Reference Document Physical verification / as per specifications Result YES / NO
Remarks
2 3 4 5 6 8 9 10 11 12 13 14
Physical verification / as per drawing Physical verification / as per drawing Physical verification / as per drawing Physical verification / as per drawing As per on site test report /as per specifications As per on site test report /as per specifications As per on site test report /as per specifications Physical verification /as per specifications Physical verification /as per specifications Physical verification /as per specifications Physical verification /as per specifications Physical verification /as per vendor document /as per specifications
15
Check the space heater resistance and space heater connection in humidifier for various cubicle Check the power cable & control cable glanding, lugging and metallic identification tags.
Physical verification /as per vendor document /as per specifications Physical verification /as per specifications
16
Check all control wires connection tightening 17 18 19 20 Check the connection of the PTs and control transformer Testing of the various relays and release of ACB feeder of PCC Check for proper connection to Ammeter and ensure no open secondary of current transformer. Ensure all protection settings are done and enabled as per recommended settings in all ACBs of PCC ( Setting should be recorded) Ensure all protection settings are done and enabled as per recommended settings in incoming bkr of PCC ( Setting should be recorded) Ensure all logics of feeder working as per control diagram Verify the proper rating of control fuses Check and confirm that no opening in panel Thoroughly clean the PCC externally and internally. Confirm the incoming supply voltage level and phase sequence Switch ON the PCC and check the phase sequence, output voltages of the respective breakers, output of the control transformer ,various indicating and measuring instrument for proper working 29 30 31 32 33 34 35 36 Check for any abnormality Availability of fire extinguisher Availability of fire detection system Availability of Danger/shut down/Man At Work board Availability of panel Keys/ rack in/rack out handle/ spring handle/ all types of breaker trolley House keeping of Room Ensure DC system is as per drawing Switch ON the 6.6KV BOARD and check the phase sequence, output voltages of the respective breakers in PT Secondary side, various indicating and measuring instrument for proper working Physical verification / as per drawing As per on site test report /as per specifications Drawing of the panel Recommended Setting Chart
21
22 23
24 25 26 27 28
Physical verification
REMARKS : Entry of unauthorized person should be prohibited and caution board should be placed.