Vous êtes sur la page 1sur 86

COROSKOP Plus

AX

Planning Guide
COROSKOP Plus hier eintragen Titel der Unterlage (+ KOORDINAT M)

Siem ens A G 1 997


The reproduction, transmission or use of this document or its contents is not permitted without express written authority. Offenders will be liable for damages. All rights, including rights created by patent grant or registration of a utility model _or_ design,_are_ reserved.

Print No.: RAA2-315.021.14.01.02


Replaces: n. a.

English Doc. Gen. Date: 10.97

0-2
Chapter all Page all Revision 01

Revision

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 2 of 4 TD SD 31

Siemens AG Medical Engineering

Contents

0-3
Page

1 _______General Remarks _______________________________________________ 1 - 1


System Configuration . . . . . . . . . . . . . . . . . . . . Remarks . . . . . . . . . . . . . . . . . . . . . . . . . Definition of Terms. . . . . . . . . . . . . . . . . . . . . . Technically feasible area, Orientation points and so on . Lists of Fixpoints Used. . . . . . . . . . . . . . . . . . Additional Information for Detail Planning . . . . . . . . . . EPS (Emergency Power Supply) (Option) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-1 .1-1 .1-2 .1-2 .1-3 .1-3 .1-4

2 _______Room Planning ________________________________________________ 2 - 1


Room Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Recommendation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . System: Top-down View . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . System: Position of the MTS-A3 . . . . . . . . . . . . . . . . . . . . . . . . . . System: Side View . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Planning Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Component Movement Ranges . . . . . . . . . . . . . . . . . . . . . . . . . Max. Admissible Floor Unevenness . . . . . . . . . . . . . . . . . . . . . . . COROSKOP Hi-P: Side View . . . . . . . . . . . . . . . . . . . . . . . . . . . . COROSKOP Hi-P: Top-down View . . . . . . . . . . . . . . . . . . . . . . . . . KOORDINAT M: Views . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Arrangement of Cabinets and Components . . . . . . . . . . . . . . . . . . . . . Recommendation 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Recommendation 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Control Room . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Static Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . COROSKOP Hi-P, Floor-mounted with Small Mounting Plate (not for USA) . . COROSKOP Hi-P, Floor-mounted with Large Mounting Plate (for USA only) . COROSKOP Hi-P, Floor-mounted in Self-leveling Grout with Mounting Frame. MTS-A3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . KOORDINAT M . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 - 1 .2-1 .2-2 .2-3 .2-4 .2-5 .2-5 .2-6 .2-7 .2-8 .2-9 2 - 10 2 - 10 2 - 10 2 - 11 2 - 13 2 - 13 2 - 14 2 - 15 2 - 16 2 - 16

3 _______Installation Preparation__________________________________________ 3 - 1
General Remarks . . . . . . . . . . . . . . . . . . . . . . . . . COROSKOP Hi-P . . . . . . . . . . . . . . . . . . . . . . . KOORDINAT M . . . . . . . . . . . . . . . . . . . . . . . . MTS-A3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . Control Room Distributor . . . . . . . . . . . . . . . . . . . VideoRec or Video Recorder + Monitor M44-2M (Option). . . M102 with Video Distributor Amplifier (Option) . . . . . . . . Reference Monitor (Option) . . . . . . . . . . . . . . . . . . Control Cabinets . . . . . . . . . . . . . . . . . . . . . . . . Cooling System . . . . . . . . . . . . . . . . . . . . . . . . Upper Body Radiation Shield, Surgery Light, Injector (Option) Lower Body Radiation Shield (Option). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-1 .3-1 .3-1 .3-2 .3-2 .3-2 .3-2 .3-2 .3-2 .3-2 .3-3 .3-3

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 3 of 6 TD SD 31

COROSKOP Plus

0-4

Contents
Page Second Display (Option) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 - 3 On-Floor-mounting with Small Mounting Plate (not for USA) . . . . . . . . . . . . . 3 - 4 COROSKOP Hi-P/KOORDINAT M . . . . . . . . . . . . . . . . . . . . . . . . . 3 - 4 COROSKOP Hi-P: Dimensional Drawing, "Small" Mounting Plate (not USA) . . . 3 - 5 KOORDINAT M: Table Base Dimensional Drawing . . . . . . . . . . . . . . . . 3 - 6 On-Floor-mounting with Large Mounting Plate (for USA only) . . . . . . . . . . . . . 3 - 7 COROSKOP Hi-P/KOORDINAT M . . . . . . . . . . . . . . . . . . . . . . . . . 3 - 7 COROSKOP Hi-P: Dimensional Drawing "Large" Mounting Plate (USA only) . . . 3 - 8 Floor-mounting in Self-leveling Grout with Mounting Frame . . . . . . . . . . . . . . 3 - 9 COROSKOP Hi-P/KOORDINAT M . . . . . . . . . . . . . . . . . . . . . . . . . 3 - 9 COROSKOP Hi-P: Dimensional Drawing, Mounting Frame . . . . . . . . . . . .3 - 10 KOORDINAT M: Mounting Frame Dimensional Drawing . . . . . . . . . . . . . .3 - 12 System Ceiling Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 14 MTS Version 1 with Fixed-position Upper Body Radiation Shield (Option). . . . .3 - 14 MTS Version 1 with Moveable Upper Body Radiation Shield (Option) . . . . . . .3 - 15 In-house Electrical Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 16 Remarks regarding the recommendation on Page 3-17 for the room electrical installation per DIN VDE 0107 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 - 16 Recommendation for Application Group 2 . . . . . . . . . . . . . . . . . . . . .3 - 17 Power Cables by Customers Contractor . . . . . . . . . . . . . . . . . . . . . .3 - 18

4 ______ System Connections ____________________________________________4 - 1


General Remarks. . . . . . . . . . . . . . . . . . . . . . . . . Overview of System Connections . . . . . . . . . . . . . . . . Maximum Fixpoint Distances / Planning of Cable Conduit Sizes Laying Cables . . . . . . . . . . . . . . . . . . . . . . . . . . Calculating the Required Cable Conduit Cross Section . . . Example of Cables Laid in Cable Conduits . . . . . . . . . . Remarks Regarding Laying of Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4-2 4-3 4-5 4-5 4-5 4-6

5 ______ Technical Data _________________________________________________5 - 1


Electrical Data . . . . . . . . . . . . . . . Dimensions, Weights and Heat Dissipation Examination Room . . . . . . . . . . . Equipment Room . . . . . . . . . . . . Control Room . . . . . . . . . . . . . . Environmental Conditions . . . . . . . . . Paint Surfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1 5-1 5-1 5-2 5-2 5-3 5-3

6 ______ Transport Conditions ___________________________________________6 - 1


Packaging and Transport Paths . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 - 1

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 4 of 6 TD SD 31

Siemens AG Medical Engineering

Contents

0-5
Page

7 _______Project Management ____________________________________________ 7 - 1


n. a. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 - 1

8 _______Detail Planning_________________________________________________ 8 - 1
Power Unit 1 (POLYDOROS IS-C) . . . . . . . . . . . . . . . . . . System Control Cabinets (Double Cabinet) . . . . . . . . . . . . . . HICOR T.O.P. Cabinet. . . . . . . . . . . . . . . . . . . . . . . . . Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . Recommendation for Cabinet Setup. . . . . . . . . . . . . . . . COROSKOP Hi-P Ceiling Outlet . . . . . . . . . . . . . . . . . . . MTS-A3 Positioning per Version 2 . . . . . . . . . . . . . . . . . . System: Top-down View . . . . . . . . . . . . . . . . . . . . . . Ceiling Installation . . . . . . . . . . . . . . . . . . . . . . . . . Installation Recommendation for MTS-A3 Longitudinal Rails . . . N465 System Control Console . . . . . . . . . . . . . . . . . . . . Table Installation. . . . . . . . . . . . . . . . . . . . . . . . . . Wall Installation . . . . . . . . . . . . . . . . . . . . . . . . . . Control Room Distributor . . . . . . . . . . . . . . . . . . . . . . . Control Console (Option)/Container (Option) . . . . . . . . . . . . . 110 V Power Pack (Option) . . . . . . . . . . . . . . . . . . . . . . M102 with Video Distributor Amplifier (Option) . . . . . . . . . . . . Fixed Mounted Upper Body Radiation Shield, Surgery Light (Option) Moveable Upper Body Radiation Shield, Surgery Light (Option) . . . Injector Wall Terminal Box (Option) . . . . . . . . . . . . . . . . . . Shown without Injector Panel . . . . . . . . . . . . . . . . . . . Planning Recommendation for Injector Wall Connection . . . . . Injector Rack Mount Unit (Option) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-1 .8-3 .8-5 .8-5 .8-6 .8-7 .8-8 .8-8 .8-9 8 - 10 8 - 11 8 - 11 8 - 11 8 - 12 8 - 13 8 - 14 8 - 15 8 - 18 8 - 19 8 - 20 8 - 20 8 - 21 8 - 22

9 _______Changes to COROSKOP T.O.P. PG _________________________________ 9-1


Changes to COROSKOP T.O.P. (+KOORDINAT M) PG RAA2-315.021.13.01.02: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 5 of 6 TD SD 31

COROSKOP Plus

0-6

Contents

This page intentionally left blank.

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 6 of 6 TD SD 31

Siemens AG Medical Engineering

General Remarks
System Configuration

1-1
1

This Planning Guide (PG) has been prepared for the COROSKOP Plus System. The COROSKOP Plus System is comprised of the following system components: COROSKOP Hi-P + KOORDINAT M + MTS-A3 + HICOR T.O.P.

Remarks A note must be made on all room plans that are created by the Planning Departments
which makes reference to the General Installation and Delivery Conditions of Siemens Medical Engineering. A copy of the General Installation and Delivery Conditions must accompany the plans when they are turned over to the customer.

For required spaces, the documents of the application fire safety regulations must be
observed.

The system was developed in accordance with IEC 601-1 (corresponds to DIN VDE
0750, Part 1 and EN 60601-1).

Unless otherwise specified, all dimensions are given in mm.

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 1 of 4 TD SD 31

COROSKOP Plus

1-2
Definition of Terms

General Remarks
1

Technically feasible area, Orientation points and so on Technically feasible area, minimum length, minimum width
The technically feasible area is the rectangle that is formed from the minimum length and minimum width as the space requirement for a system component. The following conventions apply for the technically feasible area: 1. It is the minimum area that is possible without making restrictions to unit movements necessary. 2. Unless otherwise noted, it may not be less than this area! 3. The required safety distances are included (caution: it is possible that national regulations differ from these); 4. The service areas for the unit are included; 5. The required areas for unhindered examination and operation, as well as the required installation areas for control cabinets are not taken into consideration; 6. Illustration: the technically feasible area are illustrated in the top-down views in this PG as a broken line.

Orientation points
Points specific to system components to which reference is made when positioning system components to each other or in the room. The isocenter of a radiographic system is always illustrated as the orientation point. Illustration in the drawings:

Fixpoints
Clearly marked points on system components, installation ceiling, walls or floor on which cable outlets are located. Illustration in the drawings: circle with letter/number- combination. Example: PU

The cable lengths establish the maximum fixpoint distances and thus the maximum distances between the individual system components.

Room height
The room height is the distance measured from the top surface of the finished floor to the bottom surface of the ceiling structural elements (Unistrut rails) (bottom surface of drop ceiling).

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 2 of 4 TD SD 31

Siemens AG Medical Engineering

General Remarks
Lists of Fixpoints Used
Fixpoint CRX Subsystem Control Room X-ray (console) Remark

1-3
1

Fixpoint on the bottom of the control room distributor Floor fixpoint Floor fixpoint Ceiling fixpoint Wall fixpoint Ceiling fixpoint Ceiling fixpoint Floor fixpoint Wall fixpoint Ceiling fixpoint Floor fixpoint Floor fixpoint Floor fixpoint Ceiling fixpoint Floor fixpoint
1

CRE CU1 D D1 IN1 IN2 IS IWO P1 PD/SD1

Control Room E-Medicine (measuring station) (Option) Cooling Unit 1 (cooling unit for cooling X-ray tube unit) Display (MTS-A3) Second display (display of unit data + radiation indicator) Injector head mounted on injector ceiling column in radiation shield support arm system (option) Injector head permanently mounted on ceiling (option) Image system (HICOR T.O.P.) Injector wall outlet in the examination room Plane 1 (COROSKOP Hi-P) System control cabinets (double cabinet) PD: Power Distributor SD1: System Distributor 1 Power Unit 1 (POLYDOROS IS-C) ACOM M (option) Surgery Light (option) Table (KOORDINAT M)

PU1 R1 SU T

Additional Information for Detail Planning


MTS-A3 PG:
RA53-020.021.02...

MEGALIX Cooling System PG


R71-020.021.06...

Measuring station: see the component PG ACOM T.O.P. (option) PG


RA47-010.021.01...

ECHOMAP (option) PG:


RA52-021.021.01...

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 3 of 4 TD SD 31

COROSKOP Plus

1-4
EPS (Emergency Power Supply) (Option)
The EPS is primarily comprised of:
1.

General Remarks
1

a UPS (Uninterruptable Power Supply) The power distributor (Fixpoint PD) is connected to the UPS. This way, if there is a failure of the line power supply, with the exception of the generator all system components (unit, imaging system, ...) will still be supplied with power. an ATS (Automatic Transfer Switch) The ATS is intended to be an expansion to the UPS. If line power fails, the generator is connected to the UPS via the ATS. The normal exposure mode will be blocked and only continuous fluoroscopy will be possible (with fully charged batteries, min. 30 minutes).

2.

At this time, one EPS from the Exide Company is approved:


- Uninterruptable power supply comprised of: 1. 2. 3. Powerware HV cabinet Battery cabinet

- Automatic Transfer Switch, Exide, Part No. SMATS

Detailed information about the EPS is available from the headquarters of the Exide
Company in the particular country, e.g. from: Country USA Address Exide World Headquarters 8609 Six Forks Road Raleigh, North Carolina 27615 USA Exide Electronics Mrekestr. 7 D-63814 Mainaschaff Telephone/Fax Tel.: 001 919 870-3484 Fax: -3031

Germany

Tel.: (0)6021-79692 Fax: -79698

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 4 of 4 TD SD 31

Siemens AG Medical Engineering

Room Planning
Room Plan
Recommendation
Cable cabinet System controller
2

2-1
2

Examination room
MTS-A3

Control room
Hardcopy System control console

POLYDOROS IS

Cooling unit

HICOR T.O.P.

Equipment room

COROSKOP Hi-P Measuring station

ACOM T.O.P.

KOORDINAT M

Room height: 2600 - 3100 mm

Plan the control room at the foot-end of the KOORDINAT M (optimum visual contact to
the examination room).

Plan the radiation shield window in terms of size and position so that the examination
room can be clearly viewed from the control room.

Plan the entrance area as illustrated. Plan the equipment room to the left of the examination room. Air condition the equipment room. If at all possible, do not plan the POLYDOROS IS and cooling unit in the examination
room (generation of noise and heat).

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 1 of 18 TD SD 31

COROSKOP Plus

Swivel area, normal-/oblique position (motorized movement) *2

COROSKOP Hi-P axis of rotation (motorized movement) Orientation point (KOORDINAT M) *2

Orientation point /Isocenter COROSKOP Hi-P in normal position Isocenter COROSKOP Hi-P in oblique position

*2

COROSKOP Plus RAA2-315.021.14 Rev. 01 10.97 Page 2 of 18 TD SD 31 Siemens AG Medical Engineering

2-2

COROSKOP Hi-P in oblique position

Cable fixpoint D on the ceiling for MTS-A3

System: Top-down View

Cable fixpoint P1 on the ceiling for COROSKOP Hi-P

1:50

Room Planning

*1 *1 Including 500 mm safety distance between COROSKOP Hi-P and wall. *2 Dimensions not in parenthesis: Table longitudinal movement not limited (standard) Dimensions in parenthesis: Table longitudinal movement limited by the room width.
2

Room Planning
System: Position of the MTS-A3
Position the MTS-A3 different from the standard position (Version 1) only in exceptional cases.

2-3
2

Version 1 (standard position) Room plan, see Page 2-2 Ceiling installation, see Page 3-14/15 Fixed-mounted or moveable upper body radiation shield (option), see Page 8-18/19

Version 2 Room plan, see Page 8-8 Ceiling installation, see Page 8-9 Only moveable upper body radiation shield (option) allowed, see Page 8-19

1:100

Versions 3, 4 Fixed-mounted or moveable upper body radiation shield (option), see Page 8-18/19

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 3 of 18 TD SD 31

COROSKOP Plus

2-4
System: Side View

Room Planning
2

MTS-A3 Terminal box, installed on the side

max. unit height

*1 1:50 *2 *1 *2 D P1 With room heights lower/equal to 2830 mm, there is risk of collision between MTS-A3 and KOORDINAT M; risk of injury between MTS-A3 and patient! Orientation point/isocenter COROSKOP Hi-P in normal position MTS-A3 (ceiling fixpoint) COROSKOP Hi-P (ceiling fixpoint) T KOORDINAT M (floor fixpoint)
COROSKOP Plus RAA2-315.021.14 Rev. 01 10.97 Page 4 of 18 TD SD 31 Siemens AG Medical Engineering

Room Planning
Planning Information
Component Movement Ranges

2-5
2

When planning external components in the examination room, pay attention to the movement ranges of the system components (risk of collision!). MTS-A3 movement range

COROSKOP Hi-P movement range

KOORDINAT M movement range (foot-end)

KOORDINAT M movement range (head-end) 1:50

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 5 of 18 TD SD 31

COROSKOP Plus

2-6
Max. Admissible Floor Unevenness

Room Planning
2

Max. admissible floor unevenness of the subfloor in the cross-hatched area is 8 mm. The cross-hatched area corresponds to the rotation area (normal/oblique position) of the stand, as well as to the C-Arm movement range.

Stand normal/oblique position rotation area and movement range of C-Arm

Orientation point/isocenter, COROSKOP Hi-P in normal position

1:20

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 6 of 18 TD SD 31

Siemens AG Medical Engineering

Room Planning
COROSKOP Hi-P: Side View

2-7
2

COROSKOP Hi-P in normal position

1:50

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 7 of 18 TD SD 31

COROSKOP Plus

2-8
COROSKOP Hi-P: Top-down View

Room Planning
2

Swivel area, normal/oblique position (motorized movement)

Cable fixpoint P1 on the ceiling

Orientation point/isocenter, normal position

Axis of rotation

Isocenter, oblique position

1:50

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 8 of 18 TD SD 31

Siemens AG Medical Engineering

Room Planning
KOORDINAT M: Views
View X *1 *2 *3 *4

2-9
2

*5 *6 *7

1:50

*1 *2 *3 *4

Accessory rail, e.g. used to hook on the ECG preamplifier (with CATHCOR/RECOR) Blank panel, 135x95 mm for installation of an electrical outlet (page 3-20) Panel with a nipple for compressed air connection Panel with injector connector

*5 *6 *7 T

Tabletop longitudinal movement Tabletop transverse movement


Orientation point

KOORDINAT M floor fixpoint: for laying cables, see Page 3-6

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 9 of 18 TD SD 31

COROSKOP Plus

2 - 10
Arrangement of Cabinets and Components
Recommendation 1 Recommendation 2 2

Room Planning
2 2

System distributor cabinet

Power distribution cabinet

POLYDOROS IS Cabinet

Recommendation 1:
POLYDOROS IS (PU1) and cooling unit (CU1) located in equipment room (due to generation of noise and heat).

Recommendation 2:
Control cabinets located in the examination room, cooling unit (CU1) and HICOR T.O.P. (IS) in equipment room. Caution: Take note of noise and heat generated by the POLYDOROS IS (PU1)!

Air-condition the equipment room. The cabinets can be set up as illustrated. Take note of the following:
- The cabinets can be set up separated from each other or corner-to-corner only at the places marked with arrows. When this is done, take note of the cable list on Page 4-3. - If set up is corner-to-corner, maintain at least 40 mm space to the next cabinet (needed to open the cabinet doors). - PU1 and cable cabinet can also be positioned to the right of the SD1. - For additional information, see Pages 8-1 to 8-6.

The cable cabinet is always included in the shipment.


Lead in the cables from top left/right (see Page 4-6); it is possible to lead cables into the cabinet base from below and from all sides (except from the front).

For the modem connection, see Page 2-11.

COROSKOP Plus

Cable cabinet

RAA2-315.021.14 Rev. 01 10.97

HICOR T.O.P.

Page 10 of 18 TD SD 31

Cooling unit
Siemens AG Medical Engineering

Room Planning
Control Room

2 - 11
2

Hardcopy Control console

Container ACOM T.O.P.

Measuring station

Plan the control room so it is at the foot-end to the examination room. The control console, container, second display (not shown; for details, see Page 8-16)
and ACOM T.O.P. can be ordered as options.

Position the components in the vicinity of the control room distributor (see Pages
8-11/12/13/14).

Provide a modem connection,


- preferably in the control room (max. 2 m away from control room distributor CRX) - alternately in the equipment room (max. 2 m away from the SD1 system distributor cabinet).

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 11 of 18 TD SD 31

COROSKOP Plus

2 - 12

Room Planning
2nd monitor (44 cm or 54 cm) *1*3 N465 System Control Console 2nd unit control console *1 ECC2*1 Reference monitor (44 cm or 54 cm) *1*4

Video recorder1*2

VCR interface1*2 Scan converter1*2

2nd footswitch*1 Container*1 Control console*1

Control room distributor

*1 *2

Option VideoRec (= video recorder + VCR interface + scan converter) or video recorder SONY SVO 9500... + M44-2M N-Monitor (not shown). As an alternative to the SONY video recorder every commercially available VHS recorder can be used. The Power Pack is required for the video recorder and 110V/60 Hz power systems. For details, see Page 8-14.

*3 *4

The M102 is required for the connection of additional monitors (see Page 8-15). Positioned in the MTS (standard) or in the control room.

For details, as well as for additional components that can be connected to the control room distributor, see Pages 8-12.

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 12 of 18 TD SD 31

Siemens AG Medical Engineering

Room Planning
Static Requirements

2 - 13
2

COROSKOP Hi-P, Floor-mounted with Small Mounting Plate (not for USA)
Tension occurs only at the following mounting points: F5max F6max F7max + 2.0 kN + 4.0 kN + 3.0 kN

These maximum values do not occur simultaneously. The tension depends on the operating position and on the unit movement.

Mounting holes 1-7 for installation directly on the floor Small mounting plate (722 mm dia.) Spare mounting holes 1:10

COROSKOP Hi-P center of gravity

Range of shifting center of gravity *1 Small mounting plate

Center of gravity, unit in oblique position Orientation point/isocenter, unit in normal position Center of gravity, unit in normal position 1:20

*1 Load force (unit + small mounting plate) = 5.9 kN Range of shifting load force caused by the park position, the two operating positions, as well as the unit C-Arm movement.

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 13 of 18 TD SD 31

COROSKOP Plus

2 - 14

Room Planning

COROSKOP Hi-P, Floor-mounted with Large Mounting Plate (for USA only) 2
Large mounting plate (860 mm dia.) Tension occurs only at the following mounting points: F5max F6max F7max + 3.5 kN + 3.5 kN + 3.5 kN

These maximum values do not occur simultaneously. The tension depends on the operating position and on the unit movement.

Mounting holes 1-7 for installation directly on the floor 1:10 Spare mounting holes

COROSKOP Hi-P center of gravity

Range of shifting center of gravity *1

Center of gravity, unit in oblique position

Large mounting plate Orientation point/isocenter, unit in normal position

Center of gravity, unit in normal position

1:20 *1 Load force (unit + large mounting plate) = 6.0 kN Range of shifting load force caused by the park position, the two operating positions, as well as the unit C-Arm movement.

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 14 of 18 TD SD 31

Siemens AG Medical Engineering

Room Planning

2 - 15

COROSKOP Hi-P, Floor-mounted in Self-leveling Grout with Mounting Frame


The center of gravity of the COROSKOP Hi-P is within the mounting frame. As a result, no tension is exerted on the mounting frame mounting points.

Range shifting center of gravity *1 Mounting frame

Center of gravity, unit in oblique position

Small mounting plate

Orientation point/isocenter, unit in normal position

Center of gravity, unit in normal position

1:20

*1 Load force (unit + small mounting plate + mounting frame) = 6.7 kN Range of shifting load force caused by the park position, the two operating positions, as well as the unit C-Arm movement.

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 15 of 18 TD SD 31

COROSKOP Plus

2 - 16
MTS-A3

Room Planning
2

Vertical ceiling load Fxmax: 4.0 kN (the dynamic load is exerted on each mounting point, because this is a floating single load). For further information, see PG RA53-020.021.02...

KOORDINAT M The max. tension is calculated with the table turned (+90o or -90o) and with the tabletop
extended completely in the head end position. The max. tension is determined with the weight of the patient (200 kg) and accessories (40 kg) factored in.

Mounting frame:
Tension at head-end and/or foot-end: per expansion bolt, max. tension 4.0 kN

Base mounted directly on the solid floor:


Max. tension at head-end and/or foot-end: per bolt, max. tension: 5.5 kN

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 16 of 18 TD SD 31

Siemens AG Medical Engineering

Room Planning
KOORDINAT M Center of Gravity The center of gravity when the table is turned was determined under the following conditions: Tabletop extended completely in the head position. Tabletop loaded with a patient weight of 200 kg. Table accessories (40 kg) installed on the accessory rail on the left.

2 - 17

Center of gravity, table turned +90o

Floating center of gravity

Orientation point / axis of rotation

Center of gravity, table in 0o position Center of gravity, table turned 90o

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 17 of 18 TD SD 31

COROSKOP Plus

2 - 18
This page intentionally left blank.

Room Planning

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 18 of 18 TD SD 31

Siemens AG Medical Engineering

Installation Preparation
General Remarks
COROSKOP Hi-P

3-1
3

The COROSKOP Hi-P preinstallation parts are part of the preinstallation shipment. The preinstallation kit contains the mounting frame including the small mounting plate
respectively the small mounting plate or the large mounting plate, as well as the ceiling outlet (for details, see Page 8-7).

Preinstallation on the floor:


- not for USA: small COROSKOP Hi-P mounting plate - for USA only: large COROSKOP Hi-P mounting plate

Preinstallation in self-leveling grout:


COROSKOP Hi-P mounting frame with the small mounting plate. The mounting frame is installed so that it is flush with the self-leveling grout.

Preinstallation in computer flooring:


Recommendation: COROSKOP Hi-P mounting plate installed on poured concrete or on subconstruction prepared by customers contractor; mounting frame not necessary.

KOORDINAT M The KOORDINAT M preinstallation parts are part of the preinstallation shipment. Preinstallation on the floor:
Installation Kit 50; contains base with installation hardware.

Preinstallation in self-leveling grout:


- Preinstallation Kit; contains mounting frame with installation hardware. The mounting frame is installed so that it is flush with the self-leveling grout. - Installation Kit 50; contains base with installation hardware for installing the base on the mounting frame.

Preinstallation in computer flooring:


Recommendation: table base on subconstruction prepared by the customers contractor; mounting frame not necessary.

With installation in the basement, use the mounting frame. Panels are located at the foot end of the table (see Page 2-9) for:
- Injector connection - Compressed air connection - Blank panel for installation of an electrical outlet. For details, see Page 3-20.

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 1 of 20 TD SD 31

COROSKOP Plus

3-2
MTS-A3

Installation Preparation
3

The MTS-A3 preinstallation kit is part of the preinstallation shipment. Transversely installed Unistrut rails are prerequisite for the MTS-A3 longitudinal rails.
Grid spacing for ceiling installation is max. 1350 mm.

Additional Unistrut rails for the MTS-A3 are needed (customers contractor) to position
the MTS-A3 longitudinal rails per Version 2. These must be installed turned 90 o to the exiting Unistrut rails (see Pages 8-8/9/10). Page 2-3).

The longitudinal rails can be shortened (see MTS-A3 Positioning according to Version 4,

Control Room Distributor Place the control room distributor in the control room either under the control console
(option) or mount it on the wall (obtain mounting hardware locally). For details, see Pages 8-12/13.

If configured, plan the second footswitch and/or second unit control console options in
the control room so that when they are operated, there is visual contact to operating personnel, to the patient and to the injector in the examination room.

VideoRec or Video Recorder + Monitor M44-2M (Option) When setting up the video recorder, make sure there is sufficient air circulation to
dissipate heat. The clearance to the walls of built-in fixtures or other components must be at least 3 cm.

M102 with Video Distributor Amplifier (Option) Position the M102 in the vicinity of the control room distributor on the wall. For details, see Page 8-15. Reference Monitor (Option) Positioned in the MTS (standard) or in the control room (see Page 2-12). Control Cabinets For floor and wall mounting, as well as for cable lead-in, see the chapter "Detail
Planning", Pages 8-1 to 8-4.

Store excess cable lengths in the cable cabinet, under computer flooring or in cable
conduits, etc. (see Page 4-6).

Cooling System For further information, see the MEGALIX Cooling System PG, R71-020.021.06.

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 2 of 20 TD SD 31

Siemens AG Medical Engineering

Installation Preparation
Upper Body Radiation Shield, Surgery Light, Injector (Option)
1. Overview Approved Attachments
Ceiling column, fixed mounting (for Dimensional Drawing, see Page 8-18; for positioning, see Page 3-14) or ceiling column mounted on the carriage (for Dimensional Drawing, see Page 8-19; for positioning, see Pages 3-15, 8-9) Upper body radiation shield or injector stand or upper body radiation shield and surgery light Upper body radiation shield and/or surgery light Second carriage for injector stand possible

3-3
3

Released for MTS Versions


MTS-A3 longitudinal arrangement (= MTS versions 1,3,4; see Page 2-3)

MTS-A3 longitudinal and transverse arrangement (MTS versions 1-4; see Page 2-3)

2. Upper Body Radiation Shield (Option)

2 versions are available:


- Permanently mounted upper body radiation shield. For dimensional drawing, see Page 8-18. - Moveable upper body radiation shield. For dimensional drawing, see Page 8-19.

All mounting hardware is included in the shipment. For ordering information, see the
particular SIR-PM. 3. Surgery Light (Option)

For dimensional drawing, see Page 8-18/19. For positioning, see Pages 3-14/15, 8-9. For electrical connection, see Page 3-19.
4. Injector (Option)

There are 3 different ways in which the Injector Rack Mount Unit can be installed. For
details, see Page 8-22.

For cable lengths, see Page 8-22. Lower Body Radiation Shield (Option) The lower body radiation shield is mounted on the left or right on the table. Second Display (Option) Positioned in the control room or in the examination room on the wall or on a console
(installation materials must be ordered locally).
3 3

For details, see Page 8-16/17.

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 3 of 20 TD SD 31

COROSKOP Plus

3-4

Installation Preparation
On-Floor-mounting with Small Mounting Plate (not for USA)
COROSKOP Hi-P/KOORDINAT M
The small COROSKOP Hi-P mounting plate and the table base are installed directly on solid concrete or load-bearing, self-leveling grout (cut away existing floor covering).
3

COROSKOP Hi-P small mounting plate (722 mm dia.) KOORDINAT M table base

*1 KOORDINAT M Orientation point

Orientation point/isocenter COROSKOP Hi-P in the normal position

1:50

*1

Guide cables to the table base through the opening in the ceiling of the room below (see Page 3-6). With installation in the basement, use the mounting frame.

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 4 of 20 TD SD 31

Siemens AG Medical Engineering

Installation Preparation

3-5
3

COROSKOP Hi-P: Dimensional Drawing, "Small" Mounting Plate (not USA)


Dimensions for installation on the floor or on the mounting frame

Small mounting plate with 13 holes (25 mm dia.): - for installation directly on concrete with Liebig expansion bolts (15 mm dia.); 7 holes, evenly spaced, must be used (see Page 2-13). - for installation directly on the mounting frame

Orientation point/isocenter, COROSKOP Hi-P in normal position Mounting points for COROSKOP Hi-P

Small mounting plate

Insulation parts

*1, *2

1:10 Floor covering (max. 10 mm thick)

Solid concrete

*1

S15/70 Liebig expansion bolts (7 pcs. included in shipment) Floor mounting using studs through the ceiling of room below (obtain studs locally)

*2

1:2

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 5 of 20 TD SD 31

COROSKOP Plus

3-6

Installation Preparation
KOORDINAT M: Table Base Dimensional Drawing
View A-A:
3

Table base Insulation plate

Table column

Solid concrete

All mounting hardware incl. in shipment Top-down view

M12x270 threaded studs

*1

Orientation point

1:5 *2 *1 *2 Shaded area for cable lead-in through the solid ceiling (a 75 mm dia. hole is sufficient for the standard cables) 6 holes for threaded studs

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 6 of 20 TD SD 31

Siemens AG Medical Engineering

Installation Preparation

3-7
3

On-Floor-mounting with Large Mounting Plate (for USA only)


COROSKOP Hi-P/KOORDINAT M
The large COROSKOP Hi-P mounting plate and the table base are installed directly on the solid concrete or load-bearing, self-leveling grout (cut away existing floor covering). Table base: for details, see Page 3-6.

COROSKOP Hi-P large mounting plate (860 mm dia.)

KOORDINAT M table base

*1

Orientation point, KOORDINAT M Orientation point/isocenter, COROSKOP Hi-P in normal position 1:50

*1

Guide cables into the table base through openings made in the ceiling of the rooms below (see Page 3-6). If installation is in the basement, use the mounting frame.

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 7 of 20 TD SD 31

COROSKOP Plus

3-8

Installation Preparation
COROSKOP Hi-P: Dimensional Drawing "Large" Mounting Plate (USA only) 3
Dimensions for installation on concrete

Large mounting plate with 13 mounting holes (25 mm dia.): - for installation directly on concrete with Liebig expansion bolts (15 mm dia.); 7 evenly spaced mounting holes must be used (see Page 2-14).

Orientation point/isocenter, COROSKOP Hi-P in normal position

Mounting points for COROSKOP Hi-P

Insulation parts

*1, *2

1:10

Large mounting plate Floor covering (max. 10 mm thick)

Solid concrete

1:2

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 8 of 20 TD SD 31

Siemens AG Medical Engineering

Installation Preparation
Floor-mounting in Self-leveling Grout with Mounting Frame
COROSKOP Hi-P/KOORDINAT M

3-9
3

COROSKOP Hi-PMounting frame

KOORDINAT M Mounting frame Cable conduit (customer contractor)

Orientation point, KOORDINAT M Orientation point/isocenter, COROSKOP Hi-P in normal position

1:50

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 9 of 20 TD SD 31

COROSKOP Plus

3 - 10

Installation Preparation
COROSKOP Hi-P: Dimensional Drawing, Mounting Frame
Dimensions for installation in self-leveling grout
3

4 x floor mounting *1

13xM10 thread for installing the small COROSKOP Hi-P mounting plate on the mounting frame

Orientation point/isocenter, COROSKOP Hi-P in normal position

*1

4 holes for Liebig expansion bolts (15 mm dia.)

For detail illustrations, see next page. 1:10

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 10 of 20 TD SD 31

Siemens AG Medical Engineering

Installation Preparation

3 - 11

COROSKOP Hi-P Mounting Frame: Detail Illustrations

Insulation parts COROSKOP Hi-P: small mounting plate Floor covering (max. 10 mm thick)

Mounting frame

Self-leveling grout (min. thickness 62 mm)

1:2 *1 Mounting frame installation to allow adjustment to floor level With grout thickness of 62 mm to 82 mm: adjust using shims Solid concrete

Fill in space around floor frame with concrete after installation. Solid concrete 1:5

*1 *2

B15/45 + B200 Liebig expansion bolts (4 pcs. included in shipment). After installation, cut off excessive length. Special lengths available, see Liebig catalog

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 11 of 20 TD SD 31

*2

COROSKOP Plus

3 - 12

Installation Preparation
KOORDINAT M: Mounting Frame Dimensional Drawing
Dimensions for installation in self-leveling grout Front view
3

Top-down view *1 Head-end *2 *1

Orientation point

Table base

*2 For Detail A-A, see next page

Area for leading cables into table base *1 *2 *1

*3 *1 *2 4 mounting holes 4 alternate mounting holes *3 Cable conduit (customers contractor)

1:5

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 12 of 20 TD SD 31

Siemens AG Medical Engineering

Installation Preparation

3 - 13

KOORDINAT M Mounting Frame: Detail A-A

Table base Insulation parts Floor covering

Mounting frame

Mounting frame installation to allow adjustment to floor level Self-leveling grout: minimum depth 62 mm *1

*1

Solid concrete

With grout thickness of 62 mm to 70 mm: adjust using shims

Fill in space around floor frame with concrete after installation

Solid concrete

*2 1:5 *1 *2 B15/45 + B200 Liebig expansion bolts (4 pcs. included in shipment) Cut off excess length after installation Special lengths available, see Liebig catalog
Siemens AG Medical Engineering RAA2-315.021.14 Rev. 01 10.97 Page 13 of 20 TD SD 31 COROSKOP Plus

3 - 14
System Ceiling Installation

Installation Preparation
3 3

MTS Version 1 with Fixed-position Upper Body Radiation Shield (Option)


Recommendation: Ceiling grid: 67.5 cm

Grid spacing *3 *5

*2

*1

*6

*7 1:50

*1 *2 *3 *4 *5 *6

MTS-A3 Do not plan any lighting fixtures, ventilation inlets, ventilation outlets, sprinkler elements, etc. between the rails.

*7 IN2 SU

Orientation point/isocenter, COROSKOP Hi-P in normal position COROSKOP Hi-P ceiling outlet (see Page 8-7) MTS-A3 ceiling outlet Mounting hole spacing Observe max. admissible rail overhang Mounting plate (option) for - radiation shield and surgery light (see Page 8-18) - or injector stand (see Page 8-18) With a smaller ceiling grid, shift the position of the installation plate to the side until it is centered to the ceiling grid. Injector head fixed installation on the ceiling (option) Surgery light (option) (see Pages 3-19, 8-18)

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 14 of 20 TD SD 31

*4
Siemens AG Medical Engineering

Installation Preparation
MTS Version 1 with Moveable Upper Body Radiation Shield (Option)
Recommendation: ceiling grid: 67.5 cm

3 - 15

Grid spacing *3 *5

*2

*1

*7

*5

*6

*4

1:50

Do not plan any lighting fixtures, ventilation inlets, ventilation outlets, sprinkler elements, etc. between the rails.

*1 *2 *3 *4 *5 *6

MTS-A3

*7

IN1 Radiation shield SU

Orientation point/isocenter, COROSKOP Hi-P in normal position COROSKOP Hi-P ceiling outlet (see Page 8-7) MTS-A3 ceiling outlet Mounting hole spacing Observe max. admissible rail overhang. longitudinal rails (option) for radiation shield, surgery light, injector stand (option) (see Page 8-19); length when shipped: 4m, can be shortened. With a smaller ceiling grid, shift position of longitudinal rails to the side if needed so that the max. rail overhang is not exceeded. Injector head mounted on injector ceiling column in the radiation shield rails (option) Surgery light (option) (see Pages 3-19, 8-19)

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 15 of 20 TD SD 31

COROSKOP Plus

3 - 16
In-house Electrical Installation

Installation Preparation
3

The appropriate regulations regarding electrical installation must be observed.


In Germany, these are mainly the standards in the VDE 0100 and VDE 0107series; in other countries, the particular national regulations.

For power line connection voltages, see Chapter 5. Remarks regarding the recommendation on Page 3-17 for the room electrical installation per DIN VDE 0107
Ground Fault Interrupters

Use only ground fault interrupters for AC and pulsed DC fault currents, surge-protected,
with I!N=30 mA.

Ground fault interrupters cannot be used in power systems without an N-conductor. Ground Fault Interrupter for System Power Distributor (PD):
IN = 40 A / I!N = 30 mA

Ground Fault Interrupter for the POLYDOROS IS Generator:


Commercially-available ground fault interrupters respond too quickly when used with the generator. For this reason, use only the following types: for UN= 3~400/415 V: IN = 63A I!N = 30 mA Order from SIEMENS iii Center: Order No. 5SZ3 466-OKG00 allstrom Order from SPH 2 (Med Dept., formerly INAK): Part No. 49 54 470 Y7933 (width of GFI is 144 mm = 8TE, installation on standard rail) for UN greater than 3~415 V: IN =125A I!N = 30 mA Order from SIEMENS iii Center: Order No. 5SZ3 673-Z; Z=27-30 mA Order from SPH 2 (Med Dept., formerly INAK): Part No. 49 54 488 Y7933

ON-OFF Switch (with Control Lamp) Install one ON-OFF switch in the control room for the COROSKOP Plus system. This ONOFF switch should be installed at a height of approx. 1.8 m in the vicinity of the control console. EMERGENCY OFF Switch (with Locking Mechanism) At least one Emergency OFF switch (with locking mechanism) must be installed in the examination room, control room and equipment room to enable quick switch-off of the COROSKOP Plus system in emergency situations. Position these at a height of approx. 1.8 m so that they are easily reached, but cannot be pressed unintentionally.

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 16 of 20 TD SD 31

Siemens AG Medical Engineering

Installation Preparation
Recommendation for Application Group 2
Electrical Installation on Site per DIN VDE 0107
Power supply Backup power supply SV Power lead-in for X-ray

3 - 17
3

Recommendation for room distributor

Second cable

First cable

5 x per calculation

*1 Surgery lamp connection (115 VAC or 230


VAC) (option), see Page 3-19.

*2 Table electrical outlet connection


(option), see Page 3-20

Legend: 1 Voltage monitoring and switching device per VDE 0107 2 Isolating transformer with overload monitoring 3 Isolation monitor 4 Response and test combination 5 Potential equalization leads to external, conductible parts 6 Power line to permanent or mobile operating devices 7 Power line to permanent or mobile operating devices, e.g. developer machine 8 GFI (ground fault interrupter) 8a GFI for system power distributor, see notice on Page 3-16 8b GFI for generator, see notice Page 3-16 9 System breaker EAT On-Off switch with control lamp for the X-ray system AT1 Emergency OFF switch in examination room AT2 Emergency OFF switch in control room AT3 Emergency OFF switch in equipment room SC 4-part connector socket for CATHCOR (option) PIN Gnd pin socket [] Figures are free cable lengths in m Note: The ratings of the short-circuit prefuses apply only for SIEMENS GFIs

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 17 of 20 TD SD 31

COROSKOP Plus

3 - 18
Power Cables by Customers Contractor

Installation Preparation
3

A maximum of four room power line cables are needed:

Power Line Cabling to the Power Distributor (PD)

- Power cable, 5x16 mm2. - The connector terminals are set up for max. 16 mm2. - Power line cabling 5 x per the calculation. Take note of the internal line resistance: 1. 2. Measure the internal line resistance, Ri, at the subdistributor using the line resistance meter. Size the power lead-in cable so that the max. admissible Rimax (see table) is not exceeded. Measured internal line resistance plus the resistance of the power lead-in cable " Rimax. UN P 100 kW 80 kW

Power Line Cabling to the POLYDOROS IS (PU1)

400 V* 415 V** 440 V** 480 V**

" 0.10 Ohm " 0.14 Ohm " 0.16 Ohm " 0.20 Ohm

" 0.14 Ohm " 0.17 Ohm " 0.21 Ohm " 0.27 Ohm

*Resistance values in Ohms with UN -15% ** Resistance values in Ohms with UN -10% - The POLYDOROS IS is a 100 kW generator. If there is a greater internal line resistance than listed in the above table, generator power is automatically reduced. A max. generator power of 80 kW is sufficient for the X-ray tube unit assemblies currently being shipped. - Minimum Ri: 0.2 Ohm. - Max. cross section of the cable that can be clamped: 70 mm2.

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 18 of 20 TD SD 31

Siemens AG Medical Engineering

Installation Preparation
Connection for Surgery Light (Option)
Surgery Light: - Power consumption: 50 W - Can be connected to 115 V~ or 230 V~

3 - 19

Room distributor *1 *2c

*2a

*2b

*1 *2

For connection to line power, see Page 3-17, *1 The brightness of the surgery lamp is adjusted using an internal dimmer. The light can be connected to line power: - directly, or - a wall switch (*2a), - a second footswitch, Part No. 17 41 313 (*2b), - a relay (*2c) Part No. 10 13 085 When connected over a relay, the surgery lamp is switched on and off when fluoro/exposure is triggered.

If applicable, obtain all cables, switches, relays from customers contractor.

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 19 of 20 TD SD 31

COROSKOP Plus

3 - 20

Installation Preparation
A table electrical outlet can be installed in the KOORDINAT M:
- The electrical outlet and the power lead-in cable must be obtained from the customers contractor. - A 135x95 mm blank panel is provided at the foot end of the table for installation of the electrical outlet. - Use only a fully-enclosed electrical outlet (insulated and splash-water protected). - Labeling of the max. admissible consumption at the power outlet is required. - Observe the country-specific regulations. - For connection to the room distributor, see *2 Page 3-17. - The power cable must be led directly into the table and connected to the electrical outlet, i.e. intermediate connection in the table is not allowed.

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 20 of 20 TD SD 31

Siemens AG Medical Engineering

System Connections
General Remarks
All system-specific cables are included with the shipment.

4-1
4

The system cabling is comprised of standard cables and standard wiring harnesses with
a fixed length. These may not be shortened.

Store excess cable lengths in the cable cabinet, in cable conduits, under computer
flooring, etc.

Standard cabling has already been prepared for the following options:
Second ECC Second monitor ACOM T.O.P. (ACOM M) Hardcopy Video printer Second footswitch Second unit control console VideoRec (Video-Recorder + VCR-Interface + scan converter) 110 V Power Pack

For remarks regarding the room electrical installation, see Page 3-16.

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 1 of 6 TD SD 31

COROSKOP Plus

4-2
Overview of System Connections

System Connections
4

RD

SU

RD

RD

RD

Remarks:

RD = room distributor Room distributor and power cables are not included in the shipment. The illustration includes the cable cabinet.
The wiring harnesses can be laid directly to the fixpoints, i.e. without first going through the cable cabinet. Excess cable lengths must then be stored in some other manner (in cable conduits, under computer flooring, etc.).

For the definition of the fixpoints, see Page 1-3.

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 2 of 6 TD SD 31

Siemens AG Medical Engineering

System Connections

4-3
4

Maximum Fixpoint Distances / Planning of Cable Conduit Sizes


Wiring from HarFixness point No. 1 2a 2b 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 RD RD RD
RD

to Fixpoint

Cable conduit cross section in mm2 780 500 500 3125 3125 2000 780 3125 3125 780 780 3125 3125 220 220 120 150 100 120 900 290 160

Conduit, Minimum Maximum size Opening in Fixpointin inches mm Distance in m 2" 3" 3" 3" 3" 2.5" 3" 3" 3" 2" 2" 3" 3" 3" 2" 2" 2.5" 3" 2" 2.5" 2" 2" 32 dia.
42 42

Remarks

P1 P1 P1 P1 P1 P1 SD1 SD1 SD1 SD1 SD1 SD1 IS IS CRX IS CRE CRE CRE SD1 SD1 R1 PU1 PD SU
T

PU1 PU1 PU1 SD1 SD1 CU1 D CRX T CU1 PU1 IS CRX T D CRE D CRX T IWO D1 CRX

15 15 15 15 15 30 19 19 14 48 5 34 27 29 19 27 27 27 27 18 25 20* Meas. station (opt.) Meas. station (opt.) with Cathcor (option) only Meas. station (opt.) Injector wall connection (option) 2nd display (option) Fiber optic cable for ACOM M ** (opt.) connection Contractor cable Contractor cable Contractor cable
Contractor cable

high voltage cable high voltage cable

80 x 55 80 x 55 50 dia. 60 x 35 55 x 55 80 x 55 35 dia. 35 x 35 80 x 55 73 x 35
55 x 30

min. bending radius 50 mm

20 dia. 53x30 40 x 40 70 x 17 45 x 15 60 x 30 40 x 16 16 x 8

Pwr. cable, Power Unit 1 (POLYDOROS IS) -> P.3-16/ 17/18 Pwr. cable, Power Distributor -> P. 3-16/17/18 Pwr. cable, surgery lamp (option) -> P. 3-16/17/18
Pwr. cable, table electrical outlet (option) -> P. 3-17/20

* This fiber optic cable is always configured in the HICOR T.O.P. - control room distributor wiring harness. If the free cable length (20 m) from control room distributor to ACOM M is not sufficient, a 300 m fiber optic cable can be laid directly from the ACOM to the HICOR. ** If needed, plan in a wall power outlet (by customers contractor) for the ACOM B/M power line connection. Because of the relatively high power consumption, the power connection may not be made in the control room distributor.

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 3 of 6 TD SD 31

COROSKOP Plus

4-4

System Connections
Room Light Connection, Radiation Display, Door Contact, EPS
*3

24 VAC / 1A

internal, 2 m

SD1

2 (shielded) Room light

*3

24 VAC / 1A

internal, 2 m

SD1

2 (shielded)

external radiation display

internal, 2 m

SD1

2 (shielded)

Potential-free door contact (24 VDC / 100mA)*1; Door closed = contact closed

internal, 2 m

SD1

2 (shielded)

Potential-free contact (24 VDC / 100mA) of EPS*2; emergency power "on"= contact closed

*1

If needed, a switch for radiation blocking can be installed in series with the door contact: - The switch (24 VDC / 100 mA) must be provided by customers contractor. - Control is +24 V, internal or external. - Plan in the switch so that unintentional operation is not possible. - The switch must be provided with an appropritate symbol (or label) so that its function is easily recognizable. EPS = Emergency Power Supply (option) (see Page 1-4) If a relay is controlled over this contact with DC voltage, a free-running diode must be wired over the relay coil.

*2 *3

SD1 System Distributor 1 fixpoint

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 4 of 6 TD SD 31

Siemens AG Medical Engineering

System Connections
Laying Cables
Example of Cables Laid in Cable Conduits

4-5
4 4

= Floor fixpoint = Ceiling fixpoint

Remarks:

Lay cables / wiring harnesses separately in pipes or in enclosed cable conduits. If cables are laid in open cable conduits, separate cables using metal spacer plates or a
similar method.

The depth of the cable conduit should be at least 70 mm; if there are intersections, depth
plan a greater depth.

Calculating the Required Cable Conduit Cross Section


For all cable conduit / pipe sections, calculate the sum of the cross sections of all cables/ wiring harnesses. The individual cross sections of the cables/wiring harnesses can be found in the cable list. The required fill factors are already included in this. If excess cable lengths are to be stored inside cable conduits, this fact must be taken into account when calculating the size.

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 5 of 6 TD SD 31

COROSKOP Plus

4-6
Remarks Regarding Laying of Cables

System Connections
4

Storage of Excess Cable Lengths: Cable stored in snake-like fashion in the (included in shipment) in the cable cabinet (service-friendly) in cable conduits (take note of accessibility) in ceiling/wall boxes (take note of accessibility) under computer flooring (service-friendly)

Absolutely observe: Cable coils not permitted!

Cables laid in snakelike fashion in cable conduit

Cables laid in a snake-like fashion under computer flooring

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 6 of 6 TD SD 31

Siemens AG Medical Engineering

Technical Data
Electrical Data
Nom. connection voltage* [V] +/- 10% 3 ph. 400 POLYDOROS IS (Power Unit PU1) 3 ph. 415 3 ph. 440 3 ph. 480 3 ph. 400 3 ph. 415 Power Distributor PD 3 ph. 440 3 ph. 480 50/60 60 Frequency [Hz] +/- 1Hz 50/60 50 63 50/60 60 50/60 50 35 50 A/C 14 80 A/C 18 with fluoro 160 with exposure Fuse, internal [A] Fuse, external [A]

5-1
5

Max. power consumption [kVA]

Connection value** [kVA]

43.6 45.3 48.0 52.4 24.2 25.2 26.7 29.1

* **

Max. admissible voltage between phase (L1,L2,L3) and Gnd: 300V The connection value was calculated per the following formula: ConnectionxValue = 3 # ConnectionxVoltage # intern alxFu sin g

Dimensions, Weights and Heat Dissipation


Examination Room
Fixpoint Subsystem Dimensions (W x D x H) [mm] see Page 2-2/4 see Page 2-7/8 see Page 3-5 see Page 3-8 see Page 3-10 see Page 2-9 see Page 3-12 see Page 3-6 360 x 180 x 70/120 240 x 180 x 70/120 see Page 8-17 see Page 8-18 250 x 90 x 165 ca. 2 Weight [kg] 290 (ceiling rails 54 kg additional) 552 ca. 45 ca. 60 ca. 90 385 ca. 22 ca. 16 2 2 Heat dissipation [kW] 0.5 0.2 n.a. n.a. n.a. 0.2 n.a. n.a. n. a. n.a. n.a. n.a. n. a.

MTS-A3 (with 2 SIMOMED HM 54 cm monitors) COROSKOP Hi-P (without mounting plate)

P1

Small mounting plate Large mounting plate Mounting frame KOORDINAT M (incl. base 16 kg, tabletop 12 kg, accessories 40 kg)

Mounting frame Table base

n. a. n. a. SU SU IWO

Examination control console Unit control console Fixed upper body radiation shield, surgery light (option) Moveable upper body radiation shield, surgery light (option) Injector wall terminal box (option)

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 1 of 4 TD SD 31

COROSKOP Plus

5-2
Equipment Room
Fixpoint CU1 IS Cooling Unit 1 Image System (HICOR T.O.P.) Subsystem Dimensions (W x Dx H) [mm] 440 x 313 x 485 629 x 1006 x 2008 1200 x 434 x 2209 800 x 434 x 2209 800 x 434 x 2209

Technical Data
5

Weight [kg] 35 395 400 350 max. 120

Heat dissipation [kW] 1.8 1.8 0.9 1.0 n. a.

PD/SD1 System control cabinet (double cabinet) PU1 n. a. Power Unit 1 (POLYDOROS IS) Cable cabinet

Control Room
Fixpoint CRX n.a. n. a. Subsystem Control room distributor N465 System Control Console VIdeoRec ( option) comprised of: Video recorder VCR Interface + scan converter Video recorder SONY SVO 9500 ... (option) Monitor M44-2M (option) 110 V Power Pack (option) 2nd Examination Control Console (option) 2nd unit control console (option) 2nd 44 cm SIMOMED HM monitor 2nd 54 cm SIMOMED HM monitor M102 with video distributor amplifier (option) Container (Option) Control console 2nd display (option) Dimensions (W x D x H) [mm] 770 x 220 x 530 400 x 226 x 154 270 x 370 x 144 445 x 210 x 94 270 x 370 x 144 405 x 294 x 390 160 x 155 x 270 360 x 180 x 70/120 240 x 180 x 70/110 407 x 456 x 407 500 x 520 x 480 770 x 220 x 530 570 x 800 x 730 1400 x 876 x 730 see Page 8-15/16 Weight [kg] 15 2 12 7 12 approx. 15 5 2 2 22 31 approx. 15 approx. 30 approx. 50 approx. 9 Heat dissipation [kW] 0.1 0.1

0.1 0.1 0.1 0.1 n.a. n. a. n.a. 0.15 0.15 0.1 n.a. n.a. n.a.

n.a. n.a. n.a. n. a. n. a. n. a. n.a. n. a. n. a. D1

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 2 of 4 TD SD 31

Siemens AG Medical Engineering

Technical Data
Environmental Conditions
Examination and control Temperature range: room Image System HICOR T.O.P. Relative humidity: Temperature range: Relative humidity: max. temperature gradient: Air flow volume: max. noise generation: POLYDOROS IS Temperature range: Relative humidity: max. temperature gradient: Air flow volume: max. noise generation: Cooling unit (for Megalix X-ray tubes) Cooling air: Air flow volume: max. noise generation:

5-3
5

+150 C ... +350 C (recomm. temperature 220 C) 20 - 75 % non-condensing +150 C ... +280 C 20- 80 % non-condensing 15 K/h 1680 m3/h 57 dB(A) +100 C ... +400 C 20 - 75 % non-condensing 5 K/h 800 m3/h 55 dB(A) +40 C ... +300 C (frost-free room) 1000 m3/h 60 dB(A)

Paint Surfaces
Primary color Combination color White textured, Med-No. 4146, similar to RAL gray-white 9002 Neutral gray textured, Med-No. 4426, similar to RAL dusty-gray 7037 anthracite textured, Med-No. 4079

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 3 of 4 TD SD 31

COROSKOP Plus

5-4
This page intentionally left blank.

Technical Data

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 4 of 4 TD SD 31

Siemens AG Medical Engineering

Transport Conditions
Packaging and Transport Paths
Largest crate with packaging - weight

6-1
6

W2760 x D1020 x H2090 mm - 1100 kg

Largest single part with transport carriage W2450 x D830 x H1800 mm - 660 kg (min. door opening) - weight

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 1 of 2 TD SD 31

COROSKOP Plus

6-2
This page intentionally left blank.

Transport Conditions

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 2 of 2 TD SD 31

Siemens AG Medical Engineering

Project Management
n. a.
This is an empty chapter.

7-1
7

It was added only so that the standardized chapter sequence could be maintained.

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 1 of 2 TD SD 31

COROSKOP Plus

7-2
This page intentionally left blank.

Project Management

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 2 of 2 TD SD 31

Siemens AG Medical Engineering

Detail Planning
Power Unit 1 (POLYDOROS IS-C)
Front View *4 Exhaust air *4 Side View

8-1
8

*2 *3 *3

Air intake

*1 Top-down View Cabinet base

*1 1:20

*1 *2 *3

Base panels removeable on all sides. No spacing to wall required on sides. When set up corner-to-corner, min. spacing to cable cabinet is 40 mm (needed to open cabinet doors). Wall anchoring needed because some assemblies can be swung out. Bolt cabinets to wall using supplied brackets and screw anchors. Obtain screw anchors locally. If needed, cabinet can also be bolted to floor (see next page).

*4 for Service

Removable cabinet door

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 1 of 22 TD SD 31

COROSKOP Plus

8-2

Detail Planning

Cabinet top-down view

Top-down view of cabinet base

Exhaust air

*2

*1

Side view of cabinet base

Rear view of cabinet base

*2

*2

1:20

*1 *2

Holes 2 x 14 mm dia. to bolt to the floor. Obtain screw anchors locally. Cable lead-in. In order to provide strain relief for the power cable, lead the power cable into the cabinet base as far to the right as possible (in the direction of the arrows). The power cable cannot be led in from the left side.

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 2 of 22 TD SD 31

Siemens AG Medical Engineering

Detail Planning
System Control Cabinets (Double Cabinet)
Front View *4 Side View

8-3
8

*4

Exhaust air

Power distributior cabinet + system distributor cabinet (double cabinet)

*3

*2

Air intake

1:20 *1 *1 *1 Cabinet base Top-down view *1 *2 *3 Base panels removable on all sides. No spacing to wall on side required. When set up corner-to-corner, 40 mm min. spacing to cable cabinet (needed to open cabinet doors). Wall mounting required because assemblies can be pivoted out. Bolt cabinet to wall using supplied brackets. Obtain screw anchors locally. If needed, cabinet can also be bolted to floor (see next page). Cabinet doors removable

*4 for Service
Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 3 of 22 TD SD 31

COROSKOP Plus

8-4

Detail Planning

Top-down view, cabinets

Exhaust air

Exhaust air

Top-down view, cabinet base

*2

*2

*1

Side view, cabinet base

Rear view, cabinet base

*3

*3 1:20

*1 *2 *3

14 mm dia. holes for floor mounting. Obtain screw anchors locally. Area (area outlined with heavy line) to guide in cables from the floor (cable conduit). Cables can be led into cabinet base from all sides, except from front, over the floor after removing the base cover panels.

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 4 of 22 TD SD 31

Siemens AG Medical Engineering

Detail Planning
HICOR T.O.P. Cabinet
Dimensions
Front View Side View
8

8-5
8

Rear View

Exhaust air

Air intake

Bypass switch

Top-down view Castors, can be moved over short distances

I/O panel (connector panel)

1:20

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 5 of 22 TD SD 31

COROSKOP Plus

8-6
Recommendation for Cabinet Setup

Detail Planning
8

Service area, approx. 4006 x 1429 mm; These minimum spaces must be provided for service purposes.

*2

Service position

*1

1:50

*1 *2

Admissible position during operation; can be moved on castors. Cable loop from fixpoint IS, min. 1.8 m

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 6 of 22 TD SD 31

Siemens AG Medical Engineering

Detail Planning
COROSKOP Hi-P Ceiling Outlet

8-7
8

Cable Outlet in the Unistrut Ceiling

Cable Outlet Installed Directly on Ceiling


*1

M10 threaded studs *2

M10 threaded studs *2

*3

Unistrut ceiling

Cover plate

Cover housing

Bracket can be installed in the 25 mm radius range Opening in ceiling *2

Outlet dia. approx. 100

*1 *2 *3

Ceiling mount, tension per screw, less than 1000 N Threaded stud spacing Cable run on ceiling. Cable inlet to be cut into the cover housing. Cable duct inner dimensions, min. 60 x 160 mm

1:5

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 7 of 22 TD SD 31

COROSKOP Plus

Swivel area, normal-/oblique position (motorized movement) *2

COROSKOP Hi-P axis of rotation (motorized movement) *2

Orientation point/Isocenter, COROSKOP Hi-P in normal position Isocenter, COROSKOP Hi-P in oblique position 1:50

*2

COROSKOP Plus RAA2-315.021.14 Rev. 01 10.97 Page 8 of 22 TD SD 31 Siemens AG Medical Engineering

8-8

COROSKOP Hi-P in oblique position

Cable fixpoint D on the ceiling for MTS-A3

MTS-A3 Positioning per Version 2

Cable fixpoint P1 on the ceiling for COROSKOP Hi-P

System: Top-down View

Orientation point (KOORDINAT M)

Detail Planning

*1 *1 Including 500 mm safety distance between COROSKOP Hi-P and wall. *2 Dimensions not in parenthesis: Table longitudinal movement not limited (standard) Dimensions in parenthesis: Table longitudinal movement limited by the room width.
8

Detail Planning
Ceiling Installation
Recommendation: 67.5 cm ceiling grid

8-9
8

Grid spacing

*3 *2

*1

*5 1:50 *6 *4 View in direction of arrow, see next page

Do not plan lighting fixtures, ventilation outlets, sprinklers, etc. between the ceiling rails. *1 *2 *3 *4 *5 *6 Orientation point/isocenter, COROSKOP Hi-P in normal position COROSKOP Hi-P ceiling outlet (see Page 8-7) MTS-A3 ceiling outlet Mounting hole spacing Observe max. admissible rail overhang Ceiling rails (option) for radiation shield, surgery light, injector stand (see Page 8-18); length when shipped: 4m; can be shortened Injector stand mounted on injector ceiling column in the radiation shield rail (option) Surgery light (option)

MTS-A3

IN1 SU

Radiation shield

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 9 of 22 TD SD 31

COROSKOP Plus

8 - 10

Detail Planning
Installation Recommendation for MTS-A3 Longitudinal Rails
8

Base ceiling

Suspension points for ceiling spacer rails (longitud.)

Ceiling spacer rails (transverse) MTS-A3 longitudinal rail

1:5

Ceiling spacer rail (e. g. Unistrut rail)

Unistrut nut

Shims Insulation parts Screw, M10x60 DIN 912

Washer, A 10.5 DIN 125

Longitudinal rail

1:2

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 10 of 22 TD SD 31

Siemens AG Medical Engineering

Detail Planning
N465 System Control Console
Position the N465 in the vicinity of the control room distributor.

8 - 11
8

Table Installation

Top section with Touchpanel and display

Wall Installation
Air intake slots in floor panel *1

Cover on the cable connector field.

*1

Obtain installation hardware locally.

1:5

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 11 of 22 TD SD 31

COROSKOP Plus

8 - 12
Control Room Distributor
Standard (max. distance):
N465 (System console) 2.0m 20.0m 2.0m 21m 2.7m 2.7m 2.7m *** 3.0m

Detail Planning
8

Option (max. distance):


ACOM T.O.P. (ACOM M)** ECC2 (HICOR T.O.P.) Hardcopy VideoRec or video recorder + monitor M44-2M Monitor 2nd control console Injector (injector stand) M102 2nd footswitch *

CRX

Cover can be removed for service

Fixpoint CRX for guiding in the cable from below

* ** ***
COROSKOP Plus

Obtain installation hardware locally. If needed, a fiber optic cable (max. 300 m) can be laid directly from the HICOR T.O.P. to the ACOM M. See Page 8-22
RAA2-315.021.14 Rev. 01 10.97 Page 12 of 22 TD SD 31

1:10

Siemens AG Medical Engineering

Detail Planning
Control Console (Option)/Container (Option)

8 - 13
8

Container

Control console

*1

Container for VideoRec (video recorder + VCR interface + scan converter), video printer

Height adjustable

Cable conduit

Opening for N465 and second ECC (option) 1:20

*1

Mounting points for the control room distributor.

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 13 of 22 TD SD 31

COROSKOP Plus

8 - 14
110 V Power Pack (Option)

Detail Planning
8

Das 110 V Power Pack is required only for 110V/60 Hz power nets for connection of the
video recorder (option).

Set it up in the vicinity of the control room distributor (see also Page 8-12).

Front View

Side View

*1

*1 Power outlet for video recorder

*1

1:5

*1

4 mounting points for No. 5 screws. Obtain installation hardware locally.

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 14 of 22 TD SD 31

Siemens AG Medical Engineering

Detail Planning
M102 with Video Distributor Amplifier (Option)

8 - 15
8

Without the M102, 1 monitor can be connected to the control room distributor. The
M102 makes it possible to connect additional monitors (max. 4 monitors).

Position the M102 in the vicinity of the control room distributor (see Page 8-12).

max. distance: control room distributor additional monitors 3m *3

*1

*2

*2

Cover can be removed for service

1:10

*1 *2 *3

Obtain installation hardware locally. Cable lead-in in the direction of arrow possible from above or below 2 different length cable sets (video, power, ground) can be shipped: 9 m or 29 m
RAA2-315.021.14 Rev. 01 10.97 Page 15 of 22 TD SD 31 COROSKOP Plus

Siemens AG Medical Engineering

*3

*3

COROSKOP Plus RAA2-315.021.14 Rev. 01 10.97 Page 16 of 22 TD SD 31 Siemens AG Medical Engineering

8 - 16

Second Display (Option)


Installation on customer-provided console or on the wall. Display mount: front view

Display mount: Side view

Display

Display mount

Display mount

*1

*1

View A see next page

*2

Display: adjustable angle

Detail Planning

1:5 *1 *2 *3 Lead in cables from above or below 2 x 8 mm dia. mounting holes for installation on customers console Mounting holes for wall installation

Siemens AG Medical Engineering RAA2-315.021.14 Rev. 01 10.97 Page 17 of 22 TD SD 31 COROSKOP Plus

Detail Planning

Display mount: top-down view Display mount

Display

*1

Display mount: View A Display mount

*2

*1

*2

*1 *2

Opening to guide in cables 2 x 8 mm dia. mounting holes for installation on customer-provided console

1:5

8 - 17

8 - 18

Detail Planning
Fixed Mounted Upper Body Radiation Shield, Surgery Light (Option)
Not approved for MTS-A3 positioning per Version 2 (MTS perpendicular)
(see Page 2-3).
8

When an injector stand is installed, further installation of the surgery light or of


the radiation shield is not permitted. Mounting plate

Stud for radiation shield or injector stand

Surgery light

Ceiling column

Double articulated arm

Large pane

Mounting plate

23 kg

Ceiling column with support, spring- 28 kg loaded arm and large pane, or Maximum configuration (lamp and large pane) 32 kg

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 18 of 22 TD SD 31

Siemens AG Medical Engineering

Detail Planning
Approved for MTS-A3 positioning per Version 1-4 (see Page 2-3). Second carriage for injector head also possible.

8 - 19
8

Moveable Upper Body Radiation Shield, Surgery Light (Option)

Carriage Longitudinal rail

Surgery light

Ceiling column Double articulated arm

Large pane

Longitudinal rail Carriage

30 kg 5 kg

1) Ceiling column with support, spring- 28 kg loaded arm and large pane or 2) Ceiling column with support, spring- 22 kg loaded arm and surgery light or 3) Maximum configuration (light and large pane) 32 kg

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 19 of 22 TD SD 31

COROSKOP Plus

8 - 20
Injector Wall Terminal Box (Option)
Shown without Injector Panel
Front View

Detail Planning
8

Side View

Mounting holes

Cable channel 1:5

Installation locations (optional):


a) b) In the equipment room or In the examination room in the vicinity of the table, at foot-end on the wall (injector cables from wall terminal box to moveable stand, approx. 4 m); see next page.

Obtain installation hardware locally.

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 20 of 22 TD SD 31

Siemens AG Medical Engineering

Detail Planning
Planning Recommendation for Injector Wall Connection

8 - 21
8

*1

1:50

IWO Injector wall terminal box (option, injector wall outlet) *1 Orientation point/isocenter, COROSKOP Hi-P in normal position

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 21 of 22 TD SD 31

COROSKOP Plus

8 - 22
Injector Rack Mount Unit (Option)
Versions:

Detail Planning
8

- with table base or - with permanently mounted ceiling stand (Page 8-18) or - with moveable ceiling stand (installed in rail system for radiation shield, Page 8-19).

Approved: ANGIOMAT 6000 and MEDRAD Mark V Plus For installation location and approved MTS-Variants see paragraph "1. Overview", Page
3-3.

Place injector control unit on contractor-installed wall console etc.,if possible, in the
equipment room.

Cable lengths:
Z51 (in control room distributor or wall terminal box) l1 l2 Injector control unit l3

Injector control console

Injector head

Injector stand ANGIOMAT 6000 MEDRAD

Cable lengths (m) l1 10.0 3.0 l2 24.0 max. 30.5 l3 24.0 max. 30.5

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 22 of 22 TD SD 31

Siemens AG Medical Engineering

Changes to COROSKOP T.O.P. PG


Changes to COROSKOP T.O.P. (+KOORDINAT M) PG RAA2-315.021.13.01.02:
Chapter 1 Page 1

9-1
9

The COROSKOP Plus system is the successor of the COROSKOP T.O.P system and the COROSKOP CLASSIC system.

Chapter 2

Page 4 Page 9 Page 12

Dimensions corrected. New: KOORDINAT M, view X Dimensions corrected. Now VideoRec is an option. New: Video recorder + monitor M44-2M (option) New: Reference monitor (option) M102 for connection of additional monitors added.

Chapter 3

Page 2

Now VideoRec is an option. New: M102 with video distributor amplifier (option). New: Reference monitor (option). Illustration for laying the cables to the table base changed.

Page 6

Page 17/20 Connection of the table power outlet expanded.

Chapter 4

Page 2/3 Page 3 Page 4

Connection of the table power outlet expanded. Wiring harness No. 19 (SD1 - IWO) changed from 19 to 18 m. Note *1 (optional radiation blocking switch) rewritten.

Chapter 5

Page 2

PG Speed Info 02/96 incorporated. New: Video recorder, monitor M44-2M, M102

Page 3

Paragraph "Environmental Conditions": Rel. humidity: lower tolerance changed to 20%. Examination room and control room, temperature range: lower tolerance changed to +15 degrees C.

Chapter 8

Page 12 Page 15

New: Max. distance added for CRX - M102 and CRX - video recorder. New: Dimensional drawing M102 with video distributor amplifier (option)

Changes to the COROSKOP T.O.P. (+KOORDINAT M) PG, RAA2-315.021.13.01.02 are labeled with

Siemens AG Medical Engineering

RAA2-315.021.14 Rev. 01 10.97

Page 1 of 2 TD SD 31

COROSKOP Plus

9-2

Changes to COROSKOP T.O.P. PG

Contacts:

H. Armer / TD SD 31 H. Brckl / TD SD 31 Hotline

Tel: +49(0)9191/18-9515, Fax -9903 e-Mail: heinrich.armer@med.siemens.de Tel: +49(0)9191/18-9511, Fax -9903 e-Mail: hermann.brueckl@med.siemens.de Tel. +49(0)9191/18-8080, Fax -9944

COROSKOP Plus

RAA2-315.021.14 Rev. 01 10.97

Page 2 of 2 TD SD 31

Siemens AG Medical Engineering

Vous aimerez peut-être aussi