I

7/~5/94

I ' ..

..

I ! "

' 1

'-

8-3

BO-6600.060 (12B7) 1

DESIGN CALCULATiON
(1) Drawing #-2-.$2/

(4) Building (7) Subject I W T


(8) Originator

- ~/h-;&e

3&7. Rm-o

WHC-SD-WM-DAREV. 0
(6)

160

(2) Doc. No.

5.At&..h
/

~ ? e c e , & 1 rP % ;epc ~Ik


LGd

( 5 ) Rev.

._ .PAGE B-4 - _.
2-21 - y $

OF B-5

Date

(9) Checker

4 F 5

Date

/Z/zZ/Fd

80-6000-060 (12i87) 1

D E5 I N CALCULATl ON G
(1) Drawing ~#-7-$?2/38 f l . 0 ( 2 ) Doc. No. 7. d (4) Building

WHC-SD-WM-DA-160 REV. 0
PAGE B-5 OF B-5

(7) Subject

HMT0

( 8 ) Originator

&??

F/,,;b)'e H
&*-4
J

(5) Rev. ~ e iwr e

~ G S

(9) Checker

-&&L

(6) {. C ~ ; P P ~ Date Date

/2--2)4+
I

t/ t
I

~ 95J j

= 3, 7F2 4k

.-

..o

0-5

ED-6400-060.1 (1 2.87)

' I

WHC-SD-WM-DA-160 Rev. 0

Appendix C Drawings
'

c- 1

SEE NoTt

OMFER 43.2 PL

REIKNUBLE RRHNWG RING. 2 R

ASS EM BLY
SCnLE: 3/16

%E

c
ss

t
WHC-SD-WM-DA-160

I
(UNW

REV. 0

GENERAL NOTES

OMERWISE SPECIFIED)

1
I I II

PAGE C-2 OF C-4

1. REMOVE KL BURRS *NO BREW SHARP EDGEE

2 WELD AN0 INSPECT PER AWS Dl.1 M FMK P A S OF ALL Waos MT . DESIGMTED w a s aso= ANO'MIER LOAD TESTING m s s i u BE ~ ~ D O M l H M D ON AN APPROMD INSPECTION ooCUMo\ri. WELD WRCATlONS PER W E SCTlON Ly AAE AN ACCEPTABLE SUBSTITUTK)N.

3 FIAT BAA. PIATE, AND !jTIWXURAl. %APES SHALL COFORM TO ASTM A38 . A108 GR 101% CARBON SmL ROUND BAR SHKL CONFORM TO
4. IDENiIFY ASSEMBLY WITH ORAWING NUMNBER AN0 ORAWiffi

mwnw WCATEO ON THE DRAWING. CHARMERS HlGH AND SHKL BE PAINTED WH R L K K EFurtEL T I
I ME N

RMSlON NUMBER SHUL BE 1-

SOD

RIffi. INSTALL LOOSE FIT WER PIN, 2 REao

x 2 1 18 ID x 1/4 THICK k/ENNING

8. PANT 'WACilY 20 TONS IN THE LOCATKIN INOlCATED ON BOTH SlDES OF THE UmNG PLATE CHARKIlERS SHALL BE 2 HKW AND Stl4.L ' BE BUCK ENWEL ON A YELUrn PUMU BACKCROUND.

7 THE ASSEMSLY SWU BE LOAD TESTED Wi HANFORO HMSnffi , 4 RIGGWG . 40 WUKWHC-CM-~~-+. IF THE ASSEMBLY FAILS m PASS THE UUD TEST, NECESSART REPARS SHUL BE MADE AN0 THE UUD TEST R P T O ANY EU E REPNRS MADE m THE WWNG mu. REPUIRE RE-INSPECWN OF *E

WELDS.

umffi LUG SEE

8. THE CONTRACTOR SH4J-L FIELO MRlM THE REQUIRE0 LENGTH OF THE m s i m BARS PRIOR m FMRICAW TO ASSURE THE NECDURY CLWRANCE FOR THE MIXER PUMP ASSEMBLY.

0. THE CONTRACTOR SWLL MRIW THE WIDTH RmyEEN THE NEW UTnNG WGS ON THE MISING PUMP W G E R D U R E FARRlCAnON OF M E UmNC YOKE TO ASSURE PROPER MGNHENT *NO FIT-UP BEWEEN THE LIFTING LUGS OH THE MISTING PUMP FLANGE AND THE UmNG LUGS ON THE UFTIffi YOKE.

L,'

c = F sC4E 3/18 SIZE

3 1/2

pL+7
L / 8 aAR

UFflNG LUG OH UmNG PUTE

T
BAR. b x 1 .

/-MT

----_ FF==@-

w=SCALE: Nu. SIZE

\-!l3/16

THRU CENTER OF WR m r i / e c o r n PIN. 2 PL R

F O R R E F E R E N C E ON
. I _ -

F
f

(1.-11

we)

(3'-10 3/4) SEE NOTE 9

24

1 1/2

1 1/2

PLATE. 2- THICK

PLATE,

THK

/ 7 1

DETAIL

RETAMWC PLATE,

5 00 x 2 1/16
D

H)

x 1/4 M K

@E &%

1 1

/M -T

' li2

2r FIAT W.1 X 1 .

PL

_-?

--

WHC-SO-WM-DA-160 REV. 0 PAGE C-3 OF C-4

fl

C %i & gE
M
2 PLACES

FLAT W , 1 1/2 t Sx

FlAT

8AR. b x

1 1/2

FLAT EM. b x 1 1/2

FUT W?, 1' 'Zx

SECTION
SCALE 1/4 SIZE

FOR REFERENCE O N L Y
FOR GENERAL NOTES SEE SHEET 1

=--a

ir

ii

i i

0BLAST
SCVE: 1/8

SHIELD ASSEMBLY

GENERAL NOTES:

(UNLESS OTHERWISE SPECIFIED)

IOEN~M ASSEMBLY wrr~DRAWING NUMBEX Pmr NUMBER A N D R M S l O N NUMBER PER HS-BSs-oOlS E ' % 2 USE 1/2 INCH HIGH CtWAXG?S. LOCATE WPROX 'MERE SHOW. CONTAINHD(T 3AG ( E M 2) fOlDk3 IN APPSOX C FOLDS TO COMPREjS ONTO THE BUST S h l W (mrC 3).
KK;X

mU 2 AN0 3 ALONG HNlDWlHT INC(C4TCRS AT ASSNBLY.