A pedestrian bridge and trail system will connect Riverfront Park with Minto Brown Island Park. The bridge and trail will improve pedestrian and bicycle options, access, and safety. Bridge and trail, and other planned connections, will link more than 30 miles of trails and 1200 acres of parks.
A pedestrian bridge and trail system will connect Riverfront Park with Minto Brown Island Park. The bridge and trail will improve pedestrian and bicycle options, access, and safety. Bridge and trail, and other planned connections, will link more than 30 miles of trails and 1200 acres of parks.
Droits d'auteur :
Attribution Non-Commercial (BY-NC)
Formats disponibles
Téléchargez comme PDF, TXT ou lisez en ligne sur Scribd
A pedestrian bridge and trail system will connect Riverfront Park with Minto Brown Island Park. The bridge and trail will improve pedestrian and bicycle options, access, and safety. Bridge and trail, and other planned connections, will link more than 30 miles of trails and 1200 acres of parks.
Droits d'auteur :
Attribution Non-Commercial (BY-NC)
Formats disponibles
Téléchargez comme PDF, TXT ou lisez en ligne sur Scribd
TO: AGENCY THROUGH: DIRECTO FROM: PETER FERNANDEZ, P.E., DIRECTOR PU IC SUBJECT: ISSUE: J HN H. WALES, DIRECTOR BAN DEVELOPMENT DEPARTMENT MINTO ISLAND PEDESTRIAN BRIDGE AND TRAIL DESIGN AND FUNDING UPDATES Information only. BACKGROUND: Over the last several years, the City and Urban Renewal Agency (Agency) have been working toward the Council goal of constructing a pedestrian bridge and trail system to connect Riverfront Park with Minto Brown Island Park. The bridge and trail are located in two Urban Renewal Areas (URA); South Waterfront and Riverfront Downtown (Attachment A). On January 9, 2012, the Agency Board approved the Minto Island Pedestrian Bridge and Trail Master Plan to formalize the project scope, summarize supporting actions, and strengthen the Agency's ability to obtain external funding for the bridge and trail. In February 2012, following a Request for Proposals, a contract was executed with OBEC Consulting Engineers (OBEC) to complete design, permitting, and construction oversight of the bridge and trail. Authorization was given to OBEC to complete the initial design phase, and the findings from this phase were shared with Council in a work session July 23, 2012. To date, $90,000 in South Waterfront URA and $1,829,500 Riverfront Downtown URA funding has been budgeted to support design and permitting of both the bridge and trail. The bridge and trail will improve pedestrian and bicycle options, access, and safety by providing an off-street trail network between south Salem, downtown, and west Salem. The bridge and trail, and other planned connections, will link more than 30 miles of trails and 1200 acres of parks, enhance commuting and recreation opportunities, improve resident health and well-being, attract recreational tourism, and is expected to contribute to new investment in downtown. The bridge and a connecting trail to Minto-Brown Island Park is an adopted FY 2012-13 Council goal and is identified in several supporting plans and policies, including the Agency - Minto Bridge Update Page 1 of3 September 10, 2012 Riverfront Downtown URA Plan, South Waterfront URA Plan, Comprehensive Park System's Master Plan, the Salem Transportation Plan, 2011-2035 Regional Transportation Systems Plan, Salem's Vision 2020 Action Plan, and the Urban Land Institute's 2006 Strategies for Redevelopment of the Downtown Boise Cascade Site study. FACTS AND FINDINGS: Design On March 23, 2009, following review of recommendations presented in a 2008 Bridge Design Study and substantial public testimony, Council approved a clear span, tied arch bridge design option. Several steps were taken following Council's approval to prepare for the tied arch design, including execution of an agreement with the Willamette Queen Sternwheeler, execution of an easement agreement with Boise Cascade, LLC, to secure access for the trail on Minto-Brown Island, and adoption of the Minto Island Pedestrian Bridge and Trail Master Plan. Through the concept design phase completed in July 2012, OBEC confirmed the tied arch bridge design was best suited to address the challenges of spanning the Willamette Slough and further refined the design. The current design is visually striking, unique to Oregon, and will allow open views of the surrounding environment and to the Willamette River below (Attachment B - Bridge Design). The design does not require piers in the water, thereby allowing unobstructed access for recreational kayaks, canoes, and other small watercraft. Key findings from the initial design phase include: A bridge alignment adjusted to reduce the clear span length to approximately 300 feet The approach spans on both sides of the main span will match the higher bridge elevation which is required due to a hydraulic analysis that revealed the 1 00-year flood elevation is more than one foot higher than FEMA FIS maps Use of approach spans to minimize floodway fill and ensure no rise in the 1 00-year flood elevation A trail to be constructed at the surface of the existing berm on Minto-Brown Island minimizing floodwaters overtopping the trail Special handling/disposal required for soil and groundwater removed for installation of the Riverfront Park bridge foundation, based on environmental testing results. Advantages of clear span tied arch bridge: Minimizes contaminant risk Simplifies environmental permitting Minimizes flood impacts and obstacles within waterway Minimizes impact to Riverfront Park Material efficiency Agency - Minto Bridge Update Page 2 of3 September 10, 2012 Simple foundation structures help to define and manage environmental risk Outward tilted ribs will result in visually striking, regionally unique structure Costs and Funding Current cost estimates for the design, permitting, and construction of the bridge and trail are$9,000,000. This cost assumes a 30 percent contingency, and cost for inflation, given the construction start date is not known. The cost estimate will continue to be refined as design continues and as the construction schedule is defined. Grants and other external funding will be needed to fill the funding gap, including approximately $5,200,000 for construction of the bridge and $800,000 for final design and construction of the trail. Because the funding gap for the trail is smaller, the City has focused on pursuing funding for the trail component first. In 2011, the City applied to fund the design and construction of the Minto Trail from the Oregon Department of Transportation (ODOT) Flex Funding and Federal Highway Administration Transportation, Community, and System Preservation grant programs. In 2012, staff submitted a Notice of Intent, requesting up to $1,200,000 for the Minto Trail from the ODOT Transportation Enhancement Program and $60,000 from Business Oregon's Brownfield Redevelopment Fund. To date, the Agency has received a $60,000 grant from Business Oregon. Feedback from ODOT indicates that additional City, Agency, private, or other funding will be needed to increase the competitiveness of future applications. In order to address the funding gap and be better positioned to compete for future ODOT grants for the bridge, staff recommends continuing to pursue targeted grants for the trail from other agencies, including for the Oregon Parks and Recreation Department Recreational Trails Program in October 2012, and the Local Government Grant Program in April 2013, and if desired by the Agency Board, to re-evaluate the feasibility of allocating additional one-time Riverfront Downtown URA project funds over the next two years to the bridge and trail projects. Next Steps Staff will continue to pursue grants and external funding to support design and construction of the bridge and trail. The design consultant, OBEC, is proceeding with the next phase of design and preparing materials for the necessary permits. Coordination with the Friends of Two Bridges and other important stakeholders will continue, including fund raising for the bridge and trail. Staff will likely return to Council and Agency in fall 2012 to discuss funding options in more detail, and spring 2013 to share the results of the next phase of design. Assuming full funding for construction of the bridge and trail, construction could begin as early as summer 20.14 and conclude in fall 2015. Attachment A: Map Attachment B: Bridge Design Report Prepared By: Annie Gorski and Allen Dannen G:\URBANDEV\ADMINISTRATION\FINAL COUNCIL STAFF REPORTS\2012\SEP 10\MINTO BRIDGE & TRAIL\AGENCY\AGENCY _MINTOUPDATE_SEP1 0_2012V.DOC Agency - Minto Bridge Update Page 3 of3 September 10, 2012 Public Works Department Pedestrian Bridge Urban Renewal Areas ~ B r i d g e NAME ====Trail = Contours D RIVERFRONT DOWNTOWN D SOUTH WATERFRONT parks water _polys Minto Island Bicycle and Pedestrian Bridge and Trail legend Pedestrian Bridge ~ B r i d g e =Trail iiiiiiiiiiiiiii Preferred Route -- Pari< Trails ATIACHMENTA Public Works Department Pedestrian Bridge Urban Renewal Areas = Bridge NAME ====Trail = Contours RIVERFRONT DOWNTOWN D SOUTH WATERFRONT parks water _polys Minto Island Bicycle and Pedestrian Bridge and Trail Legend Pedestrian Bridge
=Trail -- Preferred Route Park Trails ATIACHMENTA Ill 1-- z w ~ I 0 ~ <(