Catch basin
Direction of flow
Concrete apron
REVISIONS
7-20-01 7-19-02 18" [450] pins or 6" [150] staples on 6" [150] centers across bottom of trench Fill and tamp trench 1-21-05 18" [450] pins or 6" [150] staples on 6" [150] centers
J Stai s . n
I MI N LLI METERS UNLESS
STEP 1
( I BRACKETS [ ) ARE N ]
18" [450] pins or 6" [150] staples on 6" [150] centers across roll to anchor top mat
NOTES
GENERAL: The details shown govern the installation of mat Types A-I unless otherwise shown in the plan.
f cheek
ove r ap l
Direction of flow
Var i s e
4" [ 1 0] 0 mi . n
TYPE G MAT: Staple or pin mat as detailed for mat Type A-F and H-I except use staples or pins on 6" [150] centers without a buried end at the roll ends and at 1" [38] end overlaps. Place a 6" [150] overfold across long rolls at intervals of 50 [15m] or less and staple on 6" [150] centers. STAPLES: Staples and pins shall be in accordance with CMS 671.02.
6" [ 50] 1 mi . n
Anchor ditch not required unless called for in the plans. Direction of flow Apply the mat on steep slopes by backing down hill, keep the edge overlapping adjacent material by 2" [50]. On short gradual slopes, the matting may be applied horizontally. Excelsior matting Extend mat 2 [600] beyond the break at the top of the slope. 6" [150] Netting must be on top.
Type G mat
OVERFOLD DETAIL
Overlap upgrade mat by 1"[38] and staple at 6" [150] intervals.
D M -4. 2
SCD NUMBER
ERO SI N O
C O NTRO L
TYPICAL INSTALLATION
M AT
T Y PE
A -1
EN G I EERI G N N
O FFI E C
OF
Direction of flow
STRUC TURA L
Use a check slot and staple or pin in the END OF RUN: slot as shown in END OF ROLL OVERLAP Detail for mat Type A-F and H-I. When placing matting for ditch protection, start at the downstream end, as show in the CHECK SLOT AT STRUCTURES Detail.
OTHERWI SE NOTED.