Académique Documents
Professionnel Documents
Culture Documents
11/8/12
11/8/12
11/8/12
11/8/12
11/8/12
11/8/12
11/8/12
11/8/12
11/8/12
10
11/8/12
11
11/8/12
12
11/8/12
13
11/8/12
14
11/8/12
15
11/8/12
16
11/8/12
17
11/8/12
18
11/8/12
19
11/8/12
20
11/8/12
OPTION 1
OPTION 2
21
11/8/12
22
11/8/12
23
11/8/12
ORTIGAS GREENWAYS
Enhancing walkability in the Ortigas Business District
24
11/8/12
The Ortigas Business District as part of three cities: Quezon City, Mandaluyong City & Pasig City
LEGEND: Pasig City Boundary Quezon City Boundary Mandaluyong City Boundary Pasig City CBD Boundary
WALKABILITY IMPROVEMENTS PROPOSED ABOVE-GRADE PEDESTRIAN CONNECTIONS IMPROVEMENTS ON PAVING AND GREENING OF SIDEWALKS OPEN SPACE IMPROVEMENT IDENTIFICATION OF LOTS/DISTRICTS FOR REBLOCKING TO CREATE/RECOVER AN OPEN SPACE NETWORK IN THE CBD
25
11/8/12
Ortigas Greenways Project as part of the walkability improvements for the district
CENTRAL AVENUE F. ORTIGAS JR. ROAD (EMERALD AVENUE) AS CENTRAL AVENUE MAIN ENTRY PORTAL PROPOSED LOCATION OF ENTRY PORTAL AT F. ORTIGAS JR. ROAD CORNER ORTIGAS AVENUE CENTRAL PLAZA PROPOSED CENTRAL PLAZA AT F. ORTIGAS JR. STREET CORNER DOA JULIA VARGAS AVENUE
WALKABILITY IMPROVEMENTS PROPOSED ABOVE-GRADE PEDESTRIAN CONNECTIONS IMPROVEMENTS ON PAVING AND GREENING OF SIDEWALKS OPEN SPACE IMPROVEMENT IDENTIFICATION OF LOTS/DISTRICTS FOR REBLOCKING TO CREATE/RECOVER AN OPEN SPACE NETWORK IN THE CBD
LINKING MRT ORTIGAS STATION TO METROWALK: *The need for a secondary pedestrian link from EDSA (other than the Megamall-Ortigas Home Depot Doa Julia Vargas Ave. link) for ease of going in and out of the district *Connecting rapid public transport system to the district *Providing more green public spaces to the built-up district for people to enjoy
26
11/8/12
27
11/8/12
Map showing the site for the The Proposed Ortigas Greenway Corridor Proposed Ortigas Greenway Corridor
PROPOSED ADB PERIMETER ELEVATED WALKWAY PROPOSED PROPOSED PROPOSED OPTION TO ONYX RD. OPAL RD. ORTIGAS PARK & CONNECT TO ELEVATED OCAI SURROUNDINGS AT-GRADE MERALCO AVE. PARK PLAZA IMPROVEMENTS NORTHBOUND
RAMP DOWN
EDS
RAMP DOWN TO SIDEWALK LEVEL ABOVE-GRADE CONNECT TO LEVEL ELEVATED PLAZA (5.0m.ht. FFL FROM ROAD FFL) RAMP DOWN TO SIDEWALK LEVEL BELOW GRAND STAIRCASE TAKES PEDESTRIAN DOWN TO EXISTING ORTIGAS PARK (SAME LEVEL WITH SIDEWALK FFL)
EDS
28
11/8/12
TREATMENT OPTIONS FOR THE ELEVATED WALKWAY CONCRETE WALL AT ADB PROPERTY SIDE:
29
11/8/12
GREENWALL
MOOD IMAGES
PROPOSED DEVELOPMENT
30
11/8/12
EXISTING CONDITION
PROPOSED DEVELOPMENT
31
11/8/12
PROPOSED DEVELOPMENT
PROPOSED DEVELOPMENT
32
11/8/12
EXISTING CONDITION
TOPAZ ROAD
RUBY ROAD
TOPAZ ROAD
PROPOSED DEVELOPMENT
33
11/8/12
PROPOSED DEVELOPMENT
PROPOSED DEVELOPMENT
34
11/8/12
PROPOSED DEVELOPMENT
PROPOSED DEVELOPMENT
35
11/8/12
PROPOSED DEVELOPMENT
EXISTING CONDITION
36
11/8/12
PROPOSED DEVELOPMENT
PROPOSED DEVELOPMENT
37
11/8/12
SEATING AREA
38
11/8/12
VIEW OF RETAIL KIOSK WITH AL FRESCO DINING SPACE & MINI PERFORMANCE STAGE
CONNECTION TO METROWALK
OPTIONAL:
EXISTING CONDITION
39
11/8/12
CONNECTION TO METROWALK
OPTIONAL:
PROPOSED DEVELOPMENT
CONNECTION TO METROWALK
OPTIONAL:
EXISTING CONDITION
40
11/8/12
CONNECTION TO METROWALK
OPTIONAL:
PROPOSED DEVELOPMENT
41
11/8/12
TREE GRATE
Rough Cost Estimates for the Proposed Ortigas Greenway Corridor Projects
PROPOSED ADB PERIMETER ELEVATED WALKWAY Php 30,301,000 PROPOSED PROPOSED PROPOSED OPTION TO ONYX RD. OPAL RD. ORTIGAS PARK & CONNECT TO ELEVATED OCAI SURROUNDINGS AT-GRADE MERALCO AVE. PARK PLAZA IMPROVEMENTS NORTHBOUND Php 348,000,000 Php 12,552,000 Php 9,602,000 Php 7,950,000
RAMP DOWN
EDS
RAMP DOWN TO SIDEWALK LEVEL ABOVE-GRADE CONNECT TO LEVEL ELEVATED PLAZA (5.0m.ht. FFL FROM ROAD FFL) RAMP DOWN TO SIDEWALK LEVEL BELOW GRAND STAIRCASE TAKES PEDESTRIAN DOWN TO EXISTING ORTIGAS PARK (SAME LEVEL WITH SIDEWALK FFL)
EDS
42
11/8/12
43
11/8/12
REFERENCES
PGAA Pasig City Central Business District Urban Design and Landscape Development Projects PGAA Metrobank Plaza Site Inspection Images Google Image Search: MRT Ortigas Station Google Earth
44