Académique Documents
Professionnel Documents
Culture Documents
Slide
LEGACY SYSTEM
VS
Legacy System
Ann Switch Lamp Meter
RCC
RTU AI
Mux
Lamp
Prot Rly
Switch
XDCR
Meter
Aux CT
SWYD
Aux Rly
Aux Rly
SWGR Aux Contact Conventional 3 Slide CT /Copyright VT's
Aux Rly
Sensor / Switch
RTU AI
Mux
Lamp
Switch
XDCR
Meter
Aux CT
SWYD
Aux Rly
Aux Rly
SWGR Aux Contact Conventional 4 Slide CT /Copyright VT's
Aux Rly
Sensor / Switch
ERP
Communication Network
INTRANET LAN/WAN
IED
Sensor / Switch
Communication Network
INTRANET LAN/WAN
IED
No Control Room
Intelligent CB IED
ECVT Copyright
Sensor / Switch
IEC 61850
JUST ANOTHER PROTOCOL OR MORE???
Slide
It is a communication protocol and also a Technology that change way we do things! Are you interested and ready to learn, invest and use this NEW TECHNOLOGY!
Slide
SESSION 1
WHY
Slide
Slide
10
COMMUNICATION INTERFACES ACQUIRE PROCESS INPUTS USED FOR METERING EVENT RECORDS OSCILLOGRAPHIC RECORDS REMOTE CONFIGURATION OF SETTINGS
Slide
11
START OF AN ERA
HISTORY OF AUTOMATION IS DIVIDED INTO 2 AGES: BEFORE 61850 OR UNCIVILIZED AGE AFTER 61850 OR CIVILIZED AGE
Slide
12
MULTIPLICITY OF STANDARDS
SERIAL COMMUNICATIONS
Slide
13
Slide
14
HEIRARCHICAL SETUP
TOP DOWN MODEL WITH LEVELS CAUSES
ADDITIONAL HARDWARE / DATA CONCENTRATORS
TIMING ISSUES
Slide
15
Slide
16
Slide
17
Hardware interface (serial, parallel, FO, Copper, Ring, Radial, propriety..) Software interface ( RS 232, RS 485, Serial, Parallel..) Protocol ( 103, SPA, LON, Courier, J Bus, K Bus, MODBUS, DNP .)
Slide
18
Slide
19
Slide
20
Slide
21
Slide
22
Slide
23
System Configuration
IEC 61850
Slide
24
IEC 61850
Slide
25
HOW IT IS ACHIEVED
STANDARD PROTOCOL --- PEER TO PEER COMMUNICATION ---MASTER SLAVE CONCEPT ABOLISHED --- ALL ARE IEDs AND CAN TALK TO EACH OTHER
STANDARDISED NOMENCLATURE FOR DATA POINTS --- ALL IEDs CAN UNDERSTAND EACH OTHER
Slide
26
Slide
27
SESSION 2
HOW
Slide
28
HOW IT IS ACHIEVED
STANDARD PROTOCOL --- PEER TO PEER COMMUNICATION --- MASTER SLAVE CONCEPT ABOLISHED --- ALL ARE IEDs AND CAN TALK TO EACH OTHER
STANDARDISED NOMENCLATURE FOR DATA POINTS --- ALL IEDs CAN UNDERSTAND EACH OTHER
Slide
29
STANDARD PROTOCOL -- 1
PROTOCOL IS BASED ON ETHERNET ARCHITECTURE. --- ALL KINDS --- STAR, RING, DOUBLE RING ETC ARE POSSIBLE --TODAY THE TECHNOLOGY HAS IMPROVED TO GIVE HIGH SPEEDS (GIGA byte Ethernet) AND LOW COSTS AND TCP/IP PROTOCOL --- TODAY THE TECHNOLOGY IS STANDARD ACROSS APPLICATIONS AND FAMILIAR CONCEPTS EQUALLY VALID ON ANY PEER-PEER COMMUNICATION SYSTEM. IF A BETTER SYSTEM COMES IN THE FUTURE ONLY THE COMM SYSTEM WILL CHANGE AND NOTHING ELSE --- FUTURE PROOFING
Slide
30
STANDARD PROTOCOL -- 2
DOES NOT DEPEND ON THE COMMUNICATION HARDWARE -- CAN BE RADIO, WIRELESS, VSAT, CAT 5 COPPER, FIBRE OPTICS ETC OR ANY FUTURE COMMUNICATION MEDIUM
Slide
31
STANDARD PROTOCOL -- 3
AS IT IS BASED ON TCP/IP TECHNOLOGY THE BIT PATTERN OF THE COMMUNICATION TELEGRAMS ARE WIDELY KNOWN MULTIPLE COMM. ARCHITECTURES ARE AVAILABLE TO ENSURE RELIABILITY --- AGAIN WIDELY KNOWN AND PRACTICED ALSO DIFFERENT APPLICATIONS ARE AVAILABLE TO ENSURE SECURITY --- AGAIN WIDELY KNOWN AND PRACTICED
Slide
32
STANDARD PROTOCOL -- 4
PROTOCOL DEFINES ALL ASPECTS OF COMMUNICATION REQUIRED IN A S/S. NO OPTIONS FOR PROPRIETRY USAGE.
Slide
33
STANDARDISED NOMENCLATURE -- 1
EVERY POSSIBLE DATA REQUIRED IN THE SUBSTATION IS GIVEN A STANDARD NAME HOWEVER IT REQUIRES VERY LITTLE EXPANSION TO STANDARDISE THE NAME FOR ANY PROCESS HENCE EVERY IED CAN FULLY UNDERSTAND WHAT DATA TO ASK FOR AND WHAT DATA IT IS GETTING
Slide
34
STANDARD NOMENCLATURE -- 2
CONCEPT OF ALL INTELLIGENT DEVICES/SYSTEMS AS IEDs PROTECTION RELAYS/METERS ARE IEDs BCUs ARE IEDs RTU IS AN IED HMI IS AN IED THE MASTER CONTROL CENTRE IS AN IED DISTURBANCE RECORDER IS AN IED CIRCUIT BREAKER IS AND IED, WHEN IT BECOMES INTELLIGENT CT/VT ARE IEDs, WHEN THEY BECOME INTELLIGENT FIRE FIGHTING SYSTEM IS AN IED ANY DISTINCT INTELLIGENT SYSTEM IS AN IED EACH DISTINCT SYSTEM HAS ITS OWN COMMUNICATION ADDRESS
Slide
35
STANDARD NOMENCLATURE -- 3
EVERY DATA POINT IS GIVEN A UNIQUE NAME
Slide
36
STANDARD NOMENCLATURE -- 4
THIS DATAPOINT CAN HAVE DIFFERENT ATTRIBUTES LIKE QUALITY, STATUS_VALUE ETC. THUS THE DATA BREAKER POSITION IS DEFINED AS XCBR1\ST\POS\stVal NAME STANDARD AND MANDATORY IN ALL IEDs
Slide
37
STANDARD NOMENCLATURE -- 5
TO DEFINE WHICH BREAKER WE USE STANDARD TREE FORMAT FOR EG. MELAKA\E01\XCBR1\ST\POS\stVal WILL MEAN THE POSITION/STATUS of the CIRCUIT BREAKER OF BAY E01 IN MELAKA SUBSTATION THUS THE NAME OF A DATA ACROSS A NETWORK WILL BE UNIQUE
Slide
38
IEC 61850
ALL IEDS CAN TALK AND UNDERSTAND EACH OTHER FULLY STANDARDISED FOR SUBSTATION ENVIRONMENT EASILY EXPANDABLE TO OTHER PROCESSES
Slide
39
Slide
40
GENERIC xml SOFTWARE IS TO BE CONFIGURE THE ENTIRE SUBSTATION, INCLUDING SLD, LOCATIONAL DIAGRAM, ALLOCATION OF VOLTAGES, CONFURATION OF BUSBARS, ALLOCATION OF SPECIFIC IEDs/LOGICAL DEVICES/LOGICAL NODES INCLUDING THE CID FILES --- THE ENTIRE SUBSTATION CONFIGURATION DESCRIPTION OR A SCD FILE
Slide
43
SUMMARY
WITH STANDARD PROTOCOL --- IEDs CAN TALK TO EACH OTHER WITH STANDARD NOMENCLATURE --- THEY CAN UNDERSTAND WITH USE OF xml LANGUAGE ---- ALL ENGINEERS CAN ENGINEER AND FULLY CONFIGURE THE ENTIRE SUBSTATION AND ALL ENGINEERS CAN UNDERSTAND THE ENGINEERING DONE DUE TO STANDARD NOMENCLATURE WITH BROWSING, PLUG AND PLAY CONCEPTS IN ENGINEERING ARE INTRODUCED
Slide
44
ACHIEVEMENTS --1
IEDs CAN TALK AND UNDERSTAND EACH OTHER NO MORE VENDOR SPECIFIC SOLUTION NO MORE PROBLEMS DURING EXPANSION NO MORE PROBLEMS DURING REPLACEMENT NO MORE DATA CONCENTRATOR OR MASTER STANDARD TCP/IP COMMUNICATIONS PROTOCOL HIGH SPEED HARDWARE AVAILABLE SECURE AND RELIABLE NETWORKS NO PROBLEMS OF SPEED AND DISTANCE CAN BE INTEGRATED WITH MANY STANDARD APPLICATIONS DOES NOT DEPEND ON COMMUNICATION MEDIA REMOTE MANAGEMENT AND TROUBLE SHOOTING EASY ANALYSIS OF COMMUNICATION LOADING & PROBLEMS
Slide 45
Manually entered, Manually verified, App tied Self Description, Intuitive, Mapping to tag or free form alias, Any tag Drag and Drop, SCL conventions are proprietary. Commun ication System Shift Master / Slave So many components, copper hardwires, raceways, complex Data Acquisition (Limited)
Slide 46
ACHIEVEMENTS --2
ENGINEERS CAN UNDERSTAND EACH OTHER AND THE IED
STANDARDISED AND THEREFORE EASY AND ERROR FREE ENGG. MODULAR ENGINEERING ACROSS LOCATIONS REUSABILITY AND HENCE HIGHER EFFICIENCY/OUTPUT REPEATED TRAINING NOT REQUIRED DEPENDANCE ON PARTICULAR EXPERTS OBSOLETE EASY TO UNDERSTAND SPECIFICATIONS UTILITY APPROVAL PROCESS MADE EASY AND FAST REMOTE TROUBLE SHOOTING FROM ACROSS THE WORLD
Slide
47
ACHIEVEMENTS --3
SIMPLE AND CHEAP BUT SECURE AND RELIABLE SUBSTATION
PEER PEER ---- LESS CABLING AND WIRING. NO AUX. RELAYS PROCESS DATA --- LESS/NO COPPER CABLING TO THE SWITCHYARD LESS/NO CABLE TRENCHES AND SMALL CONTROL CUBICLES DISTRIBUTED PROTECTION PANELS CHEAPER THAN CONVENTIONAL VERY LOW LIFE TIME COST
Slide
48
QUESTIONS
Slide
49
SESSION 3
Slide
50
Goal of IEC61850
Interoperability: Ability for IEDs from one or several manufacturer to exchange information and use the information for their own function. Free Configuration: Support of different philosophies and ability for free allocation of function, i.e. it work equally well for centralized (RTU like) or decentralized (SCS like) systems. Long Term Stability: The standard shall be future proof, i.e. it must be able to follow the progress in communication technology as well as evolving system requirements.
Slide
51
IEC61850 Standard
Basic principles Glossary General Requirements System and project management Communication requirements Substation Automation System Configuration Basic Communication Structure Part 8 Part 1 Part 2 Part 3 Part 4 Part 5 Part 6 Part 7
Part 9
Conformance testing
Slide
Part 10
52
Slide
53
IEC61850 Scope
Slide
54
Slide
55
Physical Device: access by network address Enables data from multiple devices to be aggregated into a single physical device
1 1..*
LOGICAL-DEVICE
1 1..*
LOGICAL-NODE
1 1..*
DATA
1 1..*
DataAttribute
Slide
56
E01F34LCC1/XCBR1
Slide
57
Slide
58
Slide
59
Logical Node
Slide
60
Logical Node
A named grouping of data and associated services that is logically related to some power system function.
dddXCBR1
Logical Node Instance # Logical Node Name per IEC 61850-7-4 (breaker) Optional Application Specific Prefix
Slide
61
Description
Automatic Control (4). ATCC (tap changer), AVCO (volt. ctrl.), etc. Supervisory Control (5). CILO (Interlocking), CSWI (switch ctrl), etc. Generic Functions (3). GGIO (generic I/O), etc. Interfacing/Archiving (4). IARC (archive), IHMI (HMI), etc. System Logical Nodes (2). LLN0 (common), LPHD (Physical Device) Metering & Measurement (8). MMXU (meas.), MMTR (meter.), etc. Protection (28). PDIF, PIOC, PDIS, PTOV, PTOH, PTOC, etc. Protection Related (10). RREC (auto reclosing), RDRE (disturbance).. Sensors, Monitoring (4). SARC (archs), SPDC (partial discharge), etc. Instrument Transformer (2). TCTR (current), TVTR (voltage) Switchgear (2). XCBR (breaker), XCSW (switch) Power Transformer (4). YPTR (transformer), YPSH (shunt), etc. Other Equipment (15). ZCAP (cap ctrl), ZMOT (motor), etc. Wind (Set aside for other standards) Solar (Set aside for other standards) Hydropower (Set aside for other standards) Power Plant (Set aside for other standards) Battery (Set aside for other standards) Fuel Cells (Set aside for other standards)
Slide
62
Slide
63
Slide
64
Slide
65
GENERAL NAMES
Slide
66
Standardized file format for substation configuration Based on Extensible Markup Language (XML) Files exchanged between devices and software engineering tools File may describe one device, or whole substation Every IEC 61850 vendor must supply an SCL file Format, or schema defined in IEC 61850 Part 6
Slide
67
Slide
68
Specification SAS
Configuration of Device
Configuration of System
Parameterizing of Device
Assembly
Testing
By Client & SI
Slide 69
Slide
70
Utility Requirements
SCL Tool
3
SSD File
Done By SI
SSD File
ICD File
5 4
IED
SCD File
10 11
CID File
Slide
71
publish
subscribe
1. Server (IEDs) Client ( HMI or SCADA Gateway) via MMS 2. Peer (IEDs) to Peer (IEDs) via GOOSE
Slide
72
Slide
73
MMS Report
Data exchange mechanism between IEC61850 Client & Server 2 type of MMS report
URCB (Unbuffered Report Control Block) Less secure cause no buffer is kept and no retransmission of data if report loss due to communication issue. Used for less critical information only BRCB (Buffered report Control Block) Very secured, IED keeps internal buffer and retransmission is possible if data loss due to any reason
Spontaneous report will be created and send to the client if there is a data change in the server Multiple client can connect to one IEC61850 Server at the same time and individual communication buffer will be created by the server Very intelligent and most advance data exchange mechanism in automation system
Slide
74
What is GOOSE??
GOOSE (Generic Object Oriented Substation Event) Data exchange mechanism between IEC61850 Server & Server It is a mechanism for the fast transmission of substation events, such as commands, alarms, indications, as messages A single GOOSE message sent by an IED can be received and used by several receivers GOOSE takes advantage of the powerful Ethernet and supports real-time behaviour It is used for e.g.
providing position indication for interlocking (widely used) tripping of switchgear (widely used) starting of disturbance recorder, DFR (in use)
Slide
75
What is GOOSE??......continue
Publish / Subscribe Allows Peer-to-Peer data exchange
One device (sender) publishes information, only the subscriber devices are receiving it. The reaction of each receiver depends on its configuration and functionality.
Publishing Device
Data travels anonymously between IEDs
Subscriber Device
Slide
76
Slide
77
FUTURE DESIGNS
DS CB DS CT VT 1. AND ONLY POWER CABLES 2. EVEN FO CABLES WILL GO WHEN SECURE WIRELESS NETWORKS ARE PERFECTED
ONLY FIBRE OPTIC CABLES
Slide
78
ALTERNATE APPLICATION
Slide
79
Relay IED
Relay IED
Remote Access
Network
Clk1
MU
MU
MU
Clk2
ANY QUESTIONS
Slide
81
SHORT BREAK
Slide
82
Slide
83
IMPLEMENTATION -- FAT
COMMON FAT FOR BOTH SAS AND CRP FUNCTIONAL TESTING IS SIMPLE AND FAST DUE TO LESS COPPER WIRES. AUTOMATED TESTING AND REPORTING CAN BE IMPLEMENTED DUE TO MORE SOFTWARE BASE PROCESS INVOLVED.
Slide
84
COMMISSIONING
EASY TO TEST DUE TO LESS CABLES AUTOMATED TESTING AND REPORTING MAKES THE TEST MORE PERFECT AND EASY MISTAKES CAN BE MINIMIZED LESS MAN POWER REQUIRED DUE TO SOFTWARE BASED TESTING
Slide
85
Slide
86
FUTURE SUBSTATION
ONLY POWER CABLES TO THE SWITCHYARD. LAN CABLES REPLACED WITH SECURE WIRELESS COMMUNICATIONS. SMALL MULTIPLE PROTECTION KIOSKS IN THE YARD/CBs AND EVEN ONE CENTRAL PROTECTION ROOM FOR MULTIPLE STATIONS. EASY ACCESS TO DATA ACROSS SUBSTATIONS, LDC, WEB. PLUG AND PLAY IEDs WITH THE HMI/MASTER CONFIGURING ITSELF!! HUGE COST SAVINGS!!!
Slide 87 Copyright (c) by PSI INCONTROL Sdn. Bhd.
For SESB
Minintod 132/33/11kV Substation Lokawi 132/33/11kV Substation POIC 132/33/11kV Substation Lahad Datu Main Intake 132/33/11kV Substation Gayang 132kV Power Plant Substation Tawau Main Intake 132kV Substation Kunak 132/11kV Substation Dam Road 132kV Substation Kalumpang 132/33kV Substation
Slide
88
Slide
89
Slide
90
Slide
91
Slide
92
IEC 61850
BASIC SEMINAR ENDS OPEN FOR QUESTIONS DETAILS IN ADVANCE SEMINAR ---- SOON!!
Slide
93