UNDERGROUND CONSTRUCTION MANUAL

HV CONSTRUCTION
Back to MAIN INDEX Go to SECTION INDEX

CONSTRUCTION

DESCRIPTION

DWG

CONSTRUCTION

DESCRIPTION

DWG

11kV POLE TERMINATION CONSTRUCTION Construction code guide - 11kV cable termination and connection ABB Construction code guide - 11kV cable termination & connection Magnefix & transformer Construction code guide - 11kV Pole termination Construction code guide - 22kV cable termination & connection F&G and transformer Construction code guide - 22kV Pole termination Construction code guide - 33kV Pole termination 11kV RMU AND TRANSFORMER CONSTRUCTION 11PMCTC/ASL RMU - ABB SafeLink in padmounted 5206 Substation triplex XLPE cable termination & connection 11PMCTC/ASL RMU - ABB SafeLink in padmounted substation 5207 400mm 1C Cu. Cable termination & connection 5134/1 5134/2 5134/3 5135/1 5135/2 5247/1 Pole termination 35mm/185mm/400mm Al. and 400mm Cu XLPE cable 11CTP Pole termination 35mm/185mm/400mm AI. and 400mm Cu XLPE cable 11CTP Pole termination cable guard to pole Pole termination with links 35mm/185mm/400mm AI. XLPE Pole termination with links (trident) 35mm/185mm/400mm AI. XLPE Pole termination with ABS & EDOs 35mm/185mm/400mm AI. XLPE Pole termination with ABS & EDOs 35mm/185mm/400mm AI. XLPE Pole termination direct to mains 400mm Cu. 1 core XLPE cable 22kV RMU CONSTRUCTION RMU - F&G GA..C Triplex XLPE cable termination and connection 22CTC/FGA RMU - F&G GA..C triplex XLPE cable termination and connection RMU - Schneider Electric RM6 Triplex XLPE cable termination and connection 22CTC/RM6 RMU - Schneider Electric RM6 Triplex XLPE cable termination and connection 22 kV TRANSFORMER CONSTRUCTION Transformer Triplex XLPE cable termination and connection 22CTC/TX Transformer Triplex XLPE cable termination and connection 5120/1 5120/2 5044/1 5044/2 5279/1 5279/2 5101/1 5101/2 5101/3 5101/4 5101/5 5101/6 5101/7 5101/8

11CTC/ASD 11CTC/MMD 11CTC/TX 11CTC/ASL

RMU - ABB SD series Triplex XLPE cable termination & connection RMU & SFU Magnefix MD & Transformer Triplex XLPE cable termination & connection RMU - ABB safelink freestanding triplex XLPE cable termination & connection RMU - ABB safelink freestanding 400mm 1C Cu. cable termination & connection

5051 5054

5244

11CTC/ASL

5245

11CTC/FBX

FBX RMU - Triplex XLPE cable term. & conn. - material 5270/1 FBX RMU - Triplex XLPE cable term. & conn. - construction 5270/2

22CTC/TX

A B C D E

ORIGINAL ISSUE 30.9.05 2.6.11

APPROVED

C. Noel 2/6/11 A. Bletchly L. Burton

UNDERGROUND DISTRIBUTION
HV CONSTRUCTION INDEX

DATE

PASSED
10.01.12
Ergon Energy Corporation Ltd

17.07.12

ABN 50 087 646 062

DRAWN

FILE: 5 58 5133 1

Dwg

Sh

CONSTRUCTION

DESCRIPTION

DWG

CONSTRUCTION

DESCRIPTION

DWG

22kV POLE TERMINATION CONSTRUCTION Pole termination 35mm/185mm AI. Triplex and 630mm AI. 1 core XLPE cable Pole termination 35mm/185mm AI. Triplex and 630mm AI. 1 core XLPE cable Pole termination cable guard to pole Pole termination with links 35mm/185mm AI. XLPE cable Pole termination with links (trident) 35mm/185mm AI. XLPE cable Pole termination with ABS & EDOs 35mm/185mm AI. XLPE cable Pole termination with ABS & EDOs 35mm/185mm AI. XLPE cable Pole termination direct to mains 630mm AI. 1 core XLPE cable 5076/1 5076/2 5076/3 5076/4 5076/5 5076/6 5076/7 5076/8

22CTP 22CTP

33kV POLE TERMINATION CONSTRUCTION Pole termination 50mm/300mm Al core XLPE cable - Material Pole termination 50mm/300mm Al core XLPE cable Pole termination cable guard to pole Pole termination with links 50mm/300mm Al 1 core Pole termination with ABS and EDOs 50mm/300mm Al 1 core 5248/1 5248/2 5248/3 5248/4 5248/5

33CTP

A B

ORIGINAL ISSUE 2.6.11

APPROVED

C. Noel 2/6/11 A. Bletchly L. Burton

UNDERGROUND DISTRIBUTION
HV CONSTRUCTION INDEX

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

FILE: 5 58 5133 2

Dwg

Sh

MATERIAL - INCLUDING CABLE SCREEN EARTH CONNECTION QTY ASSY 512-1 512-4 512-7 510-1 510-6 536-5 553-1 DESCRIPTION
35mm Cable termination and connection to RMU 22kV 35mm
2 2 2 2 2

185mm

630mm

cable insect protected cable

1 1 1 1 1 1 3 3

Cable termination and connection to RMU 22kV 185mm

2 Cable termination and connection to RMU 22kV 630mm cable

Earth extension elbow connector to station earth Earth extension elbow connector to station earth Clamp to suit 3 x 1 core 630mm 35mm
2 2

cable

insect protected cable bonding brass tape to cable screen

NOTES: 1. Insulate screen wires with PVC tape and ensure that wires DO NOT CONTACT any metal before reaching the station earth bar.

A B

ORIGINAL ISSUE 11.04.12

APPROVED

C.Noel 8/2/02 A.Bletchly T.Borg

UNDERGROUND DISTRIBUTION
22kV CONSTRUCTION RMU - F&G GA...C TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 58 5044 1

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

Dwg

5044

Sh

F & G RMU Type GA...C (shown)

Screen earth
F

Assy Selection 512-1 and 553-1 or 512-4 or 512-7

Assy 510-1 or 6

Assy Selection 536-5

To Station Earth

Construction Type

22CTC/FGA

A B

ORIGINAL ISSUE 11.04.12

APPROVED

C.Noel 8/2/02 A.Bletchly T.Borg

UNDERGROUND DISTRIBUTION
22kV CONSTRUCTION RMU F&G GA...C TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 58 5044 2

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

Dwg

5044

Sh

MATERIAL - ASD ASSY 514-1 514-2 514-3 514-4 541-4 541-7 DESCRIPTION
Term. & conn. (ABB SD) 11kV 35mm
2

QTY
cable
2

Term. & conn. (ABB SD) 11kV 185mm Term. & conn. (ABB SD) 11kV 35mm
2

cable 1
F

cable insect prot.

Maximum lug width is 35mm. Machine/file both sides of palm as necessary and radius edges.

Term. & conn. (ABB SD) 11kV 185mm2 cable insect prot. Cable trifoil to channel suit 11kV 35mm
2 2

cable cable insect prot. cable cable insect prot. 1 1 Assy Selection 514-1 to 4

Cable trifoil to channel suit 11kV 35mm

Cable trifoil to channel suit 11kV 185mm

2 2

Cable trifoil to channel suit 11kV 185mm

557-21 Spring nut suit P3300 channel

BACK OF CABLE BOX

Station Earth
F

Assy Selection 541-4 or 7

NOTES: 1. Insulate screen wires with PVC tape and ensure that wires DO NOT CONTACT the unistrut bar or any earth point before reaching the station earth bar. 2. Locate cable lug and bolt head to rear of bushing.

SIDE VIEW

A B

ORIGINAL ISSUE 07.02.12

APPROVED

C.Noel 20/1/03 A.Bletchly T.Borg

UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION RMU - ABB SD SERIES TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 58 5051 1

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

Assy 557-21

Construction Type

11CTC/ASD

Dwg

5051

Sh

MATERIAL - MMD ASSY 516-1 DESCRIPTION


Term. & conn. (Magnefix MD & Transf.) 11kV 35mm
2

QTY
cable
2

516-2 Term. & conn. (Magnefix MD & Transf.) 11kV 185mm cable 516-3 Term. & conn. (Magnefix MD & Transf.) 11kV 35mm2 cable insect prot. 516-4 Term. & conn. (Magnefix MD & Transf.) 11kV 185mm2 cable insect prot. MATERIAL - TRANSF. ASSY 516-1 DESCRIPTION
Term. & conn. (Magnefix MD & Transf.) 11kV 35mm
2

Assy Selection 516-1 to 4

QTY
2
F

cable 1

516-2 Term. & conn. (Magnefix MD & Transf.) 11kV 185mm cable
2 516-3 Term. & conn. (Magnefix MD & Transf.) 11kV 35mm cable insect prot. 516-4 Term. & conn. (Magnefix MD & Transf.) 11kV 185mm2 cable insect prot. 2 541-4 Clamp trefoil to channel suit 11kV 35mm cable

Assy Selection 516-1 to 4 1

Clamp trefoil to channel suit 11kV 35mm

cable insect prot.


2

541-7 Clamp trefoil to channel suit 11kV 185mm cable


Clamp trefoil to channel suit 11kV 185mm 2 cable insect prot.

557-20 Spring nut suit P1000 channel

NOTES: 1. Insulate screen wires with PVC tape and ensure that wires DO NOT CONTACT the unistrut bar or any earth point before reaching the station earth bar.

Assy Selection 541-4 or 7 and 557-20

Support Channel
F

FRONT VIEW - RMU

Support Channel

Construction Type

11CTC/TX
FRONT VIEW - TRANSFORMER

11CTC/MMD

A B

ORIGINAL ISSUE 07.02.12

APPROVED

C.Noel 17/1/03 A.Bletchly T.Borg

UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION RMU & SFU - MAGNEFIX MD AND TRANSFORMER TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 58 5054 1

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

Dwg

5054

Sh

MATERIAL - TERMINATION ASSY 511-2 511-6 DESCRIPTION


Clamp trefoil to pole term. bracket suit 22kV 35mm2 cable insect protected Clamp trefoil to pole term. bracket suit 22kV 185mm
2

NOTES:

QTY

1. Locate cable on opposite side of pole to oncoming traffic where possible. 2. Do Not Obstruct climbing access. 3. All metalwork that passes through or into wood shall be greased for the entire length that may come into contact with the wood. 4. Minimum dimension to ground from termination bracket king bolt allows sufficient ground clearance for an LV underground termination on pole. 5. Dimension from termination bracket king bolt to LV conductor below suits triplex cable termination. 3C cable termination requires greater dimension. 6. Polymeric cable guard is not to be use in areas: subject to grass fire where metal bladed brush cutter may be used where there is a high likelihood of impact. 7. Refer Earthing Section of the Overhead Construction Manual for minimum separation requirements between metal cable guard and communication assets.

cable

511-12 Clamp trefoil to pole term. bracket suit 22kV 630mm 2 cable 515-4
Clamp cable to wood pole

557-12 Clamp trefoil to wood pole to suit 630mm2 cable 539-1 540-2 540-3
Bracket termination (11kV, 22kV & 33kV) mounting to wood pole Arrester 22kV mounting to bracket (M12) Arrester 22kV mounting to bracket (M16) - 630mm
2

AR 1 3 cable only

546-10 Termination outdoor 22kV 185mm2 cable 546-11 Termination outdoor 22kV 630mm 2 cable 546-12 Termination outdoor 22kV 35mm cable insect protected 547-1
Guard wildlife to wood pole 1
2

MATERIAL - CABLE GUARD ASSY 531-1 531-6 531-7 DESCRIPTION


Guard polymeric to wood pole Guard metal (100) to wood pole Guard metal (130) to wood pole 1

QTY

MATERIAL - TERMINATION QTY ASSY 580-1 DESCRIPTION


Cable separation mounting bracket for termination leads

35mm 185mm 630mm


1

A B C D

ORIGINAL ISSUE 28.1.05 02.08.10 16.03.11

APPROVED

C. Noel 18/2/03 A. Bletchly C.Lindsay

UNDERGROUND DISTRIBUTION
22kV CONSTRUCTION 2 2 POLE TERMINATION - 35mm /185mm AL TRIPLEX 2 AND 630mm AL 1 CORE XLPE CABLE - MATERIAL
B 1/2 DISC

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

FILE: 5 58 5076 1

Dwg

5076

Sh

Bracket King Bolt Assy Selection 540-2 or 3

Assy Selection 546-10 to 12

HV Earth - Refer Overhead Construction Manual EARTHING HV Equipment Earth

Assy Selection 511-2, 6 or 12 and 580-1 (630mm)

Earth cable to pass underneath wildlife guard


F

Assy 547-1
F

Assy Selection 515-4 or 557-12 at 1000 crs (typical)

3500 above ground level Construction Type

A B C

ORIGINAL ISSUE 28.1.05 02.08.10

APPROVED

C. Noel 18/2/03 A. Bletchly C. Lindsay

UNDERGROUND DISTRIBUTION
22kV CONSTRUCTION 2 2 POLE TERMINATION - 35mm /185mm AL TRIPLEX AND 630mm 2 AL 1 CORE XLPE CABLE
B 1/2 DISC

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

FILE: 5 58 5076 2

Assy 539-1

22CTP

Dwg

5076

Sh

MATERIAL - TERMINATION ASSY 511-1 DESCRIPTION


Clamp trefoil to pole term. bracket suit 11kV 35mm cable Clamp trefoil to pole term. bracket suit 11kV 35mm cable insect protected Clamp trefoil to pole term. bracket suit 11kV 185mm cable

MATERIAL - CABLE GUARD QTY ASSY 531-1 531-6 531-7


1 NOTES: 1. Locate cable on opposite side of pole to oncoming traffic where possible. 2. Do Not Obstruct climbing access. AR 1 3 3. All metalwork that passes through or into wood shall be greased for the entire length that may come into contact with the wood. 4. Minimum dimension to ground from termination bracket king bolt allows sufficient ground clearance for an LV underground termination on pole. 5. Dimension from termination bracket king bolt to LV conductor below suits triplex and 1 core cable termination. 3 core cable termination requires greater dimension. Polymeric cable guard is not to be use in 6. areas: subject to grass fire where metal bladed brush cutter may be used where there is a high likelihood of impact. 7. Refer Earthing Section of the Overhead Construction Manual for minimum separation requirements between metal cable guard and communication assets.

DESCRIPTION
Guard polymeric to wood pole Guard metal (100) to wood pole Guard metal (130) to wood pole

QTY
1

511-3 Clamp trefoil to pole term. bracket suit 11kV 185mm cable insect protected 511-8 Clamp trefoil to pole term. bracket suit 11kV 400mm Cu cable insect protected 511-10 Clamp trefoil to pole term. bracket suit 11kV 400mm Al cable
Clamp trefoil to pole term. bracket suit 11kV 400mm Al cable insect protected

515-4 Clamp cable to wood pole 557-8 Clamp trefoil to wood pole to suit 400mm cable 11kV 539-1 540-1 546-1
Bracket termination (11kV, 22kV & 33kV) mounting to wood pole Arrester 11kV mounting to bracket (M12)

540-4 Arrester 11kV mounting to bracket (M16) - 400mm cable


Termination outdoor 11kV 35mm Al cable

546-2 Termination outdoor 11kV 185mm Al cable 546-3 Termination outdoor 11kV 35mm Al cable insect protected 546-4 Termination outdoor 11kV 185mm Al cable insect protected 546-6 Termination outdoor 11kV 400mm Al cable 546-7 Termination outdoor 11kV 400mm Al cable insect protected 572-1 547-1
Termination outdoor 11kV 400mm Cu cable insect protected Guard wildlife to wood pole 1

MATERIAL - TERMINATION QTY ASSY 580-1 A B C D E DESCRIPTION


Cable separation mounting bracket for termination leads
APPROVED

35mm 185mm 400mm


1
C. Noel 18/2/03 A. Bletchly C.Lindsay

ORIGINAL ISSUE 29.9.05 02.08.10 16.03.11 07.02.12

UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION POLE TERMINATION 35/185/400mm AL and 400mm CU XLPE CABLE
B 1/2 DISC

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

FILE: 5 58 5101 1

Dwg

5101

Sh

Bracket King Bolt


F

Assy Selection 540-1 or 4

Assy 539-1
F

Assy Selection 546-1 to 7 or 572-1 HV Earth - Refer Overhead Construction Manual EARTHING HV Equipment Earth
F

Assy Selection 511-1, 3, 8 or 10 and 580-1 (400mm)

Earth cable to pass underneath wildlife guard


F

Assy Selection 515-4 or 557-8 at 1000 crs typical

Assy 547-1

3500 above ground level Construction Type

A B C D

ORIGINAL ISSUE 29.9.05 24.3.11 07.02.12

HARD COPY UNCONTROLLED

11CTP
APPROVED

C. Noel 18/2/03 A. Bletchly C.Lindsay

UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION POLE TERMINATION - 35/185/400mm AL AND 400mm CU XLPE CABLE
B 1/2 DISC

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

FILE: 5 58 5101 2

Dwg

5101

Sh

00

00 00

REFER:- Overhead Construction Manual CABLE TERM. POLES for pole top details.

1800 MINIMUM TO GROUND IF LV CABLE TERM. REQUIRED (TYPICAL)

1800

1800

2450
F

8200
F F

2450

2100

LV ABC 4250 4550 LV OPEN WIRE

LV ABC 4250 4550 LV OPEN WIRE

LV ABC 3900 4200 LV OPEN WIRE

300
F

TERMINATION

STRAIN
APPROVED

DELTA INTERMEDIATE
C. Noel 24/3/03 A. Bletchly C.Lindsay

A B C

ORIGINAL ISSUE 24.3.11 07.02.12

UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION POLE TERMINATION WITH LINKS 35/185/400mm AL XLPE
FILE: 5 58 5101 4

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

300

300

FF

DRAWN

Dwg

5101

Sh

00

00

REFER:- Overhead Construction Manual CABLE TERM. POLES for pole top details.

1800 MINIMUM TO GROUND IF LV CABLE TERM. REQUIRED (TYPICAL)

1800

2100

8200

2650

LV ABC 3900 4200 LV OPEN WIRE

LV ABC 4450 4750 LV OPEN WIRE

300
F

TRIDENT INTERMEDIATE

TRIDENT TERMINATION/STRAIN
APPROVED

A B C

ORIGINAL ISSUE 24.3.11 07.02.12

C. Noel 24/3/03 A. Bletchly C.Lindsay

UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION POLE TERMINATION WITH LINKS (TRIDENT) 35/185/400mm AL XLPE
FILE: 5 58 5101 5

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

F
FF

300

DRAWN

Dwg

5101

Sh

00

00

REFER:- Overhead Construction Manual CABLE TERM. POLES for pole top details.

8200
F

3700

1800

MINIMUM TO GROUND IF LV CABLE TERM. REQUIRED (TYPICAL)

1800

3000

LV ABC 5500 5800 LV OPEN WIRE

LV ABC 4800 5100 LV OPEN WIRE

300
F
FF

TRIDENT TERMINATION/STRAIN

TRIDENT INTERMEDIATE
APPROVED

A B C

ORIGINAL ISSUE 24.3.11 07.02.12

C. Noel 5/3/03 A. Bletchly C.Lindsay

UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION POLE TERMINATION WITH ABS AND EDOS 35/185/400mm AL XLPE
FILE: 5 58 5101 6

HARD COPY UNCONTROLLED


Ergon Energy Corporation Ltd ABN 50 087 646 062

DATE

PASSED

300

DRAWN

Dwg

5101

Sh

00

00

REFER:- Overhead Construction Manual CABLE TERM. POLES for pole top details.

1800

MINIMUM TO GROUND IF LV CABLE TERM. REQUIRED (TYPICAL)

1800

LV ABC 4500 4800 LV OPEN WIRE

2700

8200

2700

LV ABC 4500 4800 LV OPEN WIRE

300
F
FF

FLAT INTERMEDIATE

TERMINATION/STRAIN
APPROVED

A B C

ORIGINAL ISSUE 24.3.11 07.02.12

C. Noel 25/3/03 A. Bletchly C.Lindsay

UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION POLE TERMINATION WITH ABS AND EDOS 35/185/400mm AL XLPE
FILE: 5 58 5101 7

HARD COPY UNCONTROLLED


Ergon Energy Corporation Ltd ABN 50 087 646 062

DATE

PASSED

DRAWN

Dwg

5101

300

Sh

11kV PADMOUNTED SUBSTATION CABLE TERMINATION & CONNECTION RMU CONSTRUCTION CODE
Code shown within dashed box appears on relevant construction detail drawings in this manual.

A 11 PM/CTC/ASL/35T
CABLE SIZE

VOLTAGE 11 = 11kV LOCATION

CONSTRUCTIONS CTC = Cable Termination & Connection

PM = Padmounted Substation

35T = 35mm Al Triplex 185T = 185mm Al Triplex ASL = ABB SafeLink 35TI = 35mm Al Triplex insect protected FBX = Schneider Electric 185TI = 185mm Al Triplex insect protected FBX 400CUI = 400mm Cu 1 Core insect protected 400T = 400mm Al Triplex 400TI = 400mm Al Triplex insect protected HV SWITCHGEAR

EXAMPLE:- 11PMCTC/ASL/35T = 11kV, Padmounted Substation, Cable termination and connection, ABB SafeLink RMU, 35mm Al Triplex cable

11kV CABLE TERMINATION & CONNECTION CONSTRUCTION CODE


Code shown within dashed box appears on relevant construction detail drawings in this manual.

A 11 CTC/ASD/35T

CABLE SIZE VOLTAGE 11 = 11kV CONSTRUCTIONS CTC = Cable Termination & Connection HV SWITCHGEAR ASD = ABB SD series ASL = ABB SafeLink ASP = ABB SafePlus ASR = ABB SafeRing 35T = 35mm Al Triplex 185T = 185mm Al Triplex 35TI = 35mm Al Triplex insect protected 185TI = 185mm Al Triplex insect protected 400CUI = 400mm Cu Triplex insect protected 400T = 400mm Al Triplex 400TI = 400mm Al Triplex insect protected

EXAMPLE:- 11CTC/ASD/35T = 11kV, Cable termination and connection, ABB SD series RMU, 35mm Al Triplex cable

A B C D

ORIGINAL ISSUE 7.10.05 23.3.11 13.12.11

APPROVED

C. Noel 4/2/03 A. Bletchly C.Lindsay

UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION CONSTRUCTION CODE GUIDE CABLE TERMINATION AND CONNECTION
FILE: 5 58 5134 1

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

Dwg

5134

Sh

11kV CABLE TERMINATION & CONNECTION TRANSFORMER CONSTRUCTION CODE


Code shown within dashed box appears on relevant construction detail drawings in this manual.

A 11 CTC/TX/35TI

CABLE SIZE VOLTAGE 11 = 11kV CONSTRUCTIONS CTC = Cable Termination & Connection TRANSFORMER TX = Transformer 35T = 35mm Al Triplex 185T = 185mm Al Triplex 35TI = 35mm Al Triplex insect protected 185TI = 185mm Al Triplex insect protected

EXAMPLE:-

11CTC/TX/35TI = 11kV, Cable termination and connection, Transformer, 35mm Triplex insect protected cable

11kV CABLE TERMINATION & CONNECTION MAGNEFIX MD SERIES CONSTRUCTION CODE


Code shown within dashed box appears on relevant construction detail drawings in this manual.

A 11 CTC/MMD/185T

VOLTAGE 11 = 11kV

CONSTRUCTIONS CTC = Cable Ttermination & Connection

HV SWITCHGEAR MMD = Magnefix MD series

CABLE SIZE 35T = 35mm Al Triplex 185T = 185mm Al Triplex 35TI = 35mm Al Triplex insect protected 185TI = 185mm Al Triplex insect protected

EXAMPLE:-

11CTC/MMD/185T = 11kV, Cable termination and connection, Magnefix MD series RMU, 185mm Triplex cable
APPROVED

A B C

ORIGINAL ISSUE 23.9.05 13.12.11

UNDERGROUND DISTRIBUTION
4/2/03

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

c D. M K.
C.Lindsay

11kV CONSTRUCTION CONSTRUCTION CODE GUIDE CABLE TERM. & CONN. MAGNEFIX & TRANSFORMER
FILE: 5 58 5134 2

DRAWN

Dwg

5134

Sh

11kV POLE TERMINATION CONSTRUCTION CODE

Code shown within dashed box appears on relevant construction detail drawings in this manual.

A 11 CT P/35T/M

VOLTAGE 11 = 11kV

CONSTRUCTIONS CT = Cable termination

POLE P = Pole

CABLE SIZE 35T = 35mm Al Triplex 185T = 185mm Al Triplex 35TI = 35mm Al Triplex insect protected 185TI = 185mm Al Triplex insect protected 400CUI = 400mm Cu 1 core insect protected 400T = 400mm Al Triplex 400TI = 400mm Al Triplex insect protected

CABLE GUARD P = Polymeric M = Metal

EXAMPLE:-

11CTP/35T/M = 11kV, Cable termination, Pole, 35mm Triplex cable, Metal cable guard
APPROVED

A B C D

ORIGINAL ISSUE 24.11.05 13.11.08 13.12.11

C. Noel 4/2/03 A. Bletchly C.Lindsay

UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION CONSTRUCTION CODE GUIDE POLE TERMINATION
FILE: 5 58 5134 3

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

Dwg

5134

Sh

22kV CABLE TERMINATION & CONNECTION F & G TYPE GA CONSTRUCTION CODE


Code shown within dashed box appears on relevant construction detail drawings in this manual.

A 22 CTC/FGA/185T

VOLTAGE 22 = 22kV

CONSTRUCTIONS CTC = Cable Termination & Connection

HV SWITCHGEAR FGA = F & G GA...- C Series RM6 = Schneider Electric RM6

CABLE SIZE 35TI = 35mm Al Triplex insect protected 2 185T = 185mm Al Triplex 2 630 = 630mm Al 1C
2

EXAMPLE:-

22CTC/FGA/185T = 22kV, Cable termination and connection, F & G GA...-C series RMU, 185mm

Triplex cable

22kV CABLE TERMINATION & CONNECTION TRANSFORMER CONSTRUCTION CODE

Code shown within dashed box appears on relevant construction detail drawings in this manual.

A 22 CTC/TX/35TI

VOLTAGE 22 = 22kV

CONSTRUCTIONS CTC = Cable Termination & Connection

TRANSFORMER TX = Transformer

CABLE SIZE 35TI = 35mm Al Triplex insect protected 185T = 185mm 2 Al Triplex
2

EXAMPLE:-

22CTC/TX/35TI = 22kV, Cable termination and connection, Transformer, 35mm


APPROVED

Triplex insect protected cable

A B

ORIGINAL ISSUE 12.07.12

C.Noel 4/2/03 A.Bletchly T.Borg

UNDERGROUND DISTRIBUTION
22kV CONSTRUCTION CONSTRUCTION CODE GUIDE CABLE TERM. & CONNECTION & TRANSFORMER
FILE: 5 58 5135 1

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

Dwg

5135

Sh

MATERIAL ASSY 571-1 571-2 571-3 571-4 571-8 571-9 573-2 573-4 573-9 DESCRIPTION
Term. & conn. (ABB SafeLink) 11kV 35mm cable Term. & conn. (ABB SafeLink) 11kV 185mm cable Term. & conn. (ABB SafeLink) 11kV 35mm cable insect prot. Term. & conn. (ABB SafeLink) 11kV 185mm cable insect prot. Term. & conn. (ABB SafeLink) 11kV 400mm Al cable Term. & conn. (ABB SafeLink) 11kV 400mm Al cable insect prot. Clamp to channel suit 11kV 35mm Al cable Clamp to channel suit 11kV 35mm Al cable insect protected Clamp to channel suit 11kV 185mm Al cable Clamp to channel suit 11kV 185mm Al cable insect protected Clamp to channel suit 11kV 400mm Al cable Clamp to channel suit 11kV 400mm Al cable insect protected 3
F

QTY
F

1
F

Assy Selection 571-1 to 9

Station Earth

Bushing Boots supplied with HV switchgear. WARNING: Use only cold applied bushing boots. Heat must NOT be applied near RMU bushings. Assy Selection 573-2, 4 or 9
F

Termination and connection kit to be installed in accordance with Manufacturers installation instructions

NOTES: 1. Insulate screen wires with PVC tape.

Do not over tighten clamp on cable. Construction Type Unistrut set in concrete plinth

11PMCTC/ASL
C. Noel 23/9/05 A. Bletchly C.Lindsay

A B C D

ORIGINAL ISSUE 13.11.08 23.3.11 07.02.12

APPROVED

UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION RMU - ABB SAFELINK IN PADMOUNTED SUBSTATION TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 58 5206 1

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

Dwg

5206

Sh

MATERIAL ASSY 570-1 573-6 DESCRIPTION


Termination & connection (ABB SafeLink) 11kV 400mm Cu cable insect protected Clamp to channel suit 11kV 400mm Cu cable insect protected

QTY
1 WARNING: Use only cold applied bushing boots. Heat must NOT be applied near RMU bushings. Assy 570-1

400mm 1 core cable with semi-conductive outer sheath


F

Assy 573-6
F

Do not over tighten clamp on cable.


F

NOTES: 1. Connect cable screens and earth straps (braid) to separate holes on station earth. Construction Type

SIDE VIEW A B
ORIGINAL ISSUE 13.11.08 APPROVED

UNDERGROUND DISTRIBUTION
27/9/05

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

c D. M K.
C.Lindsay

11kV CONSTRUCTION RMU - ABB SAFELINK IN PADMOUNTED SUBSTATION 400mm 1C Cu. CABLE TERMINATION & CONNECTION
FILE: 5 58 5207 1

DRAWN

Dwg

Termination and connection kit to be installed in accordance with Manufacturers installation instructions

Screen earth Refer Note 1 Braid earth Refer Note 1

Station Earth
F
F

Unistrut set in concrete plinth

11PMCTC/ASL

5207

Sh

MATERIAL ASSY 571-1 571-2 571-3 571-4 573-2 573-4 577-1 DESCRIPTION
Term. & conn. (ABB SafeLink) 11kV 35mm cable Term. & conn. (ABB SafeLink) 11kV 185mm cable 1 Term. & conn. (ABB SafeLink) 11kV 35mm cable insect prot.
F

QTY

Term. & conn. (ABB SafeLink) 11kV 185mm cable insect prot. Clamp to channel suit 11kV 35mm cable Clamp to channel suit 11kV 35mm cable - Insect protected 3 Clamp to channel suit 11kV 185mm cable Clamp to channel suit 11kV 185mm cable - Insect protected ABB bushing boots 1
F

Assy Selection 571-1 to 4

Assy 577-1

Termination and connection kit to be installed in accordance with Manufacturers installation instructions

Assy Selection 573-2 or 4 Do not over tighten clamp on cable. Construction Type

NOTES: 1. Insulate screen wires with PVC tape.

A B

ORIGINAL ISSUE 07.02.12

APPROVED

C. Noel 17/3/11 A. Bletchly L. Burton

UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION RING MAIN UNIT ABB SAFELINK FREESTANDING TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 62 5244 1

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

Dwg

5244

WARNING: Use only cold applied bushing boots. Heat must NOT be applied near RMU bushings.

Station Earth

11CTC/ASL

Sh

MATERIAL ASSY 570-1 571-8 571-9 573-6 573-9 577-5 DESCRIPTION


Termination & connection (ABB SafeLink) 11kV 400mm Cu cable insect protected 1 Term. & conn. (ABB SafeLink) 11kV 400mm Al cable - insect prot. Clamp to channel suit 11kV 400mm cable - Insect protected Clamp to channel suit 11kV 400mm cable Clamp to channel suit 11kV 400mm cable - Insect protected Raychem bushing boots 3 Assy Selection 570-1 or 571-8 or 9
F
F

QTY

Term. & conn. (ABB SafeLink) 11kV 400mm Al cable

1 WARNING: Use only cold applied bushing boots. Heat must NOT be applied near RMU bushings.

Screen earth Termination and connection kit to be installed in accordance with Manufacturers installation instructions

Braid earth
F

Assy Selection 573-6 or 9 Do not over tighten clamp on cable.

SIDE VIEW

ORIGINAL ISSUE

APPROVED

C. Noel 17/3/11 A. Bletchly L. Burton

UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION RMU - ABB SAFELINK FREESTANDING 400mm 1C Cu. CABLE TERMINATION & CONNECTION
FILE: 5 62 5245 1

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

Dwg

5245

400mm 1 core cable with semi-conductive outer sheath

Station Earth
F

Construction Type

11CTC/ASL

Sh

33kV POLE TERMINATION CONSTRUCTION CODE

Code shown within dashed box appears on relevant construction detail drawings in this manual.

A 33 CT P/300/P

VOLTAGE 33 = 33kV

CONSTRUCTIONS CT = Cable termination

POLE P = Pole

CABLE SIZE 50 = 50mm Al 1 Core 300 = 300mm Al 1 Core

CABLE GUARD P = Polymeric M = Metal

EXAMPLE:-

33CTP/300/P = 33kV, Cable termination, Pole, 300mm Al 1 Core cable, Polymeric cable guard.
APPROVED

ORIGINAL ISSUE

C.Noel 22.03.11 A.Bletchly T.Borg

UNDERGROUND DISTRIBUTION
33kV CONSTRUCTION CONSTRUCTION CODE GUIDE POLE TERMINATION
FILE: 5 58 5247 1

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

Dwg

5247

Sh

MATERIAL - TERMINATION ASSY 511-6 DESCRIPTION


Clamp trefoil to pole term. bracket suit 33kV 50mm
2

NOTES:

QTY
cable 1

1. Locate cable on opposite side of pole to oncoming traffic where possible. 2. Do Not Obstruct climbing access. 3. All metalwork that passes through or into wood shall be greased for the entire length that may come into contact with the wood. 4. Minimum dimension to ground from termination bracket king bolt allows sufficient ground clearance for an LV underground termination on pole. 5. Dimension from termination bracket king bolt to LV conductor below suits 1 core cable termination. For 3 core termination a greater separation is required. 6. Polymeric cable guard is not to be use in areas: subject to grass fire where metal bladed brush cutter may be used where there is a high likelihood of impact. 7. Refer Earthing Section of the Overhead Construction Manual for minimum separation requirements between metal cable guard and communication assets.

511-11 Clamp trefoil to pole term. bracket suit 33kV 300mm 2 cable 557-2 557-6 539-1 540-5 584-1 584-2 547-1
Clamp trefoil to wood pole to suit 50mm cable Clamp trefoil to wood pole to suit 300mm
2

AR 1 3 1 1

cable

Bracket termination (11kV, 22kV & 33kV) mounting to wood pole Arrester 33kV mounting to bracket (M12) Termination outdoor 33kV 50mm
2

cable
2

Termination outdoor 33kV 300mm Guard wildlife to wood pole

cable

MATERIAL - CABLE GUARD ASSY 531-1 531-6 531-7 DESCRIPTION


Guard polymeric to wood pole Guard metal (100) to wood pole Guard metal (130) to wood pole 1

QTY

ORIGINAL ISSUE

APPROVED

C.Noel 23.03.11 A.Bletchly T.Borg

UNDERGROUND DISTRIBUTION
33kV CONSTRUCTION 2 2 POLE TERMINATION - 50mm /300mm AL 1 CORE XLPE CABLE - MATERIAL
B 1/2 DISC

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

FILE: 5 58 5248 1

Dwg

5248

Sh

Bracket King Bolt Assy Selection 540-5

Assy Selection 584-1 or 2

HV Earth - Refer Overhead Construction Manual EARTHING HV Equipment Earth

Assy Selection 511-6 or 11


F

Earth cable to pass underneath wildlife guard


F

Assy 547-1
F

Assy Selection 557-2 or 557-6 at 1000 crs (typical)

3500 above ground level Construction Type

ORIGINAL ISSUE

APPROVED

C.Noel 23.03.11 A.Bletchly T.Borg

UNDERGROUND DISTRIBUTION
33kV CONSTRUCTION 2 2 POLE TERMINATION - 50mm /300mm AL 1 CORE XLPE CABLE
B 1/2 DISC

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

FILE: 5 58 5248 2

Assy 539-1

33CTP

Dwg

5248

Sh

150 Max

Cable Support

Metal cable guard shall be earthed. Refer Overhead Construction Manual EARTHING for pole and cable guard earthing details.

Assy Selection 531-1, 6 or 7 (Refer note 6)

2400 Min

Wood Pole

Ground Line

100 Min

Construction Type

33CTP A
ORIGINAL ISSUE APPROVED

C.Noel 5/3/03 A.Bletchly T.Borg

UNDERGROUND DISTRIBUTION
33kV CONSTRUCTION POLE TERMINATION CABLE GUARD TO POLE
FILE: 5 58 5248 3

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

Dwg

5248

Sh

00

00 00

REFER:- Overhead Construction Manual CABLE TERM. POLES for pole top details.

2000 MINIMUM TO GROUND IF LV CABLE TERM. REQUIRED (TYPICAL)

2000

2000

2450
F

8400
F F

2450

2100

LV ABC 4450 4750 LV OPEN WIRE

LV ABC 4450 4750 LV OPEN WIRE

LV ABC 4100 4400 LV OPEN WIRE

300
F

TERMINATION

STRAIN
APPROVED

DELTA INTERMEDIATE
C. Noel 10/5/11 A. Bletchly L. Burton

ORIGINAL ISSUE

UNDERGROUND DISTRIBUTION
33kV CONSTRUCTION POLE TERMINATION WITH LINKS 50mm / 300mm Al 1 CORE
FILE: 5 58 5248 4

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

Dwg

5248

Sh

300

300

FF

00

00

REFER:- Overhead Construction Manual CABLE TERM. POLES for pole top details.

2000

MINIMUM TO GROUND IF LV CABLE TERM. REQUIRED (TYPICAL)

2000

LV ABC 4700 5000 LV OPEN WIRE

2700

8400

2700

LV ABC 4700 5000 LV OPEN WIRE

300
F
FF

FLAT INTERMEDIATE

TERMINATION/STRAIN
APPROVED

ORIGINAL ISSUE

C. Noel 10/5/11 A. Bletchly L. Burton

UNDERGROUND DISTRIBUTION
33kV CONSTRUCTION POLE TERMINATION WITH ABS AND EDOS 50mm / 300mm Al 1 CORE
FILE: 5 58 5248 5

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

Dwg

5248

300

Sh

MATERIAL - INCLUDING CABLE SCREEN EARTH CONNECTION QTY ASSY 588-1 588-4 588-7 510-6 DESCRIPTION
35mm Cable termination and connection to RMU 11kV 35mm
2 2 2 2

185mm

400mm

1 1 1 1 1 1

Cable termination and connection to RMU 11kV 185mm 2 cable Cable termination and connection to RMU 11kV 400mm Earth extension elbow connector to station earth
2

cable

NOTES: 1. Insulate screen wires with PVC tape and ensure that wires DO NOT CONTACT any metal before reaching the station earth bar.

ORIGINAL ISSUE

APPROVED

C.Noel 30.12.11 A.Bletchly T.Borg

UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION FBX RMU TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 58 5270 1

HARD COPY UNCONTROLLED


Ergon Energy Corporation Ltd ABN 50 087 646 062

DATE

PASSED

DRAWN

Dwg

5270

Sh

Areva FBX RMU


F

Screen earth
F

Assy Selection 588-1 or 588-4 or 588-7

Assy 510-6

To Station Earth

Construction Type

11CTC/FBX

ORIGINAL ISSUE

APPROVED

C.Noel 30.12.11 A.Bletchly T.Borg

UNDERGROUND DISTRIBUTION
11kV CONSTRUCTION FBX RMU TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 58 5270 2

HARD COPY UNCONTROLLED

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

Dwg

5270

Sh

MATERIAL - INCLUDING CABLE SCREEN EARTH CONNECTION QTY ASSY 512-1 512-4 512-7 591-1 591-3 510-1 510-6 DESCRIPTION
35mm Cable termination and connection to RMU 22kV 35mm
2 2 2 2 2

185mm

630mm

cable insect protected cable

1 1 1 1 1 1 1 1

Cable termination and connection to RMU 22kV 185mm

2 Cable termination and connection to RMU 22kV 630mm cable

RM6 Gland plate kit with clamps to suit 35mm cable RM6 Gland plate kit with clamps to suit 630mm cable Earth extension elbow connector to station earth Earth extension elbow connector to station earth

NOTES: 1. 2. Insulate screen wires with PVC tape and ensure that wires DO NOT CONTACT any metal before reaching the station earth bar. Clamping and gland plates supplied standard for 185mm cable.

ORIGINAL ISSUE

APPROVED

C.Noel 23.04.12 A.Bletchly T.Borg

UNDERGROUND DISTRIBUTION
22kV CONSTRUCTION RMU - SCHNEIDER ELECTRIC RM6 TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 58 5279 1

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

Dwg

5279

Sh

Schneider Electric RMU Type RM6 (shown)


F

Screen earth
F

Assy Selection 512-1 or 512-4 or 512-7

Assy 510-1 or 6

Assy Selection 591-1 or 3 Refer Sh 1 - Note 1

To Station Earth

Construction Type

22CTC/RM6

ORIGINAL ISSUE

APPROVED

C.Noel 23.04.12 A.Bletchly T.Borg

UNDERGROUND DISTRIBUTION
22kV CONSTRUCTION RMU - SCHNEIDER ELECTRIC RM6 TRIPLEX XLPE CABLE TERMINATION & CONNECTION
FILE: 5 58 5279 2

DATE

PASSED
Ergon Energy Corporation Ltd ABN 50 087 646 062

DRAWN

Dwg

5279

Sh

Vous aimerez peut-être aussi