EROSION CONTROL MAT TYPE A-F AND TYPE H-I INSTALLATION

STATE OF OHI DEPARTMENT OF TRANSPORTATI O ON

Type A-F and Type H-I Trench Completed check slot

Catch basin

Direction of flow 6" [ 50] mi . 1 n

Direction of flow

Concrete apron

REVISIONS

7-20-01 7-19-02 18" [450] pins or 6" [150] staples on 6" [150] centers across bottom of trench Fill and tamp trench 1-21-05 18" [450] pins or 6" [150] staples on 6" [150] centers
J Stai s . n
I MI N LLI METERS UNLESS

Check slots shall be as shown in STEP 1 and STEP 2 Details

across check slot

STEP 1

STEP 2 CHECK SLOT CONSTRUCTION DETAILS


Overlap should be slit only enough to allow for check slot. Type A-F and Type H-I

ALL METRI DI C MENSI ONS

( I BRACKETS [ ) ARE N ]

CHECK SLOT AT STRUCTURES

ROADWAY HYDRAULI C ENGI NEER

Type A-F and Type H-I

6" [150] overlap

18" [450] pins or 6" [150] staples on 6" [150] centers across roll to anchor top mat

NOTES
GENERAL: The details shown govern the installation of mat Types A-I unless otherwise shown in the plan.

f cheek

ove r ap l

Direction of flow

1 2- SEP- 2008 1 42PM 2:

Var i s e

4" [ 1 0] 0 mi . n

Upgrade mat shall be lapped on top as shown

3 [1 m] max. 6" [150] staples

TYPE G MAT: Staple or pin mat as detailed for mat Type A-F and H-I except use staples or pins on 6" [150] centers without a buried end at the roll ends and at 1" [38] end overlaps. Place a 6" [150] overfold across long rolls at intervals of 50 [15m] or less and staple on 6" [150] centers. STAPLES: Staples and pins shall be in accordance with CMS 671.02.

6" [ 50] 1 mi . n

18" [450] pins or


I \ pr Const ucton Dr : \ r i awi ngs\ SCD\ Hy aul dr i cs\ DM \ dm 42_ j an05_ V8. dgn

50-0" [15 m] between check slots

Anchor ditch not required unless called for in the plans. Direction of flow Apply the mat on steep slopes by backing down hill, keep the edge overlapping adjacent material by 2" [50]. On short gradual slopes, the matting may be applied horizontally. Excelsior matting Extend mat 2 [600] beyond the break at the top of the slope. 6" [150] Netting must be on top.

Type G mat

OVERFOLD DETAIL
Overlap upgrade mat by 1"[38] and staple at 6" [150] intervals.

EROSION CONTROL MAT TYPE G INSTALLATION


1 1

D M -4. 2

SCD NUMBER

ERO SI N O

C O NTRO L

END OF ROLL OVERLAP

TYPICAL INSTALLATION

M AT

Fill and tamp trench as in check slot construction.

STANDARD HYDRAULI CONSTRUCTI C ON DRAWI NG

6" [150] staples on 6" [150] centers across bottom of trench

T Y PE

A -1

EN G I EERI G N N

O FFI E C

OF

Direction of flow

STRUC TURA L

Use a check slot and staple or pin in the END OF RUN: slot as shown in END OF ROLL OVERLAP Detail for mat Type A-F and H-I. When placing matting for ditch protection, start at the downstream end, as show in the CHECK SLOT AT STRUCTURES Detail.

OTHERWI SE NOTED.

STATE HYDRAULI ENGI C NEER